Cost Efficient Residential Building

A. Sub Structure
1 Excavation and Earth Work -
2 Concrete Work #REF!
3 Masonry Work #REF!

Sub Total -A #REF!

B-SUPER STRUCTURE
1 Concrete Work #REF!
2 Block Work #REF!
3 Roofing Work #REF!
4 Carpentry Work Err:509
5 Metal Work #REF!
6 Finishing Work #REF!
7 Glazing Work #REF!
8 Painting Work #REF!
9 Electrical Installation #REF!
10 Sanitary Installation #REF!

Sub Total -B #REF!

Total A+B #REF!

ETG Designers and Consultants Plc. 1 of 141 666044717.xlsx (BOG G+4 (2))
SUMMERY OF STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa

A. SUB STRUCTURE

1 EXCAVATION & EARTH WORK Birr

2 CONCRETE WORK Birr

Total A ................ Birr

B. SUPER STRUCTURE

1 CONCRETE WORK Birr

2 BLOCK WORK Birr

3 WATER PROOFING WORK Birr

4 CARPENTRY AND JOINERY Birr

5 PLASTERING AND POINTING Birr

6 FINISHING Birr

7 GLAZING Birr

8 PAINTING Birr

9 ALUMINUM WORK Birr

10 SANITARY INSTALLATION Birr

11 ELECTRICAL INSTALLATION Birr

Total B ................ Birr

Total A + B ................ Birr

15% VAT ................ Birr

Total After VAT ................ Birr


Page 3 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
Item No Description Unit Qty Unit Rate Amount
11.0 ELECTRICAL INSTALLATION
Supply and install :-

1.1 UTILITY CONNECTION


1.1.1 EEPCO power line connection fee. Ls 1.00

Generator
3rd party cirtified from internationally recognized
institutions.

1.2.1 Supply and install out door generator with foundation


as per the manufacturer recommdation shock absorving
mounting rails and the specificatons on dwg:- No 1.00

1.2.2 Passenger Lift


Supply,Install and commission European standard simplex
MRL lift 1.6m/s and 16 stops,8person 800kg with Back up
battry and all acxessories in accordance with manufacturer
thechinical specification. No 1.00
mounting rails and the specificatons on dwg:-

1.3 Power & Tele Intakes (Provisional Quantity)


Manhole
1.3.1 Manhole in bricks and with concrete base internally of
700x700x700mm including concrete cover with lifting hole. No 4.00

1.4 PVC pipes.


1.4.1 110 mm diameter main power inake ml 35
1.4.2 50 mm diameter for Power and Tele ml 1,689
1.4.3 32 mm diameter for power lines from MDB to SDBs ml 29
1.5 Low Voltage System Earth
1.5.1
Low voltage system earthing (1x120)sq. mm bare copper
conductor from MDB-BF earth terminal ,to copper clad steel
earthing rod of 3000x20mm in manhole measured
elsewhere(15m). [needs to have a mesh of 3 earthing rods to
achieve the expected earthing resistance] No 1.00

CB Rating (A) Short circuit rating (KA)

6 - 25 6
32 - 63 10
80 - 1000 35
1250 - 3000 45

1.6 Low Voltage Switch Board


Basement FLOOR
1.6.1
Floor Standing or Surface Mounting metal enclosures main
distribution (MDB-GF) with lockable door, including earthing
lead,Cable terminal, labeling, connectors and bus bars of 500
Amp, 3 Phase rating, neutral and earth bars, connection
terminals, erected on concrete plinth, complete and consisting
of:-
1 pcs 20A,SDB-BF, 3 Phase
3 pcs 20A, SDB, GF 3 Phase
3 pcs 20A, SDB, 1F Phase
Page 4 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
Item No Description Unit Qty Unit Rate Amount
3 pcs 20A, SDB, 2F Phase
3 pcs 20A, SDB, 3F Phase
3 pcs 20A, SDB, 4F Phase
3 pcs 20A, SDB, 5F Phase
3 pcs 20A, SDB, 6F Phase
3 pcs 20A, SDB, 7F Phase
1 pcs 20A, SDB, 8F Phase
3 pcs 63 A, Power To Lift
1 PCS 32 A,Domestic Water pu
1 pcs 32 A, Fire Fight ING WP
10% reserve pitches all complete
No 1.00

Distribution Boards

1.6.2 Surface mounting metalic inclosures distribution Board, SDB-


BF- with lockable door, earthing lead, cable terminal,
connectors and including bus bars of 25Amp/3Phase, all
necessary fixing and connecting accessories, complete and
consisting:-

3 pcs 10A, SDB, 3Phase


2 pcs 16A, SDB, 3Phase
1 pc main 32A, MCB, 3Phase
10% reserve pitches all complete No 1.00

1.6.3 Ditto as above but for SDB-GF, and consisting:-


4 pcs 10A, Lighting,3Phase
4 pcs 16A, Socket, 3Phase
10% reserve pitches all complete No 1.00

1.6.4 Ditto as above but for SDB-1st F, and consisting:-


1 pcs 63A, ACB, 3Phase
2 pcs 32A, MCB, 3Phase
10% reserve pitches all complete No 1.00

1.6.4.1 Ditto as above but for SDB ,A&B-1stF, and consisting:-


2 pcs 10A, MCB, 3Phase
12 pcs 16A, MCB,3Phase
2 pc main 20A, MCB, 3Phase
2 pc main 25A, MCB, 3Phase

10% reserve pitches all complete No 2.00

1.6.5 Ditto as above but for SDB A&B-2nd,4th,6th F, and


consisting:-
4 pcs 10A, MCB, 3Phase
12 pcs 16A, MCB, 1Phase
2 pc main 25A, MCB, 3Phase
10% reserve pitches all complete No 5.00

1.6.6 Ditto as above but for SDB-A&B,3rd,5th,7thF, and


consisting:-
6 pcs 10A, MCB, 3Phase
12 pcs 16A, MCB, 3Phase
2 pcs 20A, MCB, 3Phase
2 pc main 25A, MCB, 3Phase
10% reserve pitches all complete No 10.00
Page 5 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
Item No Description Unit Qty Unit Rate Amount

1.6.6.1 Ditto as above but for SDB-A&B,3rd,5th,7thF, and


consisting:-
6 pcs 10A, MCB, 3Phase
12 pcs 16A, MCB, 3Phase
2 pcs 20A, MCB, 3Phase
2 pc main 25A, MCB, 3Phase
10% reserve pitches all complete No 4.00

1.6.6.1 Ditto as above but for SDB-A&B,3rd,5th,7thF, and


consisting:-
6 pcs 10A, MCB, 3Phase
12 pcs 16A, MCB, 3Phase
2 pcs 20A, MCB, 3Phase
2 pc main 25A, MCB, 3Phase
10% reserve pitches all complete No 8.00

1.7 Cables
1.7.1 2x2.5 mm sq.light m 1689.49
1.7.4 3x2.5 mm sq. socket m 667.91
1.7.5 3x4 mm sq.water hater m 171
1.7.6 5x10 mm sq. SDB m 339.2
1.7.7 (3x240/120+1x120) Sq.mm m

1.8 Extra Over Light Points for Flush Mounted Switches


1.8.1 Flush mounting single switch No 99.00
1.8.2 Flush mounting two way switch No 58.00
1.8.3 Flush mounting double switch No 35.00

1.9 Flush Mounted Socket Outlet Points


1.9.1 10-16A/1P socket outlet points fed through PVC insulated
conductors of 3x2.5mm2 inside PVC conduit of 16mm
diameter including junction boxes with covers and insulating
screw cap connectors.
No 158.00
1.9.2 Ditto but 20A/1ph water heater socket outlet points
fed through PVC insulated conductors of 3x4 mm2 inside
PVC conduit of 20mm diameter No 42
1.12 Data System

Horizontal Cabling
1.9.2 RJ 45 8 contact data socket out let points to for
flush mounting in thermoplastic conduit of 21mm
with appropriate type junction box fed by standard
(CAT 6A UTP data cable) for 10/100 base internet
with RJ 45 connector plug to be fixed on patch panel
data transfer rate of min.100Mbs and the necessary
accessories to make the system complete. No

1.9.3 Ditto as above but for wirless access points at H=2m No

1.1 Telephon System


-The system shall be installed as per ETC standard

1.10.1 RJ 45 4 pair Tele socket out let points to for


Page 6 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
Item No Description Unit Qty Unit Rate Amount
flush mounting in thermoplastic conduit of 21mm
with appropriate type junction box fed by standard
(CAT 6A UTP data cable) No 7

Extra over Tele socket out lets with detachable


frames & corresponding box 3rd party certified

1.10.6 RJ 45 4 pair Tele socket outlets Nº 43

Telephone Distribution cables

Note :- Use PVC conduit for risers and drops

1.10.7 CAT 6A UTP data cable


or equivalent pair as ETC standard m 286.51

1.10.8 40 pair telephone cable in PVC dia.110 mm


or equivalent pair as ETC standard m 38.47
Telephone Terminal Blocks(Punch downs)
with corresponding box and frames
1.10.9 Surface mounted main distribution frame 40 pairs
telephone terminal blocks or Punch down blocks with
lockable doors wall support structure complete
accessories or equivalent pair as ETC standard Nº 5

1.11 TV System
1.11.1 TV points fed through twin flat TV cables inside rigid PVC
conduits of 20mm diameter including junction boxes with
covers, insulating screw cap connectors , and flush
mounted terminal.
No 14.00
1.11.2 TV outlets No 14.00
1.11.3 A complete smatv system ps 1.00

1.12 Lighting fitting


Connected and tested including lamps and accessories
complete, all as specified or described in lighting fittings
schedule and as shown on the drawings.
Light fitting points fed through 2x2.5 wire and a conduit size sd
of 16mm
Lighting fittings and lamps complete (Specified type or
equivalent)
1.12.1 Philips 32005/31/76 with 1xGENIE14WCDLES 14W Lamps NO 28.00
1.12.2 MASSIVE 30204/86/10 with 1x60A1/CL/E27 60W Lamp NO 36.00
1.12.3 MASSIVE 85020/18/31 with 1xGENIE14WCDLES 14W
Lamps 57.00
NO
1.12.4 RZB 93131.772 with 1xCANDLE B35 1x60W
Lamp/Decorative 28.00
NO
1.12.5 Philips 32005/31/76 with 1xGENIE14WCDLES 14W Lamps NO 14.00
1.12.6 RZB 93131.772 with 1xCANDLE B35 1x60W Lamp/Decorativ NO 27
1.12.7 RZB 33 1080.00X with 1x60A1/CL/E27 60W Lamp NO
1.12.8 MASSIVE 36255/06/10 with 5x60A1/CL/E27 60W Lamps NO 14.00
1.12.9 Philips TCS 098 236 C3 with 2xTLD36W830ALTO 72W 14.00
NO
Lamps
1.12.10 Philips TCS 098 236 C3 with 1xTLD36W830ALTO 36W 20.00
NO
Lamps
Page 7 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
Item No Description Unit Qty Unit Rate Amount
1.12.11 Philips 32005/31/76 with 1xGENIE14WCDLES 14W Lamps NO 14.00

TOTAL CARRIED TO SUMMARY ...................................................


Page 8 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT
A-SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Clear and remove top soil to an average depth of
1.01 200mm. m2 376.80

Bulk Excavation in ordinary soil to a depth not


1.02 exceeding 1500mm from reduced level. m3 565.20

Bulk Excavation in ordinary soil to a depth not


exceeding 1500mm from reduced level. m3 565.20

Bulk Excavation in ordinary soil to a depth not


exceeding 1200mm from reduced level. m3 489.84

Back Fill around foundation with selected


1.07 material from excavated material and compact m3 1,435.55
in layers not exceednig 200mm thick

Back fill under hardcore Compacted thickness


1.08 should not be more than 20cm and the fild m3 41.30
density shoud attain 95% of the Maximum dry
density according to AASHTO-180

1.09 Cart away surples excaveted materials with in m3 260.04


the compound

1.10 Hard Core Work m2 206.50

TOTAL CARRIED TO SUMMARY...................................


2. CONCRETE WORK

2.01 50 mm lean concrete quality C-5, with minimum


cement content of 150 kg /m3, of concrete;

a) Under Mat Slab m2 261.00

Reinforced concrete quality C-30 with minimum


cement content of 400 kg of cement/m3(OPC
2.02 cement) filled in to form work and vibrated
around rod reinforcement (Formwork and
reinforcement measured separately)

a) In Mat Slab m3 56.11


b) In Basement floor column m 3
21.86
c) In Retaining wall m3 37.32
Page 9 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

Reinforced concrete quality C-25 with minimum


cement content of 360 kg of cement/m3(PPC
2.03 cement) filled in to form work and vibrated
around rod reinforcement (Formwork and
reinforcement measured separately)

a) In Mat Beam m3 80.30


b) In Basement floor beam m 3
15.06
c) In 10cm thick Basement floor slab m2 21.85
d) In Ground floor beam m 3
18.02
e) In 20cm thick ground floor slab m2 41.17
f) In Stair case m 3
17.14
g) In Ramp m3 16.88

2.03 Provide, cut and fix in position structural wood


or steel formwork which ever is appropriate.

b) In foundation shearwall m2 19.58

c) In basement floor column & Shear wall m2 141.07

d) In basment floor Beam m2 109.86


e) In Ground floor beam m2 128.17
f) In Ground floor slab m2 283.00
g) In Retaining wall m2 321.64
h) In Stair case 1 m2 41.19
h) In Ramp m2 106.89

2.04 Mild steel reinforcement according to structural


drawings.
a) Dia 6 mm plain bar Kg
b) Dia 8 mm deformed bar Kg 3,524.39
c) Dia 10 mm deformed bar Kg 6,458.02
d) Dia 12 mm deformed bar Kg 883.62
e) Dia 14 mm deformed bar Kg 3,665.77
f) Dia 16 mm deformed bar Kg 1,388.05
g) Dia 20mm deformed bar Kg 6,065.78
h) Dia 24mm deformed bar Kg 1,022.98
10mm thick and 100mm high styrofoam
2.05 expansion joint between ground slab and grade ml 69.80
beam
TOTAL CARRIED TO SUMMARY...................................
B-SUPER STRUCTURE
1. CONCRETE WORK
Page 10 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

Reinforced concrete quality C-30,400kg/m3


1.01 filled in to formwork and vibrate aound rod
reinforcement.(Formwork and reinforcement
measured separately)

a) In elevation columns, shearwalls & lift house

Ground Floor m3 13.62


1st-Floor m 3
15.71
2nd Floor m3 13.37
3rd Floor m3 13.16
4th Floor m3 12.28
5th- Floor m3 11.03
6th-7th Floor m 3
20.18
8th -9th Floor m3 18.13
10th Floor m3 8.13
Roof Terrace Floor m3 4.77

Reinforced concrete quality C-25,360kg/m3


1.02 filled in to formwork and vibrate aound rod
reinforcement.(Formwork and reinforcement
measured separately)

b) In floors and roof beam


First Floor beam (FFB) m3 37.56
Typical Floor beam (TFB) m 3
100.95
Roof terrace beam (RTB) m3 2.08

c) In 200mm thick 1st floor slab m2 283.45

d) In 200mm thick 2nd -roof teracce floor slab m2 1,785.97

e) In 200mm thick Top Roof slab m2 239.69


g) In stair case and landing
Stair case 1 ( Main stair) m3 33.87

Provide, cut and fix in position structural wood


1.03 or steel formwork appropriately.

a) In elevation columns, shearwalls


Page 11 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT
Ground Floor m2 175.20
1st-Floor m2 106.49
2nd Floor m2 115.80
3rd Floor m 2
114.76
4th Floor m2 109.56
5th- Floor m 2
106.44
6th-7th Floor m2 162.60
8th -9th Floor m2 150.12
10th Floor m 2
87.72
Roof Terrace Floor m2 51.88
b) In floors- roof beam
First Floor beam (FFB) m2 650.99
Typical Floor beam (TFB) m2 492.05
Roof terrace beam (RTB) m2 14.79
Roof Beam (RB) m 2

c) In 200mm thick 1st floor slab m2 264.18

d) In 200mm thick 2nd -roof Teracce floor slab m2 1,785.97

e) In 200mm thick ROOF slab m2 24.57

f) In stair case and landing


Stair case 1 ( Main stair) m2 162.63
Mild steel reinforcement according to structural
drawings. Price includes cutting, bending,
1.04 placing in position and tying wire and concrete
spacers.
a) Dia 6 mm plain bar kg
b) Dia 8 mm deformed bar kg 15,895.86
c) Dia 10 mm deformed bar kg 5,839.82
d) Dia 12 mm deformed bar kg 9,447.66
e) Dia 14 mm deformed bar kg 6,498.45
f) Dia 16 mm deformed bar kg 7,694.66
g) Dia 20mm deformed bar kg 3,115.55
h) Dia 24mm deformed bar kg -
TOTAL CARRIED TO SUMMARY...................................
2. BLOCK WORK
Page 12 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

20cm thick class B HCB wall which can satisfy


2.01 the designed strength bedded in cement mortar m2 2,005.50
(1:3).price shall include mortar bedding

2.02 Ditto as Item 2.01 but 15cm thick HCB wall m2 1,710.90

2.03 Ditto as Item 2.01 but 10 cm thick HCB wall m2

TOTAL CARRIED TO SUMMARY...................................

3. WATER PROOFING WORK

Supply and fix torch applied water proofing


3.01 membrene of 4mm thick which passes (ASTM
D6222) and granural finishing for roof water
proofing system(minimum slope 1/20).

m2 218.50
Supply and apply Cementitious damp proofing
3.01 material strictly following manufacturers
instruction.
a)Concrete retaining wall m2 197.85
TOTAL CARRIED TO SUMMARY...................................

4. CARPENTRY AND JOINERY

Supply and fix 40mm thick patterned MDF


panels on both sides with locks, hings &that
comply EN/ASTEM standared & shall be
approved by the designer prior to fixing .the
door frame shall be out of solid Austrraalia pin.
The toilet door frame shall be painted with
4.01 water resistance oil paint to a height of 30cm
from base.price also includes providing door
stopper. the given price is subjected to approval
of ministry of urban (Note:- The specification &
unit price is subjected to approval of ministry of
urban development &constructon .shall there be
changes ,further comminication will made
accordingly)

DOOR
Page 13 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT
a) Type D1=size 900x2100mm No 20.00

b) Type D2=size 1800x2100mm (MAIN GATE) No 60.00

c) Type D3=size 800x2100mm No 40.00


Hand Rail & Guard Rail
A.staircase ( supply & fix best quality approved
4.02 type of wooden handrail for stair case)
m2 22.32

TOTAL CARRIED TO SUMMARY...................................


5.PLASTERING AND POINTING
Apply two coats of plastering in cement mortar
5.01 (1.3).
a) To internal wall surfaces, m2 3,164.44
b) To external wall surfaces, m 2
1,635.16
c) To exposed beams, columns m 2
111.83
d) suspended slab & stair case m2 1,844.01
5.02 Gypsum Plastering to:
Finishing for lobby and corrider at Residential
house

(All material shall be supplied by the contractor)

a)Internal plastered vertical surface m2 3,164.44


b)Plastered soffit m 2
72.75
c) To exposed beams, columns m 2
111.83
TOTAL CARRIED TO SUMMARY...................................
6.FINISHING

6.01 Marble flooring to stair case bedded on and


includeing cement sand mortar mix 1:3
a) 20mm thick to landing. m2 33.00
b) Treads size 30x300mm ml 142.80
c) Riser size 30x160mm ml 190.40

Ditto but 30x3cm bull nosed marble window sill


bedded on cement mortar (1:3) ratio. Price shall
6.01 include cement screed, mirror polishing and all ml 84.50
necessary works.
Page 14 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

Supply and fix 9mm thick ceramic tiles. Price


shall include cement sand mortar(1:3) backing,
6.02 grouting with matching color and 42mm thick m2 91.60
cement screed and also other incidental works.
The colour, pattern and texture should be
approved by the Architect.

Supply and fix 8mm thick wall ceramic tiles.


Price shall include cement sand mortar(1:3)
backing, grouting with matching color and
42mm thick cement screed and also other m2 561.56
incidental works. The colour, pattern and
texture should be approved by the Architect.

6.04 Supply and fix 10cm high Marble skirting ml


Supply and fix coping white marble for roof
6.05 terrace wall (size:3x31cm) ml 73.38

Supply and fix 10mm thick porceln floor tiles.


Price shall include cement sand mortar(1:3)
6.06 backing, grouting with matching color and m2 678.40
42mm thick cement screed and also other
incidental works. The colour, pattern and
texture should be approved by the Architect.

6.07 Supply and fix porcelin skerting. ml 488.90

6.08 Supply and fix Perquate Floor finish. m2 722.00

6.09 Supply and fix Perquate skerting. ml 537.40

TOTAL CARRIED TO SUMMARY...................................

7.GLAZING

Supply and fix 6 mm thick clear and non-


reflective glass to windows and doors to the
7.01 ground floor according to the drawing .Price m2 417.48
shall include putty and all the necessary fixing
accessories.

TOTAL CARRIED TO SUMMARY...................................


8.PAINTING
Page 15 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

Apply kadisco or equivalent type Quartz paint to


8.01 external plaster wall surface according to m2 1,635.16
complete manufacturing instruction applicaton.

8.02 Apply three coats of approved type plastic


emulsion paint to
a)all internal wall surfaces, m2 3,164.44
b)exposed beams and Columns m2 111.83
c)suspended slab & stair case m2 1,844.01
TOTAL CARRIED TO SUMMARY...................................
9. ALUMUNEM & METAL WORK
Supply and fix aluminum window; with clear
glass (glazing measured separately) according to
door and window schedule attached. Suppliers
shall submit samples of the materials with their
9.01 price offers.

WINDOW
a) Type W1=size 1400x1500mm No 14.00
b) Type W2=size 900x1000mm No 28.00
c) Type W3=size 1500x1500mm No 28.00
d) Type W4=size 3270x1500mm No 8.00
DOOR
e) Type D1=size 1350x2100mm No 12.00
f) Type D2=size 900x2100mm No 60.00

g) Type D3=size 700x2100mm No 40.00

CURTAIN WALL
h) Type CW1=size 700x2700mm No 14.00
i) Type CW1=size 1000x2700mm No 14.00
Hand Rail & Guard Rail
A.For slab opening & terrace ( supply & fix best
quality approved type of Alumunem handrail for stair
case) m2 55.59

TOTAL CARRIED TO SUMMARY...................................


10. SANITARY INSTALLATION
WATER SUPPLY
Page 16 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT
Supply and install PPR Pipes for cold & hot
water distribution to all sanitary fixtures
according to the drawing complete with the
necessary pieces such as tees, bends, unions, etc.
The unit price shall include all necessary
assistance to the installation works such as
supports for horizontal & vertical pipes,
chiseling of walls, slabs, beams, floors, etc. and
1.01 closing them with concrete or cement mortar to
normal condition. The installation shall be
tested at a pressure of 10 kg/scm at the expense
of the contractor.

Diameter 15mm ml 198.04


Diameter 20mm ml 242.38
Diameter 32mm ml 106.80
Diameter 50mm ml 54.17

supply & fix gate valves of approved standard


complete with elastic water proffing and hand
1.02 wheels, get valves should be installed at fixture
inlets and branch distribuition lines for isolation
during maintenance

Diameter 25mm No 144.00


Diameter 32mm No 56.00
1.03 WATER METER
Supply & install water meter with gate valves
before & after water meter as where shown on
the drawing
Dia 25mm No 1.00

1.04 FIBER GLASS WATER TANK

Supply fiber glass water storage tank for potable


water use. The following accessories shall be
incorporated with each water tanks: Float valve,
Drain pipe, PN-10 bronze gate valve on drain
valve, over flow pipe, Automatic level control
switch connected with the base pumps, PN-10
bronze gate valve after tank, PN-10 bronze gate
valve before tank.

Size: 10,000 liters. No 3.00


Page 17 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

Size: 5,000 liters. No 3.00

1.05
WASTE WATER COLLECTION AND
VENTILATION
Supply & Install Waste water drainage uPVC
pipes complete with connecting pieces, fittings,
anchors, fixing or hanging elements to slabs,
floors, beams,… adaptors, bends, Y's, T's,
cleanouts &/or other necessary accessories. The
pipes shall be provided with a minimum slope
of 2% towards the flow direction and shall be
hanged 100mm below slab soffit. All Internal
uPVC pipes shall conform to DIN 1953/ or
equivalent for foul & venting pipes below
diameter 80mm and BS 4514:1983 or
equivalent for above or equal to diameter 80mm
Price shall50mm
Diameter also include Roding access ml 101.60
provisions, sleeves, etc as where required.
Diameter 110mm ml 250.65

1.06 DOWN PIPE


Supply & fix Diameter 110mm uPVC down pipes,
min wall thickness 3.2mm with mass concrete
support at ground level & complete with UV oil
painting, basket strainer at inlet 3cm width &
3mm thick strip out of galvanized strip clips at
every 1.0 meter interval and all accessories. The
pipes, accessories, fittings and method of
welding shall comply with the requirment of BS
EN 1329-1:2000 or equivalent institution. Unit
price shall110mm
Diameter include the necessary assistance to ml 192.00
the installation works.

1.07 VENT CAPS


Supply and fix on terminals of ventilation pipes,
vent caps (cowls). with weathering uPVC slates,
sealing gaps between the girth of the vent pipe
and hole in the roof material.

Diameter 75mm No 6.00

1.08 MANHOLE
Construct manholes for sanitary sewer lines
with double brick wall and internally plastered,
on 100 mm thick mass concrete base and 100
mm thick reinforced concrete cover with handle.
Size: as per indicated in the drawing.
Page 18 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM Construct manholes for sanitary sewer lines


DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL
NO with double brick wall and internally plastered, QTY
(Birr) AMOUNT
on 100 mm thick mass concrete base and 100
mm thick reinforced concrete cover with handle.
Size: as per indicated in the drawing.

No 9.00

SANITARY FIXTURES
10.9

All fixtures which are specified below shall be


first class standard/manufactured and subject to
the Consultant's approval, based on samples,
catalogues and brochures presented by the
contractor. Unit price shall include all the
necessary fixing brackets or hooks and all
assistance civil works such as chiseling of walls,
floors, beams and etc.

HAND WASH BASINS


Supply and fix hand wash basins made of white
vitreous china with lever controlled cold water
tap, complete with plug, chrome plated chain
holder, P- smell trap with connection pipe and
with all other necessary accessories

Size 450 x 550mm No 40.00

WATER CLOSET
Supply and install low level water closet
conforming to BS 3402 and comprising. White
glazed vitreous china WC with 9 liters capacity
white vitreous china flushing cistern with cover,
built S-trap, chrome plated fitment, fixing
screws, high impact resistant solid plastic seat
and cover with plastic hinges, and all required
accessories.
No 40.00
FLOOR DRAIN
Supply and fix Ф50mm enameled cast Iron
Floor Drain ,conform to ASME Standard ,
A112.6.3 (Light Duty)or equivalent institution
complete with P-smell trap

No 60.00
Page 19 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL


NO QTY
(Birr) AMOUNT

SOAP HOLDER
Supply and fix soap holder in white vitreous
china Complete with the necessary fixing and
other accessories for showers.

No 80.00
CRYSTAL GLASS MIRROR
Supply and fix crystal glass mirrors for toilets
hand wash basins with copper back protection,
size 500/400 mm including chrome plated
brass mirror clips with chrome plated screws
and etc..
No 40.00
WATER HEATER
Supply and install 50lt electric water heater of
approved quality and including safety valve, non
return valves, control panel and all required
accessories as per manufacturers
recommendation. Storage capacity:

No 40.00

TOWEL HUNGER
Supply and fix standard towel hanger RAK or
equivalent made of chrome plated tabular
metal rollers including fastening screws and
the necessary accessories.

No 80.00

SHOWER HEAD
Supply and fix approved standard shower unit
made of shwer tray with 8mm thick tempered
glass braced and supported by alumnium
structure

No 20.00
Bath tab
Supply and install high qualty Bath tab.
Complete with all accessories. Accessories shall
be subjected to Engineers approval.

No 20.00
TOILET PAPER HOLDER
Supply and fix toilet roll paper holder in white
vitreous china of approved standard, concealed
fixing and white plastic tubular roller including
fixing screws with overall dimension.
Page 20 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa

ITEM Supply and fix toilet roll paper holder in white


DESCRIPTON UNIT STANDARD UNIT PRICE TOTAL
NO vitreous china of approved standard, concealed QTY
(Birr) AMOUNT
fixing and white plastic tubular roller including
fixing screws with overall dimension.

No 40.00

KITCHEN SINK
Supply and fix heavy duty stainless steel Sink
single bowel, with board complete with trap,
drain connection, drainage and over flow, heavy
duty mixing faucet, plug, chain, etc. and all other
necessary accessories

doublel bowel No 18.00

SEPTIC TANK
Construct septic tank as per the detail drawing.
The price includes all excavation, cartaway,
reinforced concrete work, piping work & include
all assistance civil works.

LS 1.00
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
A.SUB STRUCTURE
1.EXCAVATION AND EARTH WORK
1.01 site clearing
1 21.47 L=19.47+2=21.47
17.55 W=15.55+2=17.55
376.80 m2
376.80 Total area of site clearing in m2
1.2 bulk excavation
1.2.1 Ordinary soil
up to 1.5m
L=19.47+2=21.47
1 21.47 W=15.55+2=17.55
17.55 D=1.5
1.5
565.20 m3
1 21.47 L=19.47+2=21.47
17.55 W=15.55+2=17.55
1.5 D=1.5
565.20
1 21.47 L=19.47+2=21.47
17.55 W=15.55+2=17.55
1.3 D=1.2
489.84
1620.23 Total volume of bulk up to 1.5m in m3
1620.23 Total volume of Bulk excavation
1.3 Back fill Around foundation pad
Total volume of pit up to 1.5m in m3
working space =0.5m, Deduct foundation pad
1 16.54 For mat Beam 1`
1.5
0.4
9.92 m3
1 16.69 - Mat Beam 1
1.5 -
0.5 -
12.52 m3
1 17.14 - Mat Beam 2
1.5 -
0.5 -
12.86 m3
1 17.84 - Mat Beam 3
1.5 -
0.5 -
13.38 m3
1 14.88 - Mat Beam 4
1.5 -
0.8 -
17.85 m3
1 13.54 - Mat Beam 5
1.5 -
0.5 -
10.16
1 13.69 - Mat Beam 6
1.5 -
0.5 -
10.27
1 13.88 - Mat Beam 7
1.5 -
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
0.5 -
10.41
1 14.09 - Mat Beam 8
1.5 -
0.5 -
10.57
1 12.6 - Mat Beam 9
1.5 -
0.4 -
7.56
-
-
-
-
-
115.49 Total Mat BEamvolume
Mat Slab Foundation
1 13
0.5
6.50 m3
1 10.8 -
0.5 -
5.40
1 14.9 - m3
0.5 -
7.45
1 5.2 -
0.5 - m3
2.60
1 14.7 -
0.5 -
7.35 m3
1 4.8 -
0.5 -
2.40
1 14.8 -
0.5 -
7.40
1 6.3 -
0.5 -
3.15
1 6.3 -
0.5 -
3.15
1 29.3 -
0.5 -
14.65
1 22.5 -
0.5 -
11.25
1 29.1 -
0.5 -
14.55
1 16 -
0.5 -
8.00
1 6.8 -
0.5 -
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
3.40
1 5.2 -
0.5 -
2.60
1 6.8 -
0.5 - m3
3.40
-
-
103.25 Total volume ofMat Slab
1401.49 Total volume of back fill around foundation in m3
1516.98

1.4 Fill under hardcore


1 13
0.2
2.60 m3
1 10.8 -
0.2 -
2.16
1 14.9 - m3
0.2 -
2.98
1 5.2 -
0.2 - m3
1.04
1 14.7 -
0.2 -
2.94 m3
1 4.8 -
0.2 -
0.96
1 14.8 -
0.2 -
2.96
1 6.3 -
0.2 -
1.26
1 6.3 -
0.2 -
1.26
1 29.3 -
0.2 -
5.86
1 22.5 -
0.2 -
4.50
1 29.1 -
0.2 -
5.82
1 16 -
0.2 -
3.20
1 6.8 -
0.2 -
1.36
1 5.2 -
0.2 -
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1.04
1 6.8 -
0.2 - m3
1.36
-
-

41.30 Total volume of back fill under hardcore in m3

1.5 cart away


75.36 total volume of site clearance
1620.23 total volume of excavation
1435.55 total volume of backfill
Back fill around working space area
2 19.47
4.2
1
163.548 m3
2 15.55
4.2
1
130.62 m3
total
1435.55 total volume of backfill in m3

-
6 260.04 Total volume of cart away in m3
1.6 hardcore
1 13
13.00 m3
1 10.8 -
10.80
1 14.9 - m3
14.90
1 5.2 -
5.20
1 14.7 -
14.70 m3
1 4.8 -
4.80
1 14.8 -
14.80
1 6.3 -
6.30
1 6.3 -
6.30
1 29.3 -
29.30
1 22.5 -
22.50
1 29.1 -
29.10
1 16 -
16.00
1 6.8 -
6.80
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 5.2 -
5.20
1 6.8 -
6.80
-
-
-
206.50 Total volume of back fill under hardcore in m3
206.50 Total area of hardcore in m2
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


A.SUB STRUCTURE
2.CONCRETE WORK
2.01.50 mm lean concrete quality C-5
a) under Mat Slab
1 18 for F1
14.5
261.00 m2

261.00 m2 Total area of lean concrete Foundation


a) Retaining wall
1 66.64
2.8
0.2
37.3184
37.3184 m3 volume concrete for retaining wall

2.02. Reinforced concrete quality C-30 & C-25,


A) Mat Slab
1 18.1 for F1
15.5
0.2
56.11 m3
56.11 Total <Mat Slab volume
Basement floor
4 0.9 C1
0.4
2.3
3.31 m3
3 1 - C2,C3
0.4 -
2.3 -
2.76 m3
6 1 - C4,C6
0.5 -
2.3 -
6.90 m3
2 1 - C5
0.6 -
2.3 -
2.76
8 0.5 - C7
0.3 -
2.3 -
2.76
18.49
Mat beam
1 16.54 For mat Beam 1`
1.5
0.4
9.92 m3
1 16.69 - Mat Beam 1
1 -
0.5 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


8.35 m3
1 17.14 - Mat Beam 2
1 -
0.5 -
8.57 m3
1 17.84 - Mat Beam 3
1 -
0.5 -
8.92 m3
1 14.88 - Mat Beam 4
1 -
0.8 -
11.90 m3
1 13.54 - Mat Beam 5
1 -
0.5 -
6.77
1 13.69 - Mat Beam 6
1 -
0.5 -
6.85
1 13.88 - Mat Beam 7
1 -
0.5 -
6.94
1 14.09 - Mat Beam 8
1 -
0.5 -
7.05
1 12.6 - Mat Beam 9
1 -
0.4 -
5.04
80.30
Basement beam
1 18.17
0.3
0.4
2.18
1 17.44 - BB2
0.3 -
0.4 -
2.09
4 14.11 - BB5
0.3 -
0.4 -
6.77

1 16.48 - BB4
0.3 -
0.4 -
1.98
1 16.96 - BB3
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


0.3 -
0.4 -
2.04
15.06
Ground Floor
1 16.19 GFB 1
0.3
0.4
1.94
1 14.497 - GFB 2
0.3 -
0.4 -
1.74
1 17.9 - GFB 3
0.3 -
0.4 -
2.15
1 17.86 - GFB 4
0.3 -
0.4 -
2.14
1 14.58 - GFB 5
0.3 -
0.4 -
1.75
1 14.09 - GFB 6
0.3 -
0.4 -
1.69
1 14.325 - GFB 7
0.3 -
0.4 -
1.72
1 11.08 - GFB 8
0.3 -
0.4 -
1.33
1 14.61 - GFB9
0.3 -
0.4 -
1.75
1 12.91 - GFB 10
0.3 -
0.4 -
1.55
1 2.13 - GFB 11
0.3 -
0.4 -
0.26
18.02
Foundation column
2 1.28 , SHW 1
0.2
2.16
1.11
2 2.38 -
0.2 -
2.16 -
2.06
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


3.16 Total volum of foundation column
1 1.28 , SHW 1
0.2
2.5
0.64
2 2.38 -
0.2 -
2.5 -
2.38
2 0.35 -
0.2 -
2.5 -
0.35
3.37
1 5.3 Basement Floor Slab
2.88
0.1
1.53 m3
1 4.2 -
3.1 -
0.1 -
1.30 m3
1 5.35 -
3.4 -
0.1 -
1.82 m3
1 3.3 -
2.26 -
0.1 -
0.75 m3
1 3.2 -
5.35 -
0.1 -
1.71
1 3.26 -
2.7 -
0.1 -
0.88
1 5.35 -
6.2 -
0.1 -
3.32
1 6.2 -
4.2 -
0.1 -
2.60
1 6.2 -
5.34 -
0.1 - m3
3.31
1 6.15 -
3.45 -
0.1 -
2.12
1 1.68 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


5.35 -
0.1 -
0.90
1 4.2 -
1.69 -
0.1 -
0.71
1 5.35 -
1.69 -
0.1 -
0.90
21.85 Total Volume of Basement Floor Slab
Ground floor Slab
1 18.85
15.7
0.2 Total volum of ground Floor slab
59.19
41.17
1 24.68 RAMP CONCRETE WORK
3.42
0.2
16.88

Staire case
1 4.2 Landing
1 1.2 -
0.16 -
-
0.77
2 1.2
1.2
0.6
1.728
1 0.09 Step
1.2
0.11
1 0.315
1.2
0.38
Sofit
8 1.2
1.38
0.16
2.12
8 1.2 -
2.64 -
0.16 -
4.06
8 1.2 -
2.68 -
0.16 -
4.12
15.22 m2 Total area of Basement floor step concrete
basment Stair case
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


1 2.66 landing slab
1.35
0.16
0.57 m3
2 0.1575 riser
1.2
0.38 m3
2 2.541
1.2
0.16
0.976 m3
1.93 Total m3
Form work
Basement beam
1 18.17 BB1 internal
0.4
7.27
1 19.5 - External
0.4 -
7.80
1 17.44 - BB2
0.4 - internal
6.98
1 18.6 - External
0.4 -
7.44
4 17.9 - BB5
0.4 - internal
28.64
4 15.01 - External
0.4 -
24.02
1 16.48 - BB4
0.4 - internal
6.59
1 17.69 - External
0.4 -
7.08
-
1 16.96 - BB3
0.4 - internal
6.78
1 18.18 - External
0.4 -
7.27
109.86 Basement Floor slab Beam Form Work
Ground Floor Plan
1 16.44 GFB 1
0.5
8.22
1 17.69 -
0.5 -
8.85
-
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


1 5.24 - GFB 2
0.5 -
2.62
1 5.85 -
0.5 -
2.93
1 7.64 - GFB 3
0.5 -
3.82
1 8.2 -
0.5 -
4.10
-
1 17.34 - GFB 4
0.5 -
8.67
1 18.64 -
0.5 -
9.32
1 18.17 - GFB 5
0.5 -
9.09
1 19.38 -
0.5 -
9.69
1 14.08 - GFB 1
0.5 -
7.04
1 15 -
0.5 -
7.50
1 14.2 - GFB 7
0.5 -
7.10
1 15.08 -
0.5 -
7.54
1 14.2 - GFB 8
0.5 -
7.10
1 15.1 -
0.5 -
7.55
-
1 14.28 - GFB 9
0.5 -
7.14
1 15 -
0.5 -
7.50
1 2.11 - GFB 10
0.5 -
1.06
1 2.7 -
0.5 -
1.35
128.17 Foundation SHW
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


SHW 1
2 5.16
1.1
11.35
2 3.74 -
1.1 -
8.23
19.58
SHW 1
2 5.16 Basement SHW
2.6
26.83
1 3.74
2.6
9.72
2 2.36
2.6
12.27
12.27
Basement Floor Column

4 2.6 C1
2.3
23.92 m3
3 2.8 - C2,C3
2.3 -
19.32 m3
6 3 - C4,C6
2.3 -
41.40 m3
2 3.2 - C5
2.3 -
14.72
8 1.6 - C7
2.3 -
29.44
128.80
128.80

1 283
283 Ground floor slab Playewood
1 20.04
16.05
321.642 Form work for retaining wall
STAIR CASE FORM WORK
1 4.2 Area of landing
1.15
4.83
2 1.2
1.2
2.88 Step
14 1.2 Rizer
16.8
4 1.2
4.8
2 1.2 Soffit
2.1
5.04
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION


1 1.2
1.2
1.44
2 2.1 Side sponda
4.2
1 1.2
1.2
41.19
STAIR CASE FORM WORK
1 1.3 Landing form Work
2.66
3.46
1 14 - Raizer
0.15 -
2.10
2 2.4 -
1.2 -
5.76
2 2.5
0.16 -
0.80
12.12

1 24.68 RAMP CONCRETE WORK


3.42
84.41
1 24.68
0.8
19.74
1 3.42
0.8
2.74
106.89
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

B.SUPER STRUCTURE

1. CONCRETE WORK
1.01 REINFORCED CONCRETE C- 30
a. In elevation Column
Ground Floor column
6 0.9 C1 and C2
0.4
3
6.48 m3
3 1 C3 and C6
0.4
3
3.60 m3
3 1 C4 and C5
0.5
3
4.50 m3
8 0.5 C7
0.3
3
3.60 m3
10.08 total in m3
First Floor column
8 0.9 C1,C2 and C6
0.4
2.6
7.49
2 1 C3 and C4
0.4
2.6
2.08
2 1 C5
0.5
2.6
2.60
12.17 m3 (Total Volume of Concrete Work )
Second Floor floor
6 0.9 C1 and C2
0.3
2.6 -
4.21 m3
2 0.9 - C3 and C4
0.4
2.6
1.87
2 1 C5
0.4
2.6
2.08
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2 0.8 C6
0.4
2.6
1.66
9.83 Total Volume OF Second Floor Colum
Third Floor
6 0.9 C1.C2
0.3
2.6
4.21
4 0.8 C3,C4 and C6
0.4
2.6
3.33
2 1 C5
0.4
2.6 -
2.08
9.62 Total Volume of Thired Floor Column
Fourth Floor
6 0.8 C1 and C2
0.3
2.6
3.74
6 0.8 C3-C6
0.4
2.6
4.99
8.74 Total Volume of 4th Floor Column
Fivth Floor
12 0.8
0.3
2.6
7.49 Total Volume of 5th Floor Column
Sixth and Seventh Floor
24 0.7
0.3
2.6
13.10 Total Volume of 5th Floor Column
Eighth and Ninth Floor
24 0.6
0.3
2.6
11.23 Total Volume of 5th Floor Column
Tenth Floor
12 0.5
0.3
2.6
4.68 Total Volume of 5th Floor Column
- terracy floor
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
4 0.5 - C2and C5
0.3 -
2.2 -
1.32
28.55 total in m3
Shear Wall
24 1.67
0.2
3
24.05
24 1.28
0.2
3
18.43
42.48 Total Volume of Shear Wal.
3.54 Volume Per Floor
b.In Floor Beam
a) in FIRST floor beam
FB-1
1 16.2
0.3
0.4
1.94
FB-2
1 6
0.4
0.3
0.72
FB-3
1 7.64
0.3
0.4
0.92
1 4.08 FB-4
0.3
0.4
0.49
FB-5
1 17.15
0.3
0.4
2.06
FB-6
1 17.15
0.4
0.3
2.06
1 14.58 - FB-7
0.4 -
0.3 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1.75
1 13.54 - FB-8
0.4 -
0.3 -
1.62
1 13.76 - FB-9
0.4 -
0.3 -
1.65
-
1 14.204 - FB-10
0.4 -
0.3 -
1.70
1 12.92 - FB-11
0.4 -
0.3 -
1.55

1 12.87 FB 12
0.3
0.4
1.54
37.56
Typical Floor Beam
9 6.355 - TFB 1
0.3 -
0.4 -
6.86
-
-
-
9 6.305 - TFB 2
0.3 -
0.4 -
6.81
9 6.96 -
0.3 -
-
9 16.847 - TFB 3
0.3 -
0.4 -
18.19
-
9 14.56 - TFB 4
0.3 -
0.4 -
15.72
9 12.225 - TFB 5
0.3 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
0.4 -
13.20
9 13.1 -
0.3 -
0.4 -
14.15
9 11.576 - TFB6
0.3 -
0.4 -
12.50
9 12.5 -
0.4 -
0.3 -
13.50
100.95 m3 Total volume of Roof beam concrete
Terracy
1 4.08 - TFB 1
0.3 -
0.4 -
0.49
1 4.08 - TFB 2
0.3 -
0.4 -
0.49
1 4.08 - TFB 3
0.3 -
0.4 -
0.49
1 5.12 - TFB4
0.3 -
0.4 -
0.61
2.08

f.In 200mm thick FIRST floor slab


1 283.45

283.45 m2
1 -4.6 Stear case
4.19
-19.27
264.18
9 217 Typical Floor 2nd floor-Terrace Floor Slab
1953.00
9 -4.18
4.44
-167.03
1785.97 Slab volume
9 4.6
5.84
239.69
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
Stear case
12 1.2 Landing
1.6
0.17
3.92
12 1.21
1.68
0.17
4.15
Sofit
12 1.2
1.38
0.16
3.18
12 1.2 -
2.64 -
0.16 -
6.08
12 1.2 -
2.68 -
0.16 -
6.17
Step
24 0.315
1.2
9.07
12 0.09
1.2
1.30
33.87 Total volum of Stear case
Ground Floor column
6 2.6 C1 and C2
3
46.80 m3
3 2.8 C3 and C6
3
25.20 m3
3 3 C4 and C5
3
27.00 m3
8 1.6 C7
3
38.40 m3
137.40 total in m3
First Floor column
8 2.6 C1,C2 and C6
2.6
54.08
2 1.81 C3 and C4
2.6
9.41
2 1 C5
2.6
5.20
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
68.69 m3 (Total Volume of Concrete Work )
Second Floor floor
6 2.4 C1 and C2
2.6
37.44 m3
2 2.6 - C3 and C4
2.6 -
13.52
2 2.8 - C5
2.6 -
14.56
2 2.4 - C6
2.6 -
12.48
78.00 Total Volume OF Second Floor Colum
Third Floor
6 2.4 C1.C2
2.6
37.44
4 2.4 - C3,C4 and C6
2.6 -
24.96
2 2.8 - C5
2.6 -
14.56
76.96 Total Volume of Thired Floor Column
Fourth Floor
6 2.2 C1 and C2
2.6
34.32
6 2.4 - C3-C6
2.6 -
37.44
71.76 Total Volume of 4th Floor Column
Fivth Floor
12 2.2
2.6
68.64 Total Volume of 5th Floor Column
Sixth and Seventh Floor
24 2
2.6
124.80 Total Volume of 5th Floor Column
Eighth and Ninth Floor
24 1.8
2.6
112.32 Total Volume of 5th Floor Column
Tenth Floor
12 1.6
2.6
49.92 Total Volume of 5th Floor Column
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
- terracy floor
4 1.6 - C2and C5
2.2
14.08
total in m3
Shear Wall
24 3.74
3
269.28
24 2.56
3
184.32
453.60 Total Volume of Shear Wal.
37.80 Volume Per Floor
b.In Floor Beam
a) in FIRST floor beam
FB-1
1 16.2 External Sponda
0.4
6.48
1 18.46 - Internal sponda
0.4 -
7.38

1 18.46 - bottom sponda


0.3 -
5.54

-
1 6.6 - FB-2
0.4 - External Sponda
2.64
1 6 - Internal sponda
0.4 -
2.40
1 6.6 - bottom sponda
0.3 -
1.98

1 8.26 - FB-3
0.4 - External Sponda
0.4 -
6.31
-
1 4.4 - 4
0.4 - External Sponda
1.76
1 4.04 - Internal sponda
0.4 -
1.62
-
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 19.4 - 5 -5 th

0.4 - External Sponda


7.76
1 17.15 - Internal sponda
0.4 -
6.86

1 18.66 6th-1
0.4 External Sponda
7.46
1 17.15 - Internal sponda
0.4 -
6.86
-
1 15.7 - 7-
0.4 - External Sponda
6.28
1 14.58 - Internal sponda
0.4 -
5.83

1 14.9 8
0.4 External Sponda
5.96
1 13.54 - Internal sponda
0.4 -
5.42
-
1 14 - 9
0.4 - External Sponda
5.60
1 13.76 - Internal sponda
0.4 -
5.50
1 15.3 - 10
0.4 - External Sponda
6.12
1 14.204 - Internal sponda
0.4 -
5.68
1 15.5 - 11
0.4 - External Sponda
6.20
1 12.92 - Internal sponda
0.4 -
5.17
-
1 13.7 - 12
0.4 - External Sponda
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
5.48
1 12.87 - Internal sponda
0.4 -
5.15
-
650.99
d) in Typical floor beam
9 6.36 TYP 1
0.4 External Sponda
22.90
9 6.96 - Internal sponda
0.4 -
25.06
-
9 6.2 - TYPF -2
0.4 - External Sponda
22.32
9 6.95 - Internal sponda
0.4 -
25.02
9 14.563 - TYP-3
0.4 - External Sponda
52.43
9 15.77 - Internal sponda
0.4 -
56.77
9 14.567 - TYPF -4
0.4 - External Sponda
52.44
9 15.77 - Internal sponda
0.4 -
56.77
-
9 13.1 - TYP -5
0.4 - External Sponda
47.16
9 12.2 - Internal sponda
0.4 -
43.92
9 12.6 - TYP -6
0.4 - External Sponda
45.36
9 11.64 - Internal sponda
0.4 -
41.90
492.05 m3 Total volume of Roof beam concrete
Terracy
1 4.08 TFB 1
0.4
1.63
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 4.6 -
0.4 -
1.84
1 4.08 - TFB 2
0.4 -
1.63
1 4.68 -
0.4 -
1.87
1 4.08 - TFB 3
0.4 -
1.63
1 4.6 -
0.4 -
1.84
1 5.12 - TFB4
0.4 -
2.05
1 5.74 -
0.4 -
2.30
-
14.79
f.In 200mm thick FIRST floor slab
1 283.45

283.45 m2
1 -4.6 Stear case
4.19
-19.27
264.18
9 217 Typical Floor 2nd floor-Terrace Floor Slab
1953.00
9 -4.18
4.44
-167.03
1785.97 Slab volume
1 4.6
5.84
24.57 Upper Roof Slab
1 217
217.00
1 -4.18
4.44
-18.56
1 63.64 Side to side sponda
0.2
12.73
211.17 Slab volume
1 5.84 Roof teracce Slab
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
4.6
26.86

FORM WORK FOR STEAR CASE


Stear case
12 1.2 Landing
1.6
23.04
12 1.21 -
1.68 -
24.39
- Sofit
12 1.2 -
1.38 -
19.87
12 1.2 -
2.64 -
38.02
12 1.2 -
2.68 -
38.59
- Step
12 0.15 -
1.2 -
2.16
12 0.15 -
1.2 -
2.16 Side sponda
24 2.1

12 1.2
14.40
162.63 Total volum of Stear case
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

7.FINISHING
7.01. Marble flooring to stair case:
Stair #1 Basement-2nd floor
A.20mm Thick to landing
Landing
1 1.25
8 1.60
16 m2
1 1.7
8 1.25
17
33 m2 Total Marble for Landing (stair#1&2)
B. Tread size 30*340mm
Stair #1 Basement-2nd floor
7 17
1.2
142.8 ml

142.8 ml Total for Tread For Stair # 1&2


C. Riser Size 20*10mm
Stair #1 Basement-2nd floor
7 20
1.36
190.4 ml
190.4 ml Total for Riser For Stair # 1
7.02. Marble window sill
Ground floor

1 84.50
84.50 ml Total for window & door sill
` 7.03. 10 mm thick Porcelain floor tile
Ground Floor
parking
1 209.7 Cement Screed FF
209.70 m2
Admin Office
1 12 Porcilen
12.00 m2
Kitchen
1 7.4
7.40 m2
Guard House
2 4.6
9.20
1 1.6 Toilet
1.60

First Floor
2 36.1 Parquet FF
72.20 m2
102.40 Porcelain FF
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

2 2.8 Balcony
5.60 m2

2 7.4 Kitchen
14.80 m2

2 12.4 Master Bed Room


24.80 m2
2 9.3 bed Room
18.60 m2
2 1.6 Balcony
3.20 m2
2 2.5 Balcony
5.00
72.00 Total 10 mm thick Porcelain floor tile in m2
Ceramic
2 4.4 Bath Room
8.80
2 4.6 Bath Room
9.20 m2
Second,fourth,sixth,Eighith and Tenth Floor
10 36.1 Parquate
361.00 Living And dining
Porcelain
10 7.4 Kitchen
74.00
10 2.8 Balcony
28.00
10 12.4 M.Bath Room
124.00
10 1.6 Balcony
16.00
10 9.3 Bed Room
93.00
10 2.5 Balcony
25.00
Third,Fivith ,Seventh and Ninth Floor
8 36.1 Parquet
288.80
- Ceramic
8 4.6 - Bath Room
36.80
8 4.4 - Mbath
35.20
- Porcilen
8 2.8 - Balcony
22.40
8 7.4 - Kitchin
59.20
8 12.4 - Master Bed Room
99.20
8 9.3 - Bed Room
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
74.40
8 1.6 - Balcony
12.80
- WALL CERAMIC
GROUND FLOOR
1 4.64
1.9
8.82
2 7.9 - First Floor Plan
1.9 -
30.02
2 6.1
1.9
23.18
Third,Fivith ,Seventh Floor
8 7.44 Master Bath Room
1.9
113.09
8 7.95 Bath Room
1.9
120.84
Second,fourth,sixth floor
10 6.2
1.9
117.80
10 7.78
1.9
147.82

ceramic
91.60
Porcilen
678.40
Parquet
722.00
wall ceram ic
561.56
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

7.Skirting

7.02. Marble window and door sill


102.7 Ground floor
58.6
161.3
ml Total for window & door sill
` Ground floor
Porcilen
Admin Office
1 12.25
12.25
-
1 6.65 - Admin Office
6.65 m2
- First Floor
- Porcelain
2 2.85 - Balcony
5.70
2 11.95 - Master bed Room
23.90
- Bed Room
2 7.8 -
15.60
2 0.9 - Balcony
1.80 Parquet
2 26.6 -
53.20

53.20 Second,fourth,sixth,Eighith and Tenth Floor


Porcelain
8 2.85 Balcony
22.80
8 11.95 - Master bed Room
95.60
- Bed Room
8 7.8 -
62.40
8 0.9 - Balcony
7.20 Parquet
8 26.9 -
215.20

0.00
403.20 Total 10 mm thick Porcelain floor tile in m2
Third,Fivith ,Seventh and Ninth Floor
Porcelain
10 2.85 Balcony
28.50

10 11.95 - Master bed Room


119.50
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

- Bed Room

10 7.8 -
78.00
10 0.9 - Balcony
9.00 Parquet
10 26.9 -
269.00
504.00

Porcelain
488.90
Parquet
537.40
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

6.Plastering and Pointing


Basement Floor
1 19.17
2.7
51.76

1 66.1
2.7
178.47
230.23
Ground Floor
1 7.3
2.7
19.71
1 12.7
2.7
34.29
1 5.65
2.7
15.255
1 4.48
2.7
12.10 on axisB b/n 1-2
1 1.8 -
2.7 -
4.86
3 -1.33 -
2.1 -
(8.38)
1 -1.5 -
1.5 -
(2.25)
1 -0.7 -
2.1 -
(1.47)
1 -3.26 -
1.5 -
(4.89)
1 7.94 -
2.7 -
21.44
1 -0.9 -
2.1 -
(1.89)
1 6.59 -
2.7 -
17.79
1 -0.7 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2.1 -
(1.47)
1 -0.9 -
1 -
(0.90)
104.19
2 4.05
2.7
21.87
1 1.5
2.7
4.05
25.92
First Floor
1 10.46 External
2.7
28.24
1 -1.5 -
1.5 -
(2.25)
1 12.81 -
2.7 -
34.59
1 10.94 -
2.7 -
29.54
1 -1.5 -
1.5 -
(2.25)
1 1.72 -
2.7 -
4.64
1 -1.5 -
1.5 -
(2.25)
1 1.15 -
2.7 -
3.11
1 17.73 -
2.7 -
47.87
141.24
- Internal
2 1.5 -
2.7 -
8.10
2 -0.9 -
1 -
(1.80)
2 0.98 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2.7 -
5.29
2 -0.7 -
2.1 -
(2.94)
2 2.6 -
2.1 -
10.92
2 5.42 -
2.1 -
22.76
2 2.5 -
2.1 -
10.50
2 4.54 -
2.7 -
24.52
2 -0.7 -
2.1 -
(2.94)
2 5.3 -
2.7 -
28.62
2 2.2 -
2.7 -
11.88
114.91
2nd,4th,6th,8th and 10th Typical
Floor plan
External
5 4.13
2.7
55.76
5 5.83 -
2.7 -
78.71
5 -1.5 -
1.5 -
(11.25)
5 1.18 -
2.7 -
15.93
5 1.84 -
2.7 -
24.84
5 1.17 -
2.7 -
15.80
5 25.184 -
2.7 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
339.98
10 -1.5 -
1.5 -
(22.50)
10 -1.48 -
1.5 -
(22.20)
5 12.79 -
2.7 -
172.67
5 -3.13 -
1.5 -
(23.48)
624.25
Internal
10 1.5
2.7
40.50
10 0.95 -
2.7 -
25.65
10 2.6 -
2.7 -
70.20
10 -0.7 -
2.1 -
(14.70)
10 0.88 -
2.7 -
23.76
10 2.5 -
2.7 -
67.50
20 -0.7 -
2.1 -
(29.40)
12 3.5 -
2.7 -
113.40
12 2.57 -
2.7 -
83.27
12 4.45 -
2.7 -
144.18
12 5.3 -
2.7 -
171.72
12 5.94 -
2.7 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
192.46
888.53
3rd,5th,7th and 9th floor
8 8.65
2.7
186.84
8 18.19 -
2.7 -
392.90
8 -1.5 -
1.5 -
(18.00)
8 12.77 -
2.7 -
275.83
4 -3.26 -
1.5 -
(19.56)
4 8.61 -
1.5 -
51.66 internal
869.68
8 1.52 -
2.7 -
32.83
8 3.53 -
2.7 -
76.25
8 3.39 -
2.7 -
73.22
8 5.31 -
2.7 -
114.70
8 2.57 -
2.7 -
55.51
8 4.48 -
2.7 -
96.77
8 -0.3 -
2.1 -
(5.04)
8 -0.8 -
2.1 -
(13.44)
8 -1 -
2.1 -
(16.80)
414.00
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
Columen plastering
4 1.2
2.7
12.96
4 0.8 -
2.7 -
8.64
2 0.6 -
2.7 -
3.24
1 1.2 -
2.7 -
3.24
2 0.3 - First floor
2.7 -
1.62
2 0.8 -
2.7 -
4.32
2 0.6 -
2.7 -
3.24
2 0.8 -
2.7 -
4.32
-
10 0.8 - 2nd,4th,6th,8th and 10th Typical
Floor plan
2.7 -
21.60
10 0.61 -
2.7 -
16.47
8 0.41 - 3rd ,5th, 7th and 9th floor
2.7 -
8.86
4 2.16 -
2.7 -
23.33
111.83
1 260.8
260.80
7 215.78
1510.46 Slab plastering
1,771.26
24 1.8 soffit slab plastering
1.25
54
10 1.25
1.5
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
18.75
1,844.01
3,164.44 M2 TOTAL Internal Plastering

1,635.16 Total block work of external work


STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

0 total area of suspended slab


STANDARD TAKE OFF SHEET

Consultant :- Agape Consulting & Trading Plc.

Project :-ATO SALEHADIN YESUF RESIDENCE


Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION

3.MASONARY WORK

3.01 500mm thick stone masonary

1 15.65 On axis Y1

0.5

7.83

1 12.1 On axis Y5

0.5

6.05

1 16.1 On axis X1

0.5

8.05

1 5.7 On axis X5

0.5

2.85

1 10.4

0.5

5.20

m3 Total stone masonary


PROJECT :-B+G+2 RESIDENCE
LOCATION:-ADDIS ABEBA
CLIENT:- ATO DEMIS AYENEW
CONSULTANT :-AGAPE CONSULTING & TRADING PLC. Page of

SUBSTRUCTURE

Page number Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24


Mat Slab and Mat Beam 711.37 7,991.38 - 1,301.18 746.40 2,161.81 288.00
Basement column 691.93 287.48 31.36 493.67 - 121.60 -
Basement beam 136.51 - - 150.49 - - -
Ground floor beam 1,261.94 - - 786.02 132.67 174.36 -
basement Slab 2,219.30 - - - - - -
Ground Floor slab 2,184.22 236.57 961.47 - - - -
Stair Bar - - - 300.71 - - -
Retaining wall 1,717.23 1,900.72 - - - - -
Total length(m) 8,922.51 10,416.16 992.83 3,032.07 879.07 2,457.77 288.00
unit weight(kg) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total weight (kg) 3,524.39 6,458.02 883.62 3,665.77 1,388.05 6,065.78 1,022.98

Total weight (Kg) 23,008.60

PROJECT :-B+G+2 RESIDENCE


LOCATION:-ADDIS ABEBA
CLIENT:- ATO DEMIS AYENEW
CONSULTANT :-AGAPE CONSULTING & TRADING PLC. Page of

SUPER-STRUCTURE

Page number Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24


Ground column - 710.31 - - 504.00 - -
1st floor column 669.38 1,032.54 26.46 324.41 440.00 152.00 -
2nd floor column 716.32 - 0.70 - - - -
3rd floor Column 288.99 - 26.46 196.41 - - -
4th floor Column 481.65 - 26.46 196.41 - - -
5th floor Column 481.65 - 26.46 196.41 - - -
6th floor Column 481.65 - 26.46 196.41 - - -
7th floor Column 481.65 - 26.46 196.41 - - -
8th floor Column 481.65 - 26.46 196.41 - - -
9th floor column 481.65 - 26.46 196.41 - - -
10th floor column 481.65 - 26.46 200.95 - - -
11th floor column 481.65 101.20 26.46 196.41 126.00 - -
Typical floor beam 8,187.60 - - 773.13 3,771.32 1,110.38 -
Top Roof 109.98 - - 53.19 31.80 - -
1st floor Slab 2,244.75 503.81 68.40 437.87 - - -
2nd-teraccy Floor Salb 24,172.47 7,071.21 10,281.65 2,014.21 - - -
Stere Case - - - 4,177.04 - - -
Total length(m) 40,242.68 9,419.07 10,615.35 5,375.06 4,873.12 1,262.38 -
unit weight(kg) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total weight (kg) 15,895.86 5,839.82 9,447.66 6,498.45 7,694.66 3,115.55 -

Total weight (Kg) 48,492.01


No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Mat Beam
MB1` 14 12.00 8 1 8 - - - 96.00 - - -
14 9.80 8 1 8 - - - 78.40 - - -
14 10.00 8 1 8 - - - 80.00 - - -
14 5.75 8 1 8 - - - 46.00 - - -
14 6.90 8 1 8 - - - 55.20 - - -
10 3.70 121 1 121 - 447.70 - - - - -
10 3.70 181 1 181 - 669.70 - - - - -
8 0.60 61 1 61 36.60 - - - - - -
MB 1 24 12.00 12 1 12 - - - - - - 144.00
20 9.80 8 1 8 - - - - - 78.40 -
20 10.00 8 1 8 - - - - - 80.00 -
20 5.75 8 1 8 - - - - - 46.00 -
20 6.90 8 1 8 - - - - - 55.20 -
10 3.70 112 1 112 - 413.17 - - - - -
10 3.70 161 1 161 - 595.70 - - - - -
8 0.60 54 1 54 32.60 - - - - - -
MB 2 24 12.00 12 1 12 - - - - - - 144.00
20 10.25 8 1 8 - - - - - 82.00 -
20 10.00 9 1 9 - - - - - 90.00 -
20 5.75 9 1 9 - - - - - 51.75 -
20 7.35 8 1 8 - - - - - 58.80 -
10 3.70 114 1 114 - 423.03 - - - - -
10 3.70 171 1 171 - 632.70 - - - - -
8 0.60 58 1 58 34.60 - - - - - -
MB3 20 12.00 12 1 12 - - - - - 144.00 -
20 10.90 8 1 8 - - - - - 87.20 -
20 10.00 9 1 9 - - - - - 90.00 -
20 5.75 9 1 9 - - - - - 51.75 -
20 8.05 8 1 8 - - - - - 64.40 -
10 3.70 120 1 120 - 442.77 - - - - -
10 3.70 179 1 179 - 662.30 - - - - -
8 0.60 60 1 60 36.20 - - - - - -
Total Length (ML) 140.00 4,287.07 - 355.60 - 979.50 288.00
Page 1 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Total Weight (Kg) 55.30 2657.98 0.00 429.92 0.00 2417.41 1022.98
Mat Beam 1.1
MB4 14 12.00 8 1 8 - - - 96.00 - - -
14 7.45 8 1 8 - - - 59.60 - - -
14 10.00 8 1 8 - - - 80.00 - - -
14 5.75 8 1 8 - - - 46.00 - - -
14 4.55 8 1 8 - - - 36.40 - - -
10 3.70 94 1 94 - 349.03 - - - - -
10 3.70 141 1 141 - 521.70 - - - - -
8 0.60 48 1 48 28.60 - - - - - -
MB 5 20 10.00 8 1 8 - - - - - 80.00 -
20 8.27 8 1 8 - - - - - 66.16 -
20 11.60 8 1 8 - - - - - 92.80 -
20 6.70 8 1 8 - - - - - 53.60 -
10 3.70 91 1 91 - 336.70 - - - - -
10 3.70 136 1 136 - 503.20 - - - - -
8 0.60 46 1 46 27.60 - - - - - -
MB 6 20 10.00 12 1 12 - - - - - 120.00 -
16 10.00 1 1 1 - - - - 10.00 - -
20 8.47 8 1 8 - - - - - 67.76 -
20 11.60 12 1 12 - - - - - 139.20 -
20 6.90 9 1 9 - - - - - 62.10 -
10 3.70 92 1 92 - 341.14 - - - - -
10 3.70 138 1 138 - 509.86 - - - - -
8 0.60 47 1 47 27.96 - - - - - -
MB 7 20 10.00 12 1 12 - - - - - 120.00 -
16 10.00 1 1 1 - - - - 10.00 - -
20 8.65 8 1 8 - - - - - 69.20 -
20 11.67 12 1 12 - - - - - 140.04 -
20 7.05 9 1 9 - - - - - 63.45 -
10 3.70 73 1 73 - 269.85 - - - - -
10 3.70 109 1 109 - 402.93 - - - - -
8 0.60 37 1 37 22.18 - - - - - -
Total Length (ML) 106.34 3,234.42 - 318.00 20.00 1,074.31 -
Page 1 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Total Weight (Kg) 42.00 2005.34 0.00 384.46 31.58 2651.40 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

MB 9 14 8.26 14 1
14 8.92 8 1
14 9.87 8 1 8 - - - 78.96 - - -
14 7.35 8 1
10 3.70 85 1
10 3.70 127 1 127 - 469.90 - - - - -
8 0.60 43 1 43 25.80 - - - - - -
8 1.92 7 4 28 53.76 - - - - - -
Column
C1 16 3.00 18 4 72 - - - - 216.00 - -
C2 16 3.00 20 2 40 - - - - 120.00 - -
C3 16 3.00 20 1 20 - - - - 60.00 - -
C4 16 3.00 20 1 20 - - - - 60.00 - -
C5 20 3.00 20 1 20 - - - - - 60.00 -
C6 20 3.00 16 1 16 - - - - - 48.00 -
C7 14 3.00 10 11 110 - - - 330.00 - - -
Share wall 14 3.66 17 2 34 - - - 123.46 - - -
8 1.77 12 4 48 85.43 - - - - - -
8 1.77 12 2 24 42.72 - - - - - -
8 2.45 12 2 23 57.17 - - - - - -
8 2.45 12 2 24 58.80 - - - - - -
8 3.65 12 1 12 43.80 - - - - - -
8 2.14 12 2 24 51.36 - - - - - -
8 3.85 12 1 12 46.20 - - - - - -
SHW 3 14 3.66 26 1 26 - - - 95.16 - - -
16 2.60 26 4 104 - - - - 270.40 - -

Total Length (ML) 465.03 469.90 - 627.58 726.40 108.00 -


Page 2 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 183.69 291.34 0.00 758.75 1146.99 266.54 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Basement floor
C1 20 3.80 10 4 40 - - - - - 152.00 -
10 2.60 17 4 68 - 176.80 - - - - -
10 1.15 16 4 64 - 73.60 - - - - -
10 2.18 18 4 70 - 152.89 - - - - -
C2 16 3.80 20 2 40 - - - - 152.00 - -
10 2.80 17 2 34 - 95.20 - - - - -
10 2.38 16 2 32 - 76.16 - - - - -
10 1.14 17 2 34 - 38.76 - - - - -
,C3 20 3.80 16 1 16 - - - - - 60.80 -
10 2.80 17 1 17 - 47.60 - - - - -
10 2.38 16 1 16 - 38.08 - - - - -
10 1.14 17 1 17 - 19.38 - - - - -
C4 20 3.00 16 1 16 - - - - - 48.00 -
10 3.00 17 1 17 - 51.00 - - - - -
10 2.44 16 1 16 - 39.04 - - - - -
10 1.44 17 1 17 - 24.48 - - - - -
C5 20 3.80 20 2 40 - - - - - 152.00 -
10 3.20 17 2 34 - 108.80 - - - - -
10 2.60 24 2 48 - 124.80 - - - - -
10 1.58 17 2 34 - 53.72 - - - - -
C6 20 3.80 16 2 32 - - - - - 121.60 -
10 3.00 17 2 34 - 102.00 - - - - -
10 2.80 16 2 32 - 89.60 - - - - -
10 1.24 17 2 34 - 42.16 - - - - -
C7 14 3.80 10 8 80 - - - 304.00 - - -
8 1.60 9 8 75 119.47 - - - - - -
8 0.95 10 8 83 78.53 - - - - - -
8 1.92 6 4 24 46.08 - - - - - -
SHW 14 3.60 17 1 17 - - - 60.72 - - -
8 1.77 18 4 71 125.08 - - - - - -
8 5.07 18 2 35 179.14 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 18 2 35 75.61 - - - - - -
8 3.85 18 1 18 68.02 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 8 - - 5.60 - - - -
Total Length (ML) 691.93 287.48 31.36 493.67 - 121.60 -
Page 3 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 273.31 178.24 27.91 596.84 0.00 300.11 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Retaining Wall
RW 10 3.45 168 2 335 - 1,156.90 - - - - -
200 8 20.00 20 2 39 786.67 - - - - - -
10 3.45 108 2 216 - 743.82 - - - - -
8 16.02 24 2 49 779.64 - - - - - -
8 1.40 108 1 108 150.92 - - - - - -
Total Length (ML) 1,717 1,901 - - - - -
Page 3 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 678.30 1178.45 0.00 0.00 0.00 0.00 0.00
Ramp
10 7.45 150 2 300 - 2,235.00 - - - - -
10 11.70 150 2 300 - 3,510.00 - - - - -
10 7.04 150 2
10 11.00 150 2
10 5.02 150 1
10 10.19 150 1
sum 19.72 10 3.42 200
Total Length (ML) - 5,745 - - - - -
Page 3 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 3561.90 0.00 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Ground Floor
C1& C2 16 4.00 18 6 108 - - - - 432.00 - -
10 2.60 18 6 110 - 286.00 - - - - -
10 2.18 17 6 104 - 226.72 - - - - -
10 1.15 18 6 110 - 126.50 - - - - -
C3 16 4.00 18 1 18 - - - - 72.00 - -
10 2.80 18 1 18 - 51.33 - - - - -
10 1.14 17 1 17 - 19.76 - - - - -
10 2.38 18 1 18 - 43.63 - - - - -
C4,C5 20 4.00 16 3 48 - - - - - 192.00 -
10 3.00 18 3 55 - 165.00 - - - - -
10 2.44 17 3 52 - 126.88 - - - - -
10 1.44 18 3 55 - 79.20 - - - - -
C6 20 4.00 14 2 28 - - - - - 112.00 -
10 2.80 18 2 37 - 102.67 - - - - -
10 1.24 17 2 35 - 42.99 - - - - -
10 2.37 18 2 37 - 86.90 - - - - -
C7 14 3.15 10 8 80 - - - 252.00 - - -
8 1.60 18 - - - - - - - -
8 0.95 18 - - - - - - - -
8 1.92 18 - - - - - - - -
- - - - - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 8 - - 5.60 - - - -
Total Length (ML) - 710.31 - - 504.00 - -
Page 4 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 440.39 0.00 0.00 795.82 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
1st Floor
C1 16 4.00 18 4 72 - - - - 288.00 - -
10 2.40 18 4 73 - 176.00 - - - - -
8 1.28 18 8 147 187.73 - - - - - -
C2 16 4.00 18 1 18 - - - - 72.00 - -
10 2.60 18 2 37 - 95.33 - - - - -
10 2.18 18 2 37 - 79.93 - - - - -
10 1.15 18 2 37 - 42.17 - - - - -
C3 16 4.00 20 1 20 - - - - 80.00 - -
10 2.80 18 1 18 - 51.33 - - - - -
10 1.14 17 1 17 - 19.76 - - - - -
10 2.38 18 1 18 - 43.63 - - - - -
C4 20 4.00 14 1 14 - - - - - 56.00 -
10 2.80 18 1 18 - 51.33 - - - - -
10 1.24 17 1 17 - 21.49 - - - - -
10 2.37 18 1 18 - 43.45 - - - - -
C5 14 4.00 16 2 32 - - - 128.00 - - -
10 3.00 18 2 37 - 110.00 - - - - -
10 1.44 18 2 37 - 52.80 - - - - -
10 2.40 18 2 37 - 88.00 - - - - -
C6 20 4.00 12 2 24 - - - - - 96.00 -
10 2.60 18 2 37 - 95.33 - - - - -
10 1.69 18 2 37 - 61.97 - - - - -
- - - - - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
Total Length (ML) 669.38 1,032.54 26.46 324.41 440.00 152.00 -
Page 4 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Total Weight (Kg) 264.41 640.17 23.55 392.22 694.76 375.14 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Second Floor
C1 16 4.00 14 4 56 - - - - 224.00 - -
10 2.40 18 4 73 - 176.00 - - - - -
8 1.28 18 8 147 187.73 - - - - - -
C2 16 4.00 16 1 16 - - - - 64.00 - -
10 2.40 18 2 37 - 88.00 - - - - -
8 1.28 18 2 37 46.93 - - - - - -
C3 16 4.00 18 1 18 - - - - 72.00 - -
10 2.60 18 1 18 - 47.67 - - - - -
10 1.15 17 1 17 - 19.93 - - - - -
10 2.18 18 1 18 - 39.97 - - - - -
C4 20 4.00 16 1 16 - - - - - 64.00 -
10 2.60 18 1 18 - 47.67 - - - - -
10 1.20 17 1 17 - 20.80 - - - - -
10 2.18 18 1 18 - 39.97 - - - - -
C5 20 4.00 14 2 28 - - - - - 112.00 -
10 2.80 18 2 37 - 102.67 - - - - -
10 1.24 18 2 37 - 45.47 - - - - -
10 2.37 18 2 37 - 86.90 - - - - -
C6 20 4.00 12 2 24 - - - - - 96.00 -
10 2.40 18 2 37 - 88.00 - - - - -
10 1.49 18 2 37 - 54.63 - - - - -
- - - - - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
Total Length (ML) 716.32 - 0.70 - - - -
Page 5 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Total Weight (Kg) 282.95 0.00 0.62 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
THIRD FLOOR
C1 16 4.00 14 4 56 - - - - 224.00 - -
10 2.40 18 4 73 - 176.00 - - - - -
8 1.28 18 8 147 187.73 - - - - - -
C2 16 4.00 16 1 16 - - - - 64.00 - -
10 2.40 18 2 37 - 88.00 - - - - -
8 1.28 18 2 37 46.93 - - - - - -
C3 16 4.00 16 1 16 - - - - 64.00 - -
10 2.40 18 1 18 - 44.00 - - - - -
10 1.16 18 1 18 - 21.27 - - - - -
10 2.18 18 1 18 - 39.97 - - - - -
C4 20 4.00 12 1 12 - - - - - 48.00 -
10 2.60 18 1 18 - 47.67 - - - - -
10 1.69 18 1 18 - 30.42 - - - - -
C5 20 4.00 12 2 24 - - - - - 96.00 -
10 2.60 18 2 37 - 95.33 - - - - -
10 1.69 18 2 37 - 61.97 - - - - -
C6 20 4.00 12 2 24 - - - - - 96.00 -
10 2.40 18 2 37 - 88.00 - - - - -
10 1.49 18 2 37 - 54.63 - - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -

Total Length (ML) 288.99 - 26.46 196.41 - - -


Page 6 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 114.15 0.00 23.55 237.46 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
4th Floor
C1 16 4.00 12 4 48 - - - - 192.00 - -
10 2.20 18 4 73 - 161.33 - - - - -
8 1.38 18 8 147 202.40 - - - - - -
C2 16 4.00 12 1 12 - - - - 48.00 - -
10 2.20 18 2 37 - 80.67 - - - - -
8 1.38 18 2 37 50.60 - - - - - -
C3 16 4.00 16 1 16 - - - - 64.00 - -
10 2.40 18 1 18 - 44.00 - - - - -
10 1.16 18 1 18 - 21.27 - - - - -
10 2.18 18 1 18 - 39.97 - - - - -
C4 16 4.00 16 1 16 - - - - 64.00 - -
10 2.60 18 1 18 - 47.67 - - - - -
10 1.69 18 1 18 - 30.42 - - - - -
C5 20 4.00 12 2 24 - - - - - 96.00 -
10 2.60 18 2 37 - 95.33 - - - - -
10 1.69 18 2 37 - 61.97 - - - - -
C6 20 4.00 12 2 24 - - - - - 96.00 -
10 2.40 18 2 37 - 88.00 - - - - -
10 1.49 18 2 37 - 54.63 - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -

Total Length (ML) 481.65 - 26.46 196.41 - - -


Page 7 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 190.25 0.00 23.55 237.46 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
5th Floor
C1 16 4.00 12 4 48 - - - - 192.00 - -
10 2.20 18 4 73 - 161.33 - - - - -
8 1.38 18 8 147 202.40 - - - - - -
C2 16 4.00 12 2 24 - - - - 96.00 - -
10 2.20 18 2 37 - 80.67 - - - - -
8 1.38 18 2 37 50.60 - - - - - -
C3 16 4.00 12 1 12 - - - - 48.00 - -
10 2.20 18 1 18 - 40.33 - - - - -
8 1.38 18 1 18 25.30 - - - - - -
C4 16 4.00 12 1 12 - - - - 48.00 - -
10 2.20 18 1 18 - 40.33 - - - - -
8 1.38 18 1 18 25.30 - - - - - -
C5 16 4.00 12 2 24 - - - - 96.00 - -
10 2.20 18 2 37 - 80.67 - - - - -
8 1.38 18 2 37 50.60 - - - - - -
C6 20 4.00 12 2 24 - - - - - 96.00 -
10 2.20 18 2 37 - 80.67 - - - - -
8 1.38 18 2 37 50.60 - - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -

Total Length (ML) 481.65 - 26.46 196.41 - - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 190.25 0.00 23.55 237.46 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

6th Floor
C1 16 4.00 12 4 48 - - - - 192.00 - -
10 2.00 18 4 73 - 146.67 - - - - -
8 1.18 18 8 147 173.07 - - - - - -
C2 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
C3 16 4.00 12 1 12 - - - - 48.00 - -
10 2.00 18 1 18 - 36.67 - - - - -
8 1.18 18 1 18 21.63 - - - - - -
C4 16 4.00 12 1 12 - - - - 48.00 - -
10 2.00 18 1 18 - 36.67 - - - - -
8 1.18 18 1 18 21.63 - - - - - -
C5 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
C6 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
- - - - - - - -
- - - - - - - -

Total Length (ML) 481.65 - 26.46 196.41 - - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Total Weight (Kg) 190.25 0.00 23.55 237.46 0.00 0.00 0.00
7th Floor
C1 16 4.00 12 4 48 - - - - 192.00 - -
10 2.00 18 4 73 - 146.67 - - - - -
8 1.18 18 8 147 173.07 - - - - - -
C2 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
C3 16 4.00 12 1 12 - - - - 48.00 - -
10 2.00 18 1 18 - 36.67 - - - - -
8 1.18 18 1 18 21.63 - - - - - -
C4 16 4.00 12 1 12 - - - - 48.00 - -
10 2.00 18 1 18 - 36.67 - - - - -
8 1.18 18 1 18 21.63 - - - - - -
C5 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
C6 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
- - - - - - - -
- - - - - - - -

Total Length (ML) 481.65 - 26.46 196.41 - - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Total Weight (Kg) 190.25 0.00 23.55 237.46 0.00 0.00 0.00
8th Floor
C1 14 4.00 12 4 48 - - - 192.00 - - -
10 1.80 18 4 73 - 132.00 - - - - -
8 1.15 18 8 147 168.67 - - - - - -
C2 16 4.00 10 2 20 - - - - 80.00 - -
10 1.80 18 2 37 - 66.00 - - - - -
8 1.15 18 2 37 42.17 - - - - - -
C3 14 4.00 12 1 12 - - - 48.00 - - -
10 1.80 18 1 18 - 33.00 - - - - -
8 1.15 18 1 18 21.08 - - - - - -
C4 16 4.00 12 1 12 - - - - 48.00 - -
10 1.80 18 1 18 - 33.00 - - - - -
8 1.15 18 1 18 21.08 - - - - - -
C5 16 4.00 10 2 20 - - - - 80.00 - -
10 1.80 18 2 37 - 66.00 - - - - -
8 1.15 18 2 37 42.17 - - - - - -
C6 14 4.00 12 2 24 - - - 96.00 - - -
10 1.80 18 2 37 - 66.00 - - - - -
8 1.15 18 2 37 42.17 - - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -

Total Length (ML) 481.65 - 26.46 196.41 - - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 190.25 0.00 23.55 237.46 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
9th Floor
C1 14 4.00 12 4 48 - - - 192.00 - - -
10 1.80 18 4 73 - 132.00 - - - - -
8 1.15 18 8 147 168.67 - - - - - -
C2 16 4.00 10 2 20 - - - - 80.00 - -
10 1.80 18 2 37 - 66.00 - - - - -
8 1.15 18 2 37 42.17 - - - - - -
C3 14 4.00 12 1 12 - - - 48.00 - - -
10 1.80 18 1 18 - 33.00 - - - - -
8 1.15 18 1 18 21.08 - - - - - -
C4 16 4.00 12 1 12 - - - - 48.00 - -
10 1.80 18 1 18 - 33.00 - - - - -
8 1.15 18 1 18 21.08 - - - - - -
C5 16 4.00 10 2 20 - - - - 80.00 - -
10 1.80 18 2 37 - 66.00 - - - - -
8 1.15 18 2 37 42.17 - - - - - -
C6 14 4.00 12 2 24 - - - 96.00 - - -
10 1.80 18 2 37 - 66.00 - - - - -
8 1.15 18 2 37 42.17 - - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
- - - - - - - -
- - - - - - - -

Total Length (ML) 481.65 - 26.46 196.41 - - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 190.25 0.00 23.55 237.46 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
10th Floor
C1 14 3.15 12 4 48 - - - 151.20 - - -
10 1.60 18 4 73 - 117.33 - - - - -
8 0.95 18 8 147 139.33 - - - - - -
C2 16 4.00 10 2 20 - - - - 80.00 - -
10 1.60 18 2 37 - 58.67 - - - - -
8 0.95 18 2 37 34.83 - - - - - -
C3 14 4.00 12 1 12 - - - 48.00 - - -
10 1.60 18 1 18 - 29.33 - - - - -
8 0.95 18 1 18 17.42 - - - - - -
C4 14 4.00 12 1 12 - - - 48.00 - - -
10 1.60 18 1 18 - 29.33 - - - - -
8 0.95 18 1 18 17.42 - - - - - -
C5 16 4.00 10 2 20 - - - - 80.00 - -
10 1.60 18 2 37 - 58.67 - - - - -
8 0.95 18 2 37 34.83 - - - - - -
C6 14 4.00 10 2 20 - - - 80.00 - - -
10 1.60 18 2 37 - 58.67 - - - - -
8 0.95 18 2 37 34.83 - - - - - -
SHW 14 4.00 18 1 18 - - - 72.00 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
- - - - - - - -
- - - - - - - -

Total Length (ML) 481.65 - 26.46 200.95 - - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 190.25 0.00 23.55 242.94 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
11th Floor
C2,C4 16 3.15 10 4 40 - - - - 126.00 - -
10 2.00 2 18 29 - 58.67 - - - - -
10 2.00 1 18 21 - 42.53 - - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
0.733333333333333 - - - - - - - -
- - - - - - - -

Total Length (ML) 481.65 101.20 26.46 196.41 126.00 - -


Page 8 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 190.25 62.74 23.55 237.46 198.95 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
BASEMENT FLOOR BEAM
BBB 1 14 8.80 3 1
14 5.75 3 1 3 - - - 17.25 - - -
14 7.28 3 1
14 10.63 2 1
14 9.99 2 1 2 - - - 19.98 - - -
18.29 8 1.30 109 1 2.00

BBB 2 14 8.62 3 1
14 5.75 3 1
14 6.38 3 1 3 - - - 19.14 - - -
14 10.43 2 1
14 9.00 2 1 2 - - - 18.00 - - -
17.42 8 1.30 103 1 103 134.51 - - - - - -
BBB 3 14 8.60 3 1 3 - - - 25.80 - - -
14 5.75 3 1
14 5.96 3 1
14 10.63 2 1
14 6.60 2 1
16.96 8 1.30 101 1
BBB 4 14 8.60 3 1 3 - -
14 5.75 3 1 - - - - -
14 5.44 3 1 - - - - -
14 10.63 2 1 - - - - -
14 8.19 2 1 - - - - -
16.96 8 1.30 101 1 - - - - -
BBB 5 14 10.70 3 1 3 - - - 32.10 - - -
14 5.75 3 - - - - - - - -
14 9.11 2 1 2 - - - 18.22 - - -
14 7.32 2 - - - - - - - -
8 1.30 83

- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
Total Length (ML) 136.51 - - 150.49 - - -
Page 12 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 53.92 0.00 0.00 181.94 0.00 0.00 0.00
Ground Floor
GFB 1 14 8.60 3 1 3 - - - 25.80 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 3 1 3 - - - 31.89 - - -
14 8.19 2 1 2 - - - 16.38 - - -
18.29 8 1.30 109 1 109 141.16 - - - - - -
- - - - - - - -
GFB 2 14 9.26 3 1 3 - - - 27.78 - - -
16 5.75 3 1 3 - - - - 17.25 - -
16 3.40 1 1 1 - - - - 3.40 - -
16 8.60 3 1 3 - - - - 25.80 - -
16 11.28 3 1 3 - - - - 33.84 - -
13.64 8 1.30 14 2 29 37.27 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 8 2 15 19.93 - - - - - -
8 1.30 7 1 7 8.95 - - - - - -
8 1.30 16 2 31 40.73 - - - - - -
8 1.30 14 1 14 18.12 - - - - - -
- - - - - - - -
- - - - - - - -
GFB 3 14 8.50 3 1 3 - - - 25.50 - - -
14 8.50 3 1 3 - - - 25.50 - - -
14 10.63 3 1 3 - - - 31.89 - - -
14 8.19 3 1 3 - - - 24.57 - - -
16.96 8 1.30 101 1 101 130.99 - - - - - -
GFB 4 14 8.60 3 1 3 - - - 25.80 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 2 1 2 - - - 21.26 - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
14 8.19 2 1 2 - - - 16.38 - - -
16.96 8 1.30 101 1 101 130.99 - - - - - -
GFB 5 14 8.50 3 1 3 - - - 25.50 - - -
14 8.50 8 1 8 - - - 68.00 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 2 1 2 - - - 21.26 - - -
14 8.19 2 1 2 - - - 16.38 - - -
16.48 8 1.30 98 1 98 127.32 - - - - - -
GFB6 14 10.30 3 1 3 - - - 30.90 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 9.00 3 1 3 - - - 27.00 - - -
14 7.22 2 1 2 - - - 14.44 - - -
8 1.30 14 1 14 17.68 - - - - - -
8 1.30 14 2 29 37.27 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 22 1 22 28.43 - - - - - -
8 1.30 21 1 21 27.56 - - - - - -
GFB 7 14 10.30 3 1 3 - - - 30.90 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 9.00 3 1 3 - - - 27.00 - - -
14 7.22 2 1 2 - - - 14.44 - - -
8 1.30 14 1 14 17.68 - - - - - -
8 1.30 14 1 14 18.63 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 22 1 22 28.43 - - - - - -
8 1.30 21 1 21 27.56 - - - - - -
GFB 8 20 4.46 2 1 2 - - - - - 8.92 -
20 3.26 3 1 3 - - - - - 9.78 -
20 6.12 3 1 3 - - - - - 18.36 -
16 7.10 3 1 3 - - - - 21.30 - -
20 9.01 4 1 4 - - - - - 36.04 -
16 4.16 3 1 3 - - - - 12.48 - -
8 1.30 13 1 13 16.90 - - - - - -
8 1.30 14 1 14 18.63 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 22 1 22 28.17 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
GFB 9 20 4.40 2 1 2 - - - - - 8.80 -
20 3.28 2 1 2 - - - - - 6.56 -
20 10.50 3 1 3 - - - - - 31.50 -
20 6.20 3 1 3 - - - - - 18.60 -
20 8.95 4 1 4 - - - - - 35.80 -
16 6.20 3 1 3 - - - - 18.60 - -
8 1.30 2 1 2 2.60 - - - - - -
2.02 8 1.30 14 1 14 18.81 - - - - - -
8 1.30 12 1 12 16.05 - - - - - -
8 1.30 21 1 21 27.13 - - - - - -
8 1.30 25 1 25 32.33 - - - - - -
GFB 10 14 10.30 3 1 3 - - - 30.90 - - -
14 6.06 3 1 3 - - - 18.18 - - -
14 9.01 3 1 3 - - - 27.03 - - -
14 7.86 3 1 3 - - - 23.58 - - -
8 1.30 62 1 62 80.60 - - - - - -
8 1.30 22 1 22 28.43 - - - - - -
8 1.3 37 1 37 47.45 - - - - - -
BBB 11 14 3.30 3 1 3 - - - 9.90 - - -
14 3.30 3 1 3 - - - 9.90 - - -
8 1.30 15 1 15 19.76 - - - - - -
- - - - - - - -
Total Length (ML) 1,261.94 - - 786.02 132.67 174.36 -
Page 13 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 498.47 0.00 0.00 950.30 209.49 430.32 0.00
First Floor
FFB 1 14 8.50 3 1 3 - - - 25.50 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 5.33 3 1 3 - - - 15.99 - - -
14 10.69 3 1 3 - - - 32.07 - - -
14 8.23 2 1 2 - - - 16.46 - - -
18.29 8 1.30 109 1 109 141.16 - - - - - -
- - - - - - - -
FFB 2 14 7.22 1 1 1 - - - 7.22 - - -
16 7.22 3 1 3 - - - - 21.66 - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
14 7.22 3 1 3 - - - 21.66 - - -
13.64 8 1.30 36 2 71 92.56 - - - - - -
- - - - - - - -
FFB 3 14 2.35 3 1 3 - - - 7.05 - - -
14 4.80 1 1 1 - - - 4.80 - - -
16 8.90 3 1 3 - - - - 26.70 - -
14 8.90 3 1 3 - - - 26.70 - - -
16.96 8 1.30 34 1 34 44.63 - - - - - -
FFB 4 14 5.30 3 1 3 - - - 15.90 - - -
14 5.30 3 1 3 - - - 15.90 - - -
16.96 8 1.30 28 1 28 35.91 - - - - - -
FFB 5 14 8.50 3 1 3 - - - 25.50 - - -
14 8.50 8 1 8 - - - 68.00 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 2 1 2 - - - 21.26 - - -
14 8.19 2 1 2 - - - 16.38 - - -
16.48 8 1.30 98 1 98 127.32 - - - - - -
FFB6 14 2.35 2 1 2 - - - 4.70 - - -
14 3.40 2 1 2 - - - 6.80 - - -
16 3.30 2 3 6 - - - - 19.80 - -
16 11.40 3 1 3 - - - - 34.20 - -
16 11.46 3 1 3 - - - - 34.38 - -
16 11.42 3 2 6 - - - - 68.52 - -
16 9.21 4 1 4 - - - - 36.84 - -
17.1 8 1.30 115 1 115 149.50 - - - - - -
FFB 7 14 8.50 3 1 3 - - - 25.50 - - -
14 8.53 3 1 3 - - - 25.59 - - -
14 10.60 3 1 3 - - - 31.80 - - -
14 8.19 3 1 3 - - - 24.57 - - -
14.58 8 1.30 98 1 98 127.66 - - - - - -
FFB 8 20 3.26 1 1 1 - - - - - 3.26 -
20 10.60 3 1 3 - - - - - 31.80 -
16 5.76 3 1 3 - - - - 17.28 - -
16 9.10 3 1 3 - - - - 27.30 - -
14 7.14 3 1 3 - - - 21.42 - - -
13.53 8 1.30 91 1 91 118.30 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
FFB 9 16 4.40 1 1 1 - - - - 4.40 - -
20 10.60 3 1 3 - - - - - 31.80 -
16 5.76 3 1 3 - - - - 17.28 - -
16 9.01 4 1 4 - - - - 36.04 - -
16 7.14 3 1 3 - - - - 21.42 - -
13.72 8 1.30 92 1 92 120.21 - - - - - -
FFB 10 14 4.46 1 1 1 - - - 4.46 - - -
14 3.26 1 1 1 - - - 3.26 - - -
20 10.59 3 1 3 - - - - - 31.77 -
14 6.06 3 1 3 - - - 18.18 - - -
16 8.98 4 1 4 - - - - 35.92 - -
14 7.86 3 1 3 - - - 23.58 - - -
14.188 8 1.3 143 1 143 185.64 - - - - - -
FFb 11 20 4.11 1 1 1 - - - - - 4.11 -
20 10.31 3 1 3 - - - - - 30.93 -
30.68 14 6.06 3 1 3 - - - 18.18 - - -
16 9.01 4 1 4 - - - - 36.04 - -
14 7.86 3 1 3 - - - 23.58 - - -
8 1.30 206 1 206 267.19 - - - - - -
FFB 12 14 10.30 4 1 4 - - - 41.20 - - -
14 6.06 3 1 3 - - - 18.18 - - -
14 9.01 3 1 3 - - - 27.03 - - -
14 7.86 3 1 3 - - - 23.58 - - -
12.88 8 1.30 86 1 86 112.23 - - - - - -
- - - - - - - -
Total Length (ML) 1,522.33 - - 695.57 437.78 133.67 -
Page 13 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 601.32 0.00 0.00 840.94 691.25 329.90 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Typical Floor Beam
TFB 1 14 3.24 2 7 14 - - - 45.36 - - -
14 2.30 2 7 14 - - - 32.20 - - -
16 7.58 3 7 21 - - - - 159.18 - -
16 7.58 3 7 21 - - - - 159.18 - -
8 1.30 8 7 56 73.41 - - - - - -
8 13.00 36 7 252 3,269.93 - - - - - -
TFB 2 16 7.58 3 7 21 - - - - 159.18 - -
16 7.58 3 7 21 - - - - 159.18 - -
16 2.36 2 7 14 - - - - 33.04 - -
16 3.61 2 7 14 - - - - 50.54 - -
8 1.30 36 7 252 326.99 - - - - - -
8 1.30 8 7 58 75.83 - - - - - -
TFB 3 16 3.40 2 7 14 - - - - 47.60 - -
16 3.4 2 7 14 - - - - 47.60 - -
16 3.50 2 7 14 - - - - 49.00 - -
16 3.54 2 7 14 - - - - 49.56 - -
16 9.66 3 7 21 - - - - 202.86 - -
16 9.62 3 7 21 - - - - 202.02 - -
16 11.80 3 7 21 - - - - 247.80 - -
16 7.42 3 7 21 - - - - 155.82 - -
8 1.30 14 7 101 130.90 - - - - - -
8 1.30 13 14 176 229.32 - - - - - -
8 1.30 28 7 197 256.62 - - - - - -
8 1.30 14 7 101 130.90 - - - - - -
8 1.30 11 14 160 208.60 - - - - - -
8 1.30 10 7 70 91.61 - - - - - -
- - - - - - - -
TFB 4 20 2.20 1 7 7 - - - - - 15.40 -
20 3.40 1 7 7 - - - - - 23.80 -
16 3.50 1 7 7 - - - - 24.50 - -
20 2.40 1 7 7 - - - - - 16.80 -
20 8.56 3 7 21 - - - - - 179.76 -
20 8.50 3 7 21 - - - - - 178.50 -
16 6.30 3 7 21 - - - - 132.30 - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
16 4.90 3 7 21 - - - - 102.90 - -
16 6.14 3 7 21 - - - - 128.94 - -
8 1.30 14 14 201 261.80 - - - - - -
8 1.30 12 7 83 108.06 - - - - - -
1.74666666666667 8 1.30 28 7 197 256.62 - - - - - -
8 1.30 14 14 201 261.80 - - - - - -
8 1.30 12 7 83 108.06 - - - - - -
TFB 5 20 3.89 1 7 7 - - - - - 27.23 -
20 3.26 1 7 7 - - - - - 22.82 -
20 10.05 3 7 21 - - - - - 211.05 -
20 4.30 3 7 21 - - - - - 90.30 -
16 15.20 4 7 28 - - - - 425.60 - -
16 6.00 3 7 21 - - - - 126.00 - -
2.02 8 1.30 11 7 78 101.01 - - - - - -
8 1.30 14 7 101 131.65 - - - - - -
TFB 6 16 3.80 2 7 14 - - - - 53.20 - -
20 10.05 3 7 21 - - - - - 211.05 -
16 3.74 3 7 21 - - - - 78.54 - -
16 15.20 4 7 28 - - - - 425.60 - -
16 5.40 3 7 21 - - - - 113.40 - -
2.02 8 1.30 14 14 203 263.29 - - - - - -
8 1.30 11 7 78 101.01 - - - - - -
8 1.30 22 7 151 195.95 - - - - - -
8 1.30 9 7 63 81.90 - - - - - -

Total Length (ML) 6,665.27 - - 77.56 3,333.54 976.71 -


Page 14 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 2632.78 0.00 0.00 93.77 5263.66 2410.52 0.00

Top Roof Beam - - - - - - - -


- - - - - - - -
TRB 1 14 5.30 3 1 3 - - - 15.90 - - -
14 5.31 4 1
8 1.30 28 1 28 36.66 - - - - - -
TRB 2 16 5.30 3 1 3 - - - - 15.90 - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
16 5.30 3 1 3 - - - - 15.90 - -
8 1.30 28 1 28 36.66 - - - - - -
TRB 3 14 5.35 3 1 3 - - - 16.05 - - -
14 5.31 4 1 4 - - - 21.24 - - -
8 1.30 28 1 28 36.66 - - - - - -
TRB 4 14 6.37 3 1 3 - - - 19.11 - - -
14 6.70 3 1 3 - - - 20.10 - - -
8 1.30 28 1 28 35.97 - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) 109.98 - - 53.19 31.80 - -
Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 43.44 0.00 0.00 64.31 50.21 0.00 0.00

basement Floor Slab - - - - - - - -


- - - - - - - -
8 14.77 22 1 22 327.89 - - - - - -
8 5.30 60 1 60 318.42 - - - - - -
8 4.20 61 1 61 254.69 - - - - - -
8 14.91 18 1 18 265.40 - - - - - -
8 15.10 22 1 22 335.22 - - - - - -
8 5.35 63 1 63 337.05 - - - - - -
8 13.30 15 1 15 194.18 - - - - - -
8 3.44 54 1 54 186.45 - - - - - -
Total Length (ML) 2,219.30 - - - - - -
Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 876.62 0.00 0.00 0.00 0.00 0.00 0.00

- - - - - - - -
- - 0 0 0 0 0 0
Ground Floor Slab - - - - - - - -
Botom Bar 8 6.80 22 1 22 146.43 - - - - - -
1 8 8.29 22 1 22 186.25 - - - - - -
2 8 10.35 45 1 45 461.31 - - - - - -
3 8 9.27 7 1 7 67.67 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
4 8 5.97 9 1 9 56.42 - - - - - -
6 8 8.60 36 1 36 312.47 - - - - - -
7 8 8.62 39 1 39 334.95 - - - - - -
8 8 9.80 30 1 30 291.06 - - - - - -
9 8 6.77 19 1 19 128.63 - - - - - -
10 8 6.77 9 2 18 120.05 - - - - - -
8 6.77 12 1 12 78.98 - - - - - -
- - - - - - - -
Top Bar - - - - - - - -
A 10 4.53 39 1 39 - 177.32 - - - - -
B 12 3.27 39 1 39 - - 127.06 - - - -
C 12 4.29 39 1 39 - - 166.70 - - - -
12 4.29 31 1 31 - - 132.99 - - - -
12 4.29 39 1 39 - - 167.62 - - - -
D 12 2.34 24 1 24 - - 55.49 - - - -
E 12 2.89 21 1 21 - - 60.69 - - - -
F 12 2.09 23 1 23 - - 48.07 - - - -
G 12 3.30 24 1 24 - - 78.73 - - - -
H 12 5.25 24 1 24 - - 124.13 - - - -
I 10 2.67 22 1 22 - 59.26 - - - - -

- -
Total Length (ML) 2,184.22 236.57 961.47 - - - -
Page 15 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 862.77 146.68 855.71 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
First Floor Slab
Bototm Bar - - - - - - - -
Bar 1` 8 6.79 18 1 18 122.62 - - - - - -
Bar 1 8 6.00 20 1
Bar 2 8 10.30 42 1 42 433.29 - - - - - -
8 10.30 12 1
Bar 3 8 10.36 22 1 22 232.75 - - - - - -
9 10.36 23 1
10 10.36 42 1
Bar 4 8 5.97 9 1 9 56.42 - - - - - -
Bar 5 8 4.79 10 1
Bar 6 8 7.05 29 1 29 203.98 - - - - - -
Bar 7 8 8.62 36 1 36 307.45 - - - - - -
8 8.62 28 1 28 244.23 - - - - - -
8 8.62 37 1 37 315.49 - - - - - -
Bar 8 8 6.78 24 1 24 162.72 - - - - - -
Top Bar - - - - - - - -
Bar A 8 4.53 37 1 37 165.80 - - - - - -
Bar B 10 3.27 37 1 37 - 119.68 - - - - -
Bar C 14 4.29 37 1 37 - - - 157.01 - - -
14 4.29 29 1 29 - - - 123.84 - - -
14 4.29 37 1 37 - - - 157.01 - - -
Bar D 10 2.34 24 2 48 - 112.32 - - - - -
Bar E 12 2.89 24 1 24 - - 68.40 - - - -
Bar F 10 2.09 23 1 23 - 47.23 - - - - -
Bar G 10 3.30 33 1 33 - 109.56 - - - - -
Bar H 10 5.24 62 1 62
Bar I 10 5.15 22 1 22 - 115.02 - - - - -

Total Length (ML) 2,244.75 503.81 68.40 437.87 - - -


Page 16 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 886.68 312.36 60.87 529.38 0.00 0.00 0.00
Typical Floor Slab
Bototm bar
Bar 1 8 7.21 20 18 355 2,557.43 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Bar 2 8 7.14 45 18 818 5,838.48 - - - - - -
Bar 3 8 5.98 49 18
Bar 4 8 4.70 57 9 516 2,426.48 - - - - - -
8 4.70 11 9
8 4.70 57 9
Bar 5 8 5.51 36 18 654 3,603.54 - - - - - -
Bar 6 8 8.16 40 18 717 5,854.22 - - - - - -
Bar 7 8 8.16 27 18 477 3,892.32 - - - - - -
top bar - - 0 0 0 0 0 0
Bar A 12 3.27 19 18 342 - - 1,118.34 - - - -
12 3.27 33 18 590 - - 1,930.61 - - - -
12 3.27 63 18 1,136 - - 3,714.07 - - - -
Bar B 10 2.08 23 18 412 - 856.13 - - - - -
Bar C 10 3.37 49 18 878 - 2,958.34 - - - - -
Bar D 12 3.62 54 18 972 - - 3,518.64 - - - -
Bar E 14 3.18 19 18 338 - - - 1,076.11 - - -
Bar F 14 2.65 20 18 354 - - - 938.10 - - -
Bar G 10 3.26 37 27 999 - 3,256.74 - - - - -

Total Length (ML) 24,172.47 7,071.21 10,281.65 2,014.21 - - -


Page 17 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 9548.13 4384.15 9150.67 2435.18 0.00 0.00 0.00

Ster Bar - - - - - - - -
Bar 1 14 2.24 9 10 92 - - - 206.08 - - -
Bar 2 14 0.89 8 10
Bar 3 14 2.39 8 10 82 - - - 196.82 - - -
Bar 4 14 4.91 3 10 35 - - - 169.89 - - -
Bar 5 14 2.24 9 10 92 - - - 206.08 - - -
Bar 6 12 2.39 9 10
10 - - - - - - - -
Bar 1 14 5.39 9 10 90 - - - 485.10 - - -
Bar 2 14 2.42 9 10 90 - - - 217.80 - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Bar 3 14 2.20 9 10 90 - - - 198.00 - - -
Bar 4 14 0.89 13 10 134 - - - 118.84 - - -
Bar 5 14 5.40 15 10 150 - - - 810.00 - - -
Bar 6 14 2.40 15 10 150 - - - 360.00 - - -
Bar 7 14 2.45 15 10 150 - - - 367.50 - - -
Bar 8 14 0.89 13 10 134 - - - 118.84 - - -
Total Length (ML) - - - 3,454.95 - - -
Page 18 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 4177.04 0.00 0.00 0.00
From basement -Ground floor - - - - - - - -
Bar 1 14 0.99 8 1 8 - - - 7.98 - - -
Bar 2 14 4.27 15 1 15 - - - 64.05 - - -
Bar 3 14 2.52 15 1
Bar 4 14 1.60 15 1 15 - - - 24.00 - - -
Bar 5 14 0.85 13 1 13 - - - 11.35 - - -
Bar 6 14 5.39 15 1 15 - - - 80.85 - - -
Bar 7 14 0.82 13 1 13 - - - 10.95 - - -
Bar 8 14 0.82 14 1 14 - - - 11.58 - - -
Bar 9 14 2.51 15 1 15 - - - 37.65 - - -
Bar 10 14 0.85 22 1 22 - - - 18.70 - - -
Bar 11 14 1.60 21 1 21 - - - 33.60 - - -
Total Length (ML) - - - 300.71 - - -
Page 19 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 363.56 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- -
- - - - - - - -

Total Length (ML) 0.79 1.24 1.78 8,599.39 3.16 4.94 7.10
Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.31 0.77 1.58 10396.66 4.99 12.18 25.23
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

- -

Total Length (ML) 1.50 2.63 4.25 18,997.25 9.72 19.59 35.89
Page 20 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.59 1.63 3.79 22967.68 15.35 48.34 127.48

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

Total Length (ML) - - - - - - -


Page 21 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-

- -
- -
- - - - - - - -

- - - - - - - -
- -
- - - - - - - -
- - -

- - - - - - - -
- -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - -
Total Length (ML) 0.40 0.62 0.89 1.21 1.58 2.47 3.55
Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.16 0.38 0.79 1.46 2.49 6.09 12.62

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
Total Length (ML) 0.95 1.62 2.57 3.88 5.65 11.03 19.72
Page 22 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.37 1.01 2.29 4.69 8.92 27.21 70.05
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 23 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
39 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 24 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 25 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 26 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 27 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 28 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -

Total Length (ML) - - - - - - -


Page 29 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

2.Block work

2.01.20cm thick class B external HCB wall


BASEMENT
1 67.55 Retaining wall
2.7
182.39

2 4.95 INTERNAL
2.7
26.73
2 2.38 -
2.7 -
12.85
1 -2.57 -
2.1 -
(5.40)
On Ground floor
2.01.20cm thick class B external HCB wall
EXTERNAL
1 9.9
2.7
26.73
1 21.95 -
2.7 -
59.27
1 15.6 -
2.7 -
42.12
1 20.55 -
2.7 -
55.49
183.60
INTERNAL
1 7.33 On axis A b/n 1`-2`
2.70
19.79
1.00 6.74 on axis c b/n 1`-2`
2.70
18.20
1.00 10.68 on axis 1 b/n B-C
2.70
28.83
1.00 10.93 on axis 2 b/n A-C
2.70
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
29.51
1.00 4.32 -
2.70 -
11.66
1.00 (5.00) -
1.20 -
(6.00)
1.00 (0.90) -
0.90 -
(0.81)
1.00 (1.35) -
2.10 -
(2.84)
1.00 (1.50) -
2.10 -
(3.15)
1.00 (1.35) -
2.10 -
(2.84)
92.36

1.00 5.95
2.70
16.07

16.07 total area after deduction of window & door


First floor
1.00 5.80 External
2.70 -
15.66
1.00 4.00 -
2.70 -
10.80
1.00 5.80 -
2.70 -
15.66
1.00 1.16 -
2.70 -
3.13
-
1.00 1.86 -
2.70 -
5.02
-
1.00 5.85
2.70
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
15.80

1.00 4.09
2.70 -
11.04
1.00 0.70 -
2.70 -
1.89
1.00 0.65 -
2.70 -
1.76
1.00 4.15 -
2.70 -
11.21
1.00 5.73 -
2.70 -
15.47
1.00 1.57 -
2.70 -
4.24 -
3.00 (0.90) - W2
0.60 -
(1.62)
4.00 (1.50) - W1
1.50 -
(9.00)
3.00 (0.90) - W3
0.60 -
(1.62)
99.43 total area after deduction of window

- Internal
2.00 3.80 -
2.70 -
20.52
2.00 (0.70) -
2.10 -
(2.94)
2.00 0.88 -
2.70 -
4.75
2.00 2.50 -
2.70 -
13.50
2.00 (0.90) -
2.10 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
(3.78)
2.00 5.46 -
2.70 -
29.48
2.00 2.57 -
2.70 -
13.88
2.00 2.90 -
2.70 -
15.66
2.00 4.77 -
2.70 -
25.76
2.00 2.50 -
2.70 -
13.50
130.33

8.00 8.71 - Third Fifth Seventh and seventh Floor


2.70 -
-
188.14
8.00 8.81 -
2.70 -
-
190.30
8.00 12.86 -
2.70 -
-
277.78
8.00 8.87 -
2.70 -
-
191.53
24.00 (1.50) -
1.50 -
-
(54.00)
8.00 (0.90) -
0.60 -
-
(4.32)
8.00 (1.40) -
1.50 -
-
789.42
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
8.00 1.50 -
2.70 104.52
32.40
8.00 2.60 -
2.70 -
56.16
8.00 3.30 -
2.70 -
71.28
8.00 3.38 -
2.70 -
73.01
8.00 2.90 -
2.70 -
62.64
8.00 2.50 -
2.70 -
54.00
8.00 1.99 -
2.70 -
42.98
8.00 2.65 -
2.70 -
57.24
8.00 6.84 -
2.70 -
147.74
8.00 1.30 -
2.70 -
28.08
8.00 5.30 -
2.70 -
114.48
8.00 2.10 - M2
2.70 -
347.54
1,192.08
Second Forth Sixth Eighith and Tenth Typical floor
Plan
10.00 10.11
2.70
272.97
10.00 5.70 -
2.70 -
153.90
10.00 20.16 -
2.70 -
544.32
10.00 9.70 -
2.70 -
261.90
20.00 (0.90) - W2
0.60 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
(10.80)
20.00 (1.50) - W1
1.50 -
(45.00)
15.00 (0.90) - W3
0.60 -
(8.10)
10.00 (1.30) - D1
2.10 -
(27.30)
30.00 (0.90) - D2
2.10 -
(56.70)
20.00 (0.70) - D3
2.10 -
(29.40)
10.00 (1.50) - D4
2.10 -
(31.50)
1,024.29
- Internal
10.00 1.52 -
2.70 -
41.04
10.00 2.60 -
2.70 -
70.20
10.00 3.40 -
2.70 -
91.80
10.00 3.62 -
2.70 -
97.74
10.00 2.02 -
2.70 -
54.54
10.00 2.50 -
2.70 -
67.50
10.00 3.50 -
2.70 -
94.50
10.00 (1.30) - D1
2.10 -
(27.30)
30.00 (0.90) - D2
2.10 -
(56.70)
20.00 (0.70) - D3
2.10 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
(29.40)
10.00 (1.50) - D4
2.10 -
(31.50)
372.42

-
1,710.90 15 CM
2,005.50 20CM EXTERNAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

3.Roofing and Water proofing work

3.06.for roof water proofing

2 9.3 For roof slab


3.75
69.75
1 10.95 -
10.2 -
111.69
2 3.4 -
5.45 -
37.06
-
218.50 m2

3.07. cementitious damp roofing material

a)all upper wet room


ON GROUND FLOOR
on Toilet
1 6
6.00 m2
on Toilet
1 4
4.00
10.00 m2Total
on 1st floor

1 5.1 on Toilet
5.10
m2
1 14 on Toilet
14.00 m2
19.10 m2Total
On second floor
3 4 Bathroom
12.00 m2
1 8 Bathroom
8.00 m2
20.00 m Total
2

49.10 m2Total Upper wet room


STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION

b.Concrete retaining wall

1 65.95 p=65.95m
3
197.85 m2 Total Retaining wall
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALHADIN
Location :-Addis Ababa Page of
TIM NUMBER TOTAL DESCRIPTION

4.Carpentry and joinery

wooden decorative flush door (5mm thick frosted glass)

D00R 1 (D1 size 1300mm & 2100)

First floor-Tenth floor


1 20.00

20 Pcs

20 Pcs Total D1

D00R 2 (D2 size900mm & 2100)

ground floor
1 60.00

60 Pcs

60 Pcs Total D2

D00R 3 (D3 size 700mm & 2100)

1 40.00 first floor-Tenth Floor

40 Pcs

40 Pcs Total D3
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE

Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
40*40*2.5 1.20 1.2 1 3 3.6
40*40*2.5 1.06 10 8.8 1.06 1 3 3.18
40*40*2.5 0.91 8.8 7.6 0.91 1 3 2.73
Vertical truss 40*40*2.5 0.77 7.6 6.4 0.77 1 3 2.31
member 40*40*2.5 0.62 6.4 5.2 0.63 1 3 1.89
40*40*2.5 0.48 5.2 4 0.48 1 3 1.44
40*40*2.5 0.34 4 2.8 0.34 1 3 1.02
1 T-1 3 40*40*2.5 0.19 2.8 1.6 0.19 1 3 0.57
40*40*2.5 1.60 1.6 1 3 4.8
40*40*2.5 1.51 1.51 1 3 4.53
40*40*2.5 1.42 1.43 1 3 4.29
Diagonal member 40*40*2.5 1.35 1.36 1 3 4.08
40*40*2.5 1.29 1.29 1 3 3.87
40*40*2.5 1.25 1.25 1 3 3.75
40*40*2.5 1.22 1.21 1 3 3.63
40*40*2.5 1.20 1.2 1 2 2.4
40*40*2.5 1.08 12.20 11 1.08 1 2 2.16
40*40*2.5 0.96 11 9.8 0.96 1 2 1.92
40*40*2.5 0.85 9.8 8.6 0.85 1 2 1.7
Vertical truss 40*40*2.5 0.73 8.6 7.4 0.73 1 2 1.46
member 40*40*2.5 0.61 7.4 6.2 0.61 1 2 1.22
40*40*2.5 0.49 6.2 5 0.49 1 2 0.98
40*40*2.5 0.37 5 3.8 0.37 1 2 0.74
40*40*2.5 0.26 3.8 2.6 0.26 1 2 0.52
2 T-2 2 40*40*2.5 0.14 2.6 1.4 0.14 1 2 0.28
40*40*2.5 1.62 1.61 1 2 3.22
40*40*2.5 1.54 1.54 1 2 3.08
40*40*2.5 1.47 1.47 1 2 2.94
40*40*2.5 1.40 1.4 1 2 2.8
Diagonal member 40*40*2.5 1.35 1.37 1 2 2.74
40*40*2.5 1.30 1.3 1 2 2.6
40*40*2.5 1.26 1.26 1 2 2.52
40*40*2.5 1.23 1.23 1 2 2.46
40*40*2.5 1.21 1.21 1 2 2.42
40*40*2.5 1.20 1.2 1 2 2.4
40*40*2.5 0.96 6 4.8 0.96 2 4 3.84
Vertical truss
40*40*2.5 0.72 4.8 3.6 0.72 2 4 2.88
member
40*40*2.5 0.48 3.6 2.4 0.51 2 4 2.04
3 T-3 2 40*40*2.5 0.24 2.4 1.2 0.26 2 4 1.04
40*40*2.5 1.54 1.54 2 4 6.16
40*40*2.5 1.40 1.4 2 4 5.6
Diagonal member
40*40*2.5 1.29 1.3 2 4 5.2
40*40*2.5 1.22 1.23 2 4 4.92
40*40*2.5 1.20 1.2 1 2 2.4
Vertical truss 40*40*2.5 0.91 5 3.8 0.91 2 4 3.64
member 40*40*2.5 0.62 3.8 2.6 0.62 2 4 2.48
4 T-4 2 40*40*2.5 0.34 2.6 1.4 0.34 2 4 1.36
40*40*2.5 1.51 1.51 2 4 6.04
Diagonal member 40*40*2.5 1.35 1.35 2 4 5.4
40*40*2.5 1.25 1.25 2 4 5
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE

Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
40*40*2.5 1.20 1.2 1 2 2.4
40*40*2.5 1.03 8.25 7.05 1.03 1 2 2.06
40*40*2.5 0.85 7.05 5.85 0.85 1 2 1.7
Vertical truss
40*40*2.5 0.68 5.85 4.65 0.68 1 2 1.36
member
40*40*2.5 0.50 4.65 3.45 0.5 1 2 1
40*40*2.5 0.33 3.45 2.25 0.33 1 2 0.66
5 T-5 2 40*40*2.5 0.15 2.25 1.05 0.15 1 2 0.3
40*40*2.5 1.58 1.58 1 2 3.16
40*40*2.5 1.47 1.47 1 2 2.94
40*40*2.5 1.38 1.38 1 2 2.76
Diagonal member
40*40*2.5 1.30 1.3 1 2 2.6
40*40*2.5 1.24 1.24 1 2 2.48
40*40*2.5 1.21 1.21 1 2 2.42
40*40*2.5 1.20 1.2 1 1 1.2
40*40*2.5 0.96 6 4.8 0.91 1 1 0.91
Vertical truss
40*40*2.5 0.72 4.8 3.6 0.62 1 1 0.62
member
40*40*2.5 0.48 3.6 2.4 0.62 1 1 0.62
6 T-6 1
40*40*2.5 0.24 2.4 1.2 0.34 1 1 0.34
40*40*2.5 1.54 1.51 1 1 1.51
Diagonal member 40*40*2.5 1.40 1.35 1 1 1.35
40*40*2.5 1.29 1.25 1 1 1.25
Vertical truss 40*40*2.5 1.20 1.2 1 1 1.2
member 40*40*2.5 0.96 6 4.8 0.91 1 1 0.91
7 T-3' 1
40*40*2.5 1.54 1.51 1 1 1.51
Diagonal member
40*40*2.5 #NAME? 1.35 1 1 1.35
Total in m 182.86
Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member

Bottom truss
1 T-1 3 member 60*40*3 10.2 10.6 1 3 31.8
Top truss member 60*40*3 10.27 10.7 1 3 32.1
Bottom truss
2 T-2 2 member 60*40*3 12.40 12.207 1 2 24.414
Top truss member 60*40*3 12.46 12.66 1 2 25.32
Bottom truss
3 T-3 2 member 60*40*3 12.2 12.6 1 2 25.2
Top truss member 60*40*3 6.22 12.82 1 2 25.64
Bottom truss 21.24
4 T-4 2 member 60*40*3 10.2 10.62 1 2
Top truss member 60*40*3 5.24 10.88 1 2 21.76
Bottom truss
5 T-5 2 member 60*40*3 8.45 8.7 1 2 17.4
Top truss member 60*40*3 8.54 8.25 1 2 16.5
Bottom truss
6 T-6 1 member 60*40*3 12.2 5.3 1 1 5.3
Top truss member 60*40*3 6.22 5.43 1 1 5.43
Bottom truss
6 T-3' 1 member 60*40*3 12.2 3.17 1 1 3.17
Top truss member 60*40*3 6.22 3.39 1 1 3.39
Total in m 258.66

Total
No.of
Purlin LATTICE Length .of
Descreption Type of Purlin Cross-section Length (m) Purlin
memeber PURLIN NO. Purlin
member
member
Lattice Purlin P-1 TOP 30*30*2.5 1 6.40 10 64.00
B/n axis A - B & 2 - 4
Lattice Purlin P-1 BOTTOM 30*30*2.5 1 6.30 10 63.00
Lattice Purlin P-2 TOP 30*30*2.5 2 6.08 10 60.80
B/n axis B - C & 2 - 4
Lattice Purlin P-2 BOTTOM 30*30*2.5 2 5.98 10 59.80
Lattice Purlin P-3 TOP 30*30*2.5 3 0.95 1 0.95
B/n axis C - D & 2 - 4
Lattice Purlin P-3 BOTTOM 30*30*2.5 3 0.85 1 0.85
Lattice Purlin P-4 TOP 30*30*2.5 4 1.65 1 1.65
B/n axis C - D & 2 - 4
Lattice Purlin P-4 BOTTOM 30*30*2.5 4 1.55 1 1.55
Lattice Purlin P-5 TOP 30*30*2.5 5 2.35 1 2.35
B/n axis C - D & 2 - 4
Lattice Purlin P-5 BOTTOM 30*30*2.5 5 2.25 1 2.25
Lattice Purlin P-6 TOP 30*30*2.5 6 3.05 1 3.05
B/n axis C - D & 2 - 4
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE

Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
B/n axis C - D & 2 - 4
Lattice Purlin P-6 BOTTOM 30*30*2.5 6 2.95 1 2.95
Lattice Purlin P-7 TOP 30*30*2.5 7 3.75 1 3.75
B/n axis C - D & 2 - 4
Lattice Purlin P-7 BOTTOM 30*30*2.5 7 3.65 1 3.65
Lattice Purlin P-8 TOP 30*30*2.5 8 4.45 1 4.45
B/n axis C - D & 2 - 4
Lattice Purlin P-8 BOTTOM 30*30*2.5 8 4.35 1 4.35
Lattice Purlin P-9 TOP 30*30*2.5 9 5.15 1 5.15
B/n axis C - D & 2 - 4
Lattice Purlin P-9 BOTTOM 30*30*2.5 9 5.05 1 5.05
Lattice Purlin P-10 TOP 30*30*2.5 10 5.85 1 5.85
B/n axis C - D & 2 - 4
Lattice Purlin P-10 BOTTOM 30*30*2.5 10 5.75 1 5.75
Lattice Purlin P-11 TOP 30*30*2.5 11 6.10 1 6.10
B/n axis E - F & 2 - 4
Lattice Purlin P-11 BOTTOM 30*30*2.5 11 6.00 1 6.00
Lattice Purlin P-12 TOP 30*30*2.5 12 6.40 11 70.40
B/n axis E - F & 2 - 4
Lattice Purlin P-12 BOTTOM 30*30*2.5 12 6.30 11 69.30
Lattice Purlin P-13 TOP 30*30*2.5 13 1.58 1 1.58
B/n axis D - E & 2 - 3
Lattice Purlin P-13 BOTTOM 30*30*2.5 13 1.48 1 1.48
Lattice Purlin P-14 TOP 30*30*2.5 14 3.03 1 3.03
B/n axis D - E & 2 - 3
Lattice Purlin P-14 BOTTOM 30*30*2.5 14 2.93 1 2.93
Lattice Purlin P-15 TOP 30*30*2.5 15 4.49 1 4.49
B/n axis D - E & 2 - 3
Lattice Purlin P-15 BOTTOM 30*30*2.5 15 4.39 1 4.39
Lattice Purlin P-16 TOP 30*30*2.5 16 6.21 1 6.21
B/n axis D - E & 2 - 3
Lattice Purlin P-16 BOTTOM 30*30*2.5 16 6.11 1 6.11
Lattice Purlin P-17 TOP 30*30*2.5 17 6.21 6 37.26
B/n axis D - E & 3 - 4
Lattice Purlin P-17 BOTTOM 30*30*2.5 17 6.11 6 36.66
Total in m 557.14
Total
No.of
Purlin LATTICE Length .of
Descreption Type of Purlin Cross-section Length (m) Purlin
memeber PURLIN NO. Purlin
member
member
Lattice Purlin P-18 TOP 30*30*2.5 18 7.4 12 88.80
B/n axis C - E & 1 - 2
Lattice Purlin P-18 BOTTOM 30*30*2.5 18 7.3 12 87.60
Lattice Purlin P-19 TOP 30*30*2.5 19 1.10 1 1.10
B/n axis D - E & 2 - 3
Lattice Purlin P-19 BOTTOM 30*30*2.5 19 1.00 1 1.00
Lattice Purlin P-20 TOP 30*30*2.5 20 2.17 1 2.17
B/n axis D - E & 2 - 3
Lattice Purlin P-20 BOTTOM 30*30*2.5 20 2.07 1 2.07
Lattice Purlin P-21 TOP 30*30*2.5 21 3.16 1 3.16
B/n axis D - E & 2 - 3
Lattice Purlin P-21 BOTTOM 30*30*2.5 21 3.06 1 3.06
Lattice Purlin P-22 TOP 30*30*2.5 22 4.15 1 4.15
B/n axis D - E & 2 - 3
Lattice Purlin P-22 BOTTOM 30*30*2.5 22 4.05 1 4.05
Lattice Purlin P-23 TOP 30*30*2.5 23 5.30 2 10.60
B/n axis C - D & 2 - 3
Lattice Purlin P-23 BOTTOM 30*30*2.5 23 5.20 2 10.40
Lattice Purlin P-24 TOP 30*30*2.5 24 5.30 2 10.60
B/n axis C - D & 2 - 3
Lattice Purlin P-24 BOTTOM 30*30*2.5 24 5.20 2 10.40
Lattice Purlin P-25 TOP 30*30*2.5 25 4.15 1 4.15
B/n axis C - D & 2 - 3
Lattice Purlin P-25 BOTTOM 30*30*2.5 25 4.05 1 4.05
Lattice Purlin P-26 TOP 30*30*2.5 26 1.50 1 1.50
B/n axis C - D & 3 - 4
Lattice Purlin P-26 BOTTOM 30*30*2.5 26 1.40 1 1.40
Lattice Purlin P-27 TOP 30*30*2.5 27 5.25 1 5.25
B/n axis C - D & 3 - 4
Lattice Purlin P-27 BOTTOM 30*30*2.5 27 5.15 1 5.15
Lattice Purlin P-28 TOP 30*30*2.5 28 3.16 1 3.16
B/n axis C - D & 3 - 4
Lattice Purlin P-28 BOTTOM 30*30*2.5 28 3.06 1 3.06
Lattice Purlin P-29 TOP 30*30*2.5 29 1.10 1 1.10
B/n axis C - D & 3 - 4
Lattice Purlin P-29 BOTTOM 30*30*2.5 29 1.00 1 1.00
B/n axis C - D On Lattice Purlin P-30 TOP 30*30*2.5 30 1.45 6 8.70
cantiliver Lattice Purlin P-30 BOTTOM 30*30*2.5 30 1.35 6 8.10
Total in m 285.78
Total
No.of
Purlin LATTICE Length .of
Descreption Type of Purlin Cross-section Length (m) Purlin
memeber PURLIN NO. Purlin
member
member
B/n axis A - B & 2 - 4 Lattice Purlin P-1 Diagonal Ø16 1 0.36 315 113.40
B/n axis B - C & 2 - 4 Lattice Purlin P-2 Diagonal Ø16 2 0.36 299 107.64
B/n axis B - C & 2 - 4 Lattice Purlin P-3 Diagonal Ø16 3 0.36 4 1.53
B/n axis C - D & 2 - 4 Lattice Purlin P-4 Diagonal Ø16 4 0.36 8 2.79
B/n axis C - D & 2 - 4 Lattice Purlin P-5 Diagonal Ø16 5 0.36 11 4.05
B/n axis C - D & 2 - 4 Lattice Purlin P-6 Diagonal Ø16 6 0.36 15 5.31
B/n axis C - D & 2 - 4 Lattice Purlin P-7 Diagonal Ø16 7 0.36 18 6.57
B/n axis C - D & 2 - 4 Lattice Purlin P-8 Diagonal Ø16 8 0.36 22 7.83
B/n axis C - D & 2 - 4 Lattice Purlin P-9 Diagonal Ø16 9 0.36 25 9.09
B/n axis C - D & 2 - 4 Lattice Purlin P-10 Diagonal Ø16 10 0.36 29 10.35
B/n axis E - F & 2 - 4 Lattice Purlin P-11 Diagonal Ø16 11 0.36 30 10.80
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE

Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
B/n axis E - F & 2 - 4 Lattice Purlin P-12 Diagonal Ø16 12 0.36 347 124.74
B/n axis D - E & 2 - 3 Lattice Purlin P-13 Diagonal Ø16 13 0.36 7 2.66
B/n axis D - E & 2 - 3 Lattice Purlin P-14 Diagonal Ø16 14 0.36 15 5.27
B/n axis D - E & 2 - 3 Lattice Purlin P-15 Diagonal Ø16 15 0.36 22 7.90
B/n axis D - E & 2 - 3 Lattice Purlin P-16 Diagonal Ø16 16 0.36 31 11.00
B/n axis D - E & 3 - 4 Lattice Purlin P-17 Diagonal Ø16 17 0.36 183 65.99
B/n axis C - E & 1 - 2 Lattice Purlin P-18 Diagonal Ø16 18 0.36 438 157.68
B/n axis D - E & 2 - 3 Lattice Purlin P-19 Diagonal Ø16 19 0.36 5 1.80
B/n axis D - E & 2 - 3 Lattice Purlin P-20 Diagonal Ø16 20 0.36 10 3.73
B/n axis D - E & 2 - 3 Lattice Purlin P-21 Diagonal Ø16 21 0.36 15 5.51
B/n axis D - E & 2 - 3 Lattice Purlin P-22 Diagonal Ø16 22 0.36 20 7.29
B/n axis C - D & 2 - 3 Lattice Purlin P-23 Diagonal Ø16 23 0.36 52 18.72
B/n axis C - D & 2 - 3 Lattice Purlin P-24 Diagonal Ø16 24 0.36 52 18.72
B/n axis C - D & 3 - 4 Lattice Purlin P-25 Diagonal Ø16 25 0.36 20 7.29
B/n axis C - D & 2 - 3 Lattice Purlin P-26 Diagonal Ø16 26 0.36 7 2.52
B/n axis C - D & 3 - 4 Lattice Purlin P-27 Diagonal Ø16 27 0.36 26 9.27
B/n axis C - D & 3 - 4 Lattice Purlin P-28 Diagonal Ø16 28 0.36 15 5.51
B/n axis C - D & 3 - 4 Lattice Purlin P-29 Diagonal Ø16 29 0.36 5 1.80
B/n axis C - D On Lattice Purlin P-30 Diagonal Ø16 30
cantiliver 0.36 41 14.58
Total in m 751.34

Cross-
Item no. Structuere mamber section Total length of RHS Weight per Total
meter weight(kg)
(mm)
1 Truss 60*40*3 258.66 4.43 1145.88
2 Truss 40*40*2.5 182.86 2.9 530.29
3 purlin 30*30*2.5 842.92 2.14 1803.85
4 Total purlin (Rebar) Ф16 751.34 1.579 1186.36
Total weight 3480.02
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of

8.GLAZING
item Description unit Qty Area in m2
Door

a) Type D1=size1.2*2.10m Pcs 1.00 2.52


b) Type D3=size 0.7x2.10m Pcs 2.00 2.94
Windows
a) Type W1=size 1.5*1.5m Pcs 40.00 90.00
b) Type w2=size 0.9*0.6m Pcs 14.00 6.72
c)Type W3- size 1.7*1.5m Pcs 19.00 39.90
Sliding door
a) Type SLD1=size 2.2x2.70m Pcs 20.00 118.80
curtain wall
a) Type CW1=size 0.7x2.70m Pcs 20.00 37.80
b) Type CW2=size 1.2x2.7m Pcs 20.00 64.80
c) Type CW3=size 2.6x2.7m Pcs 20.00 54.00
d) Type CW3=size 2.5x2.7m Pcs 11.00 74.25
Total area 417
STANDARD TAKE OFF SHEET STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc. Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of Location :-Addis Ababa Page of

TIM DIMN. TOTAL DESCRIPTION TIM DIMN. TOTAL DESCRIPTION

9.PAINTING 9.PAINTING
9.01.Quartz Paint to External Plastering Wall 9.01.Quartz Paint to Internal Plastering Wall
b.To External wall surface b.To Internal wall surface
on Ground floor on Ground floor
1 14.4 Along axis A b/n 1`&3` 2 16.29 Along axis A b/n 1`&3`
2.7 2.7
38.88 87.97
1 20.5 Along axis 1` b/n A-D 1 8.13 Along axis 1` b/n A-D
2.7 2.7
55.35 21.95
1 15.6 on axis D b/n 2-4 1 5.7 on axis C b/n 1`-2`
2.7 2.7
42.12 15.39
1 21.1 on axis3 b/n A-D 1 10.7 on axis2 b/n A`-C
2.7 2.7
56.97 28.89
1 -1.5 - 1 -3.2 -
1.5 - 1.5 -
(2.25) (4.80)
1 -0.9 - 1 -0.9 -
0.6 - 0.6 -
(0.54) (0.54)
190.53 1 -1.3 -
First floor 2.1 -
1 12.72 on axis 1` b/n A`-D (2.73)
2.7 1 -0.7 -
34.3 2.1 -
1 14.8 on axis 3 b/n A`-D (1.47)
2.7 -
39.96 -
1 9.13 on axis A b/n 1-3 -
2.7 -
24.7 144.66
1 9.15 on axis D b/n 1-3 First floor
2.7 1 12.6 on axis 1` b/n A`-D
24.71 2.7
4 -1.5 - 34.0
1.5 - 1 15.6 on axis 3 b/n A`-D
(9.00) 2.7
2 -0.9 - 42.12
0.6 - 1 9.13 on axis A b/n 1-3
(1.08) 2.7
2 -1.4 - 24.7
1.5 - 1 9.15 on axis D b/n 1-3
(4.20) 2.7
109.4 24.71
4 Third,Fifth,Seventh,and Ninth Typical floor 1 22.29 - on axis 2 b/n A-D
11.15 on axis A b/n 1-3 2.7 -
2.7 60.18
4 120.42 on axis 1` b/n A-D 2 14.8 - on axis 2-3 b/n A-D
12.73 - 2.7 -
2.7 - 79.92
4 137.48 2 2.6 -
9.1 - on axis D` b/n 1-3 2.7 -
2.7 - 14.04
4 98.28 2 3.2 -
16.68 - on axis 3 b/n A-D 2.7 -
2.7 - 17.28
180.14 2 4.58 -
4 -0.9 - 2.7 -
0.6 - 24.73
(2.16) 2 5.5 -
16 -1.5 - 2.7 -
1.5 - 29.70
(36.00) 2 4.18 -
8 -1.7 - 2.7 -
1.5 - 22.57
(20.40) 2 2.55 -
477.77 2.7 -
5 - Second,forth ,sixth ,Eighith and Tenth typical 13.77
12.8 - 2 5.2 -
2.7 - on axis 1 b/n A-D` 2.7 -
5 172.80 28.08
11.15 - on axis A b/n 1-3 2 4.7 -
2.7 - 2.7 -
5 150.53 25.38
9.23 - on axis D b/n 1-3 2 -0.8 -
2.7 - 2.1 -
5 124.61 (3.36)
16.34 - on axis 3 b/n A-D 2 -1.3 -
2.7 - 2.1 -
220.59 (5.46)
10 -0.9 - 2 -0.7 -
0.6 - 2.1 -
(5.40) (2.94)
20 -1.5 - 4 -1.5 -
1.5 - 1.5 -
(45.00) (9.00)
10 -1.7 - 2 -0.9 -
1.5 - 0.6 -
(25.50) (1.08)
592.62 2 -1.4 -
1 For Water Tanker 1.5 -
24.78 (4.20)
1.9 415.1
47.08 M2 Total water tanker Quartz Paint 3 Third,Fifth,Seventh Typical floor
47.08 m2 Total Quartz Paint 11.15 on axis A b/n 1-3
2.7
3 90.32 on axis 1` b/n A-D
12.73 -
2.7 -
3 103.11
9.1 - on axis D` b/n 1-3
2.7 -
3 73.71
16.68 - on axis 3 b/n A-D
2.7 -
135.11
6 -0.9 -
0.6 -
(3.24)
12 -1.5 -
1.5 -
(27.00)
28 -1.4 -
1.5 -
(58.80)
2 35.35 -
2.7 -
190.89
2 28.22 -
2.7 -
152.39
12 -1.35 -
2.1 -
(34.02)
36 -0.8 -
2.1 -
(60.48)
24 -0.7 -
2.1 -
(35.28)
526.70
4 - Second,forth ,sixth ,Eighith and Tenth typical
12.8 -
2.7 - on axis 1 b/n A-D`
4 138.24
11.15 - on axis A b/n 1-3
2.7 -
4 120.42
9.23 - on axis D b/n 1-3
2.7 -
4 99.68
16.34 - on axis 3 b/n A-D
2.7 -
176.47
10 -0.9 -
0.6 -
(5.40)
20 -1.5 -
1.5 -
(45.00)
20 -1.4 -
1.5 -
(42.00)
10 35.35 -
2.7 -
954.45
10 28.22 -
2.7 -
761.94
20 -1.35 -
2.1 -
(56.70)
50 -0.8 -
2.1 -
(84.00)
45 -0.7 -
2.1 -
(66.15)
1,951.96
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa

TIM DIMN. TOTAL DESCRIPTION

5. Metal Work

HandRail

high quality Glass Railling For Balcony

First Floor -10th Floor

20 2
0.9
36 m2

20 2.6
0.9
46.8 m2
20 1.55
0.9
27.9

110.7 m2 Total #

B.For Roof concrete


Total perimeter =73.7
1 73.7
0.90
66.285
66.285 m Total area of handrail
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa

TIM DIMN. TOTAL DESCRIPTION


STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALAHADIN
Location :-Addis Ababa Page of

12.ALUMINUM

item Description unit Qty Area in m2


Door

a) Type D1=size1.2*2.10m Pcs 1.00 2.52


b) Type D3=size 0.7x2.10m Pcs 2.00 2.94
Windows
a) Type W1=size 1.5*1.5m Pcs 40.00 90.00
b) Type w2=size 0.9*0.6m Pcs 14.00 6.72
c)Type W3- size 1.7*1.5m Pcs 19.00 39.90
Sliding door
a) Type SLD1=size 2.2x2.70m Pcs 20.00 118.80
curtain wall
a) Type CW1=size 0.7x2.70m Pcs 20.00 37.80
b) Type CW2=size 1.2x2.7m Pcs 20.00 64.80
c) Type CW3=size 2.6x2.7m Pcs 20.00 54.00
d) Type CW3=size 2.5x2.7m Pcs 11.00 74.25
Total area 417
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
A.SITE WORK
1.EXCAVATION AND EARTH WORK
1.1 Trench Excavation
1 6 total perimeter=6
1 W= 0.5+0.25*2=1
1.5 H=1.5
9.00 m3
9.00 Total volume of treanch up to 1.5m in m3
1.2 Back fill Around masonary wall
1 6
0.5
1.5
4.50 m3
4.50 Total volume of back fill around masonary wall in m3
1.3 cart away
4.50 total volume of excavation
4.50 Total volume of cart away in m3
1.4 hardcore
1 2.884
14.34
41.36 m2
1 1.875
5.3
9.94 m2
1 3.2
1.92
6.14 m2
57.44 Total area of hardcore in m2
1.5 Masonary wall
1 6 total perimeter=6
0.6 W= 0.5+0.25*2=1
1.5 H=1.5
5.40 m3
5.40 Total volume of masonary wall in m3
1.6 concrete
1 2.884
14.34
41.36 m2
1 1.875
5.3
9.94 m2
1 3.2
1.92
6.14 m2
57.44 Total area of concrete in m2
1.7 formwork
1 0.25 Sponda
19.144
4.79 m2
12 0.15 riser
2.884
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
5.19 m 2

6 0.15
3.2
2.88 m2
12.86 Total area of formwork in m2
1.8 marble ff
1 2 Landing
2.884
5.77 m2
1 2.884
3.2
9.23 m2
1 4.759
5.3
25.22 m2
40.22 Total area of marble in m2
6 3.2 Tread
19.20 ml
12 2.884
34.61 ml
53.81 Total length of marble in ml
6 3.2 riser
19.20 ml
13 2.884
37.49 ml
56.69 Total length of marble in ml
B. FENCE WORK
2.EXCAVATION AND EARTH WORK
2.1 Trench Excavation
1 35.5 total perimeter==17.2+18.3=35.5
1 W= 0.5+0.25*2=1
1 H=1.0
35.50 m3
35.50 Total volume of treanch up to 1.5m in m3
2.2 Back fill Around masonary wall
1 35.5
0.5
1
17.75 m3
17.75 Total volume of back fill around masonary wall in m3
2.3 cart away
17.75 total volume of excavation
17.75 Total volume of cart away in m3
2.4 Masonary wall
1 35.5 total perimeter=35.5
0.5 W= 0.5+0.25*2=1
1 H=1.0
17.75 m3
17.75 Total volume of masonary wall in m3
2.5 concrete
1 0.2 beam
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
0.5
35.5
3.55 m3
10 0.25 column
0.3
3
2.25 m3
5.80 Total volume of concrete in m3
2.6 formwork
2 0.2 Beam Sponda
17.2
6.88 m2
2 0.2 Beam Sponda
18.3
7.32 m2
10 1.1
3
33.00 m2
47.20 Total area of formwork in m2
2.7 20cm thick HCB WALL
1 3 rear side
17.2
51.60 m2
-5 0.3 deduct column
3
-4.50 m2
1 18.3 front side
3
54.90 m2
-5 0.3 deduct column
3
-4.50 m2
-1 6 deduct main gate
3
-18.00 m2
-1 1.2 deduct secondary gate
3
-3.60 m2
75.90 Total area of HCB wall in m2
2.8 Plastering
2 3 rear side
17.2
103.20 m2
2 18.3 front side
3
109.80 m2
-10 0.3 deduct column
3
-9.00 m2
-2 6 deduct main gate
3
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
-36.00 m2

-2 1.2 deduct secondary gate


3
-7.20 m2
160.80 Total area of Plastering in m2
2.9 10cm thick copping
1 17.2 rear side
17.20 ml
1 18.3 front side
18.30 ml
-1 6 deduct main gate
-6.00 ml
-1 1.2 deduct secondary gate
-1.20 ml
28.30 Total length of copping in ml