NO URAIAN PEKERJAAN SAT H.SAT (Rp)

A. EARTH WORKS

2-I-1-4 Stripping of top soil including disposal m3 10.300,00


2-I-1-5 Excavation type - A m3 19.400,00
2-I-1-6 Excavation type - B m3 27.700,00
2-I-1-7 Excavation type - C m3 22.800,00
2 - I - 1 - 11 Earthfill type - B m3 89.500,00
2 - I - 1 - 12 Hauling materials on the land with hauling distance 0.05 - 1 km for disposal m3 20.500,00
2 - I - 1 - 13 Hauling materials on the land with hauling distance 1 - 3 km for disposal m3 2.230,00
2 - I - 1 - 14 Hauling materials on the land with hauling distance 3 - 5 km for disposal m3 33.200,00
2 - I - 1 - 20 Backfill type - A m3 15.500,00
B. CONCRETE WORKS

2-I-2-1 Concrete type - B1 (Batching plant) m3 1.000.000,00


2-I-2-2 Concrete type - B2 (Portable mixer) m3 950.800,00
2-I-2-3 Concrete type - B-lining (Batching plant) m3 1.000.000,00
2-I-2-4 Concrete type - B-lining (Portable mixer) m3 990.200,00
2-I-2-5 Concrete type - D1 (Batching plant) m3 886.700,00
2-I-2-6 Concrete type - D2 (Portable mixer) m3 850.000,00
2-I-2-7 Form work type - A1 m2 110.000,00
2-I-2-8 Form work type - A2 m2 113.000,00
2-I-2-9 Reinforcement steel bar, deformed/round bar ton 10.679.000,00
2 - I - 2 - 9a Material Besi A kg 10.825,00
2 - I - 2 - 9b Jasa Pembesian (Potong,Bengkok,Instal,Material Bendrat & Lansir) kg 2.600,00
2 - I - 2 - 13 Installation of pre-cast concrete block, 1.0m x 1.0m x 0.07m including; sealent, mortar m2 90.000,00

C. STONE MASONRY WORKS

2-I-3-1 Stone masonry type - B m3 716.400,00


2-I-3-2 Surfacing & pointing of stone masonry m2 34.000,00
2-I-3-3 Plastering (Mortar 1 : 3) m2 31.000,00
2-I-3-4 Graded sand and gravel filter m3 165.000,00
2-I-3-7 Demolition, chipping and disposal of existing stone masonry m3 87.600,00
2 - I - 3 - 11 Ungraded sand gravel fill m3 200.000,00
NO URAIAN PEKERJAAN SAT H.SAT (Rp)

D MISCELINEOUS

2 - I - 4 -3 Furnishing and installation of joint-filler (t = 20 mm) m2 152.000,00


2 - I - 4 -4 Furnishing and installation of joint sealent m 142.700,00
2 - I - 4 -7 Painting at contraction joint m2 59.700,00
2 - I - 4 -8 Furnishing and installation of flap valve, dia 50 mm, for weep hole at side wall set 60.000,00
2 - I - 4 -8a Jasa instal weep hole 10.000,00
2 - I - 4 -9 Furnishing and installation of flap valve, dia. 100 mm, for under drain set 82.000,00
2 - I - 4 -9a Jasa instal underdrain 10.000,00
2 - I - 4 -12 Furnishing and installation of geotextile type - 1 for filter m2 23.400,00
2 - I - 4 -12a Instal Of Geotextile for filler 3.000,00
2 - I - 4 -12b Angkut Lining Precast Concrete Block > Nindiya Beton 25.000,00
> SAC Jatimulya 30.000,00