You are on page 1of 16

Financial Progress as on : (Based on the RA Bill against the total EPC cost)

EPC Cost 0.00 In Crores

Total Quantity
Item No Item Unit Rate
LHS RHS
A1 Road Works
A1.1 Road Works (Main carriageway - New construction for Realignment, Bypass etc)

A1.1.1 Site Clearance & Dismantling Km

Earthwork upto SG top (Inc


A1.1.2 Km/Cum
Median & Shoulder)
Embankment Top Km/Cum
Sub Grade Top Km/Cum
A1.1.3 GSB Km
A1.1.4 WMM Km
A1.1.5 DBM Km
A1.1.6 BC Km
A1.1.7 Kerb
A1.1.8 Median Drain
A1.1.9 Median Filling
A1.1.10 Shoulder Filling
A1.2 Road Works (Main Carriageway - Widening)

A1.2.1 Site Clearance & Dismantling Km

Earthwork upto SG top (Inc


A1.2.2 Km
Median & Shoulder)
Embankment Km
Sub Grade Km

Median, Shoulder & Turfing Km

A1.2.3 GSB Km
A1.2.4 WMM Km
A1.2.5 DBM + DBM (PCC) Km
A1.2.6 BC Km
A1.3 Road Works (Service Road & Slip Road)

A1.3.1 Site Clearance & Dismantling Km


Earthwork upto SG top (Inc
A1.3.2 Km
Median & Shoulder)
Embankment Km
Sub Grade Km

Median, Shoulder & Turfing Km

A1.3.3 GSB Km
A1.3.4 WMM Km
A1.3.5 DBM Km
A1.3.6 BC Km
A1.3.7 Drain
Sub-Total (A1)

A2 Structure Works
A2.1 Culverts
A2.1.1 Pipe Culvert
New Construction /
A2.1.1.1 No
Reconstruction (BHS)

A2.1.1.2 Widening of Existing Culvert No

A2.1.2 Box Culvert


New Construction /
A2.1.2.1 No
Reconstruction (BHS)

A2.1.2.2 Widening of Existing Culvert No

A2.2 Minor Bridge


A2.2.1 Minor Bridge New Construction / Reconstruction (MCW)
A2.2.1.1 Foundation No
A2.2.1.2 Substructure No
A2.2.1.3 Superstructure No
A2.2.2 Minor Bridge Widening
A.2.2.2.1 Foundation No
A.2.2.2.2 Substructure No
A.2.2.2.3 Superstructure No
A2.2.3 Minor Bridge New Construction Service Road
A2.2.3.1 Foundation No
A2.2.3.2 Substructure No
A2.2.3.3 Superstructure No
A2.3 Major Bridge
A2.3.1 Foundation No
A2.3.2 Substructure No
A2.3.3 Superstructure No
A2.4 Fly Over
A2.4.1 Foundation No
A2.4.2 Substructure No
A2.4.3 Superstructure No
A2.5 ROB
A2.5.1 Foundation No
A2.5.2 Substructure No
A2.5.3 Superstructure No
A2.6 VUP / VOP / PUP / CUP
A2.6.1 Foundation No
A2.6.2 Substructure No
A2.6.3 Superstructure No
Sub-Total (A2)

A3 RE / RCC Wall
A3.1 Casting of RE Wall Sqm
A3.2 Erection of RE Wall Sqm
Construction with Selected
A3.3 Rmt
Earth Fill

A3.4 Friction slab & RCC Parapet Rmt

A3.5 RCC Wall (VOP Approach) Rmt


Sub-Total (A3)

A4 Toll Plaza And Admin Building


Toll plaza weigh bridge, Safety
Boards, Wire mesh barriers,
A4.1 No
Blinkers, etc. safety related
works

Toll Plaza Lightning (inc High


A4.2 No
Mast & Generator)
A4.3 Admin Building (inc all) No
A4.4 Tunnel (2.5m x 2.5m) No
Toll Booth Lanes (14 lanes inc
A4.5 No
all)
A4.6 Toll Canopy No
A4.7 RCC Cover Drain Rmt
Construction upto GSB Full
A4.8 Sqm
Width
A4.9 DLC Full Width Sqm
A4.10 PQC Full Width Sqm
Miscellaneous Works like
A4.11 No
Kerbs, footpath tiles, etc.
Sub-Total (A4)

A5 Traffic signs, Markings & other Road Appurtenances


Traffic signs, Kerb, Markings,
A5.1 Junctions & other Road Km
Appurtenances
A5.2 HTMS No
Safety During Construction
A5.3 Month
Period
A5.4 Highway Lighting Km
Maintenance of road & Traffic
A5.5 Month
management
Sub-Total (A5)

A6 Miscellaneous Works
Sub-Total (A6)
Grand Total
st the total EPC cost)
Cumulative Work done till Cumulative Work done till
Work done on date
Last Date Date

Amount Qty. Amount (Rs.) Qty. Amount (Rs.) Qty.

t, Bypass etc)
umulative Work done till
Date

Amount (Rs.)
B) Physical Progress for Karnataka Section ( Km.39+000 to Km.110+542 )
EPC Cost 9,639,770,000 963.98 Cr Total Length 71.328 Km
B) Physical Progress for Karnataka Section ( Km.39+000 to Km.110+542 ) Up to April 2019
As per Cost Weightage in Weightage Average 4/6- Value of Progress upto
Cost per Qty Total Value Progress in
Sr. No. Component Unit Scope of per Qty Component in Project Lane Progress Physical Previous
(Rs.) (Cr) this Month
Work (Cr.) (%) (%) till Date Progress (%) Month
B1 Road Works
B1.1 Road Works (NCW)
B1.1.1 Site Clearance & Dismantling Km 62.264 647,712 0.06 4.03 0.42% 36.80 0.25% 36.80 0.00
Earthwork upto SG top (Inc Median &
B1.1.2 Km 124.528 10,359,186 1.04 64.50 6.69% 55.88 3.00% 21.87 34.01
Shoulder)
B1.1.3 GSB Km 62.264 3,496,523 0.35 21.77 2.26% 19.66% 21.15 0.77% 13.55 7.60
B1.1.4 WMM Km 62.264 3,689,996 0.37 22.98 2.38% 10.14 0.39% 3.41 6.73
B1.1.5 DBM Km 62.264 8,093,596 0.81 50.39 5.23% - 0.00% - -
B1.1.6 BC Km 62.264 4,144,235 0.41 25.80 2.68% - 0.00% - -
B1.2 Road Works (ECW)
B1.2.1 Site Clearance & Dismantling Km 62.264 395,357 0.04 2.46 0.26% 20.33 0.08% 17.78 2.55
Earthwork upto SG top (Inc Median &
B1.2.2 Km 124.528 5,148,048 0.51 32.05 3.33% 8.69 0.23% 2.93 5.76
Shoulder)
B1.2.3 GSB Km 62.264 2,613,279 0.26 16.27 1.69% 14.53% 0.50 0.01% - 0.50
B1.2.4 WMM Km 62.264 2,376,346 0.24 14.80 1.53% - 0.00% - -
B1.2.5 DBM + PCC Km 62.264 7,999,664 0.80 49.81 5.17% - 0.00% - -
B1.2.6 BC Km 62.264 3,960,576 0.40 24.66 2.56% - 0.00% - -
B1.3 Road Works (Concentric Widening)
B1.3.1 Site Clearance & Dismantling Km 18.128 521,535 0.05 0.95 0.10% 2.12 0.01% 2.12 -
Earthwork upto SG top (Inc Median &
B1.3.2 Km 36.256 7,753,617 0.78 14.06 1.46% 1.08 0.04% 1.08 -
Shoulder)
B1.3.3 GSB Km 18.128 3,054,901 0.31 5.54 0.57% 4.98% - 0.00% - -
B1.3.4 WMM Km 18.128 3,033,171 0.30 5.50 0.57% - 0.00% - -
B1.3.5 DBM + PCC Km 18.128 8,046,630 0.80 14.59 1.51% - 0.00% - -
B1.3.6 BC Km 18.128 4,052,406 0.41 7.35 0.76% - 0.00% - -
B1.4 Road Works (Service Road & Slip Road - BHS)
B1.4.1 Site Clearance & Dismantling Km 33.19 692,980 0.07 2.30 0.24% 8.45 0.06% 7.63 0.83
Earthwork upto SG top (Inc Median &
B1.4.2 Km 66.38 11,789,696 1.18 39.13 4.06% 9.48 0.58% 3.61 5.87
Shoulder)
B1.4.3 GSB Km 33.19 5,200,362 0.52 17.26 1.79% 9.79% 2.41 0.13% 0.62 1.79
B1.4.4 WMM Km 33.19 5,200,362 0.52 17.26 1.79% 1.12 0.06% 0.34 0.78
B1.4.5 DBM Km 33.19 3,121,422 0.31 10.36 1.07% 0.58 0.02% - 0.58
B1.4.6 BC Km 33.19 2,428,442 0.24 8.06 0.84% - 0.00% - -

B2 Structure Works
B2.1 Culverts
B2.1.1 Pipe Culvert
New Construction / Reconstruction
B2.1.1.1 No 66 945,455 0.09 6.24 0.65% 16.00 0.16% 8.00 8.00
(BHS) 1.00%
B2.1.1.2 Widening of Existing Culvert No 35 960,000 0.10 3.36 0.35% 11.00 0.11% 7.00 4.00
B2.1.2 Box Culvert
New Construction / Reconstruction
B2.1.2.1 No 42 2,228,571 0.22 9.36 0.97% 8.20 0.19% 7.40 0.80
(BHS) 1.00%
B2.1.2.2 Widening of Existing Culvert No 1 2,400,000 0.24 0.24 0.02% - 0.00% - -
B2.2 Minor Bridge
B2.2.1 Minor Bridge New Construction / Reconstruction (MCW)
B2.2.1.1 Foundation No 165 1,364,848 0.14 22.52 2.34% 14.00 0.20% 10.00 4.00
B2.2.1.2 Substructure No 165 1,364,848 0.14 22.52 2.34% 7.79% 4.00 0.06% 3.00 1.00
B2.2.1.3 Superstructure No 120 2,502,500 0.25 30.03 3.12% 3.40 0.09% 2.55 0.85
B2.2.2 Minor Bridge Widening
B.2.2.2.1 Foundation No 11 800,000 0.08 0.88 0.09% 1.00 0.01% 1.00 -
B.2.2.2.2 Substructure No 11 800,000 0.08 0.88 0.09% 0.30% - 0.00% - -
B.2.2.2.3 Superstructure No 8 1,462,500 0.15 1.17 0.12% - 0.00% - -
B2.2.3 Minor Bridge New Construction Service Road
B2.2.3.1 Foundation No 50 1,170,000 0.12 5.85 0.61% 3.00 0.04% 2.00 1.00
B2.2.3.2 Substructure No 50 1,170,000 0.12 5.85 0.61% 2.02% 1.00 0.01% - 1.00
B2.2.3.3 Superstructure No 36 2,166,667 0.22 7.80 0.81% 0.85 0.02% - 0.85
B2.3 Major Bridge
B2.3.1 Foundation No 4 3,925,000 0.39 1.57 0.16% - 0.00% - -
B2.3.2 Substructure No 4 2,275,000 0.23 0.91 0.09% 0.43% - 0.00% - -
B2.3.3 Superstructure No 3 5,500,000 0.55 1.65 0.17% - 0.00% - -
B2.4 Fly Over
B2.4.1 Foundation No 32 2,721,875 0.27 8.71 0.90% 3.00 0.08% - 3.00
B2.4.2 Substructure No 32 2,721,875 0.27 8.71 0.90% 3.01% - 0.00% - -
B2.4.3 Superstructure No 26 4,465,385 0.45 11.61 1.20% - 0.00% - -
B) Physical Progress for Karnataka Section ( Km.39+000 to Km.110+542 ) Continued…

Page 13 of 16
B) Physical Progress for Karnataka Section ( Km.39+000 to Km.110+542 )
EPC Cost 9,639,770,000 963.98 Cr Total Length 71.328 Km
B) Physical Progress for Karnataka Section ( Km.39+000 to Km.110+542 ) Up to April 2019
As per Cost Weightage in Weightage Average 4/6- Value of Progress upto
Cost per Qty Total Value Progress in
Sr. No. Component Unit Scope of per Qty Component in Project Lane Progress Physical Previous
(Rs.) (Cr) this Month
Work (Cr.)
Cost
(%) (%) till Date Progress (%) Month
As per Cost per Qty per Qty
Total Value Weightage in Weightage Average 4/6- Value of Progress upto
(Rs.) (Cr) Progress in
Sr. No. Component Unit Scope of (Cr.) Component in Project Lane Progress Physical Previous
this Month
Work (%) (%) till Date Progress (%) Month
B2.5 ROB
B2.5.1 Foundation No 4 4,400,000 0.44 1.76 0.18% - 0.00% - -
B2.5.2 Substructure No 4 4,400,000 0.44 1.76 0.18% 0.61% - 0.00% - -
B2.5.3 Superstructure No 3 7,833,333 0.78 2.35 0.24% - 0.00% - -
B2.6 VUP / VOP / PUP
B2.6.1 Foundation No 46 921,739 0.09 4.24 0.44% 5.00 0.05% 2.00 3.00
B2.6.2 Substructure No 46 921,739 0.09 4.24 0.44% 1.47% 1.00 0.01% - 1.00
B2.6.3 Superstructure No 24 2,358,333 0.24 5.66 0.59% 0.85 0.02% - 0.85

B3 RE / RCC Wall
B3.1 Casting of RE Wall Sqm 175887 1,814 0.00 31.91 3.31% 2,189.34 0.04% - 2,189.34
B3.2 Installation of RE Wall Sqm 175887 1,809 0.00 31.82 3.30% - 0.00% - -
B3.3 Construction with Selected Earth Fill Rmt 19732 37,878 0.00 74.74 7.75% 21.09% - 0.00% - -
B3.4 Friction slab & RCC Parapet Rmt 18874 25,140 0.00 47.45 4.92% - 0.00% - -
B3.5 RCC Wall (VOP Approach) Rmt 800 217,750 0.02 17.42 1.81% - 0.00% - -

B4 Toll Plaza And Admin Building


Toll plaza weigh bridge, Safety
B4.1 Boards, Wire mesh barriers, Blinkers, No 1 3,600,000 0.36 0.36 0.04% - 0.00% - -
etc. safety related works
Toll Plaza Lightning (inc High Mast &
B4.2 No 1 7,200,000 0.72 0.72 0.07% - 0.00% - -
Generator)
B4.3 Admin Building (inc all) No 1 7,200,000 0.72 0.72 0.07% - 0.00% - -
B4.4 Tunnel (2.5m x 2.5m) No 1 3,600,000 0.36 0.36 0.04% - 0.00% - -
B4.5 Toll Booth Lanes (14 lanes inc all) No 14 1,985,714 0.20 2.78 0.29% 1.25% - 0.00% - -
B4.6 Toll Canopy No 1 4,800,000 0.48 0.48 0.05% - 0.00% - -
B4.7 RCC Cover Drain Lm 1084 3,875 0.00 0.42 0.04% - 0.00% - -
B4.8 Construction upto GSB Full Width Sqm 21737 584 0.00 1.27 0.13% - 0.00% - -
B4.9 DLC Full Width Sqm 21737 391 0.00 0.85 0.09% - 0.00% - -
B4.10 PQC Full Width Sqm 21737 1,780 0.00 3.87 0.40% - 0.00% - -
Miscellneous Works like Kerbs,
B4.11 No 1 2,400,000 0.24 0.24 0.02% - 0.00% - -
footpath tiles, etc.

B5 Traffic signs, Markings & other Road Appurtenances


Traffic signs, Kerb, Markings,
B5.1 Junctions & other Road
Appurtenances
Kerb Construction & Painting Km 142.656 720,523 0.07 10.28 1.07% 0.58 0.58 0.00
Rest all items mentioned above
Km 71.328 4,824,375 0.48 34.41 3.57%
excluding Kerb
10.15%
B5.2 HTMS No 1 62,000,000 6.20 6.20 0.64% - 0.00% - -
B5.3 Safety During Construction Period Month 30 756,667 0.08 2.27 0.24% 6.00 0.05% 5.00 1.00
B5.4 Drains Km 71.328 2,471,680 0.25 17.63 1.83% - 0.00% - -
B5.5 Highway Lighting Km 71.328 2,058,098 0.21 14.68 1.52% - 0.00% - -
Maintenance of road & Traffic
B5.6 Month 20 6,165,000 0.62 12.33 1.28% 6.00 0.38% 5.00 1.00
management

B6 Miscellaneous Works
Supply of Photographs & Video
B6.1 Month 30 246,667 0.02 0.74 0.08% 6.00 0.015% 5.00 1.00
Recording
B6.2 Construction of Bus Shelter No 2 3,550,000 0.36 0.71 0.07% - 0.00% - -
Construction of Rain Water
B6.3 Km 71.328 260,767 0.03 1.86 0.19% - 0.00% - -
Harvesting Structure
Provision of Utility Ducts & Cross 0.94%
B6.4 Km 71.328 112,158 0.01 0.80 0.08% - 0.00% - -
Road Culverts
B6.5 Median & Avenue Plantation Km 71.328 286,003 0.03 2.04 0.21% - 0.00% - -
Paved Blocks for Truck Laybye &
B6.6 No 2 250,000 0.03 0.05 0.01% - 0.00% - -
BusBays
B6.7 Rest Area No 2 14,200,000 1.42 2.84 0.29% - 0.00% - -

Total (B) Overall Progress of Karnataka Section 963.98 100.00% 7.16%

Total Weighted Average of Physical Progress = 6.10%

Page 14 of 16
A) Physical Progress for Maharashtra Section (Km.0+000 to Km.39+000) Up to April 2019
EPC Cost 7,361,800,000 736.18 Cr 37.723 Km

As per Weightage in Average 4/6- Value of Progress upto


Weightage in Progress in
Sr. No. Component Unit Scope of Component Lane Progress Physical Previous
Project (%) this Month
Work (%) till Date Progress (%) Month
A1 Road Works
A1.1 Road Works (NCW)
A1.1.1 Site Clearance & Dismantling Km 58.856 0.61% 33.44 0.34% 30.23 3.21
Earthwork upto SG top (Inc Median &
A1.1.2 Km 117.712 11.54% 18.51 1.81% 6.52 11.99
Shoulder)
A1.1.3 GSB Km 58.856 3.16% 28.54% 6.25 0.34% 5.04 1.21
A1.1.4 WMM Km 58.856 3.22% - 0.00% - -
A1.1.5 DBM Km 58.856 6.62% - 0.00% - -
A1.1.6 BC Km 58.856 3.40% - 0.00% - -
A1.2 Road Works (ECW)
A1.2.1 Site Clearance & Dismantling Km 14.73 0.10% - 0.00% - -
Earthwork upto SG top (Inc Median &
A1.2.2 Km 29.46 1.97% 0.00% -
Shoulder)
A1.2.3 GSB Km 14.73 0.56% 5.70% - 0.00% - -
A1.2.4 WMM Km 14.73 0.52% - 0.00% - -
A1.2.5 DBM + DBM (PCC) Km 14.73 1.71% - 0.00% - -
A1.2.6 BC Km 14.73 0.84% - 0.00% - -
A1.3 Road Works (Concentric Widening)
A1.3.1 Site Clearance & Dismantling Km 1.86 0.02% - 0.00% - -
Earthwork upto SG top (Inc Median &
A1.3.2 Km 3.72 0.31% 0.00% -
Shoulder)
A1.3.3 GSB Km 1.86 0.09% 0.81% - 0.00% - -
A1.3.4 WMM Km 1.86 0.08% - 0.00% - -
A1.3.5 DBM + DBM (PCC) Km 1.86 0.21% - 0.00% - -
A1.3.6 BC Km 1.86 0.11% - 0.00% - -
A1.4 Road Works (Service Road & Slip Road - BHS)
A1.4.1 Site Clearance & Dismantling Km 21.072 0.20% 2.21 0.02% 2.21 -
Earthwork upto SG top (Inc Median &
A1.4.2 Km 42.144 3.41% 1.46 0.12% 0.69 0.77
Shoulder)
A1.4.3 GSB Km 21.072 1.50% 8.22% 0.14 0.01% 0.14 -
A1.4.4 WMM Km 21.072 1.50% - 0.00% - -
A1.4.5 DBM Km 21.072 0.90% - 0.00% - -
A1.4.6 BC Km 21.072 0.70% - 0.00% - -

A2 Structure Works
A2.1 Culverts
A2.1.1 Pipe Culvert
New Construction / Reconstruction
A2.1.1.1 No 84 0.62% 28.00 0.21% 14.00 14.00
(BHS) 0.83%
A2.1.1.2 Widening of Existing Culvert No 24 0.21% 11.10 0.10% 9.30 1.80
A2.1.2 Box Culvert
New Construction / Reconstruction
A2.1.2.1 No 14 0.29% - 0.00% -
(BHS) 0.44%
A2.1.2.2 Widening of Existing Culvert No 7 0.15% 0.80 0.02% - 0.80
A2.2 Minor Bridge
A2.2.1 Minor Bridge New Construction / Reconstruction (MCW)
A2.2.1.1 Foundation No 30 0.61% 4.00 0.08% 1.00 3.00
A2.2.1.2 Substructure No 30 0.61% 2.03% - 0.00% - -
A2.2.1.3 Superstructure No 21 0.81% - 0.00% - -
A2.2.2 Minor Bridge Widening
A.2.2.2.1 Foundation No 3 0.03% - 0.00% - -
A.2.2.2.2 Substructure No 3 0.03% 0.11% - 0.00% - -
A.2.2.2.3 Superstructure No 2 0.04% - 0.00% - -
A2.2.3 Minor Bridge New Construction Service Road
A2.2.3.1 Foundation No 0 0.00% - 0.00% - -
A2.2.3.2 Substructure No 0 0.00% 0.00% - 0.00% - -
A2.2.3.3 Superstructure No 0 0.00% - 0.00% - -
A2.3 Major Bridge
A2.3.1 Foundation No 24 3.43% 6.00 0.86% 6.00 -
A2.3.2 Substructure No 24 1.98% 9.02% 4.00 0.33% - 4.00
A2.3.3 Superstructure No 21 3.61% 0.80 0.14% - 0.80
A2.4 Fly Over
A2.4.1 Foundation No 26 0.76% 4.00 0.12% 2.00 2.00
A2.4.2 Substructure No 26 0.76% 2.53% - 0.00% - -
A2.4.3 Superstructure No 20 1.01% - 0.00% - -

Page 15 of 16
A) Physical Progress for Maharashtra Section (Km.0+000 to Km.39+000) Up to April 2019
EPC Cost 7,361,800,000 736.18 Cr 37.723 Km

As per Weightage in Average 4/6- Value of Progress upto


Weightage in Progress in
Sr. No. Component Unit Scope of Component Lane Progress Physical Previous
Project (%) this Month
Work (%) till Date Progress (%) Month

A) Physical Progress for Maharashtra Section (Km.0+000 to Km.39+000) Continued…


As per Weightage in Average 4/6- Value of Progress upto
Weightage in Progress in
Sr. No. Component Unit Scope of Component Lane Progress Physical Previous
Project (%) this Month
Work (%) till Date Progress (%) Month
A2.5 ROB
A2.5.1 Foundation No 8 1.15% - 0.00% - -
A2.5.2 Substructure No 8 1.15% 3.84% - 0.00% - -
A2.5.3 Superstructure No 6 1.54% - 0.00% - -
A2.6 VUP / VOP / PUP / CUP
A2.6.1 Foundation No 50 0.74% 9.00 0.13% 6.00 3.00
A2.6.2 Substructure No 50 0.74% 2.48% 2.00 0.03% - 2.00
A2.6.3 Superstructure No 26 0.99% 0.85 0.03% - 0.85

A3 RE / RCC Wall
A3.1 Casting of RE Wall Sqm 154804 4.93% - 0.00% - -
A3.2 Erection of RE Wall Sqm 154804 4.92% - 0.00% - -
A3.3 Construction with Selected Earth Fill Rmt 19598 8.13% 26.59% - 0.00% - -
A3.4 Friction slab & RCC Parapet Rmt 22552 6.50% - 0.00% - -
A3.5 RCC Wall (VOP Approach) Rmt 800 2.11% - 0.00% - -

A4 Toll Plaza And Admin Building


Toll plaza weigh bridge, Safety
A4.1 Boards, Wire mesh barriers, Blinkers, No 1 0.05% - 0.00% - -
etc. safety related works
Toll Plaza Lightning (inc High Mast &
A4.2 No 1 0.10% - 0.00% - -
Generator)
A4.3 Admin Building (inc all) No 1 0.10% - 0.00% - -
A4.4 Tunnel (2.5m x 2.5m) No 1 0.05% - 0.00% - -
A4.5 Toll Booth Lanes (14 lanes inc all) No 14 0.38% 1.64% - 0.00% - -
A4.6 Toll Canopy No 1 0.07% - 0.00% - -
A4.7 RCC Cover Drain Rmt 1084 0.06% - 0.00% - -
A4.8 Construction upto GSB Full Width Sqm 21737 0.17% - 0.00% - -
A4.9 DLC Full Width Sqm 21737 0.12% - 0.00% - -
A4.10 PQC Full Width Sqm 21737 0.53% - 0.00% - -
Miscellaneous Works like Kerbs,
A4.11 No 1 0.03% - 0.00% - -
footpath tiles, etc.

A5 Traffic signs, Markings & other Road Appurtenances


Traffic signs, Kerb, Markings,
A5.1 Junctions & other Road ###
Appurtenances
Kerb Construction & Painting Km 75.446 0.79% 0.31 0.00% 0.31 0.00
Rest all items mentioned above exclud Km 37.723 2.64% 0.00% - -
A5.2 HTMS No 1 0.62% 6.79% - 0.00% - -
A5.3 Safety During Construction Period Month 30 0.16% 6.00 0.03% 5.00 1.00
A5.4 Drains (Inc all) Km 37.723 0.46% - 0.00% - -
A5.5 Highway Lighting Km 37.723 1.24% - 0.00% - -
Maintenance of road & Traffic
A5.6 Month 20 0.89% 6.00 0.27% 5.00 1.00
management

A6 Miscellaneous Works
Supply of Photographs & Video
A6.1 Month 30 0.05% 6.00 0.01% 5.00 1.00
Recording
A6.2 Construction of Bus Shelter No 2 0.03% - 0.00% - -
Construction of Rain Water
A6.3 Km 37.723 0.12% - 0.00% - -
Harvesting Structure
Provision of Utility Ducts & Cross 0.43%
A6.4 Km 37.723 0.07% - 0.00% - -
Road Culverts
A6.5 Median & Avenue Plantation Km 37.723 0.15% - 0.00% - -
Paved Blocks for Truck Laybye &
A6.6 No 0 0.00% - - -
BusBays
A6.7 Rest Area No 0 0.00% - - -

Total (A) Overall Progress of Maharashtra Section 100.00% 4.99% ###

Page 16 of 16