BURGOS AGRO-INDUSTRIAL SCHOOL

PROGRAM OF WORK

I. PROJECT IMPROVEMENT OF SCHOOL WATER LINE SYSTEM AT JUNIOR HIGH SCHOOL AND
SENIOR HIGH SCHOOL BLDG
II. COST OF THE PROJECT

III. SOURCE OF FUND

IV. BILL OF MATERIALS

ITEM UNIT
UNIT DESCRIPTION QUANTITY AMOUNT
NO. COST
1 PCS G.I. PIPE 1" (S40) 3 ₱ 1,277.00 ₱ 3,831.00
2 PCS G.I. PIPE 1/2" (S40) 5 ₱ 662.00 ₱ 3,310.00
3 PCS COUPLING 1/2" 5 ₱ 40.00 ₱ 200.00
4 PCS G.I. ELBOW 1" 6 ₱ 90.00 ₱ 540.00
5 PCS G.I. UNION 1" 3 ₱ 208.00 ₱ 624.00
6 PCS G.I. UNION 1/2" 6 ₱ 112.00 ₱ 672.00
7 PCS G.I. UNION 3/4" 3 ₱ 140.00 ₱ 420.00
8 PCS G.I. ELBOW 1/2'' 20 ₱ 51.00 ₱ 1,020.00
9 PCS G.I. T-BOW 1" 4 ₱ 101.00 ₱ 404.00
10 PCS G.I. T-BOW 1/2" 10 ₱ 56.00 ₱ 560.00
11 PCS G.I. T-BOW 3/4" 6 ₱ 68.00 ₱ 408.00
12 PCS GATEVALVE 3/4" (BB) 5 ₱ 504.00 ₱ 2,520.00
13 PCS GATEVALVE 1" (BB) 5 ₱ 650.00 ₱ 3,250.00
14 PCS BUSHING REDUCER 1"X3/4" 5 ₱ 73.00 ₱ 365.00
15 PCS BUSHING REDUCER 3/4"X1/2" 5 ₱ 56.00 ₱ 280.00
16 PCS PRIMA ELECTRIC PUMP 1.0 HP 5 ₱ 8,540.00 ₱ 42,700.00
17 PCS STAINLESS STEEL TANK 42 GALLONS 3 ₱ 7,680.00 ₱ 23,040.00
18 PCS BRASS FOOTVALVE 1" (WB) 2 ₱ 784.00 ₱ 1,568.00
19 PCS PREASURE SWITCH 3 ₱ 616.00 ₱ 1,848.00
20 PCS METER GAUGE 3 ₱ 168.00 ₱ 504.00
21 PCS F-BRASS CONNECTOR 3 ₱ 336.00 ₱ 1,008.00
22 PCS TAPEFLON 20MM 20 ₱ 17.00 ₱ 340.00
23 PC HDPE FEMALE ADAPTER 25MMX 20MM 4 ₱ 124.00 ₱ 496.00
24 ROLL H.D. BLACK HOSE 25MMX2.0MM (sdr 13.5mm) 1 ₱ 6,000.00 ₱ 6,000.00
25 PCS BRASS FAUCET 1/2" 20 ₱ 252.00 ₱ 5,040.00
26 PCS TOILET BOWL SET 1 ₱ 7,504.00 ₱ 7,504.00
27 PCS HEAVY DUTY MALE PLUG 15A 5 ₱ 51.00 ₱ 255.00
28 PCS WIDE SERIES OUTLET 2 GANG UNIVERSAL W/ SURFACE U-BOX 5 ₱ 219.00 ₱ 1,095.00
29 PCS BRASS/PVC TANK FLOATER 1/2" 2 ₱ 784.00 ₱ 1,568.00
30 ROLLS HDPE BLACK HOSE 40MMX2.0MM (sdr 13.5mm) 3 ₱ 6,000.00 ₱ 18,000.00
SET Horizontal stainless storage tank bestank 2 ₱ 26,000.00 ₱ 52,000.00

31 PCS HDPE COUPLING CONNECTOR 40MM 3 ₱ 300.00 ₱ 900.00


32 PCS HDPE MALE ADAPTER 40MM 2 ₱ 250.00 ₱ 500.00
33 PC FOOTVALVE 1 1/4" 1 ₱ 1,008.00 ₱ 1,008.00
34 METERS FLAT CORD 2.0MM (#14) 20 ₱ 64.00 ₱ 1,280.00
TOTAL ₱ 185,058.00
V. LABOR

NO. OF DAYS NO. LABORERS RATE PER DAY TOTAL


0 0 0 ₱ -

TOTAL ₱ -

Summary: Materials :
Labor Cost : ₱ -
Total Cost :

Prepared by:

JEFFREY T. MANAGAD
Technical Working Group Noted:

ANGELITO T. BAUTISTA
School Principal II
R&M - Land Improvements - Other Land Im
R&M - Infrastructure Assets - Water Supply
R&M - Infrastructure Assets - Power Supply
Type of R&M-Semi-Exp. Machinery and Equip. - Disaster Response
Repair and Rescue Equip.
R&M - Buildings and Other Structures - Scho
R&M - Buildings and Other Structures - Oth
R&M - Machinery and Equip. - Machinery
R&M - Machinery and Equip. - Office Equip.
R&M - Machinery and Equip. - ICT Equip.
R&M - Machinery and Equip. - Communicati
R&M - Machinery and Equip. - Disaster Resp
R&M - Machinery and Equip. - Medical Equi
FILTER
UNIT

HIDE ###

HIDE ###
HIDE ###

HIDE ###
HIDE ###

HIDE ###
HIDE ###

HIDE ###
HIDE ###
HIDE ###
HIDE ###
HIDE ###

HIDE ###
HIDE ###

HIDE ###
UNHIDE
UNHIDE
UNHIDE
UNHIDE
UNHIDE
UNHIDE No. Of Days
HIDE ###
UNHIDE
UNHIDE

You might also like