A. Sub Structure
1 Excavation and Earth Work -
2 Concrete Work #REF!
3 Masonry Work #REF!
B-SUPER STRUCTURE
1 Concrete Work #REF!
2 Block Work #REF!
3 Roofing Work #REF!
4 Carpentry Work Err:509
5 Metal Work #REF!
6 Finishing Work #REF!
7 Glazing Work #REF!
8 Painting Work #REF!
9 Electrical Installation #REF!
10 Sanitary Installation #REF!
ETG Designers and Consultants Plc. 1 of 141 666044717.xlsx (BOG G+4 (2))
SUMMERY OF STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa
A. SUB STRUCTURE
B. SUPER STRUCTURE
6 FINISHING Birr
7 GLAZING Birr
8 PAINTING Birr
Generator
3rd party cirtified from internationally recognized
institutions.
6 - 25 6
32 - 63 10
80 - 1000 35
1250 - 3000 45
Distribution Boards
1.7 Cables
1.7.1 2x2.5 mm sq.light m 1689.49
1.7.4 3x2.5 mm sq. socket m 667.91
1.7.5 3x4 mm sq.water hater m 171
1.7.6 5x10 mm sq. SDB m 339.2
1.7.7 (3x240/120+1x120) Sq.mm m
Horizontal Cabling
1.9.2 RJ 45 8 contact data socket out let points to for
flush mounting in thermoplastic conduit of 21mm
with appropriate type junction box fed by standard
(CAT 6A UTP data cable) for 10/100 base internet
with RJ 45 connector plug to be fixed on patch panel
data transfer rate of min.100Mbs and the necessary
accessories to make the system complete. No
1.11 TV System
1.11.1 TV points fed through twin flat TV cables inside rigid PVC
conduits of 20mm diameter including junction boxes with
covers, insulating screw cap connectors , and flush
mounted terminal.
No 14.00
1.11.2 TV outlets No 14.00
1.11.3 A complete smatv system ps 1.00
2.02 Ditto as Item 2.01 but 15cm thick HCB wall m2 1,710.90
m2 218.50
Supply and apply Cementitious damp proofing
3.01 material strictly following manufacturers
instruction.
a)Concrete retaining wall m2 197.85
TOTAL CARRIED TO SUMMARY...................................
DOOR
Page 13 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
7.GLAZING
WINDOW
a) Type W1=size 1400x1500mm No 14.00
b) Type W2=size 900x1000mm No 28.00
c) Type W3=size 1500x1500mm No 28.00
d) Type W4=size 3270x1500mm No 8.00
DOOR
e) Type D1=size 1350x2100mm No 12.00
f) Type D2=size 900x2100mm No 60.00
CURTAIN WALL
h) Type CW1=size 700x2700mm No 14.00
i) Type CW1=size 1000x2700mm No 14.00
Hand Rail & Guard Rail
A.For slab opening & terrace ( supply & fix best
quality approved type of Alumunem handrail for stair
case) m2 55.59
1.05
WASTE WATER COLLECTION AND
VENTILATION
Supply & Install Waste water drainage uPVC
pipes complete with connecting pieces, fittings,
anchors, fixing or hanging elements to slabs,
floors, beams,… adaptors, bends, Y's, T's,
cleanouts &/or other necessary accessories. The
pipes shall be provided with a minimum slope
of 2% towards the flow direction and shall be
hanged 100mm below slab soffit. All Internal
uPVC pipes shall conform to DIN 1953/ or
equivalent for foul & venting pipes below
diameter 80mm and BS 4514:1983 or
equivalent for above or equal to diameter 80mm
Price shall50mm
Diameter also include Roding access ml 101.60
provisions, sleeves, etc as where required.
Diameter 110mm ml 250.65
1.08 MANHOLE
Construct manholes for sanitary sewer lines
with double brick wall and internally plastered,
on 100 mm thick mass concrete base and 100
mm thick reinforced concrete cover with handle.
Size: as per indicated in the drawing.
Page 18 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
No 9.00
SANITARY FIXTURES
10.9
WATER CLOSET
Supply and install low level water closet
conforming to BS 3402 and comprising. White
glazed vitreous china WC with 9 liters capacity
white vitreous china flushing cistern with cover,
built S-trap, chrome plated fitment, fixing
screws, high impact resistant solid plastic seat
and cover with plastic hinges, and all required
accessories.
No 40.00
FLOOR DRAIN
Supply and fix Ф50mm enameled cast Iron
Floor Drain ,conform to ASME Standard ,
A112.6.3 (Light Duty)or equivalent institution
complete with P-smell trap
No 60.00
Page 19 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
SOAP HOLDER
Supply and fix soap holder in white vitreous
china Complete with the necessary fixing and
other accessories for showers.
No 80.00
CRYSTAL GLASS MIRROR
Supply and fix crystal glass mirrors for toilets
hand wash basins with copper back protection,
size 500/400 mm including chrome plated
brass mirror clips with chrome plated screws
and etc..
No 40.00
WATER HEATER
Supply and install 50lt electric water heater of
approved quality and including safety valve, non
return valves, control panel and all required
accessories as per manufacturers
recommendation. Storage capacity:
No 40.00
TOWEL HUNGER
Supply and fix standard towel hanger RAK or
equivalent made of chrome plated tabular
metal rollers including fastening screws and
the necessary accessories.
No 80.00
SHOWER HEAD
Supply and fix approved standard shower unit
made of shwer tray with 8mm thick tempered
glass braced and supported by alumnium
structure
No 20.00
Bath tab
Supply and install high qualty Bath tab.
Complete with all accessories. Accessories shall
be subjected to Engineers approval.
No 20.00
TOILET PAPER HOLDER
Supply and fix toilet roll paper holder in white
vitreous china of approved standard, concealed
fixing and white plastic tubular roller including
fixing screws with overall dimension.
Page 20 of 141
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF B+G+10 APARTMENT
Location :-Addis Ababa
No 40.00
KITCHEN SINK
Supply and fix heavy duty stainless steel Sink
single bowel, with board complete with trap,
drain connection, drainage and over flow, heavy
duty mixing faucet, plug, chain, etc. and all other
necessary accessories
SEPTIC TANK
Construct septic tank as per the detail drawing.
The price includes all excavation, cartaway,
reinforced concrete work, piping work & include
all assistance civil works.
LS 1.00
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
A.SUB STRUCTURE
1.EXCAVATION AND EARTH WORK
1.01 site clearing
1 21.47 L=19.47+2=21.47
17.55 W=15.55+2=17.55
376.80 m2
376.80 Total area of site clearing in m2
1.2 bulk excavation
1.2.1 Ordinary soil
up to 1.5m
L=19.47+2=21.47
1 21.47 W=15.55+2=17.55
17.55 D=1.5
1.5
565.20 m3
1 21.47 L=19.47+2=21.47
17.55 W=15.55+2=17.55
1.5 D=1.5
565.20
1 21.47 L=19.47+2=21.47
17.55 W=15.55+2=17.55
1.3 D=1.2
489.84
1620.23 Total volume of bulk up to 1.5m in m3
1620.23 Total volume of Bulk excavation
1.3 Back fill Around foundation pad
Total volume of pit up to 1.5m in m3
working space =0.5m, Deduct foundation pad
1 16.54 For mat Beam 1`
1.5
0.4
9.92 m3
1 16.69 - Mat Beam 1
1.5 -
0.5 -
12.52 m3
1 17.14 - Mat Beam 2
1.5 -
0.5 -
12.86 m3
1 17.84 - Mat Beam 3
1.5 -
0.5 -
13.38 m3
1 14.88 - Mat Beam 4
1.5 -
0.8 -
17.85 m3
1 13.54 - Mat Beam 5
1.5 -
0.5 -
10.16
1 13.69 - Mat Beam 6
1.5 -
0.5 -
10.27
1 13.88 - Mat Beam 7
1.5 -
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
0.5 -
10.41
1 14.09 - Mat Beam 8
1.5 -
0.5 -
10.57
1 12.6 - Mat Beam 9
1.5 -
0.4 -
7.56
-
-
-
-
-
115.49 Total Mat BEamvolume
Mat Slab Foundation
1 13
0.5
6.50 m3
1 10.8 -
0.5 -
5.40
1 14.9 - m3
0.5 -
7.45
1 5.2 -
0.5 - m3
2.60
1 14.7 -
0.5 -
7.35 m3
1 4.8 -
0.5 -
2.40
1 14.8 -
0.5 -
7.40
1 6.3 -
0.5 -
3.15
1 6.3 -
0.5 -
3.15
1 29.3 -
0.5 -
14.65
1 22.5 -
0.5 -
11.25
1 29.1 -
0.5 -
14.55
1 16 -
0.5 -
8.00
1 6.8 -
0.5 -
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
3.40
1 5.2 -
0.5 -
2.60
1 6.8 -
0.5 - m3
3.40
-
-
103.25 Total volume ofMat Slab
1401.49 Total volume of back fill around foundation in m3
1516.98
-
6 260.04 Total volume of cart away in m3
1.6 hardcore
1 13
13.00 m3
1 10.8 -
10.80
1 14.9 - m3
14.90
1 5.2 -
5.20
1 14.7 -
14.70 m3
1 4.8 -
4.80
1 14.8 -
14.80
1 6.3 -
6.30
1 6.3 -
6.30
1 29.3 -
29.30
1 22.5 -
22.50
1 29.1 -
29.10
1 16 -
16.00
1 6.8 -
6.80
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 5.2 -
5.20
1 6.8 -
6.80
-
-
-
206.50 Total volume of back fill under hardcore in m3
206.50 Total area of hardcore in m2
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
1 16.48 - BB4
0.3 -
0.4 -
1.98
1 16.96 - BB3
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
Staire case
1 4.2 Landing
1 1.2 -
0.16 -
-
0.77
2 1.2
1.2
0.6
1.728
1 0.09 Step
1.2
0.11
1 0.315
1.2
0.38
Sofit
8 1.2
1.38
0.16
2.12
8 1.2 -
2.64 -
0.16 -
4.06
8 1.2 -
2.68 -
0.16 -
4.12
15.22 m2 Total area of Basement floor step concrete
basment Stair case
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
4 2.6 C1
2.3
23.92 m3
3 2.8 - C2,C3
2.3 -
19.32 m3
6 3 - C4,C6
2.3 -
41.40 m3
2 3.2 - C5
2.3 -
14.72
8 1.6 - C7
2.3 -
29.44
128.80
128.80
1 283
283 Ground floor slab Playewood
1 20.04
16.05
321.642 Form work for retaining wall
STAIR CASE FORM WORK
1 4.2 Area of landing
1.15
4.83
2 1.2
1.2
2.88 Step
14 1.2 Rizer
16.8
4 1.2
4.8
2 1.2 Soffit
2.1
5.04
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
B.SUPER STRUCTURE
1. CONCRETE WORK
1.01 REINFORCED CONCRETE C- 30
a. In elevation Column
Ground Floor column
6 0.9 C1 and C2
0.4
3
6.48 m3
3 1 C3 and C6
0.4
3
3.60 m3
3 1 C4 and C5
0.5
3
4.50 m3
8 0.5 C7
0.3
3
3.60 m3
10.08 total in m3
First Floor column
8 0.9 C1,C2 and C6
0.4
2.6
7.49
2 1 C3 and C4
0.4
2.6
2.08
2 1 C5
0.5
2.6
2.60
12.17 m3 (Total Volume of Concrete Work )
Second Floor floor
6 0.9 C1 and C2
0.3
2.6 -
4.21 m3
2 0.9 - C3 and C4
0.4
2.6
1.87
2 1 C5
0.4
2.6
2.08
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2 0.8 C6
0.4
2.6
1.66
9.83 Total Volume OF Second Floor Colum
Third Floor
6 0.9 C1.C2
0.3
2.6
4.21
4 0.8 C3,C4 and C6
0.4
2.6
3.33
2 1 C5
0.4
2.6 -
2.08
9.62 Total Volume of Thired Floor Column
Fourth Floor
6 0.8 C1 and C2
0.3
2.6
3.74
6 0.8 C3-C6
0.4
2.6
4.99
8.74 Total Volume of 4th Floor Column
Fivth Floor
12 0.8
0.3
2.6
7.49 Total Volume of 5th Floor Column
Sixth and Seventh Floor
24 0.7
0.3
2.6
13.10 Total Volume of 5th Floor Column
Eighth and Ninth Floor
24 0.6
0.3
2.6
11.23 Total Volume of 5th Floor Column
Tenth Floor
12 0.5
0.3
2.6
4.68 Total Volume of 5th Floor Column
- terracy floor
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
4 0.5 - C2and C5
0.3 -
2.2 -
1.32
28.55 total in m3
Shear Wall
24 1.67
0.2
3
24.05
24 1.28
0.2
3
18.43
42.48 Total Volume of Shear Wal.
3.54 Volume Per Floor
b.In Floor Beam
a) in FIRST floor beam
FB-1
1 16.2
0.3
0.4
1.94
FB-2
1 6
0.4
0.3
0.72
FB-3
1 7.64
0.3
0.4
0.92
1 4.08 FB-4
0.3
0.4
0.49
FB-5
1 17.15
0.3
0.4
2.06
FB-6
1 17.15
0.4
0.3
2.06
1 14.58 - FB-7
0.4 -
0.3 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1.75
1 13.54 - FB-8
0.4 -
0.3 -
1.62
1 13.76 - FB-9
0.4 -
0.3 -
1.65
-
1 14.204 - FB-10
0.4 -
0.3 -
1.70
1 12.92 - FB-11
0.4 -
0.3 -
1.55
1 12.87 FB 12
0.3
0.4
1.54
37.56
Typical Floor Beam
9 6.355 - TFB 1
0.3 -
0.4 -
6.86
-
-
-
9 6.305 - TFB 2
0.3 -
0.4 -
6.81
9 6.96 -
0.3 -
-
9 16.847 - TFB 3
0.3 -
0.4 -
18.19
-
9 14.56 - TFB 4
0.3 -
0.4 -
15.72
9 12.225 - TFB 5
0.3 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
0.4 -
13.20
9 13.1 -
0.3 -
0.4 -
14.15
9 11.576 - TFB6
0.3 -
0.4 -
12.50
9 12.5 -
0.4 -
0.3 -
13.50
100.95 m3 Total volume of Roof beam concrete
Terracy
1 4.08 - TFB 1
0.3 -
0.4 -
0.49
1 4.08 - TFB 2
0.3 -
0.4 -
0.49
1 4.08 - TFB 3
0.3 -
0.4 -
0.49
1 5.12 - TFB4
0.3 -
0.4 -
0.61
2.08
283.45 m2
1 -4.6 Stear case
4.19
-19.27
264.18
9 217 Typical Floor 2nd floor-Terrace Floor Slab
1953.00
9 -4.18
4.44
-167.03
1785.97 Slab volume
9 4.6
5.84
239.69
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
Stear case
12 1.2 Landing
1.6
0.17
3.92
12 1.21
1.68
0.17
4.15
Sofit
12 1.2
1.38
0.16
3.18
12 1.2 -
2.64 -
0.16 -
6.08
12 1.2 -
2.68 -
0.16 -
6.17
Step
24 0.315
1.2
9.07
12 0.09
1.2
1.30
33.87 Total volum of Stear case
Ground Floor column
6 2.6 C1 and C2
3
46.80 m3
3 2.8 C3 and C6
3
25.20 m3
3 3 C4 and C5
3
27.00 m3
8 1.6 C7
3
38.40 m3
137.40 total in m3
First Floor column
8 2.6 C1,C2 and C6
2.6
54.08
2 1.81 C3 and C4
2.6
9.41
2 1 C5
2.6
5.20
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
68.69 m3 (Total Volume of Concrete Work )
Second Floor floor
6 2.4 C1 and C2
2.6
37.44 m3
2 2.6 - C3 and C4
2.6 -
13.52
2 2.8 - C5
2.6 -
14.56
2 2.4 - C6
2.6 -
12.48
78.00 Total Volume OF Second Floor Colum
Third Floor
6 2.4 C1.C2
2.6
37.44
4 2.4 - C3,C4 and C6
2.6 -
24.96
2 2.8 - C5
2.6 -
14.56
76.96 Total Volume of Thired Floor Column
Fourth Floor
6 2.2 C1 and C2
2.6
34.32
6 2.4 - C3-C6
2.6 -
37.44
71.76 Total Volume of 4th Floor Column
Fivth Floor
12 2.2
2.6
68.64 Total Volume of 5th Floor Column
Sixth and Seventh Floor
24 2
2.6
124.80 Total Volume of 5th Floor Column
Eighth and Ninth Floor
24 1.8
2.6
112.32 Total Volume of 5th Floor Column
Tenth Floor
12 1.6
2.6
49.92 Total Volume of 5th Floor Column
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
- terracy floor
4 1.6 - C2and C5
2.2
14.08
total in m3
Shear Wall
24 3.74
3
269.28
24 2.56
3
184.32
453.60 Total Volume of Shear Wal.
37.80 Volume Per Floor
b.In Floor Beam
a) in FIRST floor beam
FB-1
1 16.2 External Sponda
0.4
6.48
1 18.46 - Internal sponda
0.4 -
7.38
-
1 6.6 - FB-2
0.4 - External Sponda
2.64
1 6 - Internal sponda
0.4 -
2.40
1 6.6 - bottom sponda
0.3 -
1.98
1 8.26 - FB-3
0.4 - External Sponda
0.4 -
6.31
-
1 4.4 - 4
0.4 - External Sponda
1.76
1 4.04 - Internal sponda
0.4 -
1.62
-
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 19.4 - 5 -5 th
1 18.66 6th-1
0.4 External Sponda
7.46
1 17.15 - Internal sponda
0.4 -
6.86
-
1 15.7 - 7-
0.4 - External Sponda
6.28
1 14.58 - Internal sponda
0.4 -
5.83
1 14.9 8
0.4 External Sponda
5.96
1 13.54 - Internal sponda
0.4 -
5.42
-
1 14 - 9
0.4 - External Sponda
5.60
1 13.76 - Internal sponda
0.4 -
5.50
1 15.3 - 10
0.4 - External Sponda
6.12
1 14.204 - Internal sponda
0.4 -
5.68
1 15.5 - 11
0.4 - External Sponda
6.20
1 12.92 - Internal sponda
0.4 -
5.17
-
1 13.7 - 12
0.4 - External Sponda
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
5.48
1 12.87 - Internal sponda
0.4 -
5.15
-
650.99
d) in Typical floor beam
9 6.36 TYP 1
0.4 External Sponda
22.90
9 6.96 - Internal sponda
0.4 -
25.06
-
9 6.2 - TYPF -2
0.4 - External Sponda
22.32
9 6.95 - Internal sponda
0.4 -
25.02
9 14.563 - TYP-3
0.4 - External Sponda
52.43
9 15.77 - Internal sponda
0.4 -
56.77
9 14.567 - TYPF -4
0.4 - External Sponda
52.44
9 15.77 - Internal sponda
0.4 -
56.77
-
9 13.1 - TYP -5
0.4 - External Sponda
47.16
9 12.2 - Internal sponda
0.4 -
43.92
9 12.6 - TYP -6
0.4 - External Sponda
45.36
9 11.64 - Internal sponda
0.4 -
41.90
492.05 m3 Total volume of Roof beam concrete
Terracy
1 4.08 TFB 1
0.4
1.63
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 4.6 -
0.4 -
1.84
1 4.08 - TFB 2
0.4 -
1.63
1 4.68 -
0.4 -
1.87
1 4.08 - TFB 3
0.4 -
1.63
1 4.6 -
0.4 -
1.84
1 5.12 - TFB4
0.4 -
2.05
1 5.74 -
0.4 -
2.30
-
14.79
f.In 200mm thick FIRST floor slab
1 283.45
283.45 m2
1 -4.6 Stear case
4.19
-19.27
264.18
9 217 Typical Floor 2nd floor-Terrace Floor Slab
1953.00
9 -4.18
4.44
-167.03
1785.97 Slab volume
1 4.6
5.84
24.57 Upper Roof Slab
1 217
217.00
1 -4.18
4.44
-18.56
1 63.64 Side to side sponda
0.2
12.73
211.17 Slab volume
1 5.84 Roof teracce Slab
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
4.6
26.86
12 1.2
14.40
162.63 Total volum of Stear case
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
7.FINISHING
7.01. Marble flooring to stair case:
Stair #1 Basement-2nd floor
A.20mm Thick to landing
Landing
1 1.25
8 1.60
16 m2
1 1.7
8 1.25
17
33 m2 Total Marble for Landing (stair#1&2)
B. Tread size 30*340mm
Stair #1 Basement-2nd floor
7 17
1.2
142.8 ml
1 84.50
84.50 ml Total for window & door sill
` 7.03. 10 mm thick Porcelain floor tile
Ground Floor
parking
1 209.7 Cement Screed FF
209.70 m2
Admin Office
1 12 Porcilen
12.00 m2
Kitchen
1 7.4
7.40 m2
Guard House
2 4.6
9.20
1 1.6 Toilet
1.60
First Floor
2 36.1 Parquet FF
72.20 m2
102.40 Porcelain FF
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2 2.8 Balcony
5.60 m2
2 7.4 Kitchen
14.80 m2
ceramic
91.60
Porcilen
678.40
Parquet
722.00
wall ceram ic
561.56
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
7.Skirting
0.00
403.20 Total 10 mm thick Porcelain floor tile in m2
Third,Fivith ,Seventh and Ninth Floor
Porcelain
10 2.85 Balcony
28.50
- Bed Room
10 7.8 -
78.00
10 0.9 - Balcony
9.00 Parquet
10 26.9 -
269.00
504.00
Porcelain
488.90
Parquet
537.40
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 66.1
2.7
178.47
230.23
Ground Floor
1 7.3
2.7
19.71
1 12.7
2.7
34.29
1 5.65
2.7
15.255
1 4.48
2.7
12.10 on axisB b/n 1-2
1 1.8 -
2.7 -
4.86
3 -1.33 -
2.1 -
(8.38)
1 -1.5 -
1.5 -
(2.25)
1 -0.7 -
2.1 -
(1.47)
1 -3.26 -
1.5 -
(4.89)
1 7.94 -
2.7 -
21.44
1 -0.9 -
2.1 -
(1.89)
1 6.59 -
2.7 -
17.79
1 -0.7 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2.1 -
(1.47)
1 -0.9 -
1 -
(0.90)
104.19
2 4.05
2.7
21.87
1 1.5
2.7
4.05
25.92
First Floor
1 10.46 External
2.7
28.24
1 -1.5 -
1.5 -
(2.25)
1 12.81 -
2.7 -
34.59
1 10.94 -
2.7 -
29.54
1 -1.5 -
1.5 -
(2.25)
1 1.72 -
2.7 -
4.64
1 -1.5 -
1.5 -
(2.25)
1 1.15 -
2.7 -
3.11
1 17.73 -
2.7 -
47.87
141.24
- Internal
2 1.5 -
2.7 -
8.10
2 -0.9 -
1 -
(1.80)
2 0.98 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
2.7 -
5.29
2 -0.7 -
2.1 -
(2.94)
2 2.6 -
2.1 -
10.92
2 5.42 -
2.1 -
22.76
2 2.5 -
2.1 -
10.50
2 4.54 -
2.7 -
24.52
2 -0.7 -
2.1 -
(2.94)
2 5.3 -
2.7 -
28.62
2 2.2 -
2.7 -
11.88
114.91
2nd,4th,6th,8th and 10th Typical
Floor plan
External
5 4.13
2.7
55.76
5 5.83 -
2.7 -
78.71
5 -1.5 -
1.5 -
(11.25)
5 1.18 -
2.7 -
15.93
5 1.84 -
2.7 -
24.84
5 1.17 -
2.7 -
15.80
5 25.184 -
2.7 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
339.98
10 -1.5 -
1.5 -
(22.50)
10 -1.48 -
1.5 -
(22.20)
5 12.79 -
2.7 -
172.67
5 -3.13 -
1.5 -
(23.48)
624.25
Internal
10 1.5
2.7
40.50
10 0.95 -
2.7 -
25.65
10 2.6 -
2.7 -
70.20
10 -0.7 -
2.1 -
(14.70)
10 0.88 -
2.7 -
23.76
10 2.5 -
2.7 -
67.50
20 -0.7 -
2.1 -
(29.40)
12 3.5 -
2.7 -
113.40
12 2.57 -
2.7 -
83.27
12 4.45 -
2.7 -
144.18
12 5.3 -
2.7 -
171.72
12 5.94 -
2.7 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
192.46
888.53
3rd,5th,7th and 9th floor
8 8.65
2.7
186.84
8 18.19 -
2.7 -
392.90
8 -1.5 -
1.5 -
(18.00)
8 12.77 -
2.7 -
275.83
4 -3.26 -
1.5 -
(19.56)
4 8.61 -
1.5 -
51.66 internal
869.68
8 1.52 -
2.7 -
32.83
8 3.53 -
2.7 -
76.25
8 3.39 -
2.7 -
73.22
8 5.31 -
2.7 -
114.70
8 2.57 -
2.7 -
55.51
8 4.48 -
2.7 -
96.77
8 -0.3 -
2.1 -
(5.04)
8 -0.8 -
2.1 -
(13.44)
8 -1 -
2.1 -
(16.80)
414.00
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
Columen plastering
4 1.2
2.7
12.96
4 0.8 -
2.7 -
8.64
2 0.6 -
2.7 -
3.24
1 1.2 -
2.7 -
3.24
2 0.3 - First floor
2.7 -
1.62
2 0.8 -
2.7 -
4.32
2 0.6 -
2.7 -
3.24
2 0.8 -
2.7 -
4.32
-
10 0.8 - 2nd,4th,6th,8th and 10th Typical
Floor plan
2.7 -
21.60
10 0.61 -
2.7 -
16.47
8 0.41 - 3rd ,5th, 7th and 9th floor
2.7 -
8.86
4 2.16 -
2.7 -
23.33
111.83
1 260.8
260.80
7 215.78
1510.46 Slab plastering
1,771.26
24 1.8 soffit slab plastering
1.25
54
10 1.25
1.5
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
18.75
1,844.01
3,164.44 M2 TOTAL Internal Plastering
3.MASONARY WORK
1 15.65 On axis Y1
0.5
7.83
1 12.1 On axis Y5
0.5
6.05
1 16.1 On axis X1
0.5
8.05
1 5.7 On axis X5
0.5
2.85
1 10.4
0.5
5.20
SUBSTRUCTURE
SUPER-STRUCTURE
MB 9 14 8.26 14 1
14 8.92 8 1
14 9.87 8 1 8 - - - 78.96 - - -
14 7.35 8 1
10 3.70 85 1
10 3.70 127 1 127 - 469.90 - - - - -
8 0.60 43 1 43 25.80 - - - - - -
8 1.92 7 4 28 53.76 - - - - - -
Column
C1 16 3.00 18 4 72 - - - - 216.00 - -
C2 16 3.00 20 2 40 - - - - 120.00 - -
C3 16 3.00 20 1 20 - - - - 60.00 - -
C4 16 3.00 20 1 20 - - - - 60.00 - -
C5 20 3.00 20 1 20 - - - - - 60.00 -
C6 20 3.00 16 1 16 - - - - - 48.00 -
C7 14 3.00 10 11 110 - - - 330.00 - - -
Share wall 14 3.66 17 2 34 - - - 123.46 - - -
8 1.77 12 4 48 85.43 - - - - - -
8 1.77 12 2 24 42.72 - - - - - -
8 2.45 12 2 23 57.17 - - - - - -
8 2.45 12 2 24 58.80 - - - - - -
8 3.65 12 1 12 43.80 - - - - - -
8 2.14 12 2 24 51.36 - - - - - -
8 3.85 12 1 12 46.20 - - - - - -
SHW 3 14 3.66 26 1 26 - - - 95.16 - - -
16 2.60 26 4 104 - - - - 270.40 - -
6th Floor
C1 16 4.00 12 4 48 - - - - 192.00 - -
10 2.00 18 4 73 - 146.67 - - - - -
8 1.18 18 8 147 173.07 - - - - - -
C2 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
C3 16 4.00 12 1 12 - - - - 48.00 - -
10 2.00 18 1 18 - 36.67 - - - - -
8 1.18 18 1 18 21.63 - - - - - -
C4 16 4.00 12 1 12 - - - - 48.00 - -
10 2.00 18 1 18 - 36.67 - - - - -
8 1.18 18 1 18 21.63 - - - - - -
C5 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
C6 16 4.00 12 2 24 - - - - 96.00 - -
10 2.00 18 2 37 - 73.33 - - - - -
8 1.18 18 2 37 43.27 - - - - - -
12 0.70 8 1 1 - - 0.70 - - - -
SHW 14 4.00 17 1 17 - - - 67.47 - - -
8 1.77 19 4 76 134.52 - - - - - -
8 5.07 19 2 38 192.66 - - - - - -
SHW 2 14 3.80 11 2 23 - - - 87.15 - - -
8 2.14 19 2 38 81.32 - - - - - -
8 3.85 19 1 19 73.15 - - - - - -
SHW 3 14 3.80 11 1 11 - - - 41.80 - - -
12 1.15 11 2 22 - - 25.76 - - - -
12 0.70 8 1 1 - - 0.70 - - - -
- - - - - - - -
- - - - - - - -
BBB 2 14 8.62 3 1
14 5.75 3 1
14 6.38 3 1 3 - - - 19.14 - - -
14 10.43 2 1
14 9.00 2 1 2 - - - 18.00 - - -
17.42 8 1.30 103 1 103 134.51 - - - - - -
BBB 3 14 8.60 3 1 3 - - - 25.80 - - -
14 5.75 3 1
14 5.96 3 1
14 10.63 2 1
14 6.60 2 1
16.96 8 1.30 101 1
BBB 4 14 8.60 3 1 3 - -
14 5.75 3 1 - - - - -
14 5.44 3 1 - - - - -
14 10.63 2 1 - - - - -
14 8.19 2 1 - - - - -
16.96 8 1.30 101 1 - - - - -
BBB 5 14 10.70 3 1 3 - - - 32.10 - - -
14 5.75 3 - - - - - - - -
14 9.11 2 1 2 - - - 18.22 - - -
14 7.32 2 - - - - - - - -
8 1.30 83
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
Total Length (ML) 136.51 - - 150.49 - - -
Page 12 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 53.92 0.00 0.00 181.94 0.00 0.00 0.00
Ground Floor
GFB 1 14 8.60 3 1 3 - - - 25.80 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 3 1 3 - - - 31.89 - - -
14 8.19 2 1 2 - - - 16.38 - - -
18.29 8 1.30 109 1 109 141.16 - - - - - -
- - - - - - - -
GFB 2 14 9.26 3 1 3 - - - 27.78 - - -
16 5.75 3 1 3 - - - - 17.25 - -
16 3.40 1 1 1 - - - - 3.40 - -
16 8.60 3 1 3 - - - - 25.80 - -
16 11.28 3 1 3 - - - - 33.84 - -
13.64 8 1.30 14 2 29 37.27 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 8 2 15 19.93 - - - - - -
8 1.30 7 1 7 8.95 - - - - - -
8 1.30 16 2 31 40.73 - - - - - -
8 1.30 14 1 14 18.12 - - - - - -
- - - - - - - -
- - - - - - - -
GFB 3 14 8.50 3 1 3 - - - 25.50 - - -
14 8.50 3 1 3 - - - 25.50 - - -
14 10.63 3 1 3 - - - 31.89 - - -
14 8.19 3 1 3 - - - 24.57 - - -
16.96 8 1.30 101 1 101 130.99 - - - - - -
GFB 4 14 8.60 3 1 3 - - - 25.80 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 2 1 2 - - - 21.26 - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
14 8.19 2 1 2 - - - 16.38 - - -
16.96 8 1.30 101 1 101 130.99 - - - - - -
GFB 5 14 8.50 3 1 3 - - - 25.50 - - -
14 8.50 8 1 8 - - - 68.00 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 2 1 2 - - - 21.26 - - -
14 8.19 2 1 2 - - - 16.38 - - -
16.48 8 1.30 98 1 98 127.32 - - - - - -
GFB6 14 10.30 3 1 3 - - - 30.90 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 9.00 3 1 3 - - - 27.00 - - -
14 7.22 2 1 2 - - - 14.44 - - -
8 1.30 14 1 14 17.68 - - - - - -
8 1.30 14 2 29 37.27 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 22 1 22 28.43 - - - - - -
8 1.30 21 1 21 27.56 - - - - - -
GFB 7 14 10.30 3 1 3 - - - 30.90 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 9.00 3 1 3 - - - 27.00 - - -
14 7.22 2 1 2 - - - 14.44 - - -
8 1.30 14 1 14 17.68 - - - - - -
8 1.30 14 1 14 18.63 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 22 1 22 28.43 - - - - - -
8 1.30 21 1 21 27.56 - - - - - -
GFB 8 20 4.46 2 1 2 - - - - - 8.92 -
20 3.26 3 1 3 - - - - - 9.78 -
20 6.12 3 1 3 - - - - - 18.36 -
16 7.10 3 1 3 - - - - 21.30 - -
20 9.01 4 1 4 - - - - - 36.04 -
16 4.16 3 1 3 - - - - 12.48 - -
8 1.30 13 1 13 16.90 - - - - - -
8 1.30 14 1 14 18.63 - - - - - -
8 1.30 13 1 13 16.59 - - - - - -
8 1.30 22 1 22 28.17 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
GFB 9 20 4.40 2 1 2 - - - - - 8.80 -
20 3.28 2 1 2 - - - - - 6.56 -
20 10.50 3 1 3 - - - - - 31.50 -
20 6.20 3 1 3 - - - - - 18.60 -
20 8.95 4 1 4 - - - - - 35.80 -
16 6.20 3 1 3 - - - - 18.60 - -
8 1.30 2 1 2 2.60 - - - - - -
2.02 8 1.30 14 1 14 18.81 - - - - - -
8 1.30 12 1 12 16.05 - - - - - -
8 1.30 21 1 21 27.13 - - - - - -
8 1.30 25 1 25 32.33 - - - - - -
GFB 10 14 10.30 3 1 3 - - - 30.90 - - -
14 6.06 3 1 3 - - - 18.18 - - -
14 9.01 3 1 3 - - - 27.03 - - -
14 7.86 3 1 3 - - - 23.58 - - -
8 1.30 62 1 62 80.60 - - - - - -
8 1.30 22 1 22 28.43 - - - - - -
8 1.3 37 1 37 47.45 - - - - - -
BBB 11 14 3.30 3 1 3 - - - 9.90 - - -
14 3.30 3 1 3 - - - 9.90 - - -
8 1.30 15 1 15 19.76 - - - - - -
- - - - - - - -
Total Length (ML) 1,261.94 - - 786.02 132.67 174.36 -
Page 13 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 498.47 0.00 0.00 950.30 209.49 430.32 0.00
First Floor
FFB 1 14 8.50 3 1 3 - - - 25.50 - - -
14 5.75 3 1 3 - - - 17.25 - - -
14 5.33 3 1 3 - - - 15.99 - - -
14 10.69 3 1 3 - - - 32.07 - - -
14 8.23 2 1 2 - - - 16.46 - - -
18.29 8 1.30 109 1 109 141.16 - - - - - -
- - - - - - - -
FFB 2 14 7.22 1 1 1 - - - 7.22 - - -
16 7.22 3 1 3 - - - - 21.66 - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
14 7.22 3 1 3 - - - 21.66 - - -
13.64 8 1.30 36 2 71 92.56 - - - - - -
- - - - - - - -
FFB 3 14 2.35 3 1 3 - - - 7.05 - - -
14 4.80 1 1 1 - - - 4.80 - - -
16 8.90 3 1 3 - - - - 26.70 - -
14 8.90 3 1 3 - - - 26.70 - - -
16.96 8 1.30 34 1 34 44.63 - - - - - -
FFB 4 14 5.30 3 1 3 - - - 15.90 - - -
14 5.30 3 1 3 - - - 15.90 - - -
16.96 8 1.30 28 1 28 35.91 - - - - - -
FFB 5 14 8.50 3 1 3 - - - 25.50 - - -
14 8.50 8 1 8 - - - 68.00 - - -
14 5.44 3 1 3 - - - 16.32 - - -
14 10.63 2 1 2 - - - 21.26 - - -
14 8.19 2 1 2 - - - 16.38 - - -
16.48 8 1.30 98 1 98 127.32 - - - - - -
FFB6 14 2.35 2 1 2 - - - 4.70 - - -
14 3.40 2 1 2 - - - 6.80 - - -
16 3.30 2 3 6 - - - - 19.80 - -
16 11.40 3 1 3 - - - - 34.20 - -
16 11.46 3 1 3 - - - - 34.38 - -
16 11.42 3 2 6 - - - - 68.52 - -
16 9.21 4 1 4 - - - - 36.84 - -
17.1 8 1.30 115 1 115 149.50 - - - - - -
FFB 7 14 8.50 3 1 3 - - - 25.50 - - -
14 8.53 3 1 3 - - - 25.59 - - -
14 10.60 3 1 3 - - - 31.80 - - -
14 8.19 3 1 3 - - - 24.57 - - -
14.58 8 1.30 98 1 98 127.66 - - - - - -
FFB 8 20 3.26 1 1 1 - - - - - 3.26 -
20 10.60 3 1 3 - - - - - 31.80 -
16 5.76 3 1 3 - - - - 17.28 - -
16 9.10 3 1 3 - - - - 27.30 - -
14 7.14 3 1 3 - - - 21.42 - - -
13.53 8 1.30 91 1 91 118.30 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
FFB 9 16 4.40 1 1 1 - - - - 4.40 - -
20 10.60 3 1 3 - - - - - 31.80 -
16 5.76 3 1 3 - - - - 17.28 - -
16 9.01 4 1 4 - - - - 36.04 - -
16 7.14 3 1 3 - - - - 21.42 - -
13.72 8 1.30 92 1 92 120.21 - - - - - -
FFB 10 14 4.46 1 1 1 - - - 4.46 - - -
14 3.26 1 1 1 - - - 3.26 - - -
20 10.59 3 1 3 - - - - - 31.77 -
14 6.06 3 1 3 - - - 18.18 - - -
16 8.98 4 1 4 - - - - 35.92 - -
14 7.86 3 1 3 - - - 23.58 - - -
14.188 8 1.3 143 1 143 185.64 - - - - - -
FFb 11 20 4.11 1 1 1 - - - - - 4.11 -
20 10.31 3 1 3 - - - - - 30.93 -
30.68 14 6.06 3 1 3 - - - 18.18 - - -
16 9.01 4 1 4 - - - - 36.04 - -
14 7.86 3 1 3 - - - 23.58 - - -
8 1.30 206 1 206 267.19 - - - - - -
FFB 12 14 10.30 4 1 4 - - - 41.20 - - -
14 6.06 3 1 3 - - - 18.18 - - -
14 9.01 3 1 3 - - - 27.03 - - -
14 7.86 3 1 3 - - - 23.58 - - -
12.88 8 1.30 86 1 86 112.23 - - - - - -
- - - - - - - -
Total Length (ML) 1,522.33 - - 695.57 437.78 133.67 -
Page 13 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 601.32 0.00 0.00 840.94 691.25 329.90 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Typical Floor Beam
TFB 1 14 3.24 2 7 14 - - - 45.36 - - -
14 2.30 2 7 14 - - - 32.20 - - -
16 7.58 3 7 21 - - - - 159.18 - -
16 7.58 3 7 21 - - - - 159.18 - -
8 1.30 8 7 56 73.41 - - - - - -
8 13.00 36 7 252 3,269.93 - - - - - -
TFB 2 16 7.58 3 7 21 - - - - 159.18 - -
16 7.58 3 7 21 - - - - 159.18 - -
16 2.36 2 7 14 - - - - 33.04 - -
16 3.61 2 7 14 - - - - 50.54 - -
8 1.30 36 7 252 326.99 - - - - - -
8 1.30 8 7 58 75.83 - - - - - -
TFB 3 16 3.40 2 7 14 - - - - 47.60 - -
16 3.4 2 7 14 - - - - 47.60 - -
16 3.50 2 7 14 - - - - 49.00 - -
16 3.54 2 7 14 - - - - 49.56 - -
16 9.66 3 7 21 - - - - 202.86 - -
16 9.62 3 7 21 - - - - 202.02 - -
16 11.80 3 7 21 - - - - 247.80 - -
16 7.42 3 7 21 - - - - 155.82 - -
8 1.30 14 7 101 130.90 - - - - - -
8 1.30 13 14 176 229.32 - - - - - -
8 1.30 28 7 197 256.62 - - - - - -
8 1.30 14 7 101 130.90 - - - - - -
8 1.30 11 14 160 208.60 - - - - - -
8 1.30 10 7 70 91.61 - - - - - -
- - - - - - - -
TFB 4 20 2.20 1 7 7 - - - - - 15.40 -
20 3.40 1 7 7 - - - - - 23.80 -
16 3.50 1 7 7 - - - - 24.50 - -
20 2.40 1 7 7 - - - - - 16.80 -
20 8.56 3 7 21 - - - - - 179.76 -
20 8.50 3 7 21 - - - - - 178.50 -
16 6.30 3 7 21 - - - - 132.30 - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
16 4.90 3 7 21 - - - - 102.90 - -
16 6.14 3 7 21 - - - - 128.94 - -
8 1.30 14 14 201 261.80 - - - - - -
8 1.30 12 7 83 108.06 - - - - - -
1.74666666666667 8 1.30 28 7 197 256.62 - - - - - -
8 1.30 14 14 201 261.80 - - - - - -
8 1.30 12 7 83 108.06 - - - - - -
TFB 5 20 3.89 1 7 7 - - - - - 27.23 -
20 3.26 1 7 7 - - - - - 22.82 -
20 10.05 3 7 21 - - - - - 211.05 -
20 4.30 3 7 21 - - - - - 90.30 -
16 15.20 4 7 28 - - - - 425.60 - -
16 6.00 3 7 21 - - - - 126.00 - -
2.02 8 1.30 11 7 78 101.01 - - - - - -
8 1.30 14 7 101 131.65 - - - - - -
TFB 6 16 3.80 2 7 14 - - - - 53.20 - -
20 10.05 3 7 21 - - - - - 211.05 -
16 3.74 3 7 21 - - - - 78.54 - -
16 15.20 4 7 28 - - - - 425.60 - -
16 5.40 3 7 21 - - - - 113.40 - -
2.02 8 1.30 14 14 203 263.29 - - - - - -
8 1.30 11 7 78 101.01 - - - - - -
8 1.30 22 7 151 195.95 - - - - - -
8 1.30 9 7 63 81.90 - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
Ground Floor Slab - - - - - - - -
Botom Bar 8 6.80 22 1 22 146.43 - - - - - -
1 8 8.29 22 1 22 186.25 - - - - - -
2 8 10.35 45 1 45 461.31 - - - - - -
3 8 9.27 7 1 7 67.67 - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
4 8 5.97 9 1 9 56.42 - - - - - -
6 8 8.60 36 1 36 312.47 - - - - - -
7 8 8.62 39 1 39 334.95 - - - - - -
8 8 9.80 30 1 30 291.06 - - - - - -
9 8 6.77 19 1 19 128.63 - - - - - -
10 8 6.77 9 2 18 120.05 - - - - - -
8 6.77 12 1 12 78.98 - - - - - -
- - - - - - - -
Top Bar - - - - - - - -
A 10 4.53 39 1 39 - 177.32 - - - - -
B 12 3.27 39 1 39 - - 127.06 - - - -
C 12 4.29 39 1 39 - - 166.70 - - - -
12 4.29 31 1 31 - - 132.99 - - - -
12 4.29 39 1 39 - - 167.62 - - - -
D 12 2.34 24 1 24 - - 55.49 - - - -
E 12 2.89 21 1 21 - - 60.69 - - - -
F 12 2.09 23 1 23 - - 48.07 - - - -
G 12 3.30 24 1 24 - - 78.73 - - - -
H 12 5.25 24 1 24 - - 124.13 - - - -
I 10 2.67 22 1 22 - 59.26 - - - - -
- -
Total Length (ML) 2,184.22 236.57 961.47 - - - -
Page 15 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 862.77 146.68 855.71 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
First Floor Slab
Bototm Bar - - - - - - - -
Bar 1` 8 6.79 18 1 18 122.62 - - - - - -
Bar 1 8 6.00 20 1
Bar 2 8 10.30 42 1 42 433.29 - - - - - -
8 10.30 12 1
Bar 3 8 10.36 22 1 22 232.75 - - - - - -
9 10.36 23 1
10 10.36 42 1
Bar 4 8 5.97 9 1 9 56.42 - - - - - -
Bar 5 8 4.79 10 1
Bar 6 8 7.05 29 1 29 203.98 - - - - - -
Bar 7 8 8.62 36 1 36 307.45 - - - - - -
8 8.62 28 1 28 244.23 - - - - - -
8 8.62 37 1 37 315.49 - - - - - -
Bar 8 8 6.78 24 1 24 162.72 - - - - - -
Top Bar - - - - - - - -
Bar A 8 4.53 37 1 37 165.80 - - - - - -
Bar B 10 3.27 37 1 37 - 119.68 - - - - -
Bar C 14 4.29 37 1 37 - - - 157.01 - - -
14 4.29 29 1 29 - - - 123.84 - - -
14 4.29 37 1 37 - - - 157.01 - - -
Bar D 10 2.34 24 2 48 - 112.32 - - - - -
Bar E 12 2.89 24 1 24 - - 68.40 - - - -
Bar F 10 2.09 23 1 23 - 47.23 - - - - -
Bar G 10 3.30 33 1 33 - 109.56 - - - - -
Bar H 10 5.24 62 1 62
Bar I 10 5.15 22 1 22 - 115.02 - - - - -
Ster Bar - - - - - - - -
Bar 1 14 2.24 9 10 92 - - - 206.08 - - -
Bar 2 14 0.89 8 10
Bar 3 14 2.39 8 10 82 - - - 196.82 - - -
Bar 4 14 4.91 3 10 35 - - - 169.89 - - -
Bar 5 14 2.24 9 10 92 - - - 206.08 - - -
Bar 6 12 2.39 9 10
10 - - - - - - - -
Bar 1 14 5.39 9 10 90 - - - 485.10 - - -
Bar 2 14 2.42 9 10 90 - - - 217.80 - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
Bar 3 14 2.20 9 10 90 - - - 198.00 - - -
Bar 4 14 0.89 13 10 134 - - - 118.84 - - -
Bar 5 14 5.40 15 10 150 - - - 810.00 - - -
Bar 6 14 2.40 15 10 150 - - - 360.00 - - -
Bar 7 14 2.45 15 10 150 - - - 367.50 - - -
Bar 8 14 0.89 13 10 134 - - - 118.84 - - -
Total Length (ML) - - - 3,454.95 - - -
Page 18 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 4177.04 0.00 0.00 0.00
From basement -Ground floor - - - - - - - -
Bar 1 14 0.99 8 1 8 - - - 7.98 - - -
Bar 2 14 4.27 15 1 15 - - - 64.05 - - -
Bar 3 14 2.52 15 1
Bar 4 14 1.60 15 1 15 - - - 24.00 - - -
Bar 5 14 0.85 13 1 13 - - - 11.35 - - -
Bar 6 14 5.39 15 1 15 - - - 80.85 - - -
Bar 7 14 0.82 13 1 13 - - - 10.95 - - -
Bar 8 14 0.82 14 1 14 - - - 11.58 - - -
Bar 9 14 2.51 15 1 15 - - - 37.65 - - -
Bar 10 14 0.85 22 1 22 - - - 18.70 - - -
Bar 11 14 1.60 21 1 21 - - - 33.60 - - -
Total Length (ML) - - - 300.71 - - -
Page 19 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 363.56 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
Total Length (ML) 0.79 1.24 1.78 8,599.39 3.16 4.94 7.10
Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.31 0.77 1.58 10396.66 4.99 12.18 25.23
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- -
Total Length (ML) 1.50 2.63 4.25 18,997.25 9.72 19.59 35.89
Page 20 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.59 1.63 3.79 22967.68 15.35 48.34 127.48
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 0 0 0 0 0 0
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- -
- -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - -
- - - - - - - -
- -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - -
Total Length (ML) 0.40 0.62 0.89 1.21 1.58 2.47 3.55
Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.16 0.38 0.79 1.46 2.49 6.09 12.62
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Total Length (ML) 0.95 1.62 2.57 3.88 5.65 11.03 19.72
Page 22 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.37 1.01 2.29 4.69 8.92 27.21 70.05
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 23 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
39 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 24 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 25 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 26 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 27 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total Length (ML) - - - - - - -
Page 28 Unit Weight (Kg/m) 0.395 0.62 0.89 1.209 1.579 2.468 3.552
Total Weight (Kg) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. of No. of Total Total length
Location Ø Length
bar member no.of bars Ø-8 Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
2.Block work
2 4.95 INTERNAL
2.7
26.73
2 2.38 -
2.7 -
12.85
1 -2.57 -
2.1 -
(5.40)
On Ground floor
2.01.20cm thick class B external HCB wall
EXTERNAL
1 9.9
2.7
26.73
1 21.95 -
2.7 -
59.27
1 15.6 -
2.7 -
42.12
1 20.55 -
2.7 -
55.49
183.60
INTERNAL
1 7.33 On axis A b/n 1`-2`
2.70
19.79
1.00 6.74 on axis c b/n 1`-2`
2.70
18.20
1.00 10.68 on axis 1 b/n B-C
2.70
28.83
1.00 10.93 on axis 2 b/n A-C
2.70
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
29.51
1.00 4.32 -
2.70 -
11.66
1.00 (5.00) -
1.20 -
(6.00)
1.00 (0.90) -
0.90 -
(0.81)
1.00 (1.35) -
2.10 -
(2.84)
1.00 (1.50) -
2.10 -
(3.15)
1.00 (1.35) -
2.10 -
(2.84)
92.36
1.00 5.95
2.70
16.07
1.00 4.09
2.70 -
11.04
1.00 0.70 -
2.70 -
1.89
1.00 0.65 -
2.70 -
1.76
1.00 4.15 -
2.70 -
11.21
1.00 5.73 -
2.70 -
15.47
1.00 1.57 -
2.70 -
4.24 -
3.00 (0.90) - W2
0.60 -
(1.62)
4.00 (1.50) - W1
1.50 -
(9.00)
3.00 (0.90) - W3
0.60 -
(1.62)
99.43 total area after deduction of window
- Internal
2.00 3.80 -
2.70 -
20.52
2.00 (0.70) -
2.10 -
(2.94)
2.00 0.88 -
2.70 -
4.75
2.00 2.50 -
2.70 -
13.50
2.00 (0.90) -
2.10 -
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALEHADIN YESUF RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
(3.78)
2.00 5.46 -
2.70 -
29.48
2.00 2.57 -
2.70 -
13.88
2.00 2.90 -
2.70 -
15.66
2.00 4.77 -
2.70 -
25.76
2.00 2.50 -
2.70 -
13.50
130.33
-
1,710.90 15 CM
2,005.50 20CM EXTERNAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
1 5.1 on Toilet
5.10
m2
1 14 on Toilet
14.00 m2
19.10 m2Total
On second floor
3 4 Bathroom
12.00 m2
1 8 Bathroom
8.00 m2
20.00 m Total
2
1 65.95 p=65.95m
3
197.85 m2 Total Retaining wall
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO SALHADIN
Location :-Addis Ababa Page of
TIM NUMBER TOTAL DESCRIPTION
20 Pcs
20 Pcs Total D1
ground floor
1 60.00
60 Pcs
60 Pcs Total D2
40 Pcs
40 Pcs Total D3
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE
Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
40*40*2.5 1.20 1.2 1 3 3.6
40*40*2.5 1.06 10 8.8 1.06 1 3 3.18
40*40*2.5 0.91 8.8 7.6 0.91 1 3 2.73
Vertical truss 40*40*2.5 0.77 7.6 6.4 0.77 1 3 2.31
member 40*40*2.5 0.62 6.4 5.2 0.63 1 3 1.89
40*40*2.5 0.48 5.2 4 0.48 1 3 1.44
40*40*2.5 0.34 4 2.8 0.34 1 3 1.02
1 T-1 3 40*40*2.5 0.19 2.8 1.6 0.19 1 3 0.57
40*40*2.5 1.60 1.6 1 3 4.8
40*40*2.5 1.51 1.51 1 3 4.53
40*40*2.5 1.42 1.43 1 3 4.29
Diagonal member 40*40*2.5 1.35 1.36 1 3 4.08
40*40*2.5 1.29 1.29 1 3 3.87
40*40*2.5 1.25 1.25 1 3 3.75
40*40*2.5 1.22 1.21 1 3 3.63
40*40*2.5 1.20 1.2 1 2 2.4
40*40*2.5 1.08 12.20 11 1.08 1 2 2.16
40*40*2.5 0.96 11 9.8 0.96 1 2 1.92
40*40*2.5 0.85 9.8 8.6 0.85 1 2 1.7
Vertical truss 40*40*2.5 0.73 8.6 7.4 0.73 1 2 1.46
member 40*40*2.5 0.61 7.4 6.2 0.61 1 2 1.22
40*40*2.5 0.49 6.2 5 0.49 1 2 0.98
40*40*2.5 0.37 5 3.8 0.37 1 2 0.74
40*40*2.5 0.26 3.8 2.6 0.26 1 2 0.52
2 T-2 2 40*40*2.5 0.14 2.6 1.4 0.14 1 2 0.28
40*40*2.5 1.62 1.61 1 2 3.22
40*40*2.5 1.54 1.54 1 2 3.08
40*40*2.5 1.47 1.47 1 2 2.94
40*40*2.5 1.40 1.4 1 2 2.8
Diagonal member 40*40*2.5 1.35 1.37 1 2 2.74
40*40*2.5 1.30 1.3 1 2 2.6
40*40*2.5 1.26 1.26 1 2 2.52
40*40*2.5 1.23 1.23 1 2 2.46
40*40*2.5 1.21 1.21 1 2 2.42
40*40*2.5 1.20 1.2 1 2 2.4
40*40*2.5 0.96 6 4.8 0.96 2 4 3.84
Vertical truss
40*40*2.5 0.72 4.8 3.6 0.72 2 4 2.88
member
40*40*2.5 0.48 3.6 2.4 0.51 2 4 2.04
3 T-3 2 40*40*2.5 0.24 2.4 1.2 0.26 2 4 1.04
40*40*2.5 1.54 1.54 2 4 6.16
40*40*2.5 1.40 1.4 2 4 5.6
Diagonal member
40*40*2.5 1.29 1.3 2 4 5.2
40*40*2.5 1.22 1.23 2 4 4.92
40*40*2.5 1.20 1.2 1 2 2.4
Vertical truss 40*40*2.5 0.91 5 3.8 0.91 2 4 3.64
member 40*40*2.5 0.62 3.8 2.6 0.62 2 4 2.48
4 T-4 2 40*40*2.5 0.34 2.6 1.4 0.34 2 4 1.36
40*40*2.5 1.51 1.51 2 4 6.04
Diagonal member 40*40*2.5 1.35 1.35 2 4 5.4
40*40*2.5 1.25 1.25 2 4 5
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE
Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
40*40*2.5 1.20 1.2 1 2 2.4
40*40*2.5 1.03 8.25 7.05 1.03 1 2 2.06
40*40*2.5 0.85 7.05 5.85 0.85 1 2 1.7
Vertical truss
40*40*2.5 0.68 5.85 4.65 0.68 1 2 1.36
member
40*40*2.5 0.50 4.65 3.45 0.5 1 2 1
40*40*2.5 0.33 3.45 2.25 0.33 1 2 0.66
5 T-5 2 40*40*2.5 0.15 2.25 1.05 0.15 1 2 0.3
40*40*2.5 1.58 1.58 1 2 3.16
40*40*2.5 1.47 1.47 1 2 2.94
40*40*2.5 1.38 1.38 1 2 2.76
Diagonal member
40*40*2.5 1.30 1.3 1 2 2.6
40*40*2.5 1.24 1.24 1 2 2.48
40*40*2.5 1.21 1.21 1 2 2.42
40*40*2.5 1.20 1.2 1 1 1.2
40*40*2.5 0.96 6 4.8 0.91 1 1 0.91
Vertical truss
40*40*2.5 0.72 4.8 3.6 0.62 1 1 0.62
member
40*40*2.5 0.48 3.6 2.4 0.62 1 1 0.62
6 T-6 1
40*40*2.5 0.24 2.4 1.2 0.34 1 1 0.34
40*40*2.5 1.54 1.51 1 1 1.51
Diagonal member 40*40*2.5 1.40 1.35 1 1 1.35
40*40*2.5 1.29 1.25 1 1 1.25
Vertical truss 40*40*2.5 1.20 1.2 1 1 1.2
member 40*40*2.5 0.96 6 4.8 0.91 1 1 0.91
7 T-3' 1
40*40*2.5 1.54 1.51 1 1 1.51
Diagonal member
40*40*2.5 #NAME? 1.35 1 1 1.35
Total in m 182.86
Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
Bottom truss
1 T-1 3 member 60*40*3 10.2 10.6 1 3 31.8
Top truss member 60*40*3 10.27 10.7 1 3 32.1
Bottom truss
2 T-2 2 member 60*40*3 12.40 12.207 1 2 24.414
Top truss member 60*40*3 12.46 12.66 1 2 25.32
Bottom truss
3 T-3 2 member 60*40*3 12.2 12.6 1 2 25.2
Top truss member 60*40*3 6.22 12.82 1 2 25.64
Bottom truss 21.24
4 T-4 2 member 60*40*3 10.2 10.62 1 2
Top truss member 60*40*3 5.24 10.88 1 2 21.76
Bottom truss
5 T-5 2 member 60*40*3 8.45 8.7 1 2 17.4
Top truss member 60*40*3 8.54 8.25 1 2 16.5
Bottom truss
6 T-6 1 member 60*40*3 12.2 5.3 1 1 5.3
Top truss member 60*40*3 6.22 5.43 1 1 5.43
Bottom truss
6 T-3' 1 member 60*40*3 12.2 3.17 1 1 3.17
Top truss member 60*40*3 6.22 3.39 1 1 3.39
Total in m 258.66
Total
No.of
Purlin LATTICE Length .of
Descreption Type of Purlin Cross-section Length (m) Purlin
memeber PURLIN NO. Purlin
member
member
Lattice Purlin P-1 TOP 30*30*2.5 1 6.40 10 64.00
B/n axis A - B & 2 - 4
Lattice Purlin P-1 BOTTOM 30*30*2.5 1 6.30 10 63.00
Lattice Purlin P-2 TOP 30*30*2.5 2 6.08 10 60.80
B/n axis B - C & 2 - 4
Lattice Purlin P-2 BOTTOM 30*30*2.5 2 5.98 10 59.80
Lattice Purlin P-3 TOP 30*30*2.5 3 0.95 1 0.95
B/n axis C - D & 2 - 4
Lattice Purlin P-3 BOTTOM 30*30*2.5 3 0.85 1 0.85
Lattice Purlin P-4 TOP 30*30*2.5 4 1.65 1 1.65
B/n axis C - D & 2 - 4
Lattice Purlin P-4 BOTTOM 30*30*2.5 4 1.55 1 1.55
Lattice Purlin P-5 TOP 30*30*2.5 5 2.35 1 2.35
B/n axis C - D & 2 - 4
Lattice Purlin P-5 BOTTOM 30*30*2.5 5 2.25 1 2.25
Lattice Purlin P-6 TOP 30*30*2.5 6 3.05 1 3.05
B/n axis C - D & 2 - 4
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE
Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
B/n axis C - D & 2 - 4
Lattice Purlin P-6 BOTTOM 30*30*2.5 6 2.95 1 2.95
Lattice Purlin P-7 TOP 30*30*2.5 7 3.75 1 3.75
B/n axis C - D & 2 - 4
Lattice Purlin P-7 BOTTOM 30*30*2.5 7 3.65 1 3.65
Lattice Purlin P-8 TOP 30*30*2.5 8 4.45 1 4.45
B/n axis C - D & 2 - 4
Lattice Purlin P-8 BOTTOM 30*30*2.5 8 4.35 1 4.35
Lattice Purlin P-9 TOP 30*30*2.5 9 5.15 1 5.15
B/n axis C - D & 2 - 4
Lattice Purlin P-9 BOTTOM 30*30*2.5 9 5.05 1 5.05
Lattice Purlin P-10 TOP 30*30*2.5 10 5.85 1 5.85
B/n axis C - D & 2 - 4
Lattice Purlin P-10 BOTTOM 30*30*2.5 10 5.75 1 5.75
Lattice Purlin P-11 TOP 30*30*2.5 11 6.10 1 6.10
B/n axis E - F & 2 - 4
Lattice Purlin P-11 BOTTOM 30*30*2.5 11 6.00 1 6.00
Lattice Purlin P-12 TOP 30*30*2.5 12 6.40 11 70.40
B/n axis E - F & 2 - 4
Lattice Purlin P-12 BOTTOM 30*30*2.5 12 6.30 11 69.30
Lattice Purlin P-13 TOP 30*30*2.5 13 1.58 1 1.58
B/n axis D - E & 2 - 3
Lattice Purlin P-13 BOTTOM 30*30*2.5 13 1.48 1 1.48
Lattice Purlin P-14 TOP 30*30*2.5 14 3.03 1 3.03
B/n axis D - E & 2 - 3
Lattice Purlin P-14 BOTTOM 30*30*2.5 14 2.93 1 2.93
Lattice Purlin P-15 TOP 30*30*2.5 15 4.49 1 4.49
B/n axis D - E & 2 - 3
Lattice Purlin P-15 BOTTOM 30*30*2.5 15 4.39 1 4.39
Lattice Purlin P-16 TOP 30*30*2.5 16 6.21 1 6.21
B/n axis D - E & 2 - 3
Lattice Purlin P-16 BOTTOM 30*30*2.5 16 6.11 1 6.11
Lattice Purlin P-17 TOP 30*30*2.5 17 6.21 6 37.26
B/n axis D - E & 3 - 4
Lattice Purlin P-17 BOTTOM 30*30*2.5 17 6.11 6 36.66
Total in m 557.14
Total
No.of
Purlin LATTICE Length .of
Descreption Type of Purlin Cross-section Length (m) Purlin
memeber PURLIN NO. Purlin
member
member
Lattice Purlin P-18 TOP 30*30*2.5 18 7.4 12 88.80
B/n axis C - E & 1 - 2
Lattice Purlin P-18 BOTTOM 30*30*2.5 18 7.3 12 87.60
Lattice Purlin P-19 TOP 30*30*2.5 19 1.10 1 1.10
B/n axis D - E & 2 - 3
Lattice Purlin P-19 BOTTOM 30*30*2.5 19 1.00 1 1.00
Lattice Purlin P-20 TOP 30*30*2.5 20 2.17 1 2.17
B/n axis D - E & 2 - 3
Lattice Purlin P-20 BOTTOM 30*30*2.5 20 2.07 1 2.07
Lattice Purlin P-21 TOP 30*30*2.5 21 3.16 1 3.16
B/n axis D - E & 2 - 3
Lattice Purlin P-21 BOTTOM 30*30*2.5 21 3.06 1 3.06
Lattice Purlin P-22 TOP 30*30*2.5 22 4.15 1 4.15
B/n axis D - E & 2 - 3
Lattice Purlin P-22 BOTTOM 30*30*2.5 22 4.05 1 4.05
Lattice Purlin P-23 TOP 30*30*2.5 23 5.30 2 10.60
B/n axis C - D & 2 - 3
Lattice Purlin P-23 BOTTOM 30*30*2.5 23 5.20 2 10.40
Lattice Purlin P-24 TOP 30*30*2.5 24 5.30 2 10.60
B/n axis C - D & 2 - 3
Lattice Purlin P-24 BOTTOM 30*30*2.5 24 5.20 2 10.40
Lattice Purlin P-25 TOP 30*30*2.5 25 4.15 1 4.15
B/n axis C - D & 2 - 3
Lattice Purlin P-25 BOTTOM 30*30*2.5 25 4.05 1 4.05
Lattice Purlin P-26 TOP 30*30*2.5 26 1.50 1 1.50
B/n axis C - D & 3 - 4
Lattice Purlin P-26 BOTTOM 30*30*2.5 26 1.40 1 1.40
Lattice Purlin P-27 TOP 30*30*2.5 27 5.25 1 5.25
B/n axis C - D & 3 - 4
Lattice Purlin P-27 BOTTOM 30*30*2.5 27 5.15 1 5.15
Lattice Purlin P-28 TOP 30*30*2.5 28 3.16 1 3.16
B/n axis C - D & 3 - 4
Lattice Purlin P-28 BOTTOM 30*30*2.5 28 3.06 1 3.06
Lattice Purlin P-29 TOP 30*30*2.5 29 1.10 1 1.10
B/n axis C - D & 3 - 4
Lattice Purlin P-29 BOTTOM 30*30*2.5 29 1.00 1 1.00
B/n axis C - D On Lattice Purlin P-30 TOP 30*30*2.5 30 1.45 6 8.70
cantiliver Lattice Purlin P-30 BOTTOM 30*30*2.5 30 1.35 6 8.10
Total in m 285.78
Total
No.of
Purlin LATTICE Length .of
Descreption Type of Purlin Cross-section Length (m) Purlin
memeber PURLIN NO. Purlin
member
member
B/n axis A - B & 2 - 4 Lattice Purlin P-1 Diagonal Ø16 1 0.36 315 113.40
B/n axis B - C & 2 - 4 Lattice Purlin P-2 Diagonal Ø16 2 0.36 299 107.64
B/n axis B - C & 2 - 4 Lattice Purlin P-3 Diagonal Ø16 3 0.36 4 1.53
B/n axis C - D & 2 - 4 Lattice Purlin P-4 Diagonal Ø16 4 0.36 8 2.79
B/n axis C - D & 2 - 4 Lattice Purlin P-5 Diagonal Ø16 5 0.36 11 4.05
B/n axis C - D & 2 - 4 Lattice Purlin P-6 Diagonal Ø16 6 0.36 15 5.31
B/n axis C - D & 2 - 4 Lattice Purlin P-7 Diagonal Ø16 7 0.36 18 6.57
B/n axis C - D & 2 - 4 Lattice Purlin P-8 Diagonal Ø16 8 0.36 22 7.83
B/n axis C - D & 2 - 4 Lattice Purlin P-9 Diagonal Ø16 9 0.36 25 9.09
B/n axis C - D & 2 - 4 Lattice Purlin P-10 Diagonal Ø16 10 0.36 29 10.35
B/n axis E - F & 2 - 4 Lattice Purlin P-11 Diagonal Ø16 11 0.36 30 10.80
STANDARD TAKE OFF SHEET
Consultant :- ETG Designers & Consultants Plc.
Project :-40/60 ( B+G+9) saving house.
Location :-Addis Abeba
STEEL STRUCTURE
Total
Longer Shorter No.of truss
Number of Cross-section Length No.of Total
Item no. Type of truss Truss member type Length (m) horizontal horizontal member per
truss (mm) (m) truss Length(m)
length length pcs
member
B/n axis E - F & 2 - 4 Lattice Purlin P-12 Diagonal Ø16 12 0.36 347 124.74
B/n axis D - E & 2 - 3 Lattice Purlin P-13 Diagonal Ø16 13 0.36 7 2.66
B/n axis D - E & 2 - 3 Lattice Purlin P-14 Diagonal Ø16 14 0.36 15 5.27
B/n axis D - E & 2 - 3 Lattice Purlin P-15 Diagonal Ø16 15 0.36 22 7.90
B/n axis D - E & 2 - 3 Lattice Purlin P-16 Diagonal Ø16 16 0.36 31 11.00
B/n axis D - E & 3 - 4 Lattice Purlin P-17 Diagonal Ø16 17 0.36 183 65.99
B/n axis C - E & 1 - 2 Lattice Purlin P-18 Diagonal Ø16 18 0.36 438 157.68
B/n axis D - E & 2 - 3 Lattice Purlin P-19 Diagonal Ø16 19 0.36 5 1.80
B/n axis D - E & 2 - 3 Lattice Purlin P-20 Diagonal Ø16 20 0.36 10 3.73
B/n axis D - E & 2 - 3 Lattice Purlin P-21 Diagonal Ø16 21 0.36 15 5.51
B/n axis D - E & 2 - 3 Lattice Purlin P-22 Diagonal Ø16 22 0.36 20 7.29
B/n axis C - D & 2 - 3 Lattice Purlin P-23 Diagonal Ø16 23 0.36 52 18.72
B/n axis C - D & 2 - 3 Lattice Purlin P-24 Diagonal Ø16 24 0.36 52 18.72
B/n axis C - D & 3 - 4 Lattice Purlin P-25 Diagonal Ø16 25 0.36 20 7.29
B/n axis C - D & 2 - 3 Lattice Purlin P-26 Diagonal Ø16 26 0.36 7 2.52
B/n axis C - D & 3 - 4 Lattice Purlin P-27 Diagonal Ø16 27 0.36 26 9.27
B/n axis C - D & 3 - 4 Lattice Purlin P-28 Diagonal Ø16 28 0.36 15 5.51
B/n axis C - D & 3 - 4 Lattice Purlin P-29 Diagonal Ø16 29 0.36 5 1.80
B/n axis C - D On Lattice Purlin P-30 Diagonal Ø16 30
cantiliver 0.36 41 14.58
Total in m 751.34
Cross-
Item no. Structuere mamber section Total length of RHS Weight per Total
meter weight(kg)
(mm)
1 Truss 60*40*3 258.66 4.43 1145.88
2 Truss 40*40*2.5 182.86 2.9 530.29
3 purlin 30*30*2.5 842.92 2.14 1803.85
4 Total purlin (Rebar) Ф16 751.34 1.579 1186.36
Total weight 3480.02
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
8.GLAZING
item Description unit Qty Area in m2
Door
9.PAINTING 9.PAINTING
9.01.Quartz Paint to External Plastering Wall 9.01.Quartz Paint to Internal Plastering Wall
b.To External wall surface b.To Internal wall surface
on Ground floor on Ground floor
1 14.4 Along axis A b/n 1`&3` 2 16.29 Along axis A b/n 1`&3`
2.7 2.7
38.88 87.97
1 20.5 Along axis 1` b/n A-D 1 8.13 Along axis 1` b/n A-D
2.7 2.7
55.35 21.95
1 15.6 on axis D b/n 2-4 1 5.7 on axis C b/n 1`-2`
2.7 2.7
42.12 15.39
1 21.1 on axis3 b/n A-D 1 10.7 on axis2 b/n A`-C
2.7 2.7
56.97 28.89
1 -1.5 - 1 -3.2 -
1.5 - 1.5 -
(2.25) (4.80)
1 -0.9 - 1 -0.9 -
0.6 - 0.6 -
(0.54) (0.54)
190.53 1 -1.3 -
First floor 2.1 -
1 12.72 on axis 1` b/n A`-D (2.73)
2.7 1 -0.7 -
34.3 2.1 -
1 14.8 on axis 3 b/n A`-D (1.47)
2.7 -
39.96 -
1 9.13 on axis A b/n 1-3 -
2.7 -
24.7 144.66
1 9.15 on axis D b/n 1-3 First floor
2.7 1 12.6 on axis 1` b/n A`-D
24.71 2.7
4 -1.5 - 34.0
1.5 - 1 15.6 on axis 3 b/n A`-D
(9.00) 2.7
2 -0.9 - 42.12
0.6 - 1 9.13 on axis A b/n 1-3
(1.08) 2.7
2 -1.4 - 24.7
1.5 - 1 9.15 on axis D b/n 1-3
(4.20) 2.7
109.4 24.71
4 Third,Fifth,Seventh,and Ninth Typical floor 1 22.29 - on axis 2 b/n A-D
11.15 on axis A b/n 1-3 2.7 -
2.7 60.18
4 120.42 on axis 1` b/n A-D 2 14.8 - on axis 2-3 b/n A-D
12.73 - 2.7 -
2.7 - 79.92
4 137.48 2 2.6 -
9.1 - on axis D` b/n 1-3 2.7 -
2.7 - 14.04
4 98.28 2 3.2 -
16.68 - on axis 3 b/n A-D 2.7 -
2.7 - 17.28
180.14 2 4.58 -
4 -0.9 - 2.7 -
0.6 - 24.73
(2.16) 2 5.5 -
16 -1.5 - 2.7 -
1.5 - 29.70
(36.00) 2 4.18 -
8 -1.7 - 2.7 -
1.5 - 22.57
(20.40) 2 2.55 -
477.77 2.7 -
5 - Second,forth ,sixth ,Eighith and Tenth typical 13.77
12.8 - 2 5.2 -
2.7 - on axis 1 b/n A-D` 2.7 -
5 172.80 28.08
11.15 - on axis A b/n 1-3 2 4.7 -
2.7 - 2.7 -
5 150.53 25.38
9.23 - on axis D b/n 1-3 2 -0.8 -
2.7 - 2.1 -
5 124.61 (3.36)
16.34 - on axis 3 b/n A-D 2 -1.3 -
2.7 - 2.1 -
220.59 (5.46)
10 -0.9 - 2 -0.7 -
0.6 - 2.1 -
(5.40) (2.94)
20 -1.5 - 4 -1.5 -
1.5 - 1.5 -
(45.00) (9.00)
10 -1.7 - 2 -0.9 -
1.5 - 0.6 -
(25.50) (1.08)
592.62 2 -1.4 -
1 For Water Tanker 1.5 -
24.78 (4.20)
1.9 415.1
47.08 M2 Total water tanker Quartz Paint 3 Third,Fifth,Seventh Typical floor
47.08 m2 Total Quartz Paint 11.15 on axis A b/n 1-3
2.7
3 90.32 on axis 1` b/n A-D
12.73 -
2.7 -
3 103.11
9.1 - on axis D` b/n 1-3
2.7 -
3 73.71
16.68 - on axis 3 b/n A-D
2.7 -
135.11
6 -0.9 -
0.6 -
(3.24)
12 -1.5 -
1.5 -
(27.00)
28 -1.4 -
1.5 -
(58.80)
2 35.35 -
2.7 -
190.89
2 28.22 -
2.7 -
152.39
12 -1.35 -
2.1 -
(34.02)
36 -0.8 -
2.1 -
(60.48)
24 -0.7 -
2.1 -
(35.28)
526.70
4 - Second,forth ,sixth ,Eighith and Tenth typical
12.8 -
2.7 - on axis 1 b/n A-D`
4 138.24
11.15 - on axis A b/n 1-3
2.7 -
4 120.42
9.23 - on axis D b/n 1-3
2.7 -
4 99.68
16.34 - on axis 3 b/n A-D
2.7 -
176.47
10 -0.9 -
0.6 -
(5.40)
20 -1.5 -
1.5 -
(45.00)
20 -1.4 -
1.5 -
(42.00)
10 35.35 -
2.7 -
954.45
10 28.22 -
2.7 -
761.94
20 -1.35 -
2.1 -
(56.70)
50 -0.8 -
2.1 -
(84.00)
45 -0.7 -
2.1 -
(66.15)
1,951.96
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa
5. Metal Work
HandRail
20 2
0.9
36 m2
20 2.6
0.9
46.8 m2
20 1.55
0.9
27.9
110.7 m2 Total #
12.ALUMINUM
6 0.15
3.2
2.88 m2
12.86 Total area of formwork in m2
1.8 marble ff
1 2 Landing
2.884
5.77 m2
1 2.884
3.2
9.23 m2
1 4.759
5.3
25.22 m2
40.22 Total area of marble in m2
6 3.2 Tread
19.20 ml
12 2.884
34.61 ml
53.81 Total length of marble in ml
6 3.2 riser
19.20 ml
13 2.884
37.49 ml
56.69 Total length of marble in ml
B. FENCE WORK
2.EXCAVATION AND EARTH WORK
2.1 Trench Excavation
1 35.5 total perimeter==17.2+18.3=35.5
1 W= 0.5+0.25*2=1
1 H=1.0
35.50 m3
35.50 Total volume of treanch up to 1.5m in m3
2.2 Back fill Around masonary wall
1 35.5
0.5
1
17.75 m3
17.75 Total volume of back fill around masonary wall in m3
2.3 cart away
17.75 total volume of excavation
17.75 Total volume of cart away in m3
2.4 Masonary wall
1 35.5 total perimeter=35.5
0.5 W= 0.5+0.25*2=1
1 H=1.0
17.75 m3
17.75 Total volume of masonary wall in m3
2.5 concrete
1 0.2 beam
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
0.5
35.5
3.55 m3
10 0.25 column
0.3
3
2.25 m3
5.80 Total volume of concrete in m3
2.6 formwork
2 0.2 Beam Sponda
17.2
6.88 m2
2 0.2 Beam Sponda
18.3
7.32 m2
10 1.1
3
33.00 m2
47.20 Total area of formwork in m2
2.7 20cm thick HCB WALL
1 3 rear side
17.2
51.60 m2
-5 0.3 deduct column
3
-4.50 m2
1 18.3 front side
3
54.90 m2
-5 0.3 deduct column
3
-4.50 m2
-1 6 deduct main gate
3
-18.00 m2
-1 1.2 deduct secondary gate
3
-3.60 m2
75.90 Total area of HCB wall in m2
2.8 Plastering
2 3 rear side
17.2
103.20 m2
2 18.3 front side
3
109.80 m2
-10 0.3 deduct column
3
-9.00 m2
-2 6 deduct main gate
3
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-ATO DEMSE AYENEW RESIDENCE
Location :-Addis Ababa Page of
TIM DIMN. TOTAL DESCRIPTION
-36.00 m2