ABC Form (Revised)
ABC Form (Revised)
P R IM A R Y
ST R U C T U R E S Activity Based Control Reference :
C O R P O R A T IO N
Activity Work Code No._____________ Team Designation:
Team Leader: Revision 5, 6/30/2005
RESOURCES BUDGETARY ALLOCATION
Project: WORK DESCRIPTION: Volume of Work: RESOURCES ALLOTMENT: MATERIAL TOOLS & EQUIPMENT
TO BE FILLED UP BY UPERVISING ENGR
Location:
Date/Day: Budgetary Cost per unit:
Productivity Base Rate:
Work Location: Model : Volume of Work:
Phase Interior Floor level Boundaries Budgetary Total manhrs: QUALITY CHECK POINTS Acceptable Non-Acceptable Re Inspectd
Block Exterior Grid lines Team Carrying Cost = P Projected No . Of Days: Workmanship Quality
Lot Site Dev. Team Hourly Average Cost = P and Hours. Housekeeping
Area Average Worker Manhour Cost =P Degree/ Factor of Difficulty: Resource within Budget
SUB TOTAL
CUMULATIVE TOTAL
Date/Day: Date/Day:
Project: WORK DESCRIPTION: Volume of Work: RESOURCES ALLOTMENT: MATERIAL: TOOLS &
Location:
Date/Day: Budgetary Cost per unit:
Productivity Base Rate:
Work Location: Model : Volume of Work:
Phase Interior Floor level Boundaries Budgetary Total manhrs: QUALITY CHECK POINTS: Acceptabl
Block Exterior Grid lines Team Carrying Cost: Projected No . Of Days: Workmanship Quality
Lot Site Dev. Team Hourly Average Cost: and Hours. Housekeeping
Area Average Worker Manhour Cost: Degree/ Factor of Difficulty: Resource within Budget
SUB TOTAL
CUMULATIVE TOTAL
Disturbance/Interruptions Affecting Work: Waiting for: Remarks/Comments on: Equipment Operator/
DURATION HOURS Rigger Performance, etc.
DURATION HOURS Supervisors Instruction from to = hrs. Actual Cumulative Manhours:
Rain from to = hrs Materials from to = hrs. Budgetary/Estimated Manhours:
Power Failure from to = hrs. Machines/Tools from to = hrs. Variance:
Water Interruption from to = hrs. Plan & Detail from to = hrs. NOTE: For more space, use back page.
: /
OCATION
TOOLS & EQUIPMENT: