No System Qty

1 Transformers
1.1 Unit TR 1
1.1.1 Insulation resistance Measurement 1
1.1.2 Measurement of capacitance and dielectric dissipation factor 1
1.1.3 Winding resistance measurement and secondary winding 1
1.1.4 Current transformer ohmic resistance measurement 14
1.1.5 Transformation and voltage ratio , vector group and impedance voltage check 1
1.1.6 DIRANA TEST 1
1.1.7 Oil tests 1
1.1.8 Primary and Secondary Injection Test 1
1.2 Step Down TR 1
1.2.1 Measurement of insulation resistance 1
1.2.2 Measurement of capacitance and dielectric dissipation factor 1
1.2.3 Measurement of voltage ratio and check of vector group 1
1.2.4 Measurement of winding resistance 1
1.2.5 DIRANA TEST 1
1.2.6 Oil tests 1
1.2.7 Primary and Secondary Injection Test 1
2 MV SwitchGear
2.1 MV SWGR 40
2.1.1 Mechanical Operation and Interlock Test 40
2.1.2 Circuit Breaker Test 40
2.1.3 Electrical Functionality and Interlock Test. 40
2.1.4 Protection Relay Test 40
2.1.5 Insulation Resistance Test 40
3 LV Switchgear and MCC Site Test
3.1 LV SWGR 30
3.1.1 Mechanical Operation and Interlock Test 30
3.1.2 Electrical Functionality and Interlock Test 30
3.1.3 Protection Relay Test 30
3.1.4 Insulation Resistance Test 30
3.2 MCC
3.2.1 MCC commissioning LOT
3.3 MV/LV & LV/LV Transformer 6
3.3.1 Measurement of insulation resistance 6
3.3.2 Auxiliary wiring insulation measurement test 6
3.3.3 Functional test for various circuit 6
4 BSDG 12
4.1 Generator Test 12
4.2 Function Test 12
4.3 Protection Relay Test 24
5 Earthing system
5.1 Resistance Test LOT
6 Traitement d´huile TP TS
6.1 TRAITTEMENT DHUILE TP ET TS 1