DRA Global Overview

// 1
Tigers Realm
⁄ Tiger Realm Coal project F
• PFS done from DRA’s offices in Brisbane
• Coal Handling Processing Plant design and
associated infrastructure as well as port and
marine work.

STRICTLY CONFIDENTIAL
// 2
Renard Diamond Project
⁄ Client: Stornoway Diamonds
⁄ Location: Northern Quebec, Canada
⁄ DRA Role: EP Contractor & Commissioning Support
⁄ Project duration 24 months (Q3 2014 to Q3 2016)
⁄ Design Contribution to Safety
• Reduced final designed quantities significantly from FS
• Reduced construction time and reduced risk exposure
• Pre-fabricated concrete and offsite pre-assembly
and modular construction concepts reduced
construction time and risk of working at heights.
• Quality of design enhances productivity, reduces
site based modifications and therefore reduces
potential of injuries.
• Prioritized design to allow safe and efficient
construction inside a functional winterized
building during winter in Northern Quebec.

STRICTLY CONFIDENTIAL 3
Nemaska Lithium Project
⁄ First Lithium
project in
Canada

STRICTLY CONFIDENTIAL 4
Mount Pleasant Project
⁄ Client: Mach Energy
⁄ Scope: EPC for the design and
construction of the CHPP and train load
out (TLO) facility
⁄ Location: New South Wales, Australia

COAL

STRICTLY CONFIDENTIAL 5
Kamoa-Kakula Copper Project
⁄ Client: Ivanhoe Mines
⁄ Location: DRC
⁄ Status: Prefeasibility study
⁄ DRA Role: EPCM principal
contractor for the Mining Scope
⁄ Estimate Project Cost: Total capital
cost for Project Circa AUD$ 1.8B
⁄ Project Details (DRA Scope):
• Development and Equipping of two
6Mtpa Declines
• All Underground infrastructure
• All Mining related surface
infrastructure
• Raise boring and equipping of
various ventilation shafts

STRICTLY CONFIDENTIAL 6
Kibali Gold Project
⁄ Client: Randgold Resources | AGA
⁄ Location: North Eastern DRC
⁄ Status: Operational since 2014
⁄ DRA Role: Main EPCM Contractor and
Managing Contractor

⁄ Project Cost: AUD$ 1.06B


⁄ Project Details (DRA Scope)
• Design of 7.2 Mtpa Oxide & Sulphide
Circuits
• Associated Infrastructure
• Lined & Unlined Tailing Systems
• 22 MW Hydro Power Plant &
• 44 MW Diesel Power Plant
• Gold plant completion 26 months
• Project Timeline
• First gold pour 20 months from
construction start

STRICTLY CONFIDENTIAL
// 7
Obotan Gold Project
⁄ Client: Asanko Gold
⁄ Location: Ghana
⁄ Status: Project completed in 2015
⁄ DRA Role: Study Manager, Main EPCM
Contractor and Managing Contractor

⁄ Project Cost: AUD$ 450M


⁄ Project Details:
• 3Mtpa Gold CIL Project
• Detailed Design Commenced in 2013
• Testwork & Feasibility Study work carried
out by DRA
• Construction from Q2 2014 to Q4 2015
• First gold pour December 2015
• Project duration 21 months
• 2014 West Africa Ebola Outbreak

STRICTLY CONFIDENTIAL
// 8
Bisie Tin Project
⁄ Client: Alphamin Resources
⁄ Location: Eastern DRC
⁄ Status: Currently in Construction
⁄ DRA Role: Main EPCM Contractor AND
Managing Contractor

⁄ Project Cost: AUD170M


⁄ Project Details (DRA Scope)
• Onsite and Offsite Infrastructure
• Access Road
• Airstrip
• Construction Camp
• Boxcut and Mine Development
• Process Plant
• Project Timeline
• Commissioning Q2, 2019

STRICTLY CONFIDENTIAL
// 9
Platreef Platinum Project
⁄ Client: Ivanplats part of Ivanhoe Mines
⁄ Location: South Africa
⁄ Status: FS Complete, Early works commenced
⁄ DRA Role: EPCM principal contractor
⁄ Estimate Project Cost: Total capital cost for
Project Circa AUD$2.17B
⁄ Project Details (DRA Scope)
• Development and Equipping of 7.2m early
development and ventilation shaft,
• Raise Boring and equipping of various
ventilation shafts.
• Development and Equipping of 10.2m Main
production shaft,
• All Mining related surface infrastructure
• Dual stream 4 Mtpa Concentrator plant
• All Underground infrastructure
• Bulk and general infrastructure
• Tailings dam
STRICTLY CONFIDENTIAL
// 10
Elikhulu Gold Project
⁄ Client: Pan African Recourses
⁄ Location: South Africa
⁄ DRA Role:
• Full EPCM of the Gold Tailings
Retreatment Project

⁄ Project Cost:
• Total capital cost for Project AUD$ 170M

⁄ Project Details (DRA Scope):


• Engineering, procurement and
Construction of a 1.2Mtpm Tailings
Retreatment Facility
• Management of the Tailings Dam
contractor

STRICTLY CONFIDENTIAL
// 11
Bel Air Bauxite Project
⁄ Client: Alufer Mining
⁄ Location: Guinea
⁄ DRA Role: EPCM contractor
⁄ Project Cost: AUD$165M
⁄ Project Details (DRA Scope):
• 5.5Mtpa Processing plant
• 1.4km causeway and barge loading berth built
into the Atlantic Ocean

STRICTLY CONFIDENTIAL
// 12
Ahafo SAME Gold Project
⁄ Client: Newmont
⁄ Location: Ghana
⁄ DRA Role: EPCM Contractor
⁄ Project Cost: AUD$280M
⁄ Project Details (DRA Scope):
• Line 1 to 3.3Mtpa
• Primary Gyratory 54x75 – This changed from the
original designed 60x89 to allow for communality
to the existing plant
• SAG milling P80 -106µm -34’x16.4’ (13MW) –
Optimized mill layout and reduced mill installation
height by 4m
• 2 x HP 400 pebble crushers -Lowered pebble
building by 6m
• Upgrading of mainstream pumps (Leach feed,
CCD feed and Tails disposal)
• Add 2 x 3300m3 Leach tanks ahead of the
existing 10x CIL tanks

STRICTLY CONFIDENTIAL
// 13
Belfast Coal Project
⁄ Client: Exxaro
⁄ Location: South Africa
⁄ DRA Role: EPC contractor (Plant only)
⁄ Project Cost: AUD$85M
⁄ Project Details (DRA Scope)
• 500 tph CHPP including a Fines DMS and
filter section

STRICTLY CONFIDENTIAL
// 14