CALCULATION BUILD UP BODY

COST OF LABOR $3.00


NORMAL CONDITION (HOUR)
UNNORMAL CONDITION (HOUR)

COST OF POWER CONSUMTION $1.25


NORMAL CONDITION (HOUR)
UNNORMAL CONDITION (HOUR)

COST OF TOOL
ELECTRODE ESSAB $11.00 /KG
ASBES BLANKET $11.00 /M
CUTTING INSERT $10.00 /EA
ACETHYLIN $23.00 /TUBE
OXYGEN $8.25 /TUBE
FILE $9.00 /EA
WIRE BRUSH $1.50 /EA
SANDPAPER $1.00 /EA
WCP $9.00 /EA
7HF $9.00 /EA
EPOXY $20.00 /SET
PAINT $7.00 /KG
THINNER $4.00 /KG
BOARD $4.00 /SHEET
WOOD $3.00 /EA
NAIL $2.00 /KG

COST OF MACHINE $2.00


NORMAL CONDITION
UNNORMAL CONDITION

COST OF 3RD PARTY $120.00


SAFETY FACTOR COST 10%
Y
PENGGUNAAN

8 $24.00
0 $0.00

4 $5.00
5 $6.25

4 $44.00
0 $0.00
1 $10.00
1 $23.00
1 $8.25
0 $0.00
2 $3.00
1 $1.00
1 $9.00
1 $9.00
0 $0.00
0 $0.00
0 $0.00
0 $0.00
0 $0.00
0 $0.00

1 $2.00
2 $4.00

$26.85

TOTAL $295.35