You are on page 1of 2

P R IM A R Y

STRUC TURE S
C O R P O R A T IO N
Revision 1, Series 2002

NIGHT SHIFT TURNOVER REPORT


Reference No :
Date :
Project :
Location : Weather :
Moonlight
To : Rainy
Project In-Charge / Manager Stormy

MANPOWER WORKED ACCOMPLISHED QUANTITY OF PRODUCTIVITY REMARKS


Present Absent No. of Manpower WORK DONE RATE
Engineer
Admin. Assistant
Foreman
Junior Foreman
Leadman
Team Leader
Formworker
Mason
Laborer
Steelman
Operator / Tender
Warehouse
EQUIPMENT USED PROBLEMS ENCOUNTERED SOLUTIONS DONE

Tcrane Skidloader
Mcrane Service Truck
Bhoe Generator
Dtruck Bar Cutter
Payloader Bar Bender
Conc.Pump Conc. Vibrator
Rroller Power Trowel
Bdozer Welding Machine
Mdozer Electric Hoist

HAZARD CONDITION CORRECTIVE MEASURES Prepared by: Acknowledge by:

Night Shift In-Charge Project In-Charge / Manage


REMARKS

cknowledge by:

roject In-Charge / Manager