CARGILL INDONESIA
CONTRACT NO :
DOC NO : EAGLE-00-C4-GS-001
TITLE :
PURPOSE :
FOR REVIEW
DOC. NO. :
EAGLE-00-C4-GS-001
Consultant
JOB NO. : 17-12407
PAGE : 2 of 9
PAGE : 3 of 9
TABLE OF CONTENTS
Page
1. SCOPE ....................................................................... ....................................................................... 4
2. CODES, STANDARD, AND REFERENCES ....................................................................... .......... 4
3. SITE CONDITIONS ....................................................................... ................................................... 4
4. DESIGN CRITERIA ....................................................................... ................................................... 5
4.1 ROAD WIDTH ....................................................................... ................................................. 5
4.2 SPEED LIMIT ....................................................................... .................................................. 5
4.3 TRAFFIC VOLUME DESIGN ....................................................................... ......................... 5
4.4 ROAD STRUCTURE ....................................................................... ...................................... 5
4.5 ROAD SLOPE ....................................................................... ................................................. 6
4.6 SUB-GRADE ....................................................................... ................................................... 7
4.7 BASE COURSE (IF NECESSARY) ...................................................................................... 7
4.8 COMPACTION WORK ....................................................................... ................................... 7
4.9 GROUND WATER TABLE ....................................................................... ............................. 8
4.10 SLOPE STABILITY ....................................................................... ......................................... 8
4.11 WOOD PILE ....................................................................... .................................................... 8
4.12 GEOTEXTILE ....................................................................... .................................................. 8
JOB NO. : 17-12407
PAGE : 4 of 9
a. ASTM C136 Standard Method for Sieve Analysis of Fine and Coarse Aggregate
b. ASTM D1557 Test Method for Laboratory Compaction Characteristics of Soil Using
Modified Effort
c. ASTM D1556 Test Method for Density and Unit Weight of Soil in Place by the Sand Cone
Method
d. ASTM D1883 Test Method for CBR (California Bearing Ratio) of Laboratory Compacted
Soil
e. ASTM D2940 Standard Specification for Graded Aggregate Material for Bases or Sub
Bases for Highway or Airports
f. ASTM D4429 Test Method for CBR (California Bearing Ratio) of Soil in Place
g. AASHTO American Association of State Highway and Transportation Officials (Instead
of ASTM standard, if required)
3. SITE CONDITIONS
Eagle High Road is located in Kabupaten Ketapang, West Kalimantan, Indonesia.
Table 4.1 Temperature and Humidity Data
Parameter Data
Annual temperature 27.3° C
Average relative humidity 83.2 %
Design humidity 85 %
Average rainfall 301.2 mm/hr
Maximum wind velocity 33.33 m/s or 120 km/hour
JOB NO. : 17-12407
PAGE : 5 of 9
4. DESIGN CRITERIA
CPO access road to Kelampai Jetty must 4. KRITERIA DESAIN
comply with following criteria: Akses jalan kelapa sawit menuju jetty
Kelampai harus mengikuti kriteria berikut :
4.1 ROAD WIDTH
Main access road shall have 9 meters width 4.1 LEBAR JALAN
with 2 (two) lanes, and 1 meter width for Jalan akses utama memiliki lebar jalan 9m
drainage at both sides. For traffic safety, dengan 2 lajur, memiliki drainase selebar 1m
access road shall have minimum 3 meters pada kedua sisi jalan. Untuk keamanan lalu
clearance from outer drainage line. This lintas, jalan akses harus memiliki area bersih
clearance area is for fallen palm leaf, so that sejauh 3m dari garis drainase terluar. Area
the leaf does not cover the road. bersih diperuntukan untuk daun sawit yang
gugur agar tidak menghalangi badan jalan.
4.2 SPEED LIMIT
CPO access road to Kelampai Jetty has 4.2 BATAS KECEPATAN
design speed for every vehicle that passed Jalan akses perkebunan sawit memiliki
the road. Maximum speed limit that kecepatan rencana untuk setiap kendaraan
permitted by Cargill Indonesia is 50 km/hour. yang melintas. Kecepatan maksimum yang
diizinkan oleh adalah 50 km/jam.
4.3 TRAFFIC VOLUME DESIGN
Traffic volume design for CPO access road 4.3 VOLUME LALU LINTAS RENCANA
shall comply with following criteria : Volume lalu lintas rencana untuk jalan akses
Truck HS-15-44, 8 ton : 30 vehicles / day kelapa sawit mengikuti kriteria sebagai berikut:
Truck HS-15-44, 15 ton : 100 vehicles / day Truk HS-15-44, 8 ton : 30 kendaraan / hari
Truck HS-15-44, 25 ton : 10 vehicle / day Truk HS-15-44, 15 ton : 100 kendaraan / hari
Passenger car, 2 ton : 20 vehicle / day Truk HS-15-44, 25 ton : 10 kendaraan / hari
Mobil penumpang : 20 kendaraan / hari
4.4 ROAD STRUCTURE
Road structure shall be designed to 4.4 STRUKTUR JALAN
withstand tank truck with capacity 15.000 L, Struktur jalan harus direncanakan untuk
Truck with HS-15 class wheel loading menanggung beban truk tanki kapasitas
(AASHTO class), and standard automobile 15.000 liter, truk sekelas HS-15 (standar
(AASHTO). AASHTO), dan mobil penumpang (standar
AASHTO).
JOB NO. : 17-12407
PAGE : 6 of 9
1. Road structure for common medium clay 1. Struktur jalan pada umumnya terdiri dari
soil shall consist of sub-grade layer from lapisan sub-grade dari tanah eksisting yang
compacted existing soil, base on a dipadatkan dengan nilai CBR minimum
minimum 18% CBR value. sebesar 18%.
2. Road structure that pass soft clay soil and 2. Struktur jalan yang melewati lapisan soft
does not meet 18% CBR value shall be clay dan tidak memenuhi CBR 18%, harus
overlaid by sub-base layer. Sub-base layer dilapis dengan lapisan sub-base. Sub-base
material shall be compacted soil that met harus berupa tanah yang dipadatkan
the 18% CBR value. hingga mencapai CBR 18%.
3. Road structure that pass soft sand, if the 3. Struktur jalan yang melewati pasir lunak
soft soil has 0-2m thickness, soft sand shall dengan ketebalan 0-2m, maka pasir lunak
be stripped away and replaced by medium tersebut harus dibuang dan diganti dengan
clay from existing soil in other area or material lain dari area lain hingga nilai CBR
medium sand until the 18% CBR value met. 18% terpenuhi.
4. Road structure that pass organic soil 4. Struktur tanah yang melewati gambut harus
(peat), shall have special treatment. If the mendapatkan penanganan khusus. Jika
thickness of peat 0-2m, peat shall be ketebalan gambut 0-2m, maka gambut
stripped away and replaced by laterite soil dibuang dan diganti dengan material quarry
from quarry until the 18% CBR value met. hingga nilai CBR minimum 18% terpenuhi.
5. If the thickness of peat >2m, other advance 5. Jika ketebalan lapisan gambut >2m,
treatment shall be conducted. After 2m penanganan lanjut harus dilakukan.
peat stripping, geotextile shall be lay above Setelah pengupasan gambut setebal 2m,
peat layer. Medium sand from nearest cut lapisan geotekstil dihamparkan diatas
area shall be overlaid above geotextile and gambut diikuti dengan lapisan pasir dan
overlaid by compacted laterite soil until tanah laterit yang dipadatkan hingga nilai
18% CBR value met. CBR minimum 18% tercapai.
PAGE : 7 of 9
PAGE : 8 of 9
PAGE : 9 of 9