You are on page 1of 1

PRIMARY STRUCTURES CORPORATION

HOUSEKEEPING CERTIFICATE

This is to certify that __________________________ assigned at _____________________


project has satisfactory complied in ensuring proper garbage disposal in his work assignments.
Thus, he is entittled to get the total amount billed. Hereunder are the checklist for his scope of work:

MASONRY ROOFING INSTALLATION


CHB INSTALLATION
* Installation of 4" CHB * Roofing
* Installation of 6" CHB * Gutter
* Stiffener Columns (LM) * Ridge Wall Flashing
* Lintel Beam (LM) * Insulation
* GI Wire Support

PLASTERING: PAINTING:
* Interior Plastering (smooth) * Surface Preparation
* Interior Plastering (rough) * Paint Application (brush)
* Exterior Plastering (smooth) * Paint Application (motor spray)
* Exterior Plastering (rough)
* "Apuro" Only Interior
* "Apuro" Only Exterior REBARS:
* Chipping * Installation
* Linial Meter * Fabrication

TILES INTALLATION OTHERS:


* Floor Tiles 12 x 12
* Wall Tiles 8 x 8
* Wall Band Tiles 4 x 12
* Linial Meter Tiles
* Topping Concrete

REMARKS:

Checked by:

Approved by:
Administrative Assistant

Project Supervisor

You might also like