You are on page 1of 298

Annual Report 2018-19

Shri Narendra Modi, Hon’ble Prime Minister of India launching “Saubhagya” Yojana
Contents
Sl No. Chapter Page No.
1 Performance Highlights 3
2 Organisational Set-Up 11
3 Capacity Addition Programme 13
4 Generation & Power Supply Position 17
5 Ultra Mega Power Projects (UMPPs) 21
6 Transmission 23
7 Status of Power Sector Reforms 29
8 5XUDO(OHFWULÀFDWLRQ,QLWLDWLYHV 33
,QWHJUDWHG3RZHU'HYHORSPHQW6FKHPH ,3'6 8MMZDO'LVFRP$VVXUDQFH<RMDQD 8'$< DQG1DWLRQDO
9 41
Electricty Fund (NEF)
10 National Smart Grid Mission 49
11 (QHUJ\&RQVHUYDWLRQ 51
12 Charging Infrastructure for Electric Vehicles (EVs) 61
13 3ULYDWH6HFWRU3DUWLFLSDWLRQLQ3RZHU6HFWRU 63
14 International Co-Operation 67
15 3RZHU'HYHORSPHQW$FWLYLWLHVLQ1RUWK(DVWHUQ5HJLRQ 73
16 Central Electricity Authority (CEA) 75
17 Central Electricity Regulatory Commission (CERC) 81
18 Appellate Tribunal For Electricity (APTEL) 89
PUBLIC SECTOR UNDERTAKING
19 NTPC Limited 91
20 NHPC Limited 115
21 Power Grid Corporation of India Limited (PGCIL) 123
22 Power Finance Corporation Ltd. (PFC) 131
23 5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ/LPLWHG 5(& 143
24 North Eastern Electric Power Corporation (NEEPCO) Ltd. 155
25 Power System Operation Corporation Ltd. (POSOCO) 157
JOINT VENTURE CORPORATIONS
26 SJVN Limited 159
27 THDC India Ltd 167
STATUTORY BODIES
28 Damodar Valley Corporation (DVC) 171
29 Bhakra Beas Management Board (BBMB) 181
30 %XUHDXRI(QHUJ\(IÀFLHQF\ %(( 185
AUTONOMOUS BODIES
31 Central Power Research Institute (CPRI) 187
32 National Power Training Institute (NPTI) 193
OTHER IMPORTANT ACTIVITIES
33 3XEOLF*ULHYDQFHV 197
34 Right To Information Act, 2005 201
35.1 ,PSOHPHQWDWLRQRI2IÀFLDO/DQJXDJH 205
35.2 9LJLODQFH$FWLYLWLHV'LVFLSOLQDU\&DVHV 215
35.3 $FWLYLWLHV5HODWLQJ7R:RPHQ(PSOR\HHV 227
35.4 3HUVRQV:LWK'LVDELOLWLHV 3:'V 233
35.5 5HFUHDWLRQDO$FWLYLWLHV 239
35.6 :HOIDUHRI6FKHGXOHG&DVWHV6FKHGXOHG7ULEHVDQG2WKHU%DFNZDUG&ODVVHV 245
36 (*RYHUQDQFH,QIRUPDWLRQ7HFKQRORJ\ ,7 ,QLWLDWLYHV 253
37 5HJLRQ:LVH,QVWDOOHG&DSDFLW\ 263
38 2IÀFHRI7KH&KLHI&RQWUROOHURI$FFRXQWV 277
39 $XGLW2EVHUYDWLRQVRI& $* 281

1
Annual Report 2018-19

Tuirial Hydro Electric Power Project, dedicated to Nation, by Hon’ble Prime Minister

2
CHAPTER 01

PERFORMANCE HIGHLIGHTS
1. Power Supply Position: Total-Outlay: Rs.75,893 crore, GOI Grant: Rs.63,027 crore

 7KHJURZWKLQDYDLODELOLW\RIHOHFWULFLW\GXULQJWKHFXUUHQW Salient Features -


year 2018-19 was 5.2% as compared to last year. During
‡ &RPSOHWHÁH[LELOLW\WR6WDWHIRUVHOHFWLQJVFRSHRIZRUNV
the year 2018-19, peak shortage was 0.8% and the
as per their priority.
energy shortage was 0.6% as compared to 2.0% and
UHVSHFWLYHO\ODVW\HDU ‡ $OO 9LOODJHVKDPOHWV HOLJLEOH ZLWKRXW DQ\ PLQLPXP
population criterion.
2. Generation Performance
‡ *UDP 3DQFKD\DW FRYHUHG XQGHU 6DQVDG $DGDUVK *UDP
The total electricity generation including generation <RMDQD 6$*< WREHQHFHVVDULO\FRYHUHGXQGHU'35V
from renewable sources in the country during the year
2018-19 was 1376.096 BU as against the generation of ‡ 0DQGDWRU\ (WHQGHULQJ DQG 6WDQGDUG %LGGLQJ
1308.146 BU during the last year, showing a growth of Document.
5.2%. ‡ VXEVLG\IRUGHYHORSPHQWRI3URMHFW0DQDJHPHQW
$JHQF\ WR HQVXUH HIIHFWLYH SURMHFW PDQDJHPHQW DQG
 7KH WDUJHW RI HOHFWULFLW\ JHQHUDWLRQ IURP FRQYHQWLRQDO
timely completion.
VRXUFHV IRU WKH \HDU  ZDV À[HG DV  %LOOLRQ
Unit (BU). The actual generation during the year 2018- ‡ $OO 'LVFRPV LQFOXGLQJ 3ULYDWH 'LVFRPV 5( &RRSHUDWLYH
19 was 1249.337 BU as compared to generation target Societies are eligible.
of 1265 BU for the period and actual generation of
‡ 'LVWULFW 'HYHORSPHQW &RRUGLQDWLRQ  0RQLWRULQJ
1206.306 BU during the year 2017-18, representing an
Committee namely DISHA (administrated by Ministry
DFKLHYHPHQWRIDQGDJURZWKRIDERXW RI5XUDO'HYHORSPHQW KHDGHGE\VHQLRUPRVW0HPEHU
3. Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) RI 3DUOLDPHQW /RN 6DEKD  WR UHYLHZ DQG PRQLWRU
implementation of scheme.
Components of Scheme:
Funding Pattern:
(i) Separation of agriculture and non-agriculture
feeders facilitating judicious rostering of supply to ‡ *UDQWIURP*2O  RI SURMHFW FRVW  IRU
agricultural & non- agricultural consumers in the Special category States)
rural areas; ‡ 'LVFRPV  RISURMHFWFRVW IRU6SHFLDO
category States)
(ii) Strengthening and augmentation of sub-
transmission & distribution infrastructure in rural ‡ /RDQIURP),V RI SURMHFW FRVW  IRU
area; Special category States)

LLL 0HWHULQJ RI GLVWULEXWLRQ WUDQVIRUPHUVIHHGHUV ‡ $GGLWLRQDO JUDQW  RI ORDQ FRPSRQHQW LH  IRU
consumers; special category states and 15% for other States) under
WKH VFKHPH ZLOO EH UHOHDVHG VXEMHFW WR DFKLHYHPHQW RI
LY 2QJRLQJ UXUDO HOHFWULÀFDWLRQ ZRUNV RI HUVWZKLOH
IROORZLQJPLOHVWRQHV
VFKHPHVXEVXPHGLQ''8*-<DV5XUDO(OHFWULÀFDWLRQ
(RE) component. (i) Timely completion of the scheme as per laid down
milestone;
Scheme Outlay:
LL  5HGXFWLRQ LQ $7 & ORVVHV DV SHU WUDMHFWRU\ ÀQDOL]HG
)RU&RPSRQHQWV L WR LLL DERYH2XWOD\5VFURUH*2, E\ 0R3 LQ FRQVXOWDWLRQ ZLWK WKH 6WDWH *RYHUQPHQWV
*UDQW5VFURUH (Discom-wise); and
5(&RPSRQHQW LY DERYH2XWOD\5VFURUH*2,*UDQW LLL  8SIURQWUHOHDVHRIDGPLVVLEOHUHYHQXHVXEVLG\E\6WDWH
Rs.29,574 crore *RYHUQPHQWEDVHGRQPHWHUHGFRQVXmption.

3
Annual Report 2018-19

4. SAUBHAGYA-Pradhan Mantri Sahaj Bijli Har Ghar LY  6FKHPHVIRU(QWHUSULVH5HVRXUFH3ODQQLQJ (53 DQG,7


Yojana enablement of balance urban towns are also included
XQGHU,3'66FRSHRI,7HQDEOHPHQWKDVEHHQH[WHQGHG
Ministry of Power launched the scheme Pradhan Mantri
to all 4041 towns as per Census 2011.
6DKDM %LMOL +DU *KDU <RMDQD 6DXEKDJ\D  WR DFKLHYH
XQLYHUVDOKRXVHKROGHOHFWULÀFDWLRQE\SURYLGLQJODVWPLOH Y  6PDUW PHWHULQJ VROXWLRQ IRU SHUIRUPLQJ 8'$< 6WDWHV
FRQQHFWLYLW\DQGHOHFWULFLW\FRQQHFWLRQVWRDOOUHPDLQLQJ DQG 6RODU SDQHOV RQ *RYW EXLOGLQJV ZLWK QHWPHWHULQJ
XQHOHFWULÀHGKRXVHKROGVLQUXUDODQGXUEDQDUHDV are also permissible under the scheme.

Scheme Outlay: YL  *DV,QVXODWHG6XEVWDWLRQV *,6 DWORFDWLRQVZKHUHVSDFH


FRQVWUDLQWH[LVWVDUHDOVRSHUPLVVLEOH
5XUDO2XWOD\ 5V&URUH*2,*UDQW
Rs. 10,587.50 Crore YLL 5HDO7LPH'DWD$FTXLVLWLRQ6\VWHP 57'$6 SURMHFWVIRU
accurate measurement of power interruption parameters
8UEDQ2XWOD\ 5V&URUH*2,*UDQW
OLNH 6$,',6$,), DW  .9 IHHGHU OHYHO DUH DOVR FRYHUHG
Rs. 1,732.50 Crore
under the scheme
7RWDO2XWOD\ 5V&URUH*2,*UDQW
6. Ujwal DISCOM Assurance Yojana (UDAY)
Rs. 12,320 Crore
Ujwal DISCOM Assurance Yojana (UDAY) was launched
Funding Pattern:
E\ WKH 0LQLVWU\ RI 3RZHU *RYHUQPHQW RI ,QGLD RQ
‡ *UDQWIURP*2,  RI SURMHFW FRVW  IRU WK 1RYHPEHU  IRU D VXVWDLQDEOH VROXWLRQ WR
Special category States) WKH RSHUDWLRQDO DQG ÀQDQFLDO LQHIÀFLHQFLHV RI 3RZHU
‡ 'LVFRPV  RISURMHFWFRVW IRU6SHFLDO Distribution Companies(DISCOMs). The scheme is aimed
category States) DW ÀQDQFLDO DQG RSHUDWLRQDO WXUQDURXQG RI ',6&20V
WKURXJK WDUJHWHG LQWHUYHQWLRQV WR ORZHU WKH LQWHUHVW
‡ /RDQIURP)OV RI SURMHFW FRVW  IRU FRVWV UHGXFWLRQ RI FRVW RI SRZHU LQFUHDVHG UHYHQXHV
Special category States) DQGLPSURYHGRSHUDWLRQDOHIÀFLHQFLHV
‡ $GGLWLRQDO JUDQW  RI ORDQ FRPSRQHQW LH  IRU  8'$<LVDYROXQWDU\VFKHPHIRUSDUWLFLSDWLRQE\6WDWHV
special category states and 15% for other States) Ministry of Power has signed Tripartite MoUs (with
RQ FRPSOHWLRQ RI  KRXVHKROG HOHFWULÀFDWLRQ E\ VWDWH *RYHUQPHQWV DQG ',6&20V  DQG %LSDUWLWH 0R8V
December, 2018. (with Power Department). Total 27 States and 05 Union
5. Integrated Power Development Scheme (IPDS) 7HUULWRULHV 87V  KDYH MRLQHG WKH VFKHPH 2XW RI WKLV
6WDWHVKDYHMRLQHGWKHVFKHPHIRUERWKRSHUDWLRQDO
To facilitate state utilities to ensure quality and reliable
DQGÀQDQFLDOHIÀFLHQF\LPSURYHPHQWVZKLOH6WDWHV
[ SRZHU VXSSO\ LQ WKH XUEDQ DUHDV *RYHUQPHQW
87V KDYH MRLQHG WKH VFKHPH IRU RSHUDWLRQDO HIÀFLHQF\
DSSURYHGWKH´,QWHJUDWHG3RZHU'HYHORSPHQW6FKHPHµ
LPSURYHPHQWV
(IPDS) on 20.11.2014 with a total outlay of Rs. 32,612
Crore which includes a budgetary support of Rs. 25,354 The scheme is being monitored by an inter-ministerial
&URUHIURP*RYHUQPHQWRI,QGLD7KHPDLQFRPSRQHQWV FRPPLWWHH DQG D VWDWH OHYHO FRPPLWWHH 0RQWKO\
RIWKHVFKHPHDUH PHHWLQJV DUH FRQGXFWHG WR UHYLHZ WKH SURJUHVV RI WKH
VFKHPH7KLUWHHQ0RQLWRULQJ&RPPLWWHHPHHWLQJVKDYH
(i) Strengthening of sub-transmission and distribution
already been conducted. Apart from monthly meetings,
networks in the urban areas;
RQHWRRQH ¶)RFXVHG 5HYLHZV 0HHWLQJV· DUH UHJXODUO\
LL  0HWHULQJ RI GLVWULEXWLRQ WUDQVIRUPHUV  IHHGHUV  FRQGXFWHG WR DVVHVV DQG UHYLHZ WKH SHUIRUPDQFH RI
consumers in the urban areas; states where targets are not being met. An online
8'$< SRUWDO DQG $SS DYDLODEOH ERWK RQ $QGURLG DQG
(iii) IT enablement of distribution sector and strengthening
L26 SODWIRUPV SURYLGH EDVLF DQDO\WLFV DQG SURJUHVV RI
of distribution network under R-APDRP for 12th and
SHUIRUPDQFH RI YDULRXV 6WDWHV ',6&20V LQ WKH SXEOLF
WK3ODQVE\FDUU\LQJIRUZDUGWKHDSSURYHGRXWOD\IRU
domain as a measure of transparency.
R-APDRP to IPDS.

4
7. Capacity Addition programme and Achievement e-auction window for power sector under which CIL is
during 2018-19 making arrangements for conduct of forward e-auction
RIFRDOH[FOXVLYHO\IRUSRZHUVHFWRURQDVXVWDLQHGEDVLV
 &DSDFLW\ $GGLWLRQ WDUJHW IURP FRQYHQWLRQDO VRXUFHV
RIIHULQJDGHTXDWHTXDQWLWLHVDWUHJXODULQWHUYDOVVRWKDW
LQFOXGLQJODUJHK\GURSURMHFWVRI0:ZDVÀ[HG
FRDOLVPDGHDYDLODEOHWRVXFKSRZHUSODQWVRQUHJXODU
for the year 2018-19. Against this target, a capacity of basis.
0:KDVEHHQDFKLHYHG
LLL  %DVHG RQ WKH 0R3 LQSXWV 0R& YLGH OHWWHU GDWHG
8. Power Sector Reforms  KDV QRWLÀHG SROLF\ JXLGHOLQHV IRU JUDQW RI
 7KH 8QLRQ &DELQHW KDG DSSURYHG WKH SURSRVDO IRU %ULGJH /LQNDJH WR VSHFLÀHG HQG XVH SODQWV RI &HQWUDO
and State Public Sector Undertakings (both in Power
amendment in Electricity Act, 2003 on 10th December,
DVZHOODV1RQ3RZHUVHFWRU ZKLFKKDYHEHHQDOORWWHG
2014 as contained in the Electricity (Amendment)
coal mines or blocks. So far, Bridge Linkage has been
Bill 2014. The Electricity (Amendment) Bill 2014 was
DFFRUGHGWRQRVRI7KHUPDO3URMHFWVLQ*RYW6HFWRU
introduced in the Lok Sabha on 19.12.2014. The Bill
WRWDOOLQJWR0:FDSDFLW\
was subsequently referred to the Standing Committee
RQ (QHUJ\ IRU H[DPLQDWLRQ DQG UHSRUW 7KH &RPPLWWHH LY  /LQNDJHVJUDQWHGXQGHU6+$.7,
had submitted its report on 7.5.2015. Based on the (a) To Central and State GencosDWQRWLÀHGSULFHRQ0R3·V
REVHUYDWLRQVUHFRPPHQGDWLRQV RI WKH 6WDQGLQJ UHFRPPHQGDWLRQV 8QGHU FODXVH % L  RI WKH 6+$.7,
&RPPLWWHH RQ (QHUJ\ DQG IXUWKHU FRQVXOWDWLRQ 3ROLF\ OLQNDJHV KDYH EHHQ JUDQWHG WR 6WDWH &HQWUDO
GHOLEHUDWLRQVZLWK6WDWH*RYHUQPHQWVDQGYDULRXVRWKHU *HQFRVRI0:IRUSURMHFWV
VWDNHKROGHUVIXUWKHUFKDQJHVKDYHEHHQSURSRVHGLQWKH (b) Linkage on Auction basis for Independent Power
Electricity (Amendment) Bill, 2014. Draft amendments to Producers (IPPs) with PPA based on domestic coal.
Electricity Act were circulated for stakeholder comments 8QGHU FODXVH % LL  RI WKH 6+$.7, 3ROLF\ WKH ,33V
RQ  7KH FRPPHQWV UHFHLYHG IURP YDULRXV SDUWLFLSDWLQJLQDXFWLRQZLOOELGIRUGLVFRXQWRQH[LVWLQJ
VWDNHKROGHUV DUH EHLQJ H[DPLQHG E\ WKH 'UDIWLQJ WDULII6RIDUXQGHU% LL OLQNDJHVKDYHEHHQJUDQWHGWR
Committee constituted under the Chairmen of Chief 0:FDSDFLW\ SURMHFWV 3URFHVVKDVVWDUWHGIRU
Engineer (Legal), Central Electricity Authority. VHFRQGURXQGRIDXFWLRQRI&RDO/LQNDJHVWR,33VKDYLQJ
DOUHDG\FRQFOXGHGORQJWHUP33$V 6+$.7,% LL 
The proposed amendments entail competition in retail
(i.e. choice to consumers to select retail suppliers), strict 10. Amendments in SHAKTI Policy:
enforcement of Renewable Purchase Obligations (RPO), Cabinet Committee on Economic Affairs (CCEA) on
]HURWROHUDQFHRQ*ULG6DIHW\DQG6HFXULW\UDWLRQDOL]DWLRQ DSSURYHGWKHIROORZLQJDPHQGPHQWVLQWKH
RI 7DULII GHWHUPLQDWLRQ SURFHVV REOLJDWLRQ RI [ 6+$.7, 6FKHPH IRU +DUQHVVLQJ DQG $OORFDWLQJ .R\DOD
power supply by Distribution Licensee, subsidy through (Coal) Transparently in India) Policy issued by Ministry
'%7 PHFKDQLVP VWUHQJWKHQLQJSHUIRUPDQFH UHYLHZ RI &RDO YLGH OHWWHU QR &3'&/' GDWHG
of Regulatory Commissions, facilitating Open Access 
DQG 'HYHORSPHQW RI 3RZHU 0DUNHW DQG &URVV %RUGHU , )ROORZLQJ LV DGGHG DW WKH HQG RI ÀUVW SDUD RI % LL  RI
H[FKDQJHRIHOHFWULFLW\HWF 6+$.7,3ROLF\DIWHUWKHZRUGV´ZLWK33$Vµ
9. Coal Supply for Thermal Power Projects: L 7KH SRZHU SODQWV ZKLFK ZHUH KDYLQJ YDOLG DOUHDG\
L  $IWHUWKHFDQFHOODWLRQRIFRDOEORFNV*RYWRI,QGLD concluded Long Term PPA, based on domestic
coal on or before 17.05.2017 and who could not
IRUPXODWHG D FRPSUHKHQVLYH SROLF\ IRU UHDOORFDWLRQ RI
SDUWLFLSDWHLQWKHOLQNDJHDXFWLRQVXQGHU6+$.7,% LL 
cancelled coal mines in a fair and transparent method.
due to any reason, may be allowed to participate in
*RYHUQPHQW HQVXUHG UHDOORFDWLRQ RI  EORFNV RI
WKH% LL DXFWLRQVRI6+$.7,VFKHPH
VXSSRUWLQJ FDSDFLW\ RI DERXW  0: WKURXJK
DXFWLRQDOORWPHQWWLOOGDWH LL %LGGHUV ZKR KDYH DOUHDG\ SDUWLFLSDWHG LQ 6+$.7,
B(ii) auctions and could not secure linkage for the
(ii) Based on the request of Ministry of Power, the Ministry full ACQ, may obtain the linkage for the balance
RI&RDOYLGHOHWWHUGDWHGKDVVWDUWHGVHSDUDWH quantity also by participating in future auctions at a

5
Annual Report 2018-19

later stage under B(ii) after benchmarking discount. MoP will work out in consultation with DFS – a
mechanism to ensure this.
II. At theHQGRISDUD% LLL RI6+$.7,3ROLF\DIWHUWKHZRUGV
¶DXFWLRQ SURFHVV· IROORZLQJ ZRUGV DUH DGGHG ´6XFK 11. )XUWKHU ZLWK WKH DSSURYDO RI WKH &&($ RQ 
DXFWLRQVELGVVKDOOEHKHOGDWUHJXODULQWHUYDOVµ WKH*RYHUQPHQWKDVGHFLGHGWKDW0LQLVWU\RI&RDOPD\
earmark more coal for power sector under special for-
,,, 7KH IROORZLQJ FODXVH LV DGGHG DIWHU FODXVH % YLL  RI
ZDUGHDXFWLRQE\UHGXFLQJWKHHTXLYDOHQWTXDQWLW\IURP
6+$.7,3ROLF\
the spot e-auction. The Coal India Limited may earmark
% YLLL 1RWZLWKVWDQGLQJDQ\WKLQJLQWKHIRUHJRLQJSDUDV at least 50% of the total coal meant for e-auction (in-
LWLVIXUWKHUSURYLGHGDVIROORZV cluding spot auction and special forward e-auction) for
D $OO VXFK SRZHU SODQWV LQFOXGLQJ SULYDWH JHQHUD- power. The increase insupply of coal for forward e-auc-
WRUVZKLFKGRQRWKDYH33$VVKDOOEHDOORZHG&RDO tion will be in addition to regular requirement of linkage
OLQNDJH XQGHU % LLL  DQG % LY  RI 6KDNWL 3ROLF\ IRU D coal for the power sector and the requirements of other
SHULRGRIPLQLPXPPRQWKVXSWRDPD[LPXPRI sectors.
\HDUSURYLGHGIXUWKHUWKDWWKHSRZHUJHQHUDWHG 12. Coal Stock Position:
through that linkage is sold in Day Ahead Market
'$0  WKURXJK SRZHU H[FKDQJHV RU LQ VKRUW WHUP Coal stock position for thermal power plants (127 Nos.)
through a transparent bidding process through is monitored in Central Electricity Authority on daily
'LVFRYHU\RI(IÀFLHQW(QHUJ\3ULFH '((3 SRUWDO$ EDVLV IRU UHJXODUVPRRWK VXSSO\ RI FRDO :LWK UHJXODU
methodology in this regard shall be formulated by monitoring and follow up with coal companies and
Ministry of Power in consultation with Ministry of Railways, the coal stock position has become comfort-
Coal. able. As on 31.03.2019, total coal stock position reported
by power utilities was 30.95 Million Tonnes (MT).
b. A generator which terminates PPA in case of de-
fault in payment by the DISCOM, may be allowed to Import of coal was resorted to bridge the gap between
XVHH[LVWLQJOLQNDJHFRDOIRUVDOHRISRZHUWKURXJK UHTXLUHPHQW RI FRDO DQG LWV DYDLODELOLW\ IURP GRPHVWLF
VKRUWWHUP 33$V XVLQJ '((3 SRUWDO RU SRZHU H[- VRXUFHV $Q RYHUYLHZ RI FRDO UHFHLSW LQ WKHUPDO SRZHU
FKDQJH IRU D SHULRG RI PD[LPXP  \HDUV RU XQWLO VWDWLRQRISRZHUXWLOLWLHVGXULQJLVJLYHQEHORZ
WKH\ÀQGDQRWKHUEX\HURISRZHUXQGHUORQJPH-
GLXPWHUP33$ZKLFKHYHULVHDUOLHU$GHTXDWHVDIH- Source Coal Receipt (in
Million Tonnes)
guards to be put in place.
Coal India Ltd. (CIL) 457.4
F 7KH SURYLVLRQ RI SDUD % Y  RI 6KDNWL 3ROLF\ DERYH
shall also be applicable in cases where the nodal Singareni Collieries Co. Ltd. (SCCL) 55.9
agency designated by Ministry of Power aggre-
&DSWLYH0LQHV 40.1
JDWHVSURFXUHVWKHSRZHUUHTXLUHPHQWIRUDJURXS
RIVWDWHVHYHQZLWKRXWUHTXLVLWLRQIURPVXFKVWDWHV E-auction 28.7

d. Central and State generating companies can act Import (Blending purposes) 21.4
as an aggregator of power of such stressed power Import (Import coal based) 40.3
assets and procure it through transparent bidding
process and offer that power to the DISCOM against Total Receipt 643.8
WKHLUH[LVWLQJ33$VWRVXFK',6&206WLOOVXFKWLPH
 6WHSVWDNHQIRU,PSURYHPHQWLQHIÀFLHQF\RIWKHUPDO
their own plants get commissioned. Central and
power generation:
State generating companies may be allowed to
XVHWKHH[LVWLQJXQXWLOL]HG%ULGJH/LQNDJHVIRUVXFK a. Third Party Sampling:
VWUHVVHGSRZHUDVVHWVSURYLGHGWKH\PHHWRWKHUSD-
i. The impact of Credit Notes from Third Party Sam-
UDPHWHUVRIWROOLQJJXLGHOLQHVLQFOXGLQJFRPSHWLWLYH
SOLQJDVUHSRUWHGE\173&LVSDLVDXQLWRQ(Q-
bidding.
ergy Charge Rate (ECR) and Rs. 992* Crores (*Pro-
H ,QDOOFDVHVZKHUHSURYLVLRQVRI% YLLL D E F DQG G  YLVLRQDO KDYHEHHQSDVVHGRQWRWKHEHQHÀFLDULHV
DERYHDUHXWLOL]HGQHWVXUSOXVDIWHUPHHWLQJRSHU- on account of Credit Notes for the period April to
DWLQJ H[SHQVHV JHQHUDWHG LQ WKLV PDQQHU VKDOO EH March 2019.
HQWLUHO\ XVHG IRU VHUYLFLQJ GHEW LQ WKH ÀUVW SODFH

6
LL $VSHUWKHGDWDSURYLGHGE\173&&RDO&RQWUROOHU·V National E-Mobility Programme: EESL has completed
2UJDQL]DWLRQ &&2 KDVUHJUDGHGFRDOPLQHVIRU SURFXUHPHQWRIHFDUV7KHSULFHGLVFRYHUHGE\
year 2018-19 consequent upon the results of Third EESL for e-cars through tendering is 25 % less than the
3DUW\6DPSOLQJ173&KDVUHSRUWHGDÀQDQFLDOJDLQ current retail price of similar cars in the market. Till 31st
of Rs. 623.0 Crores on account of re-grading of coal 0DUFK   HFDUV KDYH EHHQ GHSOR\HGXQGHU
mines, which translates to reduction in ECR by 2.54
registration. For charging e-cars, 286 AC Chargers and
SDLVDXQLW
'&&KDUJHUVKDYHEHHQFRPPLVVLRQHG,QDGGLWLRQ
Total effect of Third Party Sampling thus works out EESL has installed 30 Public Charging Stations (PCS)
WREH3DLVD8QLW $SSUR[ IRU)< FRPSO\LQJ ZLWK '& N:  LQ WKH 1'0& DUHD WLOO
E 6SHFLÀF&RDO&RQVXPSWLRQ 31st March 2019.

Due to efforts made by MoP including promotion Smart Meter National Programme (SMNP): EESL has
of Supercritical technology and start of Third Party LQLWLDWHG WR SURYLGH VPDUW PHWHUV WR XWLOLWLHV RQ UHQWDO
6DPSOLQJWKH6SHFLÀF&RDO&RQVXPSWLRQRI173& EDVLVIRUUHSODFLQJFRQYHQWLRQDOPHWHUV7LOOVW0DUFK
stations (quantity of coal consumed per unit gen- ODNKVPDUWPHWHUVKDYHEHHQLQVWDOOHGLQWKH
HUDWLRQ KDVJUDGXDOO\LPSURYHGIURP.J.ZK state of Uttar Pradesh, Andhra Pradesh, Haryana, Bihar
LQWR.J.ZKLQ.J DQG 1'0& DUHD 1'0& EHFRPHV WKH ÀUVW XWLOLW\ WR
.ZKLQDQG .J.ZK 3URYLVLRQDO LQ
KDYHDOOWKHLUFRQVXPHUVZLWKVPDUWPHWHUVZLWKRXWDQ\
2018-19.
XSIURQWLQYHVWPHQWIURP1'0&
 (QHUJ\(IÀFLHQF\
Small Solar Power Plant Programme: Till 31st March
Unnat Jyoti by Affordable LEDs for ALL (UJALA): Till  GHFHQWUDOL]HG VRODU SRZHU SODQW RI  0:S
31st March 2019, EESL has distributed 34.74 crore LED FXPXODWLYHFDSDFLW\ LQUDQJHRI0:WR0: KDV
bulbs across India. This has resulted in estimated energy EHHQ FRPPLVVLRQHG LQ YDFDQWXQXWLOL]HGVSDUH ODQGV
VDYLQJVRIELOOLRQN:KSHU\HDUZLWKDYRLGHGSHDN of Maharashtra State Electricity Distribution Company
GHPDQG RI  0: DQG HVWLPDWHG *+* HPLVVLRQ Limited (MSEDCL)
reduction of 36.55 million t CO2 per year Additionally,
15. Project monitoring Group
((6/KDVGLVWULEXWHGRYHUODNK/('WXEHOLJKWVDQG
ODNKHQHUJ\HIÀFLHQWIDQVXQGHU8-$/$  $Q\ 0LQLVWU\'HSDUWPHQW RU DQ\ SULYDWH HQWUHSUHQHXU
FDQ VXEPLWXSORDG WKHLU VWDOOHG LQYHVWPHQW SURMHFWV
Street Lighting National Programme (SLNP): Till
LQYROYLQJ LQYHVWPHQW RI 5V  &URUH RU PRUH RU D
31st March 2019, EESL has installed 84.90 lakh LED
project that is considered to be critical, on PMG portal of
street lights across India. This has resulted in estimated
3ULPH0LQLVWHU·V2IÀFH 302 0LQLVWU\RI3RZHULVWDNLQJ
HQHUJ\VDYLQJVRIELOOLRQN:KSHU\HDUZLWKDYRLGHG
XSFULWLFDOSRZHUSURMHFWVKDYLQJVXEVWDQWLDOLQYHVWPHQW
SHDNGHPDQGRI0:DQGHVWLPDWHG*+*HPLVVLRQ
EXWVWDOOHGGXHWRVHYHUDOUHDVRQVIRUIXUWKHUPRQLWRULQJ
reduction of 3.92 million t CO2 per year.
by PMG in PMO. During Financial Year 2018-19, projects
%XLOGLQJ (QHUJ\ (IÀFLHQF\ 3URJUDPPH %((3  Till KDYLQJ LQYHVWPHQW RI 5V  )LIW\ 7KUHH 7KRXVDQG
31st March 2019, EESL has completed building energy 6L[ +XQGUHG 7KLUW\ (LJKW  &URUHV KDYH EHHQ FOHDUHG E\
HIÀFLHQF\SURMHFWVLQEXLOGLQJVLQFOXGLQJUDLOZD\ the PMG where issues affecting timely commissioning of
VWDWLRQV 7KH HQHUJ\ DXGLWV VKRZV HQHUJ\ VDYLQJ SURMHFWVKDYHEHHQUHVROYHG
potential to the tune of up to 30-50% in these buildings.
16. State power Minister’s Conference:
7KHPDMRULQWHUYHQWLRQVLQWKHVHEXLOGLQJVDUHLQDUHDRI
lighting and air-conditioning systems. Two Conferences of Power & NRE Ministers’ of States
and UTs were held during 2018-19. First Conference was
Agriculture Demand Side Management (AgDSM):
held on 3rd July, 2018 at Shimla, Himachal. Following
EESL is implementing AgDSM for replacement of old
FRQFOXVLRQVUHFRPPHQGDWLRQGHFLVLRQV ZHUH WDNHQ
pumps with BEE 5 Star rated pumps. Till 31st March 2019
GXULQJWKHGHOLEHUDWLRQV
EESL has installed 63,100 no. of pumps in the States of
Andhra Pradesh and Uttar Pradesh.  ´ +RXVHKROG HOHFWULÀFDWLRQ E\  XQGHU

7
Annual Report 2018-19

SAUBHAGYA, Completion of all projects under IPDS by status of DISCOMs (losses and borrowings), reasons
0DUFK  H[SHGLWH DZDUG RI VPDUW PHWHUV FORVXUH for WKH SRRU ÀQDQFLDO SRVLWLRQ UHIRUPV  8'$<,, 8VH
of R-APDRP schemes, AT&C Loss reduction to 15% RI 7HFKQRORJ\ IRU UHGXFLQJ WKHIW PHWHULQJELOOLQJ
E\ 0DUFK  ´[ 32:(5 )25 $//µ SURPRWLRQ FROOHFWLRQVRODULUULJDWLRQ
RI GLJLWDO SD\PHQWV XVH RI H YHKLFOHV VHWWLQJ XS RI
 7KHUPDO 3UHVHQW 6LWXDWLRQ $QDO\VLV  6WDWH :LVH
FKDUJLQJLQIUDVWUXFWXUHIRUHYHKLFOHVDGRSWLRQRI(&%&
Outstanding payments, Remedies, Demand analysis,
code, promotion of solar, wind power and solar pumps
WR UHSODFH GLHVHO SXPSV HQFRXUDJH GHYHORSPHQW RI &RDOVLWXDWLRQ1HZ(QYLURQPHQWDOQRUPV,QWHUQDWLRQDO
new technology in the Renewable Energy Sector, R&D 3UDFWLFHVLQVDOHSXUFKDVHRISRZHU7UDQVPLVVLRQ,QWUD
Mission to be formulated”. State Transmission Status, International practice; Energy
(IÀFLHQF\/HVV&DUERQLQWHQVLYHHFRQRP\5HQHZDEOHV
The second Conference was held on 26-27th February,
/HVV&DUERQLQWHQVLYHHFRQRP\µ
2019 at Gurugram, Haryana in which the following
DJHQGDSRLQWVZHUHGLVFXVVHG  'XULQJ WKLV &RQIHUHQFH $75V UHFHLYHG IURP YDULRXV
6WDWHV87V RQ &RQFOXVLRQV5HFRPPHQGDWLRQ'HFLVLRQV
 ´'LVWULEXWLRQ ´[ 3RZHU IRU DOOµ DQDO\VLV RI SUHVHQW
taken during Shimla Conference, were also discussed.

8
6KUL5.6LQJK0R6 ,QGHSHQGHQW&KDUJH IRU3RZHUDQG15(

9
Annual Report 2018-19

10
CHAPTER 02

ORGANISATIONAL SET-UP
Shri Raj Kumar Singh assumed charge as the Minister of Programme); Power Finance Corporation; Rural
State (Independent charge) for Power with effect from the 5th (OHFWULÀFDWLRQ&RUSRUDWLRQ5XUDO(OHFWULÀFDWLRQ''8*-<
September, 2017. National Electricity Fund; Financial Restructuring Plan
Shri Ajay Kumar Bhalla assumed charge as Secretary in  8'$< 6PDUW *ULG  1DWLRQDO 6PDUW *ULG 0LVVLRQ
the Ministry of Power with effect from the 30th June, 2017 Information Technology
$1 7KH0LQLVWU\KDVVDQFWLRQHGVWUHQJWKRIWZR$GGLWLRQDO ii) Hydro matters including CPSUs namely NHPC, SJVNL,
6HFUHWDULHV RQH )LQDQFLDO $GYLVHUIRXU -RLQW 6HFUHWDULHV DQG NEEPCO, THDC, BBMB; Hydro Projects in SAARC
RQH (FRQRPLF $GYLVHU +RZHYHU SUHVHQWO\ RQO\ WZR SRVW RI FRXQWULHV(QYLURQPHQW0DQDJHPHQWIRU+\GUR3URMHFWV
Additional Secretary, one post of Additional Secretary and Vigilance & Security.
)LQDQFLDO $GYLVHU WKUHH SRVWV RI -RLQW 6HFUHWDULHV DQG RQH iii) Thermal Power; National Thermal Power Corporation;
HFRQRPLFDGYLVHUDUHÀOOHGXS Damodar Valley Corporation; Ultra Mega Power Projects,
Shri Sanjiv Nandan Sahai, Additional Secretary, RYHUVHHV ,QGHSHQGHQW 3RZHU 3URGXFHUV ,33 ,3& )XHO 6XSSO\
WKHZRUNUHODWLQJWR,QWHJUDWHG3RZHU'HYHORSPHQW6FKHPH International Cooperation.
HUVWZKLOH $FFHOHUDWHG 3RZHU 'HYHORSPHQW DQG 5HIRUPV LY  3ROLF\  3ODQQLQJ 7UDLQLQJ DQG 5HVHDUFK LQFOXGLQJ
3URJUDPPH 3RZHU)LQDQFH&RUSRUDWLRQ5XUDO(OHFWULÀFDWLRQ &35, DQG 137, (QHUJ\ &RQVHUYDWLRQ &OLPDWH &KDQJH
&RUSRUDWLRQ5XUDO(OHFWULÀFDWLRQ''8*-<1DWLRQDO(OHFWULFLW\ %XUHDX(QHUJ\(IÀFLHQF\3RZHU3URMHFWV0RQLWRULQJ
)XQG)LQDQFLDO5HVWUXFWXULQJ3ODQ8'$<6PDUW*ULG1DWLRQDO &RRUGLQDWLRQ $OO 7D[ 5HODWHG 0DWWHUV H6DPLNVKD DQG
Smart Grid Mission; Information Technology; Thermal Power; VIP Letter Monitoring System Portal; PRAGATI Portal.
National Thermal Power Corporation; Damodar Valley Administration & General Administration (including
Corporation; Ultra Mega Power Projects, Independent Power 3DUOLDPHQW 2IÀFLDO /DQJXDJH &DGUH 0DQDJHPHQW RI
3URGXFHUV ,33 ,3&)XHO6XSSO\$OOLVVXHVSHUWDLQLQJWRVXSSO\ &3(63XEOLF*ULHYDQFHV57, 
of coal to Thermal Power Plants- including grant of linkage
DQGDOORFDWLRQRIFDSWLYHPLQHVWR7KHUPDO3RZHU3ODQWVDQG  $&KLHI(QJLQHHUOHYHORIÀFHULV KDQGOLQJZRUNUHODWLQJ
the policies thereof; Fuel Supply Agreements; Reforms & Reforms & Restructuring (including administration
Restructuring (including administration of National Electricity of National Electricity Policy, Tariff Policy, CERC, JERC,
Policy, Tariff Policy, CERC, JERC, APTEL, POSOCO and Std. APTEL, POSOCO and Std. Bidding Documents for
Bidding Documents for Procurement of Power); Electricity Act, Procurement of Power); Electricity Act, 2003; Operation
2003; Operation & Monitoring. & Monitoring; All issues pertaining to supply of coal to
Thermal Power Plants-including grant of linkage and
Shri S.K.G. Rahate, Additional Secretary, RYHUVHHV WKH DOORFDWLRQRIFDSWLYHPLQHVWR7KHUPDO3RZHU3ODQWVDQG
Policy & Planning; Training and Research including CPRI and the policies thereof; Fuel Supply Agreements; Matters
137, (QHUJ\ &RQVHUYDWLRQ %XUHDX (QHUJ\ (IÀFLHQF\ 3RZHU pertaining to ACQ; Monitoring the supplies of coal
3URMHFW 0RQLWRULQJ &RRUGLQDWLRQ $OO 7D[ 5HODWHG 0DWWHUV to Thermal Power Plants and co-ordinating with the
e-Samiksha and VIP Letter Monitoring System Portal; PRAGATI Ministries of Coal and Railways for the purpose; working
Portal; Transmission (PGCIL & Grid Integration of Renewable with them to increase the supplies of coal to Thermal
Energy) Matters pertaining to ACQ; Monitoring the supplies 3RZHU 3ODQWV $UUDQJHPHQWV IRU HQVXULQJ WKH TXDOLW\
of coal to Thermal Power Plants and co-ordinationg with the FDORULÀF YDOXH RI FRDO LQFOXGLQJ WKLUG SDUW\ VDPSOLQJ
ministries of Coal and Railways for the purpose; working with and testing; Transmission (PGCIL & Grid Integration of
them to increase the supplies of coal to Thermal Power Plants; Renewable Energy).
$UUDQJHPHQWVIRUHQVXULQJWKHTXDOLW\FDORULÀFYDOXHRIFRDO
including third party sampling and testing.  )XUWKHUWKHUHLVD3ULQFLSDO$FFRXQWV2IÀFHKHDGHGE\
the Chief Controller of Accounts who in turn reports to
Shri Anurag Aggarwal, Additional Secretary and Financial WKH )LQDQFLDO $GYLVHU LQ WKH 0LQLVWU\ RI 3RZHU 0DWWHUV
$GYLVHURYHUVHHVWKH,QWHUQDO)LQDQFHDQG%XGJHWDU\&RQWURO UHODWLQJ WR UHVHUYDWLRQV IRU 6&67 3K\VLFDOO\ GLVDEOHG
of this Ministry. DQG([6HUYLFHPHQLQWKH0LQLVWU\LQFOXGLQJ368VXQGHU
The allocation of work amongst the Joint Secretaries and LWV DGPLQLVWUDWLYH FRQWURO DUH GHDOW ZLWK E\ WKH 'HSXW\
(FRQRPLF$GYLVHU ($ LQWKH0LQLVWU\RI3RZHULVDVXQGHU 6HFUHWDU\ $GPP  ZKR LV DOVR WKH /LDLVRQ 2IÀFHU IRU
L  ,QWHJUDWHG 3RZHU 'HYHORSPHQW 6FKHPH HUVWZKLOH 6&67DQG'HSXW\6HFUHWDU\ 7 5DQG(& LVWKH/LDLVRQ
$FFHOHUDWHG 3RZHU 'HYHORSPHQW DQG 5HIRUPV RIÀFHUIRU2%&V

11
Annual Report 2018-19

Conference of Power and New & Renewable Energy Ministers of States & UTs

12
CHAPTER 03

CAPACITY ADDITION PROGRAMME


1. 7KH1DWLRQDO(OHFWULFLW\3ROLF\ 1(3 HQWDLOHGSURYLVLRQRIDGHTXDWHUHOLDEOHSRZHUDWDIIRUGDEOHFRVWZLWKDFFHVVWRDOO
FLWL]HQV(OHFWULFLW\LVLQWKH&RQFXUUHQW/LVWLQWKH&RQVWLWXWLRQDQGWKHSULPDU\UHVSRQVLELOLW\RIVWUXFWXULQJLWVDYDLODELOLW\
DQGGLVWULEXWLRQLVWKDWRIWKH6WDWHV+RZHYHUERWKWKH&HQWUHDQGWKH6WDWHVKDYHWRSOD\DGHFLVLYHDQGSRVLWLYHUROH
2. 7KHLQVWDOOHGSRZHUJHQHUDWLRQFDSDFLW\LQWKHFRXQWU\DWWKHHQGRIWK3ODQZDVDERXW0:7KHFDSDFLW\
DGGLWLRQ SURJUDPPH GXULQJ WKH WK 3ODQ SHULRG ZDV WDUJHWHG DW  0: FRPSULVLQJ  0: LQ WKH 7KHUPDO
6HFWRU0:LQWKH+\GUR6HFWRUDQG0:LQWKH1XFOHDU6HFWRU
3. Year wise capacity addition (during XII Plan)
'XULQJWKHÀYH\HDUVRIWK3ODQSHULRGWKHIROORZLQJQHZFDSDFLWLHVKDYHEHHQDGGHG
LQ0:

Year Central State Private Total

2012-13 5397.3 3977 11257.5 20631.8

2013-14 2574.01 3367 11884 17825.01

2014-15 4395.2 4886.1 13285 22566.3

2015-16 3775.6 7070 13131 23976.6

2016-17 4310.5 5177.3 4722 14209.8

$FDSDFLW\DGGLWLRQWDUJHWRI0:H[FOXGLQJ0:RI5(6ZDVÀ[HGIRUWK3ODQSHULRG7KH7ZHOIWK3ODQFXPXODWLYH
FDSDFLW\DGGLWLRQRI0:ZDVDFKLHYHG7KLVLVÀUVWWLPHLQWKH+LVWRU\RI)LYH\HDUSODQWKDWWKH&DSDFLW\$GGLWLRQWDUJHW
KDVEHHQRYHUDFKLHYHG7KHGHWDLOVDUHDVXQGHU
LQ0:

Thermal Hydro Nuclear Total


Sector
Target Ach. Target Ach. Target Ach. Target Ach.
Central 14878 15,868.60 6004 2584.02 5300 2000 26182 20,452.62
State 13922 22,201.35 1608 2276 - - 15530 24,477.35
3ULYDWH 43540 53,660.50 3285 619 - - 46825 54,279.50
All India 72340 91,730.45 10897 5479.02 5300 2000 88537 99,209.47

Capacity Addition Programme - Beyond XII plan:


 )RUWKH\HDUDFDSDFLW\DGGLWLRQWDUJHWRI0:LQFOXGLQJ0:RIQXFOHDUSRZHUZDVÀ[HG$FDSDFLW\
RI0:ZDVDFKLHYHG7KH6HFWRUZLVH)XHOZLVHEUHDNXSLVDVXQGHU
LQ0:

Thermal Hydro Nuclear Total


Sector
Target Ach. Target Ach. Target Ach. Target Ach.
Central 4880 3170 800 390 500 0 6180 3560
State 3546.15 1760 300 200 - - 3846.15 1960

3ULYDWH 2940 3780 205 205 - - 3145 3985

Total 11366.15 8710 1305 795 500 0 13171.15 9505

/LVWRISURMHFWVFRPPLVVLRQHGGXULQJLVJLYHQLQ$QQH[XUH

13
Annual Report 2018-19

5. )RUWKH\HDUDFDSDFLW\DGGLWLRQWDUJHWRI0:KDVEHHQÀQDOL]HGDJDLQVWZKLFKDFDSDFLW\RI
0:KDVEHHQDFKLHYHGWLOO7KH6HFWRUZLVHDQG)XHOZLVHEUHDNXSLVDVXQGHU
LQ0:

Thermal Hydro Nuclear Total


Sector
Target Ach. Target Ach. Target Ach. Target Ach.
Central 2760 1960 710 110 - - 3470 2070
State 4506.15 2849.755 130 30 - - 4636.15 2879.755
3ULYDWH - 972 - - - - - 972
Total 7266.15 5781.755 840 140 - - 8106.15 5921.755
/LVWRISURMHFWVFRPPLVVLRQHGGXULQJLVJLYHQLQ$QQH[XUH,,
Monitoring Mechanism
6. The Ministry of Power has adopted a robust monitoring system for the capacity addition programme so as to see that
WKHSURMHFWVDUHH[HFXWHGLQWLPH7KHPRQLWRULQJPHFKDQLVPFRPSULVHVWZREURDGOHYHOVDWZKLFKPRQLWRULQJRISRZHU
SURMHFWVLVFDUULHGRXWE\WKH0LQLVWU\YL]E\WKH&HQWUDO(OHFWULFLW\$XWKRULW\DQGE\WKH0LQLVWU\RI3RZHU
7. Monitoring by the Central Electricity Authority
 7KH&HQWUDO(OHFWULFLW\$XWKRULW\ &($ KDVDQRGDORIÀFHUDVVRFLDWHGZLWKHDFKRQJRLQJSURMHFWZKRFRQWLQXRXVO\PRQLWRUV
WKH SURJUHVV DW VLWH WKURXJK IUHTXHQW YLVLWV DQG FRQWLQXRXV LQWHUDFWLRQ 7KH UHVSHFWLYH QRGDO RIÀFHU LV UHVSRQVLEOH IRU
submitting a report on the progress of each of the ongoing power project on monthly basis highlighting the critical areas
ZKHUH FRUUHFWLYH DFWLRQV DUH UHTXLUHG 7KH &KDLUSHUVRQ &($ UHYLHZV SURJUHVV RI WKH RQJRLQJ SURMHFWV ZLWK WKH QRGDO
RIÀFHUV7KH&($DOVRKROGVTXDUWHUO\UHYLHZPHHWLQJZLWKWKHGHYHORSHUVDQGRWKHUVWDNHKROGHUV
8. Monitoring by the Ministry of Power
‡ ,QWHQVLYHUHYLHZVDUHKHOGE\WKH0LQLVWU\RI3RZHUWRUHYLHZWKHFULWLFDOPLOHVWRQHVDVVRFLDWHGZLWKHDFKRQJRLQJSURMHFW
0HHWLQJVZLWKWKHOHDGLQJHTXLSPHQWPDQXIDFWXUHUVHVSHFLDOO\435VDUHDOVRRUJDQL]HGVHSDUDWHO\IRUHDFK&368WR
UHYLHZWKHVWDWXVRIWKH&HQWUDO6HFWRUSURMHFWV7KH&DSDFLW\$GGLWLRQ3URJUDPPHLVLQWHQVLYHO\PRQLWRUHGE\WKH30
and the Cabinet Secretariat as well.
‡ 7KHGHOD\HGSRZHUSURMHFWVFRVWLQJ5VFURUHDQGPRUHDQGEHWZHHQ5VWR5VFURUHKLJKOLJKWHGE\0R63,
DUHUHYLHZHGE\6HFUHWDU\ 3RZHU PRQWKO\DQGRQFHLQWZRPRQWKVUHVSHFWLYHO\
‡ ,VVXHVDUHDOVRUDLVHGRQ35$*$7,IRUSURDFWLYHJRYHUQDQFHDQGWLPHO\LPSOHPHQWDWLRQDVDQGZKHQUHTXLUHG
‡ 7KH ERWWOHQHFNV LQ SURMHFWV ERWK LQ WKH SXEOLF DQG SULYDWH VHFWRU IRU DOO ODUJH SURMHFWV RQ D IDVWWUDFN EDVLV DUH EHLQJ
UHPRYHGE\WKH3URMHFW0RQLWRULQJ*URXS 30* 3ULPH0LQLVWHU·V2IÀFH7KLV&HOOSURDFWLYHO\SXUVXHVVWDOOHGSURMHFWV
LQYROYLQJWKHLQYHVWPHQWRI5VFURUHRUPRUHVRWKDWWKHSURMHFWVDUHFRPPLVVLRQHGRQWLPH
‡ 7KH SURMHFW ,PSOHPHQWDWLRQ SDUDPHWHUVPLOHVWRQHV DUH LQFRUSRUDWHG LQ WKH DQQXDO 0HPRUDQGXP RI 8QGHUVWDQGLQJ
0R8 VLJQHGEHWZHHQUHVSHFWLYHSRZHU&368·VDQG023DQGWKHVDPHDUHPRQLWRUHGGXULQJWKHTXDUWHUO\SHUIRUPDQFH
UHYLHZPHHWLQJRI&368·VDQGRWKHUPHHWLQJVKHOGLQ023&($
‡ 0DWWHUV DUH WDNHQ XS ZLWK 6WDWH *RYHUQPHQW'LVWULFW $GPLQLVWUDWLRQ DQG WKH\ DUH H[WHQGLQJ KHOS WR WKH SURMHFW
LPSOHPHQWLQJDJHQFLHVLQUHVROYLQJ5LJKWRI:D\ 52: LVVXHV
Annexure I
PROJECTS COMMISSIONED DURING THE YEAR 2017-18

Project Name Region Sector State Developer Type Capacity


(In MW)
THERMAL PROJECTS
Nabi Nagar TPP U-2 ER Central BIHAR -92)173& 5$,/:$<6 Thermal 250
Solapur STPP U-1 :5 Central MAHARASHTRA NTPC Thermal 660

14
Chhabra STPP U-5 :5 State RAJASTHAN RRVUNL Thermal 660
Binjkote TPP U-1 :5 3ULYDWH CHHATTISGARH 6.632:(5*(1(5$7,21 Thermal 300
(CHHATTISGARH) LTD
Nawapara TPP U-2 :5 3ULYDWH CHHATTISGARH TRN ENERGY Thermal 300
Nasik TPP Ph-I U-3 :5 3ULYDWH MAHARASHTRA 5$77$1,1',$1$6,. Thermal 270
32:(5/7'
Nasik TPP Ph-I U-4 :5 3ULYDWH MAHARASHTRA 5$77$1,1',$1$6,. Thermal 270
32:(5/7'
Nasik TPP Ph-I U-5 :5 3ULYDWH MAHARASHTRA 5$77$1,1',$1$6,. Thermal 270
32:(5/7'
Bara TPP U-3 NR 3ULYDWH UTTAR PRADESH 35$<$*5$-32:(5*(1- Thermal 660
ERATION CO.LTD.
India Power TPP ER 3ULYDWH :(67%(1*$/ INDIAN ENERGY LTD Thermal 150
(Haldia) U-1 (HALDIA)
Uchpinda TPP U-3 :5 3ULYDWH CHHATTISGARH 5.032:(5*(1397 Thermal 360
LTD.
Shirpur TPP U-1 :5 3ULYDWH MAHARASHTRA 6+,538532:(5397/7' Thermal 150
Haldia, IPCL Unit-2 ER 3ULYDWH :(67%(1*$/ INDIAN ENERGY LTD Thermal 150
(HALDIA)
%736([WQ8QLW ER State BIHAR BSEB Thermal 250
Akaltara (Nariyara) :5 3ULYDWH CHATISHGARH .6.0$+$1$',32:(5 Thermal 600
COMPANY LIMITED
.XGJL67333K, SR Central .$51$7$.$ NTPC Thermal 800
Unit-3
Rayal Seema TPP SR State AP APGENCO Thermal 600
Unit-6
%DUDXQL([W733 ER State BIHAR BSPGCL Thermal 250
Unit-9
Meja STPP Unit-1 NR Central UTTAR PRADESH JV OF NTPC & UPRVUNL Thermal 660
Lara TPP Unit-1 :5 Central CHHATTISGARH NTPC Thermal 800
Binjkote TPP Unit-2 :5 3ULYDWH CHHATTISGARH 6.632:(5*(1(5$7,21 Thermal 300
LTD
TOTAL (THERMAL) 8710
HYDRO PROJECTS
New Umtru U-1 NER State MEGHALAYA MEPGCL Hydro 20
Dikchu U-1 ER 3ULYDWH 6,..,0 6,..,061(+$.,1(7,& Hydro 48
32:(5352-(&76397
LTD.
Dikchu U-2 ER 3ULYDWH 6,..,0 6,..,061(+$.,1(7,& Hydro 48
32:(5352-(&76397
LTD.
Chanju-I U-3 NR 3ULYDWH HIMACHAL PRADESH IA ENERGY Hydro 12
Tuirial HEP U-1 NER Central MIZORAM NEEPCO Hydro 30
Sainj HEP U-1 NR State HIMACHAL RADESH HPPCL Hydra 50
Sainj HEP U-2 NR State HIMACHAL PRADESH HPPCL Hydro 50
Pulichintala U-2 SR State TELANGANA TSGENCO Hydro 30

15
Annual Report 2018-19

Pulichintala U-3 SR State TELANGANA TSGENCO Hydro 30


Tashiding U-1 ER 3ULYDWH 6,..,0 61(+$.,1(7,&32:(5 Hydro 48.5
PROJECTS PVT. LTD,
Tashiding U-2 ER 3ULYDWH 6,..,0 61(+$.,1(7,&32:(5 Hydro 48.5
PROJECTS PVT. LTD.
Tuirial HEP U-2 NER Central MIZORAM NEEPCO Hydro 30
New Umtru U-2 NER State MEGHALAYA MEPGCL Hydro 20
.LVKDQ*DQJD+(3 NR Central - . NHPC Hydro 110
Unit-1
.LVKDQ*DQJD+(3 NR Central - . NHPC Hydro 110
Unit-2
.LVKDQ*DQJD+(3 NR Central - . NHPC Hydra 110
Unit-3
TOTAL (HYDRO) 795
TOTAL (NUCLEAR) 0
TOTAL (THERMAL+HYDRO+NUCLEAR) 9505

Annexure II
LIST OF POWER PLANTS COMMISSIONED DURING 2018-19

PROJECT NAME SECTOR STATE DEVELOPER CAPACITY


(MW)
THERMAL PROJECTS
Bongaigon TPP, Unit-3 Central Assam NTPC 250
Nabinagar TPP, Unit-3 Central Bihar JV of NTPC & Rly. 250
Gadarwara TPP, Unit-1 Central Madhya Pradesh NTPC 800
Solapur STPP, Unit-2 Central Maharashtra NTPC 660
Shri Singhaji TPP St-II, Unit-3 State Madhya Pradesh MPGENCO 660
Shri Singhaji TPP St-II, Unit-4 State Madhya Pradesh MPGENCO 660
&KKDEUD733([WQ8QLW State Rajasthan RRVUNL 660
.RWKDJXGHP7366W9,,8QLW State Telangana TSGENCO 800
Lakwa Replacement Power Project State Assam $3*&/:DUWVLOD,QGLD3YW/WG 69.755
Mahan TPP, Unit-2 3ULYDWH Madhya Pradesh Essar Power M.P Ltd. 600
Uchpinda TPP, Unit-4 3ULYDWH Chhattisgarh 5.03RZHUJHQ3YW/WG 360
Dishergarh TPS 3ULYDWH :HVW%HQJDO 0V,3&/ 12
A. Total (Thermal) 5781.755
HYDRO PROJECTS
PARE, UNIT-1 Central ARUNACHAL NEEPCO 55
PARE, UNIT-2 Central PRADESH NEEPCO 55
PULICHINTALA, UNIT-4 State TELANGANA TSGENCO 30
B. TOTAL (HYDRO) 140
C. Total (Nuclear) 0
Total Commissioned 5921.755

16
CHAPTER 04

GENERATION & POWER SUPPLY POSITION


GENERATION: PLANT LOAD FACTOR (PLF):

The total electricity generation including generation from The Plant Load Factor (PLF) of Thermal Power Stations (TPSs)
renewable sources in the country during year 2018-19 was LVDQLQGH[RIXWLOL]DWLRQRIWKHLQVWDOOHGFDSDFLW\7KHDYHUDJH
1376.096 BU as against the generation of 1308.146 BU during PLF of TPSs of Power Utilities during the year 2018-19 was
the last year, showing a growth of 5.2%. 7KHVHFWRUZLVHDQGRYHUDOO3/)VLQFHEHJLQQLQJRIWK
3ODQZDVDVXQGHU
7KH HOHFWULFLW\ JHQHUDWLRQ IURP FRQYHQWLRQDO VRXUFHV LQ WKH
country increased from 420.6 Billion Unit (BU) during 1997-98
WR%8GXULQJWKH\HDU7KHRYHUDOOHOHFWULFLW\ Year Central State Private Overall
generation in power utilities in the country including import
IURP%KXWDQVLQFHWKHEHJLQQLQJRIWK3ODQZDVDVXQGHU 1997-98 64.7 70.4 60.9 71.2

Year Generation Generation Total Gen- 1998-99 64.6 64.6 60.7 68.0
from from eration
Conventional Renewable (Cony. + RE) 1999-00 67.3 67.3 63.7 68.9
Sources Sources (Billion Unit)
(Billion Unit) (Billion Unit) 2000-01 74.3 65.6 73.1 69.0

1997-98 420.6 2001-02 74.3 67.0 74.7 69.9


1998-99 448.4
2002-03 77.1 68.7 78.9 72.1
1999-00 480.7
2003-04 78.7 68.4 80.5 72.7
2000-01 499.5
2004-05 81.7 69.6 85.1 74.8
2001-02 515.2
2002-03 531.6 2005-06 82.1 67.1 85.4 73.6

2003-04 558.3 3.4 561.7 2006-07 84.8 70.6 86.3 76.8


2004-05 587.4 4.5 591.9
2007-08 86.7 71.9 90.8 78.6
2005-06 617.5 6.6 624.2
2008-09 84.3 71.2 91.0 77.2
2006-07 662.4 9.9 672.4
2007-08 704.5 25.2 729.7 2009-10 85.5 70.9 82.4 77.5

2008-09 723.8 27.9 751.7 2010-11 85.1 66.7 76.7 75.1


2009-10 771.6 36.9 805.4 2011-12 82.1 68.0 76.2 73.3
2010-11 811.1 39.2 850.4
2012-13 79.2 65.6 64.1 69.9
2011-12 876.9 51.2 928.1
2013-14 76.1 59.1 62.1 65.6
2012-13 912.0 57.4 969.5
2013-14 967.2 53.1 1020.2 2014-15 74.0 59.8 60.6 64.5

2014-15 1048.7 61.7 1110.4 2015-16 72.5 55.4 60.5 62.3


2015-16 1107.8 65.8 1173.6
2016-17 72.0 54.3 55.7 59.9
2016-17 1160.1 81.5 1241.7
2017-18 71.4 55.1 55.2 59.8
2017-18 1206.3 101.8 1308.1
2018-19 1249.3 126.8 1376.1 2018-19 72.6 57.8 55.2 61.1

17
Annual Report 2018-19

Power Supply Position:


7KHJURZWKLQDYDLODELOLW\RIHOHFWULFLW\GXULQJWKHFXUUHQW\HDUKDVVXUSDVVHGWKHJURZWKLQUHTXLUHPHQWRIHOHFWULFLW\'XULQJWKH
year 2018-19, peak shortage has been 0.8% and the energy shortage has been 0.6%.
7KHSRZHUVXSSO\SRVLWLRQVLQFHEHJLQQLQJRIWK3ODQZDVDVXQGHU

Energy Energy Energy Shortage Energy Shortage


Year Requirement Availability
(MU) (MU) (MU) (%)
1997-98 424505 390330 34175 8.1
1998-99 446584 420235 26349 5.9
1999-00 480430 450594 29836 6.2
2000-01 507216 467400 39816 7.8
2001-02 522537 483350 39187 7.5
2002-03 545983 497890 48093 8.8
2003-04 559264 519398 39866 7.1
2004-05 591373 548115 43258 7.3
2005-06 631554 578819 52735 8.4
2006-07 690587 624495 66092 9.6
2007-08 737052 664660 72392 9.8
2008-09 777039 691038 86001 11.1
2009-10 830594 746644 83950 10.1
2010-11 861591 788355 73236 8.5
2011-12 937199 857886 79313 8.5
2012-13 995557 908652 86905 8.7
2013-14 1002257 959829 42428 4.2
2014-15 1068923 1030785 38138 3.6
2015-16 1114408 1090850 23558 2.1
2016-17 1142929 1135334 7595 0.7
2017-18 1213326 1204697 8629 0.7
2018-19 1274595 1267526 7070 0.6

Peak Peak Peak Peak


Year Demand Met Shortage Shortage
(MU) (MU) (MU) (%)
1997-98 65435 58042 7393 11.3
1998-99 67905 58445 9460 13.9
1999-00 72669 63691 8978 12.4

18
2000-01 78037 67880 10157 13.0
2001-02 78441 69189 9252 11.8
2002-03 81492 71547 9945 12.2
2003-04 84574 75066 9508 11.2
2004-05 87906 77652 10254 11.7
2005-06 93255 81792 11463 12.3
2006-07 100715 86818 13897 13.8
2007-08 108866 90793 18073 16.6
2008-09 109809 96785 13024 11.9
2009-10 119166 104009 15157 12.7
2010-11 122287 110256 12031 9.8
2011-12 130006 116191 13815 10.6
2012-13 135453 123294 12159 9.0
2013-14 135918 129815 6103 4.5
2014-15 148166 141160 7006 4.7
2015-16 153366 148463 4903 3.2
2016-17 159542 156934 2608 1.6
2017-18 164,066 160,752 -3,314 2.0
2018-19 177,022 175,528 -1,494 0.8

19
Annual Report 2018-19

NTPC’s Thermal Plant, Darlipali

20
CHAPTER 05

ULTRA MEGA POWER PROJECTS (UMPPs)


*RYHrnment of India through Ministry of Power launched Mundra UMPP in Gujarat: 7KH SURMHFW ZDV KDQGHG RYHU
WKHLQLWLDWLYHRI8OWUD0HJD3RZHU3URMHFWV 8033V LH to the Successful Bidder i.e. Tata Power Company Ltd., on
0:683(57+(50$/32:(5352-(&76 ERWKSLWKHDGDQG DWWKHHYDOXDWHGOHYHOLVHGWDULIIRI5VN:K
LPSRUWHG FRDO EDVHG  LQ 1RYHPEHU  ZLWK WKH REMHFWLYH Mundra UMPP is fully commissioned.
WR GHYHORS ODUJH FDSDFLW\ SRZHU SURMHFWV LQ ,QGLD 3RZHU
Sasan UMPP in Madhya Pradesh: The project was handed
Finance Corporation Ltd (PFC) has been appointed as the
RYHUWRWKH6XFFHVVIXO%LGGHULH0V5HOLDQFH3RZHU/WGRQ
1RGDO$JHQF\WRIDFLOLWDWHWKHGHYHORSPHQWRIWKHVHSURMHFWV
DWWKHHYDOXDWHGOHYHOLVHGWDULIIRI5VN:K
Various inputs for the UMPPs are tied up by the Special
Sasan UMPP is fully commissioned.
Purpose Vehicle (SPV) with assistance of Ministry of Power &
&HQWUDO(OHFWULFLW\$XWKRULW\ &($ &($LVLQYROYHGLQVHOHFWLRQ Krishnapatnam UMPP in Andhra Pradesh: The project
of sites for these UMPPs. ZDV KDQGHG RYHU WR 5HOLDQFH 3RZHU /WG RQ 
Initially following nine (9) numbers Ultra Mega Power Projects DW WKH OHYHOLVHG WDULII RI 5V N:K    7KH GHYHORSHU KDV
8033V ZHUHSURSRVHGWREHVHWXSLQGLIIHUHQWVWDWHV stopped work at site, citing new regulation of coal pricing in
Indonesia. Lead Procurer has issued termination notice to
i. Sasan UMPP in M.P- coal pithead WKH GHYHORSHU 'HOKL +LJK &RXUW KDV LVVXHG MXGJPHQW LQ WKH
ii. Mundra UMPP in Gujarat- coastal case on 15.01.2019 and has dismissed the appeal by Coastal
$QGKUD3RZHU/LPLWHG &$3/ ÀQGLQJQRPHULWLQWKHDSSHDO
LLL .ULVKQDSDWQDP8033LQ$3FRDVWDO
Tilaiya UMPP in Jharkhand:7KHSURMHFWZDVKDQGHGRYHUWR
LY 7LODL\D8033LQ-KDUNKDQGFRDOSLWKHDG
0V5HOLDQFH3RZHU/WG 53/ RQDWDQHYDOXDWHG
Y 8033LQ&KKDWWLVJDUKFRDOSLWKHDG OHYHOLVHGWDULIIRI5VSHUN:K7KHGHYHORSHU-KDUNKDQG
YL %HGDEDKDO8033LQ2GLVKDFRDOSLWKHDG Integrated Power Ltd (JIPL), a subsidiary of RPL), has issued
notice of termination of Power Purchase Agreement (PPA)
YLL &KH\\XU8033LQ7DPLO1DGXFRDOSLWKHDG RQFLWLQJQRQWUDQVIHURIODQGWRWKHGHYHORSHUE\
YLLL 8033LQ0DKDUDVKWUDFRDVWDO -KDUNKDQG*RYHUQPHQW-KDUNKDQG8UMD9LNDV1LJDP/WGYLGH
OHWWHUGDWHGLQIRUPHGWKDW-,3/KDVEHHQWDNHQRYHU
L[ 8033LQ.DUQDWDNDFRDVWDO
by the procurers from RPL.
,Q DGGLWLRQ WR QLQH 8033V RULJLQDOO\ LGHQWLÀHG UHTXHVW KDV
7KH SRZHU JHQHUDWLRQ FDSDFLW\ RI HDFK RI WKH H[LVWLQJ DQG
FRPHIURPVRPHRIWKHVWDWHJRYHUQPHQWVIRULQVWDOODWLRQRI
SURSRVHG 8033 LV 0: DSSUR[LPDWHO\ 7KH IXQG IRU
DGGLWLRQDO8033VLQWKHLUVWDWHV7KHVHDUHJLYHQEHORZ
8033 LV DUUDQJHG E\ WKH GHYHORSHU RI WKH SURMHFW ZKLFK LV
L 7ZR$GGLWLRQDO8033VLQ2GLVKD VHOHFWHG WKURXJK ,QWHUQDWLRQDO &RPSHWLWLYH %LGGLQJ 5RXWH
ii) Second UMPP in Gujarat as per the Standard Bidding Document issued by Ministry of
Power.
iii) Second UMPP in Jharkhand – Deoghar UMPP
 PRUH 8033V DUH XQGHU GLIIHUHQW VWDJHV RI GHYHORSPHQW
LY 6HFRQG8033LQ7DPLO1DGX (QYLURQPHQWDO FOHDUDQFH LV REWDLQHG DIWHU ÀUP DOORFDWLRQ RI
Y 8033LQ%LKDU²%DQND8033 FRDOEORFNV7KHVWDWXVRIWKHVH8033VLVDVIROORZV

YL 8033LQ8WWDU3UDGHVK ‡ Cheyuur UMPP in Tamil Nadu: The site at Cheyyur in


.DQFKLSXUDPGLVWULFWLQ7DPLO1DGXKDVEHHQLGHQWLÀHG
Status of UMPPs
DORQJ ZLWK FDSWLYH SRUW DW 3DQDL\XU YLOODJH &KH\\XU
Four UMPPs namely Sasan in Madhya Pradesh, Mundra in 8033ZDVRULJLQDOO\HQYLVDJHGWREHVHWXSRQLPSRUWHG
*XMDUDW .ULVKQDSDWWQDP LQ $QGKUD 3UDGHVK DQG 7LODL\D LQ FRDO +RZHYHU 0LQLVWU\ RI 3RZHU LV H[DPLQLQJ WKH
-KDUNKDQG KDYH DOUHDG\ EHHQ WUDQVIHUUHG WR WKH GHYHORSHUV possibility of setting up Cheyyur UMPP on domestic
Out of the four awarded UMPPs, two UMPPs namely Mundra coal instead of imported coal. Ministry of Coal has been
UMPP and Sasan UMPP are in operation. A brief detail of UHTXHVWHGWRDOORFDWHVXLWDEOHH[SORUHGFRDOEORFN
awarded UM33VLVDVEHORZ

21
Annual Report 2018-19

‡ Bedabahal UMPP in Odisha: The site for this UMPP FRQVLGHUDWLRQ /DQG KDV EHHQ WHQWDWLYHO\ LGHQWLÀHG DW
LVLQYLOODJH%HGDEDKDOLQ6XQGHUJDUKGLVWULFW5I4DQG Etah district.
RfP issued in 2013 were withdrawn. Bidding documents
‡ Karnataka UMPP:6WDWH*RYWKDVLGHQWLÀHGDVXLWDEOH
IRU 8033 DUH EHLQJ UHYLHZHG E\ ([SHUW &RPPLWWHH
VLWH LQ 1LGGRGL YLOODJH RI 0DQJDORUH WDOXND 'DNVKLQD
constituted under the Chairmanship of Shri Pratyush
.DQQDGD 'LVWULFW 6LWH YLVLW UHSRUW VHQW E\ &($ WR *RYW
6LQKDIRUPHU&9&WRUHFRPPHQGWKHUHYLVHG6WDQGDUG
RI .DUQDWDND IRU 1LGGRGL YLOODJH RI 0DQJDORUH WDOXND
%LGGLQJ 'RFXPHQWV 6%'V  DSSOLFDEOH WR 8033V&DVH
'DNVKLQD .DQQDGD 'LVWULFW KLJKOLJKWLQJ LVVXHV ZLWK
7KH6%'VDUHXQGHUÀQDOL]DWLRQ)UHVKELGZRXOGEH
respect to the site and requested for quick resolution of
LVVXHG DIWHU ÀQDOL]DWLRQ RI 6%'V DQG DOORFDWLRQ RI FRDO
the issues.
blocks to the Infra Special Purpose Vehicle (SPV).
‡ 2nd UMPP in Gujarat: *RYW RI *XMDUDW KDV EHHQ
‡ Banka UMPP in Bihar:$VLWHDW.DNZDUDLQ%DQND'LVWW
requested to identify additional land separately and also
KDV EHHQ LGHQWLÀHG IRU VHWWLQJ XS RI 8033 LQ %LKDU
to intimate regarding possibility of continuation of the
Infrastructure Special Purpose Vehicle (SPV) namely
project.
Bihar Infrapower Limited has been incorporated on
30.06.2015. Operating SPV namely Bihar Mega Power ‡ 2nd UMPP in Tamil Nadu: Site near Nagapattinam
Limited (BMPL) has been incorporated on 09.07.2015. ZDVLGHQWLÀHGE\*RYWRI7DPLO1DGXZKLFKZDVIRXQG
unsuitable by TANGEDCO Ltd. CEA has requested
‡ Deoghar UMPP in Jharkhand: A site at Husainabad,
7$1*(1'&2 WR LGHQWLI\ DQ DOWHUQDWLYH VLWH IRU VHWWLQJ
'HRJKDU'LVWWKDVEHHQLGHQWLÀHGIRUVHWWLQJXSRIQG
XSQG8033LQ7DPLO1DGX6LWHLVQRW\HWÀQDOL]HG
UMPP in Jharkhand. Operating SPV namely Deoghar
Mega Power Ltd and Infrastructure SPV namely Deoghar ‡ UMPP in Chhattisgarh: RfQ issued on March 2010
,QIUD/LPLWHGKDYHEHHQLQFRUSRUDWHGRQDQG ZDV ZLWKGUDZQ GXH WR FRDO EORFNV IDOOLQJ LQ LQYLRODWH
UHVSHFWLYHO\ DUHD *RYHUQPHQW RI &KKDWWLVJDUK KDV QRZ LQWLPDWHG
WKDW WKH\ DUH QRW NHHQ RQ VHWWLQJ XS RI  0:
‡ 2nd UMPP in Odisha: Site at Bijoypatna in Chandbali
Chhattisgarh UMPP. Accordingly, Chhattisgarh UMPP
7HKVLORI%KDGUDNGLVWULFWKDVEHHQLGHQWLÀHG
has been closed.
‡ 3rd UMPP in Odisha: 6LWH DW 1DUOD  .DVLQJD VXE
‡ UMPP in Maharashtra: Project has been closed as
GLYLVLRQRI.DODKDQGLGLVWULFWKDVEHHQLGHQWLÀHG
RI QRZ GXH WR UHVLVWDQFH E\ ORFDO SHRSOH *RYW RI
‡ UMPP in UP: A UMPP in Uttar Pradesh is also in Maharashtra has formally requested for closure of UMPP.

22
CHAPTER 06

TRANSMISSION
Transmission system plays an important role in the power 9 LILO-In of Cuddapah - Hindupur at N.P.
GHOLYHU\ V\VWHP E\ HVWDEOLVKLQJ WKH YLWDO OLQN EHWZHHQ WKH 18
.XQWDN9'&OLQH
generating stations and the distribution system, which is 10 6ULNDNXODP*DULYLGL 40 N9'&OLQH 288
connected to ultimate consumer. The transmission network
11 7XPNXU 3DYDJDGD 3RRO+LUL\XUOLQH
KDV H[SDQGHG RYHU WKH \HDUV IRU HYDFXDWLRQ RI SRZHU IURP 218
N9'&OLQH
Intra-state & Inter-State generating stations to load centers
12 'UDVV².DUJLON96&OLQH 60
through Intra-State and Inter-State Transmission System
13 /,/2RI.XUQRRO7KLUXYDODPOLQHDW&XG-
,676  DQG VWUHQJWKHQLQJ RI H[LVWLQJ QHWZRUN WR FDWHU WR WKH 190
GDSDKN9'&OLQH
projected peak demand. Total 22,437Ckms of transmission
14 LILO-Out of Cuddapah - Hindupur line (Q)
line and 72,705 MVA of transformation capacity in substations ERWK&NWV DW13.XQWD6XE6WDWLRQN9 19
DWN9DQGDERYHYROWDJHOHYHOV KDYHEHHQDGGHGGXULQJ '&OLQH
WKHÀQDQFLDO\HDU 7KH$OXVWHQJ%DOWDO'UDVV.DUJLO 15 &XGGDSDK+LQGXSXUOLQH 4 N9'&
338
.KDOVWL/HKN9OLQNKDVEHHQFRPSOHWHG,WKDVHVWDEOLVKHG line
JULGFRQQHFWLYLW\ZLWK1DWLRQDO*ULGIRUUHOLDEOHSRZHUVXSSO\ 16 LILO of both Ckt of Bamnauli-Samaypur
114
WRWKHVWUDWHJLFDOO\LPSRUWDQW/HK/DGDNKDUHDRI- . OLQHDW7XJKODNDEDGN90&OLQH

DEVELOPMENT OF NATIONAL GRID 17 Salem Pooling Station - Madhugiri Pooling


6WDWLRQOLQH LQLWLDOO\FKDUJHGDW.9  243
5HFRJQL]LQJWKHQHHGIRUGHYHORSPHQWRI1DWLRQDO*ULGWKUXVW N96&OLQH
ZDVJLYHQWRHQKDQFHWKHFDSDFLW\RILQWHUUHJLRQDOOLQNVLQD 18 Jharsuguda - Dharamjaygarh line(Ckt-I)
148
SKDVHGPDQQHU:RUNLQJLQWKLVGLUHFWLRQDOOWKHÀYHUHJLRQDO N9'&OLQH
grids are connected synchronously. As on Mar 31, 2019 inter- 19 $QJXO-KDUVXJXGDN9'&OLQH 590
regional power transfer capacity of the National Grid is about 20 6LOFKDU0HOULDW 1HZ N9'&OLQH 287
 0: ZKLFK ZDV DERXW  0: DW WKH HQG RI WKH 21 Jharsuguda - Dharamjaygarh line(Ckt-II)
148
;,, 3ODQ ,W LV H[SHFWHG WKDW E\  WKH LQWHUUHJLRQDO N9'&OLQH
power transfer capacity of the National Grid shall become 22 0DKDQ²6LSDWN9'&OLQH 673
0: 23 5DLJDUK .RWUD &KDPSD 3RRO  4XDG 
97
The details of ISTS (transmission lines and substations N96&OLQH
commissioned including the augmentation of transformation 24 6LSDW6736%LODVSXU 4XDG N96&
24
line
FDSDFLW\LQWKHH[LVWLQJVXEVWDWLRQV GXULQJWKHÀQDQFLDO\HDU
DUHDVXQGHU 25 6DPED$PDUJDUKOLQHN9'&OLQH 547
26 Champa (Pool) - Dharamiaygarh (Quad)
Sl. 51
Name of Transmission Element ckm N96&OLQH
No.
27 6XUDWJDUK736%LNDQHUN9'&OLQH 279
1 3DUOL²6RODSXUN9'&OLQH 236
28 *ZDOLRU0RUHQD 4XDG N9'&OLQH 96
2 3DUOL 1HZ 3DUOL 3*  4 N9'&OLQH 36
29 Sasan UMPP - Vindhyachal PS (Q) 765 kV
3 /,/2RI:DUGKD3DUOLDW:DURUD36N9 6
196 6&OLQH
'&OLQH
30 Jharsuguda (Sundargarh) - Raipur 765 kV
4 *DGDUZDUD:DURUD36N9'&OLQH 627 610
'&OLQH
5 :DURUD363DUOLN9'&OLQH 694 31 $OXVWHQJ²'UDVVN96&OLQH 115
6 /,/2RI([LWLQJ1H\YHOL76,,3RQG\FKHUU\ 32 %LKDUVKDULII &NW,,,DQG,9 .DKDOJDRQ
7 26
DW11736*HQ<DUGN9'&OLQH 173& N9'FOLQH
7 LILO of Farakka - Jeerat line at Sagah- 33 6DOHP0DGKXJLULOLQH 7%&% N96&
38 219
GLJKLN9'&OLQH line
8 Farakka - Baharampur (Twin HTLS) 400kV 34 %DQDVNDQWD&KLWWRUJDUKOLQHN9'&
164 604
'&OLQH line

23
Annual Report 2018-19

35 %KXM3RRO%DQDVNDQWDOLQHN9'&OLQH 578 Augmentation of transformation


III MVA
36 %DQDVNDQWD6DQNKDULOLQHN9'&OLQH 43 capacity at Existing Sub-Stations
37 Cuddapah - Madhugiri (QM) (PSITL - TBCB) 1 2UDL ,&7,, N9 1000
486
N9'&OLQH
2 1DUHQGUD ,&7,,5HSO   
38 LILO of Farakka - Jeerat line at Baharampur 185
3 kV
N9'&OLQH
3 .KDQGZD ([WQ N9 500
39 LILO of Subhashgram - Jeerat at Rajarhat
8 4 %RLVDU ([WQ N9 500
N9'&OLQH
40 1/&.DUDLNDOOLQHN9'&OLQH 190 5 *RRW\ ([WQ N9 500
41 /,/2RI$JUD%KDUDWSXUDW$JUDN9'&OLQH 111 6 'HJKDP ([WQ N9 500
42 /,/2RI.RWD²%DGRGOLQHDW5DQSXU*66 7 500
5 .KDPPDP ([WQ N9
N9'&OLQH
8 :DUDQJDO ([WQ N9 500
43 /,/2RI.736²0RGDNOLQHN9'& 5
44 0XQGUD8033%KXM3RROOLQHN9'&OLQH 196 9 3RQGLFKHUU\ ([WQ N9 500
45 .RWD-DLSXUN9'&OLQH 360 10 6LOFKHU,&7,,, N9 315
46 'KDUDPSXUL6RPDQDKDOOLN9'&OLQH 243 11 7XPNXU 3DYDJDGD 36,&7,,,N9 500
47 5DMQDQGJDRQ:DURUD KH[D OLQHN9 12 1000
532 3DUOL6ZLWFKLQJ6WDWLRQ ([WQ N9
'&OLQH
13 ([WQDW,QGRUHVVN9 1000
48 5DLSXU3RRO²5DMQDQGJDRQN9'&OLQH 80
49 %LODVSXU5DMQDQGJDRQ KH[D  67/7%&%  14 ([WQDW13.XQWDVVN9 500
324
N9'&OLQH 15 ([WQDW&XGGDSDKVVN9 500
50 .LVKDQJDQM 3* 'DUEKDQJD '07&/ OLQH 16 500
418 .DODVV([W UG,&7 N9
N9'&OLQH
17 7XJKODNDEDG*,6 WK,&7 N9 500
51 9LQGK\DFKDO36-DEDOSXU36'FOLQH 749
Total 12,337 18 'DOWRQJDQMVV QG,&7 N9 315
New Sub-Stations with transformation 19 ([WQDW*D\D66N9 1500
II MVA
capacity
20 ([WQDW*D\D66N9 500
1 3DUOL 1HZ 6VN9 3000
21 &XGGDSDK ([WQ N9 500
2 :DURUD36N9 3000
22 Patna (Replacement of ICT-II) (500-315)
3 7LUXQHOYHOL3RROLQJVWDWLRQN9 1000 185
N9
4 6ULNDNXODP66N9 3000
23 0LVD $XJ 66 5HSODFHPHQW[09$
5 &XGGDSDKVVN9 3000 500
E\[09$ N9
6 7XJKODNDEDG*,6N9 1500
Total 13,000
7 $PDUJDUK *,6 66N9 630
INTER-REGIONAL TRANSMISSION CAPACITY:
8 ,PSKDO66N9 315
9 %DQDVNDQWD66N9 3000 5HFRJQL]LQJ WKH QHHG IRU GHYHORSPHQW RI 1DWLRQDO *ULG
10 5DMDUKDW *,6 66N9 500 emphasis was laid to increase the transmission capacity of
11 5HZD,&7,,,66N9 500 LQWHUUHJLRQDO OLQNV LQ D SKDVHG PDQQHU IRU VPRRWK ÁRZ RI
SRZHUIURPVXUSOXVUHJLRQVWRGHÀFLWUHJLRQV:RUNLQJLQWKLV
12 *665DQSXU.RWD66N9 210
GLUHFWLRQ DOO WKH ÀYH UHJLRQDO JULGV DUH QRZ LQWHUFRQQHFWHG
13 %KXM3RROLQJ6WDWLRQN9 3000
through synchronous links forming one Nation-one Grid-one
14 +DPLUSXU,&7N9 315 frequency-one market. The inter-regional power transmission
15 /XFNQRZ,&7N9 500 FDSDFLW\RIWKH1DWLRQDO*ULGKDVLQFUHDVHGWR0: DV
RQ0DUFK ZKLFKZDV0:DWWKHHQGRIWKH;,,
Total 23,470

24
3ODQ/LVWRIH[LVWLQJ,QWHU5HJLRQDOOLQNVDQGDGGLWLRQGXULQJ Ranchi - Dharamjayagarh 2,100 2,100
WKHÀQDQFLDO\HDULVDVIROORZV :53RRLOLQJ6WDWLRQ
N96FOLQH
Region / Tr. Lines Up to Addition Expected
Mar’18 during Capacity by Ranchi - Dharamjaygarh 2,100 2,100
2018-19 the end of N9QG6F
March’2022 Jharsuguda-Dharam- 4,200 4,200
EAST-NORTH (ER-NR) MD\JDUKN9'FOLQH

'HKUL6DKXSXULN96F 130 130 Jharsuguda-Dharam- 4,200 4,200


MD\JDUKN9QG'FOLQH
0X]DIIDUSXU*RUDNKSXU 2,000 2,000
N9'F ZLWK6HULHV Jharsuguda- Raipur 4,200 4,200
Cap+TCSC) N9'FOLQH

3DWQD²%DOLDN9'F 1,600 1,600 Sub-total 12,790 8,400 21,190


(Quad) (1stckt) WEST- NORTH (WR-
Biharshariff – Balia 1,600 1,600 NR)
N9'F 4XDG Auriya-Malanpur 220 260 260
Barh-Patna– Balia 400kV 1,600 1,600 .9'F
'F 4XDG QGFNW .RWD8MMDLQ.9'F 260 260
*D\D%DOLDN96F 2,100 2,100 Vindhyachal HVDC 500 500
6DVDUDP$OODKDEDG 1,000 1,000 back-to-back
9DUDQDVLN9'&OLQH Gwalior-Agra 765 kV 2 4,200 4,200
(Sasaram HVDC back to [6F
back has been by- =HUGD.DQNUROLN9'F 1,000 1,000
passed)
&KDPSD3RRO.XUXN- 3,000 3,000
Sasaram - Fatehpur 2,100 2,100 shetra HVDC Bipole
N96F
Gwalior-Jaipur 765kV 4,200 4,200
Barh-II-Gorakhpur 1,600 1,600 [6FOLQHV
N9'F 4XDG OLQH
5$336XMDOSXUN9'F 1,000 1,000
Gaya-Varanasi 765kV 4,200 4,200
[6FOLQH Adani(Mundra) - Ma- 2,500 2,500
hendranagar HVDC
LILO of Biswanath 3,000 3,000 bipole
&KDULDOL$JUD
N90:+9'& Upgradation of Champa 3,000
Bi-pole at new pooling 3RRO.XUXNVKHWUD
station in Alipurduar HVDC Bipole
and addition of second Jabalpur - Orai 765kV 4,200 4,200
0:PRGXOH 'FOLQH
Biharsharif-Varanasi 1,600 1,600 LILO of Satna - Gwalior 4,200 4,200
N9'FOLQH 4XDG N96FOLQHDW2UDL
Sub-total 22,530 22,530 Banaskantha-Chittor- 4,200 4,200
EAST-WEST (ER-WR) JDUKN9'FOLQH
%XGKLSDGDU.RUED 390 390 Vindhyachal-Varanasi 4,200
kV 3 ckts. N9'FOLQH
Rourkela-Raipur 400 1,400 1,400 Sub-total 25,320 4,200 36,720
N9' EAST- SOUTH (ER-SR)
Ranchi –Sipat 400 kV 1,200 1,200 Balimela-Upper Sileru 130 130
'FZLWKVHULHVFRPS N96F
Rourkela-Raipur 1,400 1,400 *D]XZDND+9'&EDFN 1,000 1,000
N9'F QG to-back

25
Annual Report 2018-19

7DOFKHU.RODU+9'& 2,000 2,000 NOTE: 1N9,QWHU5HJLRQDOOLQNVZLWKWRWDOWUDQVPLVVLRQ


bipole FDSDFLW\RIDERXW0:ZKLFKDUHRSHUDWLQJLQUDGLDOPRGH
Upgradation of Talcher- 500 500 are not included.
.RODU+9'&%LSROH INTER-CONNECTION WITH NEIGHBOURING
Angul - Srikakulum 765 4,200 4,200 COUNTRIES
.9'&OLQH
India, being centrally placed in South Asian region and sharing
Sub-total 7,830 0 7,830
political boundaries with SAARC countries, namely, Nepal,
WEST- SOUTH (WR-SR)
Bhutan, Bangladesh, Sri Lanka & Pakistan, is playing a major
Chandrapur HVDC 1,000 1,000 role in facilitating planning of interconnections with some of
back-to-back WKHVHFRXQWULHVIRUHIIHFWLYHXWLOL]DWLRQRIUHJLRQDOUHVRXUFHV
.ROKDSXU%HOJDXP 260 260 ,QGLD KDV GHYHORSHG H[SHUWLVH LQ LPSOHPHQWDWLRQ RI +9'&
N9'F DQG 8+9$& SURMHFWV DQG LW ZLOO EH EHQHÀFLDO WR FRQQHFW WKH
Ponda – Nagajhari 260 260 QHLJKERULQJ FRXQWULHV HOHFWULFDOO\ WKURXJK +9'&8+9$&
N9'F WUDQVPLVVLRQOLQHV7KLVVKDOOJLYHULVHWRPXWXDOFRRSHUDWLRQ
Raichur - Sholapur 2,100 2,100 amongst neighboring nations and lead to peace and
N96FOLQH 3* prosperity in the region. This will also ensure Energy Security
Raichur - Sholapur 2,100 2,100 RI WKH UHJLRQ ,QGLD LV DOUHDG\ KDYLQJ LQWHUFRQQHFWLRQV ZLWK
N96FOLQH 3YW 6$$5&FRXQWULHVDVLVHQOLVWHGEHORZ
Sector)
1DUHQGUD.ROKDSXU 2,200 2,200 India – Nepal
N9'F FKDWN9 1HSDOLVDOUHDG\UDGLDOO\LQWHUFRQQHFWHGZLWK,QGLDDWYDULRXV
:DUGKD1L]DPDEDG 4,200 4,200 places through 11kV, 33kV and 132kV lines. For transfer of
N9'FOLQH 3DUWRI bulk power, further interconnection between India and Nepal
:DUGKD²+\GHUDEDGOLQH WKURXJKN9'KDONHEDU LQ1HSDO 0X]DIIDUSXU LQ,QGLD 
:DURUD3RRO:DUDQJDO 4,200 '& WUDQVPLVVLRQ OLQH SUHVHQWO\ FKDUJHG DW N9 YROWDJH
1HZ N9'FOLQH OHYHO LVXQGHURSHUDWLRQ7KH0X]DIIDUSXU ,QGLD 'KDONHEDU
Raigarh-Pugulur HVDC line 6,000 1HSDO N9'FOLQHLVH[SHFWHGWREHRSHUDWHGDWLWVUDWHG
LILO of Narendra- 1,600 YROWDJHE\'HFZKLFKZRXOGIXUWKHUHQKDQFHWKHSRZHU
Narendra(New) 400kV WUDQVIHUFDSDELOLW\WR1HSDOE\DERXW0: WRWDODERXW
(quad) line at Xeldam 0: )XUWKHUQG+LJK&DSDFLW\N9*RUDNKSXU²1HZ
(Goa)
%XWZDO'F 4XDG OLQHLVXQGHUGLVFXVVLRQIRUUHOLDEOHWUDQVIHU
Sub-total 12,120 0 23,920 of power between the two countries.
EAST- NORTH EAST
India – Bhutan
Birpara-Salakati 220kV 260 260
'F ,QGLDDQG%KXWDQDOUHDG\KDYHH[LVWLQJDUUDQJHPHQWVPDLQO\
Malda - Bongaigaon 1,000 1,000 IRULPSRUWRIDERXW0:SRZHUIURP7DOD+(3 0: 
N9'F/,/2HGDW &KXNKD +(3  0:   .XULFKX +(3 0:  LQ %KXWDQ WR
Siliguri &Purnea ,QGLDWKURXJKN9N9DQGN9OLQHVUHVSHFWLYHO\)RU
Siliguri - Bongaigaon 1,600 1,600 HYDFXDWLRQ RI SRZHU IURP YDULRXV XSFRPLQJ +\GUR (OHFWULF
N9'F 4XDG OLQH 3RZHUSODQWV +(3V LQ%KXWDQOLNH3XQDWVDQJFKX, 0: 
LILOed at Alipurduar 3XQDWVDQJFKX,, 0:   0DQJGHFKX  0:  +(3V
Sub-total 2,860 2,860 3XQDWVDQJFKX+(3$OLSXUGXDUN9'F 4XDG0RRVH DQG
North East-North -LJPHOLQJ %KXWDQ   $OLSXUGXDU N9 'F OLQHV DUH XQGHU
Biswanath Chariali - 3,000 3,000 implementation.
$OLSXUGXDUN9 Power from these HEPs in Bhutan and NER projects would
0:+9'&%LSROH
be transferred to other part of India through high capacity
Sub-total 3,000 0 3,000 N9 0: %LVZDQDWK &KDULDOL ² $OLSXUGXDU ² $JUD
TOTAL 86,450 12,600 1,18,050 HVDC bipole line.

26
India – Bangladesh 4 765 *DGDUZDUD:DURUD36 '& 627
A high capacity interconnection between India & Bangladesh 5 765 Jharsuguda - Dharam- '& 296
H[LVW WKURXJK %DKDUDPSXU ,QGLD  ² %KHUDPDUD %DQJODGHVK  jaygarh line
N9'FOLQHDQG[0:+9'&EDFNWREDFNWHUPLQDO 6 765 /,/2RI.XUQRRO7KLU- '& 190
at Bheramara which facilitates transfer of power of the order YXDODPOLQHDW&XGGDSDK
RI0:WR%DQJODGHVK$GGLWLRQDOUDGLDOLQWHUFRQQHFWLRQV 7 765 Vindhyachal PS - Jabalpur '& 749
from Suryamaninagar in Tripura in India to Comilla in PS
%DQJODGHVK  N9 OLQH RSHUDWLQJ DW  N9 KDYH EHHQ 8 765 :DURUD363DUOL '& 694
implemented. 400 kV operation of Surajmani Nagar – Comilla 9 400 Banaskantha - Sankhari line '& 43
'F OLQH DORQJZLWK  0: %DFN WR %DFN +9'& WHUPLQDO DW 10 400 Biharshariff (Ckt III and IV) - '& 26
Comilla is under implementation. .DKDOJDRQ 173&
%DKDUDPSXU ,QGLD  ² %KHUDPDUD %DQJODGHVK   N9 'F 11 400 Cuddapah - Hindupur (Q) '& 338
QG OLQH LV XQGHU LPSOHPHQWDWLRQ )XUWKHU .DWLKDU ,QGLD  ² 12 400 Cuddapah - Madhugiri (QM) '& 486
3DUERWLSXU %DQJODGHVK ²%RUQDJDU ,QGLD N9'FOLQHLV 13 400 Farakka - Baharampur (Twin '& 164
under discussion. HTLS)
14 400 LILO of Both Ckt of Bamnau- 0& 114
India – Sri Lanka
li - Samaypur at Tughlak-
7KHVWXG\KDVEHHQFDUULHGRXWIRU[0:+9'&ELSROH abad
line between Madurai (India) and New Anuradhapura (Sri 15 400 LILO of Farakka - Jeerat line 6& 3
Lanka) including submarine cable for sea portion. During at Baharampur
WKH UG -:* PHHWLQJ KHOG RQ  ,QGLD ² 6UL /DQND 16 400 LILO of Farakka - Jeerat line 6& 38
*ULGLQWHUFRQQHFWLRQZDVGLVFXVVHGLQGHWDLO,QYLHZRIKLJK at Sagahdighi
HVWLPDWHGSURMHFWFRVWLWZDVGHFLGHGWRH[SORUHWKHSRVVLELOLW\ 17 400 LILO of Subhashgram - 6& 8
of additional option considering entire interconnection line as Jeerat at Rajarhat
RYHUKHDGOLQHZLWKRXWDQ\FDEOH RUWKHDOWHUQDWLYHRIDQ$& 18 400 Mundra UMPP - Bhuj Pool '& 190
interconnection) to further reduce the cost. line
19 400 6ULNDNXODP*DULYLGL 40 '& 288
India - Myanmar
20 400 7XPNXU 3DYDJDGD 3RRO '& 218
$VPDOOUDGLDOLQWHUFRQQHFWLRQ N9 H[LVWVEHWZHHQ,QGLDDQG Hiriyur
Myanmar. 21 220 1/&.DUDLNDOOLQH '& 190
CENTRAL SECTOR TRANSMISSION 22 220 'UDVV.DUJLO 3DUWRI 6& 60
$OXVWHQJ'UDVV.DUJLO.KDO-
32:(5*5,'WKH´&HQWUDO7UDQVPLVVLRQ8WLOLW\µRIWKHFRXQWU\LV VWL/HK  - .
UHVSRQVLEOHIRUFRRUGLQDWLRQDQGVXSHUYLVLRQIRUGHYHORSPHQW 23 220 Alusteng-Drass (Part of 6& 115
of inter-State transmission system (ISTS) in the central sector $OXVWHQJ'UDVV.DUJLO
matching with generation capacity addition to facilitate inter- .KDOVWL/HK  - .
6WDWHLQWHUUHJLRQDOH[FKDQJHRISRZHU32:(5*5,'·VPDMRU 24 765 Parli - Solapur '& 236
transmission lines and sub-stations (MVA addition) completed 25 400 Parli - Parli line (Q) '& 36
during the year 2018-19 (up to Mar 31, 2019) are shown in the 26 400 /,/22)['&:DUGKD '& 196
following WDEOH 3DUOLOLQHDW:DURUD3RROLQJ
Stn. (Q)
S Voltage Transmission Line CKT CKM
No Level 27 400 /,/2RIH[LVWLQJ1H\YHOL76,, '& 7
3RQG\FKHUU\.96&DW
1 765 Angul - Jharsauguda line '& 590 NNTPS Gen. Yd.
2 765 Banaskanta - Chittorgarh '& 604 28 400 /,/2,QRI.9'&&XG- '& 18
line dapah - Hindupur line (Q) at
3 765 Bhuj Pool - Banaskanta line '& 578 13.XQWD

27
Annual Report 2018-19

29 220 .DUJLO.KDOVWL/LQH 6& 97 13 Patna (Replacement of ICT-II)  185


30 400 /,/22XWRI.9'& '& 19 (500-315)
Cuddapah – Hindupur line 14 5DMDUKDW *,6 66  500
4 DW13.XQWD
15 6LOFKDU 1HZ 6V  315
31 765 Salem - Madhugiri (Dhar- 6& 243
ampuri -Tumkur) 16 ,PSKDO66 XSJUDGDWLRQ  630

32 400 .9'&6LOFKDU0HOULDW '& 287 17 7XPNXU 3DYDJDGD 36,&7,,,  500


1HZ  FKDUJHGDW.9 18 7XJKODNDEDG66 *,6  2000
33 765 Salem - Madhugiri 6& 219 19 Narendra (ICT-II Repl.)(500-  185
34 220 LILO of Agra - Bharatpur at 6& 111 315)
Agra 20 ([WQDW.KDQGZD6VWQ  500
35 400 .RWD-DLSXU '& 360 21 ([WQDW%RLVDU6VWQ  500
36 400 Dharampuri - Somanahalli '& 243
22 ([WQDW3RQGLFKDU\6VWQ  500
Total 8681
23 ([WQDW'HKJDP6VWQ  500

S Name of Sub station Voltage MVA 24 ([WQDW.KDPPDP6VWQ  500


No Level 25 ([WQDW:DUDQJDO6VWQ  500
1 %DQDVNDQWD66  3000 26 ([WQDW7LUXQHOYHOL6VWQ  1000
2 Bhuj Pooling Station  3000 27 ([WQDW3DUOL6ZLWFKLQJVWQ  1000
3 &XGGDSDK6V  3000 28 ([WQDW,QGRUH66  1000
4 3DUOL 1HZ 6V  3000 29 ([WQDW13.XQWD66  500
5 6ULNDNXODP66  3000 30 ([WQDW.DOD6VWQ UG,&7  500
6 Orai ICT-II  1000 31 'DOWRQJDQM66 [ ,&7,,  315
7 :DURUD3RROLQJ6WQ 7%&%  3000 32 ([WQDW*D\D66  500
8 ([WQDW*D\D66 [09$  1500 33 Rewa Pooling Stn.  500
9 Lucknow ICT  500 34 Hamirpur ICT  315
10 &XGGDSDK ([WQ  500 35 Bongaigaon ICT  315
11 *RRW\ ([WQ  500 36 'UDVV66 [  50
12 0LVD66 5HSODFHPHQW[  500 37 .DUJLO66 [  50
09$E\[09$
Total 35,860

28
CHAPTER 07

STATUS OF POWER SECTOR REFORMS


Amendments in Electricity Act, 2003 In YLHZRIWKHG\QDPLFFKDQJHVLQWKH(OHFWULFLW\6HFWRUDQG
to carry forward Power Sector reforms, it is felt to further
7KH8QLRQ&DELQHWKDGDSSURYHGWKHSURSRVDOIRUDPHQGPHQW
DPHQG WKH SURYLVLRQV RI 7DULII 3ROLF\  $FFRUGLQJO\ FHUWDLQ
in Electricity Act, 2003 on 10th December, 2014 as contained
FKDQJHV KDYH EHHQ SURSRVHG LQ WKH 7DULII 3ROLF\  7KH
in the Electricity (Amendment) Bill 2014. The Electricity
SURSRVHG DPHQGPHQW IRFXVHV RQ HIÀFLHQF\ LPSURYHPHQW
(Amendment) Bill 2014 was introduced in the Lok Sabha on FRQVXPHUSURWHFWLRQ5(3URPRWLRQ(QYLURQPHQWSURWHFWLRQ
19.12.2014. The Bill was subsequently referred to the Standing and sustainability of the power sector. The draft Amendments
&RPPLWWHH RQ (QHUJ\ IRU H[DPLQDWLRQ DQG UHSRUW 7KH to Tariff Policy were circulated for Stakeholder comments on
Committee had submitted its report on 7.5.2015. Based on the 7KHUHYLVHG7DULII3ROLF\LVXQGHUÀQDOL]DWLRQ
REVHUYDWLRQVUHFRPPHQGDWLRQV RI WKH 6WDQGLQJ &RPPLWWHH
RQ (QHUJ\ DQG IXUWKHU FRQVXOWDWLRQGHOLEHUDWLRQV ZLWK 6WDWH Waiver of inter-state transmission charges and losses on
transmission of the electricity generated from solar and
*RYHUQPHQWVDQGYDULRXVRWKHUVWDNHKROGHUVIXUWKHUFKDQJHV
wind sources of energy
KDYH EHHQ SURSRVHG LQ WKH (OHFWULFLW\ $PHQGPHQW  %LOO
2014. Draft amendments to Electricity Act were circulated for ,QFRPSOLDQFHWRWKHSURYLVLRQVLQSDUD  RI7DULII3ROLF\
VWDNHKROGHU FRPPHQWV RQ  7KH FRPPHQWV UHFHLYHG &HQWUDO *RYHUQPHQW KDG LVVXHG ,676 ZDLYHU 2UGHUV )LUVW
IURPYDULRXVVWDNHKROGHUVDUHEHLQJH[DPLQHGE\WKH'UDIWLQJ Order was issued on 30.09.2016 in which ISTS transmission
Committee constituted under the chairmanship of Chief FKDUJHVDQGORVVHVZDLYHUZDVPDGHDYDLODEOHWRWUDQVPLVVLRQ
Engineer (Legal) Central Electricity Authority. of electricity from Solar Projects commissioned till 30.06.2017
DQG:LQG3URMHFWVFRPPLVVLRQWLOO)XUWKHUGDWHIRU
These proposed amendments entail competition in retail ZDLYHURI,676WUDQVPLVVLRQFKDUJHVDQGORVVHVZDVH[WHQGHG
(i.e. choice to consumers to select retail suppliers), strict IRU 6RODU 3URMHFWV XSWR  YLGH 023 2UGHU GDWHG
enforcement of Renewable Purchase Obligations (RPO), 14.06.2017. Thereafter based on the request from MNRE,
]HUR WROHUDQFH RQ *ULG 6DIHW\ DQG 6HFXULW\ 5DWLRQDOL]DWLRQ Ministry of Power has issued an Order dated 13.2.2018
RI 7DULII GHWHUPLQDWLRQ SURFHVV 2EOLJDWLRQ RI [ SRZHU H[WHQGLQJ WKH ZDLYHU RI ,QWHU6WDWH 7UDQVPLVVLRQ 6\VWHP
supply by Distribution Licensee, Subsidy through DBT (ISTS) charges and losses on transmission of the electricity
PHFKDQLVP6WUHQJWKHQLQJ3HUIRUPDQFHUHYLHZRI5HJXODWRU\ generated from solar and wind sources based generation
&RPPLVVLRQV )DFLOLWDWLQJ 2SHQ $FFHVV DQG 'HYHORSPHQW RI SURMHFWV FRPPLVVLRQHG WLOO VW 0DUFK  6XFK ZDLYHU
3RZHU0DUNHWDQG&URVV%RUGHUH[FKDQJHRIHOHFWULFLW\HWF ZLOO EH DYDLODEOH IRU D SHULRG RI  \HDUV IURP WKH GDWH RI
commissioning of such solar and wind projects. The ISTS
Amendments to Tariff Policy 2016
ZDLYHU ZLOO EH DYDLODEOH IRU VRODU DQG ZLQG SURMHFWV HQWHULQJ
7KH7DULII3ROLF\ZDVQRWLÀHGE\WKH&HQWUDO*RYHUQPHQWXQGHU into PPAs with all entities, including Distribution Companies,
Section 3 of the Electricity Act, 2003 on 6th January, 2006. As for sale of power from solar and wind power projects for
DQHYROYLQJUHIRUPSURFHVVWKHSURYLVLRQVRI7DULII3ROLF\KDYH compliance of their renewable purchase obligation. As a
EHHQ DPHQGHG IURP WLPH WR WLPH 7KH UHYLVHG 7DULII 3ROLF\ FRQGLWLRQ WKH DERYH ZDLYHU ZLOO EH DOORZHG RQO\ WR WKRVH
ZDV QRWLÀHG RQ WK -DQXDU\  XQGHU WKH SURYLVLRQV RI VRODUDQGZLQGSURMHFWVWKDWDUHDZDUGHGWKURXJKFRPSHWLWLYH
Electricity Act, 2003. The amendments in the Tariff Policy are bidding process in accordance with the guidelines issued by
PDGH WR HQVXUH DYDLODELOLW\ RI HOHFWULFLW\ WR FRQVXPHUV DW WKH&HQWUDO*RYHUQPHQW
UHDVRQDEOH DQG FRPSHWLWLYH UDWHV HQVXUH ÀQDQFLDO YLDELOLW\ Long Term RPO Growth Trajectory of Renewable Purchase
RIWKHVHFWRUDQGDWWUDFWLQYHVWPHQWVSURPRWHWUDQVSDUHQF\ Obligations (RPOs) for Non-Solar as well as Solar Energy
consistency and predictability in regulatory approaches across under Tariff Policy 2016
jurisdictions. The amendments inter alia includes promotion
8QGHUWKHSURYLVLRQVRI7DULII3ROLF\DQGLQRUGHUWRDFKLHYHWKH
of renewable energy (Renewable Generation Obligation, Long
WDUJHWRI0:RIUHQHZDEOHFDSDFLW\E\0DUFK
term growth trajectory of RPOs and increase in Solar RPO), the Ministry of Power in consultation with MNRE had issued
FRPSXOVRU\ SURFXUHPHQW E\ 'LVFRPV IURP :DVWH WR (QHUJ\ the Order on 22nd July, 2016 specifying ‘Long term growth
plants, mandatory use of sewage treated water by thermal trajectory of RPOs for Non-solar as well as solar, uniformly
SODQWVFRQWLQXDWLRQRIH[HPSWLRQWRK\GURSURMHFWVIURPWDULII IRU DOO 6WDWHV87V LQLWLDOO\ IRU WKUHH \HDUV IURP  WR
EDVHG FRPSHWLWLYH ELGGLQJ XSWR WK $XJXVW  6PDUW 2018-19’. Further, Ministry of Power has on 14th June, 2018
0HWHUVUHFRYHU\RI5HJXODWRU\$VVHWVUHYLVLRQRIIRUPXODIRU issued Long Term RPO growth trajectory for Solar and Non-
calculation of Cross Subsidy etc. solar for the years 2019-20 to 2021-22.

29
Annual Report 2018-19

Guidelines and Standard Bidding Documents (SBDs) &DVHUMPPs. Based on the recommendations of the
for Procurement of Electricity by Distribution Licensees Committee and consultation with stakeholders, the
through Tariff based bidding process *XLGHOLQHV6%'V EDVHG RQ $OORFDWHG 'RPHVWLF &RDO
Blocks, Imported Coal as well as for Linkage coal are
In compliance with section 63 of the Electricity Act, 2003, the
XQGHUÀQDOL]DWLRQ
&HQWUDO*RYHUQPHQWKDVQRWLÀHGJXLGHOLQHVIRUSURFXUHPHQW
RI SRZHU E\ 'LVWULEXWLRQ /LFHQVHHV WKURXJK FRPSHWLWLYH II) Medium Term procurement of power:
bidding. Model Bidding Documents (MBDs) for procurement
Competitive procurement of Power requirement by of electricity for medium term from power generating
the Distribution Licensees reduces the overall cost of VWDWLRQV VHW XS DQGRU RSHUDWHG RQ )LQDQFH 2ZQ DQG
SURFXUHPHQW RI SRZHU DQG LQ WXUQ OHDGV WR VLJQLÀFDQW Operate (FOO) basis issued on 29.1.2014. Further,
EHQHÀWVIRUFRQVXPHUV DPHQGPHQWV KDYH EHHQ LVVXHG LQ WKH 'RFXPHQWV
on 20.8.2015. Model Bidding Documents (MBDs) for
I) Long Term procurement of power: procurement of peaking power for medium term issued
 &HQWUDO *RYHUQPHQW KDG LQLWLDOO\ LVVXHG WKH 6WDQGDUG on 20.2.2014. In order to introduction of e-bidding
Bidding Documents (SBDs) containing Request for SURFHVV DORQJ ZLWK UHYHUVH DXFWLRQ UHYLVHG *XLGHOLQHV
4XDOLÀFDWLRQ 5I4 5HTXHVWIRU3URSRVDO 5I3 DQG3RZHU and Model Bidding Documents for medium-term
Purchase Agreement (PPA) for long term procurement of procurement of power by Distribution Licensees
SRZHU IURP &DVH SURMHFWV KDYLQJ VSHFLÀHG VLWH DQG WKURXJK WDULII EDVHG FRPSHWLWLYH ELGGLQJ SURFHVV ZDV
ORFDWLRQ   WKURXJK WDULII EDVHG FRPSHWLWLYH ELGGLQJ LQ QRWLÀHGRQWK-DQXDU\,QWURGXFWLRQHELGGLQJ
2006 and amended it from time to time. The Standard SURFHVVDORQJZLWKUHYHUVHDXFWLRQZLOOUHVXOWLQJUHDWHU
Bidding Documents for long term procurement of power transparency and fairness in the procurement process for
XOWLPDWHEHQHÀWRIWKHFRQVXPHUV)XUWKHUIRUHQDEOLQJ
from Case-1 projects (where the location, technology or
the use of linkage coal as per the new coal linkage
IXHO LV QRW VSHFLÀHG  ZHUH LVVXHG LQ WKH \HDU  DQG
SROLF\ 6+$.7,3ROLF\ RI0LQLVWU\RI&RDO5HYLVHG0%'V
amended it in 2010.
DQG UHYLVHG *XLGHOLQHV IRU 3URFXUHPHQW RI (OHFWULFLW\
In pursuance of the decision of the EGoM on Ultra for Medium Term were issued on 29-01-2019 and
0HJD 3RZHU 3URMHFWV 8033V  KDYLQJ VSHFLÀHG VLWH UHVSHFWLYHO\
DQG ORFDWLRQ WKH 6%'V IRU &DVH KDYH EHHQ IXUWKHU
III) Short Term procurement of power:
UHYLHZHG DQG WKH 0RGHO %LGGLQJ 'RFXPHQWV 0%'V 
comprising the Model RFQ, Model RFP and the Model  7KH &HQWUDO *RYHUQPHQW KDV LVVXHG *XLGHOLQHV IRU
PPA for construction and operation of power generation short-term procurement of electricity i.e. for a period of
SURMHFWV8033VRQ'HVLJQ%XLOG)LQDQFH2SHUDWHDQG less than or equal to one year under section 63 of the
7UDQVIHU '%)27 EDVLVKDYHEHHQLVVXHGRQWK6HSW Electricity Act, 2003 on 16 May, 2012. For introduction
RI H UHYHUVH DXFWLRQ WKH UHYLVHG JXLGHOLQHV IRU VKRUW
2013. The Guidelines for procurement of electricity from
term procurement of electricity were also issued on 30th
Thermal Power Stations set up on DBFOT basis for Case-
March, 2016.
8033V KDYH EHHQ SXEOLVKHG LQ WKH *D]HWWH RI ,QGLD
on 21st September, 2013. Model Bidding Documents Pilot Scheme for procurement of 2500 MW for three
(MBDs) for Thermal Power Stations set up on Design, years under medium Term
Build, Finance, Own and Operate (DBFOO) basis for ‡ ,Q DQ DWWHPSW WR UHYLYH WKH VWUHVVHG SRZHU SURMHFWV D
&DVHLVVXHGRQ)XUWKHUDPHQGPHQWVKDYH Pilot Scheme was introduced by Ministry of Power in
been issued in the Documents on 5.5.2015. April 2018. In this regard, Model Bidding Documents
In order to facilitate use of linkage coal in the long term and Guidelines for implementation of Pilot Scheme i.e.
procurement of power by Distribution Licensees as 3URFXUHPHQWRI0:SRZHUIRUPHGLXPWHUPLH
SHU WKH SURYLVLRQV RI 3DUD % ,  % ,,,   % ,9  RI 6+$.7, (Three) years from coal based power plant on 6th April,
DQGWK$SULOUHVSHFWLYHO\
Policy, SBDs and Guidelines for long term Procurement
of Electricity from Thermal Power Stations set up on ‡ %DVHGRQWKHH[SHULHQFHJDLQHGIURPWKH3LORW6FKHPH
Design, Build, Finance, Own and Operate (DFFOO) basis MOP issued the Bidding Documents and Guidelines for
KDYHEHHQUHYLVHGDQGLVVXHGLQ0DUFK Pilot Scheme-II to facilitate procurement of aggregated
3RZHU RI  0: IRU WKH SHULRG RI  WKUHH  \HDUV
 $Q ([SHUW &RPPLWWHH ZDV FRQVWLWXWHG E\ WKH 0LQLVWU\
FRYHUHGXQGHU0HGLXP7HUP RQDQG
RI 3RZHU WR UHYLHZ WKH 0RGHO %LGGLQJ 'RFXPHQWV IRU
02-2019 reVSHFWLYHO\

30
Competitive Bidding Guidelines for procurement of power empower common people to demand 24X7 power from
from Solar and Wind Power projects: WKHVWDWHVDQGZLOOWDNHWUDQVSDUHQF\WRWKHQH[WOHYHOE\
PDNLQJ6WDWHJRYHUQPHQWVPRUHDFFRXQWDEOH
7RSURPRWHFRPSHWLWLYHSURFXUHPHQWRIHOHFWULFLW\IURPVRODU
39 SRZHU SODQWV DQG :LQG 3RZHU SODQWV E\ GLVWULEXWLRQ LL  '((3 'LVFRYHU\ RI (IÀFLHQW (OHFWULFLW\ 3ULFH 
licensees and to protect consumer interests, Bidding e-Bidding & e-Reverse Auction portal.
*XLGHOLQHV KDYH EHHQ LVVXHG IRU ORQJ WHUP SURFXUHPHQW
In order to bring uniformity and transparency in power
of electricity by the distribution licensees. Guidelines for
procurement by the DISCOMs and also to promote
7DULII %DVHG &RPSHWLWLYH %LGGLQJ 3URFHVV IRU 3URFXUHPHQW
FRPSHWLWLRQ LQ HOHFWULFLW\ VHFWRU ´'((3 'LVFRYHU\ RI
of Power from Grid Connected Solar PV Power Projects was
(IÀFLHQW(OHFWULFLW\3ULFH H%LGGLQJ3RUWDOµZDVODXQFKHG
LVVXHG YLGH 5HVROXWLRQ GDWHG UG $XJXVW  *XLGHOLQHV
on 12th April, 2016. This Portal is being used for Short
IRU7DULII%DVHG&RPSHWLWLYH%LGGLQJ3URFHVVIRU3URFXUHPHQW
Term and Medium Term procurement of Power by
RI 3RZHU IURP *ULG &RQQHFWHG :LQG 3RZHU 3URMHFWV ZDV
'LVFRPV7KHH5HYHUVH$XFWLRQPHWKRGKDVDOVREHHQ
LVVXHGYLGH5HVROXWLRQGDWHGWK'HFHPEHU1HFHVVDU\
introduced in the short term and medium term power
Amendments to these guidelines were made considering the
procurement. During Financial Year 2018-19 Bidding for
YLHZVRIWKH6WDNHKROGHUVHQFRXUDJLQJLQYHVWPHQWDQGWLPHO\
WRWDO0:RISRZHUIRUVKRUWWHUPUHTXLUHPHQW
commissioning of such projects.
of power was conducted using DEEP Portal.
Mechanism to provide Flexibility in Generation and
(iii) MERIT (Merit Order Despatch of Electricity for
scheduling to reduce emissions of Thermal Power Stations:
Rejuvenation of Income and Transparency) web
In order to reduce emissions and also encouraging RE capacity portal
DGGLWLRQ &HQWUDO *RYHUQPHQW KDV RQ  LVVXHG WKH
 $ :HE 3RUWDO ¶0(5,7· LH 0HULW 2UGHU 'HVSDWFK RI
PHFKDQLVPIRUSURYLGLQJÁH[LELOLW\LQJHQHUDWLRQ VFKHGXOLQJ
(OHFWULFLW\IRU5HMXYHQDWLRQRI,QFRPHDQG7UDQVSDUHQF\
of Thermal Power Stations. TPPs can supply power from RE
was launched on 23rd June 2017 .This Mobile App
VRXUFHVXQGHUH[LVWLQJFRQWUDFWXDODJUHHPHQWV
DQG :HE 3RUWDO GLVSOD\V WKH DFWXDO GDWD RI GLVSDWFKHG
Mechanism to provide Flexibility in Generation and JHQHUDWLRQ E\ WKH VWDWHV WUDQVSDUHQWO\ DQG SURYLGHV
scheduling of thermal power stations to reduce cost of RSSRUWXQLW\WRVWDWHVIRULPSURYLQJWKHLUSRZHUSXUFKDVH
power to consumers: portfolio

0LQLVWU\ RI 3RZHU KDV LVVXHG D VFKHPH IRU ´)OH[LELOLW\ LQ (iv) Launch of e-Bidding portal for utilization of domestic
Generation and scheduling of Thermal Power Stations to coal in IPP Power Stations for reducing the cost of
reduce the cost of power to the consumer” on 30.08.2018, power generation
ZKHUHLQWKH*HQHUDWLQJFRPSDQ\KDVEHHQSURYLGHGÁH[LELOLW\
An e-bidding portal was launched on 5th July 2017
to supply the total scheduled power from its least cost power
IRU SURYLGLQJ H%LGGLQJ VROXWLRQ WR 6WDWHV WR VHOHFW
stations, thus reducing the cost of power to consumers.
Independent Power Producers (IPPs) for procurement
&ODULÀFDWLRQ RQ &KDUJLQJ ,QIUDVWUXFWXUH IRU (OHFWULF of power by transferring their domestic coal under the
Vehicles: VFKHPHRIÁH[LELOLW\LQXWLOL]DWLRQRIGRPHVWLFFRDO7KH
e-Bidding portal has been designed to facilitate States
$ FODULÀFDWLRQ RQ WKH LVVXH RI DSSOLFDELOLW\ RI DQ\ OLFHQVH IRU
LQ LQYLWLQJ ELGV IRU SURFXUHPHQW RI SRZHU IURP WKH
the Charging Stations for Electric Vehicles has been issued on
SURVSHFWLYH ,33V LQ WUDQVSDUHQW DQG IDLU PDQQHU 7KH
13.4.2018
VXFFHVVIXO ELGGHU VKDOO EH VHOHFWHG WKURXJK H5HYHUVH
Launch of Mobile Applications and Web-Portal to ensure %LGGLQJSURFHVV7KHÁH[LELOLW\LQXWLOL]DWLRQRIGRPHVWLF
accountability and transparency in power sector. FRDOVFKHPHHQYLVDJHVWUDQVIHUULQJFRDOWRPRUHHIÀFLHQW
IPPs generating stations, leading to lower generation
i) Mob App ‘Vidyut PRAVAH’
costs and ultimately lesser cost of electricity for the
A Mob App ‘Vidyut PRAVAH’ on Electricity Pricing and consumers. During Financial Year 2018-19 Bidding for
$YDLODELOLW\ +LJKOLJKWV ZDV ODXQFKHG RQ VW 0DUFK WRWDO  0: RI SRZHU XQGHU ÁH[LELOLW\ LQ XWLOL]DWLRQ
7KHDSSOLFDWLRQSURYLGHVKLJKOLJKWVRIWKHSRZHU of domestic coal scheme in IPP Stations was conducted
DYDLODELOLW\LQWKHFRXQWU\RQUHDOWLPHEDVLV7KLVDSSZLOO using Portal.

31
Annual Report 2018-19

Press Conference, MoS (IC) for Power & NRE with Ministers of States & UTs

32
CHAPTER 08

RURAL ELECTRIFICATION INITIATIVES OF MINISTRY

$FFHVVWRTXDOLW\DQGUHOLDEOHSRZHUVXSSO\KDVGLUHFWSRVLWLYH Salient Features


impact on quality of life of people in all aspects of daily
‡ &RPSOHWHÁH[LELOLW\WR6WDWHIRUVHOHFWLQJVFRSHRIZRUNV
KRXVHKROGFKRUHVKXPDQGHYHORSPHQWDQGHIIHFWLYHGHOLYHU\
as per their priority
RIHVVHQWLDOVHUYLFHVOLNHHGXFDWLRQKHDOWKFRPPXQLFDWLRQHWF
$YDLODELOLW\ RI HOHFWULFLW\ VXSSO\ LV DOVR WKH NH\ WR DFFHOHUDWH ‡ $OO 9LOODJHVKDPOHWV HOLJLEOH ZLWKRXW DQ\ PLQLPXP
socio-economic growth and generation of employment. population criterion.
*RYHUQPHQW RI ,QGLD WKURXJK LWV SROLFLHV DQG SURJUDPPHV
‡ *UDP 3DQFKD\DW FRYHUHG XQGHU 6DQVDG $DGDUVK *UDP
LVFRPPLWWHGWRSURYLGHDFFHVVWRHOHFWULFLW\WRDOODQGDOVRWR
<RMDQD 6$*< WREHQHFHVVDULO\FRYHUHGXQGHU'35V
ensure quality and reliable power supply at reasonable price.
‡ 0DQGDWRU\ (WHQGHULQJ DQG 6WDQGDUG %LGGLQJ
RURAL ELECTRIFICATION PROGRAMME: Document.
,QRUGHUWRSURYLGHDFFHVVWRHOHFWULFLW\WRUHPDLQLQJYLOODJHV ‡ VXEVLG\IRUGHYHORSPHQWRI3URMHFW0DQDJHPHQW
KDELWDWLRQV DQG IDFLOLWDWH DYDLODELOLW\ RI DGHTXDWH TXDOLW\ $JHQF\ WR HQVXUH HIIHFWLYH SURMHFW PDQDJHPHQW DQG
& reliable power supply in rural areas, Ministry of Power timely completion.
in December, 2014 launched Deen Dayal Upadhyaya
‡ $OO 'LVFRPV LQFOXGLQJ 3ULYDWH 'LVFRPV 5( &RRSHUDWLYH
Gram Jyoti Yojana (DDUGJY). Ministry of Power launched
Societies now eligible.
another scheme Pradhan Mantri Sahaj Bijli Har Ghar
Yojana (Saubhagya)LQ6HSWHPEHUWRDFKLHYHXQLYHUVDO ‡ 'LVWULFW 'HYHORSPHQW &RRUGLQDWLRQ  0RQLWRULQJ
KRXVHKROG HOHFWULÀFDWLRQ E\ SURYLGLQJ ODVW PLOH FRQQHFWLYLW\ Committee name DISHA (administrated by Ministry of
5XUDO 'HYHORSPHQW  KHDGHG E\ VHQLRU PRVW 0HPEHU
DQG HOHFWULFLW\ FRQQHFWLRQV WR DOO UHPDLQLQJ XQHOHFWULÀHG
RI 3DUOLDPHQW /RN 6DEKD  WR UHYLHZ DQG PRQLWRU
households in rural and urban areas. The details of schemes
implementation of scheme.
DUHDVXQGHU
Funding Pattern:
Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
‡ *UDQWIURP*2,   RI SURMHFW FRVW  IRU
Components of Scheme: Special category States)
(i) Separation of agriculture and non-agriculture feeders ‡ 'LVFRPV  RISURMHFWFRVW IRU6SHFLDO
facilitating judicious rostering of supply to agricultural category States)
& non- agricultural consumers in the rural areas
‡ /RDQIURP),V   RI SURMHFW FRVW  IRU
(ii) Strengthening and augmentation of sub-transmission & Special category States)
distribution infrastructure in rural area
‡ $GGLWLRQDO JUDQW  RI ORDQ FRPSRQHQW LH  IRU
LLL  0HWHULQJ RI GLVWULEXWLRQ WUDQVIRUPHUVIHHGHUV special category states and 15% for other States) under
consumers WKH VFKHPH ZLOO EH UHOHDVHG VXEMHFW WR DFKLHYHPHQW RI
following milestones.
LY  2QJRLQJUXUDOHOHFWULÀFDWLRQZRUNVRIHUVWZKLOHVFKHPH
VXEVXPHG LQ ''8*-< DV 5XUDO(OHFWULÀFDWLRQ 5(  (i) Timely completion of the scheme as per laid down
milestone.
component.
LL  5HGXFWLRQLQ$7 &ORVVHVDVSHUWUDMHFWRU\ÀQDOL]HG
Scheme Outlay:
E\0R3LQFRQVXOWDWLRQZLWKWKH6WDWH*RYHUQPHQWV
)RU&RPSRQHQWV L WR LLL DERYH 2XWOD\ 5V  FURUH (Discom-wise).
  *2,*UDQW5VFURUH LLL  8SIURQW UHOHDVH RI DGPLVVLEOH UHYHQXH VXEVLG\ E\
5(&RPSRQHQW LY DERYH 2XWOD\ 5V  FURUH 6WDWH*RYHUQPHQWEDVHGRQPHWHUHGFRQVXPSWLRQ
 *2,*UDQW5VFURUH Expected Outcomes
Total -Outlay: Rs. 75,893 crore, ‡ &RQQHFWLYLW\WRDOOYLOODJHVDQGKRXVHKROGV
GOI Grant: Rs. 63,027 crore
‡ 9LDEOHDQGUHOLDEOHHOHFWULFLW\VHUYLFHVLQUXUDODUHDV

33
Annual Report 2018-19

‡ ,QFUHDVHGSURGXFWLYLW\LQDJULFXOWXUH (FY2 WR )<   LQ WKH SUHFHGLQJ ÀYH \HDU
EORFN7KLVFDSLWDOLQYHVWPHQWKDVIDFLOLWDWHGWKH*RYHUQPHQW
‡ ,PSURYHPHQWLQGHOLYHU\RIKHDOWK HGXFDWLRQVHUYLFHV
LQ DFKLHYLQJ WKH LPSRUWDQW PLOHVWRQHV RI  YLOODJHV
‡ ,PSURYHPHQW LQ DFFHVV WR FRPPXQLFDWLRQV UDGLR HOHFWULÀFDWLRQDQGOHGWRLPSURYHPHQWLQTXDOLW\DQGUHOLDELOLW\
WHOHSKRQHWHOHYLVLRQPRELOH of power supply in rural areas with augmentation of network
‡ ,PSURYHPHQWLQSXEOLFVDIHW\WKURXJKOLJKWLQJ capacity in a big way by creation of new power sub-stations,
FDSDFLW\ HQKDQFHPHQW RI H[LVWLQJ SRZHU VXEVWDWLRQV
Sanction of Projects GLVWULEXWLRQWUDQVIRUPHUV+7/7OLQHVHWF)HHGHUVHSDUDWLRQ
1HZ3URMHFWVZLWKWRWDOFRVWRI5VFURUHKDYHEHHQ ZRUNV WR SURYLGH DVVXUHG DQG DGHTXDWH SRZHU VXSSO\ WR
VDQFWLRQHGIRU6WDWHV87VZLWKIROORZLQJFRPSRQHQWV farmers for agriculture through dedicated feeders are also
XQGHUH[HFXWLRQ
‡ )HHGHU6HSDUDWLRQ   5V&URUH
9LOODJH(OHFWULÀFDWLRQ
‡ 6\VWHP6WUHQJWKHQLQJ   5V&URUH
$V UHSRUWHG E\ WKH 6WDWHV WKHUH ZHUH  XQHOHFWULÀHG
‡ $FFHVVWR5XUDO+RXVHKROGV   5V&URUH
YLOODJHV LQ WKH FRXQWU\ DV RQ  +RQ·EOH 3ULPH
‡ 0HWHULQJ   5V&URUH Minister in his address to the nation from the ramparts of Red
Fort on the occasion of Independence Day on 15th August
‡ (OHFWULÀFDWLRQRI8(YLOODJHV *ULG   5V&URUH
DQQRXQFHGWKDWWKHUHPDLQLQJRGGXQHOHFWULÀHG
‡ (OHFWULÀFDWLRQRI8(YLOODJHV   5V&URUH YLOODJHV LQ WKH FRXQWU\ ZRXOG EH HOHFWULÀHG ZLWKLQ WKH QH[W
(Off-Grid)  GD\V7KH WDVN RI HOHFWULÀFDWLRQ RI DOO UHPDLQLQJ XQ
‡ 6$*<   5V&URUH HOHFWULÀHGYLOODJHVZDVWDNHQXSXQGHUWKHVFKHPHRI''8*-<
LQ D PLVVLRQ PRGH 7KH SDFH RI YLOODJH HOHFWULÀFDWLRQ ZDV
‡ 3URYLVLRQIRU30$   5V&URUH UHODWLYHO\VORZLQWKH\HDUVSULRUWR 
Rs 14,270 Crore (GOI Grant component of Rs 11,237.79 Crore)      ZKLFK LPSOLHG WKDW EXVLQHVV
has been sanctioned to States for creation of additional DV XVXDO DSSURDFK ZRXOG KDYH WDNHQ DQRWKHU  \HDUV IRU
LQIUDVWUXFWXUH XQGHU ''8*-< IRU KRXVHKROG HOHFWULÀFDWLRQ LQ FRPSOHWLRQ RI YLOODJH HOHFWULÀFDWLRQ 7KHUHIRUH GHWDLOHG
Saubhagya. consultations were held with all stakeholders to understand
FXUUHQW VFHQDULR DYDLODELOLW\ RI UHVRXUFHV SRVVLEOH UHPHGLDO
Release of funds
measures to accelerate the progress, monitoring mechanism
GOI grant of Rs. 41,317.06 crore has been released since HWF DQG WKLV JDYH ULVH WR QHZ LGHDV VWUDWHJ\ DQG DSSURDFK
XSWR7KH\HDUZLVHGHWDLOVDUHDVXQGHU GHWDLOHGEHORZ

L  3URSHULGHQWLÀFDWLRQRIYLOODJHVZLWK&HQVXV&RGH
Year GOI Fund Release (Rs. in Crore)
All States were requested to identify remaining un-
2014-15 3374.41 HOHFWULÀHGYLOODJHVZLWKFHQVXVFRGHRIWRH[DFWO\
ÀQGRXWWKHQDPHJHRJUDSKLFDOORFDWLRQGHPRJUDSK\
2015-16 4500.00 etc. for robust planning. Prior to this program, generally
the progress used to be monitored in terms of number
2016-17 7965.87 RIYLOODJHV
LL  6RODU 39 EDVHG RIIJULG VROXWLRQV IRU UHPRWH 
2017-18 9049.96
LQDFFHVVLEOHYLOODJHV,WZDVREVHUYHGWKDWPDQ\RIWKHVH
2018-19 16426.80 UHPDLQLQJ XQHOHFWULÀHG YLOODJHV DUH ORFDWHG LQ UHPRWH
DUHDVDUHDVZLWKGLIÀFXOWWHUUDLQLQVQRZERXQGKLOOVRU
Total 41317.06 LQGHHSIRUHVWDQGLQ/HIW:LQJ([WUHPLVPDIIHFWHGDUHDV
HWF5HDFKLQJWKHVHYLOODJHVWUDQVSRUWDWLRQRIPDWHULDO
7KHFDSLWDOH[SHQGLWXUHIRUUXUDOHOHFWULFLW\GLVWULEXWLRQV\VWHP and erection of necessary electricity infrastructure was a
in last 5 years has been more than 2.5 times as compared real challenge. Therefore, it was decided that in case grid
WR SUHFHGLQJ ÀYH\HDU EORFN *RYHUQPHQW RI ,QGLD KDYH H[WHQVLRQWRVRPHRIWKHYLOODJHVLVHLWKHUQRWIHDVLEOHRU
UHOHDVHGDQDPRXQWRI5VFURUHGXULQJODVWÀYH\HDUV FRVWHIIHFWLYHVXFKYLOODJHVZRXOGEHHOHFWULÀHGWKURXJK
(FY 2014-15 to FY 2018-19) as compared to Rs. 15,873.77 crore off-griGPRGHXVLQJ6RODU3KRWRYROWDLFEDVHGVROXWLRQV

34
(iii) InnoYDWLYH )LQDQFLQJ $V WKH SDFH RI ZRUN LQFUHDVHG 6WDWHV FRPPHQFHG LPSOHPHQWDWLRQ ZLWK WKH DERYH VWUDWHJ\
there ZDV D QHHG WR HQVXUH DYDLODELOLW\ RI IXQGV WR WKH
DQG GLYLGHQGV RI D ZHOO WKRXJKW FRRSHUDWLYH SODQQLQJ DQG
States under the scheme. In addition to the budgetary VWUDWHJ\ ZHUH YLVLEOH LQ WKH LPSOHPHQWDWLRQ 6XEVHTXHQWO\
support, Ministry of Finance also allowed Ministry of  DGGLWLRQDO YLOODJHV ZHUH LGHQWLÀHG E\ WKH 6WDWHV IRU
3RZHU WR UDLVH IXQGV IURP PDUNHW DV ([WUD %XGJHWDU\ HOHFWULÀFDWLRQ LQ DGGLWLRQ WR  XQHOHFWULÀHG YLOODJHV
Resource (EBR). reported by States as on 01.04.2015. Out of these 19,679
9LOODJHV   HOHFWULÀFDWLRQ LQ  YLOODJHV KDV
LY  )OH[LELOLW\WR6WDWHVIRUH[HFXWLRQRIZRUNV&RQVLGHULQJ
EHHQ FRPSOHWHG DQG UHPDLQLQJ  YLOODJHV IRXQG WR EH
WKH GLYHUVH JHRJUDSKLFDO GHPRJUDSKLF DQG RWKHU
LQKDELWHG*UD]LQJUHVHUYH
conditions, it was felt that a straight jacket approach
RU RQH VL]H ÀWV DOO PD\ QRW ZRUN DQG WKHUHIRUH 6WDWHV 7KHFRXQWU\DFKLHYHGWKHLPSRUWDQWPLOHVWRQHRIYLOODJH
ZHUH JLYHQ DGHTXDWH ÁH[LELOLW\ WR H[HFXWH SURMHFWV RQ HOHFWULÀFDWLRQRQWK$SULOZHOOEHIRUHWKHGHDGOLQHRI
WXUQNH\SDUWLDOWXUQNH\GHSDUWPHQWDOPRGHDVSHUWKH GD\VÀ[HGE\WKH+RQ·EOH3ULPH0LQLVWHURI,QGLD
suitability.
It is worthwhile to mention that most of these remaining
Y  +DQGKROGLQJ 6WDWHV'LVFRPV 1HFHVVDU\ KHOS ZDV YLOODJHV ZHUH ORFDWHG LQ UHPRWH DQG LQDFFHVVLEOH DUHDV ZLWK
SURYLGHG WR WKH 6WDWHV'LVFRPV ZKHUHYHU UHTXLUHG GLIÀFXOW KLOO\ WHUUDLQ GHHS IRUHVW DUHDV /HIW :LQJ ([WUHPLVP
1RGDODJHQF\RSHQHGLWVRIÀFHLQDOPRVWDOOWKH6WDWHV DIIHFWHGDUHDV7KXVWKHPRVWLPSRUWDQWDVSHFWRIWKLVYLOODJH
GHSXWHGLWVVHQLRURIÀFHUVWRLQWHUDFWZLWK6WDWHRIÀFLDOV HOHFWULÀFDWLRQ SURJUDP ZDV WR RYHUFRPH DOO VXFK FKDOOHQJHV
RQGDLO\EDVLVDQGSURYLGHKHOSLQRUJDQLVLQJDQGJHWWLQJ ZKLFK VWRRG DV PDMRU EDUULHU LQ H[WHQGLQJ HOHFWULFLW\ WR WKH
things done. In order to strengthen & augment capacities poor people of this country for so many years after the
RI WKH 6WDWH ',6&20V  3RZHU 'HSWW 5(& DSSRLQWHG LQGHSHQGHQFH 7KH GLIÀFXOW\ OHYHO IXUWKHU NHSW RQ LQFUHDVLQJ
*UDP9LG\XW$EKL\DQWDVDWEORFNGLVWULFWOHYHOWRDVVLVW DVWKHZRUNSURJUHVVHGIXUWKHU7KHPDMRUFKDOOHQJHVLQYROYHG
WKHPLQPRQLWRULQJDQGH[SHGLWLRXVLPSOHPHQWDWLRQRI ZHUHDVXQGHU
the program. These GVAs are graduate engineers from
D ,QDFFHVVLELOLW\ DQG QRQIHDVLELOLW\ RI FRQYHQWLRQDO *ULG
ORFDO DUHDV ZKR DVVLVWHG ',6&20V LQ H[WHQVLYH ÀHOG
system
monitoring.
E 'LIÀFXOWKLOO\WHUUDLQ
YL  0LOHVWRQH EDVHG PRQLWRULQJ 7KH HQWLUH SURFHVV RI
F +HDGORDGLQJRIPDWHULDOVRYHUGD\V
YLOODJHHOHFWULÀFDWLRQZDVGLYLGHGLQVWHSVPLOHVWRQHV
with stipulated timelines for monitoring and capturing d. Material transportation by choppers
progress. These milestones included the entire process H $UHDVDIIHFWHGZLWK/HIW:LQJ([WUHPLVP /:( DFWLYLWLHV
ULJKWIURPDZDUGRIZRUNVXUYH\PDWHULDOSURFXUHPHQW f. Forest clearance
PDWHULDOGHOLYHU\DWVLWHHUHFWLRQ FRPPLVVLRQLQJDQG
g. Railway Clearance
energisation etc. Rigorous use of project management
tools was undertaken to ensure completion of project
DQGHQHUJL]DWLRQRIYLOODJHV
YLL  7UDQVSDUHQF\DQGDFFRXQWDELOLW\7RHQVXUHWUDQVSDUHQF\
and dissemination of information to public at large
ZLWK UHJDUG WR SURFHVV DQG SURJUHVV RQ HOHFWULÀFDWLRQ
RI WKHVH YLOODJHV PRELOH $SS ´*DUYµ ZDV ODXQFKHG
Dissemination of information in public domain also
FUHDWHG DQ HQYLURQPHQW RI HQKDQFHG DFFRXQWDELOLW\ LQ
the system.
YLLL  5HJXODU UHYLHZ DQG PRQLWRULQJ $ V\VWHP IRU UHJXODU
UHYLHZDQGPRQLWRULQJDWWKH&HQWUDO*RYWOHYHODVZHOO
DV DW WKH 6WDWH DQG ',6&20 OHYHO ZDV HVWDEOLVKHG IRU
UHYLHZDQGPRQLWRULQJ5HJLRQDOUHYLHZPHHWLQJVZHUH
also held to enable better coordination and project
PDQDJHPHQW7KHLVVXHVLPSHGLQJSURJUHVVLQWKHÀHOG
ZHUH KLJKOLJKWHG LQ VXFK UHYLHZV DQG UHVROYHG DW WKH
earliest.

35
Annual Report 2018-19

36
Progress on capacity enhancement in rural electricity network under new projects:

SI. No. Parameter Unit Achievement as on 31.03.2019

1 N96XEVWDWLRQ1HZ Nos. 1,128

2 N96XEVWDWLRQ$XJPHQWDWLRQ Nos. 1,186

3 Distribution Transformers (DTRs) Nos. 2,26,884

4 Feeder Segregation &.P 70,350

5 LT Line &.P 1,53,653

6 11 kV Line &.P 85,783

7 33 & 66 kV Line &.P 12,734

8 Consumer Meters Nos. 96,98,749

9 DTR Meters Nos. 1,61,843

10 11 kV Feeder Meters Nos. 9,322

37
Annual Report 2018-19

Pradhan Mantri Sahaj Bijli Har Ghar Yojana (Saubhagya) DFFHVVRULHV KDUGZDUHHQHUJ\PHWHUHWF LL PRELOL]DWLRQRI
DGHTXDWHVNLOOHGVHPLVNLOOHGPDQSRZHU LLL LGHQWLÀFDWLRQRI
Ministry of Power launched the scheme Pradhan Mantri
EHQHÀFLDULHV PRWLYDWLQJ WKHP WR DYDLO HOHFWULFLW\ FRQQHFWLRQ
Sahaj Bijli Har Ghar Yojana (Saubhagya)WRDFKLHYHXQLYHUVDO
DQG LY PRQLWRULQJDWWKHJUDVVURRWOHYHO7KHVHFKDOOHQJHV
KRXVHKROG HOHFWULÀFDWLRQ E\ SURYLGLQJ ODVW PLOH FRQQHFWLYLW\
got multiplied when such a task is to be performed all across
DQG HOHFWULFLW\ FRQQHFWLRQV WR DOO UHPDLQLQJ XQHOHFWULÀHG
WKH FRXQWU\ VLPXOWDQHRXVO\ LQ D WLPH ERXQG PDQQHU :KLOH
households in rural and urban areas.
mitigation of most of these anticipated challenges was taken
Scheme Outlay: care of in scheme design itself, implementation in reality on
ground was not that simple and easy. As the name of the new
5XUDO  2XWOD\5V&URUH
scheme itself suggests, the scheme has inherent features of
  *2,*UDQW5V&URUH
¶6DKDM·LH6LPSOH(DV\(IIRUWOHVVDQG¶+DU*KDU·LHXQLYHUVDO
8UEDQ  2XWOD\5V&URUH FRYHUDJH7KHRWKHUNH\HOHPHQWVRIWKHVFKHPHDUHDVXQGHU
  *2,*UDQW5V&URUH
L  1R XSIURQW IHH IRU DYDLOLQJ HOHFWULFLW\ FRQQHFWLRQ
7RWDO  2XWOD\5V&URUH Absolutely free for economically poor households
  *2,*UDQW5V&URUH and for other households, Rs. 500 to be charged after
Funding Pattern: release of connection in 10 instalments to be adjusted in
monthly electricity bills
‡ *UDQWIURP*R,  RISURMHFWFRVW IRU6SHFLDO
category States) LL  2UJDQLVDWLRQRIFDPSVLQYLOODJHVFOXVWHURIYLOODJHVIRU
on spot registration and release of connections
‡ 'LVFRPV  RISURMHFWFRVW IRU6SHFLDO
category States) LLL  8VHRI0RELOH$SSIRULGHQWLÀFDWLRQRIEHQHÀFLDULHVDQG
electronic registration including requisite documentation
‡ /RDQIURP),V  RISURMHFWFRVW IRU6SHFLDO
category States) LY  639 EDVHG VWDQGDORQH V\VWHPV IRU KRXVHKROGV ORFDWHG
in remote and inaccessible areas
‡ $GGLWLRQDO JUDQW  RI ORDQ FRPSRQHQW LH  IRU
special category states and 15% for other States) Y  :HEEDVHGQHDUUHDOWLPHPRQLWRULQJDQGXSGDWLQJRI
RQ FRPSOHWLRQ RI  KRXVHKROG HOHFWULÀFDWLRQ E\ progress
December 2018. YL  &RPPXQLFDWLRQ SODQ IRU FUHDWLQJ DZDUHQHVV DERXW WKH
Fund status: VFKHPH DQG LWV EHQHÀWV WR WKH WDUJHWHG SRSXODWLRQ WR
PRWLYDWHWKHPWRDYDLOHOHFWULFLW\FRQQHFWLRQ
‡ Rs. 14,017 Crore (GOI Grant component of Rs. 10,890
Crore) has been sanctioned. YLL  )OH[LELOLW\ WR 6WDWHV LQ PRGH RI LPSOHPHQWDWLRQ
'HSDUWPHQWDO  7XUQNH\  6HPLWXUQNH\  'XULQJ
‡ *2, JUDQW RI 5V  &URUH )RU 5XUDO ++V LPSOHPHQWDWLRQLWZDVREVHUYHGWKDWWKHUHDUHYLOODJHV
Rs. 5413.95 crore, Urban HHs Rs. 306.29 Crore) has been ZKHUH EDVLF LQIUDVWUXFWXUH DOUHDG\ H[LVWV DQG RQO\
released since launch of the scheme up to 31.03.2019. VHUYLFH FRQQHFWLRQV DUH WR EH UHOHDVHG WR UHPDLQLQJ
+RXVHKROG(OHFWULÀFDWLRQ KRXVHKROGV DQG WKH VDPH WLPH PDQ\ YLOODJHV GR QRW
KDYH UHTXLVLWH EDVLF LQIUDVWUXFWXUH DQG UHTXLUHG WR EH
At the time of launch of scheme about 4 crore households
FUHDWHG EHIRUH SURYLGLQJ FRQQHFWLYLW\ WR KRXVHKROGV
ZHUH HVWLPDWHG WR EH XQHOHFWULÀHG EDVHG RQ WKH GHWDLOV
6RPH RI WKH YLOODJHV UHTXLUHG RQO\ OLWWOH LQFUHPHQWDO
UHSRUWHGE\WKH6WDWHV(OHFWULÀFDWLRQRIVXFKODUJHQXPEHURI
LQIUDVWUXFWXUHLQRUGHUWRH[WHQGHOHFWULFLW\FRQQHFWLRQV
KRXVHKROGVVSUHDGDFURVVODNKVRIYLOODJHVLQGLIIHUHQWSDUWV
to remaining households. Accordingly, different modes
of the country, in a time bound manner was a huge task and
of implementation were allowed for different category
necessitated concerted efforts by all the stakeholders with
RIYLOODJHVDVSHUWKHUHTXLUHPHQWRIWKH6WDWHV
LQQRYDWLYHDSSURDFKDQGGHWHUPLQDWLRQ7KHPDMRUFKDOOHQJHV
ZDV FUHDWLRQ RI LQIUDVWUXFWXUH IURP YLOODJH WR YLOODJH DQG  )RU PRELOLVDWLRQ RI UHTXLVLWH PDWHULDO  HTXLSPHQW WKH
SURYLGLQJ FRQQHFWLYLW\ IURP KRXVHKROG WR KRXVHKROG ZKLFK Ministry coordinated with Indian Electrical & Electronics
LQFOXGH L  PRELOL]DWLRQ RI UHTXLVLWH PDWHULDOHTXLSPHQW ² 0DQXIDFWXUHUV·$VVRFLDWLRQ ,((0$ WKHDSH[LQGXVWU\
poles, conductor, cable, distribution transformers, associated association of manufacturers of electrical, industrial

38
electronics and allied equipment in India, to ensure Conference held during 26–27th February 2019. Details
speedy supply for completion of task within stipulated RIVXFFHVVIXODZDUGHHVDUHDVXQGHU
timeframe.
(Rs. In Crore)
 6LPLODUO\ LQ RUGHU WR IDFLOLWDWH DYDLODELOLW\ RI DGHTXDWH
Sl Name of DISCOM Award Award Amount
VNLOOHGPDQSRZHUZLWKUHTXLVLWHVNLOOVHWVIRUH[HFXWLRQ
No Amount for for employees
RI HOHFWULÀFDWLRQ ZRUNV XQGHU 6DXEKDJ\D 0LQLVWU\ RI
DISCOM of DISCOMs
3RZHU FROODERUDWHG ZLWK 0LQLVWU\ RI 6NLOO 'HYHORSPHQW
I -DPPX .DVKPLU 100.00 0.50
and Entrepreneurship (MSDE) for skilling the workforce
3RZHU'HYHORSPHQW
LQYROYHGLQLPSOHPHQWDWLRQRIWKHVFKHPH3RZHU6HFWRU 'HSDUWPHQW -.3''
6NLOO &RXQFLO 366&  RUJDQL]HG WKH GHOLYHU\ RI WUDLQLQJ
II Madhya Pradesh 100.00 0.50
DQGFHUWLÀFDWLRQSURJUDPVLQWKH6WDWHV Paschim kshetra
 ,QDGGLWLRQWRWKHDERYHULJRURXVUHYLHZDQGPRQLWRULQJ Vidyut Vitaran
Company Limited
PHFKDQLVPKDVEHHQLQVWLWXWHGDWDOOOHYHOVE\WKH0LQLVWU\
033V.99&/,QGRUH
for monitoring the progress and timely resolution of
III Madhya Pradesh 100.00 0.50
issues impeding progress to ensure timely completion
Madhya kshetra
RI ZRUNV $ FRPSUHKHQVLYH :HE SRUWDO ¶VDXEKDJ\D Vidyut Vitaran
JRYLQ·ZDVGHYHORSHGWRFDSWXUHJUDQXODUGHWDLOVXSWR Company Limited
YLOODJHOHYHOIRUWKHHQWLUHFRXQWU\$OOWKHVWDNHKROGHUV 030.99&/%KRSDO
KDYHEHHQSURYLGHGVHFXUHGDFFHVVIRUUHJXODUXSGDWLQJ Total 300.00 1.50
RISURJUHVVRQWKHSRUWDO7KLVSODWIRUPZDVH[WHQVLYHO\
Grand Total: Rs. 301.50 Crore
used by all the stakeholders for day-to-day monitoring.
During LPSOHPHQWDWLRQ6WDWHVUHSRUWHGVL]HDEOHUHGXFWLRQLQ
 )RU FUHDWLQJ DQ HQYLURQPHQW RI KHDOWK\ FRPSOHWLRQ QXPEHU RI XQHOHFWULÀHG KRXVHKROGV DV FRPSDUHG WR HDUOLHU
DPRQJVW YDULRXV SRZHU GLVWULEXWLRQ XWLOLWLHV RI WKH estimates reported by the States. States were regularly updating
States, an award scheme was instituted by the Ministry. the data on Saubhagya portal as per ground conditions. The
7KHVFKHPHHQYLVDJHVWRIHOLFLWDWHWKH',6&20V3RZHU QXPEHU RI XQHOHFWULÀHGKRXVHKROGV DV RQ  EDVH
Department of the States and their employees for date of Saubhagya) reduced down to about 248.47 lakh. Out
DFKLHYLQJ  KRXVHKROG HOHFWULÀFDWLRQ LQ WKHLU DUHD RIWKHVHODNKXQHOHFWULÀHGKRXVHKROGVZHUHHOHFWULÀHG
RI RSHUDWLRQV )RU WKH SXUSRVH RI DZDUG ',6&20V  E\VW-DQXDU\$OOWKH6WDWHVKDYHDFKLHYHGVDWXUDWLRQ
3RZHU'HSDUWPHQWVZHUHGLYLGHGLQWRWKUHHFDWHJRULHV XQGHU6DXEKDJ\D6FKHPHE\SURYLGLQJHOHFWULFLW\FRQQHFWLRQV
and there were two quantum of award in each of the WRDOOZLOOLQJ+RXVHKROGVH[FHSW&KKDWWLVJDUKZKHUHLQ
WKUHH FDWHJRULHV 8QGHU ÀUVW TXDQWXP RI DZDUG WKH Households are located in highly inaccessible areas due to
VW ',6&20  3RZHU 'HSDUWPHQW WR DFKLHYH  /:(LVVXHV
KRXVHKROG HOHFWULÀFDWLRQ E\ WK 1RYHPEHU  ZDV Further, in order to ensure that no willing households left out
without electricity connection, all States were requested to
SURYLGHG FDVK DZDUG RI 5V  /DNK WR EH GLVWULEXWHG
amongst the employees. The second quantum of award launch a special campaign in all parts of the State to identify
includes cash award of Rs. 100 Crore as grant to the DQ\OHIWRXWXQHOHFWULÀHGKRXVHKROGVDQGWRSURYLGHHOHFWULFLW\
FRQFHUQHG ',6&203RZHU 'HSDUWPHQW WR EH VSHQW LQ connections to such households. A dedicated toll-free helpline
GLVWULEXWLRQLQIUDVWUXFWXUHGHYHORSPHQWLQWKHLUDUHDRI 1800-121-5555 was also launched for the purpose of reporting
RSHUDWLRQ 2WKHU ',6&203RZHU 'HSDUWPHQW RI WKH DQ\OHIWRXWKRXVHKROGV7KLVLVLQDGGLWLRQWRDOUHDG\H[LVWLQJ
6WDWHVWRDFKLHYHKRXVHKROGHOHFWULÀFDWLRQE\VW helpline of 1912. Further Saubhagya Rath campaign and
'HFHPEHU  ZHUH DOVR EH SURYLGHG FHUWLÀFDWH RI VSHFLDOFDPSDLJQVE\6WDWHVKDYHEHHQFRQGXFWHGWRSURYLGH
appreciation. the connections to any left-out households.During this
campaign, electricity connections to additional 14.65 lakh
 (DUO\ DFKLHYHUV LQ 'LVFRPV DQG WKHLU HPSOR\HHV KDYH
KRXVHKROGVLGHQWLÀHGE\WKH6WDWHVKDYHEHHQSURYLGHGVLQFH
been awarded by Hon’ble Minister of State (Independent
1st February 2019. Thus, electricity connections to total 262.84
Charge) for Power and New & Renewable Energy for
ODNKKRXVHKROGVKDYHEHHQSURYLGHGVLQFHODXQFKRIVFKHPH
HDUO\DFKLHYHPHQWRIXQLYHUVDOKRXVHKROGHOHFWULÀFDWLRQ
up to 31.03.2019 and now only Chhattisgarh is left with 18,734
on or before 31st December, 2018 in the Power Minister
Households to bHHOHFWULÀHG

39
Annual Report 2018-19

6KUL5.6LQJK0R6 ,& IRU3RZHU 15(VSHDNLQJRQWKHRFFDVLRQRIGHGLFDWLRQRI0:7XLULDO+(3LQ0L]RUDP

40
CHAPTER 09

INTEGRATED POWER DEVELOPMENT SCHEME (IPDS), UJJWAL DISCOM


ASSURANCE YOJANA (UDAY) AND NATIONAL ELECTRICTY FUND (NEF)
INTEGRATED POWER DEVELOPMENT SCHEME of additional grant of 15% (5% for special category states)
RI SURMHFW FRVW LV NHSW IRU LQFHQWLYL]LQJ WKH VWDWH XWLOLWLHV RQ
(IPDS),
DFKLHYLQJ WKH WLPHO\ FRPSOHWLRQ RI WKH SURMHFW UHGXFWLRQ LQ
7RIDFLOLWDWHVWDWHXWLOLWLHVWRHQVXUHTXDOLW\DQGUHOLDEOH[ AT&C loss as per trajectory and upfront release of subsidy. To
SRZHU VXSSO\ LQ WKH XUEDQ DUHDV *RYHUQPHQW DSSURYHG WKH support the state utilities in preparation of DPRs and project
´,QWHJUDWHG3RZHU'HYHORSPHQW6FKHPHµ ,3'6 RQ H[HFXWLRQSURYLVLRQRIÀQDQFLDODVVLVWDQFHWRWKHWXQHRI
with a total outlay of Rs. 32,612 Crore which includes a of the project cost for hiring Project Monitoring Agencies
EXGJHWDU\ VXSSRUW RI 5V  &URUH IURP *RYHUQPHQW RI 30$ E\VWDWHXWLOLWLHVLVDOVRHQYLVDJHGLQWKHVFKHPH3RZHU
,QGLD7KHPDLQFRPSRQHQWVRIWKHVFKHPHDUH Finance Corporation has been designated as Nodal Agency
(i) Strengthening of sub-transmission and distribution IRURSHUDWLRQDOL]DWLRQRIWKHVFKHPH
networks in the urban areas; $V RQ GDWH 3URMHFWV ZRUWK 5V  &URUH KDYH EHHQ
LL  0HWHULQJ RI GLVWULEXWLRQ WUDQVIRUPHUV  IHHGHUV  VDQFWLRQHGXQGHU,3'6DVGHWDLOHGEHORZ
consumers in the urban areas; (i) Distribution system strengthening projects worth
(iii) IT enablement of distribution sector and strengthening 5V  &URUH IRU  FLUFOHV FRYHULQJ  WRZQV
of distribution network under R-APDRP for 12th and across the country.
WK3ODQVE\FDUU\LQJIRUZDUGWKHDSSURYHGRXWOD\IRU (ii) IT implementation projects under phase –II worth
R-APDRP to IPDS. Rs. 985 Crore for 1931 towns.
LY  6FKHPHVIRU(QWHUSULVH5HVRXUFH3ODQQLQJ (53 DQG,7 LLL  (53SURMHFWVZRUWK5V&URUHKDYHEHHQVDQFWLRQHG
enablement of balance urban towns are also included for 39 utilities.
XQGHU,3'66FRSHRI,7HQDEOHPHQWKDVEHHQH[WHQGHG
LY  6PDUWPHWHULQJSURMHFWVZRUWK5VFURUHVKDYHEHHQ
to all 4041 towns as per Census 2011.
sanctioned for 41 lakh nodes in 21 Utilities.
Y  6PDUW PHWHULQJ VROXWLRQ IRU SHUIRUPLQJ 8'$< 6WDWHV
Y  5HDO 7LPH 'DWD $FTXLVLWLRQ 6\VWHP 57'$6  SURMHFWV
DQG 6RODU SDQHOV RQ *RYW EXLOGLQJV ZLWK QHWPHWHULQJ
worth Rs. 209 Crore are also sanctioned under IPDS in
are also permissible under the scheme.
FY 2018-19.
YL  *DV ,QVXODWHG 6XEVWDWLRQV *,6  DW ORFDWLRQV ZKHUH
YL  ,QVWDOODWLRQ RI  *DV ,QVXODWHG 6ZLWFKJHDU *,6 
VSDFHFRQVWUDLQWH[LVWVDUHDOVRSHUPLVVLEOH
6XEVWDWLRQZRUWK5V&URUHKDYHEHHQVDQFWLRQHGLQ
YLL  5HDO7LPH'DWD$FTXLVLWLRQ6\VWHP 57'$6 SURMHFWVIRU FY 2018-19.
accurate measurement of power interruption parameters
Physical progress of IPDS as on 31.03.2019:
OLNH 6$,',6$,), DW .9 IHHGHU OHYHO DUH DOVR FRYHUHG
under the scheme ‡ $Q RYHUDOO SURJUHVV RI  KDV EHHQ DFKLHYHG LQ
the Distribution System strengthening works under
Erstwhile R-APDRP has been subsumed in IPDS and CCEA-
LPSOHPHQWDWLRQ7KHVDOLHQWDFKLHYHPHQWVDUHDVXQGHU
DSSURYHG 5$3'53 RXWOD\ RI 5V  FURUH LQFOXGLQJ D
budgetary support of Rs.22,727 crore for 12th & 13th Plan R  1HZ .9 VXEVWDWLRQV KDYH EHHQ
carried forward to the new scheme of IPDS. commissioned including indoor Substations.
7KH DGRSWLRQ RI ,7 DQG WHFKQLFDO LQWHUYHQWLRQ E\ ZD\ RI R $XJPHQWDWLRQ RI DV PDQ\ DV  1RV H[LVWLQJ
QHWZRUNVWUHQJWKHQLQJHQYLVDJHGLQWKHVFKHPHZLOOQRWRQO\  .9 VXEVWDWLRQV KDYH EHHQ FRPSOHWHG E\
HQVXUH[SRZHUVXSSO\LQXUEDQDUHDEXWZLOODOVRKHOSLQ SURYLGLQJDGGLWLRQDOSRZHUWUDQVIRUPHUVRUFDSDFLW\
reduction in Aggregate Technical and Commercial (AT&C) enhancement.
losses. R 0RUH WKDQ  'LVWULEXWLRQ WUDQVIRUPHUV KDYH
*RYHUQPHQWVXSSRUWIRUWKHVFKHPHLVXSWRWKHWXQHRI been installed.
IRUVSHFLDOFDWHJRU\VWDWHV RIWKHSURMHFWFRVW3URYLVLRQ

41
Annual Report 2018-19

o Aerial Bunched cables of more than 34,000 ckm and IRUHQDEOLQJDFWLYLWLHVIRULPSOHPHQWDWLRQRI,3'6


UG cables of more than 10,000 ckm laid R-APDRP Component of IPDS:
o More than 14,000 km HT lines and 8000 km LT lines Projects under the scheme are taken up in two parts.
completed. Part-A aims to establish IT enabled system with Data
R 6RODUURRIWRSVRIPRUHWKDQ.:SLQVWDOOHG &HQWUH&XVWRPHU&DUH&HQWUHHWFIRUHQHUJ\DFFRXQWLQJ
DXGLWLQJDQG6&$'$IRUELJJHUWRZQV SRSXODWLRQODFV
‡ WRZQVXQGHU,7SKDVH,,KDYHEHHQ,7HQDEOHGDQG DQG$QQXDO(QHUJ\,QSXW08 ZKHUHDV3DUW%LVIRU
.9IHHGHUGDWDRIWKHVHWRZQVLVDYDLODEOHRQ1DWLRQDO up-gradation & strengthening of electrical networks
Power Portal. in these towns. The projects under RAPDRP under the
VDQFWLRQHGDV*R,ORDQVDQGFRQYHUWLEOHWRJUDQWVEDVHG
‡ (53 ZRUNV KDYH DOUHDG\ EHHQ DZDUGHG IRU  8WLOLWLHV
RQ WLPHO\ FRPSOHWLRQ DQG DFKLHYHPHQWV RI $7 & ORVV
and are under implementation. targets.
‡ 6WDWHV8WLOLWLHV DUH LQ DGYDQFH VWDJH RI ÀQDOLVDWLRQ RI  3URMHFWV ZRUWK 5V  FURUH 3DUW$ 5V FURUH
FRYHULQJ  WRZQV DQG  6&$'$ SURMHFWV 3DUW%
5V FURUH FRYHULQJ  WRZQV  DUH XQGHU
implementation.
 $VRQRXWRI'DWD&HQWUHKDYHEHHQ
FRPPLVVLRQHGDQGWRZQVKDYHEHHQGHFODUHG´*R
/LYHµ XQGHU 3DUW$ RI WKH SURJUDPPH 3DUW% 3URMHFWV
KDYHEHHQFRPSOHWHGLQWRZQV
 *R/LYH WRZQV DUH WRZQV ZKHUH ,7 ZRUN LV FRPSOHWHG
DQGWRZQHQHUJ\GDWDKDVVWDUWÁRZLQJWR'DWD&HQWUH
IRU HQHUJ\ DFFRXQWLQJ DQG DXGLWLQJ 8WLOLWLHV KDYH
VWDUWHG XVLQJ WKLV GDWD IRU HQHUJ\ DFFRXQWLQJDXGLWLQJ
DQG WR WDNH DGPLQLVWUDWLYH PHDVXUHV IRU FRQWUROOLQJ
AT&C losses. Reduction in AT&C loss is reported in 1129
towns in Feb’19.
Rs. 12,017 Crore has been released as loan to state
utilities under R-APDRP against Part-A and Part-B
projects. Another Rs.471 Crore has been released under
Part-C for enabling actLYLWLHV

(Indoor Power Substation commissioned under


IPDS in Andhra Pradesh)

Smart metering works sanctioned under IPDS either


through EESL or by tendering on their own

3RVLWLYH LPSDFW RI WKH DERYH ZRUN LQ WHUPV RI UHOLDEOH DQG
better quality power can be seen for around 3 crore urban
consumers in the 2,000-odd towns where the work has been
completed.
Financial progress of IPDS, as on 31.03.2019:
‡ $QDPRXQWRI5V&URUHDV*UDQWKDVEHHQUHOHDVHG
E\ 0R3 3)& WR 6WDWHV XQGHU ,3'6 DV SHU VFKHPH 5HYLHZRI,3'6GXULQJ530PHHWLQJRI0LQLVWU\RI3RZHU
JXLGHOLQHV)XUWKHU5V&URUHKDYHDOVREHHQUHOHDVHG ZLWK6WDWHVLQ1RY

42
Scheme Town No. of Approved GoI fund  WUDQVDFWLRQ GDWD RI  IHHGHUV KDYH EHHQ
covered Towns Project released uploaded by Discoms on NPP and master data of 36,673
(Nos.) Com- Cost (in (in Rs. feeders has been taken on board. Feeder wise data on Energy
pleted Rs. crore) crore) ÁRZ 9ROWDJH SURÀOH $7 & ORVV DQG SRZHU LQWHUUXSWLRQV DUH
Part-A (IT) 1405 1378 5,156 4,040 recorded on monthly basis on the NPP. Further, the data of
consumer related parameters like compliant redressal, release
Part-A 59 52 1,251 639 of new connections and e-payments are also captured on
(SCADA)
NPP. The said reports are generated from the IT systems of
Part-B 1227 1195 28,920 7,338 the Discoms and are transferred to NPP without any manual
LQWHUYHQWLRQLQGDWDJHQHUDWLRQ'LVFRPZLVHVXPPDU\UHSRUW
TOTAL 35,327 12,017
LVEHLQJVHQWUHJXODUO\WR0'VRIUHVSHFWLYH'LVFRPVWRHQDEOH
URJA App WKHPWRLQLWLDWHDGPLQLVWUDWLYHDFWLRQVIRULPSURYHPHQW7KLV
Data can be used by feeder managers as a management tool
85-$$33LVDVWHSWRZDUGV'LJLWDO,QGLDLQLWLDWLYHLQWKH8UEDQ IRUDGPLQLVWUDWLYHDFWLRQVUHGXFWLRQRI$7 &ORVV
Power Distribution Sector. The App focuses on enhancing
consumer connect by way of “Ranking” of towns, Discoms Feeder Manager Recognition & Award Scheme under IPDS
DQG 6WDWHV RQ YDULRXV SDUDPHWHUV UHODWHG WR FRQVXPHUV LQ D ,Q RUGHU WR UHFRJQL]H HIIRUWV RI 'LVFRPV)HHGHU PDQDJHUV
WUDQVSDUHQWPDQQHU)ROORZLQJSDUDPHWHUVRI*R/LYHWRZQV working towards reduction in AT&C losses, Ministry of Power
are being monitored through URJA App on a monthly basis. KDVDSSURYHG)HHGHU0DQDJHU5HFRJQLWLRQVFKHPHDZDUGV
‡ &RQVXPHU FRPSODLQWV SHQGLQJ 5DQNLQJLVGRQHEDVHG HDFKXQGHUIROORZLQJFDWHJRULHV
on the number of consumer complaint pending for
redressal, as per the IT System.

‡ 5HOHDVH RI QHZ FRQQHFWLRQ 6WDWXV RI QHZ FRQQHFWLRQV


applied and connection pending for release through IT
system is displayed on the App.

‡ $YHUDJHGXUDWLRQDQGQXPEHURISRZHUFXWV5DQNLQJLV
GRQHEDVHGRQDYHUDJHQXPEHURISRZHULQWHUUXSWLRQV
QRVPRQWK DVZHOODVGXUDWLRQRILQWHUUXSWLRQV +5V
PRQWK DWN9)HHGHUOHYHOUHFRUGHGLQWKH,7V\VWHP
7KHDYHUDJHYDOXHVDUHFDOFXODWHGRQSHUFRQVXPHUEDVLV
IRUWKH7RZQ'LVFRPDQG6WDWHOHYHOUDQNLQJ

‡ (SD\PHQWV5DQNLQJRIWRZQVLVGRQHEDVHGRQQXPEHU
of consumers making online bill payments. +RQ·EOH0LQLVWHURI3RZHUKDQGLQJRYHUWKH)HHGHU0DQDJHU
Award to a Feeder Manager from Bihar)
‡ 3HUFHQWDJHORVVRISRZHUWKHIW7RZQVDUHUDQNHGEDVHG
on AT&C losses of the town as per energy audit carried ‡ (QHUJ\6DYLQJVLQ)HHGHUV
out using IT systems created under the scheme.
‡ $PRXQWVDYHGGXHWRUHGXFWLRQLQ$7 &ORVV
7KH DERYH LQIRUPDWLRQUHSRUWV DUH JHQHUDWHG IURP WKH ,7
‡ 5HGXFWLRQLQ$7 &ORVV
systems at Discom end and the same are uploaded on IPDS
ZHEVLWH85-$$SSZLWKRXWDQ\PDQXDOLQWHUYHQWLRQLQGDWD ‡ %HVWHIIRUWLQ'DWD&RUUHFWLRQVDQLWL]DWLRQ
FROODWLRQJHQHUDWLRQ
7KHIHHGHUPDQDJHUVDUHVHOHFWHGEDVHGRQWKHGDWDSURYLGHG
Online Feeder Monitoring on NPP by the Discoms on the National Power Portal. So far, total 54
)HHGHU0DQDJHUVIURPDFURVV8WLOLWLHVKDYHEHHQDZDUGHGLQ
Online monitoring of 11kV Feeders of the IT enabled urban
WKHDERYHFDWHJRULHVRQPRQWKO\EDVLVIRUSHULRG6HSWHPEHU
WRZQV KDV EHHQ GHYHORSHG DV DQ LQWHJUDO SDUW RI 1DWLRQDO
2017 to October 2018.
Power Portal (NPP) being implemented by CEA. As on

43
Annual Report 2018-19

Third Party Concurrent Evaluation Agency (TPCEA) ¾ Feeders, Distribution transformers were metered
and monitored through automated data logging
7KH ,3'6 HQYLVDJHV FRQFXUUHQW DQG SRVW LPSOHPHQWDWLRQ
V\VWHP)HHGHUORVVHVKDYHUHGXFHGVLJQLÀFDQWO\DQG
HYDOXDWLRQRIVFKHPHE\ZD\RIPRQLWRULQJTXDOLW\RIZRUNVRQ
sample basis by separate agency called Third Party Concurrent the feeder analysis showed that 54%, 67%, 38% and
(YDOXDWLRQ $JHQF\ 73&($  IRU HIIHFWLYH LPSOHPHQWDWLRQ LQ VDPSOHIHHGHUVLQ1565:5DQG(51(5VWDWHV
terms of Quality and Project Outcomes. UHDFKHG  $7 & ORVV OHYHO DQG ORVVHV LQ RWKHU
feeders also reduced.
73&($LVUHTXLUHGWRYHULI\FRPSOLDQFHVE\8WLOLW\
¾ 7KH DERYH UHGXFWLRQ LQ $7 & ORVVHV UHVXOWHG LQ
‡ 0DQXIDFWXULQJ4XDOLW\3ODQ 043 ²IRUTXDOLW\PDWHULDOV
VDYLQJRIa08RIHOHFWULFLW\ZKLFKDPRXQWVWR
‡ )LHOG4XDOLW\3ODQ )43 ²IRUTXDOLW\ZRUNV HUHFWLRQDQG a5V&ULQSRZHUSURFXUHPHQWFRVWLQ)<
process)
D  ,7 LQLWLDWLYHV XQGHU 5$3'53 KDYH OHG WR DXWRPDWLRQ
‡ 6DIHW\VWDQGDUGVDQGUHOHYDQWVWDWXWRU\FOHDUDQFHVOLNH² LQ VHYHUDO NH\ RSHUDWLRQDO DVSHFWV 0RUH QRV RI QHZ
VDIHW\ÀUHHWF FRQQHFWLRQVLVJLYHQZLWKLQ6(5&WLPHOLQHDQGFRQVXPHU
complaints handling and dispute resolution time frames
‡ &RPSOLDQFH RI JDSVVKRUWFRPLQJVGHIHFWV UHSRUWHG LQ
SUHYLRXVLQVSHFWLRQV KDYHDOVRUHGXFHG7KLVKDVOHGWRVLJQLÀFDQWFRQVXPHU
satisfaction across the region.
‡ 3URMHFWWLPHOLQHVDQG,3'6JXLGHOLQHV
E   *,6 ,QGH[LQJ DQG PDSSLQJ RI DOO FRQVXPHUV
73&($ KDV EHHQ DSSRLQWHG LQ  JURXSV IRU  VWDWHV876
& assets completed in all sample towns. All the new
across India. Stage –I inspection is already completed in 490
FRQQHFWLRQVDUHSURFHVVHGWKURXJK,7V\VWHPV3RVLWLYH
circles and Stage-II inspection is underway in most of these
impacts of automating the billing and payment were
circles.
REVHUYHG DFURVV DOO VWDWHV 7KLV KDV OHG WR $7 & ORVV
Impact Assessment of RAPDRP (subsumed under IPDS) UHGXFWLRQ WKURXJK LPSURYHG ELOOLQJ  FROOHFWLRQ
In order to assess the impact of R-APDRP, Ministry of Power HIÀFLHQF\
DGYLVHG WKH 1RGDO DJHQF\ WR FDUU\ RXW GHWDLOHG DVVHVVPHQW F  2ZLQJWRGLJLWDOL]DWLRQRIPRVWRIWKH8WLOLW\IXQFWLRQVLW
on how the scheme has eased the life of consumers and also is easier for consumers to apply for new connection, or
EHQHÀWHGWKH'LVFRPV)RXULQGHSHQGHQWDJHQFLHVKDYHEHHQ pay bill, or lodge a complaint. It also facilitates the utility
appointed by PFC to take-up the impact assessment work on WRWUDFNFRQVXPHUVLQDQHIIHFWLYHZD\
regional basis with one region assigned to each. The agencies
KDYH VXEPLWWHG WKHLU UHSRUWV EDVHG RQ WKH GDWD FROOHFWHG d) More consumers are opting for digital bill payments as
IURP5$3'53,7V\VWHPLQ8WLOLWLHVVDPSOHFRQVXPHUVXUYH\ it reduces efforts & brings in transparency. The bill is
LQWHUDFWLRQVZLWK8WLOLW\RIÀFLDOVDQGÀHOGYLVLWVLQVDPSOH VKDUHG ZLWK FRQVXPHU LQ HPDLODSSV DQG WKH SD\PHQW
WRZQVIRUYHULÀFDWLRQRIHOHFWULFDODVVHWVRQVDPSOHEDVLV KDV EHHQ PDGH SRVVLEOH WKURXJK QHW EDQNLQJ GHELW
FUHGLW FDUGV %+,083, DSS RWKHU SRFNHW ZDOOHWV OLNH
The key highlights of the Region-wise study conducted by the
3D\70 HWF %LOO SD\PHQWV WKURXJK GLJLWDO PRGH KDYH
IRXUUHJLRQDOFRQVXOWDQWVDUH
increased across all sample towns.
D  0RVW RI WKH VDPSOH WRZQV KDYH VKRZQ D UHGXFWLRQ LQ
$7 &ORVVHVLQ)<DVFRPSDUHGWR%DVHOLQHVYDOXHV H  &HQWUDOL]HG &XVWRPHU &DUH &HQWUHV HVWDEOLVKHG DQG
functional in all the sample towns, with common toll free
¾ 43 out of 46 Utilities (on the basis of sample towns)
HOHFWULFLW\ FRPSODLQ QXPEHU  7KLV KDV VLPSOLÀHG
KDYHUHGXFHG$7 &ORVVHVZLWKYDULRXVLQWHUYHQWLRQV
WKH SURFHVVHV DQG HQKDQFHG WKH VHUYLFH GHOLYHU\ WR
under R-APDRP.
FRQVXPHUV  $ IHZ RXWFRPH RI FRQVXPHU VXUYH\ LV
¾ $W7RZQOHYHORXWRIVDPSOHWRZQV a  KLJKOLJKWHGEHORZ
KDYH VKRZQ UHGXFWLRQ LQ $7 & ORVVHV ZUW %DVHOLQH
¾ More than 97% of consumers get error-free billing,
YDOXHV)XUWKHUVDPSOHWRZQV a UHDFKHGD
whereas 98% Bills are based on actual meter reading
OHYHORI$7 &ORVVLQ)<
RQO\DYHUDJHELOOLQJGRQH 

44
¾ 0RUH WKDQ  RI WKH FRQVXPHUV VXUYH\HG KDYH Capacity Building of Discoms under IPDS:
REVHUYHG EHWWHU SRZHU TXDOLW\ UHVXOWLQJ LQWR QR
Capacity building of Discom manpower has been a focused
YROWDJHVXUJHVDIWHU5$3'53LQLWLDWLYHV
DUHD XQGHU ,3'6 5$3'53 ,Q )<  RYHU  PDQ
¾ 0RUHWKDQFRQVXPHUVVHHLPSURYHPHQWLQ3RZHU GD\VRIWUDLQLQJZDVLPSDUWHGWR'LVFRPH[HFXWLYHVHQWLUHO\
5HOLDELOLW\RYHUSDVW\HDUV WKURXJKLQKRXVHUHVRXUFHVZLWKRXWGHSOR\PHQWDQ\H[WHUQDO
WUDLQLQJLQVWLWXWHDJHQF\
¾ More than 90% consumers feel that the process of
lodging Complaint became easier 7KH WUDLQLQJ SURJUDPPHV ZHUH VWDQGDUGL]H WR VXLW WKH
requirement of Discoms and focused on IPDS related topics
¾ More than 48% consumers get billing information
VRDVWRLQFUHDVHDZDUHQHVVDPRQJWKHFRQFHUQHGÀOHGVWDII
WKURXJK606H[FHSW65UHJLRQ
about the key features of the scheme. The programmes were
¾ &RQVXPHUV KDYH VHHQ SRVLWLYH VRFLRHFRQRPLF conducted at Discoms HQ by sending the teams from PFC,
LPSDFWWKURXJKLPSURYHGHGXFDWLRQDORSSRUWXQLWLHV WKXVKLJKHUOHYHORISDUWLFLSDWLRQIURPÀHOGOHYHOZDVHQVXUHG
GXHWREHWWHUSRZHUDYDLODELOLW\
Further, a large scale Peer learning workshop was also held
¾ Consumers opined that the process of getting a new at New Delhi wherein best practice were shared by the
FRQQHFWLRQLVQRZVLPSOLÀHGDQGVHUYLFHVOLNHFKDQJH H[SHUWV IURP YDULRXV 'LVFRPV $V PDQ\ DV  SDUWLFLSDQWV
in load, name or category requests are completed from 45 Discoms took part in this day long workshop. The
within timelines. SUHVHQWDWLRQV JLYHQ E\ YDULRXV 8WLOLWLHV DUH DYDLODEOH RQ EHVW
practices section of IPDS portal.
I  7KHLQLWLDWLYHVXQGHU3DUW%KDYHUHVXOWHGLQVWUHQJWKHQLQJ
and augmentation of distribution infrastructure in the NATIONAL ELECTRICITY FUND (NEF)
sample towns. Power outage has reduced in all the *RYHUQPHQW RI ,QGLD KDV DSSURYHG VHWWLQJ XS RI 1DWLRQDO
XWLOLWLHV%DVHGRQVDPSOHWRZQVLWLVREVHUYHGWKDWWKH Electricity Fund (Interest Subsidy Scheme) in 2012 to
RYHUDOO+7WR/7UDWLRKDVLQFUHDVHG SURYLGH LQWHUHVW VXEVLG\ RQ ORDQV GLVEXUVHG WR WKH 6WDWH
g) Better power supply reliability and utility quicker Power Utilities, Distribution Companies (DISCOMS) – both in
UHVSRQVHWRFRPSODLQWVKDYHOHGWRLQFUHDVHLQLQGXVWULDO SXEOLF DQG SULYDWH VHFWRU IRU WKH ORDQV WDNHQ IURP 3ULYDWH 
DQGFRPPHUFLDODFWLYLW\ZKLFKLVHYLGHQWIURPLQFUHDVH 3XEOLF )LQDQFLDO ,QVWLWXWLRQV WR LPSURYH WKH LQIUDVWUXFWXUH LQ
in commercial & industrial electricity sales. distribution sector.

 5XUDO (OHFWULÀFDWLRQ &RUSRUDWLRQ 5(&  LV WKH 1RGDO


h) SCADA implementation in larger towns lead to reduction
$JHQF\IRURSHUDWLRQDOL]DWLRQRIWKHVFKHPH
in downtime in case of outages
 8QGHU1()VFKHPHLQWHUHVWVXEVLG\ZRXOGEHSURYLGHG
Further, to check the quality of works of completed RAPDRP
RQ ORDQV WDNHQ E\ SULYDWH DQG SXEOLF SRZHU XWLOLWLHV
projects, Quality Council of India has also been appointed by
LQ GLVWULEXWLRQ VHFWRU IRU QRQ 5DMLY *DQGKL *UDPLQ
MoP.
Vidyutikaran Yojana (RGGVY) and non- Restructured
$FFHOHUDWHG 3RZHU 'HYHORSPHQW DQG 5HIRUPV
Programme (R-APDRP) projects.

4. The pre-conditions for eligibility are linked to reform


measures taken by the States and the amount of interest
VXEVLG\ LV OLQNHG WR WKH SURJUHVV DFKLHYHG LQ UHIRUPV
linked parameters. The preconditions of eligibility
DUH RSHUDWLRQDOL]DWLRQ RI 6WDWH (OHFWULFLW\ 5HJXODWRU\
Commission (SERC), formulation of business plan for
turnaround of utilities, re-organisation of State Electricity
%RDUGV 6(% UHOHDVHRIVXEVLG\E\6WDWH*RYHUQPHQWWR
DISCOMs, submission of audited annual accounts and
(Capacity Building session for employees of PGVCL, Gujarat) WLPHO\ÀOLQJRIWDULIISHWLWLRQ

45
Annual Report 2018-19

5. There are two categories of States for working out the Comprehensive (16) : Jharkhand, Chhattisgarh, Rajasthan,
interest subsidy– Special category and focused states, 8WWDU 3UDGHVK 3XQMDE %LKDU +DU\DQD -DPPX DQG .DVKPLU
and States other than special category and focused Andhra Pradesh, Madhya Pradesh, Maharashtra, Himachal
states. Each power utility eligible for subsidy on interest Pradesh, Telangana, Assam, Tamil Nadu & Meghalaya
would be assigned marks based on reforms measures
Operational (16): *XMDUDW 8WWDUDNKDQG *RD .HUDOD
LH UHGXFWLRQ LQ $7 & ORVVHV UHGXFWLRQ LQ UHYHQXH
.DUQDWDND 3XGXFKHUU\ 0DQLSXU 6LNNLP $UXQDFKDO 3UDGHVK
JDS $YHUDJH &RVW RI 6XSSO\ $&6   $YHUDJH 5HYHQXH
7ULSXUD0L]RUDP1DJDODQG'DPDQ 'LX'DGUDDQG1DJDU
5HDOL]HG RQ VXEVLG\ UHFHLYHG EDVLV  UHWXUQ RQ HTXLW\
+DYeli, Andaman & Nicobar Islands and Lakshadweep
and multiyear tariff (MYT). Based on the consolidated
VFRUHDFKLHYHGRQWKHVHSDUDPHWHUVWKHXWLOLWLHVZRXOG I. Issuance of Bonds and Debt Conversion:
EHFDWHJRUL]HGDQGZLOOEHHOLJLEOHIRUVXEVLG\LQLQWHUHVW
rates from 3% to 5% in States other than Special category Under, UDAY, a total liability of Rs.2.69 lakh Cr is to be
and focused states and 5% to 7% in Special Category restructured through issuance of Bonds. So far, Bonds
and focused states. ZRUWK5VODFFURUHVKDYHEHHQLVVXHG RI8'$<
states debt to be addressed) consisting of States Bonds
 1DWLRQDO(OHFWULFLW\)XQGZRXOGSURYLGHLQWHUHVWVXEVLG\
of Rs.2.09 lac crores and DISCOMs Bonds of Rs.0.23 lac
DJJUHJDWLQJ 5V FURUH VSUHDG RYHU  \HDUV IRU
crores. DISCOM Bonds worth Rs.0.37 lac crores are yet to
loan disbursement amounting to Rs.25,000 crore for
be issued.
GLVWULEXWLRQVFKHPHVVDQFWLRQHGGXULQJWKH\HDUVYL]
2012-13 and 2013-14. Out of DISCOM debt of Rs.1.84 lakh Cr (which is to be
7. NEF Steering Committee during the Financial Year 2012- FRQYHUWHGLQWR*UDQW(TXLW\E\WKHHQGRI)< 5V
 KDVDSSURYHGSURMHFWVRI'LVFRPV ODNK &U KDYH EHHQ FRQYHUWHG LQWR *UDQW(TXLW\ WLOO 
from 15 States with loan component of Rs.26,406 crore Feb-2019.
IRU FRYHUDJH XQGHU 1() %XW DIWHU GHOLVWLQJ RI FHUWDLQ ‡ Review and Monitoring of UDAY: The scheme is being
QRQVWDUWHUSURMHFWVWKHUHYLVHGFRYHUDJHQRZVWDQGVDW monitored by an inter-ministerial committee and a state
920 projects with loan component of Rs.23,973 crore for
OHYHO FRPPLWWHH 0RQWKO\ PHHWLQJV DUH FRQGXFWHG WR
24 Discoms in 14 States.
UHYLHZWKHSURJUHVVRIWKHVFKHPH7KLUWHHQ0RQLWRULQJ
8. Interest Subsidy proposal amounting to Rs.175.07 crore &RPPLWWHH PHHWLQJV KDYH DOUHDG\ EHHQ FRQGXFWHG
has been released so far by Ministry of Power till March, Apart from monthly meetings, one-to-one ‘Focused
2019. 5HYLHZV 0HHWLQJV· DUH UHJXODUO\ FRQGXFWHG WR DVVHVV
UJWAL DISCOM ASSURANCE YOJANA (UDAY) DQG UHYLHZ WKH SHUIRUPDQFH RI VWDWHV ZKHUH WDUJHWV
are not being met. An online UDAY portal and App,
Ujwal DISCOM Assurance Yojana (UDAY) was launched by the
DYDLODEOH ERWK RQ $QGURLG DQG L26 SODWIRUPV SURYLGH
0LQLVWU\ RI 3RZHU *RYHUQPHQW RI ,QGLD RQ WK 1RYHPEHU
EDVLFDQDO\WLFVDQGSURJUHVVRISHUIRUPDQFHRIYDULRXV
IRUDVXVWDLQDEOHVROXWLRQWRWKHRSHUDWLRQDODQGÀQDQFLDO
6WDWHV',6&20VLQWKHSXEOLFGRPDLQDVDPHDVXUHRI
LQHIÀFLHQFLHVRI3RZHU'LVWULEXWLRQ&RPSDQLHV ',6&20V 7KH
transparency.
VFKHPH LV DLPHG DW ÀQDQFLDO DQG RSHUDWLRQDO WXUQDURXQG RI
',6&20VWKURXJKWDUJHWHGLQWHUYHQWLRQVWRORZHUWKHLQWHUHVW ‡ Key Performance Highlights of UDAY: UDAY is a 3
FRVWV UHGXFWLRQ RI FRVW RI SRZHU LQFUHDVHG UHYHQXHV DQG year long programme where performance of the States
LPSURYHGRSHUDWLRQDOHIÀFLHQFLHV is contingent to the time spent under UDAY, as different
‡ 6WDWHV· 3DUWLFLSDWLRQ LQ 8'$<  8'$< LV D YROXQWDU\ VWDWHVKDYHMRLQHG8'$<DWGLIIHUHQWSRLQWVLQWLPH(DUO\
scheme for participation by States. Ministry of Power results under UDAY are encouraging, with some distinct
KDVVLJQHG7ULSDUWLWH0R8V ZLWKVWDWH*RYHUQPHQWVDQG EHQHÀWVRQRSHUDWLRQV6RPHRIWKHPDMRUDFKLHYHPHQWV
DISCOMs) and Bipartite MoUs (with Power Department). XQGHU8'$<XSWR0)<DUHJLYHQ
7RWDO  6WDWHV DQG  8QLRQ 7HUULWRULHV 87V  KDYH
o Financial losses of UDAY states have reduced from
MRLQHG WKH VFKHPH 2XW RI WKLV  6WDWHV KDYH MRLQHG
Rs.32,150 Cr in 9MFY17 to Rs. 25,305 Cr in 9MFY19.
WKHVFKHPHIRUERWKRSHUDWLRQDODQGÀQDQFLDOHIÀFLHQF\
LPSURYHPHQWV ZKLOH  6WDWHV87V KDYH MRLQHG WKH o ACS- ARR Gap of UDAY states has reduced from Rs.
schemHIRURSHUDWLRQDOHIÀFLHQF\LPSURYHPHQWV 0.50/unit in 9MFY17 to Rs. 0.35/unit in 9MFY19.

46
-States of Andhra Pradesh, Bihar, Gujarat, Haryana, ‡ Rajasthan: ‘Mukhyamantri Vidyut Sudhar Yojna’
+LPDFKDO 3UDGHVK 0DKDUDVKWUD -KDUNKDQG .DUQDWDND VFKHPHWRLPSURYHTXDOLW\RIVHUYLFHV UHGXFHORVVHV
.HUDOD 3XQMDE 7HODQJDQD 8WWDU 3UDGHVK 8WWDUDNKDQG Consumer awareness programs like – Bijli Chaupal,
0DGK\D 3UDGHVK 7ULSXUD DQG 5DMDVWKDQ KDYH UHGXFHG Panchayat camps. Also, Rajasthan has formed a new
their ACS-ARR Gap in 9MFY19 in comparison with FRPSDQ\ 5891/  IRU RSWLPL]DWLRQ RI SRZHU SXUFKDVH
9MFY17. cost.

‡ $7 &ORVVRI8'$<VWDWHVKDVUHGXFHGIURP ‡ Maharashtra (MSEDCL): Initiated Mobile application


in 9MFY17 to 20.14% in 9MFY19. IRUFRQVXPHUVWRDYDLOVHUYLFHVÀQJHUWLSV

‡ 2YHUDOO%LOOLQJHIÀFLHQF\KDVLQFUHDVHGIURP ‡ Manipur: Installation of Pre-paid metering to reduce


in 9MFY17 to 84.06% in 9MFY19. the outstanding consumer debts, energy theft and
LPSURYHWKHELOOLQJHIÀFLHQF\
- States of Andhra Pradesh, Assam, Bihar, Daman & Diu,
+DU\DQD - . .DUQDWDND .HUDOD 0DKDUDVKWUD 3XQMDE ‡ Bihar: Customized billing software, Spot billing
Rajasthan, Telangana, Uttar Pradesh, Uttarakhand, through web-based Mobile app. Also, the state has
0DQLSXUDQG7ULSXUDKDYHUHGXFHGWKHLU$7 &ORVVHVLQ ODXQFKHG DQ DQWLWKHIW GULYH WKURXJK GHGLFDWHG
9MFY19 in comparison with 9MFY17. :KDWV$SSQRIRUJHQHUDOFRQVXPHUVLQGXOJLQJLQWKHIW
‡ A total of twenty (20) States have increased their for immediate inspection & FIR.
tariff in FY18. ‡ 8WWDU3UDGHVKKDVlaunched web portals / mobile app
‡ 7RWDOHQHUJ\ELOOHGE\',6&20VLQFUHDVHGE\LQ VXFKDV5$,'DQG6$$57+,WRWUDFNGLVFRQQHFWLRQGULYHV
FY18 over FY17, indicating a considerable growth DQGIHHGHUOHYHOSHUIRUPDQFHUHVSHFWLYHO\
in consumption, which in the past years had grown ‡ -KDUNKDQG KDV LQFUHDVHG GLIIHUHQW PRGHV RI SD\PHQW
around 5-6%.
VXFK DV 3UDJ\D .HQGUD 326 PDFKLQH H:DOOHW $73
‡ 8QGHU.H\2SHUDWLRQDO3DUDPHWHUV PDFKLQHV 2QOLQH SD\PHQWV HWF DORQJ ZLWK FHQWUDOL]HG
HT billing and spot billing systems.
-Targets under Feeder metering, Rural Feeder Audit and
/('GLVWULEXWLRQ 8-$/$ KDYHPRVWO\EHHQDFKLHYHG ‡ 7R DGGUHVV WKH LVVXH RI KLJK SHQGLQJ GXHV 7HODQJDQD
-Under DT metering (urban),Bihar, Jharkhand, Assam, has implemented pre-paid meters for Government
Gujarat, Himachal Pradesh, Meghalaya, Telangana and services.
'DPDQ  'LX KDYH DFKLHYHG  RI WKHLU RYHUDOO ‡ .DUQDWDND KDV FDUULHG RXW UHSODFHPHQW RI RYHUKHDG
targets till FY18. cables with UG cables, GPS tracking and spot billing,
-Under Feeder Segregation, Gujarat, Haryana, Andhra prepaid metering, quality power supply to rural areas
3UDGHVK0DQLSXUDQG0HJKDOD\DKDYHDFKLHYHG 1LUDQWKDUD-\RWL3URMHFW DQG[FXVWRPHUKHOSOLQH
RIWKHLURYHUDOOWDUJHWVWLOO)<
‡ Capacity Building and Knowledge sharing: Two
 $VSHUGDWDSURYLGHGE\6WDWHVLQWKH3RUWDO :RUNVKRSV RQ $7 & ORVV UHGXFWLRQ RQH :RUNVKRS
‡ .ey Initiatives taken by States under UDAY: RQ 3RZHU 3XUFKDVH &RVW 2SWLPL]DWLRQ DQG DQRWKHU
6HYHUDO 6WDWHV KDYH DGRSWHG LQQRYDWLYH PHDVXUHV DQG workshop on power sale and purchase decision support
LQLWLDWLYHVHYHQEH\RQGWKHGHVLJQHGLQWHUYHQWLRQVIRU WRROKDYHEHHQRUJDQL]HGZKHUH',6&20RIÀFLDOVDFURVV
DFKLHYLQJ8'$<WDUJHWVDQGIRULPSURYLQJWKHLURYHUDOO OHYHOV ZHUH LQYLWHG IRU SDUWLFLSDWLRQ DQG NQRZOHGJH
performance.
H[SHULHQFHVKDULQJ
‡ Haryana: ‘Mhara Gaon, Jagmag Gaon’ scheme to
address line losses in rural domestic areas.

Note: 'DWDFRPSLOHGIRUPRQWKVSHULRGRIWKHUHOHYDQW\HDU

47
Annual Report 2018-19

6ULQDJDU/HK.DUJLO'UDVV7UDQVPLVVLRQ6\VWHP

48
CHAPTER 10

NATIONAL SMART GRID MISSION

National Smart Grid Mission


Ministry of Power
Government of India
National Smart Grid Mission (NSGM) has been established
E\ WKH *RYHUQPHQW RI ,QGLD LQ  WR SODQ DQG PRQLWRU
implementation of policies and programmes related to Smart
*ULG DFWLYLWLHV LQ ,QGLD 16*0 HQYLVDJHV WKH LPSOHPHQWDWLRQ
RI $0, PHGLXP VL]HG PLFUR JULGV GLVWULEXWHG JHQHUDWLRQ
RXWDJHPDQDJHPHQWSRZHUTXDOLW\LPSURYHPHQWSHDNORDG
management and EV charging infrastructure etc. to support
the proliferation of EVs. Under sanctioned NSGM projects,
 RI WKH SURMHFW FRVW LV SURYLGHG IURP WKH 16*0 EXGJHW
whereas balance project cost is to be funded by the Utilities
WKURXJKLQQRYDWLYHÀQDQFLQJPRGHOV
The initial phase of NSGM was till March 2017. Noting the
HIIRUWV IRU 6PDUW *ULG GHYHORSPHQW DFWLYLWLHV 16*0 KDV
EHHQ H[WHQGHG WLOO 0DUFK  IRU DFFHOHUDWLQJ WKH 6PDUW
*ULGDFWLYLWLHVLQ,QGLD'XULQJWKLVSHULRGWKHLPSOHPHQWDWLRQ
RI 6PDUW *ULG SURMHFWV LV EHLQJ H[SHGLWHG WR VKRZFDVH WKH
GHPRQVWUDWHG EHQHÀWV RQ JURXQG 16*0 KDV VLQFH EHHQ
focussing on sustainable deployment of Smart Grids.
Smart Grid Projects under NSGM 7KH 6* SLORWV DW &(6& 0\VRUH  ,,7 .DQSXU DQG 8+%91
+DU\DQD  6*.& 0DQHVDU  3(' 3XGXFKHUU\  8*9&/
8QGHU16*0ÀYH6PDUW*ULGSURMHFWVKDYHEHHQVDQFWLRQHG *XMDUDW :(%6('&/ :HVW%HQJDO 7663'&/ 7HODQJDQD DQG
XQGHU LPSOHPHQWDWLRQ YL] WZR LQ &KDQGLJDUK 6XE 'LYLVLRQ +36(% +LPDFKDO3UDGHVK KDYHEHHQVXFFHVVIXOO\FRPSOHWHG
1RDQGHQWLUHFLW\ RQHHDFKDW.RFKL5RXUNHODDQG5DQFKL  LQDXJXUDWHG  GHFODUHG JROLYH DQG 76(&/ 7ULSXUD  SLORW
towns for about 7.50 lakh consumers. put under commercial operation. Remaining pilot at APDCL
7KH6*SURMHFWDW6XE'LYLVLRQRI&KDQGLJDUKZDVDZDUGHGLQ (Assam) is likely to be completed by August 2019. The Smart
6HSWHPEHUDQG1RYHPEHUIRU$0,DQG6&$'$SDFNDJHV *ULG.QRZOHGJH&HQWUHKDVEHHQLQDXJXUDWHGE\+RQRXUDEOH
UHVSHFWLYHO\ 1,7 IRU 5DQFKL 6* SURMHFW KDV EHHQ LVVXHG LQ 0LQLVWHURI6WDWHIRU3RZHU1HZDQG5HQHZDEOH(QHUJ\ ,& 
December 2018. 6K5.6LQJKLQ6HSWHPEHU

Smart Grid Pilot Projects


6SHFLDO HIIRUWV IRU WKH GHYHORSPHQW DQG GHSOR\PHQW RI
Smart Grids in India started in this decade under the aegis
RI 0LQLVWU\ RI 3RZHU *RYW RI ,QGLD (OHYHQ   6PDUW *ULG
3LORWVLQFOXGLQJD6PDUW&LW\SLORWDQG6PDUW*ULG.QRZOHGJH
Centre, sanctioned by MoP at different geographical locations
LQ WKH FRXQWU\ WR WHVW WKH IXQFWLRQDOLWLHV OLNH $GYDQFHG
Metering Infrastructure (AMI), Power Quality Management
(PQM), Peak Load Management (PLM), Distributed Generation
(DG), Microgrids and Outage Management System (OMS) are
XQGHUDGYDQFHGVWDJHRILPSOHPQWDWLRQ7KHVHSLORWSURMHFWV
FRYHUDERXWODNKFRQVXPHUVIRUDWRWDOVDQFWLRQHGFRVWRI
Rs.254.29 Cr. The GoI funding for these pilot projects is 50%
,QDXJXUDWLRQRI6*.&0DQHVDU
i.e. up to Rs.130.06 Crores.

49
Annual Report 2018-19

$Q LQWHUDFWLYH VHVVLRQ RQ 6PDUW *ULGV IRU 6PDUW &LWLHV ZDV
RUJDQL]HG RQ  LQ DVVRFLDWLRQ ZLWK ,((0$ WR EULQJ
UHOHYDQWVWDNHKROGHUVRQVDPHSODWIRUPWRGLVFXVVWKHLVVXHV
and possible solutions.
VW 6/308 PHHWLQJFXPZRUNVKRS RUJDQL]HG LQ )HEUXDU\
2019. The workshop has seen a participation of about 45
PHPEHUVIURP6/308VXWLOLWLHV
:RUNVKRSRQ6PDUW*ULG5HJXODWLRQVIRU'LVWULEXWLRQZDVDOVR
RUJDQL]HGLQ0DUFKZLWKSDUWLFLSDWLRQIURPXWLOLWLHVDQG
UHJXODWRUVRIYDULRXVVWDWHV

6KRZFDVLQJ6*)XQFWLRQDOLWLHVDW6*.&
Manesar. 19.09.2018

Domestic Collaboration, Training and Capacity Building


16*0 KDV EHHQ DFWLYHO\ HQJDJLQJ PXOWLSOH VWDNHKROGHUV IRU
bringing out best practices and solutions for deployment of
Smart Grids. Multiple workshops, seminars, training programs
ZHUHRUJDQL]HGDQGDOVRUHSUHVHQWHGLQYDULRXVSDQHOGLVFXV-
sions and conferences to promote and create awareness on
6PDUW*ULGGHSOR\PHQWV7KHIROORZLQJ6PDUW*ULG6WDQGDUG
5HIHUHQFHGRFXPHQWVKDYHDOVREHHQUHOHDVHGE\+RQRXUDEOH
0R63 ,& LQ-DQXDU\ Smart Grids for Smart Cities, Delhi. 30.10.2018

Smart Grid Regulations for Distribution,


Release of NSGM Framework, Model DPR and Model RfP Delhi. 11.03.2019
Documents, Delhi. 16.01.2019
International Collaboration
Smart Grid training programs for utility professionals and
SRZHUVHFWRUYHWHUDQVDUHDOVREHLQJRUJDQL]HGWRHTXLSWKHP Alongside the engagements with the domestic stakeholders,
ZLWK UHOHYDQW VNLOOV IRU WDFNOLQJ 6PDUW *ULG DQG 6PDUW 0HWHU international deliberation is also being carried out by NSGM
deployments. YLDVHPLQDUVZHELQDUVVWXG\WRXUVDFWLRQQHWZRUNVHWF

,Q  WKUHH WUDLQLQJ SURJUDPV ZHUH RUJDQL]HG DW ,QGLD KDV EHHQ DQ DFWLYH PHPEHU LQ ,6*$1 ,QWHUQDWLRQDO
6PDUW*ULG.QRZOHGJH&HQWHU 6*.& ,WLVEHLQJXWLOL]HGIRU Smart Grid Action Network) since its inception. Director NPMU
training and capacity building programs for training the utility KDG SDUWLFLSDWHG DV SDUW RI 3UHVLGLXP LQ WK ([&R PHHWLQJ
personnel IROORZHGE\.73ZRUNVKRSVKHOGDW9LHQQD$XVWULDLQ2FWREHU
1308DQG0LQLVWU\RI3RZHURIÀFLDOVWRXUHG6WRFNKROP
2QH GD\ H[FOXVLYH 5 ' &RQFODYH LQ DVVRFLDWLRQ ZLWK '67 Sweden August 2018 to interact with Swedish Smart Grid
RUJDQL]HG LQ -XO\  RQ 0LVVLRQ ,QQRYDWLRQ &KDOOHQJH  Forum and identify possible cooperation for collaboration
6PDUW*ULGVSURSRVDOVUHFHLYHGIRU5 'IXQGLQJ with India.

50
CHAPTER 11

ENERGY CONSERVATION
The primary energy demand in India has grown from about new coPPHUFLDOEXLOGLQJVKDYLQJDFRQQHFWHGORDGRIN:
PLOOLRQWRQVRIRLOHTXLYDOHQW WRH LQWRDERXW DERYHRUFRQWUDFWGHPDQGRIN9$ DERYH7KH(&%&
PLOOLRQWRHLQ7KLVLVH[SHFWHGWRLQFUHDVHWRVRPHZKHUH  ZLOO VHW WKH PLQLPXP HIÀFLHQF\ VWDQGDUG IRU EXLOGLQJV
between 1250 (estimated by International Energy Agency) and DLPLQJ DW QHDU ]HUR HQHUJ\ EXLOGLQJV LQ WKH IXWXUH :KLOH
1500 (estimated in the Integrated Energy Policy Report) million WKH (&%& KDV EHHQ GHYHORSHG E\ %(( LWV HQIRUFHPHQW OLHV
WRH E\  7KLV LQFUHDVH LV GULYHQ E\ D QXPEHU RI IDFWRUV ZLWKWKH6WDWH*RYHUQPHQWV ZLWK6WDWHV DQG87KDYLQJ
the most important of which are increasing incomes and DOUHDG\QRWLÀHG(&%&,QRUGHUWRDGGUHVVHQHUJ\HIÀFLHQF\
economic growth which lead to greater demand for energy LQ5HVLGHQWLDO6HFWRU(FR1LZDV6DPKLWD 3DUW%XLOGLQJ
VHUYLFHV VXFK DV OLJKWLQJ FRRNLQJ VSDFH FRROLQJ PRELOLW\ (QYHORSH  LV GHYHORSHG DQG ODXQFKHG LQ 'HFHPEHU 
LQGXVWULDO SURGXFWLRQ RIÀFH DXWRPDWLRQ HWF  7KLV JURZWK LV ZKLFKLVDQ(QHUJ\&RQVHUYDWLRQ%XLOGLQJ&RGHIRU5HVLGHQWLDO
DOVR UHÁHFWLYH RI WKH FXUUHQW ORZ OHYHO RI HQHUJ\ VXSSO\ LQ 6HFWRU ,W VHWV PLQLPXP EXLOGLQJ HQYHORSH SHUIRUPDQFH
,QGLD7KHUHLVDODUJHODWHQWGHPDQGIRUHQHUJ\VHUYLFHVWKDW standards to limit heat gains (for cooling dominated climates)
QHHGV WR EH IXOÀOOHG LQ RUGHU IRU SHRSOH WR KDYH UHDVRQDEOH and to limit heat loss (for heating dominated climate) as well
incomes and a decent quality of life. DVIRUHQVXULQJDGHTXDWHQDWXUDOYHQWLODWLRQDQGGD\OLJKWLQJ
*RYHUQPHQWRI,QGLDKDVXQGHUWDNHQDWZRSURQJHGDSSURDFK (QHUJ\HIÀFLHQF\LQH[LVWLQJEXLOGLQJVLVDOVRDNH\WKUXVWDUHD
WRFDWHUWRWKHHQHUJ\GHPDQGRILWVFLWL]HQVZKLOHHQVXULQJ RIWKH*RYHUQPHQWRI,QGLDDQGWKHYROXQWDU\VFKHPHIRUVWDU
minimum growth in CO2 emissions, so that the global UDWLQJRIFRPPHUFLDOEXLOGLQJVZDVGHYHORSHGZLWKDQDLPWR
HPLVVLRQVGRQRWOHDGWRLUUHYHUVLEOHGDPDJHWRWKHHFRV\VWHP FUHDWH D PDUNHW SXOO IRU HQHUJ\ HIÀFLHQW EXLOGLQJV &XUUHQWO\
,QWKHJHQHUDWLRQVLGHWKH*RYHUQPHQWLVSURPRWLQJJUHDWHU the scheme is applicable to 4 categories of buildings i.e. Day
XVH RI UHQHZDEOH LQ WKH HQHUJ\ PL[ PDLQO\ WKURXJK VRODU XVH2IÀFHEXLOGLQJV6KRSSLQJ0DOOV%32VDQG+RVSLWDOV
and wind and at the same time shifting towards supercritical
technologies for coal based power plants. Efforts are also Achievements
EHLQJ PDGH WR HIÀFLHQWO\ XVH HQHUJ\ LQ WKH GHPDQG VLGH ‡ 7KH(QHUJ\&RQVHUYDWLRQ%XLOGLQJ&RGHKDVVRIDUEHHQ
WKURXJKYDULRXVLQQRYDWLYHSROLF\PHDVXUHVXQGHUWKHRYHUDOO mandated in the following thirteen States and one Union
DPELWRI(QHUJ\&RQVHUYDWLRQ$FW (&$FW $OVRDVSHU 7HUULWRU\ $VVDP 5DMDVWKDQ 2GLVKD 3XQMDE $QGKUD
India’s Intended Nationally Determined Contribution (INDC) it 3UDGHVK 7HODQJDQD .DUQDWDND .HUDOD 8WWDUDNKDQG
is aimed to reduce the emissions intensity of its GDP by 33 to +DU\DQD:HVW%HQJDO 8WWDU3UDGHVK+LPDFKDO3UDGHVK
SHUFHQWE\IURPOHYHO and UT of Puducherry.
EC Act was enacted in 2001 with the goal of reducing energy ‡ (&%&&HOOVKDYHEHHQVHWXSFRYHULQJ6WDWHV87V
LQWHQVLW\RI,QGLDQHFRQRP\%XUHDXRI(QHUJ\(IÀFLHQF\ %((  under the institutional framework for capacity building
was set up as a statutory body on 1st March 2002 at the RQ(&%&LPSOHPHQWDWLRQLQ6WDWHV87V
FHQWUDOOHYHOWRIDFLOLWDWHWKHLPSOHPHQWDWLRQRIWKH(&$FW7KH
$FW SURYLGHV UHJXODWRU\ PDQGDWH IRU VWDQGDUGV  ODEHOLQJ ‡ $ 0HPRUDQGXP RI 8QGHUVWDQGLQJ 0R8  LV VLJQHG
RI HTXLSPHQW DQG DSSOLDQFHV HQHUJ\ FRQVHUYDWLRQ EXLOGLQJ EHWZHHQ %XUHDX RI (QHUJ\ (IÀFLHQF\ %((  DQG &HQWUDO
codes for commercial buildings; and energy consumption 3XEOLF:RUNV'HSDUWPHQW &3:' IRU´(QHUJ\(IÀFLHQF\
QRUPVIRUHQHUJ\LQWHQVLYHLQGXVWULHV LQ&3:'PDQDJHG%XLOGLQJVµ

PROMOTING ENERGY EFFICIENCY IN BUILDINGS ‡ (FR1LZDV6DPKLWD  3DUW  %XLOGLQJ (QYHORSH  LV
GHYHORSHG DQG ODXQFKHG E\ +RQ·EOH/RN6DEKD 6SHDNHU
5HYLVHGYHUVLRQRI(QHUJ\&RQVHUYDWLRQ%XLOGLQJ&RGH (&%& 
and Hon’ble Minister of Power on National Energy
2017 was launched in 2017 by the then Hon’ble Minister of
&RQVHUYDWLRQ'D\ WK'HFHPEHU ,WLVDQ(QHUJ\
State (IC) for Coal, Mines, NRE& Power. The scope of ECBC
&RQVHUYDWLRQ%XLOGLQJ&RGHIRU5HVLGHQWLDO6HFWRU
2017 includes norms and standards for building design,
LQFOXGLQJ WKH HQYHORSH OLJKWLQJ KHDWLQJ DLUFRQGLWLRQLQJ ‡ $ WRWDO RI  &RPPHUFLDO EXLOGLQJV KDYH EHHQ VWDU
and electrical systems. It sets minimum energy standards for rated under different categories of buildings as on date.

51
Annual Report 2018-19

‡ )RU PRQLWRULQJ RI HQHUJ\ FRQVXPSWLRQ SDWWHUQ RI DOO Corporate Average Fuel Economy Norms for Passenger
QHZDQGH[LVWLQJEXLOGLQJV(0,6 (QHUJ\0DQDJHPHQW Cars: 7KH *RYHUQPHQW RI ,QGLD 0LQLVWU\ RI 3RZHU LVVXHG
,QIRUPDWLRQ6\VWHP SRUWDOLVGHYHORSHG DYHUDJH IXHO FRQVXPSWLRQ VWDQGDUGV IRU FDUV RQ UG $SULO
7KLVVWDQGDUGLVDSSOLFDEOHIRUWKHPRWRUYHKLFOHXVLQJ
‡ /DEHOOLQJSURJUDPIRU5HVLGHQWLDOEXLOGLQJVODXQFKHGLQ
SHWURO RU GLHVHO RU OLTXHÀHG SHWUROHXP JDV RU FRPSUHVVHG
February 2019.
natural gas, which carry passengers and their luggage and
‡ 0RUH WKDQ  FDSDFLW\ EXLOGLQJ ZRUNVKRSV FRQGXFWHG FRPSULVLQJ QRW PRUH WKDQ QLQH VHDWV LQFOXGLQJ GULYHU·V VHDW
for ECBC awareness. DQG RI *URVV 9HKLFOH :HLJKW QRW H[FHHGLQJ  NLORJUDPV
‡ ´(QHUJ\ (IÀFLHQF\ /DEHO IRU 5HVLGHQWLDO %XLOGLQJVµ tested.
launched by Hon’ble Minister of State (IC) for Power and 7KH IXHO FRQVXPSWLRQ VWDQGDUGV ZRXOG EH HIIHFWLYH IURP
Renewable during the conference of Ministers for Power, 2017-18 onwards, and a second set of standards would come
New & Renewable Energy of States & Union Territories into force from 2022-23. The standards relate the Corporate
held at Gurugram, Haryana on 26th February, 2019. $YHUDJH)XHO&RQVXPSWLRQ LQOLWHUVNP WRWKH&RUSRUDWH
)XHO(IÀFLHQF\LQ7UDQVSRUW6HFWRU $YHUDJH &XUE :HLJKW RI DOO WKH FDUV VROG E\ D PDQXIDFWXUHU
LQDÀVFDO\HDU$FFRUGLQJWRWKHÀUVWVWDQGDUGWKHDYHUDJH
India’s dependence on imported fossil fuels rising continuously ZHLJKWRIDOOFDUVLVH[SHFWHGWREHNJLQDQG
due to the limited domestic petroleum resources. India WKH$YHUDJH)XHO&RQVXPSWLRQ6WDQGDUGZRXOGKDYHWREHOHVV
ranked as the fourth-largest petroleum consumer in the world WKDQ  NP OLWHUV IRU WKLV DYHUDJH ZHLJKW 7KH VHFRQG
following China, the United States, and Russia. The country’s VWDQGDUG DVVXPHV FDU DYHUDJH ZHLJKW RI  NJ LQ 
energy demand continues to climb as a result of its dynamic DQG UHTXLUHV WKH DYHUDJH IXHO FRQVXPSWLRQ WR EH OHVV WKDQ
HFRQRPLFJURZWKDQGPRGHUQL]DWLRQ,QGLD·VFRQVXPSWLRQRI ONPDWWKLVDYHUDJHZHLJKW,WPD\EHQRWHGWKDWWKH
SHWUROHXPSURGXFWVLQFUHDVHGE\WRSUHYLRXV\HDUZKLFK VWDQGDUGVDSSO\WRWKH&RUSRUDWH$YHUDJH)XHO&RQVXPSWLRQ
LV PRUH WKDQ  007 FDXVLQJ D VLJQLÀFDQW H[SHQGLWXUH RQ LHWKHDYHUDJHRIWKHVWDQGDUGIXHOFRQVXPSWLRQRIDOOYHKLFOHV
RLOLPSRUW.HHSLQJLQYLHZWKHJURZLQJGHPDQGRIIRVVLOIXHO VROGE\WKHPDQXIDFWXUHUVLQWKHÀVFDO\HDUDQGQRWWRWKHIXHO
DQGUDSLGO\JURZLQJPRWRUYHKLFOHÁHHWLQ,QGLD*RYWRI,QGLD FRQVXPSWLRQ RI DQ LQGLYLGXDO PRGHO  7KH IXHO FRQVXPSWLRQ
set a target to reduce 10% reduction on import by 2022. BEE is measured under standard conditions at the nationally
LV ZRUNLQJ RQ WKH 'HYHORSPHQW RI IXHO HIÀFLHQF\ QRUPV IRU DFFUHGLWHGODEVRYHUWKHQDWLRQDOGULYLQJF\FOH
Vehicles that could moderate the rising demand of fuel.
,WLVH[SHFWHGWKDWWKHVHVWDQGDUGVZRXOGOHDGWRDUHGXFWLRQ
Fuel Economy Norms for Heavy Duty Vehicles: In August of 22.97 million tons of fuel consumption by 2025.
WKH*RYHUQPHQWRI,QGLDÀQDOL]HGIXHOHIÀFLHQF\QRUPV
IRUFRPPHUFLDOYHKLFOHV &9V ZLWKDJURVVYHKLFOHZHLJKW *9:  2WKHULQLWLDWLYHVLQ)XHO(IÀFLHQF\LQ7UDQVSRUW6HFWRU In
of 12 tonnes or greater. Manufacturers must demonstrate DGGLWLRQWRWKHDERYHPHQWLRQHG%((LVDOVRZRUNLQJRQWKH
FRPSOLDQFH ZLWK WKH UXOH E\ HYDOXDWLQJ YHKLFOHV RYHU WKH GHYHORSPHQW RI )XHO (FRQRP\ QRUPV IRU /LJKW  0HGLXP
constant speed fuel consumption (CSFC) test procedure. In &RPPHUFLDOYHKLFOHVRI*URVVYHKLFOHZHLJKWUDQJLQJIURP
WKH &6)& SURWRFRO WUXFNV DUH GULYHQ DW FRQVWDQW VSHHG RQ D WRQQHVWRWRQQHV7KHQRUPVKDYHEHHQGHYHORSHGDQGWKH
test track at 40 and 60 kilometres per hour (kph), and buses QRWLÀFDWLRQSURFHVVLVXQGHUSURJUHVV
are run at 50 kph. Recently Ministry of Road Transport and 'HYHORSPHQWRI)XHO(FRQRP\QRUPVIRU$JULFXOWXUDOWUDFWRUV
+LJKZD\VKDVUHYLVHGWKHVDIHD[OHZHLJKWOLPLWVVXEVHTXHQWO\
LV DOVR XQGHU SURFHVV DQG OLNHO\ WR EH ÀQDOLVHG VRRQ )RU
WKHQRUPVIRU+'9VLVXQGHUUHYLHZWRPHHWWKHUHYLVHG*9: YHKLFXODU W\UHV VWDQGDUG DQG ODEHOOLQJ SURJUDPPH KDV EHHQ
range. LQLWLDWHG DOVR ,W KDV DOVR EHHQ LQLWLDWHG WKH GHYHORSPHQW RI
In addition to norms for CVs greater than 12 tonnes, the a computer-based simulation tool (like VECTO in EU) as per
GHYHORSPHQWRIIXHOHIÀFLHQF\VWDQGDUGVIRU&9VEHWZHHQ ,QGLDQ VSHFLÀF FRQGLWLRQV 7KH WRRO ZLOO EH KHOSIXO WR UHGXFH
and 12 tonnes is ongoing. The norms for this lighter segment WKHFRVWDQGWLPHIRUWHVWLQJRIYHKLFOHV
of CVs will also be centred around CSFC testing. The norms STANDARDS AND LABELING SCHEME
DUHÀQDOL]HGDQGQRWLÀFDWLRQLVXQGHUSURFHVVE\0LQLVWU\RI
6WDQGDUGVDQG/DEHOOLQJ 6 / VFKHPHLVDÁDJVKLSLQLWLDWLYH
Power.

52
RI0LQLVWU\RI3RZHUWKDWZDVODXQFKHGZLWKWKHNH\REMHFWLYH ‡ %((SURYLGHGWHFKQLFDOLQSXWVWRGHYHORS,QGLD&RROLQJ
RI SURYLGLQJ FRQVXPHUV DQ LQIRUPHG FKRLFH UHJDUGLQJ WKH Action Plan which was launched on 8th March, 2019 by
HQHUJ\ VDYLQJV DQG WKHUHE\ WKH FRVWVDYLQJ SRWHQWLDO RI MoEF& CC.
YDULRXV HQHUJ\ FRQVXPLQJ DSSOLDQFHV 6 / VFKHPH FRYHUV
CAPACITY BUILDING OF DISCOMS
the star labelling program for 23 appliances, out of which 10
appliances are under mandatory regime and remaining 13 Demand Side Management (DSM) measures in the Energy
DSSOLDQFHVDUHXQGHUYROXQWDU\UHJLPH 6HFWRU LV D FRVWHIIHFWLYH WRRO $V D FXVWRPHU VWUDWHJ\ '60
programs encourage the installation of end-use technologies
Achievements:
WKDW FRQVXPH OHVV HQHUJ\ WKHUHE\ UHGXFLQJ DQGRU VKLIWLQJ
‡ 5HYLVLRQ RI HQHUJ\ FRQVXPSWLRQ VWDQGDUGV IRU 7XEXODU WKH FXVWRPHUV· RYHUDOO HOHFWULF ELOO '60 SURJUDPV FDQ KHOS
Fluorescent lamps, Direct Cool Refrigerators, Frost Free utilities to reduce their peak power purchases on the wholesale
Refrigerators, Storage type electric water heaters, Color PDUNHWWKHUHE\ORZHULQJWKHLURYHUDOOFRVWRIRSHUDWLRQV
7HOHYLVLRQ KDV EHHQ GRQH GXULQJ WKH \HDU  ZLWK D
The capacity building and other support is essential for the
YLHZ WR EULQJ PRUH HIÀFLHQW DSSOLDQFHV LQ WKH PDUNHW
',6&20V WR LPSOHPHQW '60 LQ WKHLU UHVSHFWLYH DUHDV ,Q
from 1st January, 2019.
WKLV FRQWH[W %XUHDX RI (QHUJ\ (IÀFLHQF\ KDV ODXQFKHG D
‡ 7KHVWDUODEHOOLQJSURJUDPIRU,QYHUWHU$LU&RQGLWLRQHUV programme for capacity building of DISCOMs. This will help
and LED Lamps has been made mandatory w.e.f. January, LQFDSDFLW\EXLOGLQJRI',6&20RIÀFLDOVDQGGHYHORSPHQWRI
 7KH HQHUJ\ FRQVXPSWLRQ VWDQGDUGV IRU ,QYHUWHU YDULRXVPHFKDQLVPVWRSURPRWH'60LQWKHLUUHVSHFWLYHDUHDV
$LU &RQGLWLRQHUV KDYH EHHQ QRWLÀHG LQ WKH *D]HWWH RI
Achievements:
,QGLD YLGH 62  (  GDWHG WK $XJXVW  7KH
HQHUJ\FRQVXPSWLRQVWDQGDUGVIRU/('ODPSVKDYHEHHQ 7KH REMHFWLYH RI WKH SURJUDPPH LV WR FDUU\ RXW ORDG
QRWLÀHGLQWKH*D]HWWHRI,QGLDYLGH62 ( GDWHG PDQDJHPHQW DFWLYLWLHV GHYHORSPHQW RI '60 DFWLRQ SODQV
27th December, 2017. DQGLPSOHPHQWDWLRQRI'60DFWLRQLQWKHLUUHVSHFWLYHDUHDV
)ROORZLQJKDYHEHHQWKHPDMRUDFKLHYHPHQWVVRIDUXQGHUWKLV
‡ &RQGXFWLQJ3KDVH,RIUHWDLOHUWUDLQLQJSURJUDPPHFDOOHG
programme.
“National Retailer Training Programme on Standards and
/DEHOOLQJ 1573 µXQGHUZKLFKWRWDOZRUNVKRSVKDYH First Phase
EHHQFRQGXFWHGRYHUDSHULRGRIWLPHLQYDULRXVFLWLHV ‡ ',6&20VZHUHVHOHFWHGIRUSDUWLFLSDWLQJDVEHQHÀFLDU\
$SSUR[LPDWHO\  UHWDLOHUV ZHUH HGXFDWHG UHJDUGLQJ DISCOMs under this programme and Memorandum of
WKH YDULRXV IDFHWV RI VWDQGDUGV DQG ODEHOOLQJ VFKHPH Understanding (MoU) was signed with them.
2nd phase of retailer training program initiated in the
year 2018. In phase 2 of Retailer Training Programme ‡ '60&HOOKDVEHHQHVWDEOLVKHGE\WKHVH',6&20V
WRWDO  ZRUNVKRSV ZHUH RUJDQL]HG ZKHUHLQ LQ  ‡ '60 UHJXODWLRQ KDV EHHQ QRWLÀHG LQ  6WDWHV IRU 
UHWDLOHUVZHUHWUDLQHGRQWKHSURYLVLRQVRI6WDQGDUGV  DISCOMs.
Labelling scheme.
‡ 0DQSRZHU VXSSRUW ZDV SURYLGHG WR HDFK ',6&20 IRU
‡ %((VLJQHG0HPRUDQGXPRI8QGHUVWDQGLQJ 0R8 ZLWK IDFLOLWDWLRQ RI '60 UHODWHG DFWLYLWLHV 7KLV SURYLVLRQ ZLOO
1DWLRQDO $FFUHGLWDWLRQ %RDUG IRU &HUWLÀFDWLRQ %RGLHV be continued for the period 2017-20.
(NABCB) as Independent Agencies for Monitoring &
‡ /RDGVXUYH\LVFRPSOHWHGIRUDOO',6&20VDQGWKHLU
(YDOXDWLRQ ,$0( RQWK0D\
'60DFWLRQSODQVKDYHEHHQSUHSDUHG
‡ 9ROXQWDU\ VWDU ODEHOOLQJ SURJUDP IRU FRPPHUFLDO
‡ 1DWLRQDO 3RZHU 7UDLQLQJ ,QVWLWXWH ZDV HQJDJHG E\ %((
(water and air cooled) chillers was launched on
WR FRQGXFW WUDLQLQJ SURJUDPPHV IRU WKH RIÀFLDOV RI
14th September, 2018.
DISCOMs to create Master Trainers on DSM and Energy
‡ 9ROXQWDU\VWDUODEHOOLQJSURJUDPIRU:DVKLQJPDFKLQHV (IÀFLHQF\8QGHUWKLVSURJUDPPHRIÀFLDOVRIVHQLRU
DQG0LFURZDYH2YHQVZDVODXQFKHGRQWK0DUFK PLGGOHOHYHO PDQDJHPHQW RI WKHVH ',6&20V ZHUH
‡ /(' WHVWLQJ IDFLOLW\ VHW XS ZDV LQDXJXUDWHG DW &35, trained as Master Trainers under Training of Trainers
%DQJDORUHE\6HFUHWDU\3RZHURQWK1RYHPEHU DFWLYLW\

53
Annual Report 2018-19

‡ $ERXWFLUFOHOHYHORIÀFLDOVRI',6&20VKDYHEHHQ DZDUHQHVV SURJUDPV KDV EHHQ FRQGXFWHG LQ VHYHUDO


WUDLQHGRQ'60DQG(QHUJ\(IÀFLHQF\ states like Andhra Pradesh, Chhattisgarh, Sikkim,
Uttarakhand, and Gujarat.
Second Phase

‡ ',6&20VKDYHEHHQLGHQWLÀHGRQ3$1,QGLDOHYHODV
EHQHÀFLDU\',6&20VXQGHUWKLVSURJUDPPH

‡ 0HPRUDQGXPRI8QGHUVWDQGLQJ 0R8 KDVEHHQVLJQHG


DPRQJVW%((WKHVHOHFWHG',6&20VDQGUHVSHFWLYH
6'$V IRU VPRRWK DQG HIIHFWLYH LPSOHPHQWDWLRQ RI
QHFHVVDU\DFWLYLWLHV

‡ $ERXWVHQLRURIÀFLDOVRIWKHVH',6&20VZRXOGEH
WUDLQHGDV0DVWHU7UDLQHUVRQ'60 (QHUJ\(IÀFLHQF\
and capacity building programme for about 4000 circle
OHYHORIÀFLDOVZRXOGEHXQGHUWDNHQ

AGRICULTURE DEMAND SIDE MANAGEMENT

Agriculture sector is one of the most important sector of Indian


HFRQRP\ $JULFXOWXUH SOD\V D VLJQLÀFDQW UROH LQ WKH RYHUDOO
VRFLRHFRQRPLFGHYHORSPHQWRI,QGLD7KLVVHFWRUDFFRXQWVIRU
DSSUR[LPDWHO\RI,QGLD·VWRWDOZDWHUFRQVXPSWLRQ3XPSV
EHLQJ WKH PRVW YLWDO HOHPHQW RI WKH LUULJDWLRQ SURFHVV DQG
SUHVHQWO\WKHUHDUHDERXWPLOOLRQSXPSVHWVHQHUJL]HGLQ
India.

8SJUDGDWLRQ RI H[LVWLQJ SXPSLQJ V\VWHPV SUHVHQWV DQ


immediate need and an unprecedented opportunity. The ‡ 6WDWHV RI +DU\DQD 3XQMDE .DUQDWDND .HUDOD LVVXHG
VHFWRU LV GRPLQDWHG E\ KLJKO\ LQHIÀFLHQW SXPS VHWV KDYLQJ VWDWH ZLGH QRWLÀFDWLRQ IRU XVLQJ ((36 &KKDWWLVJDUK
DYHUDJH HIÀFLHQF\ UDQJH RI  ZKLOH HIÀFLHQF\ OHYHO  5DMDVWKDQ DUH SURYLGLQJ IUHH SRZHULQFHQWLYH WR
RI VWDU UDWHG HQHUJ\ HIÀFLHQW SXPS VHWV ((36  LV  consumers using EEPS.
7KHUHIRUH WKHUH LV D QHHG WR WDS WKH KXJH HQHUJ\ VDYLQJV
‡ 0L]RUDPKDVFDUULHGRXWWKHIHDVLELOLW\IRUGHPRSURMHFW
potential promised in agriculture pumping sector.
IRU LPSOHPHQWDWLRQ LQ 5XUDO 'ULQNLQJ :DWHU 3XPSLQJ
Achievements: Systems.
‡ $Q 0R8 ZDV VLJQHG EHWZHHQ ,QGLDQ &RXQFLO RI MUNICIPAL DEMAND SIDE MANAGEMENT
Agricultural Research (ICAR) and Bureau of Energy
7KHHQHUJ\FRQVXPSWLRQRIWKHPXQLFLSDOLWLHVLVFKDUDFWHUL]HG
(IÀFLHQF\ %(( 0LQLVWU\RI3RZHUWRFUHDWHDZDUHQHVV
E\IUHTXHQWFKDQJHVDQGULVLQJSHDNVLQSRZHUORDGFXUYHVLQ
IRUHQHUJ\HIÀFLHQWSXPSVHWVDQGRSHUDWLRQDOSUDFWLFHV
WKHPRUQLQJKRXUVGXHWRZDWHUSXPSLQJDQGHYHQLQJKRXUV
VRDVWRDGRSWHQHUJ\DQGUHVRXUFHHIÀFLHQWDSSURDFKHV
IRU VWUHHW OLJKWLQJ 7KH LQHIÀFLHQW XVH RI HOHFWULFLW\ GXH WR
ZLWKDLPWRFUHDWHDZDUHQHVVRQHQHUJ\HIÀFLHQF\DQG
OLPLWHGGLIIXVLRQRIHQHUJ\HIÀFLHQWWHFKQRORJLHVDQG'HPDQG
FRQVHUYDWLRQ LQ DJULFXOWXUDO SUDFWLFHV SDUWLFXODUO\ LQ
6LGH 0DQDJHPHQW '60  LQLWLDWLYHV KDYH FRQVLGHUDEO\
using agriculture pumpsets, tractors and other machines
increased the energy spent by the municipalities. The need
DQG WR LPSURYH IXHO DQG ZDWHU UHVRXUFH XVH HIÀFLHQF\
for affordable electricity and the energy and peak shortages
WKHUHE\UHGXFLQJWKHFRVWRIFXOWLYDWLRQVRDVWRLQFUHDVH
make the Municipal Demand Side Management (MuDSM)
farmer’s income in harmony with strategies of “Per drop
SURJUDPPHLPSRUWDQWIRU,QGLDDVLWFDQLPSURYHWKHRYHUDOO
more crop” and “Doubling Farmers’ income”.
HQHUJ\HIÀFLHQF\RIWKH8/%VZKLFKFRXOGOHDGWRVXEVWDQWLDO
‡ $V SHU 0R8 VLJQHG EHWZHHQ %(( DQG ,QGLDQ &RXQFLO VDYLQJV LQ WKH HOHFWULFLW\ FRQVXPSWLRQ WKHUHE\ UHVXOWLQJ LQ
RI $JULFXOWXUH 5HVHDUFK ,&$5  YDULRXV WUDLQLQJ DQG FRVWUHGXFWLRQVDYLQJVIRUWKH8/%V

54
SMALL AND MEDIUM ENTERPRISES (SMEs) Major Achievements –

The MSME (micro, small and medium enterprises) sector, is a ‡ )RXU   $XGLR 9LVXDO FDVH VWXGLHV ZHUH SUHSDUHG RQ
heterogeneous sector in terms of the products manufactured, LPSOHPHQWHG (( WHFKQRORJLHV 7KHVH DXGLR YLGHR
VL]HVPDQXIDFWXULQJSURFHVVHVRXWSXWDQGWHFKQRORJ\XVHG WXWRULDOVDUHGHYHORSHGWRHGXFDWHVKRZFDVHWKHDFWXDO
in manufacturing. MSMEs engaged in manufacturing, account VDYLQJVUHDOLVHG PRQHWDU\EHQHÀWV DQGPRWLYDWH60(
for about 33% of India’s manufacturing output and around entrepreneurs to adopt EE technologies.
28% contribution in the GDP as whole. ‡ (VWDEOLVKHG (0& LQ  FOXVWHUV 0RUEL 6LNNLP  .HUDOD
060(V W\SLFDOO\ DUH FKDUDFWHUL]HG ZLWK D KLJK GHJUHH RI with portable energy audit instruments worth of 30
lakhs, thereby established 12 Energy Management
heterogeneity within the manufacturing processes across
Centres Pan India.
YDULRXV JHRJUDSKLF ORFDWLRQV HYHQ IRU VLPLODU SURGXFW
RIIHULQJV :KHQ FRPSDUHG ZLWK ODUJH HQWHUSULVHV WKH\ KDYH ‡ 1DWLRQDO 6WDNHKROGHU &RQVXOWDWLRQ :RUNVKRS ZDV
smaller scale of operations, smaller capital base and do not RUJDQLVHGDW,QGRUHWRDFKLHYHWUDQVIRUPDWLRQDOUHVXOWV
KDYH DFFHVV WR FKHDSHU ÀQDQFH DQG WHFKQRORJ\ VROXWLRQV DQGVFDOLQJXSWKHSURMHFWDFWLYLWLHV
Hence, they prefer low-cost sub-standard solutions leading ‡ 0RUH WKDQ IRUW\   GLVVHPLQDWLRQ ZRUNVKRSV ZHUH
WRLQHIÀFLHQWSURGXFWLRQ7KHHQWHUSULVHVHQJDJHGLQHQHUJ\ organised through State Designated Agencies (SDAs)
LQWHQVLYH RSHUDWLRQV LQFXU GLVSURSRUWLRQDWHO\ KLJKHU FRVWV WR GLVVHPLQDWH WKH NQRZOHGJH DQG H[SHULHQFH JDLQHG
Vulnerability of MSMEs to increasing energy prices is higher VDYLQJVDFKLHYHGHQHUJ\HIÀFLHQWWHFKQRORJLHV
as they pay more per unit of energy as compared to large
‡ WKDQGWKPHHWLQJRI6$0(((.6+$ZDVRUJDQLVHG
industries.
DW.RONDWDDQG&RLPEDWRUH
7KH 060(V LQ ,QGLD DUH DURXQG 6L[W\7KUHH PLOOLRQ ² DQG
PDMRULW\RIWKHPKDYHQRWLPSOHPHQWHGDQ\HQHUJ\HIÀFLHQF\
(or) technology upgradation measures and continue to
GHSHQGRQREVROHWHORZHIÀFLHQF\WHFKQRORJLHVWKDWUHVXOWLQ
ZDVWHIXO HQHUJ\ FRQVXPSWLRQ WKHUHE\ UHGXFLQJ SURÀWDELOLW\
DQGFRPSHWLWLYHQHVVRI060(VHFWRULQ,QGLD

%((·V3URJUDPPHWR,PSURYH(QHUJ\(IÀFLHQF\RI060(
Sector –

:LWK WKH FROOHFWLYH HIIRUWV WRZDUGV LPSURYLQJ WKH HQHUJ\


performance, the current state of awareness, perception
DQG UHVSRQVLYHQHVV WRZDUGV HQHUJ\ HIÀFLHQF\ SURJUDPPHV
RI 060( VHJPHQW LQ ,QGLD (QHUJ\ (IÀFLHQF\ LQWHUYHQWLRQV
in SME sector are yet to become the mainstream across the
country.

$OWKRXJK WKH HQHUJ\ VDYLQJ SRWHQWLDO LV LPPHQVH LQ WKLV


sector which BEE intends to unlock, there are challenges
IDFHGE\,QGLDQ060(HQWUHSUHQHXUVVXFKDVULVNDYHUVHQHVV
FXPEHUVRPH GRFXPHQWDWLRQ DQG ODFN RI DZDUHQHVV
PRWLYDWLRQ

%XUHDX RI (QHUJ\ (IÀFLHQF\ KDV DOVR LPSOHPHQWHG ((


WHFKQRORJLHV LQ PDQ\ HQHUJ\ LQWHQVLYH FOXVWHUV RI ,QGLD ZLWK ‡ )LIW\   HQHUJ\ HIÀFLHQW WHFKQRORJLHV SXUVXDQW WR
WKH VXSSRUW IURP *OREDO (QYLURQPHQW )DFLOLW\ *()  WKURXJK HQHUJ\LQWHQVLYHFOXVWHUVZHUHVKRUWOLVWHGWREHXVHGWR
81,'2DQG:RUOG%ank. GHYHORSWKHPXOWLPHGLDWXWRULDOV

55
Annual Report 2018-19

‡ 0RUHWKDQ7ZR+XQGUHG  60(HQWUHSUHQHXUVZHUH media, awareness campaign in schools and colleges through
trained on “Best Operating Practices” that should be brochures and banners etc. Most of the SDAs celebrate Energy
DGRSWHG WR DFKLHYH PD[LPXP HQHUJ\ HIÀFLHQF\ XQGHU &RQVHUYDWLRQ 'D\ ZLWK GXH UHFRJQLWLRQ JLYHQ WR WKRVH ZKR
GEF – UNIDO – BEE Programme. KDYHWDNHQOHDGLQSURPRWLQJWKHFDXVHRIHQHUJ\HIÀFLHQF\
in the state. In addition to this, some of the major successful
‡ 7RHQVXUHWKHUHSOLFDWLRQRIWKHGHPRQVWUDWLRQSURMHFWV
DFFRPSOLVKPHQWVRIWKHVFKHPHDUHDVIROORZV
LQ WKH FOXVWHU FOXVWHU OHYHO HQWLWLHV ZHUH VWUHQJWKHQHG
E\ PHDQV RI HPSDQHOPHQW RI ORFDO VHUYLFH SURYLGHUV ‡ $ERXWGHPRQVWUDWLRQSURMHFWVLQWKHDUHDVRIVWUHHW
dissemination workshops, capacity building of unit OLJKWLQJZDWHUSXPSLQJDQGZDVWHKHDWUHFRYHU\KDYH
owners etc. and more than Eight Hundred (800) Local been successfully completed by SDAs.
6HUYLFH3URYLGHUVZHUHWUDLQHGDW&OXVWHUV ‡  QRV RI YLOODJHV KDYH EHHQ WDNHQ XS E\ WKH 6'$V
XQGHU ´0RGHO (QHUJ\ (IÀFLHQW 9LOODJH &DPSDLJQµ IRU
‡ 6L[ %% H[KLELWLRQ ZHUH RUJDQLVHG IROORZHG E\ DQ
FRQYHUWLQJWKHPLQWRPRGHOHQHUJ\HIÀFLHQWYLOODJHVE\
implementation support and awareness workshop
UHSODFLQJ H[LVWLQJ LQHIÀFLHQW HOHFWULFDO DSSOLDQFHV ZLWK
XQGHU*()²:RUOG%DQN²%((3URJUDPPH
BEE star rated appliances including household bulbs,
‡ 'HPRQVWUDWLRQ 3URMHFW RQ WKH WHFKQRORJ\ ´&RQYHUVLRQ street lights, fans, water pumps, etc.
RI H[LVWLQJ %XOO 7UHQFKHG .LOQV %7.V  WR =LJ=DJ .LOQVµ
‡ 5HSODFHPHQW RI H[LVWLQJ FRQYHQWLRQDO DSSOLDQFHV ZLWK
were implemented at Bhatinda and Abohar.
HQHUJ\HIÀFLHQWDSSOLDQFHVLQDERXWQRVRI*RYW
‡ 8QGHU *() ² 81,'2 ² %(( 3URJUDPPH PRUH WKDQ VFKRROV E\ 6'$V LV XQGHUZD\ 7KLV HQGHDYRU KDV EHHQ
VPDOO VFDOH HQHUJ\ VDYLQJ SURMHFWV ZLWK  HQHUJ\ completed in about 700 nos. of schools.
HIÀFLHQWWHFKQRORJLHVLPSOHPHQWHG ‡ $OPRVWQRVRIHPSOR\HHVDUHHQJDJHGE\WKH6'$V
‡ 7ZHQW\IRXU  SLORWSURMHFWVZRUWKDQLQYHVWPHQW ZKRDUHH[FOXVLYHO\LQYROYHGLQIDFLOLWDWLQJDQGHQIRUFLQJ
Lakhs Indian Rupees has been implemented. This in turn HIÀFLHQWXVHRIHQHUJ\DQGLWVFRQVHUYDWLRQDWWKH6WDWH
KDVVDYHG72(HQHUJ\ZLWKDYRLGHGWRQVRI OHYHO
CO2emissions. ‡ 6'$V KDYH FRQGXFWHG PDQ\ ZRUNVKRSVVHPLQDUV
and capacity building programmes to disseminate
‡ ,PSOHPHQWDWLRQVXSSRUWIRU,62ZDVSURYLGHGIRU
information and address practical issues faced
50 MSMEs
E\ YDULRXV VWDNHKROGHUV 7DUJHW DXGLHQFH RI WKHVH
STRENGTHENING OF STATE DESIGNATED AGENCIES TO ZRUNVKRSVLQFOXGHDFFUHGLWHGFHUWLÀHGHQHUJ\DXGLWRUV
PROMOTE EFFICIENT USE OF ENERGY energy managers, Designated Consumers, building
professionals, architects, Financial Institutions, ESCOs,
,Q H[HUFLVH RI WKH SRZHUV FRQIHUUHG E\ VHFWLRQ  G  RI (&
etc. Many such workshops cum training programmes
$FWDOO6WDWH*RYHUQPHQWV87$GPLQLVWUDWLRQVKDYH
KDYHEHHQRUJDQL]HGE\WKH6'$V
designated an agency as State Designated Agency (SDA) to
FRRUGLQDWH UHJXODWH DQG HQIRUFH WKH SURYLVLRQV RI WKLV $FW ‡ $OO WKH 6'$V KDYH HVWDEOLVKHG GHGLFDWHG ZHEVLWH
within the State, either by assigning additional responsibilities KLJKOLJKWLQJ HQHUJ\ HIÀFLHQF\ PHDVXUHV XQGHUWDNHQ LQ
WRRQHRIWKHH[LVWLQJGHSDUWPHQWVRIWKH6WDWH*RYHUQPHQW the state. The websites are linked with Bureau of Energy
or by establishing a dedicated Stand-Alone SDA for energy (IÀFLHQF\ DQG RWKHU 6'$V WR IDFLOLWDWH LQIRUPDWLRQ
HIÀFLHQF\ H[FKDQJH

Achievements: CONTRIBUTION TO STATE ENERGY CONSERVATION FUND


(SECF)
7KH 6'$V KDYH FDUULHG RXW FDSDFLW\ EXLOGLQJ DFWLYLWLHV OLNH
6HFWLRQ    RI WKH (QHUJ\ &RQVHUYDWLRQ $FW  UHTXLUHV
ZRUNVKRSV DQG WUDLQLQJ SURJUDPPHV LQYROYLQJ WKH (QHUJ\
6WDWH *RYHUQPHQWV WR FRQVWLWXWH D IXQG FDOOHG 6(&) IRU WKH
Managers, Energy Auditors and Designated Consumers
SXUSRVH RI SURPRWLRQ RI HIÀFLHQW XVH RI HQHUJ\ DQG LWV
appraising about their roles as per the mandate of the
FRQVHUYDWLRQZLWKLQWKHVWDWH,QWKLVFRQWH[WDVFKHPHFDOOHG
EC Act 2001. Media and awareness campaign has been
´&RQWULEXWLRQ WR 6WDWH (QHUJ\ &RQVHUYDWLRQ )XQG 6(&) µ WR
XQGHUWDNHQE\WKH6'$VLQWKHLUUHVSHFWLYHVWDWHV7KHPDMRU
EHJRYHUQHGE\%((ZDVDSSURYHGE\WKH0LQLVWU\RI3RZHU
focus areas include promotion through electronic and print

56
The SECF caQ IDFLOLWDWH WR RYHUFRPH WKH PDMRU EDUULHUV IRU the NECA – 2018 and awards were presented to the
LPSOHPHQWDWLRQ RI HQHUJ\ HIÀFLHQF\ SURMHFWV ,W LV LQWHQGHG awardees by the Hon’ble Speaker and Hon’ble Minister
to be used as an instrument to facilitate implementation of of State (IC) for Power & NRE.
HQHUJ\HIÀFLHQF\SURMHFWVWKURXJKPDUNHWWUDQVIRUPDWLRQ
‡ )URP  RQZDUGV DSSOLFDWLRQV DUH LQYLWHG IRU 1(&$
The contribution under SECF is made to those State on rolling cycle of three years, which implies that few
*RYHUQPHQWV  87 $GPLQLVWUDWLRQV ZKR KDYH FUHDWHG WKHLU VHFWRUVDUHDOORZHGWRSDUWLFLSDWHHYHU\\HDUDQGHYHU\
6(&)DQGÀQDOL]HGWKHUXOHVDQGUHJXODWLRQVWRRSHUDWLRQDOL]H sector will get a chance to apply for the NECA within a
WKH VDPH 7KH VFKHPH LV IRU FRQWULEXWLRQ WR DOO WKH 6WDWH block of three years.
87V ZLWK D PD[LPXP FHLOLQJ RI 5V  &URUH IRU DQ\ 6WDWH
‡  LQGXVWULDO XQLWV HVWDEOLVKPHQWV DQG RUJDQL]DWLRQV
87 SURYLGHG LQ WZR LQVWDOOPHQWV RI 5V  &URUH HDFK 7KH
participated in NECA-2018. 2384 nos. of applications
second installment of Rs. 2.00 Crore under contribution
ZHUH UHFHLYHG IRU ´0RVW (QHUJ\ (IÀFLHQW $SSOLDQFH RI
WR 6(&) LV UHOHDVHG RQO\ DIWHU WKH VWDWHV KDYH SURYLGHG D
the Year”
PDWFKLQJFRQWULEXWLRQWRWKHÀUVWLQVWDOOPHQWRI5V&URUH
SURYLGHGE\%((,WPD\EHPHQWLRQHGKHUHWKDWWKHPDWFKLQJ ‡ XQLWVZHUHDZDUGHG)LUVW3UL]HXQLWV6HFRQG3UL]H
FRQWULEXWLRQE\WKH6WDWH*RYHUQPHQWIRU1RUWK(DVWHUQ6WDWHV XQLWV&HUWLÀFDWHRI0HULWDQG$ZDUGVIRUWKH0RVW
DQGWKH87$GPLQLVWUDWLRQVLVUHOD[HGWR5VODNKVLQVWHDG (QHUJ\ (IÀFLHQW $SSOLDQFH RI WKH <HDU 7KH DZDUGV DUH
of Rs 2.0 Crore. recognition of their demonstrated commitment to
HQHUJ\FRQVHUYDWLRQDQGHIÀFLHQF\
Achievements:
‡ 7KHSDUWLFLSDWLQJXQLWVRI$ZDUGVKDYHFROOHFWLYHO\
SECF has been constituted in 30 states, out of which, 25 states
LQYHVWHG 5V  &URUHV LQ HQHUJ\ FRQVHUYDWLRQ
KDYHSURYLGHGPDWFKLQJFRQWULEXWLRQ
PHDVXUHVDQGDFKLHYHGDPRQHWDU\VDYLQJVRI5V
NATIONAL ENERGY CONSERVATION AWARD AND &URUHVKDYLQJDQDYHUDJHSD\EDFNSHULRGRI0RQWKV
PAINTING COMPETITION
‡ 7KH SDUWLFLSDWLQJ XQLWV KDYH VDYHG HOHFWULFDO HQHUJ\ RI
7KH 1DWLRQDO (QHUJ\ &RQVHUYDWLRQ $ZDUGV DUH SUHVHQWHG WR 0LOOLRQN:KRIHOHFWULFDOHQHUJ\ZKLFKLVHTXLYDOHQW
LQGXVWU\DQGRWKHUHVWDEOLVKPHQWVHYHU\\HDUE\WKH0LQLVWU\ WRWKHHQHUJ\JHQHUDWHGIRUPD0:DWD3/)RI
RI3RZHUZLWKWKHREMHFWLYHRISURPRWLQJHQHUJ\FRQVHUYDWLRQ ,QRWKHUZRUGVWKHVHSDUWLFLSDWLQJXQLWVKDYHDYRLGHG
DPRQJ DOO VHFWRUV RI HFRQRP\ 7KHVH DZDUGV UHFRJQL]H WKHLQVWDOODWLRQRISRZHUJHQHUDWLQJFDSDFLW\HTXLYDOHQW
DQG HQFRXUDJH HQGHDYRUV RI LQGXVWULDO XQLWV LQVWLWXWLRQV WR  0: LQ  ZKLFK ZRXOG RWKHUZLVH KDYH
and establishments in reducing energy consumption by been required to meet the power demand of these units.
IHOLFLWDWLQJ WKHP ZLWK (QHUJ\ &RQVHUYDWLRQ $ZDUGV RQ WKH
RFFDVLRQRI1DWLRQDO(QHUJ\&RQVHUYDWLRQ'D\FHOHEUDWHGRQ
WK'HFHPEHUHYHU\\HDU

7KHDZDUGVZHUHJLYHQIRUWKHÀUVWWLPHRQ'HFHPEHU
ZKLFKZDVGHFODUHGDVWKH¶1DWLRQDO(QHUJ\&RQVHUYDWLRQ'D\·
6LQFHWKHQ1DWLRQDO(QHUJ\&RQVHUYDWLRQ$ZDUGV 1(&$ KDV
been attracting the attention of all the stakeholders and has
ZLWQHVVHGLQFUHDVLQJSDUWLFLSDWLRQOHYHO\HDUDIWHU\HDU7KHVH
awards are presented on EC day by eminent dignitaries and
highest functionaries such as Hon’ble President, Hon’ble
Prime Minister and Hon’ble Union Minister of Power.

Achievements:

‡ +RQ·EOH6SHDNHURI/RN6DEKDZDVWKH&KLHI*XHVWIRU $QDZDUGHHUHFHLYLQJDZDUGIURP+RQ·EOH/RN6DEKD6SHDNHU

57
Annual Report 2018-19

Painting Competition on Energy Conservation for School


Children

0LQLVWU\RI3RZHULVRUJDQL]LQJ1DWLRQDO3DLQWLQJ&RPSHWLWLRQ
since 2005 under the National Awareness Campaign to
SURPRWH HQHUJ\ FRQVHUYDWLRQ LQ WKH FRXQWU\ IRU VWXGHQWV RI
4th, 5th and 6th standards. Painting competition for students
DWWKH6FKRRO6WDWHDQGDW1DWLRQDOOHYHO KDVEHHQLQFOXGHG
DV RQH RI WKH DFWLYLWLHV RI WKH FDPSDLJQ ZKLFK ZRXOG QRW
RQO\ PDNH DZDUH WKH FKLOGUHQ DERXW WKH QHHG RI FRQVHUYLQJ
HQHUJ\EXWDWWKHVDPHWLPHZRXOGHGXFDWHDQGLQYROYHWKHLU
SDUHQWV DV ZHOO LQ WKH DERYH FDXVH 7KH LGHQWLÀHG DFWLYLW\ LV
one of the measures, which can help in creating awareness
in the domestic sector. In order to strengthen and for added
FRJQL]DQFHKLJKHUFODVVHVRIWKWKDQGWKVWDQGDUGVKDYH $FKLOGH[SODLQLQJDERXWKLVSDLQWLQJWRWKH
EHHQLQFOXGHGIURPLQDGGLWLRQWRH[LVWLQJFODVVHVRIWK Hon’ble LokSabha Speaker
5th and 6th Standards.
NATIONAL MISSION FOR ENHANCED ENERGY EFFICIENCY
The painting competition is held in three stages, namely, (NMEEE)
6FKRRO 6WDWH DQG 1DWLRQDO /HYHO XQGHU WZR FDWHJRULHV
7KH1DWLRQDO0LVVLRQIRU(QKDQFHG(QHUJ\(IÀFLHQF\ 10((( 
Students of 4th, 5th & 6thstandard are under Category ‘A’ and is one of the eight missions under the National Action Plan
7th, 8th& 9th standard students are under Category ‘B’. on Climate Change (NAPCC). NMEEE aims to strengthen the
Achievements: PDUNHWIRUHQHUJ\HIÀFLHQF\E\FUHDWLQJFRQGXFLYHUHJXODWRU\
DQGSROLF\UHJLPHDQGKDVHQYLVDJHGIRVWHULQJLQQRYDWLYHDQG
This year across the country 90,78,735 students from 4th to VXVWDLQDEOHEXVLQHVVPRGHOVWRWKHHQHUJ\HIÀFLHQF\VHFWRU
9th standard participated in the Painting Competition. This
FRPSHWLWLRQ LV RUJDQL]HG DOO RYHU WKH FRXQWU\ LQ DVVRFLDWLRQ 7KH 10((( VSHOW RXW IRXU LQLWLDWLYHV WR HQKDQFH HQHUJ\
HIÀFLHQF\LQHQHUJ\LQWHQVLYHLQGXVWULHVZKLFKDUHDVIROORZV
with 12 CPSUs under Ministry of Power. The paintings drawn
E\ FKLOGUHQ UHÁHFW WKHLU LQWHUHVW LQ WKH HQHUJ\ FRQVHUYDWLRQ (i) Perform Achieve and Trade Scheme (PAT), a regulatory
DFWLYLWLHV DQG WKHLU FRQFHUQ DERXW HQHUJ\ FULVHV DQG FOLPDWH LQVWUXPHQW WR UHGXFH VSHFLÀF HQHUJ\ FRQVXPSWLRQ LQ
FKDQJHDQGKDYHHIIHFWLYHO\FRQYH\HGLQVSLULQJLGHDVWKURXJK HQHUJ\ LQWHQVLYH LQGXVWULHV ZLWK DQ DVVRFLDWHG PDUNHW
their impressing paintings. This year 108 children, all winners EDVHG PHFKDQLVP WR HQKDQFH WKH FRVW HIIHFWLYHQHVV
RIWKH6WDWH/HYHO3DLQWLQJ&RPSHWLWLRQUHDFKHGWKH1DWLRQDO WKURXJKFHUWLÀFDWLRQRIH[FHVVHQHUJ\VDYLQJZKLFKFDQ
/HYHO3DLQWLQJ&RPSHWLWLRQ3DLQWLQJVRIZLQQLQJFKLOGUHQZHUH be traded.
GLVSOD\HGLQWKHH[KLELWLRQJDOOHU\GXULQJWKHDZDUGIXQFWLRQ (ii) 0DUNHW7UDQVIRUPDWLRQIRU(QHUJ\(IÀFLHQF\ 07(( 
at Vigyan Bhawan. IRUDFFHOHUDWLQJWKHVKLIWWRHQHUJ\HIÀFLHQWDSSOLDQFHV
LQ GHVLJQDWHG VHFWRUV WKURXJK LQQRYDWLYH PHDVXUHV WR
make the products more affordable.
(iii) (QHUJ\ (IÀFLHQF\ )LQDQFLQJ 3ODWIRUP (()3  for
FUHDWLRQ RI PHFKDQLVPV WKDW ZRXOG KHOS ÀQDQFH
demand side management programmes in all sectors by
FDSWXULQJIXWXUHHQHUJ\VDYLQJV
LY  )UDPHZRUN IRU (QHUJ\ (IÀFLHQW (FRQRPLF
Development (FEEED), IRU GHYHORSPHQW RI ÀVFDO
LQVWUXPHQWVWRSURPRWHHQHUJ\HIÀFLHQF\
The Mission seeks to upscale the efforts to unlock the
PDUNHW IRU HQHUJ\ HIÀFLHQF\ ZKLFK LV HVWLPDWHG WR EH
DURXQG5VFURUHDQGKHOSDFKLHYHWRWDODYRLGHG
:LQQHUVRIWKH1DWLRQDO3DLQWLQJ&RPSHWLWLRQ
FDSDFLW\DGGLWLRQRI0:IXHOVDYLQJVRIDURXQG
with Hon’ble LokSabha Speaker

58
23 million tonnes per year and green- house gas 3DSHU 7H[WLOH DQG 7KHUPDO 3RZHU 3ODQW KDYH EHHQ
emissions reductions of 98.55 million tonnes per year at QRWLÀHG7KHWRWDOHQHUJ\FRQVXPSWLRQRIWKHVH'&V
its full implementation stage. FRPHVRXWWREHPLOOLRQWRHDQGLWLVH[SHFWHG
WR JHW D WRWDO HQHUJ\ VDYLQJV RI  PLOOLRQ WRH
Achievements:
through the implementation of PAT cycle -V.
(i) Perform Achieve and Trade Scheme (PAT):
‡ &XUUHQWO\  GHVLJQDWHG FRQVXPHUV EHORQJLQJ WR
‡ 3HUIRUP $FKLHYH DQG 7UDGH 3$7  VFKHPH LV RQH RI WKLUWHHQHQHUJ\LQWHQVLYHVHFWRUVKDYHEHHQLQFOXGHG
WKHÁDJVKLSSURJUDPVXQGHU10(((DLPLQJDWHQHUJ\ under the PAT scheme. Further, in the subsequent
VDYLQJV LQ ODUJH HQHUJ\ LQWHQVLYH LQGXVWULHV 7KH F\FOHV 3$7 6FKHPH ZLOO EH H[SDQGHG ERWK YHUWLFDOO\
HQHUJ\VDYHGE\WKHODUJHLQGXVWULHVLVFRQYHUWHGLQWR DQGKRUL]RQWDOO\WRHQKDQFHHQHUJ\HIÀFLHQF\
WUDGDEOHHPROXPHQWVFDOOHG(QHUJ\6DYLQJ&HUWLÀFDWHV
‡ (QHUJ\ 6DYLQJ &HUWLÀFDWHV (6&HUWV  7UDGLQJ RI
(6&HUWV DQGDUHWUDGHGDWWKH3RZHU([FKDQJHV7KH
(QHUJ\ 6DYLQJ &HUWLÀFDWHV (6&HUWV  DW WKH 3RZHU
Central Electricity Regulatory Commission (CERC) is
([FKDQJHV FRPPHQFHG RQ WK 6HSWHPEHU 
the market regulator for trading of ESCerts with The
$ WRWDO RI VHYHQWHHQ VHVVLRQV RI WUDGLQJ RI (6&HUWV
National Load Dispatch Centre (POSOCO) being the
HDUQHG LQ OLHX RI H[FHVV HQHUJ\ VDYHG WRRN SODFH DW
registry and the trading of ESCerts is done through
WKH 3RZHU ([FKDQJHV UHVXOWLQJ LQWR D WRWDO WUDGHG
WKH3RZHU([FKDQJHV
YROXPH RI DERXW  ODNK (6&HUWV DQG D EXVLQHVV
‡ ,Q WKH ÀUVW F\FOH RI 3$7    LQGXVWULDO of about INR 100 crores. The trading facility was
units in 8 sectors (Aluminum, Cement, Chlor- Alkali, inaugurated by the Hon’ble Minister of Power and
)HUWLOL]HU,URQ  6WHHO3DSHU 3XOS7KHUPDO3RZHU 1HZDQG5HQHZDEOH(QHUJ\6KUL5.6LQJK
7H[WLOH  ZHUH PDQGDWHG WR UHGXFH WKHLU VSHFLÀF
energy consumption (SEC) i.e. energy used per unit
RI SURGXFWLRQ 7KH DFKLHYHPHQW LQ 3$7 F\FOH , ZLWK
respect to 427 DCs comes out to be 8.67 Mtoe which
LVRYHUDFKLHYHPHQWDJDLQVWWKHDVVLJQHGWDUJHW
of 6.686 Mtoe for 478 DCs of PAT Cycle I.
‡ 3$7 &\FOH ,, KDG FRPPHQFHG IURP VW $SULO 
XQGHUZKLFK'&V H[LVWLQJDGGLWLRQDO'&V
IURP H[LVWLQJ VHFWRUV DQG  '&V IURP QHZ VHFWRUV
YL]5DLOZD\V(OHFWULFLW\',6&20VDQG5HÀQHULHV IURP
WKHH[LVWLQJDQGQHZVHFWRUV 5DLOZD\V(OHFWULFLW\
',6&20V DQG 5HÀQHULHV  ZHUH QRWLÀHG ZLWK RYHUDOO
reduction targets of 8.869 mtoe.
Inauguration of ESCerts Trading by Hon’ble Minister of
‡ 6XEVHTXHQWO\ XSRQ UHFRPPHQGDWLRQ RI YDULRXV State (Independent Charge) for Power and New &
committees, PAT scheme is now being implemented 5HQHZDEOH(QHUJ\6KUL5.6LQJK
on a rolling cycle basis i.e. inclusion of new sectors LL  0DUNHW7UDQVIRUPDWLRQIRU(QHUJ\(IÀFLHQF\ 07((
DQG QHZ '&V HYHU\ \HDU +HQFH 3$7 F\FOH,,, ZDV
 7KLVLQLWLDWLYHXQGHUWKH1DWLRQDO0LVVLRQIRU(QKDQFHG
QRWLÀHG ZLWK HIIHFW IURP $SULO  ZLWK SURMHFWHG (QHUJ\ (IÀFLHQF\ 10(((  DLPV WR DFFHOHUDWH WKH VKLIW
HQHUJ\VDYLQJVRIPWRH WR HQHUJ\ HIÀFLHQW DSSOLDQFHV LQ GHVLJQDWHG VHFWRUV
‡ 3$7F\FOH²,9ZDVQRWLÀHGZLWKHIIHFWIURPVW$SULO WKURXJK LQQRYDWLYH PHDVXUHV WR PDNH WKH SURGXFWV
more affordable.
 LQ ZKLFK  '&V IURP WKH H[LVWLQJ VHFWRUV
and two new sector namely Petrochemicals and LLL  )UDPHZRUN IRU (QHUJ\ (IÀFLHQW (FRQRPLF
&RPPHUFLDO %XLOGLQJV +RWHOV  KDYH EHHQ QRWLÀHG Development (FEEED)
ZLWKDWRWDOHQHUJ\VDYLQJWDUJHWRIPWRH  )UDPHZRUNIRU(QHUJ\(IÀFLHQW(FRQRPLF'HYHORSPHQW
)(((' VHHNVWRGHYHORSÀVFDOLQVWUXPHQWVWRSURPRWH
‡ 3$7F\FOH9KDVFRPPHQFHGZLWKHIIHFWIURPVW$SULO
HQHUJ\HIÀFLHQF\LQFOXGLQJLQQRYDWLYHÀVFDOLQVWUXPHQWV
8QGHU3$7F\FOH9'&VIURPWKHH[LVWLQJ
and policy measures like the Partial Risk Guarantee Fund
sectors of PAT i.e. Aluminum, Cement, Chlor-Alkali, IRU(QHUJ\(IÀFLHQF\ 35*)(( DQG9HQWXUH&DSLWDO)XQG
Commercial Buildings (Hotels), Iron & Steel, Pulp & IRU(QHUJ\(IÀFLHQF\ 9&)(( 

59
Annual Report 2018-19

 3DUWLDO 5LVN *XDUDQWHH )XQG IRU (QHUJ\ (IÀFLHQF\ ‡ %RDUGRI7UXVWHHVIRU9&)((KDVEHHQFRQVWLWXWHG


(PRGFEE)
‡ 9&)((5XOHVKDYHEHHQQRWLÀHG
 35*)((LVDULVNVKDULQJPHFKDQLVPWRSURYLGHÀQDQFLDO
LY  (QHUJ\(IÀFLHQF\)LQDQFLQJ3ODWIRUP (()3
LQVWLWXWLRQV EDQNVDQG1%)&V DSDUWLDOFRYHUDJHRIULVN
LQYROYHGLQH[WHQGLQJORDQVIRUHQHUJ\HIÀFLHQF\SURMHFWV  (()3 LV RQH RI WKH LPSRUWDQW LQLWLDWLYHV XQGHU
7KHJXDUDQWHHZLOOQRWH[FHHG5VFURUHSHUSURMHFWRU 10((( ZLWK WKH REMHFWLYH WR SURYLGH D SODWIRUP
RIORDQDPRXQWZKLFKHYHULVOHVV*RYHUQPHQWRI WR LQWHUDFW ZLWK ÀQDQFLDO LQVWLWXWLRQV DQG SURMHFW
,QGLD KDV DSSURYHG IXQGV RI 5V  FURUH IRU 35*)(( GHYHORSHUVIRULPSOHPHQWDWLRQRI(QHUJ\(IÀFLHQF\
6HFWRUV WR EH FRYHUHG XQGHU 35*)(( DUH *RYHUQPHQW SURMHFWV8QGHUWKLVSURJUDPPH0R8VKDYHEHHQ
EXLOGLQJV3ULYDWHEXLOGLQJVKDYLQJFRPPHUFLDORUPXOWL VLJQHG ZLWK ÀQDQFLDO LQVWLWXWLRQV WR ZRUN WRJHWKHU
storey residential accommodations, Municipalities, SMEs IRU GHYHORSPHQW RI HQHUJ\ HIÀFLHQF\ PDUNHW DQG
and Industry. IRU LGHQWLÀFDWLRQ RI LVVXHV UHODWHG WR WKLV PDUNHW
GHYHORSPHQW 0R8V DUH DOUHDG\ EHLQJ VLJQHG E\
Achievements:
%((ZLWK0V37&,QGLD/WG0V6,'%,7DWD&DSLWDO
‡ %(( DSSRLQWHG DQ ,PSOHPHQWLQJ $JHQF\ ,$  IRU DQG ,)&, /WG WR SURPRWH ÀQDQFLQJ IRU (QHUJ\
RSHUDWLRQDOL]DWLRQRI35*)(( (IÀFLHQF\SURMHFWV
‡ $QGKUD%DQN<(6%DQN,')&%DQN7DWD&OHDQWHFK For capacity building of FIs, BEE has signed
&DSLWDO /WG DQG ,QGXV,QG %DQN KDYH EHHQ MoU with Indian Banks’ Association for training
empanelled as Participating Financial Institutions. SURJUDPPPH RQ (QHUJ\ (IÀFLHQF\ ÀQDQFLQJ IRU
6FKHGXOHG&RPPHUFLDO%DQNV:LWKDQREMHFWLYH´WR
‡ 35*)((5XOHVKDYHEHHQQRWLÀHG
EXLOG JUHDWHU NQRZOHGJH DQG FRQÀGHQFH WKURXJK
‡ 2SHUDWLRQV 0DQXDO IRU WKH 35*)(( KDV DOUHDG\ WUDLQLQJ SURJUDPPH ZLWKLQ WKH ÀQDQFLDO VHFWRU
been published. RQ (( ÀQDQFLQJµ LQ 3KDVH  %(( KDV VXFFHVVIXOO\
completed 4 training of trainers (ToT) workshops.
 9HQWXUH&DSLWDO)XQGIRU(QHUJ\(IÀFLHQF\ 9&)((
BEE launched the Phase 2 of these training
 9HQWXUH &DSLWDO )XQG IRU (QHUJ\ (IÀFLHQF\ 9&)((  LV workshops to create awareness amongst the loan
D IXQG WR SURYLGH HTXLW\ FDSLWDO IRU HQHUJ\ HIÀFLHQF\ RIÀFHUVULVNPDQDJHUVFUHGLWPDQDJHUVWRZDUGV
SURMHFWV $Q\ VLQJOH LQYHVWPHQW E\ WKH IXQG VKDOO QRW WHFKQLFDOÀQDQFLDO DSSUDLVDO RI (( SURMHFWV 0RUH
H[FHHG5VFURUH7KH)XQGZLOOSURYLGHODVWPLOHHTXLW\ WKDQEDQNLQJ1%)&RIÀFLDOVKDYHEHHQWUDLQHG
VXSSRUW WR VSHFLÀF HQHUJ\ HIÀFLHQF\ SURMHFWV OLPLWHG RQ((ÀQDQFLQJXQGHUWKLVSURJUDPPH
WRDPD[LPXPRIRIWRWDOHTXLW\UHTXLUHGWKURXJK
Following are the publications:
6SHFLDO3XUSRVH9HKLFOHVRU5VFURUHZKLFKHYHULVOHVV
6HFWRUVFRYHUHGXQGHU9&)((DUHJRYHUQPHQWEXLOGLQJV ‡ 7UDLQLQJ 0DQXDO IRU (QHUJ\ (IÀFLHQF\ )LQDQFLQJ LQ
3ULYDWHEXLOGLQJVDQG0XQLFLSDOLWLHV7KHVXSSRUWXQGHU India.
9&)((KDVEHHQSURYLGHGWRRQO\JRYHUQPHQWEXLOGLQJV
‡ 6XFFHVV VWRULHV IRU (QHUJ\ (IÀFLHQF\ 3URMHFWV
SULYDWHEXLOGLQJV FRPPHUFLDORUPXOWLVWRUH\UHVLGHQWLDO
Financed in India.
buildings) and municipalities.
‡ 0DUNHW$VVHVVPHQWIRU3DUWLDO5LVN*XDUDQWHH)XQG
Achievements:
IRU(QHUJ\(IÀFLHQF\DQG9HQWXUH&DSLWDO)XQGIRU
‡ 7KH 7UXVW RI 9&)(( KDV EHHQ FRQVWLWXWHG XQGHU (QHUJ\(IÀFLHQF\
SURYLVLRQVRI,QGLDQ7UXVW$FWWKHWUXVWGHHG
‡ *XLGHOLQHVIRU)LQDQFLQJ(QHUJ\(IÀFLHQF\3URMHFWV
was registered with jurisdictional sub-registrar
in India.
*RYHUQPHQWRI'HOKL

60
CHAPTER 12

CHARGING INFRASTRUCTURE FOR ELECTRIC VEHICLES


)RUWKHSURPRWLRQRIHOHFWULFYHKLFOHVFOHDQPRELOLW\VROXWLRQV D 7DULIIVKDOOEHOHVVWKDQRUHTXDOWRWKHDYHUDJHFRVW
*RYHUQPHQWRI,QGLDLGHQWLÀHGWKHQHHGIRUFUHDWLQJFKDUJLQJ RI VXSSO\ GHWHUPLQHG EDVHG RQ $7 & ORVV OHYHO RI
infrastructure as a critical area to push the plan to promote RUDFWXDOZKLFKHYHULVORZHUDQG
Electric Vehicles in the country and suggested the role of
b. Single part tariff for this purpose in the initial 3 years
facilitating the establishment of Charging Infrastructure
for Ministry of Power. In this regard, NITI Aayog constituted Guidelines and Standards
a committee under the chairmanship of Secretary (Power) for
“Charging Infrastructure for Electric Vehicles – Guidelines &
ÀQDOL]DWLRQ RI GHWDLOV IRU &KDUJLQJ ,QIUDVWUXFWXUH IRU (OHFWULF
6WDQGDUGVµ 9HKLFOHV KDYH EHHQ LVVXHG E\ 0LQLVWU\ RI 3RZHU
Mobility.
YLGH 0R3 &RPPXQLFDWLRQ 1R (9 RQ 
Actions taken 7KH IRUPXODWLRQ RI *XLGHOLQHV LQYROYHG PXOWLVWDNHKROGHU
FRQVXOWDWLRQVZLWKYDULRXVSULYDWHHQWLWLHV6WDWH*RYHUQPHQWV
To facilitate the establishment of Charging Infrastructure for
&HQWUDO *RYHUQPHQW 0LQLVWULHV'HSDUWPHQWV 1LWL$D\RJ
(OHFWULF 9HKLFOHV IROORZLQJ DFWLRQV KDYH EHHQ WDNHQ E\ WKH
etc. A discussion paper was circulated among the key states
0LQLVWU\RI3RZHU
0DKDUDVKWUD 'HOKL +DU\DQD 8WWDU 3UDGHVK :HVW %HQJDO
L &ODULÀFDWLRQ RQ &KDUJLQJ ,QIUDVWUXFWXUH IRU (OHFWULF 7DPLO1DGX.DUQDWDND$QGKUD3UDGHVKDQG*XMDUDW IRUWKHLU
Vehicles: YLHZV DQG FRPPHQWV 7KH GUDIW ´&KDUJLQJ ,QIUDVWUXFWXUH IRU
Electric Vehicles – Guidelines and Standards” was circulated to
 0LQLVWU\RI3RZHURQKDVLVVXHGFODULÀFDWLRQ
DOOWKH6WDWHV87V0LQLVWU\RI5RDG7UDQVSRUWDQG+LJKZD\V
on Charging Infrastructure for Electric Vehicles with
'HSDUWPHQWRI6FLHQFHDQG7HFKQRORJ\'HSDUWPHQWRI+HDY\
UHIHUHQFH WR WKH SURYLVLRQV RI WKH (OHFWULFLW\ $FW 
Industry, Department of Industrial Policy & Promotion and
,WKDVEHHQFODULÀHGWKDWGXULQJWKHDFWLYLW\RIFKDUJLQJ
NITI Aayog for comments and the guidelines were issued after
RI EDWWHU\ IRU XVH LQ HOHFWULF YHKLFOHV WKH FKDUJLQJ
considering the comments of all the stakeholders. The key
VWDWLRQ GRHV QRW SHUIRUP DQ\ RI WKH DFWLYLWLHV QDPHO\
features of the “Charging Infrastructure for Electric Vehicles –
transmission, distribution or trading of electricity, which
*XLGHOLQHVDQG6WDQGDUGVµDUHDVEHORZ
UHTXLUHOLFHQVHXQGHUWKHSURYLVLRQVRIWKH$FW YLVjYLV
Section 12 of Electricity Act, 2003), hence the charging I. Phase-wise Installation of Charging Infrastructure:
RIEDWWHULHVRIHOHFWULFYHKLFOHVWKURXJKFKDUJLQJVWDWLRQ
 7KH JXLGHOLQHV HQYLVDJH D SKDVH ZLVH LQVWDOODWLRQ RI
GRHV QRW UHTXLUH DQ\ OLFHQVH XQGHU WKH SURYLVLRQV RI
Charging Infrastructure for Electric Vehicles in selected
Electricity Act, 2003.
FLWLHVDVEHORZ
ii. Grid Connectivity and Safety regulations:
i. Phase I (1-3 years) – To target 4 million plus cities
 5HJDUGLQJ *ULG &RQQHFWLYLW\ DQG 6DIHW\ RI VXSSO\ IRU DQGFRQQHFWHG([SUHVVZD\VLPSRUWDQW+LJKZD\V
Charging Stations, CEA has drafted amendments to
ii. Phase II (3-5 years) – To target State Capitals, UT
following regulations of Central Electricity Authority
headquarters & important connected Highways.
&($ 
II. Nodal Agencies:
a. Central Electricity Authority (Technical Standards
IRU FRQQHFWLYLW\ RI WKH 'LVWULEXWHG *HQHUDWLRQ Two Nodal Agencies namely Central Nodal Agency and
Resources) Regulations 2013. 6WDWH1RGDO$JHQF\KDYHEHHQSURYLGHGLQWKH*XLGHOLQHV
and Standards for facilitation of Charging Infrastructure
b. Central Electricity Authority (measures relating to
LQVWDOOPHQWDW&HQWHUDQG6WDWH/HYHOUHVSHFWLYHO\
the Safety and Electric Supply) Regulations 2010.
L &HQWUDO1RGDO$JHQF\²%XUHDXRI(QHUJ\(IÀFLHQF\
iii. Amendments in Draft Tariff Policy 2018:
has been designated as the Central Nodal Agency
Amendments to address the issue of tariff to be XQGHUWKHSURYLVLRQVRI´&KDUJLQJ,QIUDVWUXFWXUHIRU
FKDUJHGE\WKH',6&20VIURP&KDUJLQJ6WDWLRQVKDYH Electric Vehicles – Guidelines and Standards” issued
been proposed in Draft Tariff Policy 2018. Following by Ministry of Power on 14.12.2018.
amendments in the Draft Tariff Policy 2018 has been
LL 6WDWH 1RGDO $JHQF\ ² *XLGHOLQHV SURYLGH IRU
SURSRVHG
designation of a State Nodal Agency by the State

61
Annual Report 2018-19

*RYHUQPHQWV (YHU\ 6WDWH *RYHUQPHQW VKDOO iii. All these charging infrastructures will be established as
nominate a Nodal Agency for that State for setting SHU0LQLVWU\RI3RZHU1RWLÀFDWLRQYLGH1R
up charging infrastructure. The State DISCOM shall EV dated 14th Dec 2018 on the subject “Charging
generally be the Nodal Agency for such purposes. Infrastructure for Electrical Vehicles - Guidelines and
+RZHYHU 6WDWH *RYHUQPHQW VKDOO EH IUHH WR VHOHFW Standards” and as amended from time to time.
D &HQWUDO6WDWH 3XEOLF 6HFWRU 8QGHUWDNLQJ 368 
LY ,QDGGLWLRQIRUFKDUJLQJRIHOHFWULFEXVHVLWLVSURSRVHG
LQFOXGLQJ 8UEDQ /RFDO %RGLHV 8/%V  8UEDQ$UHD
WRSURYLGHWRWKHEX\HURQHVORZFKDUJHUSHUHEXVDQG
'HYHORSPHQW$XWKRULWLHVHWFDVLWV1RGDO$JHQF\
RQHIDVWFKDUJHUIRUHYHU\HOHFWULFEXVHVWREHIXQGHG
Funds allotted under Scheme for Faster Adoption and under the scheme.
Manufacturing of Electric Vehicles in India Phase II (FAME
Y )OH[LELOLW\ RI IXQGLQJ IRU HVWDEOLVKPHQW RI FKDUJLQJ
India Phase II)
LQIUDVWUXFWXUHWRWKHH[WHQWRIRIFRVWGHSHQGLQJ
'HSDUWPHQW RI +HDY\ ,QGXVWU\ '+,  KDV LVVXHG QRWLÀFDWLRQ XSRQ WKH SURMHFW SURSRVDO VKDOO EH DYDLODEOH IRU
LQ*D]HWWHRI,QGLDRQWK0DUFKUHJDUGLQJ3KDVH,, promoting electric mobility.
RI )$0( ,QGLD 6FKHPH 7KH VFKHPH SURYLGHV IRU LQFHQWLYHV
YL 3URMHFWV IRU FKDUJLQJ LQIUDVWUXFWXUH ZLOO DOVR LQFOXGH
and funds for the establishment of Charging Infrastructure for
LQIUDVWUXFWXUH SURMHFWV UHTXLUHG IRU H[WHQGLQJ
(OHFWULF9HKLFOHV7KHVFKHPHSURYLGHVIRUIROORZLQJSURYLVLRQV
HOHFWULÀFDWLRQ IRU UXQQLQJ RI YHKLFOHV OLNH SDQWRJUDSK
ZLWKUHJDUGVWRWKH&KDUJLQJ,QIUDVWUXFWXUHIRU(OHFWULF9HKLFOHV
FKDUJLQJÁDVKFKDUJLQJHWF
i. Breakup of fund allocation year wise, for the scheme’s
YLL ,QWHUOLQNLQJRIUHQHZDEOHHQHUJ\VRXUFHVZLWKFKDUJLQJ
GXUDWLRQ
infrastructure, smart grid, use of ICT etc. shall be
(Rupees in Crore) encouraged.

Year 2019-20 2020-21 2021-22 Total Amendments issued by Ministry of Housing and Urban
Fund Affairs
Funds allocated 300 400 300 1000 Ministry of Housing and Urban Affairs has issued following
for Charging amendments for facilitation of Charging Infrastructure for
Infrastructure (OHFWULF9HKLFOHV
LL 7KH 6FKHPH HQYLVDJHV VXSSRUW IRU VHWWLQJ XS RI I. Amendments in Model Building Bye-Laws (MBBL – 2016)
adequate public charging infrastructure to instill for Electric Vehicle Charging Infrastructure.
FRQÀGHQFH DPRQJVW (9 XVHUV WKURXJK DFWLYH
SDUWLFLSDWLRQ DQG LQYROYHPHQW RI YDULRXV VWDNHKROGHUV ,, $PHQGPHQWVLQ8UEDQDQG5HJLRQDO'HYHORSPHQW3ODQV
LQFOXGLQJ *RYHUQPHQW DJHQFLHV LQGXVWULHV DQG 3XEOLF Formulation and Implementation Guidelines (URDPFI –
Sector Enterprises (PSEs) 2014) for Electric Vehicle Charging Infrastructure.

62
CHAPTER 13

PRIVATE SECTOR PARTICIPATION IN POWER SECTOR

1. POLICY ON PRIVATE SECTOR: DFFRUGHGWRWKH3URMHFWE\&($LQ+RZHYHU0R() &&


 0LQLVWU\ RI 3RZHU UHFRJQL]HV WKH IDFW WKDW SULYDWH subsequently brought out the Bichom Basin Study Report with
LQYHVWRUV KDYH LPSRUWDQW UROH WR SOD\ LQ WKH SRZHU IUHVKUHFRPPHQGDWLRQRQHÁRZWREHUHOHDVHGGRZQVWUHDP
sector growth map of India. The stipulation under RI WKH SURMHFW &RQVLGHUDWLRQ RI HÁRZ DV SHU %LFKRP %DVLQ
VHFWLRQRI(OHFWULFLW\$FWKDVSURYLGHGLPSHWXV Study Report reduces the design energy from 371 MU as
WR WKH SDUWLFLSDWLRQ RI SULYDWH VHFWRU LQ *HQHUDWLRQ SHU 7(& WR  08 &RQVLGHUDWLRQ RI HÁRZ LPSDFWV WKH
DQG 7UDQVPLVVLRQ 3URYLVLRQ RI RSHQ DFFHVV DQG WDULII FRPPHUFLDOYLDELOLW\RIWKH3URMHFWGXHWRKLJKWDULII
framework under Tariff Policy has been put in place to 9DULRXVÀQDQFLDOHQJLQHHULQJRSWLRQVZHUHH[SORUHGLQFOXGLQJ
FUHDWHDQHQDEOLQJHQYLURQPHQWIRUWKHSULYDWHLQYHVWRUV SURSRVDOIRUJUDQWVWDJJHULQJZDLYHURIIUHHSRZHUHWFIRU
 6HWWLQJXSRIDSRZHUSODQWLVDGHOLFHQVHGDFWLYLW\$V SURJUHVV RI WKH SURMHFW ZKLFK KRZHYHU FRXOG QRW PDNH DQ\
per Section 7 of the Electricity Act 2003, any generating headway.
company may establish, operate and maintain a Secretary (Power), GoI on 20.04.2018 took a meeting in
JHQHUDWLQJ VWDWLRQ ZLWKRXW REWDLQLQJ D OLFHQVH SUHVHQFH RI UHSUHVHQWDWLYHV IURP &($ *RYW RI $UXQDFKDO
permission if it complies with the technical standards Pradesh, NEEPCO, NHPC, THDC and SJVNL wherein it was
UHODWLQJWRFRQQHFWLYLW\ZLWKWKHJULG recommended inter-alia to make an internal assessment of
2. MAJOR POLICY INITIATIVES TO STREAMLINE THE the feasibility of certain projects including the Dibbin HEP by
PROCESS OF PROJECT DEVELOPMENT: WKH&368V$VLQWLPDWHGVXEVHTXHQWO\E\WKH6WDWH*RYWWKH
GHYHORSHU KDV DOUHDG\ EHHQ VHUYHG 6KRZFDXVH QRWLFHV DQG
 7RDFFHOHUDWHFDSDFLW\DGGLWLRQVHYHUDOSROLF\LQLWLDWLYHV
termination of the project is in process.
KDYH EHHQ XQGHUWDNHQ E\ 0LQLVWU\ RI 3RZHU 6RPH RI
WKHSURPLQHQWSROLFLHVZKLFKKDYHERRVWHGWKHSULYDWH NEEPCO updated the cost estimate of the Project and
SOD\HUV·FRQÀGHQFHLQWKHVHFWRUDUH assessed some amount of grant shall keep the tariff below Rs.
6.00 per unit with unaltered installed capacity and aforesaid
‡ 1DWLRQDO(OHFWULFLW\3ROLF\
UHYLVHG GHVLJQ HQHUJ\ 1((3&2 YLGH OHWWHU GDWHG 
‡ 8OWUD0HJD3RZHU3URMHFW3ROLF\ requested GoAP for allotment of the Project to NEEPCO for
‡ 0HJD3RZHU3ROLF\ GHYHORSPHQWZLWKJUDQW
‡ 7DULII3ROLF\ 1((3&2 YLGH OHWWHU GDWHG  UHTXHVWHG &($ WR
‡ 1HZ+\GUR3ROLF\ FRQÀUPWKHH[WHQWRIDSSOLFDELOLW\RIWKH7(&IRUUHYLYDORIWKH
3URMHFWZLWKDSSURYDORIJUDQWIRUXQDOWHUHGLQVWDOOHGFDSDFLW\
3. FDI in Power Sector:
DQG UHYLVHG GHVLJQ HQHUJ\ &($ FRQYHQHG D PHHWLQJ LQ WKLV
 $XWRPDWLFDSSURYDOIRUIRUHLJQHTXLW\LVSHUPLWWHG regard on 23.10.2018. As suggested in the meeting, NEEPCO
in generation, transmission, and distribution and trading on 07.02.2019 submitted cost estimates and memorandum of
in power sector without any upper ceiling on the FKDQJHVIRUWZRDOWHUQDWHPDFKLQHFRPELQDWLRQVRI[0:
TXDQWXPRILQYHVWPHQW)XUWKHUH[WDQWSROLF\SURYLGHV DQG[0:IRUWKHSURMHFWLQFRPSDULVRQZLWKWKHXSGDWHG
IRU)',XQGHUDXWRPDWLFURXWHLQ3RZHU([FKDQJHV FRVWHVWLPDWHRI[0:DW1RY·3/.6.LQLWLDWHGSURFHVV
registered under the CERC (Power Market) Regulations, IRUFDUU\LQJRXWVLWHVSHFLÀFHÁRZUHTXLUHPHQWVWXG\
 +RZHYHU ),,)3, SXUFKDVHV ZHUH UHVWULFWHG WR
Joint Secretary (Hydro) in the meeting held on 28.03.2019 at
secondary market only. It has now been decided to do
1((3&2 1HZ 'HOKL DGYLVHG .6. WR DVVHVV WKH VLWH VSHFLÀF
DZD\ ZLWK WKLV SURYLVLRQ WKHUHE\ DOORZLQJ ),,V)3,V WR
HÁRZUHTXLUHPHQWDQGFRPHXSZLWKSURSRVDOVIRUPDNLQJ
LQYHVW LQ 3RZHU ([FKDQJHV WKURXJK SULPDU\ PDUNHW DV
WKHSURMHFWYLDEOHDVSHUWKHQHZQRUPVDQG3ROLF\
well.
TRANMISSION
NEEPCO
1. Promotion of competition in the electricity industry
120 MW Dibbin HEP, Arunachal Pradesh:
LQ ,QGLD LV RQH RI WKH NH\ REMHFWLYHV RI WKH (OHFWULFLW\
1((3&2VLJQHG6KDUHKROGHUV·$JUHHPHQW 6+$ ZLWK0V.6. $FW  $V SHU WKH SURYLVLRQV XQGHU 6HFWLRQ  RI
(QHUJ\9HQWXUHV/WG .6.(9/ RQWK-XQHIRUVHWWLQJ the Electricity Act, 2003 and the Tariff Policy dated 6th
XSRI0:'LEELQ+(3LQWKH6WDWHRI$UXQDFKDO3UDGHVK January, 2006, Ministry of Power, issued “Guidelines
$Q639YL]0V.6.'LEELQ+\GUR3RZHU3YW/WG .6.'+33/  IRU (QFRXUDJLQJ &RPSHWLWLRQ LQ 'HYHORSPHQW RI
ZDVFUHDWHGLQWKLVUHJDUGEHWZHHQ1((3&2DQG.6.(9/ZLWK 7UDQVPLVVLRQ 3URMHFWVµ DQG 7DULII %DVHG &RPSHWLWLYH
HTXLW\ SDUWLFLSDWLRQ RI  DQG  UHVSHFWLYHO\ 7(& ZDV %LGGLQJ *XLGHOLQHV IRU 7UDQVPLVVLRQ 6HUYLFHVµ 7KHVH

63
Annual Report 2018-19

guidelines aim at laying down a transparent procedure NCT recommends the mode of implementation {Tariff
for facilitating competition in the transmission sector %DVHG &RPSHWLWLYH %LGGLQJ 7%&%   5HJXODWHG 7DULII
WKURXJK ZLGH SDUWLFLSDWLRQ LQ SURYLGLQJ WUDQVPLVVLRQ Mechanism (RTM)). of transmission schemes agreed in
VHUYLFHV DQG WDULII GHWHUPLQDWLRQ WKURXJK D SURFHVV RI Regional Standing Committee on Transmission (RSCTs).
WDULIIEDVHGFRPSHWLWLYHELGGLQJ Based on the recommendations of NCT, ECT allocates
the transmission projects to BPCs.
 $V HQYLVDJHG LQ WKH *XLGHOLQHV 0LQLVWU\ RI 3RZHU KDG
constituted an Empowered Committee on Transmission 6. As far as Inter-State transmission system is concerned,
to .identify inter-state transmission projects to be WLOOGDWHIRUW\RQHSURMHFWVKDYHEHHQDZDUGHGWKURXJK
GHYHORSHGWKURXJKFRPSHWLWLYHELGGLQJDQGWRRYHUVHH 7DULII %DVHG &RPSHWLWLYH %LGGLQJ RXW RI ZKLFK WZHQW\
WKH SURFHVV RI FRPSHWLWLYH ELGGLQJ 0LQLVWU\ RI 3RZHU WZR SURMHFWV KDYH DOUHDG\ EHHQ FRPPLVVLRQHGUHDG\
KDVDOVRLVVXHG6WDQGDUG%LGGLQJ'RFXPHQWV 6%'V YL] IRU FRPPLVVLRQLQJ DQG ÀIWHHQ SURMHFWV DUH XQGHU
5HTXHVW IRU 4XDOLÀFDWLRQ 5I4  5HTXHVW IRU 3URSRVDO LPSOHPHQWDWLRQ E\ YDULRXV 7UDQVPLVVLRQ 6HUYLFH
3URYLGHUV 2XW RI EDODQFH IRXU SURMHFWV RQH SURMHFW
5I3 7UDQVPLVVLRQ6HUYLFH$JUHHPHQW 76$ DQG6KDUH
has been cancelled by CERC, in one project the TSP has
3XUFKDVHDJUHHPHQW 63$ $VSURYLGHGLQWKH*XLGHOLQHV
requested for closure and construction of two projects
Ministry of Power has appointed PFC Consulting Limited
could not start due to litigation. Apart from this, there
(PFCCL) and REC Transmission Projects Company Limited
DUH WZHOYH SURMHFWV ZKLFK DUH SUHVHQWO\ XQGHU ELGGLQJ
(RECTPCL) as the Bid Process Coordinators (BPC) for
process out of which one project is currently on hold.
carrying out the bidding process.
 'HWDLOV RI WKH 6FKHPHV QRWLÀHG WKURXJK 7DULII %DVHG
 )XUWKHU 0R3 LQ FRPSOLDQFH ZLWK SURYLVLRQV ODLG GRZQ &RPSHWLWLYH%LGGLQJ 7%&%
in Tariff Policy dated 6th January, 2006 issued an O.M
a. Schemes already commissioned/ready for
RQ WK 'HFHPEHU  ZKLFK SURYLGHV WKDW VLQFH WK
commissioning by Transmission Service Providers:
January, 2011, all the ISTS transmission projects are
WR EH LPSOHPHQWHG WKURXJK WDULII EDVHG FRPSHWLWLYH 1. Transmission system for Strengthening in SR for
ELGGLQJ H[FHSW VRPH SURMHFWV DV LGHQWLÀHG E\ 0R3 Import of Power from ER.
which are to be implemented by CTU under compressed 2. ATS of Unchahar TPS
time schedule. 3. Northern Region System Strengthening Scheme,
 7KH5HYLVHG7DULII3ROLF\LVVXHGE\0LQLVWU\RI3RZHURQ NRSS-XXXI (Part-A)
WK-DQXDU\VWDWHVWKHIROORZLQJ 4. Transmission System associated with Gadarwara
Clause 5.3: The tariff of all new generation and 6736 [0: RI173&3DUW$
transmission projects of company owned or controlled 5. Transmission system associated with Gadarwara
E\ WKH &HQWUDO *RYHUQPHQW VKDOO FRQWLQXH WR EH 6736 [0: RI173& 3DUW%
GHWHUPLQHG RQ WKH EDVLV RI FRPSHWLWLYH ELGGLQJ DV 6. Transmission System Strengthening associated with
SHUWKH7DULII3ROLF\QRWLÀHGRQµ-DQXDU\XQOHVV Vindhyachal - V
RWKHUZLVHVSHFLÀHGE\WKH&HQWUDO*RYHUQPHQWRQFDVH  6\VWHPVWUHQJWKHQLQJIRU:5
to case basis.
 6\VWHPVWUHQJWKHQLQJFRPPRQIRU:5DQG15
Further, intra-state transmission projects shall be
 6FKHPHIRUHQDEOLQJLPSRUWRI1(5(5VXUSOXVE\
GHYHORSHG E\ 6WDWH *RYHUQPHQW WKURXJK FRPSHWLWLYH
NR
ELGGLQJSURFHVVIRUSURMHFWVFRVWLQJDERYHDWKUHVKROG
limit which shall be decided by the SERCs.” 10. Part ATS for RAPP U-7&8 in Rajasthan

Clause 7.1(7):´:KLOHDOO)XWWLUHLQWHUVWDWHWUDQVPLVVLRQ 11. Eastern Region System Strengthening Scheme-VII


SURMHFWV VKDOO RUGLQDULO\ EH GHYHORSHG WKURXJK 12. Northern Region System Strengthening Scheme,
FRPSHWLWLYH ELGGLQJ SURFHVV WKH &HQWUDO *RYHUQPHQW NRSS-XXIX
PD\JLYHH[HPSWLRQIURPFRPSHWLWLYHELGGLQJÅIRU D   &RQQHFWLYLW\ /LQHV IRU 0DKHVKZDUDP +\GHUDEDG 
VSHFLÀF FDWHJRU\ RI SURMHFWV RI VWUDWHJLF LPSRUWDQFH N93RROLQJ6LWV
technical upgradation etc. or (b) works required to be 14. Eastern Region Strengthening Scheme-VI (ERSS-VI)
done to cater to an urgent situation on a case to case
1S. Northern Region System Strengthening Scheme,
basis’ NRSS-XXXI (Part-B)
5. Recently, MoP has reconstituted the Empowered  7UDQVPLVVLRQ 6\VWHP UHTXLUHG IRU HYDFXDWLRQ RI
Committee on Transmission(ECT) and has also constituted SRZHU IURP .XGJL 736 [ 0: LQ 3KDVH,  RI
WKH 1DWLRQDO &RPPLWWHH RQ 7UDQVPLVVLRQ 1&7  YLGH NTPC Ltd.
RIÀFHRUGHUQR7UDQVGDWHG7KH

64
 7UDQVPLVVLRQ6\VWHPIRU3DWUDQN966 14. Eastern Region Strengthening Scheme-XXI
18. Transmission System Associated with (ERSS-XXI)
.ULVKQDSDWWQDP80336\QFKURQRXVLQWHUFRQQHFWLRQ  ,PPHGLDWHHYDFXDWLRQIRU1RUWK.DUDQSXUD ;
EHWZHHQ65DQG:5 3DUW% 0:  JHQHUDWLRQ SURMHFW RI 173& 6 &UHDWLRQ RI
19. Common Transmission System for Phase-II  N9 VXEVWDWLRQ DW 'KDQEDG3URSRVDO RI
Generation Projects in Odisha(Orissa) and JUSNL (ERSS-XIX) B
,PPHGLDWH(YDFXDWLRQ6\VWHPIRU23*& 0: 
c. Schemes under bidding process by Bid Process
Project in Odisha
Coordinators:
20. Additional System Strengthening for Sipat STPS
 &RQQHFWLYLW\ 6\VWHP IRU /DQFR 9LGDUEKD 7KHUPDO
21. Transmission system associated with IPPs of 3RZHU3YW/WG /9733/ DQG,QWHU6WDWH7UDQVPLVVLRQ
1DJDSDWWLQDP&XGGDORUH$UHD3DFNDJH$
system strengthening in Chhatarpur area in Madhya
22. Additional System Strengthening Scheme for Pradesh
Chhattisgarh IPPs - Part-B
 :HVWHUQ5HJLRQ6WUHQJWKHQLQJ6FKHPH;,; :566
b. Schemes under implementation by the
XIX) and North Eastern Region Strengthening
Transmission Service Providers
Scheme- IX (NERSS-IX)
1. North Eastern Region System Strengthening
 N98GXSL 83&/ .DVDUJRGH'&OLQH
Scheme - VI (NERSS - VI)
 :566  3DUW$ 7%&%   7UDQVPLVVLRQ 6\VWHP
2. Transmission System Strengthening in India System
for transfer of power frrim new HEPs in Bhutan VWUHQJWKHQLQJIRUUHOLHYLQJRYHUORDGLQJVREVHUYHG
in Gujarat Intra-state system due to RE injections in
3. Strengthening of Transmission System beyond
Bhuj PS
Vemagiri
4. System Strengthening Scheme in Northern Region  :566  3DUW% 7UDQVPLVVLRQ 6\VWHP
(NRSS-XXXVI)” along with LILO of Sikar-Neemrana VWUHQJWKHQLQJIRUUHOLHYLQJRYHUORDGLQJVREVHUYHG
N9'&OLQHDW%DEDL 55931/ in Gujarat Intra-state system due to RE injections in
Bhuj PS
5. System strengthening for IPPs in Chhattisgarh and
RWKHUJHQHUDWLRQSURMHFWVLQ:HVWHUQ5HJLRQ 6. Transmission system associated with RE generations
6. Additional inter-Regional AC link for import into at Bhuj -II, Dwarka & Lakadia
6RXWKHUQ 5HJLRQ LH :DURUD  :DUDQJDO DQG  7UDQVPLVVLRQ 6\VWHP IRU SURYLGLQJ FRQQHFWLYLW\ WR
&KLODNDOXULSHWD+\GHUDEDG.XUQRRON9OLQN 5(SURMHFWVDW%KXM,, 0: LQ*XMDUDW
7. Creation of new 400kV GIS Substations in Gurgaon  -DP.KDPEDOL\D3RROLQJ6WDWLRQDQG,QWHUFRQQHFWLRQ
and Palwal area as a part of ISTS RI -DP .KDPEDOL\D 3RROLQJ 6WDWLRQ IRU SURYLGLQJ
8. Transmission system for NERSS-II Part B and FRQQHFWLYLW\ WR 5( SURMHFWV  0:  LQ 'ZDUND
NERSS-V *XMDUDW   ,QVWDOODWLRQ RI  N9 ,&7 DORQJ
 7UDQVPLVVLRQ 6\VWHP 6WUHQJWKHQLQJ LQ :5 ZLWKDVVRFLDWHGED\VDW0V&*3/6ZLWFK\DUG
DVVRFLDWHGZLWK.KDUJRQH733 0: 9. Transmission system associated with LTA
10. 765 kV System Strengthening Scheme in Eastern applications from Rajasthan SEZ Part-B
Region (ERSS-XVIII) 11.Additional 400 kV feed to
10. Transmission system associated with LTA
*RD LL  $GGLWLRQDO 6\VWHP IRU 3RZHU (YDFXDWLRQ
applications from Rajasthan SEZ Part-C
from Generation Projects pooled at Raigarh
(Tamnar) Pool 11. Transmission system associated with LTA
 1HZ:515N9,QWHUUHJLRQDOFRUULGRU applications from Rajasthan SEZ Part-D

13. Transmission system for Ultra Mega Solar Park in  &RQVWUXFWLRQ RI $MPHU 3* 3KDJL  N9 'F OLQH
Fatehgarh,distt. Jaisalmer Rajasthan along with associated bays for Rajasthan SEZ

65
Annual Report 2018-19

*URXSSKRWRRI,QGLDQDQG8.GHOHJDWLRQ

66
CHAPTER 14

INTERNATIONAL CO-OPERATION
InternDWLRQDO &RRSHUDWLRQ 'LYLVLRQ ZRUNV IRU HQKDQFLQJ BILATERAL COOPERATION
&RRSHUDWLRQ ZLWK YDULRXV FRXQWULHV LQ WKH 3RZHU 6HFWRU
BANGLADESH
$FWLYH LQWHUHVW KDV EHHQ WDNHQ LQ HQKDQFHPHQW RI %LODWHUDO
Cooperation with Bangladesh, Bhutan, Nepal, Japan, Germany, $Q0R8EHWZHHQWKH*RYWRIWKH5HSXEOLFRI,QGLDDQGWKH
8QLWHG.LQJGRP86$'HQPDUNHWF0XOWLODWHUDOHQJDJHPHQWV *RYWRIWKH3HRSOH·V5HSXEOLFRI%DQJODGHVKRQ&RRSHUDWLRQ
in Power Sector was signed on 11th January, 2010.
under the umbrellas of SAARC, Clean Energy Ministerial
(CEM), International Energy Agency (IEA) and BRICS were also Bangladesh has been connected with both Eastern and North
undertaken. (DVWHUQ 5HJLRQ RI ,QGLD DQG WRWDO SRZHU XSWR  0: LV
being transferred from India to Bangladesh.
5HSUHVHQWDWLYHV RI PDQ\ FRXQWULHV UHJXODUO\ YLVLW 0LQLVWU\ RI
3RZHUZKLFKGHPRQVWUDWHVWKHLUFRQÀGHQFHLQWKHSROLFLHVRI A high capacity cross border interconnection between India
power sector in India. and Bangladesh through Baharampur (India) - Bheramara
%DQJODGHVK N9'FOLQHDORQJZLWKD+9'&%DFNWR%DFN
7KH IROORZLQJ KLJK OHYHO YLVLWV ZHUH XQGHUWDNHQ GXULQJ
terminal at Bheramara, which facilitates transfer up to 1000
 0:SRZHUWR%DQJODGHVK
L  6HFUHWDU\ 3RZHU  YLVLWHG 0\DQPDU GXULQJ  $SULO Further, additional cross border interconnection between India
2018 to participate in the 2nd meeting of India – and Bangladesh through Surjyamaninagar in Tripura (India) to
Myanmar Joint Steering Committee and 1st meeting of North Comilla (Bangladesh) – South Comilla (Bangladesh) 400
-RLQW:RUNLQJ*URXS N9'FOLQN SUHVHQWO\RSHUDWHGDWN9 RSHUDWLQJLQUDGLDO
PRGH IRU LPSRUW XS WR  0: SRZHU IURP 7ULSXUD VLGH RI
LL  6HFUHWDU\ 3RZHU  YLVLWHG 7KDLODQG GXULQJ 
India to the Eastern side of Bangladesh is in operation since
June, 2018 to participate in the 7th South Asia Power
March, 2016.
Secretaries Roundtable.
NEPAL
LLL  +RQ·EOH0LQLVWHURI6WDWH ,& IRU3RZHUDQG15(YLVLWHG
South Africa during 28-29 June, 2018 to participate in $Q$JUHHPHQWEHWZHHQWKH*RYWRI1HSDODQGWKH*RYWRI
the 3rd meeting of BRICS Energy Ministerial. the Republic of India on Electric Power Trade, Cross – Border
7UDQVPLVVLRQLQWHUFRQQHFWLRQDQGJULGFRQQHFWLYLW\ZDVVLJQHG
LY  6HFUHWDU\ 3RZHU YLVLWHG6UL/DQNDGXULQJ-XO\
on 21st October, 2014.
WR SDUWLFLSDWH LQ WKH UG PHHWLQJ -RLQW :RUNLQJ *URXS
between India and Sri Lanka on Power Sector. $W SUHVHQW 1HSDO LV GUDZLQJ DERXW  0: RI SRZHU IURP
,QGLD WKURXJK N9 N9  N9 YROWDJH OHYHO WUDQVPLVVLRQ
Y  6HFUHWDU\ 3RZHU  YLVLWHG %DQJODGHVK GXULQJ ² lines connecting with state grids of UP, Uttarakhand& Bihar
September, 2018 to participate in the 15th meeting Joint DQG'KDONHEDU 1HSDO ²0X]DIIDUSXU ,QGLD N9'&OLQH
6WHHULQJ &RPPLWWHH -RLQW :RUNLQJ *URXS EHWZHHQ (presently operating at 220 kV), which was commissioned in
India and Bangladesh. Feb’16 for transfer of bulk power between the two countries.
YL  6HFUHWDU\ 3RZHU YLVLWHG,WDO\GXULQJ2FWREHU :LWK XSJUDGDWLRQ RI 'KDONHEDU0X]]DIDUSXU N9 'F OLQH
WRSDUWLFLSDWHLQWKHPHHWLQJRI:RUOG(QHUJ\&RQJUHVV WRLWVUDWHGYROWDJH SUHVHQWO\RSHUDWLQJDW.9 WKHH[SRUW
RI SRZHU ZRXOG LQFUHDVH IXUWKHU E\ DURXQG  0: WR
YLL  +RQ·EOH0LQLVWHURI6WDWH ,& IRU3RZHUDQG15(YLVLWHG
Nepal.
WKH8.GXULQJ6HSWHPEHUWRSDUWLFLSDWHLQ
WKH (OHFWULF 9HKLFOH 6XPPLW DQG WKH ,QGLD ² 8. (QHUJ\ BHUTAN
Dialogue. $Q$JUHHPHQWEHWZHHQWKH*RYWRIWKH5HSXEOLFRI,QGLDDQG
YLLL  6HFUHWDU\ 3RZHU  YLVLWHG +DUYDUG 8QLYHUVLW\ 86$ WKH5R\DO*RYWRI%KXWDQFRQFHUQLQJ&RRSHUDWLRQLQWKHÀHOG
during 16-19 February, 2019 to participate in the India of Hydroelectric Power was signed on 28th July, 2006.
Conference 2019. ,QGLD DQG %KXWDQ DOUHDG\ KDYH H[LVWLQJ DUUDQJHPHQWV IRU

67
Annual Report 2018-19

H[FKDQJHRISower. Bulk power generated at Tala HEP (1020 The IGEF is co-chaired by the Secretary (Power) from the
0:  &KXNKD +(3  0:  DQG .XULFKX +(3  0:  LQ Indian side and the Parliamentary Secretary, Federal Ministry
%KXWDQLVEHLQJH[SRUWHGWR,QGLDWKURXJKN9N9DQG IRU(FRQRPLF$IIDLUV (QHUJ\ %0:L IURPWKH*HUPDQVLGH
N9 OLQHV UHVSHFWLYHO\ 3UHVHQWO\ DERXW  0: SRZHU The meetings of the Forum are held alternately in Germany
IURPWKHH[LVWLQJK\GURSURMHFWVLQ%KXWDQLVEHLQJLPSRUWHG and India. Two of the four Sub-Groups under the IGEF are
to India from Bhutan. steered by Ministry of Power.

7KHH[SHFWHGLPSRUWFDSDFLW\IURP%KXWDQZRXOGLQFUHDVHE\ )ROORZLQJIRXU6XE*URXSVKDYHEHHQFRQVWLWXWHGXQGHUWKH
DERXW  0: E\  IURP YDULRXV XSFRPLQJ +\GUR )RUXP
Electric power plant (HEPs) in Bhutan like Mangdechu (720
L  6XE *URXS, ´(IÀFLHQF\ (QKDQFHPHQW LQ )RVVLO )XHO
0: 3XQDWVDQJFKX, 0: DQG3XQDWVDQJFKX,, 
based Power Plants” [co-chaired by JS (Thermal)]
0: +(3VHWF
LL  6XE*URXS,,´5HQHZDEOH(QHUJLHVµ>FRFKDLUHGE\-6
MYANMAR
MNRE]
$Q0R8EHWZHHQWKH*RYWRIWKH5HSXEOLFRI,QGLDDQGWKH
LLL  6XE*URXS,,,´'HPDQGVLGHHQHUJ\HIÀFLHQF\DQGORZ
*RYWRIWKH5HSXEOLFRIWKH8QLRQRI0\DQPDURQ&RRSHUDWLRQ
carbon growth strategies” [co-chaired by DG, BEE]
LQWKHÀHOGRI3RZHU6HFWRUZDVVLJQHGRQWK2FWREHU
LY  6XE*URXS,9´*UHHQ(QHUJ\&RUULGRUVµ>FRFKDLUHGE\
,QGLDLVSURYLGLQJDERXW0:RISRZHU VLQFH$SULO 
JS (ABC), DEA]
from Manipur (India) to Myanmar through 11 kV transmission
line from Moreh in Manipur (India) to Tomu town in Myanmar Out of these, the Sub-Group - I and III are handled by Ministry
of Power.
SRI LANKA
6XE*URXS,´(IÀFLHQF\(QKDQFHPHQWLQ)RVVLO)XHOEDVHG
7ULQFRPDOHH 3RZHU &RPSDQ\ /WG 73&/  LV D MRLQW YHQWXUH
Power Plants”
Company between NTPC Ltd. and Ceylon Electricity Board,
Sri Lanka (CEB) incorporated in Sri Lanka on September 26, The last meeting of the Sub Group I was held on 11.04.2019 in
2011. NTPC and CEB each hold 50% equity share capital of *HUPDQ\7KHVXPPDU\RIGHFLVLRQVWDNHQLVDVXQGHU
the Company.
‡ )OH[LELOLVDWLRQ RI FRDO ÀUHG SRZHU SODQWV WR DGDSW WR
This Joint Venture Company was formed to undertake the ÁXFWXDWLQJ UHQHZDEOH HQHUJ\ JHQHUDWLRQ UHPDLQV
GHYHORSPHQW FRQVWUXFWLRQ HVWDEOLVKPHQW RSHUDWLRQ DQG D SULRULW\ UHOHYDQW HQHUJ\ LVVXH IRU WKH ZRUN RI WKLV
PDLQWHQDQFH RI FRDO EDVHG WKHUPDO SRZHU SODQW RI  0: subgroup,
[0: FDSDFLW\DW7ULQFRPDOHHLQ6UL/DQND
‡ 7DVN IRUFH WR HQVXUH VSHHG\ LPSOHPHQWDWLRQ RI
)XUWKHU *RYHUQPHQW RI 6UL /DQND *R6/  KDV UHTXHVWHG *R, UHFRPPHQGDWLRQVDVVXJJHVWHGE\066LHPHQVLQYLHZ
IRUFKDQJLQJIXHOVRXUFHVWR/LTXHÀHG1DWXUDO*DV /1* DQG RI7HVWUXQFRPSOHWHGDWRQHRI173&SODQW'$'5,8
IRUUHORFDWLQJWKH3URMHFWDW.HUDZDOSLWL\D7KHVDPHKDVEHHQ 0: IRUPLQLPXPORDGRSHUDWLRQDWORDGDQG
agreed by GoI. higher ramp test run.

*R6/KDVLVVXHGOHWWHURILQWHQWWR*R,IRUGHYHORSPHQWRI ‡ 'HSOR\PHQW RI )OH[SHUWV IURP 9*% IRU IDFLOLWDWLRQ


0: /1* SURMHFW DQG  0: VRODU SURMHFW 5HYLVHG 3URMHFW RI FRPPLVVLRQLQJ DFWLYLWLHV OLNH LQVWDOODWLRQ RI PLOO
$JUHHPHQWVDUHXQGHUÀQDOLVDWLRQ scheduler, automatic start of pump and fans.

GERMANY ‡ ,QSXW IRU 5HJXODWRU\ DVSHFWV RI ÁH[LELOLVDWLRQ DUH LQ


SODFHDQGÀQDOIUDPHZRUNLVH[SHFWHG
The Indo-German Energy Forum (IGEF) has been established
LQDVDQLQVWLWXWLRQDOL]HGHQHUJ\GLDORJXHZLWKWKHDLPRI ‡ 1HZ HPLVVLRQ VWDQGDUGV KDYH D KLJK LPSDFW RQ WKH
promoting Indo-German co-operation in the areas of energy energy security of India and power generator like
VHFXULW\ HQHUJ\ HIÀFLHQF\ LQFOXGLQJ HQHUJ\ FRQVHUYDWLRQ NTPC is taking concrete steps in installing DE-SOX and
UHQHZDEOH HQHUJ\ LQYHVWPHQW LQ HQHUJ\ SURMHFWV DQG DE-NOX SODQWV DSDUW IURP UHQRYDWLQJ (63V WR KDQGOH
FROODERUDWLYH UHVHDUFK DQG GHYHORSPHQW WDNLQJ LQWR DFFRXQW KLJK IXJLWLYH DVK FRQWURO ,*() DQG 9*% ZLOO PXWXDOO\
the enYLURQPHQWDOFKDOOHQJHVRIVXVWDLQDEOHGHYHORSPHQW share its learning.

68
‡ 0DLQWDLQLQJKLJKHVWHPLVVLRQQRUPVZLOOEHWKHFKDOOHQJH RSHUDWLRQDO DQG PDUNHW LQWHUYHQWLRQV IRU WKH ODUJHVW
under low load and frequent load following conditions HQHUJ\DQGFDUERQVDYLQJVLQFRROLQJ
but NTPC will comply with the norms by adhering to
‡ 5HSRUWODXQFKHGRQ¶(QHUJ\(IÀFLHQF\3RWHQWLDOLQ,QGLD·
standard operating practices.
ZKLFK XQGHUOLQHG WKH SRWHQWLDO RI VDYLQJ HQHUJ\ DQG
‡ 2QHPRUHZRUNVKRSIRUVWDWH*HQFRVDQG,336PD\EH JUHHQKRXVH JDV HPLVVLRQV WKURXJK HQHUJ\ HIÀFLHQF\
carried out in cooperation of IGEF, VGB, EEC. measures.

6XE *URXS,,, ´'HPDQG VLGH HQHUJ\ HIÀFLHQF\ DQG ORZ ‡ &RRUGLQDWLRQ RI ZRUNLQJ JURXS WR VXSSRUW %(( GDWD
carbon growth strategies” YLVXDOLVDWLRQ SURMHFW LPSOHPHQWHG E\ :RUOG 5HVRXUFH
,QVWLWXWH :5, LVRQJRLQJDQGZLOOEHODXQFKHGVRRQ
$FWLYLWLHVXQGHUWKHIUDPHZRUNRI6XE*URXS²,,,DUHDVXQGHU
JAPAN
‡ 7KH RSSRUWXQLWLHV IRU FRPELQHG KHDW DQG SRZHU
generation has been discussed since a long time and The cooperation with Japan in the energy sector is steered
now with the cooperation of GIZ, a demo trigeneration XQGHU WKH ,QGR ² -DSDQ (QHUJ\ 'LDORJXH 7KHUH DUH ÀYH
SODQWZDVVHWXSDWWKH-DL3UDNDVK1DUD\DQ$SH[7UDXPD :RUNLQJ *URXSV XQGHU WKH ,QGLD ² -DSDQ (QHUJ\ 'LDORJXH
Center, New Delhi. namely,

‡ ,Q WKH UHVLGHQWLDO EXLOGLQJV VHFWRU )UDXQKRIHU LQVWLWXWH o Electricity & Power Generation;
DQG 7(5, MRLQWO\ GHYHORSHG DQ HQHUJ\ SHUIRUPDQFH
R (QHUJ\(IÀFLHQF\
DVVHVVPHQW WRRO ZKLFK FDOFXODWHV HQHUJ\ VDYLQJV
SRWHQWLDO IRU YDULRXV HQHUJ\ HIÀFLHQF\ PHDVXUHV LQ WKH o Coal;
residential buildings in India. o Renewable Energy;
‡ )RU GHYHORSLQJ DQ LQWHUQDWLRQDO LQWHUQHWEDVHG o Petroleum and Natural Gas
NQRZOHGJH SODWIRUP IRU HQHUJ\ HIÀFLHQF\ LQ YDULRXV
ÀHOGV WKH *HUPDQ VLGH KDV WDNHQ DQ LQLWLDWLYH QDPHG The 9th meeting of the India – Japan Energy Dialogue was held
bigEE which means “Bridging the Information Gap on on 1st May, 2018 in New Delhi. Both the ministers appreciated
(QHUJ\(IÀFLHQF\µ WKHUHOHYDQFHRIWKHJULGVWDELOLW\JLYHQWKHKLJKSHQHWUDWLRQ
RIYDULDEOHUHQHZDEOHHQHUJ\%RWKFRXQWULHVDJUHHGWRLQLWLDWH
‡ 'HHS'LYH:RUNVKRSRQ´&RROLQJ'HPDQGDQG(QHUJ\ WKHGLVFXVVLRQWRZDUGVGHYHORSPHQWRI(OHFWULF9HKLFOHV (9V 
(IÀFLHQF\ 3RWHQWLDO RI ,QGLDµ KHOG LQ 1HZ'HOKL LQ A Joint Statement, stating our mutual areas of cooperation,
December 2017. was also signed after the Dialogue.
‡ ,QGR*HUPDQ%XVLQHVV5RXQGWDEOHRQ´)XWXUH%XVLQHVV
2SSRUWXQLWLHV LQ (QHUJ\ (IÀFLHQF\µ LQ 1HZ'HOKL ZLWK
IRFXVRQPDUNHWDQGWHFKQRORJ\GHYHORSPHQWLQFRROLQJ
DV ZHOO DV HQHUJ\ HIÀFLHQW EXLOGLQJ PDWHULDOV KHOG LQ
December 2017.

‡ $FWLYH SDUWLFLSDWLRQ RI &R&KDLUV DW RIÀFLDO VLGH HYHQW


RI 1DWLRQDO (QHUJ\ (IÀFLHQF\ 'D\ ´(QKDQFLQJ (QHUJ\
(IÀFLHQF\ $ 6WHS WRZDUGV 6XVWDLQDEOH 'HYHORSPHQWµ
RUJDQL]HG E\ %(( ZLWK LQSXW RQ (QHUJ\ (IÀFLHQF\
through Networking and NAPE (National Action Plan on
(QHUJ\(IÀFLHQF\LQ*HUPDQ\ LQ'HFHPEHU

‡ 5HSRUW ODXQFKHG RQ ¶'HPDQG $QDO\VLV IRU &RROLQJ E\


6HFWRU LQ ,QGLD LQ · LQ 2FWREHU  ,W H[SORUHV
7KH0LQLVWHURI6WDWH O& IRU3RZHUDQG15(0U5DM.XPDU
India’s cooling demand in buildings, mobile air- Singh and the Minister of Economy, Trade and Industry,
conditioning, refrigeration, cold-chain and process -DSDQ0U+LURVKLJH6HNRH[FKDQJLQJWKH-RLQW6WDWHPHQWDW
FRROLQJ LQ LQGXVWULHV DQG LGHQWLÀHV NH\ WHFKQRORJLFDO the 9th Japan -India Energy dialogue

69
Annual Report 2018-19

An Indian delegation led by Joint Secretary (Thermal & IC) An Indian delegation led by Hon’ble Minister of State (IC)
participated in the Electric Vehicle Summit (EVS 31) and the IRU 3RZHU DQG 15( YLVLWHG 8QLWHG .LQJGRP GXULQJ 
PHHWLQJ RI WKH -RLQW :RUNLQJ *URXS RQ (OHFWULFLW\ XQGHU September, 2018 to participate in the Zero Emissions Vehicles
the India – Japan Energy Dialogue) in Japan during 30th =(9 6XPPLWDQGWKH,QGLD²8.(QHUJ\IRU*URZWK'LDORJXH
September 2018 to 3rd October, 2018. 7KH PHHWLQJ RI WKH -RLQW :RUNLQJ *URXS -:*  RQ 3RZHU
XQGHUWKHGLDORJXHZDVDOVRKHOGRQLQWKH8.

During the dialogue, the on-going Power Sector Reform (PSR)


SURJUDPPHZDVUHYLHZHG7KH-:*UHYLHZHGWKHSURJUHVVRI
ZRUNGRQHE\WKH7DVN)RUFHVRQ8WLOLW\DQG(QHUJ\(IÀFLHQF\
DQGDUHDVRIIXWXUHFRRSHUDWLRQZHUHLGHQWLÀHG

UNITED STATES OF AMERICA

$Q0R8EHWZHHQWKH*RYWRIWKH5HSXEOLFRI,QGLDDQGWKH
*RYWRIWKH8QLWHG6WDWHVRI$PHULFDWRHQKDQFHFRRSHUDWLRQ
on Energy Security, Clean Energy and Climate Change was
signed on 2nd June, 2016.

The cooperation between India and the US in the Power


sector is under the umbrella of US – India Strategic Energy
Indian Delegation with H.E. the Ambassador of India to Japan
3DUWQHUVKLS 7KH 6(3 KDV IRXU SLOODUV YL] 2LO  *DV 3RZHU
'LVFXVVLRQV ZHUHKHOGRQGHYHORSLQJD5RDG0DSIRU,QGLD  (QHUJ\ (IÀFLHQF\ &OHDQ  5HQHZDEOH (QHUJ\ 6XVWDLQDEOH
-DSDQFRRSHUDWLRQRQ,QWHJUDWLQJYDULDEOH5(DQG(9FKDUJLQJ *URZWK 7KH SLOODU RQ 3RZHU  (QHUJ\ (IÀFLHQF\ LV OHG E\
systems into Power System. Options and way forward for the Ministry of Power.
same were deliberated. Further, the on-going cooperation
7KH ÀUVW PHHWLQJ RI 86 ² ,QGLD 6WUDWHJLF (QHUJ\ 3DUWQHUVKLS
DFWLYLWLHV EHWZHHQ ,QGLD DQG -DSDQ ² LQFOXGLQJ GHVLJQLQJ RI
was held on 17th April, 2018 in India which was chaired by
DQFLOODU\PDUNHWLPSURYLQJHOHFWULFLW\TXDOLW\7 'ORVVHVJULG
stability, energy storage, pumped storage were also discussed. US Secretary of Energy Mr. Rick Perry and Indian Minister of
P&NG Shri Dharmendra Pradhan. Both the Ministers took
UNITED KINGDOM VWRFN RI WKH RQJRLQJ DFWLYLWLHV XQGHU WKH GLIIHUHQW SLOODUV RI
A Memorandum of Understanding in the Energy Sector with the SEP.
WKH8.*RYWZDVVLJQHGRQWKHVLGHOLQHVRIWKHYLVLWRI+RQ·EOH
The priority areas of cooperation under the Power & Energy
30WR8.LQ1RYHPEHU
(IÀFLHQF\ SLOODU WR EH WDNHQ XS ZLWK WKH 86 VLGH KDYH EHHQ
ÀQDOL]HGLQFRQVXltation with all the stakeholders.

MULTILATERAL COOPERATION:
INTERNATIONAL ENERGY AGENCY (IEA)

The International Energy Agency (IEA) is an autonomous


RUJDQL]DWLRQZKLFKZDVVHWXSLQUHVSRQVHWRWKHRLO
crisis. The oil crisis was the result of an embargo imposed on
the USA by OPEC in retaliation for the US decision to support
Israel during the Arab-Israel war. The nodal Ministry dealing
ZLWK,($LQWKH*RYHUQPHQWRI,QGLDLVWKH0LQLVWU\RI3RZHU

,QGLD EHFDPH D SDUWQHU FRXQWU\ RI ,($ LQ 1RYHPEHU 


5W+RQ·EOH*UHJ&ODUN8QLWHG.LQJGRP·V6HFUHWDU\RI6WDWHIRU India has been a partner country until March 30, 2017 and
Business, Energy and Industrial Strategy welcoming Hon’ble cooperation with IEA has been through the Joint Statement
0LQLVWHURI6WDWH ,& IRU3RZHUDQG15(6KUL5.6LQJKGXULQJ and joint schedule of actions, agreed during the IEA Ministerial
WKH,QGLD8.(QHUJ\IRU*URZWK'LDORJXH/RQGRQ8.

70
HYHU\ WZR \HDUV 2Q WK 0DUFK  ,QGLD DQQRXQFHG WKH 26 members. The CEM focuses on three global climate and
DFWLYDWLRQRI´$VVRFLDWLRQµVWDWXVZLWKWKH,QWHUQDWLRQDO(QHUJ\ HQHUJ\SROLF\JRDOV
Agency (IEA).
‡ ,PSURYHHQHUJ\HIÀFLHQF\ZRUOGZLGH
7KH 0LQLVWU\ LV FRQVLGHULQJ DQ LQYLWH WR ,QGLD IRU D PHHWLQJ
‡ (QKDQFHFOHDQHQHUJ\VXSSO\
with the IEA Board Members to discuss the possibility of India
EHFRPLQJDIXOOÁHGJHGPHPEHURI,($$FFRUGLQJWR'U%LURO ‡ ([SDQGFOHDQHQHUJ\DFFHVV
WKLVLVWKHÀUVWWLPHLQWKHKLVWRU\RI,($WKDWDQRQPHPEHU ,QGLDLVSDUWLFLSDWLQJLQWKHIROORZLQJLQLWLDWLYHVXQGHU&(0
FRXQWU\KDVEHHQLQYLWHGIRUDPHHWLQJZLWKWKH%RDUGRI,($
‡ 7KH 6XSHU(IÀFLHQW (TXLSPHQW DQG $SSOLDQFH
BRICS 'HSOR\PHQW 6($' ,QLWLDWLYH
$ 0HPRUDQGXP RI 0XWXDO 8QGHUVWDQGLQJ LQ HQHUJ\ VDYLQJ ‡ (OHFWULF9HKLFOHV (9, 
DQGHQHUJ\HIÀFLHQF\DPRQJWKHPLQLVWULHVDQGJRYHUQPHQWDO
DJHQFLHVRI%5,&6UHVSRQVLEOHIRUHQHUJ\DQGHQHUJ\HIÀFLHQF\ ‡ (QHUJ\0DQDJHPHQW:RUNLQJ*URXS (0:* 
ZDVVLJQHGLQ1RYHPEHU ‡ 7KHVW&HQWXU\3RZHU3DUWQHUVKLS
+RQ·EOH 0LQLVWHU RI 6WDWH ,&  IRU 3RZHU DQG 15( YLVLWHG ‡ 7KH,QWHUQDWLRQDO6PDUW*ULG$FWLRQ1HWZRUN ,6*$1 
South Africa during 28-29 June, 2018 to participate in the
3rd meeting of BRICS Energy Ministerial. Members agreed ‡ 7KH0XOWLODWHUDO6RODUDQG:LQG:RUNLQJ*URXS
WR HVWDEOLVK D %5,&6 &RPPLWWHH RI 6HQLRU (QHUJ\ 2IÀFLDOV ‡ 7KH&OHDQ(QHUJ\6ROXWLRQV&HQWHU
WR FRRUGLQDWH DQG HOHYDWH HQHUJ\ FRRSHUDWLRQ DFWLYLWLHV DQG
‡ $GYDQFHG&RROLQJ&KDOOHQJH
LPSOHPHQWDWLRQLQDPDQQHUWKDWDGYDQFHVLQWUD%5,&6HQHUJ\
VHFXULW\DQGWUDQVLWLRQLQJWRPRUHHQYLURQPHQWDOO\VXVWDLQDEOH ‡ $FFHOHUDWLQJWKH$GRSWLRQRI'LVWULEXWHG*HQHUDWLRQLQ
energy systems. Strategic regions.

CLEAN ENERGY MINISTERIAL (CEM) ‡ (9#FDPSDLJQ

&OHDQ (QHUJ\ 0LQLVWHULDO &(0  LV D KLJK OHYHO JOREDO IRUXP ‡ $GYDQFHG3RZHU3ODQW)OH[LELOLVDWLRQFDPSDLJQ
created since 2009, initially with the support from US-
7KHQH[W WK &OHDQ(QHUJ\0LQLVWHULDO &(0 LVVFKHGXOHG
Department of Energy to share lessons learnt and best
WR EH KHOG 9DQFRXYHU %ULWLVK &ROXPELD &DQDGD IURP 
practices, and to encourage the transition to a global clean
May, 2019. A delegation led by Secretary (Power) is proposed
energy economy. It was announced during the United
to participate in the same.
1DWLRQV)UDPHZRUN&RQYHQWLRQRQ&OLPDWH&KDQJH 81)&&& 
conference in Copenhagen in December 2009, by the then INTERNATIONAL FUNDING
86 6HFUHWDU\ RI (QHUJ\ ZKR DOVR KRVWHG WKH ÀUVW &(0 7KH
/LVW RI SURMHFWV DSSURYHG E\ 0LQLVWU\ RI 3RZHU IRU IRUHLJQ
CEM is currently the only regular meeting of energy Ministers
IXQGLQJ ORDQJUDQW LQ)<
IRFXVHG H[FOXVLYHO\ RQ FOHDQ HQHUJ\ 7KH &(0 SUHVHQWO\ KDV

Sr. Name of the Project Govt/Implementing Project cost Loan Amount


No. Agency (in Crore) (in Crore)
1. Uttarakhand Transmission Strengthening and
'LVWULEXWLRQ,PSURYHPHQW3URJUDP *RYWRI8WWDUDNKDQG 1754 1403

2. Proposal for 2nd Line of Credit for US$ 500 million


IURP$VLDQ'HYHORSPHQW%DQN EESL 6981 3490.5

3. 8WWDU3UDGHVK3RZHU6HFWRU,PSURYHPHQW3URMHFW *RYWRI83 9400 6400


4. Enhancement of Intra State Transmission System of *RYWRI$VVDP 3857.71 3185.73
Assam

71
Annual Report 2018-19

5. High Voltage Distribution System (HVDS) &


other power distribution system strengthening *RYWRI0DKDUDVKWUD 5048 2248
implementation program in Maharashtra
6. Assam Distribution System Enhancement and Loss
Reduction *RYWRI$VVDP 3284.04 2627.23

7. ¶%DQJDORUH6PDUW(QHUJ\(IÀFLHQW3RZHU'LVWULEXWLRQ
3URMHFW·E\*RYWRI.DUQDWDNDZLWKH[WHUQDODVVLVWDQFH *RYWRI.DUQDWDND 1917.68 710
from ADB
8. 0HJKDOD\D3RZHU6HFWRU,PSURYHPHQW3URMHFW *RYWRI0HJKDOD\D 1172.10 937.68
(A) Total Amount (in crores) 33,414.53 21,002

9. -,&$*UDQWDVVLVWDQFHIRULPSURYHPHQWRI3RZHU
Supply in Andaman and Nicobar Islands through Andaman & Nicobar Grant Grant
WKHLQVWDOODWLRQRI0:'*VHWV0:K%DWWHU\ Admn.
system + SCADA
10. /RDQ$JUHHPHQWRQ5HQRYDWLRQ0RGHUQL]DWLRQ 
Upgradation of UmiamUmtru Stage-III HEP” for JICA Meghalaya 408 326.4
ODA loan under FY 2018-19
11. 0:7XUJD3XPSHG6WRUDJH3URMHFW :HVW%HQJDO 6922 5001
[0:
(B) Total (In crore) 7330 5327.4

12. 5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ2'$RI(XUR
PLOOLRQIURP.I:WRVXSSRUW5HQHZDEOHHQHUJ\
GHYHORSPHQWXQGHU,QGR*HUPDQ'HYHORSPHQW REC 2000 1500
Cooperation
13. REC project proposal of Euro 200 million RIL from
.I:WRVXSSRUW(QHUJ\(IÀFLHQF\LQLWLDWLYHVRI8WWDU
Pradesh State Power Utilities under Indo-German REC 4500 1500
'HYHORSPHQW&RRSHUDWLRQ
(C )Total (In crore) 6500 3000
14. :RUOG%DQN/RDQ$VVLVWDQFHIRU'LVWULEXWLRQ :HVW%HQJDO 2825.54 1988.38
Network Strengthening with HVDS, LT AB cabling,
Underground cabling & creation of IT backbone for
$0,DQG6&$'$XQGHU:HVW%HQJDO6WDWH(OHFWULFLW\
'LVWULEXWLRQ&RPSDQ\/LPLWHG :%6('&/ 
15. Non-Lending Technical Assistance (NLTA) support Punjab - -
IURPWKH:RUOG%DQNIRULPSOHPHQWDWLRQRI'LUHFW
%HQHÀW7UDQVIHUIRU(OHFWULFLW\ '%7( 3LORWLQ3XQMDE
regarding.
(D) Total in Crores 2825.54 1988.38
Total A+ B+C+D (In crores) 50,070.07 33,317.78

72
CHAPTER 15

POWER DEVELOPMENT ACTIVITIES IN NORTH EASTERN REGION


NEEPCO

7KHYDULRXVSRZHUSURMHFWVEHLQJGHYHORSHGE\1((3&2LQWKH1(5HJLRQDUHDVXQGHU

PROJECTS UNDER CONSTRUCTION:

Sl. No. Name of the Project State Installed Capacity Anticipated Commissioning
(MW)
1. .DPHQJ+(3URMHFW Arunachal Pradesh 600 Unit I & II-August’ 2019
Unit-III & IV- Decmber’ 2019
T O TA L 600

FUTURE PROJECTS PLANNED BY NEEPCO ON OWNERSHIP BASIS:

Sl. No. Name of the Project State Installed Capacity (MW)


Hydro
1. :DK8PLDP6W,,,+(3 Meghalaya 85
2. :DK8PLDP6W,+(3 Meghalaya 50
3. :DK8PLDP6W,,+(3 Meghalaya 100
Hydro Total 235

FUTURE PROJECTS PLANNED BY NEEPCO THROUGH JOINT VENTURE BASIS:

Sl. No. Name of the Project State Installed Capacity (MW)


Hydro
1. .XUXQJ+(3 Arunachal Pradesh 330
2. Dibbin HEP Arunachal Pradesh 120
3. 6LDQJ8SSHU6W,,+(3 Arunachal Pradesh 3750
Total Joint Venture 4200

# Note: MoP vide Letter Dtd.18th Nov’15 communicated its decision to put on hold the works on Siang upper Stage II HE Project.

SJVN

In terms of hydro power, the North Eastern Region has huge hydro potential i.e. around 40% of the country’s total hydro
potential. Additionally, the Region also has abundant resource of coal, oil and gas for thermal power generation. In spite of such
huge potential the Region ranks lowest in the country in terms of per capita energy consumption. This has been mainly due to
inhospitable climatic conditions, remote location and inaccessibility of geographical locations.

+RZHYHUZLWKFRQWLQXDOLPSURYHPHQWRILQIUDVWUXFWXUHDQGFRPPXQLFDWLRQIDFLOLWLHVWKH1RUWK(DVWUHJLRQVWDQGVWREHFRPH
WKH3RZHU+RXVHRI,QGLDE\XWLOLVLQJLWVVXUSOXVSRZHUSRWHQWLDOHVSHFLDOO\LQWKHK\GHOVHFWRUOQYLHZRIDERYH6-91LVSXUVXLQJ
ZLWK*RYWRI$UXQDQFKDO3UDGHVKDQGH[SORULQJWKHDYHQXHVLQWKHUHJLRQIRUGHYHORSLQJ+\GUR3URMHFWV

NTPC

173&·V%RQJDLJDRQ7KHUPDO3RZHU3URMHFWLQ$VVDPKDVWKUHHXQLWVRI0:HDFK$OOWKUHHXQLWVKDYHVWDUWHGFRPPHUFLDO
RSHUDWLRQ7KLVVWDWLRQVXSSOLHVSRZHUWR$VVDP0HJKDOD\D7ULSXUD0DQLSXU0L]RUDP$UXQDFKDO3UDGHVKDQG1DJDODQG

73
Annual Report 2018-19

TRANSMISSION 2. For GHYHORSPHQW RI ,QWUD6WDWH 7UDQVPLVVLRQ DQG


1. In order to tap the hydro potential in the North-Eastern Distribution (T&D) system in the states of NER, a
Region an outline of Transmission system has been &RPSUHKHQVLYH6FKHPHIRUVWUHQJWKHQLQJRIWKHLQWUD
PDGH IRU HYDFXDWLRQ RI SRZHU IURP K\GUR SURMHFWV RI State Transmission and Distribution system comprising
DERXW  0: LQ 1(5 DQG  0: LQ 6LNNLP transmission, sub-transmission and distribution system
Bhutan. The Inter State Transmission System consists  N9  DERYH  KDV EHHQ SUHSDUHG DV WZR VHSDUDWH
of interconnecting the NER with the National Grid for
SURMHFWV DQG DSSURYHG E\ WKH *RYW RI ,QGLD IRU
H[FKDQJHRISRZHUE\KLJKFDSDFLW\$&DVZHOODV+9'&
OLQHV KDYH EHHQ DUH EHLQJ SODQQHG  LPSOHPHQWHG LPSOHPHQWDWLRQ E\ 32:(5*5,' )RU WKH 7 ' SURMHFW
,Q WKLV UHJDUG D PLOHVWRQH KDV EHHQ DFKLHYHG ZLWK in Arunachal Pradesh & Sikkim, the entire cost of the
FRPPLVVLRQLQJRI3ROH² 0: RI”N90: SURMHFWZLOOEHERUQHE\*RYHUQPHQWRI,QGLDWKURXJKWKH
HVDC bi-pole line from Bishwanath Chariali (NER) to 3ODQ6FKHPHRI0LQLVWU\RI3RZHU)RUWKHUHPDLQLQJVL[
Agra (NR), which interconnecting en-route at Alipurduar VWDWHVLH$VVDP0DQLSXU0HJKDOD\D0L]RUDP7ULSXUD
(5  ZLWK  0: WHUPLQDOV HDFK DW %LVKZDQDWK
DQG1DJDODQGWKHVFKHPHZLOOEHIXQGHGE\WKH*RYW
&KDULDOL $OLSXUGXDUDQG[0:WHUPLQDODW$JUD
This transmission system also includes 4 nos. Of high of India through the Budget of Ministry of Power and the
FDSDFLW\ FRUULGRUV HDFK RI  0: FDSDFLW\ LQ WKH :RUOG %DQN RQ  EDVLV 32:(5*5,' KDV LQLWLDWHG
5LJKWRI:D\ FRQVWUDLQHG &KLFNHQ 1HFN DUHD WKHUHE\ LPSOHPHQWDWLRQDFWLYLWLHVRIDERYHSURMHFWVDQGERWKWKH
UHVHUYLQJ WRWDO WUDQVPLVVLRQ FDSDFLW\ RI  0: LQ projects are unGHUYDULRXVVWDJHVRILPSOHPHQWDWLRQ
this constrained corridor.

74
CHAPTER 16

CENTRAL ELECTRICITY AUTHORITY (CEA)


1. Constitution of the CEA public, data related to all segments of the electricity
VHFWRUFDUU\RXWLQYHVWLJDWLRQVDQGSURPRWHUHVHDUFK
The Central Electricity Authority (CEA) is a statutory
RUJDQL]DWLRQ FRQVWLWXWHG XQGHU 6HFWLRQ    RI WKH 2. Functions of the CEA
repealed Electricity (Supply) Act, 1948 and continued
The Functions and duties of the Authority are delineated
under Section 70 of the Electricity Act, 2003. It was
under section 73 of the Electricity Act, 2003. Besides, the
established as a part –time body in the year 1951 and
&($ KDV WR GLVFKDUJH YDULRXV RWKHU IXQFWLRQV DV ZHOO
made a full- time body in the year 1975.
under Sections 3, 8, 34, 53, 55 and 177 of the Act. As
As per section 70(3) of the Electricity Act, 2003, the per Section 73 of the Electricity Act, 2003, the Central
Authority shall consist of not more than 14 members, Electricity Authority shall perform such functions and
including its Chairperson of whom not more than 8 shall GXWLHV DV WKH &HQWUDO *RYHUQPHQW PD\ SUHVFULEH RU
be full-time Members to be appointed by the Central direct, and in particular to-
*RYHUQPHQW7KH&($LVKHDGHGE\D&KDLUSHUVRQZKR
D $GYLVH WKH &HQWUDO *RYHUQPHQW RQ WKH PDWWHUV
DVWKH&KLHI([HFXWLYHRIWKH$XWKRULW\RYHUVHHVODUJHO\
relating to National Electricity Policy, formulate
WKH GHYHORSPHQW RI 3RZHU 6HFWRU LQ WKH FRXQWU\ $
VKRUWWHUPDQGSHUVSHFWLYHSODQVIRUGHYHORSPHQWRI
6HFUHWDU\DSSRLQWHGE\WKH$XWKRULW\ZLWKWKHDSSURYDO
WKHHOHFWULFLW\V\VWHPDQGFRRUGLQDWHWKHDFWLYLWLHVRI
RIWKH&HQWUDO*RYHUQPHQWXQGHUVHFWLRQRI(OHFWULFLW\
Act 2003, assists the Chairperson in discharging CEA’s WKH SODQQLQJ DJHQFLHV IRU WKH RSWLPDO XWLOL]DWLRQ RI
statutory functions. The Secretary also assists him in UHVRXUFHV WR VXEVHUYH WKH LQWHUHVWV RI WKH QDWLRQDO
all matters pertaining to administration and technical HFRQRP\ DQG WR SURYLGH UHOLDEOH DQG DIIRUGDEOH
LQFOXGLQJ +XPDQ 5HVRXUFH 'HYHORSPHQW DQG 7HFKQR electricity to all consumers;
Economic Appraisal and concurrence of power projects b. Specify the technical standards for construction of
HWF 3UHVHQWO\ WKHUH DUH VL[ ZLQJV QDPHO\ 3ODQQLQJ HOHFWULFDOSODQWVHOHFWULFOLQHVDQGFRQQHFWLYLW\WRWKH
Hydro, Thermal, Grid Operation & Distribution, grid;
Economic & Commercial and Power System, each
c. Specify the safety requirements for construction,
headed by a Member of the Authority. Besides, there
are also two C.P.E.S. Cadre posts of Principal Chief operation and maintenance of electrical plants and
Engineer(PCE) in the HA Grade. Under each Member, electric lines;
WKHUHDUHWHFKQLFDOGLYLVLRQVHDFKKHDGHGE\DQRIÀFHU d. Specify the grid standards for operation and
of the rank of Chief Engineer. CEA has its Headquarters maintenance of transmission lines;
LQ 1HZ 'HOKL ,Q DGGLWLRQ &($ KDV RIÀFHV ORFDWHG LQ
e. Specify the conditions for installation of meters for
YDULRXVSDUWVRIWKHFRXQWU\7KH&($LVUHVSRQVLEOHIRU
transmission and supply of electricity;
RYHUDOO SRZHU VHFWRU SODQQLQJ FRRUGLQDWLRQ DFFRUGLQJ
concurrence to hydro-electric schemes, promote & f. Promote and assist in the timely completion of
assist in timely completion of projects, specifying of VFKHPHVDQGSURMHFWVIRULPSURYLQJDQGDXJPHQWLQJ
technical standards, safety requirements, Grid Standards the electricity system;
as well as conditions for installation of meters applicable
J 3URPRWHPHDVXUHVIRUDGYDQFLQJWKHVNLOOVRISHUVRQV
WRWKH3RZHU6HFWRURIWKHFRXQWU\7KH&($DGYLVHVWKH
engaged in electricity industry;
&HQWUDO *RYHUQPHQW RQ WKH 1DWLRQDO (OHFWULFLW\ 3ROLF\
DQG IRUPXODWHV WKH 3HUVSHFWLYH 3ODQV IRU GHYHORSPHQW K $GYLVH&HQWUDO*RYHUQPHQWRQDQ\PDWWHURQZKLFK
RIWKHHOHFWULFLW\V\VWHP,WDOVRDGYLVHVWKH&HQWUDODQG LWV DGYLFH LV VRXJKW RU PDNH UHFRPPHQGDWLRQ WR
6WDWH*RYHUQPHQWVDVZHOODVWKH(OHFWULFLW\5HJXODWRU\ WKDW *RYHUQPHQW RQ DQ\ PDWWHU LI LQ WKH RSLQLRQ
Commissions on all technical matters relating to of the Authority, the recommendation would help
generation, transmission and distribution of electricity. LQ LPSURYLQJ WKH JHQHUDWLRQ WUDQVPLVVLRQ WUDGLQJ
It also has the mandate to collect, record and make distributLRQDQGXWLOL]DWLRQRIHOHFWULFLW\

75
Annual Report 2018-19

i. Collect and record the data concerning the AuthorityUHYLHZRUUHYLVHWKH1DWLRQDO(OHFWULFLW\3ROLF\


generation, transmission, trading, distribution and and the Tariff Policy referred to in sub-section(1).
XWLOL]DWLRQRIHOHFWULFLW\DQGFDUU\RXWVWXGLHVUHODWLQJ
4. The Authority shall prepare a National Electricity Plan in
WR FRVW HIÀFLHQF\ FRPSHWLWLYHQHVV DQG VXFK OLNH
accordance with the National Electricity Policy and notify
matters;
VXFKSODQRQFHLQÀYH\HDUV
j. Make public from time to time the information
PROVIDED that the Authority while preparing the
VHFXUHG XQGHU WKLV $FW DQG SURYLGH IRU WKH
SXEOLFDWLRQRIUHSRUWVDQGLQYHVWLJDWLRQV National Electricity Plan shall publish the draft National
(OHFWULFLW\ 3ODQ DQG LQYLWH VXJJHVWLRQ DQG REMHFWLRQV
k. Promote research in the matters affecting generation, thereon from licensees, generating companies and the
transmission, distribution and trading of electricity; public within such time as may be prescribed;
O &DUU\RXWRUFDXVHWREHFDUULHGRXWDQ\LQYHVWLJDWLRQ
PROVIDED FURTHER that the Authority shall-
for the purpose of generating or transmitting or
distributing electricity; D 1RWLI\ WKH 3ODQ DIWHU REWDLQLQJ WKH DSSURYDO RI WKH
&HQWUDO*RYHUQPHQW
P$GYLVH DQ\ 6WDWH *RYHUQPHQW OLFHQVHHV RU WKH
generating companies on such matters which E 5HYLVH WKH 3ODQ LQFRUSRUDWLQJ WKHUHLQ GLUHFWLRQV LI
shall enable them to operate and maintain the DQ\JLYHQE\WKH&HQWUDO*RYHUQPHQWZKLOHJUDQWLQJ
electricity system under their ownership or control DSSURYDOXQGHUFODXVH D 
LQ DQ LPSURYHG PDQQHU DQG ZKHUH QHFHVVDU\ LQ
 7KH$XWKRULW\PD\UHYLHZRUUHYLVHWKH1DWLRQDO(OHFWULFLW\
FRRUGLQDWLRQ ZLWK DQ\ RWKHU *RYHUQPHQW OLFHQVHH
plan in accordance with the National Electricity Policy.
RU WKH JHQHUDWLQJ FRPSDQ\RZLQJ RU KDYLQJ WKH
control of another electricity system; Section 8-Hydro –Electricity Generation

Q $GYLVH WKH DSSURSULDWH *RYHUQPHQW DQG WKH 1. Any generating company intending to set up a hydro
appropriate Commission on all technical matters generating station shall prepare and submit to the
relating to generation, transmission and distribution Authority for its concurrence, a scheme estimated to
of electricity; and LQYROYH D FDSLWDO H[SHQGLWXUH H[FHHGLQJ VXFK VXP DV
R 'LVFKDUJHVXFKRWKHUIXQFWLRQVDVPD\EHSURYLGHG PD\EHÀ[HGE\WKH&HQWUDO*RYHUQPHQWIURPWLPHWR
under this Act. WLPHE\QRWLÀFDWLRQ

 ,Q DGGLWLRQ WR DERYH IXQFWLRQV DQG GXWLHV &($ KDV 2. The Authority shall, before concurring in any scheme
to perform the following functions in terms of the VXEPLWWHG WR LW XQGHU VXEVHFWLRQ   KDYH SDUWLFXODU
XQGHUPHQWLRQHGVHFWLRQRIWKH(OHFWULFLW\$FW UHJDUGWRZKHWKHURUQRWLQLWVRSLQLRQ

Section 3-National Electricity Policy and Plan D 7KHSURSRVHGULYHUZRUNVZLOOSUHMXGLFHWKHSURVSHFWV


IRUWKHEHVWXOWLPDWHGHYHORSPHQWRIWKHULYHURULWV
 7KH &HQWUDO *RYHUQPHQW VKDOO IURP WLPH WR WLPH
tributaries for power generation, consistent with the
prepare the National Electricity Policy and Tariff Policy,
UHTXLUHPHQWVRIGULQNLQJZDWHULUULJDWLRQQDYLJDWLRQ
LQ FRQVXOWDWLRQ ZLWK WKH 6WDWH *RYHUQPHQWV DQG WKH
$XWKRULW\IRUGHYHORSPHQWRIWKH3RZHU6\VWHPEDVHGRQ ÁRRG FRQWURO RU RWKHU SXEOLF SXUSRVHV DQG IRU
RSWLPDOXWLOL]DWLRQRIUHVRXUFHVVXFKDVFRDOQDWXUDOJDV this purpose the Authority shall satisfy itself, after
nuclear substances or materials, hydro and renewable FRQVXOWDWLRQZLWKWKH6WDWH*RYHUQPHQWWKH&HQWUDO
sources of energy; *RYHUQPHQWRUVXFKRWKHUDJHQFLHVDVLWPD\GHHP
appropriate, that an adequate study has been made
 7KH &HQWUDO *RYHUQPHQW VKDOO SXEOLVK WKH 1DWLRQDO
RI WKH RSWLPXP ORFDWLRQ RI GDPV DQG RWKHU ULYHU
Electricity Policy and Tariff Policy from time to time;
works;
 7KH &HQWUDO *RYHUQPHQW PD\ IURP WLPH WR WLPH LQ
b. The proposed scheme meets, the norms regarding
FRQVXOWDWLRQ ZLWK WKH 6WDWH *RYHUQPHQWV DQG WKH
dam design and safety.

76
 :KHUH D PXOWLSXUSRVH VFKHPH IRU WKH GHYHORSPHQW Section 55- Use etc. of meters
RI DQ\ ULYHU LQ DQ\ UHJLRQ LV LQ RSHUDWLRQ WKH 6WDWH
  1R OLFHQVHH VKDOO VXSSO\ HOHFWULFLW\ DIWHU WKH H[SLU\ RI
*RYHUQPHQW DQG WKH *HQHUDWLQJ &RPSDQ\ VKDOO
WZR \HDUV IURP WKH DSSRLQWHG GDWH H[FHSW WKURXJK
FRRUGLQDWH WKHLU DFWLYLWLHV ZLWK WKH DFWLYLWLHV RI WKH
installation of a correct meter in accordance with the
persons responsible for such scheme in so far as they
regulations to be made in this behalf by the Authority;
are interrelated.
 3URYLGHGWKDWWKHOLFHQVHHPD\UHTXLUHWKHFRQVXPHUWR
Section 34- Grid Standards
JLYHKLPVHFXULW\IRUWKHSULFHRIPHWHUDQGHQWHULQWR
(YHU\ WUDQVPLVVLRQ OLFHQVHH VKDOO FRPSO\ ZLWK VXFK WHFKQLFDO an agreement for the hire thereof, unless the consumer
standards, of operation and maintenance of transmission lines, elects to purchase a meter;
LQDFFRUGDQFHZLWKWKH*ULG6WDQGDUGVDVPD\EHVSHFLÀHGE\
 3URYLGHG IXUWKHU WKDW WKH 6WDWH &RPPLVVLRQ PD\ E\
the Authority.
QRWLÀFDWLRQ H[WHQG WKH VDLG SHULRG RI WZR \HDUV IRU D
Section53-Provision Relating to Safety and Electricity class or classes of persons or for such areas as may be
Supply VSHFLÀHGLQWKDWQRWLÀFDWLRQ

7KH$XWKRULW\PD\LQFRQVXOWDWLRQZLWKWKH6WDWH*RYHUQPHQWV 2) For proper accounting and audit in the generation,


6SHFLI\VXLWDEOHPHDVXUHVIRU transmission and distribution or trading of electricity,
the Authority may direct the installation of meters,
a. Protecting the public (including the person engaged in
by a generating company or licensee at such stages
the generation, transmission or distribution or trading)
of generation, transmission or distribution or trading
from dangers arising from the generation, transmission
of electricity and at such locations of generation,
or distribution or trading of electricity, or use of
transmission or distribution or trading, as it may deem
electricity supplied or installation, maintenance or use of
necessary.
any electric line or electrical plant;
  ,IDSHUVRQPDNHVGHIDXOWLQFRPSO\LQJZLWKWKHSURYLVLRQV
b. Eliminating or reducing the risks of personal injury to
contained in this section or the regulations made under
any person, or damage to property of any person or
sub-section (1), the appropriate Commission may make
interference with use of such property;
VXFKRUGHUVDVLWWKLQNVÀWIRUUHTXLULQJWKHGHIDXOWWREH
c. Prohibiting the supply or transmission of Electricity made good by the generating company or licensee or
H[FHSW E\ PHDQV RI D V\VWHP ZKLFK FRQIRUPV WR WKH E\DQ\RIÀFHURIDFRPSDQ\RURWKHUDVVRFLDWLRQRUDQ\
VSHFLÀFDWLRQDVPD\EHVSHFLÀHG other person who is responsible for its default.
G *LYLQJDQRWLFHLQWKHVSHFLÀHGIRUPWRWKHDSSURSULDWH Section 177- Powers of the Authority to make Regulations.
Commission and the Electrical Inspector, of accidents
 7KH $XWKRULW\ PD\ E\ QRWLÀFDWLRQ PDNH UHJXODWLRQV
and failures of supplies or transmission of electricity;
consistent with this Act and the rules generally to carry
H .HHSLQJE\DJHQHUDWLQJFRPSDQ\RUOLFHQVHHWKHPDSV RXWWKHSURYLVLRQVRIWKLV$FW
plans and sections relating to supply or transmission of
2. In particular and without prejudice to the generality of
electricity;
the power conferred in sub-section (1), such regulations
f. Inspection of maps, plans and sections by any person PD\ SURYLGH IRU DOO RU DQ\ RI WKH IROORZLQJ PDWWHUV
DXWKRUL]HG E\ LW RU E\ (OHFWULFDO ,QVSHFWRU RU E\ DQ\ QDPHO\
SHUVRQRQSD\PHQWRIVSHFLÀHGIHH
a. The Grid Standards under section-34.
g. Specifying action to be taken in relation to any electric
b. Suitable measures relating to safety and electricity
line or electrical plant, or any electrical appliance under
supply under section-53;
the control of a consumer for the purpose of eliminating
or reducing the risk of personal injury or damage to c. The installation and operation of meters under
property or interference with its use. section-55;

77
Annual Report 2018-19

d. The rules of procedure for transaction of business 3. All regulations made by the Authority under this Act shall
under sub-section (9) of section-70; EHVXEMHFWWRWKHFRQGLWLRQVRISUHYLRXVSXEOLFDWLRQ

e. The technical standards for construction of electrical Framing and Amendments of the CEA Regulations
SODQWVDQGHOHFWULFOLQHVDQGFRQQHFWLYLW\WRWKHJULG under Section 177 of the Electricity Act, 2003:
under clause (b) of section-73;  7KH &HQWUDO (OHFWULFLW\ $XWKRULW\ KDV EHHQ YHVWHG ZLWK
f. The form and manner in which and the time at the powers to make Regulations under Section 177 of
ZKLFK WKH 6WDWH *RYHUQPHQW DQG OLFHQVHHV VKDOO WKH(OHFWULFLW\$FW7KHVWDWXVRIWKHQRWLÀFDWLRQRI
furnish statistics, returns or other information under principle regulations and their subsequent amendments
section-74 since the enactment of the Electricity Act, 2003, is as
XQGHU
J $Q\RWKHUPDWWHUZKLFKLVWREHRUPD\EHVSHFLÀHG

$ 1RWLÀHG5HJXODWLRQV

 7KHIROORZLQJDUHWKHSULQFLSOHUHJXODWLRQVDOUHDG\EHHQIUDPHGDQGQRWLÀHGE\WKH$XWKRULW\GXULQJSUHYLRXV\HDUVVLQFH
WKHHQDFWPHQWRIWKH(OHFWULFLW\$FW

Sl. Date of publication in


Regulation
No. Gazette of India

1 CEA (Installation & Operation of Meters), Regulations 2006 22.03.2006

2 Central Electricity Authority (Procedure for Transaction of Business) Regulations, 2006 22.8.2006

&HQWUDO(OHFWULFLW\$XWKRULW\ 7HFKQLFDO6WDQGDUGVIRU&RQQHFWLYLW\WRWKH*ULG 5HJXODWLRQ


3 09.03.2007
2007

Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulation,


4 19.04.2007
2007

5 Central Electricity Authority (Grid Standards) Regulation, 2010 26.06.2010

Central Electricity Authority (Measures relating to Safety and Electricity Supply)


6 24.09.2010
Regulations, 2010

20.08.2010 (English
Central Electricity Authority (Technical Standards for Construction of Electrical Plants and
7 Version) & 07.09.2010
Electric Lines) Regulations, 2010
(Hindi Version)

Central Electricity Authority (Safety requirements for construction, operation and


8 14.02.2011
maintenance of electrical plants and electric lines) Regulations, 2011

&HQWUDO(OHFWULFLW\$XWKRULW\ 7HFKQLFDO6WDQGDUGVIRU&RQQHFWLYLW\RIWKH'LVWULEXWHG
9 07.10.2013
Generation Resources) Regulations, 2013

Central Electricity Authority (Technical Standards for Communication System in Power Under
10
System Operations) Regulations, 2019 Process

78
% 1RWLÀHGSURSRVHGWREHQRWLÀHG$PHQGPHQWVRI5HJXODWLRQV
7KHUHJXODWLRQVDUHUHJXODUO\UHYLHZHGDQGDPHQGHGE\WKH$XWKRULW\DVSHUWKHUHTXLUHPHQWVRIYDULRXVVWDNHKROGHUVLQWKH
SRZHU VHFWRU LQFOXGLQJ JHQHUDO SXEOLF DW ODUJH 7KH DPHQGPHQWV QRWLÀHGSURSRVHG WR EH QRWLÀHG E\ WKH $XWKRULW\ GXULQJ
SUHYLRXV\HDUVVLQFHWKHHQDFWPHQWRIWKH(OHFWULFLW\$FWDUHDVXQGHU

Sl. Date of publication in


Regulation
No. Gazette of India

Central Electricity Authority (Installation and Operation of meters) (Amendment)


1 26.06.2010
Regulations 2010

&HQWUDO(OHFWULFLW\$XWKRULW\ 7HFKQLFDO6WDQGDUGVIRU&RQQHFWLYLW\WRWKH*ULG 
2 15.10.2013
Amendment Regulations, 2013

Central Electricity Authority (Installation and Operation of meters) (Amendment)


3 26.11.2014
Regulations 2014

Central Electricity Authority (Technical Standards for Construction of Electrical Plants


4 06.04.2015
and Electric Lines) Amendment Regulations, 2015

Amendment to Central Electricity Authority (Measures relating to Safety and Electricity


5 13.04.2015
Supply) Amendment Regulations, 2015

Amendment to Central Electricity Authority (Measures relating to Safety and Electric


6 01.03.2018
Supply) Amendment Regulations, 2018

&HQWUDO(OHFWULFLW\$XWKRULW\ 7HFKQLFDO6WDQGDUGVIRU&RQQHFWLYLW\EHORZN9 )LUVW


7 08.02.2019
Amendment) Regulations, 2019

&HQWUDO(OHFWULFLW\$XWKRULW\ 7HFKQLFDO6WDQGDUGVIRUFRQQHFWLYLW\WRWKH*ULG 
8 08.02.2019
(Amendment) Regulation, 2019

3rd Amendment to Central Electricity Authority (Measures relating to Safety and Electric Amendment under
9
Supply) Regulations, 2010 process

1st Amendment to Central Electricity Authority (Furnishing of Statistics, Returns and Amendment under
10
Information) Regulations, 2007 process

4th Amendment to Central Electricity Authority (Measures relating to Safety and Electric Amendment under
11
Supply) Regulations, 2010- Periodic Comprehensive Review process

3rd Amendment to Central Electricity Authority (Installation and Operation of Meters) Amendment under
12
Regulations, 2006 process

2nd Amendment to Central Electricity Authority (Technical Standards for Construction of Amendment under
13
(OHFWULFDO3ODQWVDQG(OHFWULF/LQHV 5HJXODWLRQV3HULRGLF&RPSUHKHQVLYH5HYLHZ process

3rd Amendment to Central Electricity Authority (Technical Standards for Construction of Amendment under
14
Electrical Plants and Electric Lines) Regulations, 2010 process

79
Annual Report 2018-19

Nathpa Jhakri Hydro Power Station

80
CHAPTER 17

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC)


1. INTRODUCTION Section 79 (2) of the Electricity Act. 2003 lays the onus
RQ&(5&WRDGYLVHWKH&HQWUDO*RYHUQPHQWRQPDWWHUV
The Central Electricity Regulatory Commission (CERC),
VXFKDV
an autonomous statutory body with quasi-judicial
powers, was constituted on 25th July, 1998 under the a. formulation of National Electricity Policy and tariff
erstwhile Electricity Regulatory Commissions Act, 1998 policy;
and continues to be recognised under the Electricity Act,
E SURPRWLRQ RI FRPSHWLWLRQ HIÀFLHQF\ DQG HFRQRP\
2003. The Commission consists of a Chairperson and
LQDFWLYLWLHVRIWKHHOHFWULFLW\LQGXVWU\
three full time Members apart from the Chairperson of
WKH&HQWUDO(OHFWULFLW\$XWKRULW\DV([2IÀFLR0HPEHU F SURPRWLRQ RI LQYHVWPHQW LQ HOHFWULFLW\ LQGXVWU\
and d. any other matter referred to the Central
2. FUNCTIONS OF CERC
&RPPLVVLRQE\WKDW*RYHUQPHQW
As per the Electricity Act, 2003 the Commission has the
3. MAJOR ACTIVITIES DURING THE YEAR 2018-19
UHVSRQVLELOLW\WRGLVFKDUJHWKHIROORZLQJIXQFWLRQV
(Upto 31st March, 2019)
a. to regulate the tariff of generating companies owned $0DMRU5HJXODWLRQV$PHQGPHQWV1RWLÀHG
RUFRQWUROOHGE\WKH&HQWUDO*RYHUQPHQW
i. Central Electricity Regulatory Commission (Terms
b. to regulate the tariff of generating companies other and Conditions of Tariff) Regulations, 2019
than those owned or controlled by the Central
*RYHUQPHQWVSHFLÀHGLQFODXVH D LIVXFKJHQHUDWLQJ  7KH&RPPLVVLRQYLGHQRWLÀFDWLRQGDWHGWK0DUFK
FRPSDQLHVHQWHULQWRRURWKHUZLVHKDYHDFRPSRVLWH 2019 issued the Central Electricity Regulatory
scheme for generation and sale of electricity in more Commission (Terms and Conditions of Tariff)
than one State; Regulations, 2019, which are applicable for the tariff
period 2019-24.
c. to regulate the inter-State transmission of electricity;
 ,PSRUWDQWSURYLVLRQVDVQRWLÀHGLQWKHVH5HJXODWLRQV
d. to determine tariff for inter-State transmission of include retaining Rate of Return on Equity at 15.50%
electricity; IRU DOO UHJXODWHG HQWLWLHV H[FHSW SXPS VWRUDJH
e. to issue licenses to persons to function as hydro projects) and 16.50% (for pump storage hydro
Transmission Licensee and electricity trader with SURMHFWV  +RZHYHU DGGLWLRQDO UHWXUQ RI  IRU
respect to their inter-State operations. timely completion of projects has been discontinued.
Further, addition or reduction in ROE, depending
I WR DGMXGLFDWH XSRQ GLVSXWHV LQYROYLQJ JHQHUDWLQJ
XSRQ DELOLW\ WR DFKLHYH UDPS UDWH LV LQWURGXFHG
companies or transmission licensee in regard to
with effect from 1.4.2020 (separate guidelines to be
PDWWHUVFRQQHFWHGZLWKFODXVHV D WR G DERYHDQG issued by NLDC subsequently).
to refer any dispute for arbitration;
For computation of interest on working capital,
J WROHY\IHHVIRUWKHSXUSRVHVRIWKLV$FW UHFHLYDEOHV UHGXFHG IURP  GD\V WR  GD\V FRDO
K WRVSHFLI\*ULG&RGHKDYLQJUHJDUGWR*ULG6WDQGDUGV stock reduced from 15 days to 10 days for pit-
head and from 30 days to 20 days for non-pit head
i. to specify and enforce the standards with respect
stations.
WR TXDOLW\ FRQWLQXLW\ DQG UHOLDELOLW\ RI VHUYLFH E\
licensees. Further, while computing Energy Charge Rate of
a coal based generating stations, an additional
M WRÀ[WKHWUDGLQJPDUJLQLQWKHLQWHU6WDWHWUDGLQJRI
DOORZDQFH RI  N&DONJ RQ *&9 ¶DV UHFHLYHG· RQ
electricity, if considered, necessary; and
DFFRXQWRIYDULDWLRQGXULQJVWRUDJHLVDOORZHG
k. to discharge such other functions as may be assigned
 7KH 5HJXODWLRQV SURYLGH IRU VXSSOHPHQWDU\
under this Act.
FDSDFLW\ FKDUJHV IRU DGGLWLRQDO FDSLWDOL]DWLRQ DQG

81
Annual Report 2018-19

supplementary energy charges, on account of These Regulations are aimed at creating a


LPSOHPHQWDWLRQ RI UHYLVHG HPLVVLRQ VWDQGDUGV IDFLOLWDWLYH UHJXODWRU\ HQYLURQPHQW WR HQDEOH &78
LQ H[LVWLQJ JHQHUDWLQJ VWDWLRQ RU QHZ JHQHUDWLQJ WR SODQ DQ HIÀFLHQW UHOLDEOH DQG HFRQRPLFDO LQWHU
station. State Transmission System and associated intra-
State systems through a transparent process of
 3URYLVLRQ RI VSHFLDO VLQJOH SDUW WDULII KDV EHHQ
H[WHQVLYH LQIRUPHG DQG LQFOXVLYH FRQVXOWDWLRQ ZLWK
LQWURGXFHG VR WKDW VXFK WDULII PD\ EH UHFRYHUHG
VWDNHKROGHUV DQG JHW LW GHYHORSHG LQ WHUPV RI WKH
based on actual dispatch in respect of thermal
Electricity Act, 2003 and policies formulated under
JHQHUDWLQJ VWDWLRQ ZKLFK KDYH FRPSOHWHG  \HDUV
the Act.
of operation from the date of commercial operation,
ZKHUHWKHJHQHUDWLQJFRPSDQ\DQGWKHEHQHÀFLDU\  7KH REMHFWLYHV RI WKH 5HJXODWLRQV LQFOXGH OD\LQJ
may agree on an arrangement. down the broad principles. procedures and processes
WR EH IROORZHG IRU SODQQLQJ DQG GHYHORSPHQW RI
 *HQHUDWLQJ 6WDWLRQV ZKLFK KDYH VLJQHG 3RZHU DQ HIÀFLHQW FRRUGLQDWHG UHOLDEOH DQG HFRQRPLFDO
Purchase Agreements on or before 5.1.2011, but not system of inter-State transmission system (ISTS) for
DFKLHYHGÀQDQFLDOFORVXUHE\DUHUHTXLUHG VPRRWK ÁRZ RI HOHFWULFLW\ IURP JHQHUDWLQJ VWDWLRQV
WRREWDLQIUHVKFRQVHQWIURPEHQHÀFLDULHV to the load centres. ensuring wider participation of
These Regulations introduced differential rate stakeholders in the planning process and specify
UHJLPH WR EH HIIHFWLYH IURP   GXULQJ 3HDN the procedures for stakeholders consultation and
+RXUVDQG2II3HDN+RXUVIRUUHFRYHU\RI&DSDFLW\ participation, specifying procedures to bring about
Charges, including a High Demand Season of three transparency in the planning process, demarcating
months (continuous or otherwise) and Low Demand UROHVDQGUHVSRQVLELOLWLHVRIYDULRXVRUJDQLVDWLRQVLQ
Season of remaining 9 months (to be declared by the line with the Act etc.
FRQFHUQHG5/'&VDWOHDVWVL[PRQWKVLQDGYDQFH  iii. Central Electricity Regulatory commission
(Open Access in inter-State Transmission) (Fifth
 7KH 5HJXODWLRQV DOVR SURYLGH IRU LQFHQWLYH IRU
Amendment), Regulations, 2018
H[FHHGLQJ VSHFLÀHG QRUPDWLYH SODQW ORDG IDFWRU
DW WKH UDWH RI  SDLVH N:K IRU H[EXV VFKHGXOHG  7KH ÀIWK DPHQGPHQW WR &(5& 2SHQ $FFHVV LQ
HQHUJ\GXULQJ3HDN+RXUVDQGDSDLVHN:KIRU LQWHU6WDWH 7UDQVPLVVLRQ  5HJXODWLRQV ZDV QRWLÀHG
H[EXV VFKHGXOHG HQHUJ\ GXULQJ 2II3HDN +RXUV ZLWK DQ REMHFWLYH WR FUHDWH DQ HQDEOLQJ UHJXODWRU\
Further, In case of Hydro Generating Stations, the framework for the implementation of National Open
energy charge rate for secondary energy has been Access Registry (NOAR).
UHYLVHGIURPQLQHW\SDLVHSHUN:KWRRQHKXQGUHG  ,W LV HQYLVDJHG WKDW WKH 12$5 ZRXOG FRQVWLWXWH
WZHQW\SDLVHSHUN:K D FHQWUDOL]HG HOHFWURQLF SODWIRUP WKURXJK ZKLFK
ii. Central Electricity Regulatory Commission the short-term open access to the inter-State
(Planning, Coordination and Development of transmission system shall be administered. All the
(FRQRPLF DQG (IÀFLHQW ,QWHU6WDWH 7UDQVPLVVLRQ DSSOLFDWLRQV  DSSURYDOV UHODWHG WR VKRUWWHUP
System by Central Transmission Utility and other open access in inter-State transmission system
related matters) Regulations, 2018 shall be made through the NOAR. The NOAR shall
FRQWDLQ WKH UHOHYDQW LQIRUPDWLRQ YL] VWDQGLQJ
CERC (Indian Electricity Grid Code) Regulations, 2010 FOHDUDQFHV SURYLGHG E\ 6/'&V 5/'&V DYDLODELOLW\
SURYLGHV3ODQQLQJ&RGHIRULQWHU6WDWHWUDQVPLVVLRQ of transmission corridor, short-term open access
XQGHU 3DUW ZKLFK FRYHUV YDULRXV DVSHFWV RI granted to the customers, and application status etc.
Planning relating to inter-State transmission systems. which shall be automatically updated and accessed
CERC (IEGC) Regulations, 2010 under the Planning by the concerned stakeholders online. NOAR shall
&RGHVSHFLÀHVWKHSKLORVRSK\DQGSURFHGXUHVWREH DOVRLQWHUIDFHZLWK3RZHU([FKDQJHVIRUYHULÀFDWLRQ
applied in planning of National Grid, Regional Grids of Standing Clearance and processing of Day Ahead
and Inter Regional links. & Term Ahead transactions.

82
 )XUWKHULWLVHQYLVDged that the NOAR shall facilitate v. Central Electricity Regulatory Commission
ÀQDQFLDO WUDQVDFWLRQV E\ SURYLGLQJ WKH SD\PHQW (Sharing of inter-State Transmission Charges and
gateway for making all payments related to short- Losses) (Sixth Amendment), Regulations, 2019
WHUP WUDQVDFWLRQV 7KH 12$5 VKDOO DOVR SURYLGH
 ,Q VXSHUVHVVLRQ RI 0R3 2UGHU 1R 
the audit trail of applications and dashboard
R&R dated 30 September, 2016 and Order No.
IDFLOLW\ VXPPDUL]LQJ WKH LQIRUPDWLRQ QHFHVVDU\ IRU
5 5 GDWHG  -XQH  0LQLVWU\ RI
PDUNHW PRQLWRULQJ DQG PDUNHW GHVLJQ HYDOXDWLRQ
3RZHUQRWLÀHGWKDWIRUJHQHUDWLRQEDVHGRQVRODUDQG
SXUSRVHV $OO RI WKHVH IHDWXUHV DUH H[SHFWHG WR
wind resources, no inter-State transmission charges
EULQJLQVXEVWDQWLDOLPSURYHPHQWVLQHIÀFLHQF\DQG
DQGORVVHVZLOOEHOHYLHGRQWUDQVPLVVLRQRIHOHFWULFLW\
transparency in administering the short term open
through the inter-State transmission system for sale
access to inter-state transmission system of the
of power by such projects commissioned till 31
country.
0DUFK  VXEMHFW WR IXOÀOPHQW RI RWKHU UHODWHG
iv. Central Electricity Regulatory Commission FRQGLWLRQV 7KH &RPPLVVLRQ FRQVLGHUHG WKH DERYH
(Deviation Settlement Mechanism and related DQG QRWLÀHG WKH &HQWUDO (OHFWULFLW\ 5HJXODWRU\
matters) (Fourth Amendment) Regulations, 2018 Commission (Sharing of inter-State Transmission
 7KH '60 5HJXODWLRQV DV QRWLÀHG LQ  SURYLGH &KDUJHV /RVVHV  6L[WK$PHQGPHQW 5HJXODWLRQV
IRU UHYLVLRQ RI '60 SULFH YHFWRU $ QXPEHU RI  ZKLFK SURYLGHV WKDW QR WUDQVPLVVLRQ FKDUJHV
GHYHORSPHQWVKDYHWDNHQSODFHLQWKHSRZHUVHFWRU and losses for the use of ISTS network shall be payable
since 2014. In this backdrop, the Commission for the generation based on solar and wind power
FRQVLGHUHG LW QHFHVVDU\ WR UHYLHZ WKH H[LVWLQJ resources for a period of 25 years from the date of
operational band of frequency with due regard to commercial operation of such generation projects if
the need for safe, secure and reliable operation of such generation capacity has been awarded through
WKH JULG DQG WR UHYLHZ WKH SULQFLSOHV RI GHYLDWLRQ FRPSHWLWLYH ELGGLQJ SURFHVV LQ DFFRUGDQFH ZLWK
settlement mechanism (DSM) rates, including their WKH JXLGHOLQHV LVVXHG E\ WKH &HQWUDO *RYHUQPHQW
linkage with frequency in the light of the emerging such generation capacity has been declared
market realities. under commercial operation between 13.2.2018
WLOO  3RZHU 3XUFKDVH $JUHHPHQW V  KDYH
 $FFRUGLQJO\ WKH &RPPLVVLRQ QRWLÀHG WKH &HQWUDO EHHQH[HFXWHGIRUVDOHRIVXFKJHQHUDWLRQFDSDFLW\
(OHFWULFLW\ 5HJXODWRU\ &RPPLVVLRQ 'HYLDWLRQ to all entities including Distribution Companies for
Settlement Mechanism and related matters) (Fourth compliance of their renewable purchase obligations.
Amendment) Regulations. 2018, following the due
procedure. vi. Central Electricity Regulatory Commission (Cross
Border Trade of Electricity) Regulations, 2019
 7KH DPHQGPHQW WR WKH 5HJXODWLRQV SURYLGH IRU
UHYLVLRQRI'603ULFH9HFWRUE\OLQNLQJLW WKHSULFH  7KH &RPPLVVLRQ LQ DFFRUGDQFH ZLWK WKH UHOHYDQW
DW  +]  WR WKH GDLO\ DYHUDJH $UHD &OHDULQJ 3ULFH SURYLVLRQV RI WKH (OHFWULFLW\ $FW  DQG WKH
GLVFRYHUHGLQ'D\$KHDG0DUNHWVHJPHQWRISRZHU *XLGHOLQHVRQLPSRUWDQGH[SRUWRI(OHFWULFLW\LVVXHG
H[FKDQJH EHVLGHV UHYLVLRQ RI UHIHUHQFH IUHTXHQF\ E\0LQLVWU\RI3RZHU*RYHUQPHQWRI,QGLDQRWLÀHG
EDQG YL]+]WR+] IRU'603ULFH9HFWRU the Central Electricity Regulatory Commission
7KH DPHQGPHQW DOVR SURYLGHV IRU WKH PD[LPXP (Cross Border Trade of Electricity) Regulations, 2019
FHLOLQJ OLPLW IRU DYHUDJH 'DLO\ $&3 GLVFRYHUHG LQ which are applicable to the Participating Entities
WKH '$0 VHJPHQW RI 3RZHU ([FKDQJH DW  +] in India and the neighbouring countries which are
WREH5VSHUXQLWDQGDOVROLQNHGWKHFDSUDWHV engaged in cross border trade of electricity with
for regulated and non-regulated entities separately. ,QGLD +RZHYHU WKH HQWLWLHV ORFDWHG LQ ,QGLD ZKR
As an important measure towards grid discipline, DUH VHHNLQJ FRQQHFWLYLW\ RU ORQJ WHUP DFFHVV RU
number of time blocks for change of sign in case medium-term open access or short-term open
RI VXVWDLQHG GHYLDWLRQ LQ RQH GLUHFWLRQ KDYH EHHQ access to the Indian grid in the course of cross
reduced from 12 time-blocks to 6 time-blocks. border trade of electricity between India and any

83
Annual Report 2018-19

of the neighbouring countries shall continue to be RenewDEOH 3RZHU 3DUN DXWKRUL]HG E\ WKH &HQWUDO
JRYHUQHGE\&RQQHFWLYLW\5HJXODWLRQVDQGWKH672$ *RYHUQPHQW RU 6WDWH *RYHUQPHQW DV 5HQHZDEOH
Regulations. 3RZHU 3DUN GHYHORSHU HQWLW\ GHVLJQDWHG E\ WKH
&HQWUDO *RYHUQPHQW RU 6WDWH *RYHUQPHQW DV
 7KHVH 5HJXODWLRQV SURYLGH WKDW &URVV ERUGHU WUDGH
Renewable Energy Implementing Agency on behalf
of electricity between India and the neighbouring
of the Renewable Energy Generating Station(s)
country(ies) shall be allowed through mutual
and Standalone Storage project has been made
agreements between Indian entity(ies) and entity(ies)
HOLJLEOH WR VHHN VXFK FRQQHFWLYLW\ DQG /7$ WR 676
RI WKH QHLJKERXULQJ FRXQWU\ LHV  XQGHU WKH RYHUDOO
$SSOLFDWLRQVIRUJUDQWRI&RQQHFWLYLW\DUHUHTXLUHGWR
framework of agreements signed between India and
EHSURFHVVHGLQWKHWZRVWDJHV 6WDJH&RQQHFWLYLW\
the neighbouring country(ies) consistent with the DQG 6WDJH,, &RQQHFWLYLW\  DV SHU WKH 'HWDLOHG
SURYLVLRQV RI WKH SUHYDLOLQJ ODZV LQ WKH UHVSHFWLYH Procedure issued from time to time.
country(ies), including through bilateral agreement
EHWZHHQ WZR FRXQWULHV WKURXJK ELGGLQJ URXWH B. Inter-State Trading License
or through mutual agreements between entities. By the end of 2017-18. there are 36 inter-State
+RZHYHULQFDVHRIWULSDUWLWHDJUHHPHQWVWKHFURVV WUDGLQJOLFHQVHHV+RZHYHURIWKHVHDERXWWUDGLQJ
border trade of electricity across India shall be OLFHQVHHVKDYHEHHQXQGHUWDNLQJWUDGLQJLQHOHFWULFLW\
DOORZHG XQGHU WKH RYHUDOO IUDPHZRUN RI ELODWHUDO These trading licensees undertake bilateral contracts
DJUHHPHQWV VLJQHG EHWZHHQ *RYHUQPHQW RI ,QGLD for both buyers and sellers, separately for Round the
DQGWKH*RYHUQPHQWVRIWKHUHVSHFWLYHQHLJKERXULQJ Clock (RTC) period, peak period and other than RTC
countries of the Participating Entities. SHDNSHULRGV7KHYROXPHRIHOHFWULFLW\WUDQVDFWHG
through trading licensees has increased from 26.72
vii. Central Electricity Regulatory Commission (Grant
BU in 2009-10 to 38.94 BU in 2017-18.
of Connectivity, Long-term Access and Medium-
term Open Access in inter-State Transmission C. Power Exchange Business
and related matters) (Seventh Amendment)  3RZHU ([FKDQJHV HVWDEOLVKHG LQ  DQG LQ
Regulations, 2019 RSHUDWLRQIRU\HDUVDUHIXQFWLRQLQJDQGSURYLGLQJ
The Ministry of New & Renewable Energy (MNRE) trading platform for day-ahead contracts, term-
KDV YLGH QRWLÀFDWLRQ 1R :LQG GDWHG ahead contracts (weekly contracts. intra-day
WK0D\LVVXHG´1DWLRQDO:LQG6RODU+\EULG FRQWUDFWV HWF  5HQHZDEOH (QHUJ\ &HUWLÀFDWHV DQG
3ROLF\µ ZLWK REMHFWLYH WR SURYLGH D IUDPHZRUN IRU (QHUJ\6DYLQJ&HUWLÀFDWHV7KHHOHFWULFLW\WUDQVDFWHG
promotion of large grid connected wind- solar PV RQ SRZHU H[FKDQJHV KDV JURZQ IURP  %8 LQ
K\EULG V\VWHP IRU RSWLPDO DQG HIÀFLHQW XWLOL]DWLRQ 2009-10 to 47.70 BU in 2017-18. The number of
of transmission infrastructure and land, reducing SDUWLFLSDQWVLQSRZHUH[FKDQJHVKDVDOVRJURZQZLWK
WKH YDULDELOLW\ LQ UHQHZDEOH SRZHU JHQHUDWLRQ DQG RYHU  RSHQ DFFHVV FRQVXPHUV DFURVV YDULRXV
DFKLHYLQJEHWWHUJULGVWDELOLW\7KHPDLQREMHFWLYHRI states.
WKH3ROLF\LVWRSURYLGHDIUDPHZRUNIRUSURPRWLRQ The Commission in its Order dated 8.4.2015 directed
of large grid connected wind-solar PV hybrid system WKH3RZHU([FKDQJHVWRRSHUDWLRQDOL]HWKHH[WHQGHG
IRU RSWLPDO DQG HIÀFLHQW XWLOL]DWLRQ RI WUDQVPLVVLRQ market session (i.e. Round-the-clock, intra-day I
LQIUDVWUXFWXUH DQG ODQG UHGXFLQJ WKH YDULDELOLW\ FRQWLQJHQF\ PDUNHW  7KH SRZHU H[FKDQJHV KDYH
LQ UHQHZDEOH SRZHU JHQHUDWLRQ DQG DFKLHYLQJ VWDUWHGWKHLURSHUDWLRQVRQH[WHQGHGPDUNHWVHVVLRQ
better grid stability. Policy also aims to encourage LQ -XO\  ZKLOH FRQWLQXLQJ ZLWK WKH H[LVWLQJ
QHZ WHFKQRORJLHV PHWKRGV DQG ZD\ RXW LQYROYLQJ products for day-ahead contingency and intra-day
combined operation of wind and solar PV plants. markets.

These Regulations introduced New category of D. Power Market Monitoring


renewable projects such as Renewable Hybrid A well-functioning electricity market requires an
Generating Station with or without storage, HIIHFWLYHPDUNHWPRQLWRULQJSURFHVV$VSDUWRIWKH

84
electricity market monitoring process. the Central iii. Draft Central Electricity Regulatory Commission
Electricity Regulatory Commission (CERC) has been (Fees and Charges of Regional Load Despatch
preparing and disseminating information through Centre and other related matters) Regulations,
WZRUHSRUWV7KHVHDUH 2019
a. Monthly report on short-term transactions of LY 'LVFXVVLRQ 3DSHU RQ ´0DUNHW %DVHG (FRQRPLF
HOHFWULFLW\LQ,QGLDZLWKWKHREMHFWLYH 'LVSDWFK RI (OHFWULFLW\ 5HGHVLJQLQJ RI 'D\
L WRREVHUYHWKHWUHQGVLQYROXPHDQGSULFHRIWKH Ahead Market (DAM) in India-
short-term transactions (contract period of less Y 'LVFXVVLRQ 3DSHU RQ ´5H'HVLJQLQJ $QFLOODU\
than one year) of electricity; 6HUYLFHV0HFKDQLVPLQOQGLD
ii. to analyse competition among the market
YL 'LVFXVVLRQ 3DSHU RQ 5H'HVLJQLQJ 5HDO 7LPH
players; and
Electricity Market in India”
LLL WR GLVFORVH  GLVVHPLQDWH DOO UHOHYDQW PDUNHW
YLL6WDII SDSHU RQ 5HYLVHG 0HWKRGRORJ\ IRU
information.
Application of the Escalation Rates for Payment’
Here, “short term transaction of electricity- refers
F. E-Court System - SAUDAMINI
to contracts of less than one year period for
electricity transferred under bilateral transactions  .HHSLQJ ZLWK WKH GUHDP RI 'LJLWDO ,QGLD &HQWUDO
through inter-State Trading Licensees (only Electricity Regulatory Commission (CERC) has
inter-State part) and directly by the Distribution ODXQFKHG DQ HÀOLQJ DSSOLFDWLRQ ZHI 
/LFHQVHHV 3RZHU ([FKDQJHV DQG 'HYLDWLRQ under its project -Court Case Management
Settlement Mechanism (DSM). $XWRPDWLRQ 6\VWHPµ &&0$6  WR GHYHORS DQ
LQWHJUDWHG ÁH[LEOH DQG G\QDPLF GDWDEDVH IRU ÀOLQJ
b. Annual Report on the Short-term Power Market
of petitions and other documents online. Through
LQ,QGLD&(5&EURXJKWRXWWKH5HSRUWRQ6KRUW
WKHHÀOLQJDSSOLFDWLRQXVHUVFDQÀOHWKHLUSHWLWLRQV
Term Power Market in India for the year 2017-
UHSOLHVUHMRLQGHUVRWKHUGRFXPHQWVRQOLQHDQGFDQ
18. The report mainly analyses the trends in WUDFNYLHZWKHVWDWXVRIWKHLUSHWLWLRQV,WRIIHUVTXLFN
short-term transactions of electricity, analysis of and easy access to CERC’s legal system and is a part
RSHQ DFFHVV FRQVXPHUV RQ SRZHU H[FKDQJHV RI WKH RUJDQLVDWLRQ·V RQJRLQJ HIIRUWV WR DFKLHYH
major sellers and buyers of electricity through WKH REMHFWLYHV RI VSHHG\ GLVSRVDO WUDQVSDUHQF\
WUDGLQJ OLFHQVHHV DQG SRZHU H[FKDQJHV HIIHFWV LQWURGXFLQJ HFRQRP\ DQG HIÀFLHQF\ :LWK IHDWXUHV
RI FRQJHVWLRQ RQ YROXPH RI HOHFWULFLW\ WUDGHG VXFK DV 606 LQWLPDWLRQV RQOLQH VHUYLFH RI QRWLFHV
WKURXJKH[FKDQJHVWUDGLQJPDUJLQVFKDUJHGE\ online communication of record of proceedings,
trading licensees. trading of Renewable Energy RUGHUV HWF WKH HÀOLQJ V\VWHP LV DLPHG DW
&HUWLÀFDWHRQSRZHUH[FKDQJHVDQG&RPSDULVRQ transforming the manner in which the legal system
of short-term price with tariff of long term sources in CERC functions.
RISRZHUIRUYDULRXVGLVWULEXWLRQFRPSDQLHV
,Q H[HUFLVH RI WKH SRZHUV FRQIHUUHG E\ 6HFWLRQ  RI WKH
E. Draft Regulations/ Discussion Papers (other (OHFWULFLW\ $FW  WKH &HQWUDO *RYHUQPHQW FRQVWLWXWHG
WKDQWKRVHIRUZKLFKÀQDOUHJXODWLRQVKDYHEHHQ a two member (including Chairperson) Joint Electricity
issued) 5HJXODWRU\&RPPLVVLRQIRUDOO8QLRQ7HUULWRULHVH[FHSW'HOKL
i. Draft Central Electricity Regulatory Commission to be known as ‘Joint Electricity Regulatory Commission for
*UDQW RI &RQQHFWLYLW\ /RQJWHUP $FFHVV DQG 8QLRQ 7HUULWRULHV· ZLWK +HDGTXDUWHU DW 'HOKL DV QRWLÀHG YLGH
Medium-term Open Access in inter-State QRWLÀFDWLRQQR5 5GDWHGQG0D\/DWHU
with the joining of the State of Goa, the Commission came to
7UDQVPLVVLRQ DQG UHODWHG PDWWHUV  6HYHQWK
be known as ‘Joint Electricity Regulatory Commission for the
Amendment) Regulations, 2018
6WDWHRI*RDDQG8QLRQ7HUULWRULHV·DVQRWLÀHGYLGHQRWLÀFDWLRQ
ii. Draft Central Electricity Regulatory’ Commission QR   5 5 9RO ,,  RQ WK 0D\  7KH -RLQW
6WDII&DU'ULYHU 5HJXlations, 2019 Electricity Regulatory Commission for the State of Goa and

85
Annual Report 2018-19

Union Territories started functioning with effect from August l) discharge such other functions as may be assigned
7KHRIÀFHRIWKH&RPPLVVLRQLVSUHVHQWO\ORFDWHGLQD to it under the Act.
rented building in the district town of Gurgaon, Haryana.
 7KH&RPPLVVLRQVKDOODGYLVHWKH6WDWH8QLRQ7HUULWRU\
 $VSHUWKH(OHFWULFLW\$FWWKH&RPPLVVLRQLVYHVWHG *RYHUQPHQW RQ DOO RU DQ\ RI WKH IROORZLQJ PDWWHUV
with the responsibility of discharging the following QDPHO\
IXQFWLRQV
D  SURPRWLRQ RI FRPSHWLWLRQ HIÀFLHQF\ DQG HFRQRP\
a) determine the tariff for generation, supply, LQDFWLYLWLHVRIWKHHOHFWULFLW\LQGXVWU\
transmission and wheeling of electricity, wholesale,
E  SURPRWLRQRILQYHVWPHQWLQHOHFWULFLW\LQGXVWU\
bulk or retail, as the case may be;
F  UHRUJDQL]DWLRQ DQG UHVWUXFWXULQJ RI HOHFWULFLW\
b) regulate electricity purchase and procurement
LQGXVWU\LQWKH6WDWH87V
process of distribution licensees including the
price at which electricity shall be procured from the d) matters concerning generation, transmission,
generating companies or licensees or from other distribution and trading of electricity or any other
sources through agreements for purchase of power matter referred to the Joint Commission by that
IRU GLVWULEXWLRQ DQG VXSSO\ ZLWKLQ WKH 6WDWH8QLRQ *RYHUQPHQW
Territories; 2.1 The Commission shall ensure transparency while
c) facilitate intra-state transmission and wheeling of H[HUFLVLQJLWVSRZHUVDQGGLVFKDUJLQJLWVIXQFWLRQV
electricity; 2.2 In discharge of its functions, the Joint Commission shall
d) issue licenses to persons seeking to act as be guided by the Electricity Act, 27303, the National
transmission licensees, distribution licensees and Electricity Policy, National Electricity Plan and Tariff
electricity traders with respect to their operations Policy.
ZLWKLQWKH6WDWH8QLRQ7HUULWRULHV The Joint Electricity Regulatory Commission is
e) promote cogeneration and generation of electricity FRPPLWWHGWRIXOÀOOLWVPDQGDWHIRUFUHDWLQJDQHIÀFLHQW
IURP UHQHZDEOH VRXUFHV RI HQHUJ\ E\ SURYLGLQJ DQG HFRQRPLFDOO\ YLDEOH HOHFWULFLW\ V\VWHP LQ WKH 6WDWH
VXLWDEOHPHDVXUHVIRUFRQQHFWLYLW\ZLWKWKHJULGDQG of Goa & the Union Territories, balance the interests of
sale of electricity to any person and also specify DOOVWDNHKROGHUVZKLOHIXOÀOOLQJLWVSULPDU\UHVSRQVLELOLW\
for purchase of electricity from such sources a to ensure reliable supply of power at affordable rates
percentage of the total consumption of electricity in and shall be guided by the principles of transparency,
the area of a distribution license; accountability, equitability and participation in discharge
of its functions, to safeguard the interests of the licensees
f) adjudicate upon the disputes between the licensees
and generating companies in the State of Goa & Union
and generating companies and to refer any dispute
7HUULWRULHV DQG WR JLYH D IDLU GHDO WR FRQVXPHUV DW WKH
for arbitration;
same time.
J  OHY\IHHIRUWKHSXUSRVHVVSHFLÀHGXQGHUWKLV$FW
7RDFKLHYHWKHDERYHWKH&RPPLVVLRQDLPVWR
h) specify State Grid Code consistent with the Indian
D  3URPRWHFRPSHWLWLRQHIÀFLHQF\DQGHFRQRP\LQWKH
(OHFWULFLW\ *ULG &RGH ,(*&  VSHFLÀHG E\ &HQWUDO
DFWLYLWLHVRIWKH(OHFWULFLW\,QGXVWU\ZLWKLQWKH6WDWHRI
Electricity regulatory Commission;
Goa & Union Territories;
i) specify or enforce standards with respect to quality,
E  5HJXODWH HIIHFWLYHO\ WKH SRZHU SXUFKDVH DQG
FRQWLQXLW\DQGUHOLDELOLW\RIVHUYLFHE\OLFHQVHHV
procurement process of the distribution licensees for
M  À[ WKH WUDGLQJ PDUJLQ LQ WKH LQWUD6WDWH WUDGLQJ RI sale, distribution and supply of electricity within the
electricity, if considered necessary; State of Goa & Union Territories;

N  DSSURYDORI3RZHU3XUFKDVH$JUHHPHQWVDQG c) Encourage cogeneration and use of energy


generated from Renewable Sources;

86
d) Ensure Consumer satisfaction and create a YLLL'DGUD 1DJDU+DYHOL  
mechanism to redress complaints immediately; (Transmission)

e) Introduce open-access & reduce the cross-subsidy; L[ 3XGXFKHUU\3RZHU&RUSRUDWLRQ


Limited 16.03.2018
I  ,PSURYHDFFHVVWRLQIRUPDWLRQIRUDOO6WDNHKROGHUV
Tariff Orders for all the Utilities were issued within the
 1RWLÀFDWLRQ$PHQGPHQWRI5HJXODWLRQV
VFKHGXOHG WLPH DQG WKH\ KDYH EHHQ ZHOO LPSOHPHQWHG
 7KHIROORZLQJ5HJXODWLRQVKDYHEHHQQRWLÀHGDPHQGHG by all the Departments.
NHHSLQJLQYLHZRIWKHODWHVWGHYHORSPHQWVLQWKHSRZHU
5. The Commission has already issued8 Orders for
VHFWRU
DSSURYDO RI %XVLQHVV 3ODQ IRU 0XOWL<HDU &RQWURO
1. Joint Electricity Regulatory Commission for the State Period from FY 2019-20 to FY 2021-22 for all the
RI*RDDQG8QLRQ7HUULWRULHV &RQQHFWLYLW\DQG2SHQ territories under the jurisdiction of JERC namely
Access in Intra-State Transmission and Distribution) Andaman & Nicobar Islands, Chandigarh, Daman &
5HJXODWLRQVQRWLÀHGRQ Diu, DNH Power Distribution Corporation Limited,
2. Joint Electricity Regulatory Commission for the Puducherry, Lakshadweep and the State of Goa and
State of Goa and Union Territories (Generation, one Transmission Company namely Dadra & Nagar
Transmission and Distribution Multi Year Tariff) +DYHOL 7UDQVPLVVLRQ 
5HJXODWLRQVQRWLÀHGRQ 6. Major Target likely to be achieved upto
3. Joint Electricity Regulatory Commission for the State 31’ March 2019
of Goa and Union Territories (Electricity Supply Code)  *HQHUDWLRQ7UDQVPLVVLRQDQG'LVWULEXWLRQ$557DULII
5HJXODWLRQVQRWLÀHGRQ Orders (Nine in numbers) for Multi-Year control
4. Annual Revenue Requirement and Tariff period from FY 2019-20 to FY 2021-22 are likely
determination for FY 2018-19 WR EH LVVXHG IRU DOO WKH VHYHQ GLVWULEXWLRQ XWLOLWLHV
under the jurisdiction of JERC namely Andaman &
 7KH &RPPLVVLRQ KDG DSSURYHG $55 2UGHUV IRU WKH )< Nicobar Islands, Chandigarh, Daman & Diu, DNH
2018-19 and determined tariff for FY 2018-19 as per Power Distribution Corporation Limited, Puducherry,
GHWDLOHGEHORZ Lakshadweep and the State of Goa,one Generation
i. Goa 28.03.2018 Company namely Puducherry Power Corporation
Limited (PPCL) and one Transmission Company
ii. DNH Power Distribution
QDPHO\'DGUD 1DJDU+DYHOL 7UDQVPLVVLRQ 
Corporation Limited 30.01.2018
 7KH&RPPLVVLRQKDVH[WHQGHGWKH6RODU5HJXODWLRQV
iii. Daman & Diu 13.03.2018
for a period of one year alongwith some other
LY 3XGXFKHUU\    dispensations. In the meantime the Commission
LQWHQGV WR UHYLHZ WKH H[LVWLQJ 6RODU 5HJXODWLRQV
Y &KDQGLJDUK   
DQG LVVXH FRPSUHKHQVLYH 5HQHZDEOH 5HJXODWLRQV
YL $QGDPDQ 1LFREDU,VODQGV  considering other renewable mode of Generation
YL]%LR0DVV7LGDO)ORDWLQJVRODUHWF
YLL /DNVKDGZHHS   

87
Annual Report 2018-19

N9+\GHUDEDG²:DUGKD'FOLQH

88
CHAPTER 18

APPELLATE TRIBUNAL FOR ELECTRICITY (APTEL)

1. The Appellate Tribunal for Electricity (APTEL) has been CourWRIDOO6WDWHVH[FHSWWKH6WDWHRI-DPPX .DVKPLU
VHWXSXQGHUWKHSURYLVLRQVRIWKH(OHFWULFLW\$FW on the subject were also transferred to this tribunal.
6HFWLRQ ZLWKDOO,QGLD-XULVGLFWLRQV H[FHSWWKHVWDWH
 $Q\ SHUVRQ DJJULHYHG E\ DQ RUGHU PDGH E\ DQ
RI - .  DQG KDV EHHQ HVWDEOLVKHG RQ WK 0D\ 
DGMXGLFDWLQJ RIÀFHU XQGHU WKH (OHFWULFLW\ $FW 
It started accepting appeals w.e.f. 21st July, 2005. The
H[FHSW XQGHU VHFWLRQ   RU DQ RUGHU PDGH E\ WKH
Tribunal is presently located at 7th Floor, Core-4, SCOPE
Appropriate Commission under this Act may prefer
&RPSOH[/RGKL5RDG1HZ'HOKL
an appeal to the Appellate Tribunal for Electricity. Any
2. APTEL is headed by a Chairperson. Hon’ble Mrs. person appealing against the order of the adjudicating
Justice Manjula Chellur former Hon’ble Chief Justice RIÀFHUOHY\LQJDQ\SHQDOW\VKDOOZKLOHÀOLQJWKHDSSHDO
RI +LJK &RXUWV RI 0XPEDL .DUQDWDND DQG .HUDOD LV GHSRVLWWKHDPRXQWRIVXFKSHQDOW\(YHU\DSSHDOVKDOO
the Chairperson of the Tribunal w.e.f. 13.08.2018. The EH ÀOOHG ZLWKLQ D SHULRG RI  GD\V IURP WKH GDWH RQ
7ULEXQDOLVDOVRKDYLQJWKHSRVWVRI2QH-XGLFLDO0HPEHU which a copy of the order made by the adjudicating
DQGWKUHH7HFKQLFDO0HPEHUV+RQ·EOH0U-XVWLFH1. RIÀFHURUWKH$SSURSULDWH&RPPLVVLRQLVUHFHLYHGE\WKH
3DWLOIRUPHU-XGJHRI.DUQDWDND+LJK&RXUWLVWKH-XGLFLDO DJJULHYHGSHUVRQ 6HFWLRQ 
Member and Shri S. D. Dubey is the Technical Member
7. Proceedings are conducted in two Courts, each Court
RI WKLV 7ULEXQDO +RQ·EOH 6KUL ,- .DSRRU ZDV DOVR WKH
consisting of one Judicial Member and a Technical
Technical Member of the Tribunal upto 20.08.2018.
Member.
3. The Tribunal has also been conferred jurisdiction under
 $VRQVW0DUFKDSSHDOVSHWLWLRQVPDWWHUV
the Petroleum and Natural Gas Regulatory Board Act.,
HWF KDYH EHHQ ÀOHG 2XW RI ZKLFK  KDYH EHHQ
 WR KHDU DSSHDOV DJDLQVW WKH RUGHUVGHFLVLRQV RI
disposed of (number of pending matters as on 31.03.2019
the Petroleum and Natural Gas Regulatory Board set
is 2303 including Appeals, Interim Applications, Original
XSXQGHUWKH$FW7KH7ULEXQDOLVKDYLQJRQH7HFKQLFDO 3HWLWLRQV5HYLHZ3HWLWLRQV5HYLVLRQ3HWLWLRQV([HFXWLRQ
Member (P & NG), Sh. B. N. Talukdar. Petitions & Contempt Petitions etc.

 $WSUHVHQW'U$VKX6DQMHHY7LQMDQLVWKH5HJLVWUDURIWKH 9. Thus within a short span of its operating, APTEL has
Tribunal. She is a member of Haryana Superior Judicial become fully operational and has been successful in
6HUYLFHVLQWKHUDQNRI$GGO'LVWULFW 6HVVLRQV-XGJH GLVSRVLQJRIDODUJHQXPEHURIPDWWHUVWKXVH[SHGLWLQJ
justice. The Tribunal is also operating Circuit Benches
 $37(/ KHDUV DQG GLVSRVHV RI DSSHDOV ÀOHG DJDLQVW WKH
VLWWLQJLQ&KHQQDL0XPEDLDQG.RONDWD
orders of the Central Electricity Regulatory Commission,
State Electricity Regulatory Commissions, Joint  7KH ZHEVLWH RI WKH 7ULEXQDO ZZZDSWHOJRYLQ  LV
&RPPLVVLRQVDQG$GMXGLFDWLQJ2IÀFHUV6XEVHTXHQWWR SURYLGLQJ HDV\ DFFHVV WR WKH GDLO\ FDVHV OLVWV DQG
the setting up of APTEL, the appeals pending in the High MXGJPHQWVRUGers.

89
Annual Report 2018-19

173&.DQLKDSODQW7DOFKHU

90
CHAPTER 19

NTPC LIMITED
 173&/LPLWHGD0DKDUDWQD&RPSDQ\RIWKH*RYHUQPHQW 2.4. NTPC has discontinued operations at Badarpur
of India, is the largest power generator in India with 7KHUPDO 3RZHU 6WDWLRQ 1HZ 'HOKL KDYLQJ
FRPSUHKHQVLYHLQKRXVHFDSDELOLWLHVLQFRQVWUXFWLQJDQG LQVWDOOHG FDSDFLW\ RI  0: ZLWK HIIHFW IURP
RSHUDWLQJSRZHUVWDWLRQV173&KDVDQDXWKRUL]HGVKDUH 15th October 2018 as per the Graded Response
capital of Rupees 10,000 Crore, while the paid up capital $FWLRQ 3ODQ *5$3  RI (QYLURQPHQW 3ROOXWLRQ
is Rupees 8,245.5 Crore. As on 31st March 2019, 56.19% 3UHYHQWLRQDQG&RQWURO $XWKRULW\$Q(FRSDUN
HTXLW\LVKHOGE\WKH*RYHUQPHQWRI,QGLD ZRXOGEHGHYHORSHGDWWKLVVLWH

NTPC’s Vision is “To be the world’s leading power 2.5. Construction work is in progress at 21 projects
FRPSDQ\ HQHUJL]LQJ ,QGLD·V JURZWKµ DQG 0LVVLRQ LV ZLWKDQDJJUHJDWHFDSDFLW\RI0:
WR ´3URYLGH UHOLDEOH SRZHU DQG UHODWHG VROXWLRQV LQ DQ
2.6. .XGJL8QLW 0: %RQJDLJDRQ8QLW 
HFRQRPLFDOHIÀFLHQWDQGHQYLURQPHQWIULHQGO\PDQQHU
0: %5%&/8QLW 0: DQG6RODSXU8QLW
GULYHQE\LQQRYDWLRQDQGDJLOLW\µ
0: LHWRWDO0:VWDUWHGFRPPHUFLDO
 &RUH9DOXHVRI173&DUHDVEHORZ RSHUDWLRQLQWKHFXUUHQWÀQDQFLDO\HDU

‡ Integrity, 2.7. NTPC acquired Barauni Thermal Power Project


from Bihar State Power Generation Company
 ‡ Customer Focus,
/LPLWHG %63*&/  ZKHUH WZR XQLWV RI  0:
 ‡ OUJDQL]DWLRQDO3ULGH each are in commercial operation and two units
 ‡ Mutual Respect and Trust, RI0:HDFKDUHXQGHUFRQVWUXFWLRQ

 ‡ IQQRYDWLRQDQG/HDUQLQJµDQG 2.8. 173& VR IDU KDV FRPPLVVLRQHG  0: 6RODU
39  0: ZLQG DQG  0: VPDOO K\GUREDVHG
 ‡ Total Quality and Safety”. 5HQHZDEOHFDSDFLW\&XUUHQWO\0:FDSDFLW\
In short, it is referred to as “ICOMIT”. Solar PV power project is under construction in
EPC mode.
 2YHUWKH\HDUV173&KDVDWWDLQHGDJOREDOVWDWXUH,QWKH
Platts Top 250 Global Energy Companies for 2018, NTPC 3. COMMERCIAL PERFORMANCE
has been ranked number 1 Independent Power Producer 3.1. 3.1. Extension of TPA: *RYHUQPHQW RI ,QGLD
in the world. KDV DSSURYHG WKH H[WHQVLRQ RI WKH 7UL 3DUWLWH
2. OPERATIONAL PERFORMANCE HIGHLIGHTS FOR Agreement (TPA) signed amongst the Central
THE YEAR 2018-19 *RYHUQPHQW 5HVHUYH %DQN RI ,QGLD DQG
WKH UHVSHFWLYH 6WDWH *RYHUQPHQWV 7KH 73$
2.1. *URVVJHQHUDWLRQIURP173&VWDWLRQVH[FOXGLQJ
mechanism secures the payments of the Central
MRLQWYHQWXUHVLV%8'XULQJWKHSHULRG
Power Sector Companies towards supply of
173&FRDOEDVHGVWDWLRQVDFKLHYHGD3/)RIPRUH
HOHFWULFLW\WRWKH'LVWULEXWLRQ8WLOLWLHV6WDWHV
WKDQZLWKDYDLODELOLW\LQFOXGLQJ
87V KDYH VR IDU VLJQHG WKH $JUHHPHQW DQG
5HVHUYH6KXWGRZQ
signing by 2 states namely Maharashtra and
2.2. 6L[ 173& FRDO VWDWLRQV DFKLHYHG PRUH WKDQ  Punjab is awaited.
3/)YL]6LSDW  9LQGK\DFKDO  
3.2. Billing and Realization: NTPC has been able to
7DOFKHU7KHUPDO  .RUED  5LKDQG
FRQVLVWHQWO\PDLQWDLQUHDOL]DWLRQRIELOOVIRU
(86.33%) and Barh (85.14%).
16 years in succession. During the 2018-19 NTPC
2.3. ,QVWDOOHG FDSDFLW\ RI 173& LV  0: KDVUHDOL]HG,15&U 5XSHHV1LQHW\7KUHH
LQFOXGLQJ  0: XQGHU -9V  6XEVLGLDULHV  7KRXVDQG 6L[ +XQGUHG 6L[W\ )LYH &URUH  DJDLQVW
Details of NTPC’s installed capacity are placed at the billing of INR 93,494 Cr.(Rupees Ninety
$QQH[XUH, Three Thousand Four Hundred Ninety Four

91
Annual Report 2018-19

Crore). As part of the payment security, Letters of 5. GROWTH


Credit (LC) of the amount equal to 105% of the
NTPC has prepared its long term Corporate Plan for a
DYHUDJHPRQWKO\ELOOLQJRIEHQHÀFLDULHVLVEHLQJ
WLPHKRUL]RQWLOOZKLFKOD\VWKHEURDGURDGPDSIRU
PDLQWDLQHGE\PRVWRIWKHEHQHÀFLDULHV
NTPC’s growth. Under this plan, NTPC has targeted to
3.3. Customer Relationship Management: KDYHDQLQVWDOOHGFDSDFLW\RI*:E\WKH\HDU
Customer Focus has been central to NTPC’s ZLWK D ZHOOGLYHUVLÀHG IXHO PL[ RI &RDO   *DV
commercial philosophy. This is in line with the (4.6%), Solar (23.1%), Hydro (3.8%), Other RE (1.5%) and
FRUH YDOXHV RI 173& ZKLFK FRQWDLQV &XVWRPHU Nuclear (1.5%).
Focus as a key element. 5.1. Capacity Addition Program
 7RLQWHQVLI\WKHFXVWRPHUIRFXVVHYHUDOLQLWLDWLYHV Construction work is in progress for 19,856
KDYHEHHQWDNHQE\173&&XVWRPHU5HODWLRQVKLS 0: FDSDFLW\ DW  SURMHFW ORFDWLRQV LQFOXGLQJ
0DQDJHPHQW &50 LVRQHRIWKHNH\LQLWLDWLYHV Joint Ventures & Subsidiaries. Details placed at
undertaken to strengthen the relationship with Annexure-II.
customers.
5.2. Growth through Joint Ventures/ Subsidiaries:
Under CRM, regular structured interactions with NTPC has formed Joint Venture and Subsidiaries
customers take place for getting feedbacks companies for pursuing growth. Details of these
from the customers and understanding their FRPSDQLHVDUHSODFHGDW$QQH[XUH,,,
H[SHFWDWLRQV%DVHGRQWKHVHLQWHUDFWLRQV173&
5.3. Initiatives for Capacity Addition in
LGHQWLÀHV SRWHQWLDO DUHDV RI FRRSHUDWLRQ DQG
neighboring Countries (through JVs)
SURYLGHVYDULRXVVXSSRUWVHUYLFHVOLNH'LVWULEXWLRQ
loss reduction, sharing of best practices, Power 5.3.1. Bangladesh: 173& KDV IRUPHG D MRLQW YHQWXUH
3ODQW SHUIRUPDQFH LPSURYHPHQW &RPPHUFLDO company called Bangladesh India Friendship
aspects of power business etc. to them. This Power Company Limited (BIFPCL), which is a
DOVR SURYLGHV DQ RSSRUWXQLW\ IRU VKDULQJ RI  -RLQW 9HQWXUH FRPSDQ\ RI 173& DQG
each other’s best practices. Further, NTPC offers %DQJODGHVK 3RZHU 'HYHORSPHQW %RDUG %3'% 
WUDLQLQJ SURJUDPV WR WKH UHSUHVHQWDWLYHV RI to set up a coal based power plant. This JV
EHQHÀFLDU\ FRPSDQLHV DW 3RZHU 0DQDJHPHQW FRPSDQ\ LV VHWWLQJ XS D  0: FRDO EDVHG
Institute (PMI). In 2018-19, 74 participants from SRZHUSURMHFWLQ%DQJODGHVKDW5DPSDO .KXOQD 
YDULRXVFXVWRPHURUJDQL]DWLRQVDWWHQGHGWUDLQLQJ This project has been christened as Maitri Power
in 20 programs. 3URMHFW&RQVWUXFWLRQDFWLYLWLHVDUHLQSURJUHVV

3.4. Sale of URS Power: NTPC has been selling URS 5.3.2. Sri Lanka: 173& KDV D MRLQW YHQWXUH FRPSDQ\
SRZHU LQ WKH 3RZHU ([FKDQJH RQ WKH EDVLV RI ‘Trincomalee Power Company Limited’ in Sri
FRQVHQWVUHFHLYHGIURPWKHEHQHÀFLDULHV'XULQJ /DQND ZLWK HTXDO   HTXLW\ FRQWULEXWLRQ
 ÀQDQFLDO \HDU 173& VROG  08 856 from NTPC and Ceylon Electricity Board (CEB) of
Power. The gains from this sale has been shared Sri Lanka.
ZLWKWKHEHQHÀFLDULHVLQWKHUDWLRRILQOLQH This JV Company was formed to undertake
ZLWKSURYLVLRQVXQGHU7DULII3ROLF\ WKH GHYHORSPHQW FRQVWUXFWLRQ HVWDEOLVKPHQW
4. FINANCIAL PERFORMANCE operation and maintenance of coal based
WKHUPDO SRZHU SODQW RI  0:  [  0: 
 173&KDVEHHQPDLQWDLQLQJVRXQGÀQDQFLDOSHUIRUPDQFH capacity at Trincomalee in Sri Lanka.
During April-December 2018, NTPC recorded a total
LQFRPHRI,15&U 5XSHHV6L[W\1LQH7KRXVDQG  )XUWKHUWKH*RYHUQPHQWRI6UL/DQND *R6/ KDV
6L[+XQGUHGDQG7KLUW\)RXU&URUH  8QDXGLWHG DQGQHW requested the GoI for changing fuel sources to
SURÀWDIWHUWD[RI,15&U 5XSHHV6HYHQ7KRXVDQG /LTXHÀHG 1DWXUDO *DV /1*  DQG IRU UHORFDWLQJ
Four Hundred Crore) (unaudited). WKH3URMHFWDW.HUDZDOSLWL\D7KHVDPHKDVEHHQ
agreed by GoI.

92
GoSL has issued letter of intent to GoI for (NPCIL) with equity holding 49% and 51%
GHYHORSPHQW RI  0: /1* SURMHFW DQG  UHVSHFWLYHO\ WR VHW XS 1XFOHDU 3RZHU 3URMHFWV
0: VRODU SURMHFW 5HYLVHG 3URMHFW $JUHHPHQWV This JV Company named “Anushakti Vidyut
DUHXQGHUÀQDOLVDWLRQ Nigam Limited” was incorporated on 27.01.2011.

5.3.3. 173&LVDOVRH[SORULQJEXVLQHVVRSSRUWXQLWLHVLQ 5.6. 6WUDWHJLF 'LYHUVLÀFDWLRQ ,Q RUGHU WR VWUHQJWKHQ


Myanmar, Oman, Qatar and Morocco. LWV FRPSHWLWLYH DGYDQWDJH LQ SRZHU JHQHUDWLRQ
EXVLQHVV 173& KDV GLYHUVLÀHG LWV SRUWIROLR WR
5.4. Renewable Energy
areas such as coal mining, consultancy, power
 7KHEULHIVWDWXVRI173&·VUHQHZDEOHLQLWLDWLYHVLV trading etc.
JLYHQEHORZ
5.6.1. Development of Captive Coal Mines: Coal
 6RODU 3RZHU 3URMHFWV 173& KDV DOUHDG\ mining is integral to NTPC’s fuel security
FRPPLVVLRQHG  0: RI VRODU SURMHFWV XQGHU VWUDWHJLHV 173& UHDOL]HV WKDW JUHDWHU VHOI
(3&PRGHDQG0:RI6RODUSURMHFWVXQGHU reliance on coal will go a long way in ensuring
'HYHORSHU0RGH173&KDVZRQ0:RI6RODU the sustained growth of generation.
SURMHFWV XQGHU 7DULII EDVHG FRPSHWLWLYH ELGGLQJ
 *RYW RI ,QGLD KDV DOORFDWHG  PLQHV WR 173&
and presently under implementation. Also 1,000
Eight coal mines namely Pakri-Barwadih, Chatti-
0: RI 6RODU SURMHFWV XQGHU 'HYHORSHU PRGH LV
%DULDWX .HUDQGDUL 7DODLSDOOL 'XODQJD %DQDL
under implementation.
%KDOXPXGDDQG0DQGDNLQL%KDYHGLUHFWO\EHHQ
 )XUWKHU173&KDVUHFHQWO\DZDUGHG0:RI DOORFDWHG WR 173& ,Q DGGLWLRQ *RYHUQPHQW RI
6RODUSURMHFWVZLWK,676FRQQHFWLYLW\DQGORFDWHG ,QGLD KDV DOVR DOORFDWHG .XGDQDOL/XEXUL FRDO
DQ\ZKHUH LQ ,QGLD LQ 'HYHORSHU 0RGH 33$36$ EORFN MRLQWO\ WR 173& DQG -DPPX  .DVKPLU
for these projects are likely to be concluded 6WDWH 3RZHU 'HYHORSPHQW &RPSDQ\ /LPLWHG
shortly. - .63'&/  6LPLODUO\ %DQKDUGLK FRDO EORFN
Further, solar projects of aggregate capacity allocated earlier to Jharkhand Urja Utpadan
 0: LQ WKH ODQG DYDLODEOH LQ 173&·V 3RZHU Nigam Limited, has now been allocated to Patratu
VWDWLRQVDUHXQGHUYDULRXVVWDJHVRIWHQGHULQJ Vidyut Utpadan Nigam Limited, a subsidiary
company incorporated between NTPC and
 )ORDWLQJ 6RODU SURMHFWV RI  0: FDSDFLW\ LQ *RYHUQPHQW RI -KDUNKDQG )XUWKHU %DGDP &RDO
ZDWHU UHVHUYRLUV RI 173& WKHUPDO VWDWLRQV DUH Mine, linked to Barauni Thermal Power Project is
XQGHUYDULRXVVWDJHVRIWHQGHULQJ DOVRXQGHUSURFHVVRIWDNLQJRYHUE\173&
In addition, NTPC has already installed Roof Top  7KH HVWLPDWHG JHRORJLFDO UHVHUYH RI DOO FRDO
Solar projects and also planning to further install blocks allocated to NTPC is about 7.3 billion
RQ VRPH RI LWV WRZQVKLSV DQG RIÀFH EXLOGLQJV Tonnes with an estimated ultimate production
ZKHUHYHUDGHTXDWHVKDGRZIUHHDUHDLVDYDLODEOH capacity of 116 Million Tonnes of coal per annum.
 :LQG3RZHU3URMHFW173&KDVFRPPLVVLRQHGLWV Coal production has commenced from Pakri-
ÀUVWZLQGHQHUJ\EDVHG0:SURMHFWLQ*XMDUDW Barwadih and Dulanga coal mines. During the
)XUWKHU173&KDVUHFHQWO\DZDUGHG0:RI current Financial Year 2018-19 7.31 MMT coal has
:LQGSURMHFWVZLWK,676FRQQHFWLYLW\DQGORFDWHG been produced from these mine. Other mines are
DQ\ZKHUH LQ ,QGLD LQ 'HYHORSHU 0RGH  33$ XQGHUGLIIHUHQWVWDJHVRIGHYHORSPHQW
PSA for these projects are likely to be concluded
shortly. 5.6.2. Consultancy: &RQVXOWDQF\:LQJRI173&ZDVVHW
XSLQWRVKDUH&RPSDQ\·VYDULHGH[SHULHQFH
5.5. Nuclear Power DQG SURYHQ V\VWHPV ,W SURYLGHV FRQVXOWDQF\
NTPC Limited has formed a JV company with VHUYLFHV WR 'RPHVWLF DQG ,QWHUQDWLRQDO FOLHQWV
Nuclear Power Corporation of India Limited LQ YDULRXV SKDVHV RI SRZHU SODQWV 7KH VHUYLFHV

93
Annual Report 2018-19

FRYHU ´&RQFHSW WR FRPPLVVLRQLQJ DFWLYLWLHV DQG NVVN has also traded 97 MU of Renewable
EH\RQGµ VXFK DV 2ZQHUV (QJLQHHU 6HUYLFHV (QHUJ\&HUWLÀFDWHV 5(&V WLOOVW0DUFKLQ
/HQGHU·V(QJLQHHU6HUYLFHV3URMHFW0DQDJHPHQW 3RZHUH[FKDQJH
 &RQVWUXFWLRQ 6XSHUYLVLRQ 6HUYLFHV 2 0
6. TECHNOLOGY INITIATIVES
6HUYLFHV LQFOXGLQJ 3HUIRUPDQFH HQKDQFHPHQW
5HQRYDWLRQ  0RGHUQL]DWLRQ 6HUYLFHV 4XDOLW\  173& /WG KDV SLRQHHUHG WKH DGRSWLRQ RI VHYHUDO
$VVXUDQFH ,QVSHFWLRQ VHUYLFHV &XVWRPL]HG QHZ WHFKQRORJLHV LQFOXGLQJ ÁRDWLQJ VRODU 39 
7UDLQLQJ  ,7 UHODWHG 6HUYLFHV (53 VHUYLFHV kV Switchyard, Ash water recirculation, Liquid waste
Procurement, Recruitment and HR related management systems, PADO (Performance Analysis
VHUYLFHV 2 0 RI 6WUDQGHG DVVHWV HWF 0DMRU DQG'LDJQRVWLF2SWLPL]DWLRQ 7XQQHO%RULQJ0DFKLQHV
FOLHQWHOHLQGRPHVWLFVHFWRULQFOXGHYDULRXVVWDWH and Supercritical technology. These technologies
XWLOLWLHV  368V DQG SULYDWH VHFWRU FRPSDQLHV KDYH FRQWULEXWHG WR LQFUHDVH HIÀFLHQF\ DQG JUHDWHU
173&&RQVXOWDQF\LVDFWLYLW\HQJDJHGLQSURYLGLQJ HQYLURQPHQWDO SURWHFWLRQ LQ LWV RSHUDWLRQV DQG WKHVH
VXSSRUW WR YDULRXV FOLHQWV LQ DUHDV RI )*' 'H KDYHEHHQDGRSWHGZLGHO\LQWKH,QGLDQSRZHULQGXVWU\
12[LQVWDOODWLRQWRPHHWQHZHQYLURQPHQWQRUPV as well.
renewable energy projects, coal mining, fuel gas  :LWK HPSKDVLV RQ HIÀFLHQF\ RI HOHFWULFLW\ JHQHUDWLRQ
ZDVWHKHDWEDVHGDLUFRQGLWLRQLQJGHVDOLQDWLQJ NTPC has adopted ultra-super critical technology by
R&M etc. LPSURYLQJ WKH VWHDP SDUDPHWHUV IRU 1RUWK .DUDQSXUD
NTPC Consultancy has been associated with ;0: WRNJFPo&o&)RU.KDUJRQH
D FDSDFLW\ RI DURXQG  0: LQ ,QGLD DQG ;0: 7HODQJDQD ;0: DQG3DWUDWX [
abroad. 0:  VWHDP SDUDPHWHU DUH  NJFP o& oC.
3ODQW HIÀFLHQF\ RI WKHVH XQLWV LV H[SHFWHG WR LQFUHDVH
 173& &RQVXOWDQF\ KDG VXFFHVVIXOO\ SURYLGHG
E\ DURXQG  RYHU WKDW RI D FRQYHQWLRQDO VXEFULWLFDO
2 0VHUYLFHVWR[0:6LGGKLUJDQM3HDNLQJ
 0: XQLW DQG  RYHU FRQYHQWLRQDO VXSHU FULWLFDO
Power Plant (SPPP) for last 6 years with effect
units using similar coal.
from 01-11-2012. NTPC has been instrumental
LQ SURYLGLQJ DOO V\VWHPV IRU HIÀFLHQW RSHUDWLRQ To reduce water usage, Air-cooled condenser technology
RISRZHUSODQW173&FRQVXOWDQF\KDVSURYLGHG LV XQGHU LPSOHPHQWDWLRQ DW 1RUWK .DUDQSXUD 6XSHU
2ZQHU·V (QJLQHHUV 6HUYLFHV WR  0: Thermal Power project and Patratu Super Thermal Power
[ 0:  6LQJDUHQL &ROOLHULHV &RUSRUDWLRQ Project.
Limited Thermal Power Plant (SCCL TPP) till NTPC has formed an ash mound at its National
commissioning of both units. &DSLWDO3RZHU6WDWLRQ'DGULIRUVWRUDJHRIÁ\DVK7KLV
Further, during the year FY 2018-19, NTPC WHFKQRORJ\KDVFRPHRXWDVWKHPRVWYLDEOHDOWHUQDWLYH
&RQVXOWDQF\ KDV VHFXUHG  ZRUN MRE RUGHUV IRU DVK GLVSRVDO LQ DQ HFRQRPLF DQG HQYLURQPHQW
worth Rupees 227 Crore. friendly way by minimum use of land and water.

5.6.3. Power trading: NTPC’s 100% wholly owned  ,QGLDQ SURJUDP WR GHYHORS $86& WHFKQRORJ\ LV
subsidiary NTPC Vidyut Vyapar Nigam Limited underway by a consortium of NTPC, BHEL and IGCAR.
1991  LV LQYROYHG LQ SRZHU WUDGLQJ DQG LQ 7KH SURJUDP HQYLVDJHV GHYHORSPHQW RI LQGLJHQRXV
WKH FXUUHQW ÀQDQFLDO \HDU WLOO VW 0DUFK  WHFKQRORJ\ IRU VWHDP SDUDPHWHUV RI  .JFP2 and
LW KDV WUDGHG  08 SURYLVLRQDO  7RWDO ƒ&ƒ& WHPSHUDWXUH 6XFK SDUDPHWHUV DUH ZD\
YROXPH WUDGHG XS WR VW 0DUFK  LQFOXGHV higher than steam parameters used in contemporary
 08 SURYLVLRQDO  WUDGHG XQGHU VRODU  SODQWVJOREDOO\DQGZRXOGUHVXOWLQWRSRIOLQHHIÀFLHQF\
WKHUPDO EXQGOHG SRZHU  08 XQGHU 6:$3 of 46%. It will result in reduction of CO2 emissions to the
arrangements, 2,349 MU under bilateral trade, tune of 20% compared to a sub-critical plant. The phase-I
 08 WKURXJK 3RZHU ([FKDQJH DQG  of the program, which constitutes R&D for technology
MU traded under Cross Border Power Trading. GHYHORSPHQWVWDUWHGIURP$SULO6HFRQGSKDVHRI

94
the pURJUDP LH VHWWLQJ XS RI DQ  0: WHFKQRORJ\ ‡ &RROLQJ7RZHU'HVLJQ 3HUIRUPDQFH,PSURYHPHQW
demonstration plant (TDP) is being planned at NTPC’s
‡ 6RODU39SHUIRUPDQFHDQGGHJUDGDWLRQVWXG\
Sipat plant located in Chhattisgarh.
‡ 'HYHORSPHQW RI PLFURDOJDH EDVHG SURFHVV IRU
7. NTPC ENERGY TECHNOLOGY RESEARCH ALLIANCE XWLOL]DWLRQRI&22LQÁXH*DV%LRPHWKDQDWLRQ
(NETRA)
‡ $SSOLFDWLRQRI8$9V'URQHVLQ3RZHU6HFWRU HJ6RODU
As a leading player in the world energy sector, NTPC PV Inspection & Volumetric Analysis of coal etc.)
UHFRJQL]HG WKH SRWHQWLDO RI FXWWLQJ HGJH WHFKQRORJ\
‡ 'HYHORSPHQWRI+LJK$FFXUDF\6RODU)RUHFDVWLQJPRGHO
LQ IXUWKHU LPSURYLQJ LWV VHUYLFHV DQG HIÀFLHQF\ 7KH
FDSWXULQJ $WPRVSKHULF $HURVRO DQG &ORXG PRYHPHQW
company is fully aligned to the needs of adapting to
with satellite image data with ISRO
emerging technologies and upgrading the technologies
WKURXJK UHVHDUFK DQG GHYHORSPHQW 7KH FRPSDQ\ LV  $SDUW IURP YDULRXV SURMHFWV 1(75$ DOVR SURYLGHV
SDUWLFXODUO\ VHQVLWLYH WR 5HVHDUFK  'HYHORSPHQW DQG DGYDQFHGVFLHQWLÀFVXSSRUWWR173&6WDWLRQVDQGRXWVLGH
the paradigm shift which it can make. NETRA (NTPC SRZHUXWLOLWLHVLQYDULRXVDUHDVVXFKDV1RQ'HVWUXFWLYH
Energy Technology Research Alliance) set up in 2009 is (YDOXDWLRQ DQG ,PDJLQJ 0HWDOOXUJ\  )DLOXUH $QDO\VLV
WKHRXWFRPHRIWKLVYLVLRQ,WVFRUHDUHDVRIUHVHDUFKDUH Transformer, Generator Health, Creep & fatigue analysis,
&RUURVLRQ :DWHU&KHPLVWU\&RDO &RPEXVWLRQDQG
 L (IÀFLHQF\LPSURYHPHQW (QYLURQPHQWHWF
ii. New and renewable energy,  1(75$ KDV FROODERUDWHG ZLWK YDULRXV LQWHUQDWLRQDO DQG
 LLL &OLPDWH&KDQJHDQG(QYLURQPHQW3URWHFWLRQ QDWLRQDO ,QVWLWXWHV RUJDQL]DWLRQV OLNH &6,52$XVWUDOLD
1(7/86$ &XUWLQ 8QLYHUVLW\$XVWUDOLD 1HZFDVWOH
 LY :DVWHWR(QHUJ\ 8QLYHUVLW\$XVWUDOLD '/5 ,6(*HUPDQ\ 7RN\R ,QVWLWXWH
 Y 6FLHQWLÀF VXSSRUW WR 173& DQG H[WHUQDO XWLOLWLHV IRU of Technology-Japan, CIPET Chennai, CBRI, CGCRI, ARCI
 LPSURYLQJDYDLODELOLW\UHOLDELOLW\DQGHIÀFLHQF\ Hyderabad, INST Mohali, IISC Bangalore, IIT Bombay, IIT
.DQSXU,,7'HOKL,,7.KDUDJSXU,,75RRUNHH,,7*XZDKDWL
 1(75$ KDV WDNHQ XS SURMHFWV LQ WKH DERYH PHQWLRQHG IOC-R&D, ONGC, NIT Calicut etc. The tie up for these
FRUHDUHDV6RPHRIWKHPDMRUSURMHFWVDUHDVEHORZ RUJDQL]DWLRQ  KDYH EHHQ GRQH IRU UHVHDUFK UHODWHG WR
 ‡ 6RODU6HD:DWHU'HVDOLQDWLRQDW17(&/²9DOOXU GHYHORSPHQWRIFRVWHFRQRPLFWHFKQRORJLHVLQWKHÀHOG
RIFOLPDWHFKDQJHQHZ UHQHZDEOHHQHUJ\HIÀFLHQF\
 ‡ 0:ÁRDWLQJVRODUDW173&.DZDV & reliability enhancement of thermal power generation,
 ‡ +LJK TXDOLW\ IXHO JHQHUDWLRQ IURP 0XQLFLSDO 6ROLG CO2 PLWLJDWLRQ À[DWLRQ GHYHORSPHQW RI PLFUR JULGV
 :DVWH ZLWK7RN\R8QLYHUVLW\  etc.

 ‡ 6HWWLQJ XS RI  73' %LR&1* 3URGXFWLRQ IURP  $ 5HVHDUFK $GYLVRU\ &RXQFLO 5$&  FRPSULVLQJ RI
 ELRPDVV $JULUHVLGXHZDVWH  HPLQHQWVFLHQWLVWVDQGH[SHUWVIURP,QGLDDQGDEURDGKDV
been constituted to steer NETRA for high end research.
 ‡ 6RODU7KHUPDO+\EULG3ODQWDW173&'DGUL ,QKRXVH6FLHQWLÀF$GYLVRU\&RXQFLO 6$& KDVDOVREHHQ
 ‡ /LJKW:HLJKW$JJUHJDWH /:$ 3ODQWDW6LSDW FRQVWLWXWHG WR SURYLGH GLUHFWLRQV IRU LPSURYLQJ SODQW
performance & reducing cost of generation.
 ‡ %RWWRP$VKDV)LQH$JJUHJDWHVLQFHPHQWFRQFUHWH
8. SUSTAINABLE DEVELOPMENT
 ‡ 'HYHORSPHQWRI1DQROXEULFDQWIRUFRDOPLOOJHDUER[
6XVWDLQDEOH GHYHORSPHQW LV LQWHQGHG WR PHHW WKH
 ‡ 6XSHUK\GURSKRELF1DQRFRDWLQJIRUVRODU39SDQHO needs of present generation without compromising
cleaning the ability of future generation to meet their own need.
 ‡ 'HYHORSPHQWRI1DQRÁXLGVDVDQRYHOFRRODQW 6XVWDLQDEOH'HYHORSPHQWFDOOVIRUVRFLDOO\LQFOXVLYHDQG
HQYLURQPHQWDOO\VXVWDLQDEOHHFRQRPLFJURZWK,Q173&
 ‡ &)'6HUYLFHVIRU$X[LOLDU\3RZHU6DYLQJV 6XVWDLQDEOH 'HYHORSPHQW LV D FHQWUDO FRQFHSW WR LWV

95
Annual Report 2018-19

business. The Company has been pioneer in adopting A dedicated group CEETEM – Centre for Energy
WHFKQRORJ\ DQG SUDFWLFHV WKDW SURPRWH HQYLURQPHQWDO (IÀFLHQW 7HFKQRORJ\  (QHUJ\ 0DQDJHPHQW
management, social responsibility and economic conducts regular Energy audits to identify
performance (triple bottom line approach). The SRWHQWLDO LPSURYHPHQW DUHDV DQG LPSURYHPHQW
philosophy of sustainability is embedded in all aspects actions.
RI173&·VEXVLQHVVDFWLYLWLHV CenPEEP also coordinated implementation of
 (IÀFLHQF\PDQDJHPHQW&HQ3((3 3HUIRUP $FKLHYH  7UDGH 3$7  VFKHPH XQGHU
Prime Minister’s National Mission on Enhanced
 ¶&HQWHU IRU 3RZHU (IÀFLHQF\ DQG (QYLURQPHQWDO
(QHUJ\ (IÀFLHQF\ 10(((  2YHUDOO 173& FRDO
Protection’ (CenPEEP), was set up to reduce
DQG JDV VWDWLRQV H[FHHGHG WKH 1HW +HDW 5DWH
Greenhouse Gas (GHG) emissions through
LPSURYHPHQWWDUJHWVDQGHDUQHGDURXQG
HIÀFLHQF\LPSURYHPHQWRIFRDOÀUHGVWDWLRQV,WLV (6&HUWV (QHUJ\VDYLQJFHUWLÀFDWHV LQ3$7,&\FOH
DV\PERORI173&·VYROXQWDU\SURDFWLYHDSSURDFK 173& DFWLYHO\ SDUWLFLSDWHG LQ (6&HUWV WUDGLQJ
towards GHG reduction and its commitment through NVVN & IEX. Subsequent to the trading,
WRZDUGVHQYLURQPHQWDOSURWHFWLRQ 173&LVKDYLQJ(6FHUWVWKDWZLOOEHXVHG
 &HQ3((3 LV ZRUNLQJ IRU LPSURYHPHQW RI for PAT Cycle-II. NTPC has taken all measures for
HIÀFLHQF\DQGUHOLDELOLW\RI173&SRZHUVWDWLRQV +HDWUDWH $3&LPSURYHPHQWIRUPHHWLQJ3$7
WKURXJK V\VWHPV VWUDWHJLF LQLWLDWLYHV DQG Cycle-II (2016-19) targets for Coal & Gas stations
introduction of new techniques & practices. The IRUZKLFKLVWKHHYDOXDWLRQ\HDU
Centre carries out Performance gap analysis 8.2. Energy Conservation
 &DSDELOLW\ WHVWV WR LGHQWLI\ DQG VROYH LVVXHV
In its concern for climate change and sustainable
UHODWHG WR HIÀFLHQF\ DQG UHOLDELOLW\ $ VWUXFWXUHG
GHYHORSPHQW 173& FRQWLQXHG LWV FRPPLWPHQW
¶$X[LOLDU\ 3RZHU· UHGXFWLRQ SURJUDP· LV EHLQJ
WRZDUGV HQHUJ\ FRQVHUYDWLRQ WKURXJK SURSHU
LPSOHPHQWHGDWDOOVWDWLRQVWRRSWLPL]H$X[LOLDU\
monitoring of power consumption of major
Power Consumption (APC). On-line performance
equipment’s and by maintaining good
monitoring tools like Thermal Loss Analysis
operational & maintenance practices.
(TLA) are used for identifying the performance
JDSVDQGSODQIRUVXLWDEOHLPSURYHPHQWDFWLRQV  'XULQJ WKH ÀQDQFLDO \HDU  0DQGDWRU\
Implementation of action plans during unit (QHUJ\$XGLWVKDYHEHHQFRQGXFWHGLQVHOHFWHG
RYHUKDXOVDQGRSSRUWXQLW\VKXWGRZQVLVFORVHO\ VWDWLRQV173&KDVWDNHQDQLQLWLDWLYHIRUFRPSOHWH
monitored. UHSODFHPHQW RI H[LVWLQJ OLJKWLQJ ZLWK /(' OLJKW
ÀWWLQJVDWLWVDOOVWDWLRQVLQFOXGLQJWRZQVKLSV7LOO
 3DUDPHWULF 2SWLPL]DWLRQ DW SDUW ORDGV KDV EHHQ 0DUFKODNK/('ÀWWLQJV RIWKH
LGHQWLÀHGDVDWKUXVWDUHDLQFOXGLQJRSWLPL]DWLRQ SRSXODWLRQ  KDYH EHHQ UHSODFHG RQ 3DQ 173&
RI QXPEHU RI UXQQLQJ DX[LOLDULHV VOLGLQJ basis. Commissioning of HT VFD on ID Fans of
SUHVVXUH RSHUDWLRQ H[FHVV DLU RSWLPL]DWLRQ HWF 8QLW RI 7DOFKHU .DQLKD DQG 8QLW RI 'DGUL
Performance of condensers & cooling towers also &RDOKDYHEHHQFRPSOHWHGDQGQRZEHLQJNHSW
KDVSRWHQWLDOIRULPSURYHPHQWDQGLPSURYHPHQW LQ VHUYLFH WR WDNH DGYDQWDJH RI HQHUJ\ VDYLQJ
action plans are being implemented at stations. 5HWURÀWWLQJ RI 9)' LQ &(3 RI 8QLW  FRPSOHWHG
8VH RI DGYDQFHG DQDO\WLFDO WRROV OLNH ULVN JULG HT VFD in Ramagundam Unit 4 ID fans, Dadri
and risk plot has helped in identifying reliability 8QLW  ,' IDQV DQG .RUED 8QLWV    &(3·V DUH
issues and plan for timely remedial actions. These also being taken up.
+HDW5DWHDQG$3&LPSURYHPHQWLQLWLDWLYHVKDYH
8.3. Environment Management
KHOSHG 173& VWDWLRQV WR VXVWDLQ KLJK OHYHO RI
performance. CenPEEP is also working towards  173& VLQFH LQFHSWLRQ KDV EHHQ SURDFWLYH LQ
UHGXFWLRQ LQ VSHFLÀF ZDWHU FRQVXPSWLRQ LQ FRDO DGGUHVVLQJ HQYLURQPHQWDO FRQFHUQV 173&
and gas stations. KDV LGHQWLÀHG (QYLURQPHQW 0DQDJHPHQW DV D

96
thrXVW DUHD WR DFKLHYH H[FHOOHQFH 7R PHHW WKH NTPC has installed CEMS (Continuous Emission
HQYLURQPHQWDO FKDOOHQJHV 173& KDV DGRSWHG Monitoring System) to monitor emissions of
VRXQG (QYLURQPHQW 0DQDJHPHQW SUDFWLFHV SO2, NOX and CO2 DQG (406 (IÁXHQW 4XDOLW\
DQG DGYDQFHG HQYLURQPHQW SURWHFWLRQ V\VWHP Monitoring System) for monitoring of treated
WR PLQLPL]H LPSDFW RI SRZHU JHQHUDWLRQ RQ HIÁXHQWVLQDOOLWVVWDWLRQVRQUHDOWLPHEDVLVZLWK
HQYLURQPHQW online real-time basis access to the regulators.

 $OO 173& 6WDWLRQV DUH HTXLSSHG ZLWK DGYDQFHG  173&KDVSODQWHGDWRWDORIRYHUPLOOLRQWUHHV


(QYLURQPHQWDO 3URWHFWLRQ DQG 3ROOXWLRQ &RQWURO IRU SURWHFWLRQ RI HQYLURQPHQW ZKLFK DFW DV &22
6\VWHPV VXFK DV +LJK (IÀFLHQF\ (OHFWURVWDWLF sink and also help in absorption of pollutants.
3UHFLSLWDWRUV LQ LWV FRDO EDVHG XQLWV $VK :DWHU
8.4. Corporate Social Responsibility (CSR)
5H&LUFXODWLRQ 6\VWHPV $:56  /LTXLG :DVWH
7UHDWPHQW 3ODQW /:73  DQG 6HZDJH 7UHDWPHQW  7R DFKLHYH WKH DLP RI LQFOXVLYH JURZWK
3ODQW 673  DUH DYDLODEOH LQ PRVW RI WKH 3RZHU DQG HTXLWDEOH GHYHORSPHQW &65 KDV EHHQ
6WDWLRQV 173& KDV WDNHQ SURDFWLYH DSSURDFK synonymous with Company’s core business
of making all its power stations to operate with of power generation. The Company’s spirit of
=/' =HUR /LTXLG 'LVFKDUJH  SURJUHVVLYHO\ LQ caring and sharing is embedded in its mission
SKDVHV %\ DGRSWLQJ DERYH PHDVXUHV 173& LV VWDWHPHQW 7KH &RPSDQ\ KDV D FRPSUHKHQVLYH
DEOHWRFRQVHUYHZDWHULQLWVYDULRXVXQLWVZKLOH Resettlement & Rehabilitation (R&R) policy
following the principle of “3 R’s” (Reduce, Recycle FRYHULQJFRPPXQLW\GHYHORSPHQW &' DFWLYLWLHV
and Reuse). ZKLFKKDVEHHQUHYLVHGDQGXSGDWHGIURPWLPH
WR WLPH &' DFWLYLWLHV LQ JUHHQ ÀHOG DUHD DUH
For reduction of SOX emission, NTPC has
LQLWLDWHG DV VRRQ DV SURMHFW LV FRQFHLYHG DQG
LQVWDOOHG )OXH *DV 'HVXOSKXUL]DWLRQ )*'  XQLW
WKHUHDIWHU H[WHQVLYH FRPPXQLW\  SHULSKHUDO
DW 9LQGK\DFKDO 6WDJH9 RI  0: FDSDFLW\
GHYHORSPHQW DFWLYLWLHV DUH WDNHQ XS DORQJ
&RQVWUXFWLRQ ZRUN RI )*' DW YDULRXV VWDWLRQV
ZLWK WKH SURMHFW GHYHORSPHQW 6HSDUDWH &65
DQGSURMHFWV 0:FDSDFLW\ LVLQSURJUHVV
&RPPXQLW\ 'HYHORSPHQW 3ROLF\ IRUPXODWHG LQ
Further, NTPC has issued NIT for more than
July 2004 and Sustainability Policy formulated
0:FDSDFLW\
LQ 1RYHPEHU  ZHUH FRPELQHG DQG UHYLVHG
 )RU 12[ UHGXFWLRQ 173& KDV WDNHQ XS VWXG\ in 2015 and further in 2016 as “NTPC Policy for
RI 6HOHFWLYH &DWDO\WLF DQG 1RQ &DWDO\WLF 5HFWRUV CSR & Sustainability” in line with Companies
(SCR and SNCR) on Pilot Basis at its stations and Act 2013 and Department of Public Enterprises
after completion of pilot study, these would be '3( *XLGHOLQHVIRU&65,WFRYHUVDZLGHUDQJH
UHWURÀWWHGDWLWVFRDOEDVHGSRZHUVWDWLRQV173& RIDFWLYLWLHVLQFOXGLQJLPSOHPHQWDWLRQRIVSHFLÀF
KDV DOVR WDNHQ XS &RPEXVWLRQ PRGLÀFDWLRQ WR programs through NTPC Foundation.
UHGXFH12[HPLVVLRQ
Corporate Social Responsibility (CSR) &
 0RVW RI 173& VWDWLRQV KDYH EHHQ ,62  Sustainability programs undertaken by the
FHUWLÀHG E\ UHSXWHG 1DWLRQDO ,QWHUQDWLRQDO 173& LQFOXGH DFWLYLWLHV VSHFLÀHG LQ 6FKHGXOH
certifying agencies. In order to monitor key VII of the Companies Act 2013 & rules made
HQYLURQPHQWDO SDUDPHWHUV RI $PELHQW $LU DQG WKHUHXQGHUDQGDQ\RWKHUDFWLYLW\IRUEHQHÀWRI
Stack Emissions continuously on real time basis, community at large. Focus areas of NTPC’s CSR &
Automation in Monitoring Techniques has been 6XVWDLQDELOLW\DFWLYLWLHVLQFOXGHKHDOWKVDQLWDWLRQ
taken up in NTPC. NTPC has installed continuous drinking water, education, capacity building,
Ambient Air Quality Monitoring Systems to women empowerment, Social Infrastructure
monitor air quality around its all operating power 'HYHORSPHQW VXSSRUW WR 3K\VLFDOO\ &KDOOHQJHG
SODQWVDQGDFFHVVRIGDWDKDVEHHQSURYLGHGWR 3HUVRQ DQG DFWLYLWLHV FRQWULEXWLQJ WRZDUGV
CPCB on real time basis. (QYLURQPHQW6XVWDLQDELOLW\

97
Annual Report 2018-19

Preference for CSR & SXVWDLQDELOLW\ DFWLYLWLHV LV ‡ 5HYLYDODQGRSHUDWLRQRI0HFKDQL]HG6ROLG:DVWH


JLYHQ WR ORFDO DUHDV DURXQG 173&·V RSHUDWLRQV 0DQDJHPHQWSODQWDW.DUVDGD8WWDU3UDGHVK
Therefore, the NTPC ensures that majority CSR
‡ ,QVWDOODWLRQRI%RUHZHOOVDQG(OHFWULFSXPSVHWV
IXQGV DUH VSHQW IRU DFWLYLWLHV LQ ORFDO DUHDV
EHQHÀWWLQJ VFKHGXOHG WULEH IDUPHUV DW 1DJUDP
+RZHYHU FRQVLGHULQJ ,QFOXVLYH *URZWK 
YLOODJH7HODQJDQD
(QYLURQPHQW 6XVWDLQDELOLW\ DQG WR VXSSOHPHQW
*RYHUQPHQW HIIRUW DFWLYLWLHV DUH WDNHQ XS ‡ 6XSSRUWLQJ¶$UFKHU\·6SRUWVXQGHU&65
anywhere in the country.
‡ 6XSSRUW IRU GHYHORSPHQWDO  EHDXWLÀFDWLRQ
 2YHU WKH SDVW \HDU PRUH WKDQ  YLOODJHV DQG works at Charminar Hyderabad, under ‘Swachh
PRUHWKDQVFKRROVKDYHEHHQEHQHÀWWHGE\ ,FRQLFSODFHV3URMHFW·RI*RYWRI,QGLD
173&IRUYDULRXV&65LQLWLDWLYHVLQWKHSUHYLRXVO\
‡ ,QVWDOODWLRQ RI 6RODU 7KHUPDO &RRNLQJ V\VWHP LQ
mentioned focus areas at different locations.
*RYHUQPHQWVFKRROVLQ/DNVKDGZHHS
173&·V&65LQLWLDWLYHVKDYHWRXFKHGWKHOLYHVRI
around 10 lakhs people in one or the other way,  $QRWKHU0DMRULQLWLDWLYHRIWKH173&ZDV´3URYLVLRQIRU
residing at remote locations. The NTPC has been LQFRPH JHQHUDWLRQ RSSRUWXQLWLHVµ WKURXJK YRFDWLRQDO
creating a large amount of social infrastructure training, skill upgradation and income generation
through construction of community centers, programs. NTPC had adopted 18 ITI’s and is setting up
PXOWLSXUSRVH KDOOV URDGV FXOYHUWV EXV VWDQGV eight new ITI’s. NTPC had signed MoU with NSDC for
cremation sheds, installation of streetlights, VNLOO GHYHORSPHQW RI  \RXWK RYHU D SHULRG RI 
high mast lights. In addition to this, it has also years spread in 12 states. To enhance Income generation
SURYLGHG ÀQDQFLDO VXSSRUW WR SUHVHUYH VLWHV RI RIWKHYLOODJHFRPPXQLW\WKH173&KDVEHHQSURYLGLQJ
historical heritage. The NTPC has been promoting YRFDWLRQDO WUDLQLQJ WR WKH YLOODJH \RXWK DQG KDG WDNHQ
the use of renewable energy by installing solar OLYHVWRFNGHYHORSPHQWVDQGFURSPDQDJHPHQW3URMHFWV
streetlights, setting up of integrated domestic
 ,Q WKH DUHD RI HGXFDWLRQ 173& LV SURYLGLQJ TXDOLW\
HQHUJ\V\VWHPSURYLGLQJFOHDQVRODUHQHUJ\DQG
education primarily to rural community children
cooking solutions, solar water heaters etc. Some
through 34 schools located in NTPC Townships. NTPC
RIWKHRWKHU&65LQLWLDWLYHVXQGHUWDNHQRYHUWKH
KDV SURYLGHG VXSSRUW IRU VHWWLQJ XS ¶173& $// *LUO
SDVW\HDUDUH
6XSHU · DW 9DUDQDVL 8WWDU 3UDGHVK IRU SURYLGLQJ IUHH
‡ 2QHPRQWK UHVLGHQWLDO VXPPHU ZRUNVKRSV IRU residential coaching and mentoring for admission in
400 girl children in the age group of 10-12 years IITs, NITs and prestigious Engineering Institute. NTPC is
through Flagship Program Girl Empowerment DOVRWDNLQJXSGLVWULEXWLRQRIHGXFDWLRQDOWDEOHWVKDYLQJ
0LVVLRQ *(0 ZKHUHLQLQWHUYHQWLRQVZHUHWDNHQ study material to resource poor students of standard VIII
WRPDNHWKHJLUOVVHOIUHOLDQWDQGFRQÀGHQWLQDOO to X in selected schools in Maharashtra. NTPC has taken
ZDONVRIOLIH7KHJLUOVZHUHFKRVHQIURPYDULRXV up the construction of ITI in Ganjam District, Odisha
VFKRROV LQ YLOODJHV VXUURXQGLQJ 173& SRZHU & ITI Baloda, Sipat, Chhattisgarh under CSR. Utkarsh
stations in Singrauli and Sonbhadra districts 6FKRODUVKLS6FKHPHIRUPDUJLQDOL]HGVHFWLRQVRIVRFLHW\
(Aspirational districts) around NTPC stations. LQ WKH YLOODJHV VXUURXQGLQJ 173&·V SRZHU SODQWV WR
‡ &RQVWUXFWLRQRIVFKRRO KRVWHOIRUWULEDOFKLOGUHQ SXUVXHLQGXVWULDOWUDLQLQJLQ,7,VIXOOWLPH%(%7HFKLQ
near NTPC Rihand, in Uttar Pradesh and a full- ,,7V 1,7V DQG *RYW (QJLQHHULQJ &ROOHJHV DQG IXOO WLPH
ÁHGJHG 6FLHQFH  ,7 ODE IRU D VFKRRO FDWHULQJ 0%%6LQ*RYW0HGLFDOFROOHJHV
PDUJLQDOL]HGFKLOGUHQ
 7RSURPRWHKHDOWKFDUHEHVLGHVRWKHUDFWLYLWLHVOLNHIUHH
‡ 6XSSRUW IRU &RPEDWLQJ FDQFHU WKURXJK health camps & surgical camps, NTPC is taking up the
infrastructure & equipment at National Cancer construction of Eye hospital near NTPC Dadri. NTPC has
Institute Nagpur and AIIMS New Delhi. SURYLGHG ÀQDQFLDO VXSSRUW IRU (OHFWUR &KHPRWKHUDS\
'HYLFH (OHFWURGHVIRUWKHWUHDWPHQWRIFDQFHUSDWLHQWV
‡ 6HWWLQJ XS %XUQ 8QLWV DW $,,06 3DWQD $,,06
at All India Institute of medical Sciences, New Delhi.
Bhubaneswar &.LQJ*HRUJH+RVSLWDO/XFNQRZ

98
NTPC has committed support for Mobile Medical Units YLVXDOO\ FKDOOHQJHG VWXGHQWV HVWDEOLVKLQJ 'LVDELOLW\
in Hamirpur, Himachal Pradesh and Sheohar, Bihar. Rehabilitation Centres (DRC) and operating Directly
2EVHUYHG7UHDWPHQWFXP'HVLJQDWHG0LFURVFRS\&HQWUH
 173& LV WDNLQJ XS LQLWLDWLYHV IRU ZDVWH PDQDJHPHQW
(DOTs cum DMC) with Mobile ambulance facilities. A
water is promoting usage of renewable energy by taking
ÁDJVKLSSURJUDPRIIRXQGDWLRQ¶173&8WNDUVK·0HULW
installation of roof top solar systems on public buildings,
6FKRODUVKLS IRU VWXGHQWV WR HQFRXUDJH DQG PRWLYDWH
solar plants, solar lights, solar water pumps and solar
students who are pursuing secondary, high school,
water heaters etc. which is further enhancing the quality
HQJLQHHULQJ  PHGLFDO VFLHQFH VWXGLHV HQYLVDJHV
of life.
EHQHÀWLQJVWXGHQWVHYHU\\HDU
 7R LPSURYH LUULJDWLRQ IDFLOLWLHV 173& KDV WDNHQ
During the year, NTPC has won the following CSR
LQVWDOODWLRQRIPRWRUL]HGERUHZHOOVLQGLIIHUHQWORFDWLRQV
awards:
for community farming and has committed funds for
LQVWDOODWLRQRIHQHUJ\HIÀFLHQWZDWHUSXPSLQJV\VWHPLQ  ‡ (71RZ&65/HDGHUVKLS$ZDUG
WKHÀHOGVRIIDUPHUVUHVLGLQJQHDU173&VWDWLRQVORFDWHG
 ‡ ,6&),&&,6DQLWDWLRQ$ZDUGV
LQLQYDULRXVGLVWULFWVRI8WWDU3UDGHVK173&LVSURYLGLQJ
VDIH GULQNLQJ ZDWHU 52 ZDWHU SODQWV :DWHU $70V DQG  ‡ 6.2&+2UGHURI0HULW$ZDUG
ZDWHUÀOWHUV  ‡ )$0(([FHOOHQFH$ZDUG
 173& KDV WDNHQ XS SUHVHUYDWLRQ DQG FRQVHUYDWLRQ RI  ‡ 173&$QWDZRQWKH'LDPRQG7URSK\DW4&),·VVW+5
3 monuments, Group of Monuments, Mandu (MP), Conference held at Vadodara.
([FDYDWHGVLWHDW9LNUDPVKLOD %LKDU DQG$UFKDHRORJLFDO
site, Lalitgiri (Odisha), in association with Archaeological  ‡ 6HYHQ   DZDUGV 6LSDW 9LQGK\DFKDO DQG %KLODL LQ
6XUYH\RI,QGLD $6, DQG1DWLRQDO&XOWXUH)XQG 1&) )RU  ´3DU ([FHOOHQFHµ FDWHJRU\ .DZDV 5RXUNHOD DQG 
protection and promotion of heritage of dying art forms  YLOODJH4&WHDPVRI6LQJUDXOLLQ´([FHOOHQW&DWHJRU\µ 
RI2GLVKD173&LVVXSSRUWLQJ6RFLHW\IRU'HYHORSPHQW  LQ 4&),·V QG 1DWLRQDO &RQYHQWLRQ RQ 4XDOLW\
RI 5XUDO /LWHUDWXUH IRU HVWDEOLVKLQJ 3XUYDVKD )RON DQG Concepts (NCQC) at Gwalior.
Tribal Art Museum, Odisha.  ‡ 173&&65&RIIHH7DEOH%RRN´0HJD:DWWVIURP2XU
 173& KDV XQGHUWDNHQ FRQVHUYDWLRQ RI YXOQHUDEOH   +HDUWVµKDVZRQWKHQGSUL]HLQWKHWK$OO,QGLD
HQGDQJHUHGVSHFLHVRI2OLYH5LGOH\7XUWOHV·WKHVPDOOHVW Public Relations Conference held at Dehradun.
RIDOOVHDWXUWOHVWKDWWUDYHOIURP0H[LFRWR,QGLDQVKRUHV  ‡ 'DLQLN -DJUDQ &65 $ZDUGV  LQ (GXFDWLRQ
just to breed and nest in peace. Category
 173&LVXQGHUWDNLQJWUHHSODQWDWLRQFRYHULQJYDVWDUHDV 8.5. Rehabilitation & Resettlement (R&R)
of land in and around its projects and till date about 34
NTPC is committed to help the populace displaced
PLOOLRQWUHHVKDYHEHHQSODQWHGWKURXJKRXWWKHFRXQWU\
IRUH[HFXWLRQRILWVSURMHFWVDQGKDVEHHQPDNLQJ
173&LVVXSSRUWLQJWKHUHVWRUDWLRQZRUNVIRUGHYHORSLQJ
HIIRUWVWRLPSURYHWKH6RFLRHFRQRPLFVWDWXVRI
Brahma Jahari Forest in Chaumuha in Mathura District,
Project Affected Persons (PAPs). In line with its
Uttar Pradesh
VRFLDO REMHFWLYHV WKH &RPSDQ\ KDV IRFXVHG RQ
Further, NTPC has embarked upon long-term HIIHFWLYH 5HKDELOLWDWLRQ DQG 5HVHWWOHPHQW 5 5 
Memorandums with State authorities to assist RI 3$3V DQG DOVR RQ &RPPXQLW\ 'HYHORSPHQW
DFKLHYHPHQW RI ,QWHQGHG 1DWLRQDOO\ 'HWHUPLQHG (CD) works, in and around its projects.
Contributions (INDC) in COP 21, 10 million trees are
 *RYW RI ,QGLD KDV HQDFWHG FRPELQHG /DQG
SODQQHGWRSODQWHGRYHUDSHULRGRI\HDUV
Acquisition and R&R Act - ‘The Right to Fair
NTPC has also set up the NTPC Foundation, engaged Compensation and Transparency in Land
LQ VHUYLQJ  HPSRZHULQJ WKH SK\VLFDOO\ FKDOOHQJHG Acquisition, Rehabilitation and Resettlement Act,
and economically weaker section of the society. Current 2013 (RFCT LARR Act, 2013) which is applicable
DFWLYLWLHV DUH SURYLGLQJ ,7 HGXFDWLRQ WR SK\VLFDOO\  VLQFH173&KDVUHYLVHGLWV5 53ROLF\

99
Annual Report 2018-19

to incorporate R&R entitlements as per RFCT Areas for Community Development activities:
LARR Act, 2013 as also retained NTPC’s good ‡ Swachh Bharat Abhiyan – 9DULRXV LQLWLDWLYHV
SUDFWLFHVJXLGHOLQHVRQIDFLOLWLHVWREHH[WHQGHG ZHUH WDNHQ WR PDNH SURMHFW DIIHFWHG YLOODJHV
for Project Affected Families (PAFs). ¶2SHQ 'HIHFDWLRQ )UHH· E\ WDNLQJ XS DFWLYLWLHV
NTPC takes measures for R&R of PAFs as per its UHODWHG WR FRQVWUXFWLRQ RI LQGLYLGXDO WRLOHWV DQG
5 53ROLF\SURYLVLRQVZLWKWKHREMHFWLYHWKDWWKH awareness programs.
3$)ZLOOLPSURYHRUDWOHDVWUHJDLQWKHLUSUHYLRXV ‡ Drinking water – Planning and implementation
VWDQGDUGVRIOLYLQJ$VSHUWKH3ROLF\DQGLQOLQH IRU DFFHVV WR GULQNLQJ ZDWHU IRU  FRYHUDJH
ZLWKSURYLVLRQVRI5)&7/$55$FWD6RFLR RI DOO SURMHFWDIIHFWHG YLOODJHV RI 173& SURMHFWV
HFRQRPLF 6XUYH\ 6(6  &HQVXV 6XUYH\ ZLOO DOVR under construction is being undertaken.
KDYHWREHFRQGXFWHGE\WKH6WDWH*RYHUQPHQWWR
‡ Capacity building / Skill up gradation – Need
collect detailed demographic details of the area
based training are being conducted to enhance
which shall form the basis for the preparation
the skills of affected persons for increasing their
RI ¶5HKDELOLWDWLRQ DQG 5HVHWWOHPHQW 5 5  3ODQ
HPSOR\DELOLW\DQGOLYHOLKRRG
Scheme’. Apart from the R&R Plan formulated in
line with RFCT LARR Act, need based Community ‡ Education – &RQVWUXFWLRQ DFWLYLWLHV XQGHU
'HYHORSPHQW &' DFWLYLWLHVZLOODOVREHLQFOXGHG progress for Medical College cum Hospital at
IRUFRQWULEXWLQJWRVRFLRHFRQRPLFGHYHORSPHQW Sundargarh (Odisha) and Engineering College at
RIWKHSHRSOHSURMHFWYLFLQLW\ 6KLYSXUL 0DGK\D3UDGHVK 

‡ Health - )RU WKH EHQHÀWV RI SURMHFW DIIHFWHG


 5 5 3ODQ H[SHQGLWXUH LV D SDUW RI &DSLWDO FRVW
persons and neighboring population, ‘Mobile
of the project and the Plan is implemented
Health Clinic’, Medical camps and dispensaries
in a time bound manner so as to complete
DUH EHLQJ RSHUDWHG IRU FRPSUHKHQVLYH KHDOWK
its implementation by the time the project is
FRYHUDJHRI3$3VDWYDULRXVSURMHFWV
commissioned. On completion of the R&R Plan
LPSOHPHQWDWLRQD6RFLDO,PSDFW(YDOXDWLRQ 6,(  Socio-economic Survey (SES)/ Social Impact
is conducted by a professional agency to know Assessment (SIA)/ Social Impact Evaluation (SIE)/
WKH HIÀFDF\ RI 5 5 3ODQ LPSOHPHQWDWLRQ IRU Need assessment Survey (NAS) / Census and Survey
future learnings. (C&S):6,(LVEHLQJFDUULHGRXWDW.ROGDPDVSHU173&
3ROLF\6,$DVSHUSURYLVLRQVRI5)&7/$55$FWKDVEHHQ
Achievement during 2018-19:
FDUULHGRXWDW7DODLSDOOL .RUED
 5 5&'DFWLYLWLHVDUHEHLQJLPSOHPHQWHGDWWKH 8.6. Sustainability Report
QHZ*UHHQÀHOG%URZQÀHOG7KHUPDOSURMHFWVDW
%DUK%RQJDLJDRQ'DUOLSDOL*DGDUZDUD.KDUJRQH NTPC has prepared its Sustainability Report FY18
.DQWL13*&1DELQDJDU%5%&/1DELQDJDU.XGJL EDVHGRQYDULRXVLQLWLDWLYHVWDNHQLQWKHDUHDVRI
HQYLURQPHQWHFRQRPLFODERXUSUDFWLFHVKXPDQ
/DUD 0HMD 0RXGD 1RUWK.DUDQSXUD 6RODSXU
rights, society and product responsibility. This is
Tanda-II, Unchahar-IV, Vindhyachal Stage-IV,
WKH WK 6XVWDLQDELOLW\ 5HSRUW RI 173& FRYHULQJ
Vindhyachal Stage-V, Telangana, Hydro projects
DOOVXVWDLQDELOLW\SDUDPHWHUVRI7\SHKLJKOHYHO
DW.ROGDP7DSRYDQ9LVKQXJDG5DPPDP6WDJH
&RPSUHVVLYH ODVSHUWKHPRVWZLGHO\DFFHSWHG
III and Coal Mining Projects at Pakri-Barwadih,
*5, *OREDO 5HSRUWLQJ ,QLWLDWLYH  6WDQGDUGV 7KH
&KDWWL%DULDWX.HUHQGDUL'XODQJDDQG7DODLSDOOL
report has been assured by an independent
7KHVH DFWLYLWLHV DUH WDNHQ XS XQGHU DSSURYHG
H[WHUQDODVVXUDQFHSURYLGHU
R&R Plans and on case-to-case basis requirement
IRU VSHFLÀF SURMHFWV WR FDWHU ORFDO UHTXLUHPHQWV 9. CORPORATE GOVERNANCE
 VWDNHKROGHUV UHTXHVW DQG NHHSLQJ LQ YLHZ WKH $VDJRRGFRUSRUDWHFLWL]HQ173&LVFRPPLWWHGWRVRXQG
LPSURYHPHQWLQ6RFLDO'HYHORSPHQW,QGLFDWRUV corporate practices based on conscience, openness,

100
fairness, professionalism and accountability besides appraisal of all functional directors. Further, NTPC
EXLOGLQJFRQÀGHQFHLQLWVYDULRXVVWDNHKROGHUVWKHUHE\ enters into Memorandum of Understanding (MoU) with
SDYLQJWKHZD\IRUORQJWHUPVXFFHVV *RYHUQPHQW RI ,QGLD HDFK \HDU ZKLFK GHPDUFDWHV NH\
performance parameters for the company. The MoU
 173&ÀUPO\EHOLHYHVWKDWVRXQG&RUSRUDWH*RYHUQDQFH
targets are cascaded down and form an integral part
LVFULWLFDOIRUHQKDQFLQJDQGUHWDLQLQJLQYHVWRUWUXVW:H
RI WKH SHUIRUPDQFH DSSUDLVDO RI WKH LQGLYLGXDOV 7KH
are committed to meet our performance goals with ethics
LQWHUQDO 0R8 FRYHUV DOO RSHUDWLRQDO DQG SHUIRUPDQFH
DQG JRRG JRYHUQDQFH 173& LV FRQVWDQWO\ VWULYLQJ WR
SDUDPHWHUV OLNH ² 3ODQW 3HUIRUPDQFH DQG (IÀFLHQF\
DGRSWHPHUJLQJEHVWSUDFWLFHVLQFRUSRUDWHJRYHUQDQFH
)LQDQFLDO WDUJHWV &RVW FXWWLQJ WDUJHWV (QYLURQPHQW
,W LV RXU HQGHDYRU WR DFKLHYH KLJKHU VWDQGDUGV DQG
:HOIDUH &RPPXQLW\ GHYHORSPHQW DQG DQ\ RWKHU
SURYLGH RYHUVLJKW DQG JXLGDQFH WR PDQDJHPHQW LQ
UHOHYDQW IDFWRU 7KH SHUIRUPDQFHV RI WKH &RPSDQ\ DUH
strategy implementation and risk management and
HYDOXDWHGE\WKH'HSDUWPHQWRI3XEOLF(QWHUSULVHYLVj
IXOÀOPHQWRIVWDWHGJRDOVDQGREMHFWLYHV
YLV0R8HQWHUHGLQWRZLWKWKH*RYHUQPHQWRI,QGLD
The Company has broadly complied with all the
10. SAFETY
requirements of SEBI LODR, Companies Act, 2013 and
*XLGHOLQHVRQ&RUSRUDWH*RYHUQDQFHIRU&HQWUDO3XEOLF Occupational Health and Safety at workplace is one
Sector Enterprises issued by Department of Public of the prime concerns of NTPC Management and
(QWHUSULVHV 0LQLVWU\ RI +HDY\ ,QGXVWULHV DQG 3XEOLF XWPRVW LPSRUWDQFH LV JLYHQ WR SURYLGH VDIH ZRUNLQJ
(QWHUSULVHV *RYHUQPHQW RI ,QGLD H[FHSW UHTXLUHPHQW HQYLURQPHQWDQGWRLQFXOFDWHVDIHW\DZDUHQHVVDPRQJ
regarding number of independent director during WKHHPSOR\HHV6DIHW\LVSDUWRI173&·VFRUHYDOXHV
WRDQGHYDOXDWLRQRI'LUHFWRUV
 7RSURYLGHVDIHZRUNLQJHQYLURQPHQWDQGVWULYHIRU]HUR
 0LQLVWU\ RI &RUSRUDWH $IIDLUV 0&$  YLGH QRWLÀFDWLRQV LQFLGHQWV DW ZRUN 173& KDV UHYLHZHG DQG UHYLVHG LWV
GDWHG WK -XQH  KDV H[HPSWHG *RYHUQPHQW Safety policy on 20th August 2018. The safety policy is
&RPSDQLHVIURPWKHIROORZLQJSURYLVLRQV supported by safety rules and procedures as applicable
IRUDOOEXVLQHVVDFWLYLWLHVFDUULHGRXWE\173&
  UHJDUGLQJ SHUIRUPDQFH HYDOXDWLRQ RI %RDUG RI
Directors by the Nomination & Remuneration NTPC has 3-tier structure for Occupational Health and
Committee 6DIHW\ PDQDJHPHQW QDPHO\ DW 6WDWLRQV 3URMHFWV DW
Regional Head Quarters and at Corporate Centre. At
  PHQWLRQLQJ WKH PDQQHU RI IRUPDO HYDOXDWLRQ RI LWV
FRUSRUDWHOHYHO&RUSRUDWH6DIHW\'HSDUWPHQWLVKHDGHG
 RZQ SHUIRUPDQFH E\ WKH %RDUG  &RPPLWWHHV
E\ ([HFXWLYH 'LUHFWRU DQG LV UHVSRQVLEOH IRU PDNLQJ
 LQGLYLGXDO'LUHFWRULQ%RDUG·V5HSRUWLIGLUHFWRUVDUH
3ROLFLHV *XLGHOLQHV RQ VDIHW\ UHYLHZ  PRQLWRULQJ
 HYDOXDWHG E\ WKH 0LQLVWU\ RU 'HSDUWPHQW RI WKH
regions and sites.
 &HQWUDO *RYHUQPHQW ZKLFK LV DGPLQLVWUDWLYHO\ LQ
charge of the company, or, as the case may be, Business Unit Head and Senior Management carry out
 WKH 6WDWH *RYHUQPHQW DV SHU LWV RZQ HYDOXDWLRQ UHJXODU SODQW LQVSHFWLRQ DQG UHYLHZ ,QWHUQDO VDIHW\
methodology. DXGLWV RI DOO VLWHV E\ LWV RZQ VDIHW\ RIÀFHUV RI YDULRXV
3URMHFWV6WDWLRQVDQGH[WHUQDOVDIHW\DXGLWVE\UHSXWHG
 )XUWKHU YLGH QRWLÀFDWLRQ GDWHG WK -XO\  0&$
RUJDQL]DWLRQV OLNH 'X3RQW 1DWLRQDO 6DIHW\ &RXQFLO
H[HPSWHG *RYHUQPHQW &RPSDQLHV IURP UHTXLUHPHQW
Mumbai, Disaster Management Institute Bhopal etc. are
RI UHYLHZ RI SHUIRUPDQFH RI ,QGHSHQGHQW 'LUHFWRUV 
FDUULHGRXWIRUHDFK3URMHFW6WDWLRQ5HFRPPHQGDWLRQV
%RDUGDVZKROHUHYLHZWKHSHUIRUPDQFHRI&KDLUSHUVRQ
RIDXGLWRUVDUHUHJXODUO\UHYLHZHGDQGFRPSOLHGZLWK
by Independent Directors in separate meeting and
UHTXLUHPHQWRISHUIRUPDQFHHYDOXDWLRQE\,QGHSHQGHQW Cross-functional safety task forces are functional at all
'LUHFWRUV E\ HQWLUH %RDUG 6LPLODU H[HPSWLRQV ZHUH 3URMHFWV6WDWLRQVWRPRQLWRUXQVDIHZRUNLQJFRQGLWLRQV
VRXJKWIURPWKH6(%,KRZHYHUYLHZRI6(%,LVDZDLWHG DWVLWHDQGWKHLUUHFWLÀFDWLRQ$OOVLWHVKDYHEHHQGLYLGHG
LQWR ]RQHV DQG D OHDGHU IRU HDFK ]RQH KDYH EHHQ
It may be noted that Department of Public Enterprise
LGHQWLÀHGIRUPDLQWDLQLQJVDIHW\$6DIHW\&RRUGLQDWRU
(DPE) has already laid down a mechanism for performance

101
Annual Report 2018-19

DW WKH OHYHO RI $GGLWLRQDO *HQHUDO 0DQDJHU $*0  DQG and strategies to mitigate them on short term as well as
VXLWDEOHQXPEHUVRITXDOLÀHGVDIHW\RIÀFHUVDUHSRVWHG long term basis.
DWDOOXQLWVDVSHUVWDWXWRU\UXOHVSURYLVLRQVWRORRNDIWHU The RMC meets regularly to deliberate on strategies.
safety of workforce & materials. For strict compliance Risks are monitored through reporting of key
& enforcement of safety norms and practices by the performance indicators. Outcomes of RMC are submitted
contractors, safety clauses are included in General for information of the Board of Directors.
&RQGLWLRQVRI&RQWUDFW(UHFWLRQ&RQGLWLRQRI&RQWUDFW$
12. BUSINESS EXCELLENCE
pre bid discussion is also carried out with the contractor
and a written commitment is taken from the contractor In its pursuit to embrace digital and paperless working,
for following NTPC safety systems. 173& KDV LPSOHPHQWHG DQ ,7 HQDEOHG LQLWLDWLYH
Corporate Performance Management and Business
To mitigate the on-site emergencies at all operating
,QWHOOLJHQFH V\VWHP WR HQDEOH VWUDWHJ\ H[HFXWLRQ DQG
VWDWLRQV HIIHFWLYH HQJLQHHULQJ FRQWUROV DUH SURYLGHG
communication, analytics, query response, reporting
to indicate and handle emergency situation.
and automating few business processes that shall
'HWDLOHG HPHUJHQF\ SODQV KDYH EHHQ GHYHORSHG DQG
SURYLGHHIIHFWLYHGHFLVLRQVXSSRUWIRUWKHPDQDJHPHQW
responsibilities are assigned to each concerned to across different tiers. The system implementation was
handle the emergencies. Mock drills are conducted completed in August 2018.
regularly to check the healthiness of the system. These
 173& KDV GHYHORSHG DQG DGRSWHG ¶173& %XVLQHVV
DFWLYLWLHVDUHDOVRUHYLHZHGE\)DFWRU\LQVSHFWRUGXULQJ
([FHOOHQFH 0RGHO· RQ WKH OLQHV RI JOREDOO\ DFFHSWHG
WKHLUYLVLWVWRWKHSODQWV
3HUIRUPDQFH ([FHOOHQFH IUDPHZRUNV VXFK DV WKH
NTPC’s commitment towards the safety has won many 0DOFROP %DOGULJH 3HUIRUPDQFH ([FHOOHQFH IUDPHZRUN
safety awards and laurels to the company’s units from the European Foundation for Quality Management
reputed institutions, namely Ministry of Labour & ()40 ([FHOOHQFH0RGHO'HPLQJDQG,7&VXVWDLQDELOLW\
(PSOR\PHQW*RYHUQPHQW RI ,QGLD 1DWLRQDO 6DIHW\ PRGHO ,Q WKLV ÀQDQFLDO \HDU  173& KDV
&RXQFLO0XPEDL6WDWHFKDSWHUV,QVWLWXWLRQRI(QJLQHHUV completed assessment of 21 generating stations using
*UHHQWHFK)RXQGDWLRQDVZHOODV6WDWH*RYHUQPHQWV WKLV SHUIRUPDQFH H[FHOOHQFH IUDPHZRUN 7KH RXWFRPH
RI DVVHVVPHQW SURFHVV LV TXDOLWDWLYH DQG TXDQWLWDWLYH
11. RISK MANAGEMENT
IHHGEDFNWRUHVSHFWLYHVWDWLRQRQVWUHQJWKDQGDUHDVWR
Pursuant to compliance with the Companies Act, 2013 LPSURYH
and Regulation 21 of SEBI’s Listing Obligations and
Other contemporary Total Quality Management (TQM)
Disclosure Requirements, NTPC has implemented an
concepts and techniques like ISO, Quality Circles,
elaborate Enterprise Risk Management framework for
3URIHVVLRQDO&LUFOHV6HWFKDYHEHHQGHSOR\HGDFURVV
IROORZLQJ
WKHRUJDQL]DWLRQ4XDOLW\&LUFOHWHDP¶=HQ;·RI173&²
 ‡ 7RÀQDOL]HULVNDVVHVVPHQWXQGHUWKHULVNPDQDJHPHQW .RUEDKDGSDUWLFLSDWHGLQ,QWHUQDWLRQDO4&&RQYHQWLRQ
framework, held at Singapore in October 2018.

 ‡ 0RQLWRU DQG UHYLHZ ULVN PDQDJHPHQW SODQ 13. USING INFORMATION AND COMMUNICATION
 IUDPHZRUNDVDSSURYHGE\WKH%RDUG TECHNOLOGY FOR PRODUCTIVITY ENHANCEMENT

 ‡ ,QIRUPLQJ WKH %RDUG DERXW WKH ULVN DVVHVVHG DQG NTPC has implemented Enterprise Resource Planning
 DFWLRQ UHTXLUHG WR EH WDNH DOUHDG\ WDNHQ IRU (ERP) application to integrate all its business functions
mitigating the risks on quarterly basis WR LPSURYH LQIRUPDWLRQ DYDLODELOLW\ WUDQVSDUHQF\ DQG
decision making. Process Integration data system has
 ‡ 7DNHXSRWKHUPDWWHUDVGLUHFWHGE\WKH%RDUGIURP EHHQ GHYHORSHG WR FDSWXUH GLVSOD\ DQG DQDO\]H WKH
time to time. plant performance parameters on real time basis. ERP
 $)XQFWLRQDO'LUHFWRUOHYHO´5LVN0DQDJHPHQW&RPPLWWHH KDVEHHQXSJUDGHGWRWKHODWHVWYHUVLRQ
(RMC)” has been entrusted with the responsibility to Non-ERP applications in other areas such as Engineering
LGHQWLI\  UHYLHZ WKH ULVNV DQG IRUPXODWH DFWLRQ SODQV 'UDZLQJV DSSURYDO 4XDOLW\ &RQWURO 0DQDJHPHQW

102
Hospital Management, Guest House Management, 14.2. Training & Development
5LJKW WR ,QIRUPDWLRQ DQG 6HFXULW\ &RQWURO KDYH EHHQ
Understanding the necessity of consistently
implemented.
FUHDWLQJNQRZOHGJHDQGGHYHORSLQJQHZVNLOOVDQG
 173&SODQWVDQG2IÀFHVDFURVV,QGLDDUHFRQQHFWHGWR FRPSHWHQFLHV173&KDVVHWXSDFRPSUHKHQVLYH
&RUSRUDWH 2IÀFH DQG 'DWD &HQWUH WKURXJK KLJK VSHHG training infrastructure comprising NTPC Power
MPLS (Multi-Protocol Label Switching) to facilitate 0DQDJHPHQW ,QVWLWXWH 173&30,  DW WKH DSH[
seamless communication. The progress of ongoing OHYHO 5HJLRQDO /HDUQLQJ ,QVWLWXWHV DW 173&
projects and issues of the running power stations UHJLRQV DQG (PSOR\HH 'HYHORSPHQW &HQWHUV
DUH GLVFXVVHG UHJXODUO\ RYHU KLJK GHÀQLWLRQ 9LGHR (EDCs) at sites. NTPC also sponsors employees
Conferencing system at Project Monitoring Centre of WRH[WHUQDOWUDLQLQJIDFLOLWLHVLQ,QGLDDQGDEURDG
&RUSRUDWH2IÀFH173&KDVLWVRZQPDLOLQJVROXWLRQZLWK As on date only Sipat RLI has a simulator. The
main and back up systems Solapur Simulators, which will is a set of two
 $ YHQGRU SRUWDO ZDV GHYHORSHG WR IDFLOLWDWH YHQGRUV simulators capable of running four units 660
to get registered, bid and track their bills for payment 0:   0: HDFK KDYH  ZLOO EH IXQFWLRQDO
without any physical interaction. The same is now only by Sept 2019. Additionally most of the 500
DYDLODEOHRQDPRELOH$SSDVZHOO 0:XQLWVRI173&KDYHDVPDOO%+(/VLPXODWRU
Security of digital assets of NTPC is of top most priority WKDW FDQ EH XVHG WR SURYLGH EDVLF WUDLQLQJ 7KH
DQGKHQFHD[6HFXULW\2SHUDWLRQ&HQWUH 62& ZDV  0:VLPXODWRUVDW.RUEDKDYHDOUHDG\
VWDUWHG5RXQGWKHFORFNPRQLWRULQJRIDOOH[WHUQDODQG EHHQUHQRYDWHGDQGLQVWDOODWLRQRIRQH0:
LQWHUQDOGDWDWUDIÀFLVEHLQJPRQLWRUHGWKURXJK62&DQG VLPXODWRUDW%RQJDLJDRQDQGRQHPRUH0:
ODWHVWWKUHDWPDQDJHPHQWWRROVKDYHEHHQGHSOR\HGWR Simulator in Unchahar is under planning stage.
SUHYHQWDQ\F\EHUDWWDFNRUGDWDWKHIW  $SH[OHYHO173&30,DW1RLGDLVWKHFRUQHUVWRQH
 173&KDVLWVRZQ'LVDVWHU5HFRYHU\6LWH%RWKWKHGDWD of NTPC’s learning infrastructure. It has the primary
FHQWHUDQGGLVDVWHUUHFRYHU\FHQWHUDUHQRZ,62 responsibility of enhancing and upgrading the
FHUWLÀHG LQWHOOHFWXDOFDSLWDORIWKHRUJDQL]DWLRQ2YHUWKH
last 35 years, it has emerged as a leading institute
NTPC has initiated the process of switching to
SURYLGLQJ OHDUQLQJ RQ PDQDJHPHQW WHFKQLFDO
3DSHUOHVV 2IÀFH $OO DSSURYDOV DQG HQWLUHSURFHVV IURP
competencies and leadership. In fact, assuming
procurementWRSD\PHQWDUHHQYLVDJHGWREHSDSHUOHVV
for itself the role of a change agent, NTPC-PMI has
14. HUMAN RESOURCE DEVELOPMENT become the learning facility for the entire power
 173& WDNHV SULGH LQ LWV KLJKO\ PRWLYDWHG DQG WUDLQHG VHFWRU ,W LV SOD\LQJ D SLYRWDO UROH LQ GHYHORSLQJ
Human Resource that has contributed its best to bring ZRUOGFODVVFRPSHWHQFLHVE\SURYLGLQJVWDWHRI
NTPC to its present height. The total employee strength the-art training to power professionals from India
of NTPC stands at 20,239 as on 31st March 2019 DQG RWKHU GHYHORSLQJ FRXQWULHV  'XULQJ 
H[FOXGLQJ7UDLQHHV  19 (up to 31st March 2019), PMI has conducted
total 2,184 (2003 Instructor led training and
14.1. Induction Plans 181 e-Learning modules) training programs
 6HYHUDO LQLWLDWLYHV KDYH EHHQ WDNHQ WR HQVXUH FRYHULQJ  H[HFXWLYHV ORJJLQJ D WRWDO RI
a robust talent pipeline in order to meet the 2,00,882 training man-days (1,34,190 man-days
increasing requirement of manpower for the of e-Learning and 66,692 man-days of Instructor
Company’s growth program. Considering the Led training).
VLJQLÀFDQW FDSDFLW\ DGGLWLRQ SODQ ([HFXWLYH NTPC has also adopted latest Virtual Reality
Trainees as well as Diploma & ITI Trainees are %DVHG FRJQLWLYH WHFKQRORJLHV WR SURYLGH
recruited as per the requirement & continuous DQ LPPHUVLYH H[SHULHQWLDO WUDLQLQJ IRU VDIH
HIIRUWVKDYHEHHQPDGHWRHIIHFWLYHO\XWLOL]HWKH operation of its electrical Low Tension &High
PDQSRZHUE\UDWLRQDOL]DWLRQ Tension switchgears. It is also in the process of

103
Annual Report 2018-19

GHYHORSLQJ PDQ\ VXFK WUDLQLQJ PRGXOHV RQ LPSDUWLQJDQGHYDOXDWLQJWKHRQH\HDULQWHQVLYH


YDULRXV RWKHU DUHDV RI SRZHU SODQW HTXLSPHQW FRPSXOVRU\WUDLQLQJRIIUHVKO\UHFUXLWHG([HFXWLYH
NTPC-PMI is also implementing Project Analytics Trainees (ETs) in NTPC. This year ET program has
IRUIDVWHUDQGEHWWHUSURMHFWGHOLYHU\G\QDPLF5LVN been Restructured and Redesigned as NTPC
management using International bookmarked Induction Program to unleash new Talents
methodology. (NIPUN). In 2018, NTPC recruited 234 ETs in
Finance, Electrical, Mechanical, C&I, and Mining,
The training imparted is in tune with emerging
disciplines. In separate groups, these ETs are
needs and challenges and for this purpose, the
presently undergoing training in functional areas
H[LVWLQJ WUDLQLQJ SURJUDPV DUH UHYLHZHG DQG
at NTPC-PMI and Regional Learning Centres at
some new programs are included in the annual
VSTPP, Sipat and Simhadri projects.
FDOHQGDUHYHU\\HDU
 )RUDOOURXQGGHYHORSPHQWRI,QGLD·VSRZHUVHFWRU
From the current year, NTPC-PMI is additionally
30, KDV FRQGXFWHG VHYHUDO FXVWRPL]HG WUDLQLQJ
JLYLQJ VSHFLDO SULRULW\ WR 6DIHW\ +HDOWK DQG
SURJUDPV IRU WKH EHQHÀW RI 6WDWH XWLOLWLHV IURP
(QYLURQPHQW 6+(  DV LW JRHV D ORQJ ZD\ LQ
Rajasthan, Uttar Pradesh and Haryana; CPSEs
establishing operating practices that make
like Power Finance Corporation (PFC), National
SRZHU SODQWV HIÀFLHQW DQG VXVWDLQDEOH 173& LV
Hydroelectric Power Corporation (NHPC), THDC
GHYHORSLQJD6DIHW\$FDGHP\DW8QFKDKDU
,QGLD/LPLWHG(G&,/DQG((6/DQGSULYDWHVHFWRU
In order to take training closer to the employees, companies like Reliance Industries Limited (RIL)
173&30, KDV DGRSWHG WUDLQLQJ WKURXJK YLGHR and Tata Power, etc., at their locations as well as
conferencing, web conferencing and e-learning. LQ30,,QDGGLWLRQVHYHUDOLQGLYLGXDOVIURP6WDWH
Additionally NTPC has introduced learning XWLOLWLHVKDYHEHQHÀWHGIURPWKHUHJXODUWUDLQLQJ
WKURXJK H OHDUQLQJ DV D SODWIRUP WR SURYLGH programs being conducted at PMI, Noida. In all
training to its employees at anywhere, anytime  PDQGD\V RI WUDLQLQJ ZHUH SURYLGHG WR
EDVLV WKURXJK +DUYDUG 0DQDJH 0HQWRU DQG IURPRWKHURUJDQL]DWLRQVE\30,WLOO0DUFK·
GPiLearn. It has also put in place its own Learning
15. SUPPORT TO THE SECTOR
0DQDJHPHQW 6HUYHU /06  DQG KDV GHYHORSHG
173& VSHFLÀF WHFKQLFDO DQG (53 UHODWHG H  173& KDV H[WHQGHG LWV VHUYLFHV IRU WKH GHYHORSPHQW
OHDUQLQJ PRGXOHV :LWK WKH LQWURGXFWLRQ RI RI ,QGLDQ 3RZHU 6HFWRU LQ VHYHUDO SURJUDPV RI
learning through e-Learning, the L&D scenario in WKH *RYHUQPHQW RI ,QGLD WKURXJK 160 ''8*-<
NTPC has taken a leap jump with as much as 35% SAUBHAGYA and NSDF. Some of the highlights of
learning happening through e learning. 173&·VUROHLQ,QGLD·VSRZHUVHFWRUGHYHORSPHQWDUHDV
EHORZ
 $W WKH LQWHUQDWLRQDO OHYHO 30, FRQGXFWHG D 
weeks program in Abu Dhabi this year for ABB 15.1. National Solar Mission (NSM)
on Power Plant Operation and Simulator Training
 7KH*RYHUQPHQWRI,QGLDKDVGHVLJQDWHG1991
on GE Combined Cycle Gas Power Plant. Three
as the Nodal Agency for Phase-I of National Solar
programs for Bangladeshi employees of NTPC’s
Mission (NSM) with a mandate for purchase of
-RLQW YHQWXUH FRPSDQ\ %,)3&/ JLYLQJ WKHP
power from the solar power projects connected
inputs on Power Plant Construction.
to grid and for sale of such power bundled with
NTPC imparts hands-on training on Power Plant the power sourced from NTPC coal power stations
2SHUDWLRQV WKURXJK LWV  0: 0: DQG to Distribution Utilities under Phase-I of NSM,
0:6LPXODWRUVDW.RUEDDQG6LSDWWRIUHVKO\ ZKLFK HQYLVDJHG VHWWLQJ XS RI  0: VRODU
recruited engineers as well as professionals from capacity. NVVN introduced transparent bidding
NTPC and other power utilities. SURFHVVLQYROYLQJUHYHUVHELGGLQJIRUVHOHFWLRQRI
6RODU 3RZHU GHYHORSHUV ZKLFK KHOSHG WR EULQJ
NTPC-PMI is also responsible for designing,
GRZQ VRODU WDULII YHU\ VLJQLÀFDQWO\ EHORZ &(5&

104
QRWLÀHG WDULII DW WKDW WLPH $OUHDG\  SURMHFWV ZRUN DQG KDQGLQJ RYHU RI WKH FRPSOHWHG
ZLWK VRODU JHQHUDWLRQ FDSDFLW\ RI  0:  LQIUDVWUXFWXUH WR ',6&20V LV H[SHFWHG WR EH
0: 6RODU 39 DQG  0: 6RODU 7KHUPDO  KDV DFKLHYHGE\-XQH
been commissioned under the scheme.
15.3. National Skill Development Fund (NSDF)
This solar power bundled with power from
NTPC has entered into 2 tripartite MoUs with
HTXLYDOHQW FDSDFLW\ RXW RI IURP XQDOORFDWHG
0LQLVWU\RI6NLOO'HYHORSPHQW (QWUHSUHQHXUVKLS
quota of NTPC coal power stations is presently
16')1DWLRQDO 6NLOO 'HYHORSPHQW )XQG  DQG
EHLQJVXSSOLHGWR'LVFRPV8WLOLWLHVRI5DMDVWKDQ
1DWLRQDO6NLOO'HYHORSPHQW&RUSRUDWLRQ 16'& 
Maharashtra, Punjab, Andhra Pradesh, Telangana,
and has allocated total Rupees 36.50 Crore
:HVW %HQJDO $VVDP 2GLVKD 8WWDU 3UDGHVK
IURP LWV &65 IXQG IRU YDULRXV VNLOO GHYHORSPHQW
&KKDWWLVJDUK7DPLO1DGX.DUQDWDNDDQG'9&
SURJUDPV 173& ZLOO SURYLGH IXQG WR 16') DV
During the current FY 2018-19, NVVN has SHU WKH SURYLVLRQV RI WKH 0R8 DQG 16'& ZLOO
VXSSOLHG  08 SURYLVLRQDO  RI EXQGOHG GUDZWKHPRQH\IURP16')WRH[HFXWHWKHVHVNLOO
SRZHUWR'LVFRPV8WLOLWLHV GHYHORSPHQWSURJUDPVDWYDULRXVORFDWLRQV

 173&KDGEHHQHQWUXVWHGWRGHYHORS0:  7KHVH VNLOO GHYHORSPHQW SURJUDPV DUH EHLQJ


Solar PV through NSM Phase-II in three tranches carried out in different parts of the country to
from 2014-15 to 2018-19, where NTPC would be train 30,000 youths in different market linked
WKHIDFLOLWDWRUWUDGHUEHWZHHQ'LVFRPVDQGWKH YRFDWLRQDOVNLOOVHWVIRUYDULRXVVHFWRUVOLNHVHUYLFH
SURMHFWGHYHORSHUV173&ZRXOGSXUFKDVHSRZHU sector, manufacturing sector, industry sector, etc.
IURP WKH GHYHORSHUV DQG VHOO LW WR WKH 'LVFRPV WKURXJK VSHFLDOL]HG LPSOHPHQWDWLRQ SDUWQHUV RI
Under Tranche-I, NITs were published for 3,000 NSDC.
0:RIVRODUFDSDFLW\DQGVWDWHVSHFLÀFOHYHOOLVHG
The Multi Skill Centers at Talcher, Solapur,
solar tariff got determined through transparent
6XQGDUJDUK 0RXGD 3DWQD %DUK  .DKDOJDRQ
UHYHUVH DXFWLRQ SURFHVV $IWHU VLJQLQJ RI 3RZHU
9LQGK\DQDJDU 7DODLSDOOL 'DGUL .XGJL
Sale Agreements (PSAs) with State Discoms,
5DPDJXQGDP 6LPKDGULKDYHEHHQVWDUWHG
Letter of Intent (LOI) had been placed on selected
VRODU SURMHFW GHYHORSHUV 63'V  173& DOVR  7LOO GDWH  QXPEHU RI FDQGLGDWHV KDYH
entered in to Power Purchase Agreements (PPAs) been trained and 2,527 are undergoing training.
with the selected SPDs. So far, solar projects of  WUDLQHG SHRSOH KDYH EHHQ DVVHVVHG DQG
 0: FDSDFLW\ KDYH EHHQ FRPPLVVLRQHG KDYHEHHQSODFHG
DQGDVRODUSURMHFWRIEDODQFH0:LVXQGHU 16. AWARDS AND ACCOLADES
construction.
NTPC, the Maharatna company, has been consistently
15.2. DDUGJY and SAUBHAGYA UHFRJQL]HGE\ORFDO LQWHUQDWLRQDOERGLHVLQWKHÀHOGV
 173&KDVEHHQHQWUXVWHGZLWK5XUDO(OHFWULÀFDWLRQ RI 3URGXFWLYLW\ (QYLURQPHQW DQG 6DIHW\ 0DMRU DZDUGV
work under DDUGJY (Deen Dayal Upadhyay DQGUDQNLQJVUHFHLYHGE\173&GXULQJWKHSHULRG
Gram Jyoti Yojana) and SAUBHAGYA (Pradhan DUHDVXQGHU
Mantri Sahaj Bijli Har Ghar Yojana) schemes ‡ *OREDOUDQNLQJ173&/LPLWHGUDQNHGQR,QGHSHQGHQW
RI *R, $OO WKH GLVWULFWV KDYH EHHQ VDWXUDWHG E\ Power Producer and Energy Trader Globally in the Platt’s
SURYLGLQJQHDUO\/DNKV+RXVHKROGFRQQHFWLRQV Top 250 Global Energy Company Ranking, 2018.
DVSHUWKHHOLJLEOHEHQHÀFLDU\OLVWUHFHLYHGIURP
UHVSHFWLYH',6&20V*RYHUQPHQWRI2GLVKD2XW ‡ *UHDW 3ODFH WR ZRUN ,Q D VWXG\ FDUULHG RXW E\ *UHDW
RIDUHYLVHGYLOODJHVFRSHRIQXPEHUV 8Q 3ODFHWR:RUNDQG7KH(FRQRPLF7LPHV173&KDVEHHQ
HOHFWULÀHG  3DUWLDOO\ HOHFWULÀHG  LQIUDVWUXFWXUH UHFRJQL]HGIRUEHLQJDPRQJWKHEHVWLQWKH,QGXVWU\
work has been completed in 13,127 Villages and Public Sector Company to work for the year 2018. NTPC
work is in progress in 778 Villages. Remaining LVRYHUDOOUDQNHGDPRQJRUJDQL]DWLRQVDFURVVWKH

105
Annual Report 2018-19

country who participated in the assessment of the study E\ $7' 86$ WR WKH RUJDQL]DWLRQV WKDW GHPRQVWUDWH
´,QGLD·V%HVW&RPSDQLHVWR:RUNIRUµ HQWHUSULVHZLGHH[FHOOHQFHLQ/HDUQLQJ 'HYHORSPHQW
DQG7DOHQW'HYHORSPHQW
‡ 'XQ  %UDGVWUHHW $ZDUG 7KH 'XQ  %UDGVWUHHW ,QIUD
Award-2018 has been conferred on NTPC Limited for ‡ ,67'1DWLRQDO$ZDUGIRU,QQRYDWLYH7UDLQLQJ3UDFWLFHV
([FHOOHQFH LQ 3RZHU *HQHUDWLRQ 6KUL 3UDNDVK 7LZDUL 173&KDVZRQWKH,67'1DWLRQDO$ZDUGIRU,QQRYDWLYH
'LUHFWRU 2SHUDWLRQV  UHFHLYHG WKH DZDUG IURP 6KUL 7UDLQLQJ3UDFWLFHV )LUVW3UL]H 
$PLWDEK.DQW,$6&KLHI([HFXWLYH2IÀFHURI1LWL$D\RJ
‡ %0/0XQMDO$ZDUGIRUOHDUQLQJDQGGHYHORSPHQW173&
GOI in New Delhi on 31st October 2018.
secures the 2nd position and wins the BML Munjal
‡ *OREDO(QHUJ\0DQDJHPHQW$ZDUG173&·VWKUHHVWDWLRQV $ZDUG  IRU 6XVWDLQHG ([FHOOHQFH LQ /HDUQLQJ 
5DPDJXQGDP 9LQGK\DFKDO DQG .DZDV KDV UHFHLYHG 'HYHORSPHQW DIWHU FRPSHWLQJ ZLWK SULYDWH DQG SXEOLF
Global Energy Management Award 2018 in Thermal and sector companies. The team was felicitated by Dr. Pranab
*DV3RZHUFDWHJRU\IRUH[FHOOHQFHLQHQHUJ\HIÀFLHQF\ Mukherjee, former President of India, at New Delhi on
19th April 2018.
‡ ),&&,:DWHU$ZDUG173&·VUHVHDUFKDUP1(75$UHFHLYHG
),&&,:DWHU$ZDUG UGSRVLWLRQ DW,QGLD,QGXVWU\ZDWHU ‡ 6.2&+$ZDUGRI0HULWIRU&65173&KDVEHHQDZDUGHG
FRQFODYH RQ VXVWDLQDEOH :DWHU 0DQDJHPHQW  XQGHU WKH SUHVWLJLRXV 6.2&+ DZDUG RI 0HULW IRU WRS &65
7HFKQRORJ\ ,QQRYDWLRQ FDWHJRU\ IRU GHYHORSPHQW RI projects in India for “Enhancing agricultural incomes by
low cost seawater desalination process using waste heat LPSURYLQJIDUPSURGXFWLYLW\µ
IURPÁXHJDVDW6LPKDGUL3RZHUSODQW
‡ ),&&, 6DIHW\ 6\VWHPV ([FHOOHQFH $ZDUGV 173&·V
‡ &,,&XVWRPHU (QJDJHPHQW DQG 6DWLVIDFWLRQ 3UDFWLFHV Faridabad Gas Power Station has been awarded
DZDUG173&9LQGK\DFKDOZRQQGUXQQHUXSDZDUGIRU ´&HUWLÀFDWHRI$SSUHFLDWLRQIRU*RRG3UDFWLFHVLQ6DIHW\
‘CII- Customer Engagement and Satisfaction Practices’ 6\VWHPVµ DW WKH WK ),&&, 6DIHW\ 6\VWHPV ([FHOOHQFH
under the category Infrastructure and power at function Awards for Industry 2018.
RUJDQL]HGDW%DQJDORUH
‡ 1DWLRQDO 6DIHW\ $ZDUG 173&·V 7DOFKHU 6XSHU 7KHUPDO
‡ ,QQRYDWLYH3UDFWLFHV$ZDUGVIRU6XVWDLQDEOH'HYHORSPHQW Power Station and Jhanor Gandhar Gas Power Station
*RDOV 6'*V 173&LVDPRQJ7RS3HUIRUPHUVDW,QQRYDWLYH UHFHLYHG WKH 3UHVWLJLRXV 1DWLRQDO 6DIHW\ $ZDUG IURP
3UDFWLFHV $ZDUGV IRU 6XVWDLQDEOH 'HYHORSPHQW *RDOV *RYWRI,QGLD1HZ'HOKLRQ
6'*V  RUJDQL]HG E\ *OREDO &RPSDFW 1HWZRUN RQ WK
‡ .DOLQJD 6DIHW\ $ZDUG 173&·V 7DOFKHU 7KHUPDO 3RZHU
June 2018.
6WDWLRQ DQG 7DOFKHU 6XSHU 7KHUPDO 3RZHU 6WDWLRQ KDYH
‡ 'DLQLN-DJUDQ&65$ZDUG173&/WGKDVEHHQFRQIHUUHG EHHQFRQIHUUHGZLWKWKHPXFKFRYHWHG*ROGDQG6LOYHU
with “Dainik Jagran CSR Awards 2019” in Education ´.DOLQJD 6DIHW\ $ZDUGµ DW WKH WK 2GLVKD 6WDWH 6DIHW\
Category in a function held in New Delhi on 27th &RQFODYHRQQG1RYHPEHU
)HEUXDU\  7KH $ZDUG ZDV JLYHQ E\ 6KUL 0DQRM
‡ 6DIHW\ &XOWXUH $ZDUG 173& $QDQWKDSXUDPX 6RODU
6LQKD+RQ·EOH0LQLVWHURI6WDWH ,F IRU&RPPXQLFDWLRQ
3URMHFWUHFHLYHG%HVW6DIHW\&XOWXUH$ZDUGIURP1DWLRQDO
and Minister of State for Railways.
Safety Council, Andhra Pradesh Chapter on 8th March
‡ $ZDUG LQ WKH ÀHOG RI OHDUQLQJ DQG GHYHORSPHQW 173& RQWKHRFFDVLRQRI6DIHW\:HHN&HOHEUDWLRQV
KDV UHFHLYHG WKH SUHVWLJLRXV $VVRFLDWLRQ IRU 7DOHQW
‡ &%,3 DZDUGV 173& KDV EHHQ DZDUGHG DV WKH %HVW
'HYHORSPHQW $7'  %HVW  $ZDUG D JOREDOO\
Performing Utility of the Country in Thermal Power
UHVSHFWHG DZDUG LQ WKH /HDUQLQJ  'HYHORSPHQW DQG
Sector by Central Board of Irrigation and Power (CBIP)
7DOHQW'HYHORSPHQWVSDFH7KLVJOREDODZDUGLVFRQIHUUHG
on 4th January, 2019 at a function held in New Delhi.

106
Annexure-I
LIST OF NTPC COMMISSIONED STATIONS / PROJECTS
I. COAL BASED PROJECTS

Sl. Project State Capacity (MW)


1 Simhadri- I & II Andhra Pradesh 2000
2 Bongaigaon Assam 750
3 .DKDOJDRQ, ,, Bihar 2340
4 Barauni Bihar 220
5 Barh-II Bihar 1320
6 Sipat- I &II Chhattisgarh 2980
7 .RUED,,, ,,, Chhattisgarh 2600
8 Lara Chhattisgarh 800
9 .XGJL .DUQDWDND 2400
10 Mouda-I&II Maharashtra 2320
11 Solapur Maharashtra 1320
12 Gadarwara Madhya Pradesh 800
13 Vindhyachal- I, II, III, IV & V Madhya Pradesh 4760
14 Talcher STPS- I & II Odisha 3000
15 Talcher TPS Odisha 460
16 Ramagundam- I, II, & III Telangana 2600
17 Rihand- I,II & III Uttar Pradesh 3000
18 Singrauli- I&II Uttar Pradesh 2000
19 Dadri- I & II Uttar Pradesh 1820
20 Unchahar- I, II, III & IV Uttar Pradesh 1550
21 Tanda Uttar Pradesh 440
22 Farakka- I , II & III :HVW%HQJDO 2100
Total (Coal) 41580
II. COMBINED CYCLE GAS/LIQUID FUEL BASED PROJECTS

Sl. Project State Capacity (MW)


1 Jhanor-Gandhar Gujarat 657
2 .DZDV Gujarat 656
3 Faridabad Haryana 432
4 .D\DPNXODP .HUDOD 360
5 Anta Rajasthan 419
6 Dadri Uttar Pradesh 830
7 Auraiya Uttar Pradesh 663
Total (Gas/Liquid) 4017

107
Annual Report 2018-19

III. HYDRO BASED PROJECTS

Sl. Project State Capacity (MW)

1 .ROGDP Himachal Pradesh 800

2 Singrauli Small Hydro Uttar Pradesh 8

Total (Hydro) 808

IV. RENEWABLE PROJECTS

Sl. Project State Capacity (MW)


1 A&N Solar A&N 5
2 Faridabad Solar Haryana 5
3 Raigarh Solar MP 50
4 Talcher Solar Odisha 10
5 Ramagundam Solar Telangana 10
6 Dadri Solar UP 5
7 Singrauli Solar UP 15
8 Unchahar Solar UP 10
9 Ananthapuram Solar Andhra Pradesh 250
10 Bhadla Solar Rajasthan 260
11 Mandsaur Solar Madhya Pradesh 250
12 5RMPDO:LQG Gujarat 50

Total (Renewable) 920

V. POWER PROJECTS UNDER JOINT VENTURES AND SUBSIDIARIES

Sl. Project State Capacity (MW)

1 0X]DIIDUSXU .%81/  Bihar 610

2 Nabinagar (BRBCL) Bihar 750

3 Bhilai (NSPCL) Chhattisgarh 574

4 Jhajjar (APCPL) Haryana 1500

5 Ratnagiri (RGPPL) Maharashtra 1967

6 Rourkela (NSPCL) Odisha 120

7 Vallur (NTECL) Tamil Nadu 1500

8 Durgapur (NSPCL) :HVW%HQJDO 120

9 Meja (MUNPL) Uttar Pradesh 660

Total (Under JVs) 7801

GRAND TOTAL (I+II+III+IV+V) 55126

108
Annexure-II
DETAILS OF ONGOING PROJECTS

Sl. Name of the project (Fuel)/State/Country) Capacity (MW)

1 %DUK, &RDO %LKDU 1980

2 %DUDXQL &RDO %LKDU 500

3 /DUD, &RDO &KKDWWLVJDUK 800

4 1RUWK.DUDQSXUD &RDO -KDUNKDQG 1980

5 *DGDUZDUD &RDO 0DGK\D3UDGHVK 800

6 .KDUJRQH &RDO 0DGK\D3UDGHVK 1320

7 'DUOLSDOOL &RDO 2GLVKD 1600

8 $XUDL\D 6RODU 5DMDVWKDQ 20

9 7HODQJDQD &RDO 7HODQJDQD 1600

10 %LOKDXU 6RODU 8WWDU3UDGHVK 225

11 7DQGD,, &RDO 8WWDU3UDGHVK 1320

12 /DWD7DSRYDQ +\GUR 8WWDUDNKDQG 171

13 7DSRYDQ9LVKQXJDG +\GUR 8WWDUDNKDQG 520

14 5DPPDP +\GUR :HVW%HQJDO 120

15 1DELQDJDU:KROO\RZQHG6XEVLGLDU\RI173& &RDO %LKDU 1980

16 1DELQDJDU-9ZLWK5DLOZD\ &RDO %LKDU 250

17 3DWUDWX²-9ZLWK-%91/ &RDO -KDUNKDQG 2400

18 0HMD²-9ZLWK83591 &RDO 8WWDU3UDGHVK 660

19 5RXUNHOD-9ZLWK6$,/ &RDO 2GLVKD 250

20 'XUJDSXU,,,-9ZLWK6$,/ &RDO :HVW%HQJDO 40

21 .KXOQD-9ZLWK%3'% &RDO %DQJODGHVK 1320

Total 19856

:RUNKDVEHHQVWRSSHGVLQFHDVSHU+RQ·EOH6XSUHPH&RXUWRUGHUGDWHG

109
Annual Report 2018-19

Annexure-III
NTPC Group-Joint Ventures and Subsidiaries

SI. Name of the JV/ Equity Holding as on Area (s) of Operation/Status


No. Subsidiary Co. 31st March 2019
(Incorporated on)
Joint Ventures /Subsidiaries for Capacity Addition
1 NTPC-SAIL Power NTPC-50% 7KHFRPSDQ\RZQVDQGRSHUDWHVFDSWLYHSRZHUSODQWVIRU6$,/
&RPSDQ\3YW/WG Steel Authority of India DW 'XUJDSXU  0:  5RXUNHOD  0:   %KLODL  0: 
(NSPCL) Limited (SAIL)-50% DQG%KLODL33,,, ;0: ZKLFKLVVXSSO\LQJSRZHUWR6$,/
(08.02.1999) &KKDWWLVJDUK 'DGUD  1DJDU +DYHOL DQG 'DPDQ  'LX ,WV
SUHVHQWLQVWDOOHGFDSDFLW\LV0:

NSPCL is constructing new Coal based Capacities at Rourkela


33,,([SDQVLRQ [0:  'XUJDSXU33,,, [0: 
6RODU 3RZHU FDSDFLW\ RI  0: DW YDULRXV SODQW ORFDWLRQV RI
SAIL is also being pursued.
2 NTPC Tamil Nadu Energy NTPC-50% The Joint Venture Company was formed to set up a coal-based
Company Limited TANGEDC0-50% SRZHU VWDWLRQ RI  0:  ;  0:  FDSDFLW\ DW 9DOOXU
(23.05.2003) using Ennore port infrastructure facilities. All three units are
under commercial operation.
3 Bhartiya Rail Bijlee NTPC 74% 7KLV 6XEVLGLDU\ &RPSDQ\ ZDV IRUPHG WR XQGHUWDNH YDULRXV
Company Ltd. Indian Railways-26% DFWLYLWLHVUHODWHGWRVHWWLQJXSD0:FRDOEDVHGWKHUPDO
(22.11.2007) SRZHU SODQW [ 0:  DW 1DELQDJDU 'LVWULFW$XUDQJDEDG
Bihar. Unit-1, 2 & 3 are in commercial operation. Construction
work for Unit-4 is in progress.
4 .DQWL%LMOHH8WSDGDQ NTPC- 100% 7KHFRPSDQ\RZQVDQGRSHUDWHV0: [0:[
Nigam Ltd. (06.09.2006) 0:  0X]DIIDUSXU 7KHUPDO 3RZHU 6WDWLRQ $OO IRXU XQLWV DUH
under commercial operation. Due to buyout of BSPGCL stake by
173&LQ.%81/WKLVLVQRZDZKROO\RZQHGVXEVLGLDU\&RPSDQ\
of NTPC.
5 Patratu Vidyut Utpadan NTPC-74% 7KLV6XEVLGLDU\&RPSDQ\ZDVIRUPHGWRLPSURYHSHUIRUPDQFH
Nigam Ltd JBVNL-26% RI H[LVWLQJ FDSDFLW\ DQG IXUWKHU FDSDFLW\ H[SDQVLRQ RI 3DWUDWX
(15.10.2015) Thermal Power Station (PTPS).

.HHSLQJ LQ YLHZ WKH KLJK FRVW RI JHQHUDWLRQ DJH RI WKH XQLWV
DQG GLIÀFXOW\ LQ FRPSO\LQJ ZLWK WKH QHZ HQYLURQPHQWDO
QRUPVRSHUDWLRQVRIDOOH[LVWLQJXQLWVKDVEHHQVWRSSHGZHI
24.01.2017.

3981/LVGHYHORSLQJWKHUPDOSRZHUSURMHFWRI0: ;
0: (3&SDFNDJHKDVEHHQDZDUGHGWR%+(/ FRQVWUXFWLRQ
DFWLYLWLHVDUHXQGHUSURJUHVV
6 Nabinagar Power NTPC-100 % This Joint Venture Company was formed to set-up a coal based
Generating Company SRZHU SURMHFW KDYLQJ FDSDFLW\ RI  0: [ 0:  DQG
3ULYDWH/WG  operation & maintenance thereof at Nabinagar in district
Aurangabad in the State of Bihar. Construction work is under
progress. Due to buyout of BSPGCL stake by NTPC in NPGCL,
this is now a wholly owned subsidiary Company of NTPC.
7 0HMD8UMD1LJDP3ULYDWH NTPC-50% This Joint Venture Company was formed to set-up a power plant
Ltd. (02.04.2008) UPRVUNL-50% RI0: [0: DW0HMD7HKVLORI$OODKDEDGGLVWULFWLQ
the state of Uttar Pradesh. Construction work is under progress.

110
8 $UDYDOL3RZHU&RPSDQ\ NTPC-50% IPGCL-25% APCPL has setup Indira Gandhi Super Thermal Power Station of
3ULYDWH/WG  HPGCL-25% 0: [0: LQ'LVWULFW-KDMMDU+DU\DQD$OOWKHXQLWV
are under commercial operation.
9 Ratnagiri Gas and Power NTPC -25.51%, 7KLV FRPSDQ\ ZDV IRUPHG DV D MRLQW YHQWXUH DPRQJ 173&
3YW/WG 5*33/ GAIL -25.51%, *$,/ 06(% +ROGLQJ &R /WG DQG ,QGLDQ ÀQDQFLDO LQVWLWXWLRQV
(08.07.2005) IFIs-35.47% IRUWDNLQJRYHUDQGRSHUDWLQJJDVEDVHG'DEKRO3RZHU3URMHFW
MSEB Holding Co.- along with LNG terminal.
13.51%
All the three Power Blocks with a combined capacity of 1,967.08
0: DIWHUUHUDWLQJ DUHXQGHUFRPPHUFLDORSHUDWLRQVLQFH0D\
2009.
PPA has been signed by RGPPL with Indian Railways for supply
RI a 0: IRU  \HDUV ZHI  DQG *DV 6XSSO\
Agreement was signed with GAIL for supply of 1.75 MMSCMD
of RLNG w.e.f. 01.04.2017 for 5 years.

'XHWRQRVFKHGXOHIURP06('&/ RWKHUEHQHÀFLDULHV5/1*
is not being purchased from GAIL beyond railways requirement.
7KHUH LV GHÀFLW RI GRPHVWLF JDV IRU IXOO XWLOL]DWLRQ RI 5*33/
installed capacity.

After demerger of LNG business of RGPPL into a new Company


0V.RQNDQ/1*3ULYDWH/LPLWHG ./3/ FDPHLQWRHIIHFWIURP
26.03.2018 with appointed date of 01.01.2016.
10 Trincomalee Power NTPC-50%, This Joint Venture Company was formed to undertake the
Company Limited (TPCL) CEB-50% GHYHORSPHQW FRQVWUXFWLRQ HVWDEOLVKPHQW RSHUDWLRQ DQG
(26.09.2011) PDLQWHQDQFHRIFRDOEDVHGWKHUPDOSRZHUSODQWRI0: [
0: FDSDFLW\DW7ULQFRPDOHHLQ6UL/DQND

)XUWKHUWKHJRYHUQPHQWRI6UL/DQNDKDVUHTXHVWHGWKH*R,IRU
FKDQJLQJIXHOVRXUFHVWROLTXHÀHGQDWXUDOJDVDQGIRUUHORFDWLQJ
WKH3URMHFWDW.HUDZDOSLWL\D7KHVDPHKDVEHHQDJUHHGE\*R,

*R6/KDVLVVXHGOHWWHURILQWHQWWR*R,IRUGHYHORSPHQWRI
0:/1*SURMHFWLQ-XQHDQG0:VRODUSURMHFW5HYLVHG
3URMHFW$JUHHPHQWVDUHXQGHUÀQDOL]DWLRQ
11 Bangladesh India NTPC-50%, This Joint Venture Company was formed to undertake the
Friendship Power BPDB-50% GHYHORSPHQWLPSOHPHQWDWLRQRSHUDWLRQVDQGPDLQWHQDQFHRI
&RPSDQ\ 3YW /LPLWHG the project in Bangladesh on a build, own and operate basis.
(31.10.2012) 7KHFRPSDQ\LVFXUUHQWO\FRQVWUXFWLQJD0: ;0: 
FRDOEDVHGSRZHUSURMHFWDW.KXOQD%DQJODGHVK
0V%+(/ZDVVHOHFWHGDVWKH(3&DJHQF\WKURXJKLQWHUQDWLRQDO
FRPSHWLWLYH ELGGLQJ WR H[HFXWH WKH SURMHFW &RQVWUXFWLRQ
DFWLYLWLHVDUHLQSURJUHVV
12 Anushakti Vidyut Nigam NTPC-49%, This JV company was incorporated between NTPC Ltd. and
Limited NPCIL- 51% Nuclear Power Corporation of India Ltd. (NPCIL) for setting up
(27.01.2011) nuclear power project(s).

'HSDUWPHQW RI $WRPLF (QHUJ\ KDV SHUPLWWHG MRLQW YHQWXUH RI


two CPSEs to set up Nuclear Power Project, due to change
LQ GHÀQLWLRQ RI *RYHUQPHQW &RPSDQ\ XQGHU $WRPLF (QHUJ\
$PHQGPHQW $FW&XUUHQWO\QRDFWLYLWLHVDUHEHLQJWDNHQ
up by the Company.

111
Annual Report 2018-19

Joint Ventures / Subsidiaries — Forward Integration


1 NTPC Electric Supply Co. NTPC-100% NTPC Electric Supply Company Ltd. (NESCL), a wholly owned
Ltd. VXEVLGLDU\WUDQVIHUUHGDQGYHVWHGDOOLWVRSHUDWLRQVZLWKHIIHFW
(21.08.2002) from April 1, 2015, to NTPC Limited.

NESCL was incorporated for the distribution business and


later started deposit and consultancy works. The transfer and
YHVWLQJRIH[LVWLQJRSHUDWLRQVZRXOGHQDEOHDIRFXVHGEXVLQHVV
DSSURDFK LQ WKH DUHD RI GLVWULEXWLRQ WKH REMHFWLYH IRU ZKLFK
NESCL was incorporated.

$OWKRXJK FXUUHQWO\ 1(6&/ GRHV QRW KDYH DQ\ EXVLQHVV


operations in retail distribution, the same will be taken-up at an
DSSURSULDWHWLPHZKHQWKHRSSRUWXQLW\EHFRPHVYLVLEOH
2 NTPC Vidyut Vyapar NTPC-100% NTPC Vidyut Vyapar Nigam Ltd. (NVVN), a wholly owned
Nigam Limited subsidiary, is engaged in the business of Power trading. NVVN
(01.11.2002) has a trading License under Category-I (highest category).

NVVN has been designated as the nodal agency for cross border
trading of power with Bangladesh, Bhutan and Nepal.

As per Power Purchase Agreement (PPA) with Bangladesh


3RZHU'HYHORSPHQW%RDUG %3'% 0:DQG0:SRZHU
is being supplied by NVVN from NTPC stations, and Tripura
6WDWH(OHFWULFLW\&RUSRUDWLRQ/LPLWHG 76(&/ UHVSHFWLYHO\GXULQJ
WKH ÀQDQFLDO \HDU  )XUWKHU 1991 KDV VLJQHG DQRWKHU
$JUHHPHQW ZLWK %3'% IRU VXSSO\ RI  0: SRZHU WKURXJK
DVC and supply of power commenced from 10th September
2018.

NVVN has been designated as the nodal agency for cross


border trading of electricity with Nepal. PPA has been signed
between NVVN and Nepal Electricity Authority. Presently NVVN
LV VXSSO\LQJ XS WR  0: SRZHU WR 1HSDO WKURXJK  N9
0X]DIIDUSXU'KDONDEDUWUDQVPLVVLRQOLQHSUHVHQWO\FKDUJHGDW
220 kV.
Joint Ventures / Subsidiaries — Strategic Alliance
1 International Coal NTPC-0.27%, ,QWHUQDWLRQDO &RDO 9HQWXUHV 3YW /WG ,&9/  D -RLQW 9HQWXUH
9HQWXUHV3YW/WG RINL-24.80%, Company was incorporated on 20.05.2009 under the name
(20.05.2009) SAIL- 49.59, ¶,QWHUQDWLRQDO&RDO9HQWXUHV3ULYDWH/LPLWHG·LQDVVRFLDWLRQZLWK
NMDC-24.80%, Steel Authority of India Limited (SAIL), Coal India Limited (CIL),
CIL-0.54%
Rashtriya Ispat Nigam Limited (RINL), NMDC Limited (NMDC).

,Q YLHZ RI ODFN RI VXLWDEOH FRPPHUFLDOO\ YLDEOH RSSRUWXQLWLHV


IRU WKHUPDO FRDO 173& KDV GHFLGHG WR H[LW IURP ,&9/ $V WKH
&RPSDQ\ ZDV IRUPHG E\ D GLUHFWLYH IURP WKH *RYHUQPHQW RI
,QGLDDSSURYDORIWKH*RYHUQPHQWLVDZDLWHGIRUH[LW

112
2 CIL NTPC URJA PRIVATE NTPC-50% &,/ 173& 8UMD 3YW /WG &183/  LV D  -9 LQFRUSRUDWHG
LIMITED (27.04.2010) CIL-50% between NTPC Ltd. and Coal India Ltd. for undertaking the
GHYHORSPHQW RSHUDWLRQ  PDLQWHQDQFH RI %UDKPLQL DQG
Chichro Patsimal coal blocks in Jharkhand and integrated coal
based power plants.
02& YLGH LWV FRPPXQLFDWLRQ GDWHG  GHDOORFDWHG
Brahmini & Chichro-Patsimal coal blocks from the JV Company.
Further, Hon’ble Supreme Court in September 2014 had
cancelled allocation of 204 coal blocks including these two
EORFNV6RIDU%UDKPLQLDQG&KLFKUR3DWVLPDOFRDOEORFNVKDYH
QRWEHHQFRQVLGHUHGIRUDOORFDWLRQDXFWLRQ
3 ./3/ .RQNDQ/1*3ULYDWH 173&*$,/ 'HPHUJHU VFKHPH ÀOHG E\ 5*33/ ZDV DSSURYHG E\ 1&/$7
Limited) 40.921% , on 28.02.2018, thereby separating the RLNG business from
5*33/ 5*33/ WR WKH QHZ HQWLW\ .RQNDQ /1* 3ULYDWH /LPLWHG ./3/ 
IFIs- 28.136 % The demerger scheme came into effect from 26.03.2018 with
MSEB Holding Co.- DSSRLQWHGGDWHRI:LWKWKLVWKH/1*EXVLQHVVDQG
10.717 % DOOLWVDVVRFLDWHGDVVHWVDQGOLDELOLWLHVKDYHEHHQPHUJHGLQWR
DVHSDUDWHFRPSDQ\QDPHO\./3/ZLWKPLQRUVKDUHKROGLQJRI
RGPPL.
 -RLQW9HQWXUHV6XEVLGLDULHV³6WUDWHJLF'LYHUVLÀFDWLRQ
1 +LQGXVWDQ8UYDUDN  NTPC -29.67% +85/ZDVLQFRUSRUDWHGLQMRLQWYHQWXUHZLWK&,/,2&/)&,/ 
Rasayan Limited (HURL) CIL - 29.67 % +)&/RQWRHVWDEOLVKDQGRSHUDWHQHZIHUWLOL]HUDQG
(15.06.2016) IOCL-29.67% FKHPLFDOVFRPSOH[HV XUHDDPPRQLDDQGDVVRFLDWHGFKHPLFDO
FCIL- 7.33% plants) at Gorakhpur & Sindri Units of FCIL and Barauni unit of
HFCL- 3.66% HFCL and to market its products, taking into consideration the
assets of FCIL and HFCL at Gorakhpur, Sindri and Barauni.
7KH&DELQHW&RPPLWWHHRQ(FRQRPLF$IIDLUV &&($ *RYHUQPHQW
RI,QGLDIRUPDOO\DSSURYHGWKHUHYLYDORIWKH*RUDNKSXU 6LQGUL
units of FCIL and Barauni unit of HFCL on 13.07.2016
)LQDQFLDO &ORVXUH DFKLHYHG IRU DOO  3URMHFWV /RDQ $JUHHPHQW
was signed on 20.09.18 for Gorakhpur and 11.10.18 for Barauni
 6LQGUL 3URMHFWV 3UH 3URMHFWDFWLYLWLHV KDYH EHHQ DOPRVW
completed and basic infrastructure is in position at all three
ORFDWLRQV 5HTXLUHG PDMRU DSSURYDOV DQG FOHDUDQFHV REWDLQHG
Scrap disposal and site clearance completed. Gas pipe line work
by GAIL is in progress.
6LWHVKDYHEHHQPRELOL]HGE\DJHQFLHVLQ$SULODQG-XO\
DW *RUDNKSXU DQG %DUDXQL  6LQGUL 3URMHFWV UHVSHFWLYHO\ DQG
presently construction works are in progress.
2 Transformer & Electricals NTPC-44.60% 173&/WGMRLQHGKDQGVZLWK*RYHUQPHQWRI.HUDODIRUVWUDWHJLF
.HUDOD/WG  *RYWRI.HUDOD DFTXLVLWLRQRIVWDNHLQ7(/.LQWKH\HDU
Others-0.84% 7(/.PDQXIDFWXUHVDQGUHSDLUVKLJKYROWDJHWUDQVIRUPHUVDQG
DVVRFLDWHG HTXLSPHQW 7KLV YHQWXUH ZDV H[SHFWHG WR HQDEOH
NTPC to meet the requirements of its own power stations, and
DOVRVHUYLFHWKHYHU\ODUJHDJHLQJÁHHWRIWUDQVIRUPHUVLQWKH
country.
'XH WR FKDQJH LQ EXVLQHVV HQYLURQPHQW 173& %RDUG KDV
DFFRUGHG LQSULQFLSOH DSSURYDO IRU ZLWKGUDZDO RI 173& IURP
7(/. RQ  0R3 WKURXJK OHWWHU GDWHG WK -DQXDU\
KDVJLYHQDSSURYDOIRU173&·V([LWIURP7(/.

113
Annual Report 2018-19

3 NTPC BHEL Power NTPC-50% 173&%+(/3RZHU3URMHFWV3YW/WG 1%33/ LVDMRLQWYHQWXUH


3URMHFWV3ULYDWH/WG BHEL-50% company formed between NTPC and BHEL for taking up
(28.04.2008) DFWLYLWLHV RI (QJLQHHULQJ 3URFXUHPHQW DQG &RQVWUXFWLRQ
(EPC) of power plants and manufacturing of equipment. The
PDQXIDFWXULQJSODQWRI1%33/DW0DQQDYDUDP7LUXSDWL'LVWULFW
Andhra Pradesh for CHP and AHP has commenced production
from 1st December 2014. Due to changed business scenario, the
SURPRWHUVKDYHGHFLGHGWRZLQGXSWKH&RPSDQ\DQGZLQGLQJ
XSDFWLYLWLHVDUHLQSURJUHVV
4 BF-NTPC Energy Systems NTPC-49%, %)173&(QHUJ\6\VWHPV/WG %)1(6/ DMRLQWYHQWXUHFRPSDQ\
Ltd. (19.06.2008) Bharat Forge Ltd.-51% formed between NTPC and Bharat Forge Ltd. to manufacture
FDVWLQJVIRUJLQJVÀWWLQJVDQGKLJKSUHVVXUHSLSLQJUHTXLUHGIRU
power projects and other industries. Due to change in business
VFHQDULRLWKDVEHHQGHFLGHGWRZLQGXSWKH&RPSDQ\$FWLYLWLHV
for winding up are in progress
Joint Ventures / Subsidiaries — Service Business
1 Utility Powertech Ltd. NTPC-50%, 8WLOLW\ 3RZHUWHFK /WG 83/  LV D MRLQW YHQWXUH FRPSDQ\ RI
(23.11.1995) Reliance Infrastructure NTPC and Reliance Infrastructure Limited formed to take up
Ltd. 50% DVVLJQPHQWV RI FRQVWUXFWLRQ HUHFWLRQ DQG VXSHUYLVLRQ RI
EXVLQHVVLQSRZHUVHFWRUDQGRWKHUVHFWRUVOLNH2 0VHUYLFHV
5HVLGXDO /LIH $VVHVVPHQW 6WXGLHV QRQFRQYHQWLRQDO SURMHFWV
etc.
2 173&*(3RZHU6HUYLFHV NTPC-50%, 173&*(3RZHU6HUYLFHV3ULYDWH/LPLWHG 1*6/ HDUOLHUNQRZQ
3ULYDWH/LPLWHG 1*6/ GE Power Systems-50% DV 173& $OVWRP 3RZHU 6HUYLFHV 3ULYDWH /LPLWHG LV D MRLQW
(27.09.1999) YHQWXUHFRPSDQ\RI173&DQG*(3RZHU6\VWHPVIRUPHGIRU
WDNLQJXS5 0VHUYLFHVUHQRYDWLRQPRGHUQL]DWLRQUHIXUELVK
UHKDELOLWDWHXSJUDGHUHYHUVHHQJLQHHULQJFRPSRQHQWGDPDJH
assessments, residual life assessment, reengineering of power
SODQWVLQ,QGLDDQGDEURDGXWLOL]LQJVWDWHRIWKHDUWWHFKQRORJ\
3 National High Power Test NTPC-20%, 1DWLRQDO +LJK 3RZHU 7HVW /DERUDWRU\ 3YW /WG 1+37/  LV D -9
/DERUDWRU\ 3ULYDWH /WG NHPC-20% Company formed in association with NHPC Limited, Power Grid
(22.05.2009) PGCIL-20%, Corporation of India Limited, Damodar Valley Corporation and
DVC-20%, Central Power Research Institute. The Company was incorporated
CPRI-20% on 22.05.2009 for setting up facility for short-circuit testing of
transformers and other electrical equipment. The laboratory is
located at Bina, Madhya Pradesh and has started Commercial
operations w.e.f 01.07.17.
4 (QHUJ\(IÀFLHQF\6HUYLFHV NTPC-36.36% (QHUJ\(IÀFLHQF\6HUYLFHV/WG ((6/ LVDMRLQWYHQWXUHFRPSDQ\
Ltd. (10.12.2009) PFC-36.36% formed with Power Finance Corporation Ltd., Power Grid
PGCIL- 5.58% &RUSRUDWLRQ RI ,QGLD /WG DQG 5XUDO (OHFWULÀFDWLRQ &RUSRUDWLRQ
REC-21.70% /WG IRU LPSOHPHQWDWLRQ RI (QHUJ\ (IÀFLHQF\ SURMHFWV DQG
WR SURPRWH HQHUJ\ FRQVHUYDWLRQ DQG FOLPDWH FKDQJH ((6/ LV
ZRUNLQJ RQ (QHUJ\ $XGLW RI %XLOGLQJV 3HUIRUP $FKLHYH 7UDGH
(PAT) scheme work and standard & labeling work of BEE,
Consultancy work, implementing Bachat Lamp Yojana, Street
Lighting National Program (SLNP) and Agricultural & Municipal
3XPSUHSODFHPHQWIRUYDULRXV6WDWH*RYHUQPHQWV

&RQVLGHULQJ WKH DVSHFWV OLNH FKDQJH LQ EXVLQHVV HQYLURQPHQW ODFN RI RSSRUWXQLWLHV QRQDYDLODELOLW\ RI VXLWDEOH SDUWQHU
QRQDWWDLQPHQWRIEXVLQHVVREMHFWLYHVRQFDVHWRFDVHEDVLV173&KDVFORVHGGRZQ-9FRPSDQLHVQDPHO\1DWLRQDO3RZHU
([FKDQJH/LPLWHG 13(; 3DQ$VLDQ5HQHZDEOHV3ULYDWH/WG 173&6&&/*OREDO9HQWXUH3YW/WG

114
CHAPTER 20

NHPC LIMITED
1+3& ZDV LQFRUSRUDWHG RQ 1RYHPEHU   DV D SULYDWH +\GURSRZHU1+3&LVDQ,62,62DQG
limited company under the name “National Hydroelectric 2+6$6FHUWLÀHGFRPSDQ\
3RZHU&RUSRUDWLRQSULYDWH/WGµ1+3&ZDVFRQYHUWHGWR3XEOLF
1+3& LV D PXOWLGLVFLSOLQDU\ RUJDQL]DWLRQ DQG KDV DFTXLUHG
limited company w.e.f. April, 2, 1986. The name of the company
VXIÀFLHQW H[SHUWLVH DQG VWDWHRIWKHDUW WHFKQRORJ\ IRU
was changed to its present name “NHPC Limited” in 2008. Its
LQYHVWLJDWLRQ 3ODQQLQJ GHVLJQLQJ DQG H[HFXWLQJ ODUJH
YLVLRQLVWREHFRPH´7REHDJOREDOOHDGLQJRUJDQL]DWLRQIRU
DQG VPDOO VL]H K\GURSRZHU SURMHFWV ,W KDV WKH VWUHQJWK RI
VXVWDLQDEOHGHYHORSPHQWRIFOHDQSRZHUWKURXJKFRPSHWHQW
KLJKO\ TXDOLÀHG DQG H[SHULHQFHG SURIHVVLRQDOV LQ GHVLJQ 
UHVSRQVLEOHDQGLQQRYDWLYHYDOXHVµ
engineering, geotechnical engineering, construction planning
NHPC is a Schedule-‘A’ Enterprise and a Mini Ratna company and construction Management for building hydroelectric
ZLWK   RZQHG E\ *RYHUQPHQW RI ,QGLD :LWK DQ SURMHFWV 7KH WHFKQLFDO  HQJLQHHULQJ SURÀFLHQF\ DQG
$XWKRUL]HGVKDUHFDSLWDORI5VFURUHDQGDQLQYHVWPHQW H[SHULHQFH RI 1+3& SODFHV LW LQ D OHDGLQJ SRVLWLRQ LQ WKH
EDVH RI RYHU 5V  &URUH 'HF·   1+3& LV UDQNHG DV ÀHOG RI K\GURSRZHU GHYHORSPHQW LQ ,QGLD DQG QHLJKERULQJ
D SUHPLHU RUJDQL]DWLRQ LQ WKH &RXQWU\ IRU GHYHORSPHQW RI countries.

7KHEULHIRIWKHFRUSRUDWLRQDFWLYLWLHVRSHUDWLRQVLVDVXQGHU

An overview of NHPC projects:


Hydro Power stations under operation: 22 Nos : 6971.20 MW
Own 1R 0:
JV 1R 0:
Wind Power Project under operation: 01 Nos : 50 MW
Solar Power Project under operation: 01 Nos : 50 MW
Projects under construction 05 No. : 4924 MW
- On its own
Hydro 1R 0:
- In Joint Venture
Hydro 1R 0:
Projects under Clearances 12 No. : 7361 MW
- On its own 08 No. : 5953 MW
Hydro 1R 0:
:LQG 1R 0:
- In Joint Venture 1R 0:
Hydro (In India) 1R 0:
Hydro (In Bhutan) 1R 0:
Solar 1R 0:
Projects under S&I 01 No. : 630 MW
Hydro 1R 0:
Projects under Anvil (pre- S&I) 03 No. : 581 MW
Hydro 1R 0:

1+3&KDVDOVRFRPSOHWHG3URMHFWVRQ7XUQNH\ GHSRVLWZRUNEDVLVLQ,QGLD $EURDGDJJUHJDWLQJFDSDFLW\RI0:

1+3&KDVDOVRDGGHGN:SURRIWRSJULGFRQQHFWHGVRODUSRZHUSODQWV

115
Annual Report 2018-19

PROJECTS UNDER OPERATION BRIEF OF NHPC PROJECTS UNDER CONSTRUCTION

NHPC has so far commissioned 24 Projects in the states of 1. PARBATI - II -800 MW (4X200 MW) – HIMACHAL
+LPDFKDO 3UDGHVK -DPPX  .DVKPLU 8WWDUDNKDQG 6LNNLP PRADESH
0DQLSXU:HVW%HQJDO0DGK\D3UDGHVK5DMDVWKDQDQG7DPLO
 7KH3DUEDWL,,K\GURHOHFWULFSURMHFWLVDUXQRIWKHULYHU
1DGXZLWKDFDSDFLW\RI0: LQFOXGLQJZLQGVRODU 
VFKHPHRQWKH5LYHU3DUEDWLORFDWHGLQ.XOOX'LVWULFWRI
SURMHFWVWDNHQXSLQMRLQWYHQWXUH 
Himachal Pradesh. The project is estimated to generate
PROJECT ALREADY COMMISSIONED ON TURNKEY / 08$SSURYHG&RVWRIWKHSURMHFWLV5V&U
DEPOSIT BASIS:- DW'HF¶3ULFH/HYHO'DPFRQFUHWLQJDQG3RZHU+RXVH
FRQFUHWLQJKDYHEHHQFRPSOHWHG2XWRIWRWDO.P
NHPC has commissioned 5 projects with installed capacity of
ORQJ +57  .P H[FDYDWLRQ DQG  .P OLQLQJ
0:QDPHO\'HYLJKDW²0:LQ1HSDO.XULFKX²
KDYHEHHQFRPSOHWHG( 0DQG+0ZRUNVDUHDOPRVW
0:LQ%KXWDQ.DOSRQJ0:LQ$ 1LVODQGV6LSSL
FRPSOHWH+RZHYHU8QLW KDYHEHHQVXFFHVVIXOO\
0: DQG .DPEDQJ  0: LQ $UXQDFKDO3UDGHVKRQ7XUQNH\
V\QFKURQL]HG ZLWK JULG DW SDUW ORDG RQ  
Deposit basis.
22.09.2018 using discharge from Jiwa Nallah. The Project
ACTUAL GENERATION & PLANT AVAILABILITY FACTOR is likely to be completed in Dec. 2021.
(PAF) FROM NHPC POWER STATIONS FOR THE YEAR
2. SUBANSIRI LOWER HEP (8x250=2000 MW),
2018-19.
ARUNACHAL PRADESH
Total generation of NHPC during 2018-19 from its own 22
 7KH SURMHFW LV ORFDWHG LQ /RZHU 6XEDQVLUL 'KHPDML
3RZHU6WDWLRQVWLOO0DU·LV082YHUDOO3$)DFKLHYHG
GLVWULFW RI $UXQDFKDO 3UDGHVK $VVDP RQ ULYHU
by NHPC during 2018-19 till Mar’19 is 84.84%.
6XEDQVLUL D WULEXWDU\ RI %UDKPDSXWUD &&($ DSSURYDO
PROJECTS UNDER CONSTRUCTION for implementation was accorded on 09.09.2003 at
NHPC is presently engaged in construction of 3 Hydro Projects sanctioned cost of Rs. 6285.33 Crores (at Dec’02 PL).
ZLWK DJJUHJDWH LQVWDOOHG FDSDFLW\ RI  0: &RQVWUXFWLRQ Annual energy generation of the project is estimated
DFWLYLWLHVLQRQJRLQJSURMHFW3DUEDWL,,+(3DUHLQSURJUHVV to be 7422 MU in 90% dependable year. The work of
Subansiri Lower HE Project commenced from 01.01.2005
&RQVWUXFWLRQDFWLYLW\RI6XEDQVLUL+(3URMHFWLVVWDOOHGGXHWR and apart from minor hindrances on different occasions
RQJRLQJ SURWHVW E\ YDULRXV DJLWDWLRQ JURXSV LQ $VVDP IURP E\ ORFDOV  VWDNHKROGHUV WLOO 'HF· ZRUNV ZHUH LQ
16.12.2011. progress. Unfortunately, due to the agitation and
)XUWKHU'HYHORSHURI7HHVWD9,+(3URMHFW 0: LH0V SURWHVWE\DIHZVHFWLRQVRIWKHFLYLOVRFLHW\WKHSURMHFW
/DQFR 7HHVWD +\GUR 3RZHU /LPLWHG 0V /7+3/  LV XQGHU WKH construction work came to a grinding halt in Dec’11. In
&RUSRUDWH ,QVROYHQF\ 5HVROXWLRQ 3URFHVV &,53  5HVROXWLRQ the case related to the Project, NGT stayed restart of
SODQ VXEPLWWHG E\ 1+3& IRU DFTXLVLWLRQ RI 0V /7+3/ ZDV WKHZRUNYLGHRUGHUGDWHG+RZHYHU3URMHFW
DSSURYHGE\&RPPLWWHHRI&UHGLWRUV &R& RQDQG Proponent (NHPC) was allowed to undertake emergency
LV SUHVHQWO\ ZLWK 1&/7 IRU DSSURYDO ,QYHVWPHQW DSSURYDO E\ maintenance works for safety and protection of the
&&($IRUDFTXLVLWLRQRI0V/7+3/DQGH[HFXWLRQRIEDODQFH public and property.
ZRUNVRI7HHVWD9,+(3URMHFWKDVEHHQFRQYH\HGRQ  7R UHVROYH WKH LVVXHV YDULRXV &RPPLWWHHV ZHUH
,QDGGLWLRQ3DNDO'XO 0: 3URMHFW .LUX 0: LQ FRQVWLWXWHG E\ &HQWUDO *RYW 6WDWH *RYW  1+3& DQG
- .DUHEHLQJH[HFXWHGXQGHU-RLQW9HQWXUHQDPHO\&KHQDE WKH\ KDYH VXEPLWWHG WKHLU UHSRUWVUHFRPPHQGDWLRQV
9DOOH\3RZHU3URMHFWV3YW/WG &933/ 3RZHU+RXVH'DPDQG +RQ·EOH1*7.RONDWDKDVGLVSRVHGRIIWZRFDVHVUHODWHG
E&M packages of Pakal Dul HE Project awarded and HRT-TBM to the project on 16.10.2017 mentioning to formulate a
SDFNDJHRI3DNDO'XO+(3URMHFWLV\HWWREHDZDUGHG)RU.LUX committee. In reference to the judgment, MoEF &CC has
023 RQ  KDV FRQYH\HG WKH ,QYHVWPHQW 6DQFWLRQ FRQVWLWXWHGWKH&RPPLWWHHRIWKUHHH[SHUWPHPEHUVRQ
of the project at an estimated cost of Rs. 4287.59 Crores at IRUUHVROYLQJWKHYDULRXVLVVXHVSHUWDLQLQJWR
-XO\·SULFHOHYHO7KHDZDUGRIZRUNVLVXQGHUSURFHVVE\0V Project. The report by the committee is to be submitted
CVPPPL. ZLWKLQ D SHULRG RI WKUHH PRQWKV ([SHUW &RPPLWWHH

116
UHSRUW ZRXOG EH SODFHG EHIRUH ([SHUW $SSUDLVDO up by Hon’ble NGT, New Delhi on 09.04.2019 and is now
&RPPLWWHH ($&  IRU DSSUDLVDO XQGHU (QYLURQPHQWDO listed for hearing on 25.07.2019. The balance works of
,PSDFW $VVHVVPHQW (,$  1RWLÀFDWLRQ  7KHUHDIWHU WKH6XEDQVLUL/RZHU3URMHFWLVH[SHFWHGWREHFRPSOHWHG
EAC within 60 days would place it before the competent within 4 years after resumption of the work.
DXWKRULW\IRUÀQDOGHFLVLRQ
3. Teesta-VI -500 MW (4X125 MW) – SIKKIM
 7ZR PHHWLQJ RI WKH ([SHUW &RPPLWWHH ZHUH KHOG RQ
 'HYHORSHU RI 7HHVWD9, +( 3URMHFW  0:  LH 0V
21st & 22nd Dec’17 and 16th Jan’18. The third meeting
/DQFR7HHVWD+\GUR3RZHU/LPLWHG 0V/7+3/ LVXQGHU
RI ([SHUW &RPPLWWHH ZDV VFKHGXOHG RQ  DW
WKH &RUSRUDWH ,QVROYHQF\ 5HVROXWLRQ 3URFHVV &,53 
Guwahati. In the meantime, the Applicant (Sh. Abhijeet
Resolution plan submitted by NHPC for acquisition of
Sharma and Sh. Tularam Gogoi) raised objection in NGT,
0V /7+3/ ZDV DSSURYHG E\ &RPPLWWHH RI &UHGLWRUV
.RONDWD RQ WKH FRQVWLWXWLRQ RI FRPPLWWHH E\ 0LQLVWU\
(CoC) on 05.12.2018 and is presently with NCLT for
RI(QYLURQPHQW)RUHVW &OLPDWH&KDQJH 0R() && 
DSSURYDO ,QYHVWPHQW DSSURYDO E\ &&($ IRU DFTXLVLWLRQ
+RQ·EOH 1*7 3ULQFLSOH %HQFK 1HZ 'HOKL YLGH RUGHU
RI0V/7+3/DQGH[HFXWLRQRIEDODQFHZRUNVRI7HHVWD
dated 15.02.2018 deferred the meeting of Committee
9,+(3URMHFWKDVEHHQFRQYH\HGRQ
till further order. The Hon’ble NGT, Principal Bench,
New Delhi on 19.11.2018 & 14.12.2018 dismissed the STATUS OF PROJECTS UNDER GOVT. CLEARANCE/
applications of petitioner Sh. Abhijeet Sharma and Sh. SANCTION
7XODUDP*RJRLUHVSHFWLYHO\ 1. KOTLI BHEL IA (195 MW)
Subsequent to order of Hon’ble NGT, Principal Bench, All statutory clearances such as Concurrence from CEA
GDWHGUGPHHWLQJRI([SHUW&RPPLWWHHZDV 'HIHQFH&OHDUDQFH(QYLURQPHQW&OHDUDQFHDQG)RUHVW
held on 12.12.2018 at MoEF & CC, New Delhi. &OHDUDQFH 6W, KDYHEHHQUHFHLYHG3,%UHFRPPHQGHG
 ([SHUW &RPPLWWHH DOVR YLVLWHG *XZDKDWL 6XEDQVLUL LPSOHPHQWDWLRQ RI 3URMHFW RQ  +RZHYHU
Lower Project and Pare HE Project of NEEPCO during the project could not be posed before CCEA pending
WK -DQ· 'XULQJ WKH YLVLW WKH FRPPLWWHH KDG LWV clearance from Hon’ble Supreme Court. Hon’ble Supreme
4th meeting at Circuit House, Guwahati on 08.01.2019. Court dated 24.11.2015 directed MoP, MoEF&CC
7KH WK PHHWLQJ RI WKH ([SHUW &RPPLWWHH ZDV KHOG DQG 0R:5 WR DUULYH DW D FRPPRQ SROLF\ IUDPHZRUN
GXULQJ WK )HE· DW 0R() && 1HZ 'HOKL 5HYLHZ amongst three ministries. In compliance, additional
PHHWLQJRI([SHUW&RPPLWWHHZDVKHOGRQWK0DUFK time of three months as sought by MoEF&CC for the
 7KHUHDIWHU 5HSRUW RI WKH ([SHUW &RPPLWWHH ZDV eighth time from Hon’ble Supreme Court of India for
submitted on 26.03.2019 to MOEF & CC. DUULYLQJDWDFRPPRQSROLF\IUDPHZRUNDPRQJVWWKUHH
PLQLVWULHV YL] 0R3 0R() && DQG 0R:5 KDV ODSVHG
The petitioners Sh.Tularam Gogoi and Sh. Aabhijeet
on 06.02.2019. Meanwhile, two member committee
Sharma approached Hon’ble Supreme Court on
FRQVWLWXWHGE\0R:5RQYLVLWHGWKHSURMHFW
 DQG  UHVSHFWLYHO\ FKDOOHQJLQJ
site on 24.03.2019 for the assessment of the project.
NGT orders dtd 14.12.2018 and 19.11.2018 with prayer
&RQVWUXFWLRQVKDOOVWDUWDIWHUÀQDOGHFLVLRQRI6XSUHPH
for setting aside the said orders. In the said matter, after
Court.
KHDULQJ WKH SDUWLHV RQ  +RQ·EOH
Supreme Court set aside the impugned orders dtd. 2. DIBANG MULTIPURPOSE PROJECT (2880 MW),
19.11.2018 and 14.12.2018 of Hon’ble NGT and ordered ARUNACHAL PRADESH:
WKHDSSOLFDWLRQVWREHUHVWRUHGWRWKHÀOHRIWKH7ULEXQDO  $OOVWDWXWRU\FOHDUDQFHVYL]&RQFXUUHQFHIURP&($ 
for determination afresh. The restored application 0:  )RUHVW &OHDUDQFH (QYLURQPHQW &OHDUDQFH DQG
of Sh. Abhijeet Sharma was listed for admission on 'HIHQFH &OHDUDQFH KDYH EHHQ REWDLQHG &RPSOLDQFH
26.03.2019 in Hon’ble NGT, New Delhi. Application of RI FRQGLWLRQV XQGHU )RUHVW &OHDUDQFH 6WDJH,  YL]
Sh. Tularam Gogoi was also tagged with the aforesaid LGHQWLÀFDWLRQRIODQGIRU&$&$7SODQDSSURYDOKDVEHHQ
application on 26.03.2019. The same was further listed completed. Demand of Rs. 628.69 cr towards payment
for hearing on 09.04.2019. The case could not be taken of NPV, CA, CAT and wildlife Management plan has been

117
Annual Report 2018-19

UHFHLYHG from Forest Department on 17.10.2017. Ministry 5. TAWANG -II H.E. PROJECT (800 MW), ARUNACHAL
of Tribal Affairs has accorded Clearance to the project on PRADESH
04.01.18. PIB meeting for implementation of project held
 $OO VWDWXWRU\ FOHDUDQFHV YL] 7(& )RUHVW &OHDUDQFH
RQ  3,% KDV UHFRPPHQGHG WKH H[SHQGLWXUH 6WDJH,  (QYLURQPHQW &OHDUDQFH SUHLQYHVWPHQW
RI 5V FU RQ SUHLQYHVWPHQW DFWLYLWLHV DQG YDULRXV DSSURYDO DQG 'HIHQFH &OHDUDQFH KDYH EHHQ REWDLQHG
clearances of the project. Accordingly, material for +RZHYHU )RUHVW &OHDUDQFH )&  6WDJH,, LV SHQGLQJ )&
Cabinet Note submitted to MoP on 22.01.2019 (Stage-II) is linked with Tawang Basin Study Report and
3. TEESTA-IV (520 MW), SIKKIM compliance under FRA 2006. Tawang basin Study Report
was accepted by MoEF & CC on 03.02.2016. Regarding
 $OO VWDWXWRU\ FOHDUDQFHV KDYH EHHQ UHFHLYHG H[FHSW compliance under FRA 2006, Gram Sabha Meetings
Forest Clearance (Stage-II). State Forest Dept. on KDYHEHHQFRQGXFWHGDWYLOODJHVRXWRIYLOODJHV
31.01.2018 had forwarded compliance report to FC
6. BURSAR (800MW), J&K
6W,  OHWWHU WR 0R() && 0R() && DIWHU H[DPLQDWLRQ
RI FRPSOLDQFH UHSRUW IRUZDUGHG FHUWDLQ REVHUYDWLRQV The DPR submitted to CEA on 06.01.2017. Presently the
to State Forest Dept. on 03.04.2018. Reply to the '35 LV XQGHU H[DPLQDWLRQ DW &($&:&*6, ($& LQ LWV
REVHUYDWLRQV RI 0R() && ZDV VXEPLWWHG E\ 6WDWH meeting on 05.12.2017 has recommended for grant of
Forest Dept. to MoEF&CC on 07.1.2019. In response, (&WRWKHSURMHFW0R() &&YLGHOHWWHUGDWHG
MoEF&CC on 05.02.2019 has again raised certain has requested that Forest Clearance letter may be
REVHUYDWLRQV DQG IRUZDUGHG LW WR 3ULQFLSDO 6HFUHWDU\ VXEPLWWHGIRULVVXDQFHRI(QYLURQPHQW&OHDUDQFHOHWWHU
)RUHVWV  *RYW RI 6LNNLP 1RGDO RIÀFHU RQ  to the project. NHPC on 15.11.2018 has requested
has requested NHPC to furnish additional information 0R() &&WRH[WHQGWKHSHULRGRIUHFRPPHQGDWLRQRI
in consultation with DFO (T), North. The matter is being EAC by another 6 months for submission of FC letter
as per MoEF&CC’s OM dated 09.09.2011. Proposal for
followed up with DFO. SIA report submitted by SIA
)RUHVW &OHDUDQFH VXEPLWWHG WR - . *RYW 6WDWH )RUHVW
XQLW '(60 (  WR 6HFUHWDU\ /DQG 5HYHQXH  'LVDVWHU
Dept. started joint inspection and enumeration of
0DQDJHPHQW  RQ  5HSRUW KDV WR EH UHYLHZHG
WUHHV RQ IRUHVW ODQG WR EH GLYHUWHG IRU WKH SURMHFW RQ
E\([SHUW&RPPLWWHHZKLFKLV\HWWREHFRQVWLWXWHGE\
 KRZHYHU WKH ZRUN KDV EHHQ VWRSSHG IURP
6WDWH *RYW 3,%  PHPR IRU LPSOHPHQWDWLRQ RI 3URMHFW
 GXH WR ORFDO RSSRVLWLRQ :LOGOLIH FOHDUDQFH
circulated by MoP on 29.11.2018. Reply to comments of
proposal for the project was discussed by State Board
DOOVFUXWLQL]LQJDJHQFLHVVWDQGVVXEPLWWHG
RI:LOGOLIH- .RQDQGSURMHFWZDVDSSURYHG
4. TAWANG -I H.E. PROJECT (600 MW), ARUNACHAL with some additional conditions. Standing Committee
PRADESH RI 1%:/ KDV UHFRPPHQGHG WKH SURMHFW DQG WKH VDPH
ZDV FRPPXQLFDWHG E\ 0R() && YLGH OHWWHU GDWHG
 $OOVWDWXWRU\FOHDUDQFHVYL]7(&(QYLURQPHQW&OHDUDQFH
25.03.2019.
DQG 'HIHQFH &OHDUDQFH KDYH EHHQ REWDLQHG +RZHYHU
Forest Clearance (Stage-I) is pending. For Forest Further, NHPC has requested MOP to take up the matter
Clearance (Stage-I), meetings as required under FRA, ZLWK02:5IRUUHOHDVHRIH[SHQGLWXUHRI5VFURUHV
 KDYH EHHQ FRQGXFWHG DW  YLOODJHV RXW RI  incurred for preparation of DPR to NHPC. Secretary
3RZHU  KDV UHTXHVWHG 6HFUHWDU\ 02:5 IRU WKH VDPH
YLOODJHV)RUUHPDLQLQJYLOODJHVPDWWHULVEHLQJSXUVXHG
YLGH '2 OHWWHU GDWHG  $ GHWDLOHG SURSRVDO
ZLWK6WDWH*RYW)XUWKHU)$&RQDOVRGHVLUHG
VHHNLQJLQSULQFLSOHDSSURYDOIRUDJUDQWRI5V
NHPC to get study conducted regarding habitat of black
FURUH VXEPLWWHG WR 0R3 YLGH OHWWHU GDWHG 
QHFNHGFUDQHLQWKHSURMHFWDUHDWKURXJK:,,'HKUDGXQ
7KHUHOHDVHRIIXQGDZDLWHGIURP0R:5
The matter is being taken up with State Forest Deptt.
',% PHHWLQJ IRU SUHLQYHVWPHQW DFWLYLWLHV KHOG RQ MOP desired the Draft PIB proposal for complete project
24.10.2018. MOM issued on 12.11.2018. ATR submitted cost. NHPC intimated that the same shall be submitted
RQ $SSURYDORISUHLQYHVWPHQW DIWHU '35 H[DPLQDWLRQ LV FRPSOHWHG E\ &($ &:&
DFWLYLWLHVFRQYH\HGE\023RQ01.2019. 02:5

118
In a meeting chaired by JS(H), MoP on 10.07.2018, it Dugar Hydro Power Limited, a JV Company between
ZDV PHQWLRQHG WKDW LQ D UHFHQW KLJK OHYHO PHHWLQJ  Tata Power and SN Power. The statutory clearances are
SUREOHPV RI LUULJDWLRQ SRWHQWLDO RI - . ZDV GLVFXVVHG DYDLODEOH7HFKQR(FRQRPLF&OHDUDQFH 7(& OHWWHULV\HW
$FFRUGLQJO\LWVHHPVXQOLNHO\WKDW0R:5ZLOOEHDEOHWR WREHLVVXHG1RZ*RYWRI+LPDFKDO3UDGHVK *R+3 KDV
JLYH JUDQWV WR 1+3& RQ WKDW DFFRXQW +RZHYHU 1+3& FRQYH\HGDOORWPHQWRIWKLV3URMHFWWR1+3&YLGHOHWWHU
PD\ UHTXHVW &:& WR GHFLGH DFFRUGLQJO\ DQG WR UHWXUQ dated 07.08.18 with certain terms & conditions. Terms &
SURSRVDO WR &($ IRU GHYHORSLQJ LW DV D SURMHFW ZLWKRXW
FRQGLWLRQVDUHXQGHUÀQDOL]DWLRQQHJRWLDWLRQZLWK*R+3
FXUUHQW LUULJDWLRQ FRPSRQHQW $FFRUGLQJO\ 1+3& YLGH
LWVOHWWHUGDWHGPDGHDUHTXHVWWR&:&7KH 2. TEESTA INTERMEDIATE, 84 MW, WEST BENGAL &
UHVSRQVHRI&:&LVDZDLWHG SIKKIM
7. GORIGANGA STAGE-IIIA HE PROJECT (150 MW), The power house location of the project lies on Sikkim
UTTARAKHAND side and consequent upon withdrawn of concurrence
ToR clearance-Accorded. Project is under DPR E\*RYWRI6LNNLPWKH6XUYH\ ,QYHVWLJDWLRQDFWLYLWLHV
SUHSDUDWLRQ 6WDJH DQG 6 , DFWLYLWLHV LQ SURJUHVV FRXOGQRWSURFHHGIXUWKHU+RZHYHU1+3&LVZLOOLQJWR
3UHOLPLQDU\'UDIW(,$(03VXEPLWWHGE\&RQVXOWDQW$OO FRQWLQXH IXUWKHU LQYHVWLJDWLRQ IRU DQ DOWHUQDWH EDUUDJH
major clearances to be processed after DPR preparation. site, for which other issues are being studied.
DPR uploaded on CEA website on 30.03.2018 and the
3. RAMMAM-I, 48 MW, WEST BENGAL
same has been submitted to CEA on 02.04.2018. The
VDPHLVXQGHUH[DPLQDWLRQDW&($7KHSURSRVDOVHHNLQJ  'XHWRQHZVWLSXODWLRQRIHQYLURQPHQWDOFRQVLGHUDWLRQ
DSSURYDOIRU3UHLQYHVWPHQWDFWLYLWLHVVKDOOEHVXEPLWWHG resulting in substantial reduction of Installed Capacity
after receipt of concurrence from CEA. and due to inaccessibility to the project components,
PROJECTS UNDER S&I WKHSURMHFWLVSURSRVHGIRUKDQGLQJRYHUEDFNWR*RYW
RI:HVW%HQJDO
1. GARBA TAWAGHAT HE PROJECT, 630 MW,
UTTARAKHAND JOINT VENTURE PROJECTS

 3URMHFW DOORWWHG E\ *R8. RQ  028 IRU 1. LOKTAK DOWNSTREAM (66 MW) MANIPUR
,PSOHPHQWDWLRQ DJUHHPHQW 6LJQHG ZLWK *R8.
 7KHSURMHFWLVEHLQJH[HFXWHGE\-RLQW9HQWXUH&RPSDQ\
 )XUWKHU H[WHQGHG XSWR  3&&)
 &KLHI ZDUGHQ :LOG OLIH  JUDQWHG SHUPLVVLRQ RQ (JVC) Loktak Downstream Hydroelectric Corporation Ltd.
 IRU 6 , DFWLYLWLHV RI WKH SURMHFW 0R3 RQ /'+&/ IRUPHGEHWZHHQ1+3&DQG*RYWRI0DQLSXU
20.9.2017 forwarded the proposal to Joint Secretary (GoM) in year 2009 with a share holding of NHPC (74%)
(Trans), MoP with a request that the implementation DQG*RYHUQPHQWRI0DQLSXU  
of the project may kindly be included as agenda item
 $OO VWDWXWRU\ FOHDUDQFHV RI SURMHFW H[FHSW &&($ DUH
IRUQH[WVFKHGXOHGPHHWLQJRI-:*ZLWK1HSDO$VSHU
DYDLODEOH %HIRUH WKH SURFHVV IRU ,QYHVWPHQW DSSURYDO
0R0 RI -:* DQG -6& PHHWLQJ RQ  $SULO 
YDULRXV RSWLRQV FRQVLGHULQJ VXEGHEW KDYH EHHQ
there was no mention about the project. So a request
letter was issued to MoP on 25.04.2018 requesting to H[SORUHG E\ 1+3&  WR EULQJ GRZQ WKH WDULII EHORZ 5V
WDNHXSWKHPDWWHULQWKHQH[W-:*-6&PHHWLQJ6DPH 5 per unit. Tendering of all major works is in process.
was again requested to MoP on 06.08.2018. In response The same has been submitted by NHPC on 09.04.2019,
WR0R:5OHWWHUGDWHGUHJDUGLQJWKPHHWLQJ which is under perusal.
RI-&:5RQWKHSURSRVDORIWKHSURMHFWZDV
2. PAKAL DUL AND OTHER HYDROELECTRIC PROJECTS
IRUZDUGHG WR 0R:5 RQ  ZLWK D UHTXHVW WR
IN J&K
take up as agenda item for due proposed meeting.
Pakal-Dul and other hydroelectric projects in the
PROJECTS UNDER ANVIL (PRE-S&I)
&KHQDE5LYHU%DVLQRI- .DUHWREHGHYHORSHGWKURXJK
1. DUGAR, 449 MW, HIMACHAL PRADESH Joint Venture Company “Chenab Valley Power Projects
 7KH SURMHFW LV ORFDWHG RQ &KHQDE ULYHU LQ &KDPED 3ULYDWH /LPLWHGµDPRQJVW-.63'&1+3&/WGDQG37&
district of Himachal Pradesh. It was earlier alloted to with share holding of 49%, 49% aQGUHVSHFWLYHO\

119
Annual Report 2018-19

PAKAL DUL (1000MW) Hydro (OHFWULF 3URMHFW  0:  WKURXJK D -RLQW


Venture Company (JVC) to be incorporated with equity
 023 RQ  KDV FRQYH\HG WKH ,QYHVWPHQW
shareholding of 51% by NHPC & 49% by Jammu
Sanction of the project at an estimated cost of Rs.
DQG .DVKPLU 6WDWH 3RZHU 'HYHORSPHQW &RUSRUDWLRQ
 &URUHV DW 0DU· SULFH OHYHO 023 YLGH OHWWHU
-.63'& 
GDWHG   LVVXHG PRGLÀHG 6DQFWLRQ OHWWHU RI
3DNDO'XO+(3URMHFWWRWKHH[WHQWWKDWWKHHTXLW\SDUWRI NHPC OTHER JOINT VENTURE INITIATIVES
-.63'&LHFURUHVKDOOEHUHOHDVHGE\*RYHUQPHQW 1. NARMADA HYDROELECTRIC DEVELOPMENT
RI,QGLDDVD*UDQWWR0V&9333/'DPDQG3RZHUKRXVH CORPORATION LTD. (NHDC)
SDFNDJHV KDYH EHHQ DZDUGHG DQG ZRUN KDV VWDUWHG
/HWWHU RI $ZDUG IRU ( 0 ZRUNV LVVXHG WR 0V 9RLWK The company was incorporated on 01.08.2000 with
Hydro Limited on 02.01.2019. Tendering for other two HTXLW\ VKDUH RI 1+3& /WG    *RYHUQPHQW RI
0DGK\D3UDGHVK  IRUGHYHORSPHQWRIK\GURSRZHU
packages is in progress.
thermal and other renewable energy potential in the
KIRU (624MW) VWDWH RI 0DGK\D 3UDGHVK 7ZR +\GUR SURMHFWV RQ ULYHU
 023 RQ  KDV FRQYH\HG WKH ,QYHVWPHQW 1DUPDGD YL] ,QGLUD 6DJDU 3RZHU 6WDWLRQ  0: 
Sanction of the project at an estimated cost of Rs. DQG2PNDUHVKZDU3RZHU6WDWLRQ 0: KDYHEHHQ
FRPPLVVLRQHGLQWKH\HDUDQGUHVSHFWLYHO\
 &URUHV DW -XO\· SULFH OHYHO %LGV KDYH EHHQ
Both the projects were commissioned ahead of schedule.
HYDOXDWHG DQG VKDOO EH SODFHG EHIRUH WKH %RDUG IRU
DSSURYDO 2. NATIONAL HIGH POWER TEST LABORATORY
PRIVATE LIMITED (NHPTL)
KWAR (540MW)
NHPTL, a Joint Venture Company of NHPC, NTPC,
 $OO FOHDUDQFHV H[FHSW ,QGXV :DWHU 7UHDW\ &OHDUDQFH DUH
32:(5*5,'DQG'9&ZLWKHTXDOHTXLW\SDUWLFLSDWLRQRI
DYDLODEOH3,%0HPRFLUFXODWHGE\023RQ
25% each, was incorporated on 22.05.2009 for setting up
$OO UHSOLHV WR FRPPHQWV RI UHVSHFWLYH $JHQFLHV
an On-line High Power Test Laboratory in Bina, Madhya
0LQLVWULHV VWDQGV VXEPLWWHG *R-. KDV H[HPSWHG WKH
Pradesh for short circuit test facility in the country.
SD\PHQWRIOHY\RIWROOVRQDOOLPSRUWVE\WKHFRQWUDFWRUV
/DWHU &35, ZDV LQGXFWHG DV ÀIWK HTXDO HTXLW\ SDUWQHU
WREHHQJDJHGE\&9333/3URSRVDOIRUZDLYHURI
in NHPTL. A supplementary Joint Venture Agreement
IUHH SRZHU DQG ZDWHU XVDJH FKDUJHV LV XQGHU DFWLYH
was signed on 15.02.2012 between NHPC, NTPC,
FRQVLGHUDWLRQ RI *R-. %LGV IRU &LYLO :RUNV DQG +0
32:(5*5,''9& &35,ZLWKHTXDOHTXLW\SDUWLFLSDWLRQ
3DFNDJHV DUH XQGHU HYDOXDWLRQ 7HQGHULQJ IRU ( 0 of 20% each. Date of Commercial Operation (DOCO) of
3DFNDJHKDVEHHQÁRDWHG the HVTR laboratory was declared on 01.07.17. After
3. CHAMKHARCHHU-I HEP (770MW), BHUTAN declaration of the DOCO, NHPTL has become capable
for doing short circuit test of 50 MVA, 132 kV Class to
 ,QWHUJRYHUQPHQWDO ,* $JUHHPHQWVLJQHGRQ
315 MVA, 400kV Class transformers. The laboratory
EHWZHHQ*RYWRI,QGLD *2, DQGWKH5R\DO*RYWRI%KXWDQ
FDSDFLW\ KDV EHHQ HQKDQFHG IXUWKHU XSWR  N9 OHYHO
(RGOB) for implementation of Chamkharchhu-I HEP DQGVKRUWFLUFXLWWHVW RQOLQH RQÀUVWFRPPHUFLDON9
0: LQ%KXWDQWKURXJK-9EHWZHHQ1+3& 'UXN transformers was completed on 11.09.17. Now, NHPTL
Green Power Corporation (DGPC) of Bhutan. Appraisal is also capable for doing online short circuit test of 765
RI '35 RI &KDPNKDUFKKX, +(3 ZDV FRQYH\HG E\ &($ kV Class transformers for 85 MVA to 333.3 MVA. NHPTL
RQ  3,% PHPR ZDV FLUFXODWHG E\ 0R3 YLGH became NABL accredited laboratory after grant of NABL
OHWWHU1R)LQGWGWK6HSW&RPPHQWV DFFUHGLWDWLRQ RQ  0975 ODE LV H[SHFWHG WR EH
RI&($0($1,7,$D\RJ'HSWWRI([SHQGLWXUH 'HSWW FRPPLVVLRQHGE\2FW1RY·
Of Economic Affair has been replied. Joint Venture cum
OTHER INITIATIVES BY NHPC
Share Holding Agreement and Article of Incorporation
ZLOOEHH[HFXWHGDIWHU*RYW$SSURYDO A. SOLAR POWER PROJECTS

 %HVLGHV DERYH D 0HPRUDQGXP RI 8QGHUVWDQGLQJ (i) 50MW Solar PV Power project in Kalpi, UP by
(MoU) has been signed for implementation of Ratle Bundelkhand Saur Urja Limited (BSUL) a JV between

120
NHPC & UPNEDA: - NHPC (Minimum 74%) & UPNEDA WRWDSWKHKLJKZLQGSRWHQWLDODYDLODEOHLQ$JDOLYLOODJH
(upto 26%) RI 3DODNNDG GLVWULFW DV SHU DYDLODELOLW\ RI HYDFXDWLRQ
LQIUDVWUXFWXUH 3UHYLRXV FDOOHG WHQGHU IRU (3& &RQWUDFW
The Company was incorporated on 02.02.2015 for
IRU  0: KDG WR EH FDQFHOOHG GXH WR QRQUHVSRQVH
GHYHORSPHQW RI  0: 6RODU 3RZHU 3URMHFW LQ 7HKVLO
3URMHFWSDUDPHWHUVEHLQJUHYLHZHGIRUUHWHQGHULQJ/DQG
.DOSL 'LVWULFW -DODXQ 83 DQG RWKHU FRQYHQWLRQDO 
DOORWPHQW33$DQGFRQQHFWLYLW\DSSURYDOLVLQSURFHVV
QRQFRQYHQWLRQDO SRZHU SURMHFWV HQWUXVWHG E\ WKH
*RYHUQPHQWRI83 COMMERCIAL PERFORMANCE UPTO 31.03.2019

63.491 Ha land has been transferred to BSUL. On the ¾ $FKLHYHG FXPXODWLYH UHDOL]DWLRQ RI ` 6498.7 Crs. up
EDVLVRIDYDLODELOLW\RIODQGD0:6RODU3RZHU3ODQW to 31.03.2019 during the year 2018-19 including late
KDV EHHQ HQYLVDJHG IRU LPSOHPHQWDWLRQ 3UHYLRXV payment surcharge collection of ` 190.76 Crs.
tenders cancelled due to high quoted price. Techno- ¾ Principal outstanding dues for more than 60 days as on
FRPPHUFLDOHYDOXDWLRQRIELGVDIWHUUHWHQGHULQJLVXQGHU 31.03.2019 are ` 1356.09 Crs.
progress. Issues regarding Power Purchase Agreement
33$ &RQQHFWLYLW\DQGDOORWPHQWRIODQGIRUEDODQFH ¾ &(5& YLGH LWV RUGHU GDWHG   JUDQWHG D
0:SODQWLVEHLQJSXUVXHGZLWKFRQFHUQHG'HSDUWPHQWV Category-I license to NHPC for interstate trading in
Electricity in whole of India.
RI6WDWH*RYW
¾ NHPC obtained trader membership in Indian Energy
(ii) 10 MW Floating Solar Project, Kerala :
([FKDQJH RQ   3;,/ PHPEHUVKLS RQ
1+3&LVLQWKHSURFHVVRIGHYHORSPHQWRI)ORDWLQJ6RODU 07.02.2019.
3RZHUSURMHFWLQ.DOODG.HUDOD$VGHVLUHGE\.HUDOD6WDWH
¾ 1+3&KDVDOVRUHJLVWHUHGRQ'((3 'LVFRYHU\RI(IÀFLHQW
(OHFWULFLW\%RDUG .6(% 0:VKDOOEHGHYHORSHGLQ,VW
(OHFWULFLW\3ULFH SRUWDOIRUVKRUWPHGLXPWHUPRI3RZHU
3KDVH%LGHYDOXDWLRQFRQFOXGHG6LJQLQJRI33$EHLQJ
7UDGLQJZKLFKLVDFWLYDWHGZHI
H[SHGLWHG EHIRUH WKH LVVXH RI /HWWHU RI $ZDUG 6LJQLQJ
of Tripartite Agreement for transfer of land to NHPC is in ¾ 1+3&UHFHLYHG/2$IURP3''- .RQIRU
process. VDOHSXUFKDVHRI3RZHULQ3RZHU([FKDQJHIRUSHULRG
RI RQH \HDU WKURXJK FRPSHWLWLYH ELGGLQJ $ZDUG LV IRU
(iii) 100 MW NHPC Solar Park in Odisha (40 MW in Ist
buying 1000 MUs and sale of 400 MUs through power
Phase):
([FKDQJH
015(KDVFRQYH\HGLQSULQFLSOHDSSURYDOIRUVHWWLQJXS
¾ NHPC has been appointed as “Aggregator” under Pilot
RIRQHVRODUSDUNRIFDSDFLW\0:LQ2GLVKDE\1+3&
6FKHPH²,,QRWLÀHGE\0LQLVWU\RI3RZHU*RYWRI,QGLD
0:VKDOOEHGHYHORSHGLQ,VW3KDVHDWWKHLGHQWLÀHG
on 30.01.2019 for procurement of aggregated Power
ODQG LQ *DQMDP 'LVWULFW $SSURYDO RI 6WDWH 7HFKQLFDO
RI  0: IRU  \HDUV WKURXJK 3)& &RQVXOWDQF\
&RPPLWWHH 67& IRU0:KDVEHHQFRQYH\HGE\0V
Limited– the Nodal Agency. Power will be tied up with
*UHHQ(QHUJ\'HYHORSPHQW&RUSRUDWLRQRI2GLVKD/WG
'LVFRPVDIWHUWKH*HQHUDWRUDQG7DULIILVÀQDOL]HGE\3)&
(GEDCOL) on 25.08.2018. Transfer of Land, signing of
Consulting.
33$DQGFRQQHFWLYLW\DSSURYDOLQSURFHVV1,7IRU(3&
&RQWUDFWIRUGHYHORSPHQWRI0:DW*DQMDP'LVWULFW ¾ A MOU was signed between NHPC and NLC for Power
KDVEHHQÁRDWHGRQ'HYHORSPHQWRIEDODQFH Trading on 18.02.2019 wherein NHPC will offer surplus
FDSDFLW\LVEHLQJH[SORUHG SRZHUDYDLODEOHZLWKJHQHUDWRUVGLVFRPVLQ1RUWKHUQ 
North-eastern region to NLC who in turn offer the same
B. WIND POWER PROJECTS to the open access consumers in the southern region.
L  .HUDOD:LQG3RZHU3URMHFW 0:LQÀUVWSKDVH  7UDGLQJ0DUJLQZLOOEHVKDUHGLQWKHUDWLRRI

 1+3&KDVWDNHQXS:LQG3RZHU3URMHFWVIRUGHYHORSPHQW ¾ Power Purchase agreements in respect of


LQ WKH 6WDWH RI .HUDOD DQG KDV VLJQHG 0R8 ZLWK WKH Dhauliganga, Chamera-II, Salal, Tanakpur, Chamera-I, Uri-I,
3RZHU'HSDUWPHQW*RYHUQPHQWRI.HUDODLQ,QWKH Chamera-III, Bairasuil & Parbati-III Power Stations of
ÀUVW LQVWDQFH WKH .HUDOD *RYHUQPHQW KDV DVNHG 1+3& NHPC were renewed with Himachal Pradesh on 11th

121
Annual Report 2018-19

0D\   IRU  \HDUV IURP &2' RI LQGLYLGXDO 3RZHU Major DFKLHYHPHQWV RI 5XUDO (OHFWULÀFDWLRQ ZRUNV WLOO
Station. DUHDVXQGHU

¾ 3RZHU 3XUFKDVH DJUHHPHQW LQ UHVSHFW RI .LVKDQJDQJD ‡ (OHFWULÀHG  QRV 8QHOHFWULÀHG 'HHOHFWULÀHG
Power Station was signed with UP on 22.06.2018 for 35 YLOODJHV
years from COD.
‡ (OHFWULÀHGQRV3DUWLDOO\HOHFWULÀHGYLOODJHV
¾ Power Purchase agreement in respect of Chamera-
‡ 3URYLGHGVHUYLFHFRQQHFWLRQVWR/DFV%3/IDPLOLHV
III Power Station was renewed with Rajasthan on
05.10.2018 for 35 years from COD ‡ &RQVWUXFWHGQRV.9QHZVXEVWDWLRQVLQ/HK
¾ Power Purchase agreement in respect of Bairasuil DQG.DUJLO
3RZHU 6WDWLRQ ZDV VLJQHG  IRU ,QWHUYHQLQJ SHULRG  ‡ &RQVWUXFWHGQRV.9QHZVXEVWDWLRQ
years from R&M of last unit with Himachal Pradesh on
11.05.2018 ‡ $XJPHQWHG  8SJUDGHG  QRV  .9 QHZ VXE
stations
¾ Power Purchase agreement in respect of Bairasuil Power
6WDWLRQ ZDV VLJQHG  IRU ,QWHUYHQLQJ SHULRG  \HDUV RURAL ROAD PROJECTS UNDER PRADHAN MANTRI
from R&M of last unit with TPDDL, Delhi on 09.01.2019 GRAM SADAK YOJNA (PMGSY)

¾ NHPC has signed Power Purchase agreement (PPA) on An MOU was signed amongst NHPC; Ministry of Rural
26.03.2019 with Rajasthan Urja Vikas Nigam Limited 'HYHORSPHQW*RYHUQPHQWRI,QGLDDQG*RYHUQPHQWRI%LKDU
(RUVNL) in respect of Parbati-III Hydro Electric Project IRU WKH FRQVWUXFWLRQ RI UXUDO URDGV LQ VL[ GLVWULFWV QDPHO\
for a period of 35 years from COD. 9DLVKDOL 0X]DIIDUSXU 6LWDPDUKL (DVW &KDPSDUDQ 6KHRKDU
DQG:HVW&KDPSDUDQRI%LKDUXQGHUWKH3UDGKDQ0DQWUL*UDP
STATUS OF RURAL ELECTRIFICATION WORKS UNDER
SadakYojna (PMGSY). Under the scheme, NHPC awarded the
RAJIV GANDHI GRAMIN VIDYUTIKARAN YOJNA (RGGVY)
ZRUNV IRU H[HFXWLRQ RI  URDGV VSUHDG RYHU  GLVWULFWV
RGGVY (now DDUGJY – DEEN DAYAL UPADHYAYA GRAM DQG KDYLQJ FRVW RI 5V  &URUHV 7LOO  
JYOTI YOJANA) URDGVKDYLQJNPOHQJWKKDYHEHHQFRPSOHWHG)XUWKHU
1+3&LPSOHPHQWHGQRV5XUDO(OHFWULÀFDWLRQSURMHFWVXQGHU construction of balance 05 roads in Vaishali district is under
the Xth and XIth plan scheme of DEEN DAYAL UPADHYAY progress.
*5$0 -<27, <2-1$ (UVWZKLOH 5**9<  LQ YDULRXV VWDWHV RI
As per the Tripartite Agreement, maintenance of all 758 roads
,QGLDRQWKHEDVLVRIÀ[HGDJHQF\IHHVLHRIWKHFRVW
DUH WR EH FDUULHG RXW IRU ÀYH   \HDUV DIWHU FRPSOHWLRQ RI
RIWKHSURMHFW5XUDOHOHFWULÀFDWLRQSURMHFWVZHUHDOORFDWHGWR
their construction. Out of 753 roads already completed,
1+3&LQGLVWULFWVVSUHDGRYHUÀYHVWDWHVYL]:HVW%HQJDO
PDLQWHQDQFHSHULRGRIÀYH\HDUVRIURDGVFRYHULQJ
%LKDU - . &KKDWLVJDUK DQG 2GLVKD DW DQ HVWLPDWHG FRVW RI
NP RI URDG OHQJWK LV RYHU ZKLOH  URDGV KDYLQJ  NP RI
DSSUR[5VFURUHV2XWRISURMHFWVZRUNVKDYHEHHQ
road length are under maintenance period.
FRPSOHWHGLQQRVSURMHFWVH[FHSW/HKSURMHFWLQ- .

122
CHAPTER 21

POWER GRID CORPORATION OF INDIA LIMITED (PGCIL)


3RZHU *ULG &RUSRUDWLRQ RI ,QGLD /LPLWHG 32:(5*5,'  ZDV a transmission network around 1,53,128 ckt. Kms. of
LQFRUSRUDWHG RQ 2FWREHU    KDV EHHQ QRWLÀHG DV transmission lines along with 242 Extra High Voltage (EHV)
Central Transmission Utility since 1998. The Corporation AC & DC sub-stations with transformation capacity of
LV UHVSRQVLEOH IRU LQWHJUDWHG GHYHORSPHQW RI LQWHU6WDWH about 3,65,467 MVA, VSUHDG RYHU WKH OHQJWK DQG EUHDGWK
WUDQVPLVVLRQ V\VWHP LQ WKH FRXQWU\ IRU HYDFXDWLRQ RI SRZHU of the country. The Company has been able to display its
from central sector projects & IPPs, system strengthening FDSDELOLW\ LQ FRQVLVWHQWO\ PDLQWDLQLQJ WKH DYDLODELOLW\ RI WKLV
scheme etc., and for implementation of transmission projects JLJDQWLF WUDQVPLVVLRQ QHWZRUN RYHU  FRPSDUDEOH ZLWK
assigned to it. WKH EHVW LQWHUQDWLRQDO VWDQGDUGV 32:(5*5,' WUDQVPLVVLRQ
POWERGRID: An Overview network comprises about 85% of total Inter-State Transmission
network of the country.
32:(5*5,' WKH &HQWUDO 7UDQVPLVVLRQ 8WLOLW\ RI WKH FRXQWU\
KDV EHHQ FRQWULEXWLQJ VLJQLÀFDQWO\ WRZDUGV GHYHORSPHQW RI 'XULQJ)<XSWR0DU·DYDLODELOLW\RIRYHU99.71%,
,QGLDQSRZHUVHFWRUE\XQGHUWDNLQJFRRUGLQDWHGGHYHORSPHQW was maintained for the transmission system. Also no.of
of power transmission network through continuous WULSSLQJ SHU OLQH ZDV UHVWULFWHG WR  )RU FHQWUDOL]HG
LQQRYDWLRQVLQWHFKQLFDO PDQDJHULDOÀHOGV5HFRJQL]LQJWKH remote monitoring, operation & control of sub-stations
FRQWULEXWLRQ RI &RPSDQ\ IRU RYHUDOO GHYHORSPHQW RI SRZHU “National Transmission Asset Management Centre” has been
sector, it has been conferred with ‘Navratna’VWDWXVE\*RYW LPSOHPHQWHG ZKLFK ZLOO IXUWKHU LPSURYH WKH HIÀFLHQF\ DQG
RI ,QGLD LQ 0D\  32:(5*5,' LV OLVWHG FRPSDQ\ ZLWK transparency in the operation of the transmission system in
*RYW RI ,QGLD DV WKH PDMRU VWDNH KROGHU 7KH FRPSDQ\ KDV the country.
EHHQ UHFHLYLQJ KLJKHVW UDWLQJ LH “Excellent” under MoUs
VLQFHVLJQLQJRIÀUVW0R8LQ 7KH &RPSDQ\ KDV UHFRUGHG DQ LPSUHVVLYH ÀQDQFLDO
SHUIRUPDQFH GXULQJ )<  DFKLHYLQJ D WXUQRYHU RI
32:(5*5,' FRQWLQXHG WR HDUQ ODXUHOV IRU LWV SHUIRUPDQFH ` &URUHDQG1HW3URÀWRI` 8,239 Crore.
and at the Dun & Bradstreet PSU Award 2018 HYHQW WKH
company bagged three awards, including award for the “Best During FY 2018-19 (upto March 31, 2019), the company
Navratna Overall”. The other awards were for “Electricity DFKLHYHGDWXUQRYHURIDERXW` 36,618 Crore (Unaudited) and
Sector: Transmission” and “Best Navratna: Services”. 1HW3URÀWRI` 9,939 Crore (Unaudited). The gross asset base
Hon’ble Governor of Andhra Pradesh & Telangana and of the Company has been enhanced to ` 1,97,793 Crore as on
President of the Indian Red Cross Society (IRCS) has presented 31.03.2019.
Gold Medal to POWERGRID IRU PRELOL]LQJ UHVRXUFHV LQ
7KH FRPSDQ\ PDGH D &DSH[ RI ` 25,791 Crore during
FRQGXFWLQJPHGLFDOFDPSVLQ$3DQG7HODQJDQD32:(5*5,'
)<IRULPSOHPHQWDWLRQRIYDULRXVWUDQVPLVVLRQSURMHFWV
has been adjudged as the winner of the “Golden Peacock
7KHUHTXLVLWHIXQGVZHUHPRELOL]HGIURPGRPHVWLFPDUNHWDQG
Award for Corporate Social Responsibility” for the year
proceeds of ongoing loans from multilateral funding agencies,
2017.
7KH:RUOG%DQN.I:DQG$VLDQ'HYHORSPHQW%DQNHWFZHUH
7KH&RPSDQ\LVFHUWLÀHGIRU,QWHJUDWHG0DQDJHPHQW6\VWHP WKHRUJDQL]DWLRQVEHVLGHVLQWHUQDOUHVRXUFHV
DVSHU3XEOLFO\$YDLODEOH6SHFLÀFDWLRQPAS 99:2006 integrating
'XULQJ)<RXWRIHQYLVDJHG&DSH[RIDERXW` 25,000
requirements of ISO 9001:2008 (Quality Management
&URUHDQLQYHVWPHQWRI` 25,807 Crore (Unaudited) has been
6\VWHP ,62 (QYLURQPHQW0DQDJHPHQW6\VWHP 
and OHSAS 18001:2007 (Occupational Health & Safety made till 31 0DUFK·IRULPSOHPHQWDWLRQRIYDULRXVSURMHFWV
st

Management System). All the Establishments of the Company During April’ 18 – March’ 19, about 8,681 ckm of transmission
KDYH EHHQ DXGLWHG IRU LWV 6RFLDO DFFRXQWDELOLW\ V\VWHPV  OLQHV09$RIWUDQVIRUPDWLRQFDSDFLW\DQG0:
FHUWLÀFDWLRQIRU6RFLDO$FFRXQWDELOLW\6WDQGDUGSA 8000:2008. RILQWHUUHJLRQDOSRZHUWUDQVIHUFDSDFLW\KDYHEHHQDGGHGE\

At the end of March 31, 2019, the Company owns & operates 32:(5*5ID.

123
Annual Report 2018-19

GRID INTEGRATION OF RENEWABLE ENERGY *,6  [09$ DORQJZLWK7LUXQHOYHOL7XWLFRULQN9;'


C(Quad) line] is already commissioned. Balance transmission
The demand for electricity in the country has been growing
VFKHPH LV XQGHU YDULRXV VWDJHV RI LPSOHPHQWDWLRQ ZLWK
at a rapid rate. In order to meet the increasing requirement of
commissioning schedule in FY 2018-19.
HOHFWULFLW\JHQHUDWLQJFDSDFLW\DGGLWLRQWKURXJKFRQYHQWLRQDO
and renewable energy sources has been planned and GoI As part of Control Infrastructure, establishment of REMCs
KDV VHW D WDUJHW WR HVWDEOLVK  *: 5HQHZDEOH *HQHUDWLRQ comprising RE forecasting & RE scheduling systems,
FDSDFLW\ E\  ZKLFK LQFOXGHV  *: IURP 6RODU DQG LQWHJUDWHG ZLWK H[LVWLQJ 6&$'$ FRORFDWHG DW UHQHZDEOH
*:IURPZLQG UHVRXUFHVULFKVWDWHV·6/'&V5/'&V1/'&LVEHLQJFDUULHGRXW
India is bestowed with abundant Renewable Energy potential. E\32:(5*5,'DWORFDWLRQV 6/'&VRI7DPLO1DGX$QGKUD
7R KDUQHVV DERYH SRWHQWLDO WKH *RYHUQPHQW RI ,QGLD *2,  3UDGHVK .DUQDWDND *XMDUDW 0DKDUDVKWUD 0DGK\D 3UDGHVK
has been facilitating implementation of broad spectrum 5DMDVWKDQ 65/'& :5/'& 15/'&  1/'&  5(0&V DUH
of renewable energy programme through an elaborate VFKHGXOHGIRUFRPPLVVLRQLQJSURJUHVVLYHO\IURP0DUFK·
LPSOHPHQWDWLRQPHFKDQLVP$PRQJYDULRXVUHQHZDEOHHQHUJ\ As part of Green Energy Corridors-II VFKHPH 32:(5*5,'
resources, India possesses a large solar and wind energy is implementing Interstate transmission scheme for eight (8)
UHVRXUFH FRQÀQHG LQ WKH 6WDWHV RI 7DPLO 1DGX .DUQDWDND VRODUSDUNV>0:@YL]$QDQWKDSXU 0: 3DYDJDGD
Andhra Pradesh, Telangana, Maharashtra, Madhya Pradesh, 0: 5HZD 0: %KDGOD,,, 0: %KDGOD,9
Gujarat and Rajasthan.  0:  (VVHO  0:  %DQDVNDQWKD 0:   RWKHU
3UHVHQWO\DERXW0:JULGLQWHUDFWLYH :LQG0: VRODUSDUNVLQ03 0: 7UDQVPLVVLRQVFKHPHIRU13.XQWD
6RODU0:6PDOO+\GUR3RZHU0:RWKHUV 0:@806337XPNXU3K, 0:  5HZD6RODU3DUN
0: DQG0:RIIJULG5HQHZDEOH(QHUJ\ 5( JHQHUDWLRQ 0:  DUH DOUHDG\ FRPPLVVLRQHG ZKHUHDV EDODQFH DUH
FDSDFLW\ LV DYDLODEOH LQ WKH FRXQWU\ >$V RQ  6RXUFH under implementation. LTA from other solar parks in Madhya
MNRE]. RE is contributing 20% penetration in the capacity 3UDGHVK 0: LVDZDLWHG
portfolio and about 8-9% penetration in energy. As per BUSINESS DEVELOPMENT
*R, WDUJHW RI  *: 5HQHZDEOH *HQHUDWLRQ E\  LW LV
HQYLVDJHGWKDWEDODQFHDERXW*:UHQHZDEOHJHQHUDWLRQ ,QKRXVH H[SHUWLVH KDV EHHQ DFTXLUHG E\ WKH FRPSDQ\
FDSDFLW\VKDOOEHDGGHGLQWKHQH[W\HDUV  PDLQO\ DW SDU ZLWK JOREDO VWDQGDUGV LQ WKH ÀHOG RI 3ODQQLQJ
through wind, solar & small hydro in the renewable rich states. Design, Engineering, Load Despatch and Communication,
Telecommunication, Contracts, Finance and Project
For integration of large scale renewable generation capacity,
0DQDJHPHQW 8WLOLVLQJ WKLV H[SHUWLVH FRQVXOWDQF\ LV EHLQJ
*UHHQ(QHUJ\&RUULGRUV *(& VFKHPHZDVHYROYHG7KHVFKHPH
RIIHUHGDWQDWLRQDO LQWHUQDWLRQDOOHYHO
includes Intra state transmission [in states of Tamil Nadu,
$QGKUD 3UDGHVK .DUQDWDND *XMDUDW 0DKDUDVKWUD 0DGK\D In the international arena, Company has footprints in
Pradesh, Rajasthan & Himachal Pradesh] and Interstate FRXQWULHVDQGFXUUHQWO\H[HFXWLQJFRQVXOWDQF\SURMHFWV
transmission system strengthening. The scheme also includes in Bangladesh, Bhutan, Nepal and Fiji.
control infrastructure comprising establishment of Renewable 2Q WKH GRPHVWLF IURQW GXULQJ )<  32:(5*5,'
Energy Management Centers (REMC), forecasting of RE bagged 27 new domestic consultancy assignments with
generation etc. GEC-Intra state transmission scheme is being
UHYHQXH SRWHQWLDO RI DSSUR[ ` 349.8 Cr during FY 18. Major
LPSOHPHQWHGE\UHVSHFWLYH678V*(&,QWHU6WDWHWUDQVPLVVLRQ
Assignments bagged during FY 18 include Strengthening
system (ISTS) includes about 3200 ckt km high capacity
RI 6XEWUDQVPLVVLRQ ZRUNV DQG 5XUDO (OHFWULÀFDWLRQ ZRUNV
transmission lines along with 6 nos. substations (17,000 MVA),
LQ WKH VWDWH RI - . XQGHU 3ULPH 0LQLVWHU 'HYHORSPHQW
ZKLFK LV XQGHU LPSOHPHQWDWLRQ E\ 32:(5*5,' 3DUW LQWHU
Program (PMDP) with estimated cost of ` 426 Cr and
6WDWH WUDQVPLVVLRQ VFKHPH >N9 &KLWWRUJDUK$MPHU '&
`&UUHVSHFWLYHO\
DORQJ ZLWK N9 &KLWWRUJDUK  &KLWWRUJDUK '&  N9
$MPHU$MPHU'&OLQHVDQGN909$&KLWWRUJDUK 32:(5*5,' LV H[HFXWLQJ WUDQVPLVVLRQ ZRUNV LQ GLIÀFXOW
 $MPHU VXEVWDWLRQV 7LUXQHOYHOL *DV ,QVXODWHG 6XEVWDWLRQ geographic terrain DUHDV VXFK DV WKH 6L[ 6WDWHV RI 1(5 IRU

124
imSOHPHQWDWLRQRI´1(53RZHU6\VWHP,PSURYHPHQW3URMHFWµ project in co-ordination with State Transmission Utilities of
IXQGHG E\ 7KH :RUOG %DQN DQG &RPSUHKHQVLYH 6FKHPH Eastern Region has been undertaken for Pollution Mapping of
for Strengthening of Transmission & Distribution in the WKHHQWLUHJHRJUDSK\RI(DVWHUQUHJLRQDQGWKHÀQDOUHSRUWLV
States of Arunachal Pradesh & Sikkim. The Company is also under preparation.
LPSOHPHQWLQJ WUDQVPLVVLRQ SURMHFW LQ - . WR SURYLGH JULG
)XUWKHUIRUERRVWLQJLWVUHVHDUFKDQGWHFKQRORJ\GHYHORSPHQW
FRQQHFWLYLW\ DQG UHOLDEOH SRZHU VXSSO\ WR WKH VWUDWHJLFDOO\
SRUWIROLR WKH &RPSDQ\ KDV VHWXS DQ $GYDQFHG 5HVHDUFK
important Ladakh region. In addition, other important
and Technology Centre at Manesar, Gurgaon comprising of
consulting assignments under implementation include
YDULRXVVWDWHRIWKHDUWODERUDWRULHVIRUSRZHUV\VWHPDQDO\VLV
6WUHQJWKHQLQJRIWUDQVPLVVLRQQHWZRUNLQ'HOKLDQGH[HFXWLRQ
LQFOXGLQJ 5HDO 7LPH 6LPXODWRU DQG YDULRXV VRIWZDUH GHVLJQ
RIWUDQVPLVVLRQV\VWHPIRUHYDFXDWLRQRISRZHUIURP/DOLWSXU
VLPXODWLRQDQGYDOLGDWLRQ3KDVRU0HDVXUHPHQW8QLWV&RQWURO
power plant of Uttar Pradesh.
DQG$XWRPDWLRQ0DWHULDO6FLHQFHDQDO\VLVDQGDQ$GYDQFHG
32:(5*5,' FRPSOHWHG HOHFWULÀFDWLRQ RI  5NP 0DQVL Diagnostic Centre.
Saharsa - Dauram Madhepura single line section of Indian CONTRIBUTING TO DISTRIBUTION REFORMS
Railways before allotted time in FY18.
Deen Dayal Upadhyay Gram Jyoti Yojana (DDUGJY):
TECHNOLOGY DEVELOPMENT
*RYW RI ,QGLD KDV EHHQ LPSOHPHQWLQJ ´'HHQ 'D\DO
,QRUGHUWRVXVWDLQWKHIXWXUHFRPSHWLWLYHPDUNHW32:(5*5,' Upadhyay Gram Jyoti Yojana (DDUGJY)” for Strengthening
KDV EHHQ VXSSRUWLQJ D QXPEHU RI 5HVHDUFK  'HYHORSPHQW and augmentation of sub-transmission and distribution
DFWLYLWLHVLQWKHÀHOGRI3RZHU7UDQVPLVVLRQ infrastructure in rural areas, facilitating judicious rostering
7KHFRPSDQ\KDVPDGHVWULYLQJHIIRUWVIRUWKHDSSOLFDWLRQRI of agriculture and non-agriculture consumers and rural
Resin Impregnated Paper bushings for 800 kV Transformers HOHFWULÀFDWLRQHWF
DQGUHDFWRUV7KHGHYHORSPHQWRIVDPHLVXQGHUSURJUHVV 32:(5*5,'SOD\HGDVLJQLÀFDQWUROHLQFDUU\LQJIRUZDUGWKH
7KH FRPSDQ\ KDV FDUULHG RXW LQKRXVH GHYHORSPHQW RI distribution reforms through undertaking DDUGJY works on
software for automatic fault detection of Transformer based EHKDOIRI*RYWRI,QGLDLQYDULRXVSDUWVRIWKHFRXQWU\8QGHU
RQRQOLQH'LVVROYHG*DVDQDO\VLVDQGVXFFHVVIXOO\FRPSOHWHG ''8*-< WK DQG WK 3ODQ FXPXODWLYHO\ WLOO 'HF  
its installation in the National and Regional Transmission Asset LQIUDVWUXFWXUH KDV EHHQ FUHDWHG IRU HOHFWULÀFDWLRQ RI 
PDQDJHPHQW&HQWHUVRI32:(5*5,' YLOODJHV DQG VHUYLFH FRQQHFWLRQV WR DERXW  /DNK %3/
KRXVHKROGVKDYHDOVREHHQUHOHDVHG
7KH FRPSDQ\ KDV DOVR YHQWXUHG LQWR H[WHQGLQJ VHUYLFHV WR
GLVWULEXWLRQXWLOLWLHVIRUWDFNOLQJWKHYROWDJHSUREOHPV$N9 )XUWKHUXQGHU5( 5XUDO(OHFWULÀFDWLRQ ZRUNRIGLVWULFWVLQ
PRELOHFDSDFLWRUEDQNKDVEHHQGHYHORSHGIRUWKHVDPHDQG 2GLVKDDQGGLVWULFWLQ83KDYHEHHQDVVLJQHGWR32:(5*5,'
is presently commissioned at one of the substation of HVPNL, under DDUGJY at an estimated cost of around ` 2100 Crore,
Haryana. LQYROYLQJHOHFWULÀFDWLRQRIDERXW 8( 3( 
YLOODJHVDQGSURYLGLQJVHUYLFHFRQQHFWLRQVWRDERXWODNK
*DLQLQJ H[SHULHQFH IURP WKH HDUOLHU SLORW SURMHFWV FRPSDQ\
%3/KRXVHKROGV&XPXODWLYHO\WLOOHQG'HF·LQIUDVWUXFWXUH
KDV YHQWXUHG LQWR D WDVN RI UHWURÀWWLQJ FRQYHQWLRQDO FRQWURO
KDV EHHQ FUHDWHG IRU HOHFWULÀFDWLRQ RI   YLOODJHV DQG
and protection system of an old substation into state-of-the
VHUYLFHFRQQHFWLRQVWRDERXW/DNK%3/KRXVHKROGVKDYH
art Process Bus based substation automation system. This is a DOVREHHQUHOHDVHG7RWDO%3/VHUYLFHFRQQHFWLRQVUHOHDVHGWLOO
SDUWRIWKHRQJRLQJLQLWLDWLYHWRZDUGVIXOO\GLJLWDOVXEVWDWLRQV 31-12-2018 are 39.1 lacs.
in the upcoming years.
,Q  GLVWULFW RI - . WRWDO  QRV VHUYLFH FRQQHFWLRQV KDYH
Understanding the need for high end reliability of power EHHQUHOHDVHG LQ-DPPXQRVLQ.DVKPLUQRV LQ
WUDQVPLVVLRQV\VWHPDJDLQVWIDXOWVGXHWRSROOXWLRQÁDVKRYHU Leh package-242nos).
it was felt necessary to create data repository on pollution
VHYHULWLHVDFURVVOHQJWKDQGEUHDGWKRIWKHFRXQWU\ZKLFKFDQ SAUBHAGYA:
EH XWLOL]HG IRU IXUWKHU LPSURYLQJ V\VWHP GHVLJQ $ PDVVLYH *RYW RI ,QGLD KDV ODXQFKHG ¶3UDGKDQ 0DQWUL 6DKDM %LMOL +DU

125
Annual Report 2018-19

Ghar Yojna- Saubhagya WR DFKLHYH XQLYHUVDO KRXVH KROG by Indian Society for Training and Development”.”
HOHFWULÀFDWLRQLQWKHFRXQWU\
32:(5*5,' $FDGHP\ RI /HDGHUVKLS 3$/  LV D VWDWHRI
8QGHU 6DXEKDJ\D 6FKHPH  /DNKV VHUYLFH FRQQHFWLRQV the-art Institution which has become fully functional the
are released in Odisha along with associated infra scheme in YDULRXV +5' LQWHUYHQWLRQV DUH JRLQJ RQ WKHUH LQ DGGLWLRQ WR
UHVSHFWLYH YLOODJHV LQ  'LVWULFWV ,Q 'HRULD GLVWULFW RI 8WWDU ([HFXWLYH 7UDLQLQJ LQGXFWLRQ SURJUDP $SDUW IURP ,QKRXVH
3UDGHVK  QRV VHUYLFH FRQQHFWLRQV DUH UHOHDVHG XQGHU training programs including induction training of ETs, PAL
Saubhagya scheme. also conducts series of programs for other National and
International power utilities on regular basis. Apart from these,
LEVERAGING HUMAN CAPITAL TO ACHIEVE EXCELLENCE
32:(5*5,'LVSURYLGLQJFRQVXOWDQF\WRVWDWHXWLOLWLHVLQ1RUWK
A succession plan is ‘Integrated HR’ in practice as this nudges (DVWHUQ5HJLRQIRU3RZHU6\VWHP,PSURYHPHQWDQGFDSDFLW\
WKH VKRUWVLJKWHG UHDFWLYH DQG VWDQGDORQH +5 SROLFLHV WR building.
D ORQJ WHUP SURDFWLYH DQG LQWHJUDWHG YLHZ RI EXLOGLQJ WKH
CITIZEN’S CHARTER
OHDGHUVKLSHQJLQHRIWKHRUJDQL]DWLRQ
7KH&RPSDQ\KDVIRUPXODWHGLWV&LWL]HQ·V&KDUWHUVSURYLGLQJD
7R WKLV HQG 32:(5*5,' KDV PDGH SROLF\ RQ 6XFFHVVLRQ
YLVLEOHIURQWRILWVREMHFWLYHVPLVVLRQFRPPLWPHQWVWHUPVRI
3ODQQLQJ7KHREMHFWLYHRI32:(5*5,'3ROLF\RQ6XFFHVVLRQ
VHUYLFHDQGLWVREOLJDWLRQWRYDULRXVVWDNHKROGHUV,QIRUPDWLRQ
Planning is to identify a talent pool of high performing
about its schemes, policies, project plans and issues of general
H[HFXWLYHV DQG UDLVH WKH TXDOLW\ RI WKHLU OHDGHUVKLS WKURXJK
LQWHUHVWWRVWDNHKROGHUVLVDYDLODEOHLQWKHRIÀFHV
IRFXVHG LQWHUYHQWLRQV WR HQDEOH WKHP WR WDNH FKDUJH RI
NH\ SRVLWLRQV LQ 32:(5*5,' LQ IXWXUH ZKR VKDOO QDYLJDWH SOCIAL JUSTICE
32:(5*5,' WR WKH QH[W OHYHO RI PDUNHW SURGXFW VHUYLFH
*RYHUQPHQW GLUHFWLYHV RQ UHVHUYDWLRQ FRQFHVVLRQV DQG
FXVWRPHUWHFKQRORJ\ÀQDQFHEUDQGDQGSHRSOHOHDGHUVKLS
UHOD[DWLRQV WR 6&V 67V 2%&V  3:'V  DUH VWULFWO\ IROORZHG
)XUWKHU +XPDQ 5HVRXUFH 'HYHORSPHQW ,QWHUYHQWLRQV DUH LQWKH32:(5*5,',QRUGHUWRLPSOHPHQWUHVHUYDWLRQSROLF\
directed towards learning new competencies and to reinforce DQGWRORRNDIWHUWKHZHOIDUHRIUHVHUYHGFDWHJRU\HPSOR\HHV
JRRGZRUNSUDFWLFHV FKDQJHZRUNSODFHEHKDYLRUDVSHUWKH IROORZLQJVWHSVKDYHEHHQWDNHQWRLPSOHPHQWWKHUHVHUYDWLRQ
2UJDQL]DWLRQDO UHTXLUHPHQWV 7KH +5' $FWLRQ 3ODQ IRU WKH SROLF\RI*RYHUQPHQWRI,QGLD
year 2018-19 was based on the premise of the outcome of
L &RQVWLWXWLRQ RI 5HVHUYDWLRQ &HOOV LQ DOO UHJLRQDO
WZR SURQJHG VWUDWHJ\ QDPHO\ 2UJDQL]DWLRQDO 1HHG $QDO\VLV
establishments and Corporate Centre.
(ONA) and Competency based Training Needs Assessment
&71$ 7KH &RPSDQ\ KDV EHHQ DEOH WR OLQN WKH ,QGLYLGXDO LL  1RPLQDWLRQ RI VHSDUDWH /LDLVRQ 2IÀFHU IRU PDWWHUV
GHYHORSPHQW SODQV ,'3  RI HPSOR\HHV DV SHU WKH EXVLQHVV UHODWHGWRUHVHUYHGFDWHJRULHVDWUHJLRQDOHVWDEOLVKPHQWV
UHTXLUHPHQW ZKLFK KHOSV WKH RUJDQL]DWLRQ WR NHHS XSGDWLQJ and Corporate Centre.
the competencies of employees to meet current and future (iii) Maintenance of post-based, discipline and grade-
requirements. ZLVH UHFUXLWPHQW UHVHUYDWLRQ URVWHUV LQ DOO DIRUHVDLG
,Q RUGHU WR DOLJQ ZLWK JURZLQJ FRPSHWLWLYH EXVLQHVV establishments of the Corporation.
HQYLURQPHQW 32:(5*5,' LPSDUWHG WUDLQLQJ RQ +DQGV LY  $QQXDO LQVSHFWLRQ RI UHVHUYDWLRQ URVWHUV LQWHUQDOO\ DQG
on training on Transformers & Reactors, SAS and Remote SHULRGLFDOLQVSHFWLRQE\0LQLVWU\2IÀFLDOV
RSHUDWLRQ*,6+9'&5LJKWRI:D\ 1HZ/DQGDFTXLVLWLRQ
$FWFHUWLÀHG3URMHFW0DQDJHPHQWSURJUDPPHV/DWHVWVXUYH\ Y  $YDLODELOLW\RI/LDLVRQ2IÀFHUVHSDUDWHIRU6&V67V2%&V
techniques, Cyber Security and Networking Skills, Team  3:'V  WR KHDU WKH FRPSODLQWV RI WKH FRQFHUQHG
EXLOGLQJ/HDGHUVKLSGHYHORSPHQWHWF employees.

32:(5*5,'KDVDOVREHHQFRQIHUUHG“BML Munjal AWARD YL  $YDLODELOLW\ RI D &RPSOLDQW 5HJLVWHU LQ 5HVHUYDWLRQ &HOO
for excellence in Learning & Development” and “Special IRU UHVHUYHG DQG 3:' FDWHJRULHV HPSOR\HHV WR ORGJH
Commendation Award for Innovative Training Practices their complaints, if any.

126
YLL  6XEPLVVLRQRISHULRGLFDO5HSRUWUHWXUQWR*RYHUQPHQW :LWK WKH FRQWLQXRXV VXSSRUW DQG JXLGDQFH RI 0R3*R,
Ministry of Power. 32:(5*5,'XQGHUWRRNIRFXVHGHIIRUWVWRZDUGVRSWLPL]DWLRQ
RI)RUHVW:LOGOLIHFOHDUDQFHSURFHVVIRUOLQHDUSURMHFWVVSHFLDOO\
YLLL  )LOOLQJ XS EDFNORJ UHVHUYHG YDFDQFLHV IRU UHVHUYHG
WUDQVPLVVLRQ /LQHV 7KLV UHVXOWHG LQ VHYHUDO SURJUHVVLYH
categories as part of regular recruitment as well as
changes such as Empowerment of Standing Committee of
WKURXJK6SHFLDO5HFUXLWPHQW'ULYHVIURPWLPHWRWLPH
WKH 1DWLRQDO %RDUG IRU :LOGOLIH 1%:/  DQG 5HJLRQDO RIÀFHV
MANAGEMENT OF ENVIRONMENTAL AND SOCIAL ISSUES of MoEFCC, which in turn, eased the process of forest and

7KHLQFUHDVHGDZDUHQHVVDERXWHQYLURQPHQWDOLVVXHVDQGWKHLU ZLOGOLIH FOHDUDQFH 7LOO 0DUFK  32:(5*5,' ZDV DEOH


impact on society has brought a paradigm shift in the attitude to obtain In-Principle (Stage-I) forest clearances for about
RI %XVLQHVV RUJDQL]DWLRQV DERXW WKH QHJDWLYH H[WHUQDOLWLHV +DRIIRUHVWODQGFRYHULQJOLQHVVXFKDVN9'&
associated with their business processes. The businesses are -LJPHOLQJ $OLSXUGXDU  .9 5DLJDUK3XJDOXU  N9 '&
QRZ PRYLQJ EH\RQG PHUH FRPSOLDQFH WR D PRUH HODERUDWH &KLODNDOXULSHWD.DGDSDN9'&0XQGUD%KXMDQG)LQDO
YROXQWDU\ GLVFORVXUH IUDPHZRUN EDVHG RQ WKH SULQFLSOH RI 6WDJH,, FOHDUDQFHIRU+DFRYHULQJOLQHVVXFKDV
&RQWLQXDO,PSURYHPHQW,QFUHDVLQJHPSKDVLVRI3ROLF\PDNHUV N9'&-KDUVXJXGD'KDUDPMD\JDUK.9'&6ULNDNXODP
5HJXODWRUV &RQVXPHUV DQG ,QYHVWRUV DV ZHOO DV PHPEHUV RI 3RROLQJ6WDWLRQ²$QJXO.9'&:DUGKD²+\GHUDEDG
JHQHUDOSXEOLFRQSURSHUPDQDJHPHQWRI(QYLURQPHQWDODQG .9'&.DOD.XGXV.9$XUDQJDEDG%RLVDUHWF
social impacts has resulted in this welcome change. )XUWKHURQWKHIURQWRI6XVWDLQDELOLW\32:(5*5,'KDVWDNHQ
32:(5*5,' DV D UHVSRQVLEOH FRUSRUDWH HQWLW\ KDV DOZD\V YDULRXVLQLWLDWLYHVWRIXOÀOOLWVFRPPLWPHQWWRZDUGVWKHJRDORI
UHPDLQHGDKHDGRIWKHFXUYHLQHQVXULQJFRPSOLDQFHZLWKQRW VXVWDLQDEOHGHYHORSPHQWDQGWRIXUWKHUUHGXFHRUJDQL]DWLRQ·V
only the applicable regulations but actually going beyond (QYLURQPHQWDO,PSDFWV.H\LQLWLDWLYHVLQWKLVUHJDUGDUHFKDQJH
WKHP:D\EDFNLQ\HDU32:(5*5,'GLVFORVHGLWVÀUVW LQWRZHUGHVLJQWRFRQVHUYHWKHSUHFLRXV5LJKWRI:D\ 5R: 
(QYLURQPHQWDO DQG 6RFLDO 3ROLF\  3URFHGXUHV (633  ZKLFK HQKDQFLQJ WKH FDUU\LQJ FDSDFLW\ RI H[LVWLQJ OLQHV WKURXJK
RXWOLQHV WKH &RPSDQ\·V DSSURDFK WR GHDO ZLWK HQYLURQPHQW YDULRXV WHFKQRORJLFDO LQWHUYHQWLRQV 5DLQ ZDWHU KDUYHVWLQJ
& social issues and lays out management procedures and made an integral part of substation design, installation of
SURWRFROV WR DGGUHVV WKH VDPH 7KLV FRPSUHKHQVLYH %RDUG LED bulbs & solar street lighting in substation, fuel catalysts
DSSURYHG GRFXPHQW ZDV IXUWKHU UHYLVHG LQ \HDU  DQG GHYLFHVIRU'*VHWVHWF5HFRJQL]LQJWKHLPSRUWDQFHRIVRODU
2009 to keep it updated in line with the changing regulatory power in combating Climate change and in-line with GOI’s
UHJLPH DQG H[SHFWDWLRQV RI 0XOWLODWHUDO IXQGLQJ DJHQFLHV FRPPLWPHQW WRZDUGV 3DULV $JUHHPHQW 32:(5*5,' LV LQ
&HUWLI\LQJ WKH GHWDLOHG DQG FRPSUHKHQVLYH FRYHUDJH RI WKH SURFHVV RI LQVWDOOLQJ  0:S 5RRIWRS 6RODU 39 6\VWHPV
32:(5*5,'·V (633 WZR OHDGLQJ 0XOWLODWHUDO DJHQFLHV RI FRYHULQJPRUHWKDQORFDWLRQVLQLWVSUHPLVHV7KLVLQLWLDWLYH
WKHZRUOGLH7KH:RUOG%DQNDQGWKH$'%KDYHUHFRJQL]HG ZLOOUHVXOWLQVDYLQJRIPLOOLRQXQLWV 08V RI*ULGFRQQHFWHG
it under their policy of “Use of Country System (UCS)” and energy per annum, thereby, reducing atmospheric emission of
´&RXQWU\ 6DIHJXDUG 6\VWHP &66 µ UHVSHFWLYHO\ ZKLFK LV QRW 35916 mt of CO2 SHU \HDU $QRWKHU VLJQLÀFDQW LQLWLDWLYH
only a unique distinction, but also has no parallel in the world. XQGHUWDNHQE\32:(5*5,'LVWKHXVHRILQGXFWLYHSRZHULQ
HDUWK ZLUH IRU SRZHULQJ RI WHOHFRP DQWHQQDV 7KLV LQGXFWLYH
7KRXJK QRW PDQGDWHG E\ WKH ODZ RI WKH ODQG 32:(5*5,'
power which otherwise goes waste will eliminate the use of
XQGHUWDNHVGHWDLOHG(QYLURQPHQWDO 6RFLDO$VVHVVPHQWRILWV
DG sets, a constant source of pollution and GHGs emission.
projects as prescribed in its ESPP and selects the most optimum
The technology has been successfully tested at pilot scale
URXWHDOLJQPHQWVLWHZLWKOHDVWDGYHUVHQHJDWLYHLPSDFWV$V
DQG LI DSSURYHG E\ WKH UHJXODWRU ZLOO EH LPSOHPHQWHG DW
SDUWRIWKLVH[HUFLVH32:(5*5,'DYRLGVHQYLURQPHQWDOO\DQG
commercial scale.
VRFLDOO\VHQVLWLYHDUHDVVXFKDV)RUHVW:LOGOLIHKDELWDWHGDUHDV
KLVWRULFDODUFKHRORJLFDO VLWHV UHOLJLRXV SODFHV HWF )ROORZLQJ In a country like India, where the population is much higher
WKH SULQFLSOH RI DYRLGDQFH LQYROYHPHQW RI IRUHVW ODQG KDV FRPSDUHGWRDYDLODELOLW\RITXDQWXPRIXVDEOHODQGFRQÁLFWV
EHHQUHGXFHGSURJUHVVLYHO\IURPLQWROHVVWKDQ DUH FRPPRQ ZKHQHYHU WKH TXHVWLRQ RI ODQG DFTXLVLWLRQ
LQDVDUHVXOWRIDGRSWLRQRIYDULRXVWHFKQRORJLFDODQG DULVHV &RQVLGHULQJ WKLV 32:(5*5,' KDV WDNHQ WKH LQLWLDWLYH
managerial iQQRYDWLRQV to secure land through direct purchase on willing buyer

127
Annual Report 2018-19

ZLOOLQJVHOOHUEDVLVRQPDUNHWQHJRWLDWHGUDWHWRDYRLGSXEOLF 2. Ranchi (Jharkhand)


UHVLVWDQFHDQGFRXUWLQWHUYHQWLRQIDFHGGXULQJODQGDFTXLVLWLRQ
‡ &RQVWUXFWLRQ RI 32:(5*5,' 9LVKUDP 6DGDQ DW 5,06
$OZD\VDÀUPEHOLHYHULQOHYHUDJLQJWKHUROHRIWHFKQRORJ\LQ
Ranchi
DGGUHVVLQJWKHSUHVVLQJQHHGVRIWKHVRFLHW\32:(5*5,'KDV
been forthcoming in up gradation and adoption of new and 3. Rajnandgaon (Chhattisgarh)
better technologies such as Gas Insulated Switchyard (GIS)
which requires lesser area Compared to the traditional Air ‡ 32:(5*5,' KDV LQDXJXUDWHG ´6DPDUWK\Dµ &KDWUDYDDV
Insulated Switchyard (AIS). 6FKRROFXP+RVWHOIRU'LY\DQJFKLOGUHQ DW5DMQDQGJDRQ
Chhattisgarh
)XUWKHUWRUHVROYHWKH52:LVVXHVDQGUHGXFHVRFLDOLPSDFWV
32:(5*5,'KDVVWDUWHGPDNLQJSD\PHQWIRUWRZHUEDVHODQG ‡ 32:(5*5,' KDV DOVR XQGHUWDNHQ XS JUDGDWLRQ RI
DQG FRUULGRU LQ DOO WKH  VWDWHV RI WKH FRXQWU\ ZKLFK KDYH Community Health Centre, Manpur, Rajnandgaon
DGRSWHG WKH ODQGPDUN JXLGHOLQHV RQ 52: FRPSHQVDWLRQ VHUYLFHVXSWR,QGLDQ3XEOLF+HDOWK6WDQGDUGV
LVVXHG E\ 0R3 6XFK DGGLWLRQDO SD\PHQW IRU ODQG FRVW
4. Kalahandi (Odisha)
GLPLQLVKLQJ ODQG YDOXH KDV UHYROXWLRQL]HGWUDQVIRUPHG WKH
YHU\ EDVLV RI FRPSHQVDWLRQ DQG KDV SDYHG WKH ZD\ IRU WUXH ‡ 3URYLGLQJ PHGLFDO HTXLSPHQWV DQG LQVWUXPHQWV DW
LQFOXVLYHJURZWK YDULRXVKRVSLWDOVRI.DODKDQGL'LVWULFW

CORPORATE SOCIAL RESPONSIBILITY ‡ 32:(5*5,' KDV XQGHUWDNHQ ´,PSURYLQJ 5XUDO


/LYHOLKRRGWKURXJK,QWHJUDWHG:DWHUVKHG0DQDJHPHQWµ
32:(5*5,'KDVWDNHQPDQ\SURDFWLYHPHDVXUHVIRULPSURYLQJ
DW-DLSDWQD%ORFNRI.DODKDQGLGLVWULFWLQ2GLVKDWKURXJK
WKH TXDOLW\ RI OLIH RI SHRSOH WKURXJK LWV &65 LQLWLDWLYHV LQ
ICRISAT.
WKH ÀHOG RI +HDOWKFDUH (GXFDWLRQ 5XUDO 'HYHORSPHQW
DQG 6DQLWDWLRQ 6NLOO 'HYHORSPHQW SURJUDPPHV 5XUDO ‡ 3URYLGLQJ52GULQNLQJZDWHUV\VWHPLQYDULRXV5HVLGHQWLDO
'HYHORSPHQW 6DQLWDWLRQ DQG (QYLURQPHQWDO 6XVWDLQDELOLW\ VFKRROVRI.DODKDQGL'LVWULFW
HWF DV PDQGDWHG E\ WKH &RPSDQLHV $FW  32:(5*5,'
earmarked ` 186.72 Cr. under CSR for FY 2018-19, which is ‡ 3URYLGLQJ  QR 2UJDQLF &RPSRVW 0DFKLQH  QR
 RI LWV DYHUDJH QHW SURÀW RI WKH SUHFHGLQJ WKUHH \HDUV Vehicle Compactor, 10 no Dumper Bin, 01 no Vehicle
Mounted Fogging Machine, 01 Mortuary Van and 01
EXGJHWIRULWV&65DFWLYLWLHV
no Bobcat Machine at Bhawanipatna Municipality of
$V RQ VW 'HFHPEHU  32:(5*5,' KDV DSSURYHG D .DODKDQGL'LVWULFW
WRWDORIQXPEHURI&65LQLWLDWLYHVDPRXQWLQJWR` 187.37
&U 7KHVH &65 LQLWLDWLYHV DUH GLUHFWHG WRZDUGV YDULRXV WKUXVW 5. Damoh (Madhya Pradesh)
areas with major allocation in Healthcare (` 54.44 Crore), Rural ‡ &RQVWUXFWLRQ RI 'LQLQJ ZLWK .LWFKHQ DQG SURYLVLRQ RI
'HYHORSPHQW `  &URUH  6DQLWDWLRQ  'ULQNLQJ :DWHU WDEOHDQGEHQFKDW*RYW%OLQG'HDI 'XPE6FKRRODW
(`  &U  (QYLURQPHQW `  &U  6NLOO 'HYHORSPHQW Damoh
(` 13.05 Cr.), Education (` 9.38 Cr.) etc.
‡ ,QVWDOODWLRQRI6RODUOLJKWVDW'LDPRQGSDUN'DPRK
Further, a total of 34 number of CSR projects amounting to
`&URUHDUHXQGHUDSSURYDODVRQVW-DQXDU\ ‡ 3URYLGLQJ  QRV +LJKWHFK VHZLQJ PDFKLQHV DQG 
nos. semi-automatic Sanitary Napkin manufacturing
32:(5*5,' LV XQGHUWDNLQJ YDULRXV LQWHJUDWHG GHYHORSPHQW
machines at Damoh, Madhya Pradesh.
LQLWLDWLYHVLQQLQHDVSLUDWLRQDOGLVWULFWVDOORFDWHGE\*RYHUQPHQW
RI,QGLDDVXQGHU 6. Hailakandi (Assam)
1. Sitamarhi (Bihar) ‡ 5HSDLULQJ DQG UHQRYDWLRQ RI  EHGGHG 6.5R\ &LYLO
ƒ Construction of community center, installation of high Hospital, Hailakandi, Assam.
PDVW OLJKW VXSSO\ RI JDUEDJH ULFNVKDZ DQG PRWRUL]HG
‡ &RQVWUXFWLRQ RI  EHGGHG QHZ ZDUG DW 6.5R\ &LYLO
WULF\FOHVIRU'LY\DQJ
Hospital, Hailakandi.

128
7. Baran (Rajasthan) $V RQ  DURXQG  &65 LQLWLDWLYHV DUH XQGHU
LPSOHPHQWDWLRQDFURVVYDULRXVORFDWLRQVRIWKHFRXQWU\
ƒ Transformation of Aspirational District Baran with
5HQRYDWLRQ RI  $QJDQZDGL FHQWUH LQ  *UDP TELECOM BUSINESS
SDQFKD\DWV LQ 6KDKEDG %ORFN 5HQRYDWLRQ  PLQRU
32:(5*5,'KDVGLYHUVLÀHGIURPLWVFRUHSRZHUWUDQVPLVVLRQ
UHSDLULQJ RI  3ULPDU\ +HDOWK &HQWUH VXE FHQWUH LQ
EXVLQHVVWR7HOHFRPEXVLQHVVE\XWLOL]LQJVSDUHÀEHUVLQVWDOOHG
%ORFNVRI6KDKEDG.LVKDQJDQM%DUDQ
LQ 8QLÀHG /RDG 'LVSDWFK &HQWUH VFKHPHV OHYHUDJLQJ LWV
8. Ferozpur (Punjab)- 3URMHFWVDUHEHLQJÀQDOL]HGE\WKH FRXQWU\ ZLGH WUDQVPLVVLRQ LQIUDVWUXFWXUH 23*: EDVHG
District administration. RSWLFDOWHOHFRPQHWZRUNSURYLGHVUHOLDEOHWHOHFRPPXQLFDWLRQ
9. Muzaffarpur (Bihar) - 3URMHFWV DUH EHLQJ ÀQDOL]HG E\ FRQQHFWLYLW\WRYDULRXVFXVWRPHUVDURXQGWKHFRXQWU\
the District administration. 7KH &RPSDQ\ KROGV ,QIUDVWUXFWXUH 3URYLGHU &DWHJRU\,
$PRQJ WKH QRWDEOH LQLWLDWLYHV 32:(5*5,' KDV FRPSOHWHG ,3, 5HJLVWUDWLRQDQG8QLÀHG/LFHQVH 8/ ZLWK1DWLRQDO/RQJ
´32:(5*5,' 9LVKUDP 6DGDQµ DW $,,06 ZLWK DQ REMHFWLYH RI 'LVWDQFH 1/'  DQG ,QWHUQHW 6HUYLFH 3URYLGHU ,63  &DWHJRU\
SURYLGLQJDIIRUGDEOHDFFRPPRGDWLRQIDFLOLW\WRWKHGHSULYHG ¶$·6HUYLFH$XWKRUL]DWLRQV7KH&RPSDQ\KDVHVWDEOLVKHGKLJK
VHFWLRQV32:(5*5,'KDVDSSURYHGPRUH9LVKUDP6DGDQV FDSDFLW\WHOHFRPQHWZRUNEDVHGRQ1;*':'0DQG6'+
bearing an estimated cost of `  &URUH DW PDMRU *RYW WHFKQRORJLHVDFURVVWKHFRXQWU\$SDQ,QGLD,303/6QHWZRUN
health institution during the year (IGIMS-Patna, Guwahati KDV DOVR EHHQ HVWDEOLVKHG IRU VHUYLQJ HQWHUSULVH FXVWRPHUV
Medical College, Guwahati, RIMS, Ranchi, NIMHANS, ZLWK D UHTXLUHPHQW RI 9LUWXDO 3ULYDWH 1HWZRUN 931  DQG
%HQJDOXUX0HGLFDO&ROOHJH'DUEKDQJD.LQJ*HRUJH0HGLFDO ,QWHUQHW6HUYLFHV7KH03/6QHWZRUNLVLPSOHPHQWHGLQWLHU
8QLYHUVLW\/XFNQRZ architecture with Core, Edge and Access layers. The network is
FDSDEOHRIFDUU\LQJYRLFH'DWDDQG9LGHRVWUHDPVVHFXUHO\WR
32:(5*5,' KDYH XQGHUWDNHQ FRPSUHKHQVLYH GHYHORSPHQW
a customer’s multiple locations with applied QoS.
DFWLYLWLHV DW %DED %DLG\DQDWK 'KDP 'HRJDUK -KDUNKDQG
adopted under “Swachh Iconic Place. :LWK LWV EUDQG QDPH POWERTEL, LW RIIHUV VHUYLFHV VXFK
as (i) Domestic Leased Circuits (both annual and long term
$PRQJ UXUDO GHYHORSPHQW LQLWLDWLYHV RI 32:(5*5,'
FRQWUDFWV  DQG LL  ,QWHUQHW 6HUYLFHV  (QWHUSULVH 6HUYLFHV
´,PSURYLQJ 5XUDO /LYHOLKRRGV DQG 3URWHFWLQJ (QYLURQPHQW
such as VPN on its Multi-Protocol Label Switching (MPLS)
WKURXJK )DUPHU FHQWULF ,QWHJUDWHG :DWHUVKHG 0DQDJHPHQWµ
Network. The Company operates a telecom network of about
LQDERXW+DRIVHPLDULGODQGHDFKLQ.XUQRROGLVWULFW
NPSURYLGLQJFRQQHFWLYLW\WRDOOPHWURVPDMRUFLWLHV 
$QGKUD 3UDGHVK  DQG 9LMD\DSXUD GLVWULFW .DUQDWDND  LV
WRZQV LQFOXGLQJ UHPRWH DUHDV RI - . DQG 1RUWK(DVW 6WDWHV
underway, which has already yielded result through substantial
DQG RIIHULQJ YDOXH DGGHG VHUYLFHV WR PDMRU WHOHFRP VHUYLFH
increase of 96,950 m3 in net water storage capacity resulting in
SURYLGHUVHQWHUSULVHV *RYHUQPHQWRUJDQL]DWLRQV
FRQVHUYDWLRQRIPRUHWKDQP3 of water and increase
LQ FURS SURGXFWLYLW\ LQ WKH UDQJH RI  LQ WKH WDUJHWHG *RYW RI ,QGLD LV LQ WKH SURFHVV RI LPSOHPHQWDWLRQ RI %KDUDW
area. 1HW RU 1DWLRQDO 2SWLF )LEHU 1HWZRUN 12)1  IRU SURYLGLQJ
FRQQHFWLYLW\ WR  *UDP 3DQFKD\DWV LQ WKH FRXQWU\
)XUWKHU32:(5*5,'KDYHXQGHUWDNHQ´6ZDFKKDQG%KDY\D
32:(5*5,'KDVEHHQQRPLQDWHGDVRQHRIWKHLPSOHPHQWLQJ
.XUXNVKHWUDµSURJUDPPHIRU.XUXNVKHWUD ` 7.24 Crores), Rural
agencies for this project and has been entrusted with the task
'HYHORSPHQWSURMHFWVLQ%KRMSXU$UD%LKDU ` 11 Crores), Skill
RIGHYHORSPHQWDQGPDLQWHQDQFHRIWKH%KDUDW1HWQHWZRUN
'HYHORSPHQW SURJUDPPH IRU  \RXWKV LQ SRZHU VHFWRU
LQ IRXU VWDWHV YL] 7HODQJDQD +LPDFKDO 3UDGHVK -KDUNKDQG
area (` 10.18 Crore),Equipping 100 Railway Stations with fast
and Odisha under Phase I of the project. Further, Department
:L)L VHUYLFHV LQ 0XPEDL VXEXUEDQ DUHDV DQG  VWDWLRQV
RI7HOHFRPPXQLFDWLRQV 'R7 KDVDXWKRUL]HG32:(5*5,'WR
LQ 6DPDVWLSXU 5DLOZD\ GLYLVLRQ `  &URUHV  3URYLVLRQLQJ
H[HFXWH 3KDVH,, RI %KDUDW 1HW SURMHFW LQ VWDWHV RI +LPDFKDO
of 19,800 dustbins (`  &URUH  DW YDULRXV UDLOZD\ VWDWLRQV
Pradesh and Uttarakhand.
RI :HVW &HQWUDO 6RXWK :HVW &HQWUDO ]RQHV DQG 6DPDVWLSXU
'LYLVLRQV DQG /DGLHV +RVWHO IRU .HUDOD $JULFXOWXUH 8QLYHUVLW\ 7KH&RPSDQ\LVDOVRSURYLGLQJKLJKVSHHGUHOLDEOHDQGVHFXUH
Thrissur (` 4.45 Crores) has also been undertaken. GDWD FRPPXQLFDWLRQ QHWZRUN WR YDULRXV HGXFDWLRQDO DQG

129
Annual Report 2018-19

research institutions across the country under the National  0: FDSDFLW\ LQ WKH 5LJKWRI:D\ FRQVWUDLQHG &KLFNHQ
.QRZOHGJH1HWZRUN 1.1 SURMHFWRI*RYWRI,QGLD 1HFN DUHD WKHUHE\ UHVHUYLQJ WRWDO WUDQVPLVVLRQ FDSDFLW\ RI
0:LQWKLVFRQVWUDLQHGFRUULGRU
POWERGRID’s EFFORTS TOWARDS DEVELOPMENT OF
NORTH EASTERN REGION (NER) )RUGHYHORSPHQWRI,QWUD6WDWH7UDQVPLVVLRQDQG'LVWULEXWLRQ
7 '  V\VWHP LQ WKH VWDWHV RI 1(5 D &RPSUHKHQVLYH
In order to tap the hydro potential in the North-Eastern
Scheme for strengthening of the intra-State Transmission
Region an outline of Transmission system has been made
and Distribution system comprising transmission, sub-
IRU HYDFXDWLRQ RI SRZHU IURP K\GUR SURMHFWV RI DERXW
WUDQVPLVVLRQ DQG GLVWULEXWLRQ V\VWHP  N9  DERYH  KDV
 0: LQ 1(5 DQG  0: LQ 6LNNLP %KXWDQ 7KH
EHHQ SUHSDUHG DV WZR VHSDUDWH SURMHFWV DQG DSSURYHG E\
Inter State Transmission System consists of interconnecting
WKH*RYWRI,QGLDIRULPSOHPHQWDWLRQE\32:(5*5,')RUWKH
WKH 1(5 ZLWK WKH 1DWLRQDO *ULG IRU H[FKDQJH RI SRZHU E\
T&D project in Arunachal Pradesh & Sikkim, the entire cost
KLJKFDSDFLW\$&DVZHOODV+9'&OLQHVKDYHEHHQDUHEHLQJ
RIWKHSURMHFWZLOOEHERUQHE\*RYHUQPHQWRI,QGLDWKURXJK
SODQQHGLPSOHPHQWHG,QWKLVUHJDUGDPLOHVWRQHKDVEHHQ
WKH3ODQ6FKHPHRI0LQLVWU\RI3RZHU)RUWKHUHPDLQLQJVL[
DFKLHYHGZLWKFRPPLVVLRQLQJRI3ROH² 0: RI”N9
VWDWHVLH$VVDP0DQLSXU0HJKDOD\D0L]RUDP7ULSXUDDQG
0:+9'&ELSROHOLQHIURP%LVKZDQDWK&KDULDOL 1(5 
1DJDODQG WKH VFKHPH ZLOO EH IXQGHG E\ WKH *RYW RI ,QGLD
to Agra (NR), which interconnecting en-route at Alipurduar
WKURXJKWKH%XGJHWRI0LQLVWU\RI3RZHUDQGWKH:RUOG%DQN
(5 ZLWK0:WHUPLQDOVHDFKDW%LVKZDQDWK&KDULDOL 
RQ  EDVLV 32:(5*5,' KDV LQLWLDWHG LPSOHPHQWDWLRQ
$OLSXUGXDUDQG[0:WHUPLQDODW$JUD7KLVWUDQVPLVVLRQ
DFWLYDWHVRIDERYHSURMHFWV
system also includes 4 nos. Of high capacity corridors, each of

6KUL1DUHQGUD0RGL+RQ·EOH3ULPH0LQLVWHURI,QGLDGHGLFDWLQJ6ULQDJDU/HK.DUJLO
Transmission Line to the Nation

130
CHAPTER 22

POWER FINANCE CORPORATION LTD.


1.0. OVERVIEW OF PFC PDMRUSRZHUVHFWRURUJDQL]DWLRQV&HQWUDODQG6WDWH
SRZHUXWLOLWLHVDVZHOODVSULYDWHVHFWRUSRZHUSURMHFW
1.1. Introduction
GHYHORSHUV
PFC was incorporated on July 16, 1986, as a part of
1.3. PFC’s association with Government of India
*RYHUQPHQW RI ,QGLD·V LQLWLDWLYH WR HQKDQFH IXQGLQJ
WR SRZHU SURMHFWV LQ ,QGLD ZLWK DQ REMHFWLYH WR  3)& LV LQYROYHG LQ YDULRXV *RYHUQPHQW RI ,QGLD
SURYLGH ÀQDQFLDO UHVRXUFHV DQG HQFRXUDJH ÁRZ RI programs for the power sector, including acting as
LQYHVWPHQWV WR WKH SRZHU DQG DVVRFLDWHG VHFWRUV ,W the Nodal agency for implementation of UMPPs and
was declared a Public Financial Institution (PFI), under WKHQHZO\FKULVWHQHG,QWHJUDWHG3RZHU'HYHORSPHQW
Section-4A of Companies Act, in 1990. Scheme (IPDS) [erstwhile R-APDRP program has been
subsumed into IPDS], and as a bid process coordinator
Power Finance Corporation Limited (PFC) is a leading
for the Independent Transmission Projects and
Power Sector Public Financial Institution and a Non-
implementation partner of Capacity Building under
%DQNLQJ)LQDQFLDO&RPSDQ\SURYLGLQJIXQGDQGQRQ
R-APDRP.
IXQG EDVHG VXSSRUW IRU WKH GHYHORSPHQW RI ,QGLDQ
Power Sector. 1.4. Joint Ventures and Subsidiaries

 3)&LVD6FKHGXOH$1DYUDWQD&36(LQWKH)LQDQFLDO 7KH &DELQHW &RPPLWWHH RQ (FRQRPLF $IIDLUV JDYH


6HUYLFHV 6HFWRU XQGHU WKH DGPLQLVWUDWLYH FRQWURO RI LWV ¶,Q 3ULQFLSOHµ DSSURYDO IRU VWUDWHJLF VDOH RI WKH
the Ministry of Power, with 59.05% shareholding *RYHUQPHQWRI,QGLD·VRIWRWDOSDLGXSHTXLW\
RI WKH *RYHUQPHQW RI ,QGLD DV RQ  ,WV shareholding in REC to PFC alongwith the transfer
5HJLVWHUHGDQG&RUSRUDWH2IÀFHVDUHDW1HZ'HOKL of management control. On 28 March, 2019, PFC
acquired GoI’s 52.63% shares of REC by paying an
The Corporation has been conferred with the status of
DPRXQW RI 5V FURUHV WR *RYW RI ,QGLD  3)&
¶1DYUDWQD·E\*RYHUQPHQWRI,QGLDRQ-XQH
has entered into the group of promoters of REC.
5%, KDV UHFODVVLÀHG 3)& IURP D ¶/RDQ &RPSDQ\· WR
7KH DFTXLVLWLRQ ZRXOG HQDEOH LQFUHDVHG HIÀFLHQFLHV
an ‘Infrastructure Finance Company’ (IFC) on July 28,
in leaning processes and policies across both
2010.
WKH LQVWLWXWLRQV DQG ZRXOG FUHDWH SXEOLF YDOXH E\
1.2. PFC’s Clients and Products offering better loan products to the power sector.
3)& SURYLGHV D FRPSUHKHQVLYH UDQJH RI ÀQDQFLDO 7KH FRQYHUJHQFH EHWZHHQ WKH HQWLWLHV DV FRPELQHG
SURGXFWVDQGUHODWHGDGYLVRU\DQGRWKHUVHUYLFHVIURP group entities would help the power sector reap
SURMHFWFRQFHSWXDOL]DWLRQWRWKHSRVWFRPPLVVLRQLQJ EHQHÀWVIURPDGHFHQWUDOL]HGRXWUHDFKRI5(&DQGD
stage for our clients in the power sector, including SURIHVVLRQDOSURMHFWÀQDQFHH[SHUWLVHRI3)&)XUWKHU
IRU JHQHUDWLRQ FRQYHQWLRQDO DQG UHQHZDEOH  WKH HQVXLQJ GLYHUVLÀFDWLRQ RI DVVHWV RI WKH JURXS
transmission and distribution projects as well as for as well as portfolio risk, would help in resolution of
UHODWHG UHQRYDWLRQ DQG PRGHUQL]DWLRQ SURMHFWV 3)& stressed power sector assets of the group in a better
SURYLGHV YDULRXV IXQG EDVHG ÀQDQFLDO DVVLVWDQFH and co-ordinated manner.
LQFOXGLQJ SURMHFW ÀQDQFH VKRUW WHUP ORDQV EX\HU·V As a Corporate Strategy, PFC is focusing on
OLQHRIFUHGLWDQGGHEWUHÀQDQFLQJVFKHPHVDVZHOODV YDULRXV VSHFLÀF EXVLQHVV RSSRUWXQLWLHV DQG DUHDV
non-fund based assistance including default payment of operations such as consultancy, renewable
JXDUDQWHHVDQGOHWWHUVRIFRPIRUW3)&DOVRSURYLGHV HQHUJ\ HWF 3)& LV DOVR HQWHULQJ LQWR MRLQW YHQWXUH
YDULRXVIHHEDVHGWHFKQLFDODGYLVRU\DQGFRQVXOWDQF\ collaborations in areas of national interest leading to
VHUYLFHV IRU SRZHU VHFWRU SURMHFWV WKURXJK  HQYLURQPHQWDO SUHVHUYDWLRQ DV ZHOO DV GHYHORSPHQW
owned subsidiary, namely, PFC Consulting Limited. RISRZHUPDUNHWVVXFKDV¶(QHUJ\(IÀFLHQF\6HUYLFHV
PFC has well established relationships with the GoI /LPLWHG·¶1DWLRQDO3RZHU([FKDQJH/LPLWHG·DQG37&
DQG 6WDWH JRYHUQPHQWV UHJXODWRU\ DXWKRULWLHV India Ltd.

131
Annual Report 2018-19

Subsequent to acquisition of REC, PFC is the joint Commercial papers, Inter-corporate deposits etc.
SURPRWHUDQGKROGLQJFRPSDQ\RI(QHUJ\(IÀFLHQF\ IURPYDULRXV%DQNDQG)LQDQFLDO,QVWLWXWLRQV3)&DOVR
6HUYLFHV/WG ((6/  raises its funds from international market through
ECBs and Loans from Bilateral and Multilateral
 ([SDQVLRQDQG'LYHUVLÀFDWLRQ6WUDWHJ\
Agencies.
3)&KDVDOVRVWUDWHJLFDOO\H[SDQGHGLWVIRFXVDUHDVWR
2.4 Experienced and Committed Human Capital
include projects that represent forward and backward
linkages to the core power sector projects, including 3)& KDV DQ H[SHULHQFHG TXDOLÀHG DQG FRPPLWWHG
procurement of capital equipment for the power management and employee base. Many of PFC’s
sector, fuel sources for power generation projects and HPSOR\HHV SDUWLFXODUO\ VHQLRU PDQDJHPHQW KDYH
UHODWHGLQIUDVWUXFWXUHGHYHORSPHQW ZRUNHG ZLWK 3)& IRU VLJQLÀFDQWO\ ORQJ SHULRGV 3)&
KDV DQ HIÀFLHQW DQG OHDQ RUJDQL]DWLRQDO VWUXFWXUH
2.0. PFC’S STRENGTHS UHODWLYHWRWKHVL]HRILWVRSHUDWLRQVDQGSURÀWDELOLW\
2.1 Memorandum of Understanding with Govt. of PFC’s personnel policies are aimed towards recruiting
talented employees and facilitating their integration
India
LQWRWKH&RPSDQ\DQGHQFRXUDJLQJWKHGHYHORSPHQW
 3)& KDV EHHQ VLJQLQJ 0R8 ZLWK WKH *RYW RI ,QGLD of their skills.
since 1993-94 and has consistently been rated
 3)&·VPDQDJHPHQWKDVVLJQLÀFDQWH[SHULHQFHLQWKH
¶([FHOOHQW· EDVHG RQ 028 WDUJHWV LQ UHVSHFW RI
SRZHU VHFWRU DQG WKH ÀQDQFLDO VHUYLFHV LQGXVWU\
YDULRXV SHUIRUPDQFH SDUDPHWHUV ¶9HU\ *RRG· LQ
ZKLFK KDV HQDEOHG LW WR GHYHORS D FRPSUHKHQVLYH
FY 2004-05).
DQG HIIHFWLYH SURMHFW DSSUDLVDO SURFHVV LPSOHPHQW
2.2 Favorable Credit Rating and Access to Various a stringent risk management framework, identify
Cost-competitive Sources of Funds VSHFLÀF UHTXLUHPHQWV RI SRZHU VHFWRU SURMHFWV DQG
RIIHUFRPSUHKHQVLYHÀQDQFLQJVROXWLRQVDQGDGYLVRU\
 ([FHOOHQFH LQ SHUIRUPDQFH LV DOVR UHÁHFWHG LQ
assistance to such projects.
consistently obtaining the highest Credit Rating
IURPGRPHVWLFUDWLQJDJHQFLHVDQGLQYHVWPHQWJUDGH 2.5 High Net Worth
rating from international credit rating agencies. Most projects in the Power Sector are highly
FDSLWDO LQWHQVLYH DQG DUH ODUJH VL]H SURMHFWV ZKLFK
PFC Credit Ratings
UHTXLUH FRQVLGHUDEOH DPRXQW RI ÀQDQFLDO UHVRXUFHV
Rating Agency Long Term Short Term
Considering the RBI regulatory regime, lending
borrowings Borrowings
towards each such project is dependent upon the
Domestic Rating WRWDO SHUPLVVLEOH H[SRVXUH LQ UHVSHFW RI WKH VSHFLÀF
CRISIL ‘AAA’ (Stable) `A1+’ (Highest Rating) borrower. Since PFC has considerably high net worth,
ICRA ‘AAA’ ‘A1+’ (Highest Rating) LW LV DEOH WR WDNH VLJQLÀFDQW H[SRVXUH LQ SURMHFWV RI
CARE ‘AAA’ ‘A1+’ (Highest Rating) HDFKERUURZHU7KLVLQWXUQOHDGVWRDQHDUO\ÀQDQFLDO
International Rating (at par with ‘Sovereign’ rating) closure leading to faster capacity addition.

Moody’s Baa3 2.6 Robust Appraisal Methodology


Standard & BBB- 3)& KDV GHYHORSHG H[WHQVLYH NQRZOHGJH DQG
Poor’s
H[SHULHQFH LQ WKH ,QGLDQ SRZHU VHFWRU DQG KDV
FITCH BBB- FRPSUHKHQVLYH FUHGLW DSSUDLVDO SROLFLHV DQG
2.3 Effective Resource Mobilization SURFHGXUHVZKLFKHQDEOH3)&WRHIIHFWLYHO\DSSUDLVH
DQG H[WHQG ÀQDQFLDO DVVLVWDQFH WR YDULRXV SRZHU
PFC raises the funds through market borrowings sector projects. PFC follows a systematic institutional
RI YDULRXV PDWXULWLHV DQG FXUUHQFLHV 3)& DFFHVVHV and project appraisal process to assess and mitigate
GRPHVWLFGHEWPDUNHWVWKURXJKYDULRXVLQVWUXPHQWV project and credit risk. PFC’s internal processes and
which include Long Term Infrastructure Bonds, FUHGLW UHYLHZ PHFKDQLVPV UHGXFH WKH QXPEHU RI
7D[ )UHH %RQGV /RQJ 7HUP DQG 6KRUWWHUP /RDQV defaults on loans aQGFRQWULEXWHWRSURÀWDELOLW\

132
2.7 ISO CerWLÀFDWLRQ 5.0 OPERATIONAL HIGHLIGHTS

3)&·V RSHUDWLRQV DUH ¶,62 · FHUWLÀHG DQG PFC sanctioned loans amounting to Rs. 1,16,233 Crore
WKH LQLWLDO FHUWLÀFDWLRQ ZDV GRQH LQ -DQXDU\  GXULQJ ÀVFDO  WR 6WDWH &HQWUDO 3ULYDWH DQG
¶,62 · 3UHVHQWO\ 3)&·V RSHUDWLRQV DUH ,62 Joint Sector entities. An amount of Rs. 64,414 Crore
 FHUWLÀHG DQG WKH FHUWLÀFDWLRQ LV YDOLG WLOO ZDVGLVEXUVHGGXULQJWKHVDPHSHULRG:LWKWKLVDV
07-Jan-2019. RQ0DUFKWKHFXPXODWLYHVDQFWLRQVDPRXQW
3.0 PERFORMANCE HIGHLIGHTS WR 5V &URUH DQG FXPXODWLYH GLVEXUVHPHQWV
amount to Rs. 5,19,769 Crore. The loan assets as at
3.1 3)& KDV EHHQ D SURÀWPDNLQJ HQWHUSULVH ULJKW VLQFH
31.03.2018 stand at Rs. 2,78,915 Crore out of which
LQFHSWLRQ DQG KDV UHJLVWHUHG LPSUHVVLYH JURZWK
LQ LWV QHW SURÀW HYHU\ \HDU ,W SRVWHG D QHW SURÀW RI RIWKHORDQDVVHWVDUHUHJXODULQVHUYLFLQJRIGXHV
5V &URUH %DVHG RQ ,QG $6 ÀQDQFLDOV DGRSWHG DQGQRVWUHVVLVHQYLVDJHG
ZHI  DQG WKH HIIHFWLYH GDWH RI WUDQVLWLRQ 6.0 RESOURCE MOBILISATION
was 01.04.2017, prescribed under section 133 of the
&RPSDQLHVDFWUHDGZLWKUHOHYDQWUXOHVLVVXHG 6.1 Domestic
thereunder) during the half-year ended 30.09.2018. 3)& PRELOL]HG IXQGV DPRXQWLQJ WR 5V FURUH
3.2 NPA/stage III Assets: from the domestic market during FY 2018-19 till
 2XW RI WKH DERYH 5V FURUH ZDV
‡ 7KH OHYHO RI QHW 1RQ3HUIRUPLQJ $VVHWV 13$V  KDV
UDLVHGWKURXJKLVVXHRIWD[DEOHERQGVLQWKHQDWXUHRI
been recorded at Rs.20,600 crore which is 7.39% to
debentures, Rs. 182 crore through Capital Gain Bonds,
the Gross Loan Assets as on 31.03.2018.
Rs.33,029 crore through term loan and Rs.19,711
‡ )XUWKHUQHW6WDJH,,,/RDQ$VVHWV !GD\VRYHUGXH  crore by way of issue of Commercial Paper.
are Rs.13,841 crore which is 4.66% of the Gross Loan
Assets as on 30.09.2018. 6.2 External

3.3 $VQDSVKRWRI3)&·VÀQDQFLDOSHUIRUPDQFHIRUWKHODVW 3)& GLYHUVLÀHG LWV ERUURZLQJ WKURXJK WDSSLQJ


\HDUVEDVHGRQ,*$$3)LQDQFLDOVLVXQGHU international market. During FY 2017-18, PFC’s
foreign currency raising amounts to USD 1,659
(Rs. Crore)
million (eq. INR 10,686 crores) and during FY 2018-19
FINANCIAL PERFORMANCE AT A GLANCE (LAST 3 YEARS)
(up to March, 2019) PFC has raised USD 1,350 million
PARTICULARS 2015-16 2016-17 2017-18
HT,15FURUHV XQGHU(&%*XLGHOLQHV)&15
Sanctions 65,042 1,00,603 1,16,233 (B) loans.
Disbursements 46,588 62,798 64,414
PFC issuance of maiden Green Bonds under MTN
3URÀWEHIRUHWD[ 9,061 5,110 8,327
programme for USD 400 million in December 2017 at
3URÀWDIWHUWD[ 6,113 2,126 5,855
DFRXSRQRISDZDV&OLPDWH%RQGV,QLWLDWLYH
'LYLGHQG ,QWHULP)LQDO 1,835 1,320 2,059
FHUWLÀHGDQGLVOLVWHGRQWKH/RQGRQ6WRFN([FKDQJH
4.0 AWARDS & ACCOLADES DQGWKH6LQJDSRUH6WRFN([FKDQJH7KHSULFLQJRIWKH
*UHHQ %RQGV VDZ WKH WLJKWHVW HYHU VSUHDG RI 
L 5HFHLYHG WKH FRYHWHG ¶5DMEKDVKD .LUWL 3UDWKDP
Puruskar’ for the year 2017-18 (in the category of ESV EDVLV SRLQWV  RYHU \HDU 86 7UHDVXU\ E\ DQ\
Region “A”) from Shri M. Venkaiah Naidu, Hon’ble Indian issuer for the inaugural 10-year transaction.
Vice President of India.  $OVR 3)&·V HQWLUH H[LVWLQJ IRUHLJQ FXUUHQF\ ORDQ
LL 5HFHLYHGWKHSUHVWLJLRXV¶&%,3$ZDUG·IRUEHLQJ SRUWIROLR RI HTXLYDOHQW 86  PLOOLRQ ZDV
the Best Power Financing Company. VXFFHVVIXOO\ QHJRWLDWHG IRU UHÀQDQFLQJ  UHSULFLQJ
This has resulted in reduction of cost of up to 70
LLL 3)& UDQNHG WK +LJKHVW 3URÀW 0DNLQJ 368 LQ WKH
ESVDQGVDYLQJRIDSSUR[LPDWHO\5VFURUHVIRUWKH
FRXQWU\ DV SHU '3( *RYHUQPHQW RI ,QGLD 6XUYH\
2017-18. residual maturity of the said borrowings.

133
Annual Report 2018-19

7.0 NEW BUSINESS INITIATIVES 8.3 Buyers Line of Credit


7.1 Investment in Power Exchanges 3)& KDV EHHQ SURYLGLQJ QRQUHYROYLQJ UXSHH OLQH
3)& KDV LQYHVWHG 5V FURUHV LQ WKH HTXLW\ VKDUH RI FUHGLW WR 6WDWH 6HFWRU *HQFRV'LVFRPV7UDQVFRV
FDSLWDO RI 3RZHU ([FKDQJH ,QGLD /WG 3;,/  ZKLFK for purchase of machinery, equipment and other
is 6.64% of the paid up equity capital of Rs. 48.47 capital goods. PFC has Sanctioned amount Rs.74.33
crores up to 31.03.2018. &U WR 'LVFRPV*HQFRV7UDQVFR RI RQH VWDWH QDPHO\
 3RZHU ([FKDQJH ,QGLD /LPLWHG 3;,/  LV ,QGLD·V Rajasthan during the reported period.
ÀUVW LQVWLWXWLRQDOO\ SURPRWHG 3RZHU ([FKDQJH 8.4 Other Loans
WKDW SURYLGHV LQQRYDWLYH DQG FUHGLEOH VROXWLRQV WR
3)& KDV EHHQ SURYLGLQJ ÀQDQFLDO VXSSRUW XQGHU
WUDQVIRUP WKH ,QGLDQ 3RZHU 0DUNHWV 3;,/ SURYLGHV
QDWLRQZLGH HOHFWURQLF ([FKDQJH IRU WUDGLQJ RI Regulatory Assets funding, Rupee Line of Credit for
power and handles power trading and transmission Import of Coal and Financing for Purchase of Power
FOHDUDQFH VLPXOWDQHRXVO\ LW SURYLGHV WUDQVSDUHQW WKURXJK 3RZHU ([FKDQJH 3)& KDV QRW VDQFWLRQHG
QHXWUDO DQG HIÀFLHQW HOHFWURQLF SODWIRUP 3;,/ RIIHUV DQ\QHZORDQVXQGHUWKHDERYHSURGXFWVGXULQJWKH
YDULRXV SURGXFWV VXFK DV 'D\ $KHDG 'D\ $KHDG reported period.
&RQWLQJHQF\$Q\'D\,QWUD'D\DQG:HHNO\&RQWUDFWV
8.5 Investment
3;,/SURYLGHVWUDGLQJSODWIRUPIRU5HQHZDEOH(QHUJ\
&HUWLÀFDWHV'XHWRHURVLRQRI1HW:RUWKRI3;,/3)& 3)& KDV EHHQ LQYHVWLQJ LQ ,32)322)6 RI &HQWUDO
KDV SURYLGHG WKH HQWLUH LQYHVWPHQW DPRXQW RI 5V Public Sector Undertakings (CPSUs). Till date, PFC has
FURUHDVSURYLVLRQIRUGLPLQXWLRQLQWKHYDOXHRI LQYHVWHGLQWKH,32VRI5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ
LQYHVWPHQWLQLWVERRNV Limited (REC) and Power Grid Corporation India
8.0 STRUCTURED PRODUCTS GROUP (SPG) Limited (PGCIL) and in OFS of Coal India Limited and
NHPC Ltd.
7KHLQIRUPDWLRQUHODWLQJWR63*LVDVEHORZ
 3)&KDVDOVREHHQLQYHVWLQJLQWKH(TXLW\6KDUH&DSLWDO
8.1 Short Term Loans/ Medium Term Loans/Long Term
Loans to State Gencos/Discoms/Transcos RI -RLQW 9HQWXUH FRPSDQ\ LH (QHUJ\ (IÀFLHQF\
6HUYLFHV /LPLWHG ((6/  DQG LWV 6XEVLGLDULHV639V
3)& KDV EHHQ SURYLGLQJ ÀQDQFLDO VXSSRUW XQGHU
8033V 3)& KDV LQYHVWHG LQ (TXLW\ 6KDUHV LQ 3RZHU
6KRUW7HUP/RDQV0LQL6KRUW7HUP/RDQV)OH[L/LQH
([FKDQJH ,QGLD /LPLWHG 3;,/   37& ,QGLD /LPLWHG
of Credit, Medium Term & Long Term Loan to State
)XUWKHU3)&KDVLQYHVWHGLQ3HUSHWXDO$GGLWLRQDO7LHU
6HFWRU *HQFRV'LVFRPV7UDQVFRV WKDW DUH LQ WKH
EXVLQHVV RI JHQHUDWLRQGLVWULEXWLRQWUDQVPLVVLRQ RI ,%DVHO,,,&RPSOLDQW1RQ&RQYHUWLEOH7D[DEOH%RQGV
power to meet their immediate requirement of funds RI$QGKUD%DQN3)&KDVDOVRLQYHVWHGLQ.6.6PDOO
such as working capital loans under UDAY Scheme LV%HDXWLIXO)XQG .6.6,% 
RI *RYHUQPHQW RI ,QGLD SXUFKDVH RI IXHO IRU SRZHU 9.0 RISK MANAGEMENT
plant, purchase of consumables, essential spares,
HPHUJHQF\SURFXUHPHQWZRUNIRUJHQHUDWLQJSODQW As a part of Risk Management, the Corporation has
& T&D network in the nature of repair & maintenance WRPDQDJHYDULRXVULVNVDVVRFLDWHGZLWKLWVEXVLQHVV
ZRUNSXUFKDVHRISRZHUDQGDJDLQVWUHFHLYDEOHV3)& For managing such risk, PFC has an integrated risk
KDV6DQFWLRQHGWRWDODPRXQW5V&UWR*HQFRV PDQDJHPHQW IUDPHZRUN ZKLFK LGHQWLÀHV WKH ULVN V 
'LVFRPV7UDQVFRVRIVWDWHVQDPHO\5DMDVWKDQ3XQMDE impacting PFC and the appropriate measures to
Uttar Pradesh, Madhya Pradesh, Maharashtra, Tamil mitigate the same. The risks are monitored through a
Nadu, Haryana, Telangana, Meghalaya, Andhra Risk Management Committee (RMC) which comprises
3UDGHVK DQG .DUQDWDND GXULQJ WKH UHSRUWHG SHULRG of departmental heads who are responsible for
XQGHUWKHDERYHVDLGORDQV PRQLWRULQJDQGSHULRGLFDOO\UHYLHZLQJWKHULVNSURÀOH
8.2 Short Term Loan to Private Sector Borrowers: RIWKHLUUHVSHFWLYHIXQFWLRQ7KH50&WKHQDSSULVHWKH
3)&KDVVDQFWLRQHG6KRUW7HUP/RDQWR3ULYDWH6HFWRU Risk Management Committee of Board comprising of
%RUURZHU LH 37& ,QGLD )LQDQFLDO 6HUYLFHV /LPLWHG  %RDUGOHYHOPHPEHUVRQWKHNH\ULVNVDVVRFLDWHGZLWK
amounting to Rs. 500 crore during the reported the business, its root causes and measures taken to
period. mitigate the same.

134
Further, to monitor some key risk associated with 10.2 Ministry of Power’s Integrated Rating Framework
the lending business, PFC has constituted separate For State Distribution Utilities
committee(s). To monitor the liquidity and interest 0LQLVWU\RI3RZHULQLWLDWHGDFWLRQIRUGHYHORSPHQWRI
rate risk, PFC has an Asset Liability Management DQ,QWHJUDWHG5DWLQJ0HWKRGRORJ\FRYHULQJWKH6WDWH
Committee (ALCO) headed by Director (Finance). 3RZHU'LVWULEXWLRQ8WLOLWLHVNHHSLQJLQYLHZWKHSRRU
The Asset Liability Management framework includes ÀQDQFLDOKHDOWKRIWKH6WDWH'LVWULEXWLRQ8WLOLWLHVGXH
SHULRGLFDQDO\VLVRIORQJWHUPOLTXLGLW\SURÀOHRIDVVHW to multifarious factors.
UHFHLSWVDQGGHEWVHUYLFHREOLJDWLRQV6XFKDQDO\VLVLV  7KH REMHFWLYH RI WKH LQWHJUDWHG UDWLQJ LV WR UDWH
FDUULHGRXWRQDSHULRGLFEDVLVLQYDULRXVWLPHEXFNHWV DOO VWDWH GLVWULEXWLRQ FRPSDQLHV LQFOXGLQJ 6(%V
and is being used for critical decisions regarding the utilities with integrated operations) on the basis
WLPHYROXPHDQGPDWXULW\SURÀOHRIWKHERUURZLQJV of their performance and their ability to sustain
DQGFUHDWLRQRIPL[RIDVVHWVDQGOLDELOLWLHVLQWHUPV WKH SHUIRUPDQFH OHYHO 7KH PHWKRGRORJ\ DGRSWHG
of time period (short, medium and long-term) and in DWWHPSWVWRREMHFWLYHO\DGMXGJHWKHSHUIRUPDQFHRI
WHUPVRIÀ[HGDQGÁRDWLQJLQWHUHVWUDWHV VWDWHGLVWULEXWLRQXWLOLWLHVDJDLQVWYDULRXVSDUDPHWHUV
EURDGO\ FODVVLÀHG XQGHU L   2SHUDWLRQDO  5HIRUP
To manage the foreign currency risk, PFC has a SDUDPHWHUV LL  ([WHUQDO 3DUDPHWHUV DQG LLL  )LQDQFLDO
separate Currency Risk Management Framework SDUDPHWHUV 7KH HYDOXDWLRQ RI FHUWDLQ SDUDPHWHUV
under which a separate Currency Risk Management ZRXOG FRYHU FXUUHQW OHYHOV RI SHUIRUPDQFH DV ZHOO
Committee has been constituted. To protect against DV UHODWLYH LPSURYHPHQW IURP \HDU WR \HDU 7KH
foreign currency risk, PFC enters into hedging RSHUDWLRQDODQGUHIRUPSDUDPHWHUVYL]$7 &/RVVHV
WUDQVDFWLRQV WR FRYHU H[FKDQJH UDWH DQG LQWHUHVW (IÀFLHQF\ RI 3RZHU 3XUFKDVH FRVW GLJLWDO SD\PHQW
UDWH ULVN WKURXJK YDULRXV LQVWUXPHQWV OLNH FXUUHQF\ IDFLOLW\HWFFDUU\ZHLJKWDJHRIDQGWKHÀQDQFLDO
forward, option, principal swap and forward rate SDUDPHWHUV YL] FRVW FRYHUDJH UDWLR SD\DEOHV
swaps. UHFHLYDEOHV WLPHO\ VXEPLVVLRQ RI DXGLWHG DFFRXQWV
HWF FDUU\ ZHLJKWDJH RI  ([WHUQDO SDUDPHWHUV
10.0 INSTITUTIONAL DEVELOPMENT OF BORROWERS UHODWLQJWRUHJXODWRU\HQYLURQPHQW6WDWH*RYWVXEVLG\
10.1 CATEGORISATION OF STATE POWER UTILITIES BY VXSSRUWHWFKDYHEHHQDVVLJQHGZHLJKWDJHRI
PFC 7KH PHWKRGRORJ\ SURYLGHV IRU DVVLJQLQJ QHJDWLYH
PDUNV IRU QRQFRPSOLDQFH RQ VXFK SDUDPHWHUV YL]
)RU SXUSRVHV RI IXQGLQJ 3)& FODVVLÀHV 6WDWH 3RZHU XQDYDLODELOLW\RIDXGLWHGDFFRXQWVQRQIRUPDWLRQRI
Generation and Transmission utilities into A++, 6WDWH7UDQVPLVVLRQ8WLOLW\QRQÀOLQJRIWDULIISHWLWLRQ
$ $ % & DQG 1RQUHVSRQVLYH FDWHJRULHV 7KH HWF 7KH QHJDWLYH PDUNV IRU VXFK SDUDPHWHUV JLYH
categorisation (biannually) of State Power Generation necessary depth to rating methodology.
DQG 7UDQVPLVVLRQ XWLOLWLHV LV DUULYHG EDVHG RQ WKH  7KH ,QWHJUDWHG 5DWLQJ IUDPHZRUN FRYHUV DOO VWDWH
HYDOXDWLRQ RI XWLOLW\·V SHUIRUPDQFH DJDLQVW VSHFLÀF GLVWULEXWLRQ XWLOLWLHV LQFOXGLQJ 6(%VXWLOLWLHV
SDUDPHWHUV FRYHULQJ RSHUDWLRQDO  ÀQDQFLDO ZLWK LQWHJUDWHG RSHUDWLRQV  H[FHSW VWDWH SRZHU
SHUIRUPDQFH LQFOXGLQJ UHJXODWRU\ HQYLURQPHQW departments. The integrated rating is carried out on
generation of audited accounts, etc. an annual basis by independent credit rating agencies.
 :LWK UHJDUGV WR 6WDWH 3RZHU 'LVWULEXWLRQ XWLOLWLHV Presently, ICRA and CARE are the designated rating
agencies. PFC has been nominated by MoP as the
LQFOXGLQJ6(%VXWLOLWLHVZLWKLQWHJUDWHGRSHUDWLRQV 
QRGDODJHQF\IRUFRRUGLQDWLQJWKHDFWLYLWLHVUHODWLQJ
3)& &DWHJRULVDWLRQ SROLF\ SURYLGHV IRU DGRSWLRQ RI
to integrated rating of state distribution utilities
0R3·V ,QWHJUDWHG 5DWLQJV E\ DOLJQLQJ VXFK UDWLQJV
including appointment of credit rating agencies.
gradings with PFC’s standard categories of A+, A, B
 6R IDU VL[ $QQXDO ,QWHJUDWHG 5DWLQJV KDYH EHHQ
and C.
declared by Ministry of Power with the last i.e.
The categorisation enables PFC to determine credit 6L[WK $QQXDO ,QWHJUDWHG 5DWLQJV FRYHULQJ  VWDWH
H[SRVXUHOLPLWVDQGSULFLQJRIORDQVWRWKHVWDWHSRZHU GLVWULEXWLRQ XWLOLWLHV KDYLQJ EHHQ GHFODUHG LQ -XO\
utilities. As on 31st December 2018, 127 utilities were  7KH 6HYHQWK ,QWHJUDWHG 5DWLQJ H[HUFLVH IRU
categorised, 12 as ‘A++’, 44 as “A+”, 38 as “A”, 17 as UDWLQJ\HDU)<LVLQSURJUHVVDQGLVH[SHFWHGWR
“B”, 14 as “C” and 2 as “Non-ResSRQVLYHµ EHQRWLÀHGVKRUWO\

135
Annual Report 2018-19

10.3 Annual Performance Report of State Power 11.0 FINANCING TO GENERATION PROJECTS
Utilities 11.1 THERMAL PROJECTS
PFC brought out the 14th edition of the Report on Thermal power generation comprises a major
the Performance of State Power Utilities (SPUs) for proportion of India’s installed capacity. During FY
WKH \HDUV  WR  FRYHULQJ  XWLOLWLHV 2018-19 as on 31st December, 2018, the Company has
for the year 2015-16. The Report is a part of PFC’s sanctioned Rs. 3,151 Crore and disbursed an amount
HIIRUWWRSURYLGHDUHOLDEOHGDWDEDVHZKLFKFDQKHOS RI5V&URUH7KHFXPXODWLYHÀQDQFLDOVXSSRUW
to determine the results associated with the reforms SURYLGHG E\ WKH &RPSDQ\ IRU WKHUPDO JHQHUDWLRQ
LQWKHVHFWRU7KH5HSRUWLVDOVRUHFRJQL]HGE\YDULRXV schemes is Rs. 3,06,944 Crore out of which Rs.
stakeholders as a useful source of information 2,46,027 Crore has been disbursed till 31st December,
regarding the state power sector. The Report 2018. Thermal generation projects sanctioned during
DQDO\VHV WKH ÀQDQFLDO DQG RSHUDWLRQDO SHUIRUPDQFH WKH\HDUDUHJLYHQEHORZ
HJ SURÀWDELOLW\ JDS EHWZHHQ DYHUDJH FRVW RI
Name of the Project Amount
VXSSO\ DQG DYHUDJH UHDOL]DWLRQ 5VNZK QHW ZRUWK Sanctioned
FDSLWDO HPSOR\HG UHFHLYDEOHV SD\DEOHV FDSDFLW\ ` Crore
0: JHQHUDWLRQ 0NZK $7 &ORVVHV  HWFDQG MPPGCL – SHREE SINGAJI TPS STAGE II 1325
consumption pattern of the sector at utility, state, ;0:
UHJLRQDODQGQDWLRQDOOHYHO7KH5HSRUWIRUWKH\HDUV 1833/²*+$7$0385736;0: 1826
2014-15 to 2016-17 is under preparation.
11.2 HYDRO GENERATION PROJECTS
10.4 24X7 Power For All (PFA)
Hydro generation capacity in the country needs
*RYHUQPHQWRI,QGLDKDGWDNHQDMRLQWLQLWLDWLYHZLWK
VLJQLÀFDQW DXJPHQWDWLRQ IRU RYHUDOO V\VWHPV WR
DOOVWDWHVDQG8QLRQ7HUULWRULHV 87V WRSURYLGH;
KDYH RSWLPDO HQHUJ\ PL[ 'XULQJ )<  DV RQ
3RZHUIRU$OO 3)$ 7KLVLQLWLDWLYHDLPVDWHQVXULQJ
31st December, 2018, the Company has sanctioned
XQLQWHUUXSWHG VXSSO\ RI TXDOLW\ SRZHU WR H[LVWLQJ
Rs. 376 Crore and disbursed an amount of Rs. 92
FRQVXPHUV DQG SURYLGLQJ DFFHVV WR HOHFWULFLW\ WR DOO
&URUH 7KH FXPXODWLYH ÀQDQFLDO VXSSRUW SURYLGHG
unconnected consumers. Ministry of Power (MoP)
by the Company for hydro generation schemes is
intended to prepare roadmap for all the States and
Rs.46,016 Crore out of which Rs. 34,445 Crore has
UTs in the country. For the purpose, MoP mandated
been disbursed till 31st December, 2018.
Power Finance Corporation Ltd (PFC) to appoint three
FRQVXOWDQWV WR SUHSDUH URDGPDS IRU VWDWH VSHFLÀF 12.0 RENOVATION, MODERNISATION AND LIFE
SODQIRUVXSSO\LQJ[3RZHUIRU$OO 3)$ LQYDULRXV EXTENSION
states and Union Territories (UTs) in time bound 12.1 THERMAL PROJECTS
manner.
During FY 2018-19 as on 31st December, 2018, the
 6WDWHVDQG87VRI,QGLD H[FHSW5DMDVWKDQDQG$QGKUD
Company has sanctioned Rs.443 Crore and disbursed
3UDGHVK IRU ZKLFK GRFXPHQWV KDYH DOUHDG\ EHHQ
an amount of Rs. 96 Crore against R&M of thermal
SUHSDUHG  KDYH EHHQ GLYLGHG LQWR WKUHH SDFNDJHV
SURMHFWV 7KH FXPXODWLYH ÀQDQFLDO VXSSRUW SURYLGHG
Consultants were appointed for all the three
by the Company for R&M of thermal generation
packages and had completed the work. The study
schemes is Rs.10,933 Crore out of which Rs. 9,605
ZDV FRQGXFWHG XQGHU RYHUDOO VXSHUYLVLRQ RI &HQWUDO
Crore has been disbursed till 31st December, 2018.
Electricity Authority (CEA).
12.2 HYDRO PROJECTS
 3RZHUIRU$OO 3)$ GRFXPHQWVKDYHEHHQVLJQHGE\
all the States. The signed PFA documents of all the During FY 2018-19 as on 31st December, 2018, the
6WDWHVDUHDYDLODEOHRQZHEVLWHRI0LQLVWU\RI3RZHU Company has not made any sanction against R&M of
(www.powermin.nic.in) as well as Power for All (www. hydro projects but has disbursed an amount of Rs. 8
powerforall.co.in). &URUH7KHFXPXODWLYHÀQDQFLDOVXSSRUWSURYLGHGE\

136
the Company for R&M of hydro generation schemes Commitment of the workforce is ensured through an
is Rs. 2,132 Crore out of which Rs. 1,399 Crore has HIIHFWLYHSDFNDJHRIZHOIDUHPHDVXUHVZKLFKLQFOXGH
been disbursed till 31st December, 2018. FRPSUHKHQVLYHLQVXUDQFHPHGLFDOIDFLOLWLHVDQGRWKHU
amenities which lead to a healthy workforce.
13.0 MEMORANDUM OF UNDERSTANDING WITH
GOVT. OF INDIA 14.3 Human Resource Development & Training

For the Financial Year 2018-19, PFC has signed a During the FY 2018-19 (upto 31st December,
Memorandum of Undertaking with Ministry of Power 2018), the focus of conducting in house programs
IRUIROORZLQJNH\ÀQDQFLDOWDUJHWV ZDV PDLQWDLQHG LQ RUGHU WR HQVXUH VSHFLÀF VNLOO
GHYHORSPHQW LQ OLQH ZLWK WKH FRUSRUDWH JRDOV
S. Financial Performance Unit MoU 2018-19 &XVWRPL]HG SURJUDPV OLNH WUDLQLQJ RQ .QRZ <RXU
No. Criteria targets under &XVWRPHU 3ROLF\ 0DQDJHPHQW 'HYHORSPHQW
excellent Category 3URJUDP /HDGHUVKLS  7HDP %XLOGLQJ ([SHULHQWLDO
i Turnover /HDUQLQJ 3URJUDP IRU :RPHQ HPSOR\HHV ,QGXVWULDO
5HODWLRQV  5HVHUYDWLRQ 3ROLF\ HWF ZHUH RUJDQL]HG
5HYHQXHIURP ` 27,000
Operation (Net) Crore along with other need-based programs.

ii 2SHUDWLQJ3URÀW/RVV As on 31st December 2018, 10 Nos. of In-house


WUDLQLQJ SURJUDPV ZHUH RUJDQL]HG E\ 3)& IRU LWV
2SHUDWLQJ3URÀWDVD % 25.00%
HPSOR\HHV$WRWDORIPDQGD\VZHUHDFKLHYHG
SHUFHQWDJHRI5HYHQXH
from operation (Net) WKURXJK FRQGXFWLQJ YDULRXV LQKRXVH SURJUDPV
and by sponsoring PFC employees to the programs
iii Return on Investment RUJDQL]HGE\RWKHUWUDLQLQJDJHQFLHV
3$7$YHUDJH1HWZRUWK % 11.50%
14.4 Capacity Building Process under R-APDRP
14.0 HUMAN RESOURCE MANAGEMENT AND 3)& LV WKH 1RGDO $JHQF\ IRU RSHUDWLRQDOL]LQJ WKH
TRAINING SURJUDPPH IRU WKH *RYHUQPHQW RI ,QGLD 3)& KDV
empanelled Partner Training Institutes (PTIs) to impart
14.1 Human Resource Management
WUDLQLQJWRERWKOHYHO$ %DQGOHYHO& 'VWDWH3RZHU
7KH FRPSDQ\ KDV SXW LQ SODFH HIIHFWLYH KXPDQ 'LVWULEXWLRQ 8WLOLW\ SHUVRQQHO 6R IDU RYHU 
resource acquisition and maintenance function, SHUVRQQHORIYDULRXVXWLOLWLHVKDYHEHHQWUDLQHGXQGHU
which is benchmarked with best corporate practices ,3'6 6XEVXPHG5$3'53 &DSDFLW\%XLOGLQJLQLWLDWLYH
GHVLJQHG WR PHHW WKH RUJDQL]DWLRQDO QHHGV 7KLV
15.0 CORPORATE SOCIAL RESPONSIBILITY (CSR) AND
DSDUW IURP RWKHU VWUDWHJLF LQWHUYHQWLRQV OHDGV WR DQ
SUSTAINABLE DEVELOPMENT (SD):
HIIHFWLYH PDQDJHPHQW RI +XPDQ 5HVRXUFHV WKHUHE\
HQVXULQJKLJKOHYHORISURGXFWLYLW\ 3)&WKURXJKLWV&65LQLWLDWLYHLVXQGHUWDNLQJSURMHFWV
IRU VXVWDLQDEOH GHYHORSPHQW IRFXVLQJ RQ WKH WKUXVW
 7KH ,QGXVWULDO 5HODWLRQV ZLWKLQ WKH RUJDQL]DWLRQ KDV areas mentioned in its policy such as ensuring
EHHQYHU\FRUGLDODQGKDUPRQLRXVZLWKWKHHPSOR\HHV HQYLURQPHQWDO VXVWDLQDELOLW\ VNLOO GHYHORSPHQW
FRPPLWWLQJ WKHPVHOYHV HQWLUHO\ WR WKH REMHFWLYHV RI leading to employment for unemployed youth
WKHRUJDQL]DWLRQ7KHUHZDVQRPDQGD\VORVWGXULQJ belonging to weaker sections of society, basic
WKH\HDUXQGHUUHYLHZ7KHDWWULWLRQUDWHIRUWKHSHULRG education, sanitation, drinking water etc. PFC is
from 1st April 2018 to 31st December 2018 comes FRQVLVWHQWO\HQGHDYRXULQJWKURXJKLWV&65LQLWLDWLYHV
out to NIL. for upliftment of women and supporting persons
with disabilities.
14.2 Welfare Measure
15.1 CSR Expenditure:
The Corporation follows good management practices.
7KHHPSOR\HHVRIWKHFRPSDQ\KDYHDFFHVVWRWKH7RS For the FY 2018-19, PFC has earmarked a budget of
0DQDJHPHQWRIÀFLDOVWKHUHE\FRQWULEXWLQJHIIHFWLYHO\ Rs.148.15 crore against budget of Rs.149.21 crore for
in the management and growth of the Corporation. WKHSUHYLRXV)< #RIWKHDYHUDJHVWDQGDORQH3%7

137
Annual Report 2018-19

RI WKH WKUHH LPPHGLDWHO\ SUHFHGLQJ ÀQDQFLDO \HDUV 9LOODJH 'HYHORSPHQW 3URJUDPPH DPRXQWLQJ WR
as per Companies Act, 2013). PFC has sanctioned Rs.18.53 crore
SURMHFWV ZRUWK 5V FURUH XQGHU &65 DFWLYLWLHV
9 Project for Construction of Building of Brij Mohan
till 31st March 2019.
School for the Blind in Meerut amounting to Rs.4.43
15.2 Major initiatives: crore
15.2.1 Rural Development: )RUGHYHORSPHQWRIUXUDODUHDV 9 3URMHFW IRU SURYLGLQJ 5HQHZDEOH (QHUJ\ V\VWHPV
in Bihar, PFC has sanctioned around Rs. 24.48 crores LQ YDULRXV EDFNZDUG YLOODJHVEORFNV RI 'XUJL DQG
IRU GHYHORSPHQW ZRUNV LQ WKH  EORFNV 3LUR %LKL\D Veldurthy Mandals in Guntur District, Andhra Pradesh
Jagdishpur) of Arrah, Bihar and creation of ‘Adarsh amounting to Rs.2.33 crore
3DQFKD\DW· LQ WKUHH YLOODJHV %KDQGDUL 0DQFKL DQG
9 Project for supply, installation and commissioning of
Maheshpur of Bhandari Panchayat in Belsand block,
500 nos. of LED based Solar Street Lighting System
6LWDPDUKL%LKDU WUDQVIRUPDWLRQRIWZR*RYHUQPHQW
6/6  LQ YDULRXV YLOODJHV RI $JUD  8WWDU 3UDGHVK
6FKRROV LQ %KDQGDUL YLOODJH )XUWKHU 3)& VDQFWLRQHG
amounting to Rs.1.13 crore
Rs. 41.40 crores for dissemination of information of
‘Saubhagya’ scheme in Jharkhand. 9 Project for supply, installation and commissioning of
500 nos. of LED based Solar Street Lighting System
15.2.2 Environment Sustainability: PFC also focused
6/6 LQYDULRXVYLOODJHVRI3XUQLD%LKDUDPRXQWLQJWR
RQ WDNLQJ XS 5HQHZDEOH HQHUJ\ (QHUJ\ (IÀFLHQF\
Rs.1.13 crore
projects considering the needs of basic lighting and
energy needs of rural areas of the country. In FY 2018- 9 Project for supply, installation and commissioning of
3)&SURYLGHGVDQFWLRQRI5VFURUHIRUVXFK 500 nos. of LED based Solar Street Lighting System
projects. 6/6  LQ YDULRXV YLOODJHV RI /DOJDQM 8WWDU 3UDGHVK
amounting to Rs.1.13 crore
15.2.3 Sanitation, Drinking Water & Health: PFC
sanctioned Rs.15.23 crore on ‘Swachhta’ related 9 Appointment of consultants for project for sanitation,
DFWLYLWLHVLQVWDOODWLRQRI52XQLWVLQ*RYHUQPHQW FOHDQOLQHVV DQG HQYLURQPHQW LPSURYHPHQW LQ DQG
*RYHUQPHQW DLGHG 6FKRROV RI )HUR]HSXU 'LVWULFW DURXQG.DONDMLWHPSOHDPRXQWLQJWR5VFURUH
Punjab and installation & commissioning of operating
9 Project for supply, installation and commissioning of
PLFURVFRSHLQ%KDJZDQ0DKDYHHU&DQFHU+RVSLWDO 
500 nos. of LED based Solar Street Lighting System
Research Centre, Jaipur(BMCHRC).
6/6  LQ YDULRXV YLOODJHV RI %DJKSDW 8WWDU 3UDGHVK
15.2.4 Basic Education: In FY 2018-19, PFC has also amounting to Rs.1.13 Crore
sanctioned around Rs. 31.76 crores for construction of
9 Project for supply, installation and commissioning of
school building for the Blind in Meerut, infrastructure
43 Nos. of solar High Mast Lights Systems (SHLMS)
ZRUNV LQ 'U .% +HGJHZDU 6FKRRO LQ 7LZDGL *RD
LQYDULRXVYLOODJHVRI6DWQD'LVWULFW0DGK\D3UDGHVK
6RXWK 6LNNLP .KDPDP DQG XSJUDGDWLRQ RI
amounting to Rs. 0.97 crore
*RYHUQPHQW6FKRROV 1RV  'LVWULFW/LEUDU\LQ
6KUDYDVWL8WWDU3UDGHVK 9 3URMHFW IRU LQIUDVWUXFWXUH ZRUNV LQ 'U .% +HGJHZDU
School in Tiwadi, Goa amounting to Rs.3.00 crore
15.2.5 List of major Projects sanctioned during FY 2018-19:
9 Project for supply, installation and commissioning
9 Project for display of hoardings of ‘Pradhan Mantri
of 500 nos. LED based Solar Street Lighting System
Sahaj Bijli Har Ghar Yojana’ (SAUBHAGYA) amounting
6/6 LQYDULRXVYLOODJHVRI%DVWL5HJLRQ8WWDU3UDGHVK
to Rs. 41.40 crore in the state of Jharkhand
amounting to Rs.1.13 crore
9 Project for installation of 10000 Dustbins in the
9 Project for supply, installation and commissioning of
Varanasi district amounting to Rs.4.43 Crore
500 nos. LED based Solar Street Lighting System (SLS)
9 3URMHFWIRUGHYHORSPHQWZRUNVLQWKHEORFNV 3LUR LQYDULRXVYLOODJHVRI0DKEXEQDJDUDQG5DQJD5HGG\
Bihiya, Jagdishpur) of Arrah District, Bihar-Bhojpur Districts in Telangana amounting to Rs.1.40 crore

138
9 3URMHFWIRUFUHDWLQJ$GDUVK3DQFKD\DWLQWKUHHYLOODJHV 'HYHORSPHQW7UDLQLQJWR1RV8QHPSOR\HG<RXWK
Bhandari, Manchi and Maheshpur of Bhandari EHORQJLQJWR6&672%&3Z':RPHQ(:6VHFWLRQV
Panchayat in Belsand Block, Sitamarhi district of Bihar RIVRFLHW\LQ.DQ\DNXPDUL'LVWULFW 7DPLO1DGX
DQG WUDQVIRUPDWLRQ RI WZR *RYHUQPHQW 6FKRROV LQ
9 Financial Assistance to Project for Supply, installation
Bhandari amounting to Rs.2.56 crore
and commissioning of operating micro scope in
9 3URMHFW IRU SURYLGLQJ SRUWDEOH VRODU 0LFUR 3XPSLQJ BMCHRC, Jaipur
System (PSMP) to 20 Gram Panchayat Region, Uttar
9 Financial Assistance to Project for Supply, installation
Pradesh amounting to Rs.0.69 crore
of 250 Nos. of India Mark II Hand pumps for Drinking
9 Project for Supply, installation and commissioning of :DWHUSXUSRVHVLQ0LU]DSXU5HJLRQ8WWDU3UDGHVK
100 nos. of Solar PV High-mast Lighting Systems in
YDULRXVORFDWLRQVRI*LULGLK5HJLRQ-KDUNKDQG 9 Financial Assistance to Project for Supply, installation
and commissioning of 12 nos. of Solar PV Highmast
9 Project for Supply, installation and commissioning of /LJKWLQJ 6\VWHPV 6+0/6  LQ YDULRXV ORFDWLRQV RI
500 nos. LED based Solar Street Light System (SLS) in .KDJDULD'LVWW%LKDU
YDULRXVYLOODJHVRI%DQGDUHJLRQ8WWDU3UDGHVK
9 Financial Assistance to construct new hostel building
9 Project for Supply, installation and commissioning
IRU 6&67 VWXGHQWV LQ FDPSXV RI 90+( +LJK
of 100 nos. of Solar PV High-mast Lighting Systems
6FKRROVLZDQWKURXJK([HFXWLYH(QJLQHHU/RFDO$UHD
:KLWH /('  6+0/6  LQ YDULRXV YLOODJHV RI %DVWL
(QJLQHHULQJ 2UJDQLVDWLRQ /$(2  :RUN 'LYLVLRQ
Region, Uttar Pradesh
6LZDQXQGHUWKH&65LQLWLDWLYHRI3)&/LPLWHG
9 Project for supply, installation and commissioning of
16.0 PFC Consulting Ltd (PFCCL), A wholly owned
500 nos. of LED based Solar Street Lighting System
subsidiary of PFC
6/6 LQYDULRXVYLOODJHVRI%LNDQHU5HJLRQ 3KDVH,, 
Rajasthan 16.1 Introduction
9 Project for supply, installation, commissioning of 100 PFC Consulting Ltd (PFCCL) was incorporated on
QRVRI6RODU39+LJKPDVW/LJKWHQLQJ6\VWHP :KLWH March 25, 2008 as a wholly owned subsidiary of Power
/('  6+0/6  LQ YDULRXV YLOODJHV RI 6LGGKDUWKQDJDU )LQDQFH &RUSRUDWLRQ /LPLWHG WR SURYLGH FRQVXOWDQF\
District, Uttar Pradesh VHUYLFHV WR WKH 3RZHU 6HFWRU 3)&&/ FRPPHQFHG LWV
9 )LQDQFLDO&RQWULEXWLRQRI5V&URUHWR6ZDFKK.XPEK business on April 25, 2008. PFCCL is headquartered
.RVKIRUWKHEHQHÀWRI6DQLWDWLRQ:RUNHUVHQJDJHGLQ LQ 1HZ 'HOKL DQG KDV FRQVXOWDQF\ VLWH RIÀFHV LQ
.XPEK0HODXQGHU3)&·V&65LQLWLDWLYHV %KXEDQHVZDU &KH\\XU .RONDWD 5DQFKL %DQND DQG
Sundargarh.
9 Financial Assistance to Project for installation of RO
XQLWVLQ*RYHUQPHQW*RYHUQPHQWDLGHG6FKRROV PFC Consulting Ltd (PFCCL), has undertaken
RI)HUR]HSXU'LVWULFW3XQMDE DVVLJQPHQWV LQYROYLQJ HQWLUH VSHFWUXP RI SRZHU
VHFWRU DGYLVRU\ VHUYLFHV LQFOXGLQJ %LG 3URFHVV
9 Financial Assistance to Project for Up-gradation of Management, regulatory matters like preparation &
*RYHUQPHQW6FKRROV 1RV  'LVWULFW/LEUDU\LQ ÀOLQJ RI WDULII SHWLWLRQV  $55V 'LVWULEXWLRQ 6\VWHP
6KUDYDVWL'LVWULFW8WWDU3UDGHVK ,PSURYHPHQW 6FKHPH ,3'6  ''8*-<6PDUW *ULGV 
9 Financial Assistance to Project for Up-gradation of Resource Mobilisation, selection of EPC Contractor,
6HOHFWHG*RYHUQPHQW6FKRROVDQGRWKHU,QIUDVWUXFWXUH 3URMHFW  ÀQDQFLDO DGYLVRU\ IRU QHZ SRZHU SODQW
'HYHORSPHQW:RUNVLQ6RXWK6LNNLP'LVWULFW Reforms and Restructuring of Power Sector, assistance
WR 5HJXODWRU\ ERGLHV SRZHU WUDGLQJ DGYLVRU\
9 Financial Assistance to Project for Up-gradation of
7UDQVDFWLRQ$GYLVRU\SURMHFWDSSUDLVDO33$VWUDWHJ\
YDULRXV *RYHUQPHQW 6FKRROV LQ .KDPPDP 'LVWULFW
3ROLF\ (QHUJ\ $XGLW &RQWUDFW UHODWHG DGYLVRU\
Telangana GHYHORSPHQW RI QHZ 3RZHU 3URMHFWV 7UDQVPLVVLRQ
9 )LQDQFLDO $VVLVWDQFH WR 3URMHFW IRU 3URYLGLQJ 6NLOO Projects etc.

139
Annual Report 2018-19

16.2 Services Offered ‡ %LG 3URFHVV 0DQDJHPHQW IRU VHOHFWLRQ RI SURMHFW
GHYHORSHUIRUJHQHUDWLRQDQGWUDQVPLVVLRQSURMHFWV
‡ $GYLVRU\ VHUYLFHV RQ LVVXHV HPDQDWLQJ IURP
implementation of Electricity Act 2003 like reform, ‡ 6HOHFWLRQRI-9SDUWQHUIRUYDULRXVVHJPHQWVRISRZHU
restructuring, regulatory etc. sector.

‡ 6HOHFWLRQ RI 'HYHORSHU IROORZLQJ 7DULII EDVHG ‡ 3UHSDUDWLRQRI*XLGHOLQHVDQG%LGGLQJ'RFXPHQWVIRU


FRPSHWLWLYHELGGLQJDVSHUWKH*XLGHOLQHVLVVXHGE\ renewable Power.
0R3*R,IRUYDULRXVVHJPHQWVRI3RZHU6HFWRU ‡ $VVLVWLQJ 0R3 LQ SUHSDUDWLRQ RI *XLGHOLQHV DQG
‡ 3URMHFW 6WUXFWXULQJ3ODQQLQJ'HYHORSPHQW6SHFLÀF Standard Bidding Documents under Section 63 of
6WXGLHV LQFOXGLQJ (QYLURQPHQW  6RFLDO ,PSDFW Electricity Act, 2003.
Assessment Studies. ‡ %LGGLQJRQEHKDOIRIXWLOLW\IRUVKRUWWHUPDQGPHGLXP
‡ &RPPXQLFDWLRQ LQIRUPDWLRQ GLVVHPLQDWLRQ DQG WHUPSURFXUHPHQWRI3RZHUWKURXJK'((3HUHYHUVH
feedback. portal.

‡ 3UHSDUDWLRQ RI RUJDQL]DWLRQ SHUIRUPDQFH ‡ 5HJXODWRU\DGYLFHDQGDVVLVWDQFH


LPSURYHPHQWSODQV ‡ &RQVXOWDQF\ IRU DXFWLRQ RI &RDO OLQNDJHV WR
‡ &RQWUDFWUHODWHGVHUYLFHVIRUSRZHUVHFWRU ,QGHSHQGHQW 3RZHU 3URGXFHUV ,33V  XQGHU 6+$.7,
Scheme.
‡ )LQDQFLDO PDQDJHPHQW UHVRXUFH PRELOL]DWLRQ
accounting system etc. ‡ 3URFXUHPHQW RI 3RZHU IURP 6WUHVVHG $VVHWV XQGHU
Pilot Scheme.
‡ &RDOEORFNGHYHORSPHQW
16.4 Footprints
‡ 5HQHZDEOH DQG QRQFRQYHQWLRQDO HQHUJ\ SURMHFW
GHYHORSPHQW 7LOO GDWH VHUYLFHV KDYH EHHQ UHQGHUHG WR  FOLHQWV
VSUHDGDFURVV6WDWHV87VQDPHO\$QGKUD3UDGHVK
‡ 7UDQVDFWLRQ $GYLVRU\ :DVWH WR (QHUJ\ :W(  SURMHFW Arunachal Pradesh, Assam, Bihar, Chhattisgarh, Delhi,
GHYHORSPHQW *RD+DU\DQD+LPDFKDO3UDGHVK-DPPX .DVKPLU
‡ 3UHSDUDWLRQ RI 'HWDLOHG 3URMHFW 5HSRUWV '35V  IRU -KDUNKDQG .DUQDWDND .HUDOD 0DGK\D 3UDGHVK
Projects like -Smart Grid and project management Maharashtra, Meghalaya, Odisha, Puducherry, Punjab,
consultancy for transmission system and distribution 5DMDVWKDQ7HODQJDQD7ULSXUD8WWDU3UDGHVKDQG:HVW
V\VWHPLPSURYHPHQWVFKHPHVOLNH''8*-<,3'6DQG Bengal. PFCCL is also handling the entire work on
SAUBHAGYA. the UMPPs and behalf of PFC, the nodal agency for
GHYHORSPHQWRI8033V$SDUWIURP8033VDQG,73V
‡ 'HYHORSPHQW RI '((3 HUHYHUVH ELGGLQJ SRUWDO DQG
DVVLJQPHQWVKDYHEHHQXQGHUWDNHQE\3)&&/WLOO
conducting bidding on behalf of Discom’s for short
date.
term and medium term procurement of Power.
Clients No.
‡ $FTXLVLWLRQRIODQGREWDLQLQJ(QYLURQPHQWDQG)RUHVW
clearance, carrying out technical studies for setting States Utilities 32
up of thermal power projects
/LFHQVHHV,33V 10
‡ ([SORUDWLRQDQGSUHSDUDWLRQRI*HRORJLFDO5HSRUW
Public Sector Undertakings 8
 ,Q DGGLWLRQ WR DERYH 3)&&/ SURYLGHV FXVWRPL]HG
VHUYLFHVIRUYDULRXVQHHGVRI3RZHU8WLOLWLHV 6WDWH*RYHUQPHQWV 7

16.3 Operations Regulatory Commissions 3

3)&&/·VRSHUDWLRQVDUHVSUHDGRYHU &HQWUDO*RYW'HSDUWPHQW0LQLVWULHV 2

‡ *RYWRI,QGLDLQLWLDWLYHVOLNH8033VDQG,73V Total 62

140
UMPP by PFC for holding the land for power plant and
land for coal blocks in case of domestic coal based
a) STATUS OF ULTRA MEGA POWER PROJECTS
UMPPs (Odisha, Bihar, Deoghar, Cheyyur and Tilaiya
*RYHUQPHQW RI ,QGLD WKURXJK 0LQLVWU\ RI 3RZHU UMPPs). These Infra SPVs would be transferred to the
ODXQFKHGWKHLQLWLDWLYHRI8OWUD0HJD3RZHU3URMHFWV UHVSHFWLYHSURFXUHUVRISRZHU2XWRIWKHVHWZR639V
8033V LH0:VXSHUWKHUPDOSRZHUSURMHFWV namely Tatiya Andhra Power Ltd and Chhattisgarh
ERWKSLWKHDGDQGLPSRUWHGFRDOEDVHG LQ1RYHPEHU Surguja Power Ltd are being closed on the direction
 ZLWK WKH REMHFWLYH WR GHYHORS ODUJH FDSDFLW\ RI 0R3 DV SHU WKH UHTXHVW RI WKH UHVSHFWLYH VWDWH
power projects in India. Power Finance Corporation JRYHUQPHQWV
Ltd (PFC) has been appointed as the Nodal Agency
b) UMPPs in operation
WRIDFLOLWDWHWKHGHYHORSPHQWRIWKHVHSURMHFWV6RIDU
8033VKDYHEHHQLGHQWLÀHGWREHORFDWHGLQWKH 8033VLQRSHUDWLRQDUHDVIROORZV
States of Madhya Pradesh, Gujarat, Andhra Pradesh,
Sl Name of Type Date of Levellised Successful
-KDUNKDQG .DUQDWDND 0DKDUDVKWUD 2GLVKD 7DPLO
No. UMPP Transfer Tariff (in developer
Nadu, Bihar, Chhattisgarh and Uttar Pradesh. Rs. Per
kWh)
Ten (10) projects in Odisha (3), Tamil Nadu (1),
Madhya Pradesh (1), Chhattisgarh (1), Jharkhand (2), 1 Mundra, Coastal 22.04.2007 2.264 Tata Power
U.P.(1) and Bihar (1) are domestic coal based while the Guajarat Ltd
RWKHU 6HYHQ   SURMHFWV LQ *XMDUDW   0DKDUDVKWUD 2 Sasan, Pithead 07.08.2007 1.196 Reliance
 .DUQDWDND  $QGKUD3UDGHVK  DQG7DPLO1DGX Madhya Power Ltd
(1) are based on imported coal. 19 Special Purpose Pradesh
9HKLFOHV 639V KDYHEHHQHVWDEOLVKHGIRU8033V2XW
5HOLDQFH 3RZHU /LPLWHG KDYH LVVXHG 7HUPLQDWLRQ 1RWLFH RI
of these, 14 SPVs (Operating SPVs) were incorporated
Power Purchase Agreement on 28.4.2015 citing non transfer
WR XQGHUWDNH VLWH DFWLYLWLHV OLNH ODQG DFTXLVLWLRQ
RI ODQG E\ -KDUNKDQG *RYHUQPHQW -KDUNKDQG 8UMD 9LNDV
necessary statutory clearances for conducting the
1LJDP /WG RQ EHKDOI RI 3URFXUHUV KDG WDNHQRYHU -KDUNKDQG
bidding process for the projects. These SPVs shall be
Integrated Power Limited (JIPL) on 16.05.2018 from RPL. For
transferred to successful bidder(s) selected through
.ULVKQDSWQDP8033WKHGHYHORSHUKDVVWRSSHGZRUNDWVLWH
7DULII%DVHG,QWHUQDWLRQDO&RPSHWLWLYH%LGGLQJ3URFHVV
citing new regulation of coal pricing in Indonesia. The procurers
IRU GHYHORSPHQW  LPSOHPHQWDWLRQ DQG RSHUDWLRQ
KDYHLVVXHGWHUPLQDWLRQQRWLFH7KHPDWWHULVVXEMXGLFH
)LYH DGGLWLRQDO 639V ,QIUD 639V  ZHUH LQFRUSRUDWHG

141
Annual Report 2018-19

5(&WR6SRQVRU6HDVRQRI¶0DLQ.XFK%KL.DU6DNWL+RRQ·7KH0R$IRU5VFURUHZDVVLJQHGE\
6KUL61*DLNZDG([HFXWLYH'LUHFWRU &65 5(&DQG0V3RRQDP0XWWUHMD([HFXWLYH'LUHFWRU
PFI in the presence of Dr. P. V. Ramesh, Chairman & Managing Director, REC in September 2018.

142
CHAPTER 23

RURAL ELECTRIFICATION CORPORATION LIMITED (REC)


1. REC Limited (REC) was incorporated as a Company REC has also been appointed as a nodal agency for
under the Companies Act, 1956 in the year 1969 with the *RYHUQPHQW RI ,QGLD·V ÁDJVKLS VFKHPHV LH 3UDGKDQ
PDLQREMHFWLYHRIÀQDQFLQJUXUDOHOHFWULÀFDWLRQVFKHPHV Mantri Sahaj Bijli Har Ghar Yojana (Saubhagaya), Deen
LQ WKH FRXQWU\ 7KH PDQGDWHREMHFW FODXVH RI 5(& ZDV Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) and
H[SDQGHGLQWKH\HDUWRHQDEOHÀQDQFLQJDOONLQGV National Electricity Fund (NEF). REC also assists Ministry
of power projects without any restriction on population, of Power in monitoring of the Ujjwal Discom Assurance
JHRJUDSKLFDOORFDWLRQRUVL]H,QWKH\HDU5(&ZDV Yojana (UDAY) and Power for All.
QRWLÀHG DV D 3XEOLF )LQDQFLDO ,QVWLWXWLRQ XQGHU 6HFWLRQ 2 Highlights of Performance (during 2018-19)
4A of the Companies Act, 1956 (corresponding Section
2.1 The highlights of performance of REC Limited for the
2(72) of the Companies Act, 2013). In the year 1998, REC
ÀQDQFLDO\HDUDUHJLYHQEHORZ
was registered as a Non-Banking Financial Company
Amount (` in crore)
(NBFC) under Section 45 IA of the RBI Act, 1934. The
*RYHUQPHQW RI ,QGLD XSJUDGHG 5(& DV D 6FKHGXOH ´$µ Particulars FY 2018-19 FY 2017-18
PSU in the year 2001. REC was granted Mini Ratna Loans Sanctioned  1,07,534.05
Grade-I Status in the year 2002. REC was conferred Disbursements 72,165.43 61,712.47
ZLWK´1DYUDWQD6WDWXVµLQ0D\5(&KDVDOVREHHQ
Subsidy under DDUGJY- 19,663.91 10,568.72
FDWHJRUL]HGDVDQ,QIUDVWUXFWXUH)LQDQFH&RPSDQ\ ,)&  RE and DDG
E\5HVHUYH%DQNRI,QGLD 5%, LQ6HSWHPEHU7KH
5HFRYHULHV LQFOXGLQJ - 46,351.13
equity shares of REC are listed on the National Stock interest)
([FKDQJHRI,QGLD/LPLWHG 16( DQG%6(/LPLWHG %6(  5HVRXUFH0RELOL]DWLRQ 76,858.00 51,164.89
since March, 2008.
3URÀWEHIRUH7D[ Being a Listed 6,852.09
Consequent upon change in the name of the Company 3URÀWDIWHU7D[ CPSU, the desired 4,647.00
ÀQDQFLDO GDWD DV
IURP´5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ/LPLWHGµWR´5(& 1HW:RUWK
on 31.03.2019 35,490.51
Limited”, the Registrar of Companies, NCT of Delhi & 'LYLGHQG ,QWHULP cannot be shared 1,807.05
+DU\DQD KDV LVVXHG )UHVK &HUWLÀFDWH RI ,QFRUSRUDWLRQ Final) as the same is
dated October 13, 2018. Further, the Company has also Business per employee* XQGHU ÀQDOLVDWLRQ 204.67
UHFHLYHGUHTXLVLWHDSSURYDOV1R2EMHFWLRQ&HUWLÀFDWHIRU and are further
subject to the
WKHVDLGFKDQJHLQQDPHIURP0LQLVWU\RI3RZHU5HVHUYH
approval of the
%DQNRI,QGLD 6WRFN([FKDQJHV Board of the
Directors of the
 5(& /LPLWHG LV D SUHPLHU ÀQDQFLDO LQVWLWXWLRQ RI WKH Company.
FRXQWU\ ZLWK WKH REMHFWLYH RI ÀQDQFLQJ VFKHPHV
IRU H[WHQGLQJ DQG LPSURYLQJ WKH UXUDO HOHFWULFLW\ *(Business per employee = Disbursements + Recoveries/ No. of
LQIUDVWUXFWXUH 5(& ÀQDQFHV SURMHFWV LQ WKH FRPSOHWH Employees as on 31.03.2018) # Provisional
SRZHUVHFWRUYDOXHFKDLQEHLWJHQHUDWLRQWUDQVPLVVLRQ 2.2 Memorandum of Understanding with Ministry of
RU GLVWULEXWLRQ 5(& SURYLGHV ÀQDQFLDO DVVLVWDQFH WR Power (MoP)
VWDWH HOHFWULFLW\ ERDUGV VWDWH JRYHUQPHQWV FHQWUDO
The performance of REC in terms of Memorandum of
state power utilities, independent power producers,
Understanding (MoU) signed with the Ministry of Power;
UXUDO HOHFWULF FRRSHUDWLYHV DQG SULYDWH VHFWRU XWLOLWLHV
*RYHUQPHQWRI,QGLDIRUWKHÀQDQFLDO\HDUKDV
which are critical to the projected addition of installed been rated as “Very Good”.
FDSDFLW\ LQ WKH FRXQWU\ 7KH &RUSRUDWH 2IÀFH RI WKH
company is located at New Delhi and there are 24 State 2.3 Share Capital
2IÀFHV ORFDWHG LQ GLIIHUHQW VWDWHV RI WKH FRXQWU\ LQ  $VRQ$SULODQGRQ0DUFKWKH$XWKRUL]HG
DGGLWLRQWR7UDLQLQJ,QVWLWXWHYL]5(&,QVWLWXWHRI3RZHU share Capital of the Company was Rs. 5,000 crore
Management & Training (RECIPMT). FRQVLVWLQJRIFURUHHTXLW\VKDUHVRI5VHDFKDQG

143
Annual Report 2018-19

the Issued and Paid up Share Capital of the Company Credit Rating Agencies. REC also enjoys International
was Rs. 1,974.92 crore consisting of 197,49,18,000 equity FUHGLWUDWLQJHTXLYDOHQWWRVRYHUHLJQUDWLQJRI,QGLDIURP
VKDUHVRI5VHDFK International Credit Rating Agencies Moody’s and FITCH
ZKLFK LV ´%DDµ DQG ´%%%µ UHVSHFWLYHO\ ´%DDµ UDWHG
As on April 1, 2018, the President of India held
obligations denote moderate credit risk and “BBB”-
1,15,16,78,783 equity shares i.e. 58.32% of the paid up
UDWHG REOLJDWLRQV GHQRWH WKDW H[SHFWDWLRQV RI GHIDXOW
equity share capital of the Company.
risk are currently low.
 'XULQJ WKH ÀQDQFLDO \HDU  WKH 3UHVLGHQW RI
 3URJUHVVPDGHGXULQJWKHÀQDQFLDO\HDU
,QGLDDFWLQJWKURXJK0LQLVWU\RI3RZHU*RYHUQPHQWRI
,QGLD GLYHVWHGVROG  HTXLW\ VKDUHV LH  3.1 Sanctions
of total paid up capital of the Company on June 18,
 'XULQJ WKH ÀQDQFLDO \HDU  5(& KDV VDQFWLRQHG
2018 through off market sale of shares under ‘Bharat
ÀQDQFLDO DVVLVWDQFH RI 5V  FURUH WR YDULRXV
 ([FKDQJH 7UDGHG )XQG· 7KH 3UHVLGHQW RI ,QGLD RQ
State 3ULYDWH6HFWRU3RZHUHQWLWLHVDVIROORZV
'HFHPEHU   IXUWKHU GLYHVWHGVROG 
equity shares i.e. 5.14% of total paid up capital of the (` in crore)
Company through off market sale under third Further
Sl. Particulars Targets achieved till
Fund Offer (FFO 3) of CPSE ETF Mutual Fund Scheme. No. 31.03.2019
(Provisional)
The President of India on February 21, 2019, further
GLYHVWHGVROG  HTXLW\ VKDUHV RI IDFH YDOXH 1. Transmission & Distribution 50,710.29
(including DDUGJY)
5V  HDFK LH  RI WRWDO SDLG XS FDSLWDO RI WKH
Company, to ICICI Prudential Asset Management 2. Generation Projects 41,313.68
Company Limited, the Asset Management Company of
3. Renewable Energy 11,866.70
Bharat 22 ETF Scheme and accordingly the holding of
President of India was reduced to 52.63% of the paid up 4. 6KRUW7HUP/RDQ0HGLXP7HUP 12,040.00
equity share capital of the Company. Loan

 )XUWKHU LQ OLQH ZLWK WKH ´LQSULQFLSOHµ DSSURYDO RQ Total 1,15,930.67
December 6, 2018 of the Cabinet Committee on
Economic Affairs for strategic sale of shares held by the 3.2 Sanctions under National Electricity Fund:
3UHVLGHQWRI,QGLD*RYHUQPHQWRI,QGLDLQWKH&RPSDQ\  1() VFKHPH SURYLGHV LQWHUHVW VXEVLG\ WR 6WDWH 3RZHU
to Power Finance Corporation Limited (PFC), the Utilities, Distribution Companies (DISCOMs) based on
3UHVLGHQWRI,QGLDRQ0DUFKKDVGLYHVWHGVROG DFKLHYHPHQWRISUHGHÀQHGUHIRUPSDUDPHWHUVDJDLQVW
HTXLW\VKDUHVRIIDFHYDOXH5VHDFK WKH LQWHUHVW SDLG RQ ORDQV DYDLOHG E\ WKHP ² ERWK LQ
i.e. 52.63% of total paid up capital of the Company held SXEOLF DQG SULYDWH VHFWRU IRU FDSLWDO LQYHVWPHQW LQ
by President of India, GOI in the Company to PFC. distribution sector.

As on March 31, 2019, the President of India was not  1()SURYLGHVLQWHUHVWVXEVLG\VSUHDGRYHU\HDUVIRU


holding any equity shares in the equity share capital of ORDQDSSURYHGGXULQJÀQDQFLDO\HDUV 
the Company. against the projects. In respect of 920 NEF projects with
loan component of Rs. 23,973 crore for 24 DISCOMs
2.4 Mobilization of Funds
in 14 States, till March, 2019, around Rs. 17,740 crore
The total market Borrowing Programme of the Company ORDQKDYHEHHQUHOHDVHG%DVHGRQWKHLQWHUHVWVXEVLG\
IRU WKH ÀQDQFLDO \HDU  LV DW 5V  FURUH HYDOXDWLRQ LH UHGXFWLRQ RI $7 & ORVVHV DQG 5HYHQXH
7KH DPRXQW PRELOL]HG IURP WKH PDUNHW GXULQJ WKH *$3DVFDUULHGRXWE\,QGHSHQGHQW(YDOXDWRUDQG1RGDO
ÀQDQFLDO\HDUZDV5VFURUHDQGGXULQJ Agency, the Ministry of Power has released Rs. 90.16
WKH ÀQDQFLDO \HDU  WKH FRPSDQ\ KDV PRELOL]HG FURUHWR6WDWHV3RZHU8WLOLWLHVGXULQJWKHÀQDQFLDO\HDU
Rs. 76,858 crore. The domestic debt instruments of 2018-19. In addition, during the FY 2018-19, MoP has
REC continued to enjoy “AAA” rating-the highest rating DOVR UHOHDVHG 5V  FURUH DV 1RGDO $JHQF\ VHUYLFH
assigned by CRISIL, CARE, India Rating & Research & ICRA charges under the scheme.

144
3.3 Disbursements

7KHKLJKOLJKWVRISHUIRUPDQFHRI5(&IRUWKHÀQDQFLDO\HDUDUHJLYHQEHORZ

FY 2018-19
Particulars
April 1, 2018 to March 31, 2019
Disbursements (including subsidy under DDUGJY-RE & DDG) 91,829.34

7KH GHWDLOV RI 'LVEXUVHPHQWV H[FOXGLQJ VXEVLG\ XQGHU ''8*-<5(  ''* PDGH GXULQJ WKH ÀQDQFLDO \HDU  DUH DV
EHORZ

Actual disbursement till 31.03.2019


Sl. No. Particulars
(Rs. in crore)
1. Transmission 10,761.42
2. Distribution 20,603.00
3. *HQHUDWLRQ&RQYHQWLRQDO 19,581.63
4. Renewable Energy 6,627.76
5. Loan under Saubhagya scheme 1,251.22
6. Loan under DDUGJY scheme 3,969.08
7. Loan under RGGVY scheme 467.12
8. Loan under DDG scheme 34.20
9. Short Term Loan 3,840.00
10. Medium Term Loan 5,030.00
Total 72,165.43

3.4 Performance Highlights from 01.04.2018 to 31.12.2018

%DVHGRQ/LPLWHG5HYLHZHG)LQDQFLDO5HVXOWV

Sl. No. Financial Parameters Unit Achievement as MoU targets for % Achievement
at 31.12.2018 the year 2018-19
(Annualised)*
1 5HYHQXHIURPRSHUDWLRQV Rs. crore 25,481 22,250 115
2 2SHUDWLQJ3URÀW5HYHQXH % 33.73 24.00 141
from Operations
3 3$7$YHUDJH1HW:RUWK % 17.77 10.50 169
4 1HW13$/RDQ$VVHWV 1HW % 4.16 90% of the Lower than the target
H[FOXGLQJ5.03RZHU*HQ DFKLHYHPHQWLQ)< VLJQLÀHVEHWWHUDFKLHYHPHQW
3YW/WG 2017-18 i.e. 5.25 of the set target

%HLQJD/LVWHG&368WKHGHVLUHGÀQDQFLDOGDWDDVRQFDQQRWEHVKDUHGDVWKHVDPHLVXQGHUÀQDOLVDWLRQDQGDUH
IXUWKHUVXEMHFWWRWKHDSSURYDORIWKH%RDUGRIWKH'LUHFWRUVRIWKH&RPSDQ\

4. Wholly owned Subsidiaries of REC

 5(& KDV IROORZLQJ WZR :KROO\ 2ZQHG 6XEVLGLDULHV WR IRFXV RQ DGGLWLRQDO EXVLQHVV RI FRQVXOWDQF\ LQ WKH DUHDV RI
GLVWULEXWLRQWUDQVPLVVLRQHWF

(1) REC Transmission Projects Company Limited; and

(2) REC Power Distribution Company Limited

145
Annual Report 2018-19

4. 1 REC Transmission Projects Company Limited

 5(& 7UDQVPLVVLRQ 3URMHFWV &RPSDQ\ /LPLWHG 5(&73&/  LV HQJDJHG LQWHUDOLD LQ WKH EXVLQHVV WR SURPRWH RUJDQL]H RU
FDUU\RQWKHEXVLQHVVRIFRQVXOWDQF\VHUYLFHVDQGRUSURMHFWLPSOHPHQWDWLRQLQDQ\ÀHOGUHODWLQJWRWUDQVPLVVLRQDQG
distribution of electricity in India or abroad.

 7KH0LQLVWU\RI3RZHU*RYHUQPHQWRI,QGLDDOORFDWHVLQGHSHQGHQWWUDQVPLVVLRQSURMHFWVIURPWLPHWRWLPHWR5(&73&/
WRZRUNDV%LG3URFHVV&RRUGLQDWRU %3& IRUVHOHFWLRQRIGHYHORSHUDV7UDQVPLVVLRQ6HUYLFH3URYLGHU 763 WKURXJK7DULII
%DVHG&RPSHWLWLYH%LGGLQJ3URFHVV,QRUGHUWRLQLWLDWHGHYHORSPHQWRIHDFKWUDQVPLVVLRQSURMHFW5(&73&/LQFRUSRUDWHVD
SURMHFWVSHFLÀF6SHFLDO3XUSRVH9HKLFOH 639 DV:KROO\2ZQHG6XEVLGLDU\&RPSDQ\DQGDIWHUWKHVHOHFWLRQRIVXFFHVVIXO
ELGGHUWKURXJK7DULII%DVHG&RPSHWLWLYH%LGGLQJ3URFHVVQRWLÀHGIRUWUDQVPLVVLRQSURMHFWVWKHUHVSHFWLYHSURMHFWVSHFLÀF
SPV along with all its assets and liabilities is transferred to the successful bidder.

 'XULQJWKH&XUUHQWÀQDQFLDO\HDU XSWR0DUFK IROORZLQJWZRSURMHFWVSHFLÀFFRPSDQLHVIRU,QWUD²6WDWH


7UDQVPLVVLRQ3URMHFWVE\8337&/KDYHEHHQWUDQVIHUUHGWRWKHVHOHFWHGELGGHUDVSHUIROORZLQJGHWDLOV

Sl. Name of Transmission Project Name of project Date of Transfer Details


No. 6SHFLÀF639 Incorporation
of SPV
1. (YDFXDWLRQRI3RZHUIURP;0: Ghatampur 02.12.2016 7UDQVIHUUHGWR0V$GDQL
Ghatampur Thermal Power project. Transmission Limited Transmission Limited on
(VWLPDWHG3URMHFW&RVW5VFURUH 19.06.2018.
2. (YDFXDWLRQRI3RZHUIURP[0: -DZDKDUSXU)LUR]DEDG 20.08.2018 7UDQVIHUUHGWR0V3RZHU
Jawaharpur Thermal Power Project Transmission Limited Grid Corporation of India
and construction 400 kV substation Limited on 21.12.2018.
DW)LUR]DEDGDORQJZLWKDVVRFLDWHG
Transmission Lines.
(VWLPDWHG3URMHFW&RVW5VFURUH

,QDGGLWLRQWRWKHDERYHWKHELGSURFHVVRIWKHIROORZLQJ,QWHU6WDWHWUDQVPLVVLRQSURMHFWVDUHXQGHUSURJUHVV

Sl. Name of Transmission Project Name of project Bidding Status


No. 6SHFLÀF639
1. N98GXSL 83&/ .DVDUJRGH'FOLQH 8GXSL.DVDUJRGH
(VWLPDWHG3URMHFW&RVW5VFURUH Transmission Limited
2. &RQVWUXFWLRQRI$MPHU 3* 3KDJLN9'&OLQHDORQJZLWKDVVRFLDWHG Ajmer Phagi Transco
bays for Rajasthan SEZ. Limited
(VWLPDWHG3URMHFW&RVW5VFURUH
3. :HVWHUQ5HJLRQ6WUHQJWKHQLQJ6FKHPH :566 3DUW$ :566;;, $ 7UDQVFR
7UDQVPLVVLRQ6\VWHP6WUHQJWKHQLQJIRUUHOLHYLQJRYHUORDGLQJVREVHUYHG Limited
in Gujarat Intra-State System due to RE Injections in Bhuj PS.
(VWLPDWHG3URMHFW&RVW5VFURUH ([SHFWHGWR
4. Transmission System associated with RE generations at Bhuj-II, Dwarka Lakadia Banaskantha conclude during
/DNDGLD (VWLPDWHG3URMHFW&RVW5VFURUH Transco Limited 2019-20

5. -DP.KDPEDOL\D3RROLQJ6WDWLRQDQG,QWHUFRQQHFWLRQRI-DP.KDPEDOL\D -DP.KDPEDOL\D
3RROLQJ6WDWLRQIRUSURYLGLQJFRQQHFWLYLW\WR5(3URMHFWV 0:  Transco Limited
LQ'ZDUND *XMDUDW DQG,QVWDOODWLRQRI.Y,&7DORQJZLWK
DVVRFLDWHGED\VDW0V&*3/6ZLWFK\DUG
(VWLPDWHG3URMHFW&RVW5VFURUH
6. Transmission system associated with LT A application from Rajasthan .KHWUL7UDQVFR/LPLWHG
SEZ (Part -C).
(VWLPDWHG3URMHFW&RVW5VFURUH

146
5(&73&/LVDFWLQJDV%LG3URFHVV&RRUGLQDWRUIRUIROORZLQJ6L[ Empowered Committee on Transmission helping bidders to
,QWUD6WDWHWUDQVPLVVLRQSURMHFWV gear up future transmission projects.
1. Transmission System Strengthening in Jharkhand State 11 kV Rural Feeder Monitoring Scheme: - RECTPCL has
(Package-1) been appointed as the nodal agency for “11 kV Rural Feeder
2. Transmission System Strengthening in Jharkhand State Monitoring Scheme”. The scheme aims to enable monitoring
(Package-2) RIHQHUJ\LQSXWSRZHUVXSSO\DWIHHGHUOHYHODQGDOVRWRJLYH
3. Transmission System Strengthening in Jharkhand State an accurate picture of power supply in rural area of country to
(Package-3) HQVXUHDFKLHYHPHQWRI´[3RZHUIRU$OOµ8QGHUWKHVFKHPH
WKHGLVWULEXWLRQSDUDPHWHUVYL]3RZHUVXSSO\KRXUVRXWDJH
4. Transmission System Strengthening in Jharkhand State
YROWDJH&XUUHQW 3)DUHFDSWXUHG7KHPRGHPLQVWDOODWLRQ
(Package-4)
on 11 kV rural feeders is almost completed and data is being
5. Intra-State Transmission work associated with DFTXLUHG DW FHQWUDO VHUYHU IURP ZKHUH YDULRXV UHSRUWV DUH
construction of 400 kV substation near Guna (Distt.-
being generated. These reports are useful in decision support
Guna) & Intra-State Transmission work associated with
for betterment of rural power supply status.
FRQVWUXFWLRQRIN96VQHDU%KLQG 'LVWW%KLQG

 &RQVWUXFWLRQRIN9*,66XEVWDWLRQ5DPSXU 7KH &RPSDQ\ FRQWLQXHG WR GR SURÀWDEOH EXVLQHVV LQ WKH
DQG N9 *,6 6XEVWDWLRQ 6DPEKDO ZLWK ÀQDQFLDO \HDU  DQG HDUQHG WRWDO LQFRPH RI 5V 
associated Transmission Lines &URUHDQG1HW3URÀWDIWHU7D[RI5V&URUHDVRQ0DUFK
31, 2019. During the year, the Company has paid an interim
Further, RECTPCL under the guidance of Ministry of Power
'LYLGHQGRI5VFURUH
*RYWRI,QGLDKDVGHYHORSHGRQOLQHZHESODWIRUPDQG0RELOH
App for better Transparency & Accountability as detailed 4.2 REC Power Distribution Company Limited
EHORZ
REC Power Distribution Company Limited (RECPDCL)
Urja Mitra: 8UMD 0LWUD LV DQ LQLWLDWLYH RI 0LQLVWU\ RI 3RZHU
LV DQ ,62  4XDOLW\ 0DQDJHPHQW 6\VWHP 
*RYHUQPHQW RI ,QGLD ZKLFK SURYLGHV 2XWDJH 0DQDJHPHQW
,62  (QYLURQPHQWDO 0DQDJHPHQW 6\VWHP 
DQG 1RWLÀFDWLRQ 3ODWIRUP IRU GLVVHPLQDWLQJ WKH RXWDJH
2+6$6  2FFXSDWLRQDO +HDOWK  6DIHW\ 
information to power distribution consumers across India
WKURXJK 606HPDLOSXVK QRWLÀFDWLRQV ,W DOVR SURYLGHV 3DQ FHUWLÀHG FRPSDQ\ DQG D ZKROO\ RZQHG VXEVLGLDU\
India integrated Mobile Application for Android and iOS RI 5XUDO (OHFWULÀFDWLRQ &RUSRUDWLRQ /LPLWHG 5(&  D
SODWIRUPVWRHQDEOHFLWL]HQWRDFFHVVRXWDJHLQIRUPDWLRQIRU ´1DYUDWQD &36(µ XQGHU WKH 0LQLVWU\ RI 3RZHU *RYW RI
Distribution Companies. Power Consumers can also inform India.
about power outage in their area through mobile app.
 5(&3'&/ LV SURYLGLQJ FRQVXOWDQF\ DQG IHH EDVHG
$VRQVW0DUFKGDWDRIDURXQG&URUH5XUDO8UEDQ VHUYLFHV LQ WKH DUHDV RI UXUDO HOHFWULÀFDWLRQ $7 & /RVV
0L[HG IHHGHU FRQVXPHUV RI  ',6&206 KDYH DOUHDG\ EHHQ reduction strategies, IT implementation work including
OLQNHGRQZHESRUWDODQGWKHDSSOLFDWLRQLVOLYHLQ'LVFRPV setting up of Data Centre, Customer care centre, etc. with
ZLWKFRQVXPHUEDVHRIDSSUR[LPDWHO\&URUH$URXQG GIS integration, Implementation of Smart Grid Projects
&URUH606HVKDYHEHHQVHQWWRWKHFRQVXPHUV
FRYHULQJ 6PDUW 0HWHULQJ ZLWK $0, &RQVWUXFWLRQ RI
Tarang (Transmission App for Real Time Monitoring & 6RODU 39 3ODQWV 6&$'$ LPSOHPHQWDWLRQ 05,$05
Growth): - Tarang monitors the progress of transmission based meter reading & billing works, DPR preparation &
system in the country, both Intra State and Inter State Project Management Consultancy for Power Distribution
7UDQVPLVVLRQ 3URMHFWV WKURXJK 7DULII %DVHG &RPSHWLWLYH projects, Strengthening works of Power Distribution,
Bidding (TBCB) as well as Regulated Tariff Mechanism. Tarang (QHUJ\ (IÀFLHQF\ SURMHFWV DQG 4XDOLW\  4XDQWLWDWLYH
DOVR VKRZV WKH SURVSHFWLYH XSFRPLQJ ,QWUD6WDWH DV ZHOO DV
6XUYHLOODQFH,QVSHFWLRQVRIWKHZRUNVH[HFXWHG
,QWHU6WDWH3URMHFWVDORQJZLWK1,7VEHLQJÁRDWHGE\GLIIHUHQW
7UDQVPLVVLRQ 8WLOLWLHV 3DQ,QGLD 7DUDQJ SURYLGHV DGYDQFH  7KHFRPSDQ\LVUHQGHULQJH[SHUWFRQVXOWDQF\VHUYLFHVWR
LQIRUPDWLRQ RI XSFRPLQJ WUDQVPLVVLRQ SURMHFWV DSSURYHG E\ power utilities across the country i.e. in 41 Distribution

147
Annual Report 2018-19

&RPSDQLHV ',6&206  DQG &RRSHUDWLYHVRFLHWLHVLQ (c) Material Procurement: RECPDCL has completed the
27 States with a project cost more than INR 85,000 crore. project of Material Procurement of Major materials
YL] 7UDQVIRUPHU &RQGXFWRU &DEOHV 3ROH ,QVXODWRU
4.2.1 Progress of work done/achievement during the
etc.) used in Power Distribution system for the state
current year 2018-19
RI$UXQDFKDO3UDGHVK$VVDP7ULSXUD0L]RUDPXQGHU
 'XULQJ WKH FXUUHQW ÀQDQFLDO \HDU  5(&3'&/ 6DXEKDJ\D''8*-< VFKHPH ZLWK DQ SURMHFW FRVW RI
KDVEHHQZRUNLQJRQLWVRQJRLQJSURMHFWUHODWHGWR more than Rs.500 Crore.

(a) Project Implementing Agency (PIA) projects (d) TPI Works:  L  -%91/ 'LVFRP RI -KDUNKDQG XQGHU
QDPHO\ L  ,7 ,PSOHPHQWDWLRQ :RUNV LQ *(' *RD 'HSDUWPHQWDO VFKHPH LL  :%6('&/ 'LVFRP RI :HVW
XQGHU5$3'533DUW$ LL ,PSOHPHQWDWLRQLQ-.3''RI Bengal under BRGF scheme (iii) MSPDCL Discom of
-DPPX .DVKPLUXQGHUXUEDQVFKHPHV ,3'630'3 0DQLSXUXQGHU''8*-<5(;,3ODQ LY $3'&/'LVFRP
and R-APDRP part-B) (iii) Installation of 2 lakh Smart RI$VVDPXQGHU''8*-<5(;,,3ODQVFKHPH Y 1%3'&/
0HWHUVLQ-.3'''LVFRPRI-DPPX .DVKPLU LY 3,$ & SBPDCL Discoms of Bihar under DDUGJY RE XI Plan
for installation of 9.25 lakh smart prepaid electricity
PHWHUV ZLWK FRPPXQLFDWLRQ PRGXOH IRU -.3'' Y  (e) RQM & NQM works: L  540 ;,, 3ODQ :RUNV LQ
Implementation of Solar Power Project in Arunachal %LKDU&KKDWWLVJDUK:HVW%HQJDO0L]RUDP1DJDODQG
3UDGHVKLQYLOODJHVIRU6(&, YL 3,$IRULQVWDOODWLRQ -DPPX  .DVKPLU DQG 0DQLSXU LL  540 ZRUNV LQ
of off-grid stand-alone solar system in 3601 households Madhya Pradesh and Manipur under DDUGJY RE XI
in Tripura. 3ODQVFKHPH LLL 5401HZ3URMHFW:RUNVLQ6WDWHV
XQGHU ''8*-< 6FKHPH LY  140 ZRUNV LQ 0DGK\D
(b) Project Management Agency (PMA) Projects:
Pradesh, Odisha and Rajasthan under DDUGJY RE XII
‡ 30$ IRU LPSOHPHQWDWLRQ RI $GYDQFHG 0HWHULQJ Plan scheme.
Infrastructure (AMI), SCADA & Distribution Transformer
(f) Other Works: L  5HYLHZ RI FDSLWDOL]DWLRQ RI DVVHWV
Monitoring Unit (DTMU) for CED under National Smart
IRU '(5& LL  30&$0& 6HUYLFHV IRU 6WUHHW /LJKWQLQJ
Grid Mission;
Project of EESL in Tripura, Rajasthan, Chhattisgarh,
‡ )XUWKHU 5(&3'&/ LV SURYLGLQJ 30$ VHUYLFHV XQGHU Jharkhand, Punjab and Chandigarh (iii) Management &
DDUGJY and IPDS schemes for APDA Discom of 7HFKQLFDO6HUYLFHVXQGHUWKHSURMHFW6$57+,LQ833&/
Arunachal Pradesh, BESCOM, CESCOM, MESCOM, LY  3RZHU 0DQDJHPHQW 6\VWHP IRU +33& LQ 8+%91
HESCOM, GESCOM Discoms and Hukkeri Society of DQG '+%91 Y  $7 & /RVV DQDO\VLV LQ 1DUVLQJKSXU
.DUQDWDND *(' 'LVFRP RI *RD &63'&/ 'LVFRP RI
Madhya Pradesh.
&KKDWWLVJDUK 030.99&/  033.99&/ 'LVFRP RI
Madhya Pradesh, TSSPDCL & TSNPDCL Discoms of  7KH &RPSDQ\ FRQWLQXHG WR GR SURÀWDEOH EXVLQHVV
7HOHQJDQD:%6('&/'LVFRPRI:HVW%HQJDO LQ WKH ÀQDQFLDO \HDU  DV ZHOO DQG JHQHUDWHG
D 5HYHQXH RI 5V  FURUH XQDXGLWHG  DQG 1HW
‡ 30$ 6HUYLFHV XQGHU ''8*-< IRU $3'&/ 'LVFRP RI
3URÀW EHIRUH 7D[ RI 5V  FURUH XQDXGLWHG  WLOO
$VVDP$3(3'&/$363'&/.5(&6&5(&6DQG$5(&6
March 31, 2019.
Discoms of Andhra Pradesh;
‡ 30$ 6HUYLFHV XQGHU ,3'6 IRU '3/ 'LVFRP RI :HVW New Initiatives
Bengal, MePDCL Discom of Meghalaya, MSPDCL 'XULQJ WKH FXUUHQW ÀQDQFLDO \HDU  WKH &RPSDQ\ KDV
Discom of Manipur; XQGHUWDNHQIROORZLQJQHZLQLWLDWLYHV
‡ ,Q DGGLWLRQ 5(&3'&/ LV DOVR SURYLGLQJ 30& VHUYLFHV a. Material Procurement in North Eastern states (Assam,
for DVVNL Discom of Uttar Pradesh, JBVNL Discom of $UXQDFKDO 3UDGHVK 0L]RUDP  7ULSXUD  XQGHU
Jharkhand and TSECL Discom of Tripura under DDUGJY Saubhagya & DDUGJY
RE XII Plan scheme, and PuVVNL Discom of Uttar
Pradesh under DDUGJY RE XI and XII Plan scheme, b. PIA for installation and commissioning of solar
JBVNL Discom of Jharkhand under DDUGJY RE X Plan standalone system in 3601 Households in Tripura
scheme (left out work). c. DPR Preparation under STN Scheme for Chhattisgarh
‡ 30$VHUYLFHVIRULPSOHPHQWDWLRQRI,3'6,7LQ&63'&/ State

148
G ([WHQVLRQRI30$XQGHU''8*-< ,3'6LQ&KKDWWLVJDUK d. PM$ IRU ,QVWDOODWLRQ RI  09$  N9 3RZHU
&63'&/  0DGK\D 3UDGHVK 030.99&/  .DUQDWDND Transformer at Sec-39 Grid Sub Station in place of
(HESCOM, MESCOM, GESCOM, BESCOM, HESCOM, Damaged Transformer along with 11 kV Switchgear.
+5(&6 &(6&20 DQG:HVW%HQJDO :%6('&/
e. PMA for Replacement of 14 No. 66 kV MOCBs with
H ([WHQVLRQ RI 30$ XQGHU ''8*-<WK SODQ LQ 7ULSXUD SF6 Breakers and 45 Nos. 11 kV OCB’s with VCB’s at
(TSECL) and Uttar Pradesh (DVVNL, PVVNL & PuVVNL) 66 kV Grid Substations Sector 52 & 12, Chandigarh.” The
I ([WHQVLRQRI30$XQGHU,3'6LQ0DQLSXU 063'&/ YDOLGLW\RIWHQGHUZLOOH[SLUHRQ

g. TPIA work in Tripura and DVVNL f. Smart Metering DPR preparation and further
LPSOHPHQWDWLRQRI6PDUW0HWHULQJLQ0L]RUDP
h. PMA work under IPDS for additional sanction of DPR
LQ 8WWDU 3UDGHVK 3991/  DQG .DUQDWDND  WRZQV RI J $0&30&ZRUNVIRU/('VWUHHWOLJKWXQGHU((6/LQWKH
+(6&20QDPHO\%HOJDYL*RNDN+XEEDOL state of Maharashtra, Uttar Pradesh, Goa.
L ,7 UHYHQXHDVVXUDQFHVXSSRUWFHOOIRU*RD(OHFWULFLW\ h. TPIA for refurbishing works of distribution network in 10
Dept. GLYLVLRQVRI+(6&20
M 73, IRU 6XU\D 5DLWKD 3LORW 3URMHFW LQ .DQDNSXUD 7DOXN ² L 30$XQGHU6DXEKDJ\D''8*-<VFKHPHLQWKHVWDWHRI
BESCOM. Meghalaya.
k. TPI for Solar PV Systems for UPNEDA. 7KHWRWDOFRQWUDFWYDOXHRIWKHDERYHPHQWLRQHGZRUNVZKLFK
l. Project Management Agency (PMA) for the works of LVH[SHFWHGWREHDZDUGHGWR5(&3'&/GXULQJÀQDQFLDO\HDU
replacement of bare LT conductor to AB Cable in the 2019-20 till date amounts to Rs. 144.50 crore. During the year,
GHQVHO\ SRSXODWHG WKHIW SURQH DUHD RI YLOODJHV KDYLQJ WKH&RPSDQ\KDVSDLGDQLQWHULP'LYLGHQGRI5VFURUH
population more than 1000 no’s in all the 14 districts
5. Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
under PVVNL, Meerut.
REC is Nodal Agency for Ministry of Power’s schemes
m. PMA for additional DPR works in 3 circles under IPDS
Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
Scheme for MESCOM.
and Pradhan Mantri Sahaj Bijli Har Ghar Yojana –
Q (PSDQHOPHQW RI 7KLUG 3DUW\ ,QGHSHQGHQW (YDOXDWLQJ Saubhagya.
Agency (TPIEA) in U.P. Power Corporation Limited and its
associated Discoms under Saubhagya Scheme. 5.1 Achievements during 2018-19 under DDUGJY (RE
& New Projects): (Upto 31.03.2019)
o. TPI for underground Cabling work for 3 no. of towns
QDPHO\$]DPJDUK 1DJSXU 0DKPXGDEDG 6LWDSXU DQG ‡  N9 )HHGHU VHJUHJDWLRQ LQFOXGLQJ 1HZ  N9 OLQHV
Behraich (Nagar) in Uttar Pradesh for UPPCL. ZRUNVRI&.PKDYHEHHQFRPSOHWHG

Further, the following proposals are already submitted to ‡  6XEVWDWLRQV LQFOXGLQJ $XJPHQWDWLRQ RI 
',6&20V3RZHU'HSWVDQGWKH\DUHH[SHFWHGWREHDZDUGHG 6XEVWDWLRQV KDYHEHHQFRPPLVVLRQHG
WR5(&3'&/LQ)< ‡  'LVWULEXWLRQ WUDQVIRUPHUV '75  KDYH EHHQ
commissioned.
D 3URSRVDO IRU 30$ ZRUNV RI 6&$'$'06 DQG ,3'6 ,7
3KDVH,,LQWKH-.3'' ‡ 8QGHU WKH VFKHPH 0LQLVWU\ RI 3RZHU UHOHDVHG JUDQW
of Rs. 20,593 Cr to REC Limited for projects being
b. PMA for Construction of 66 kV GIS Substation at Diesel
LPSOHPHQWHGE\WKH6WDWHV3RZHU8WLOLWLHV
3RZHU+RXVH6HFDORQJZLWK8*&DEOHIURPN9,7
Park Grid Substation at Chandigarh. 5.2 Saubhagya - Progress:

c. PMA for Up-gradation of 33 kV Grid Sub-Station at ‡ $V RQ VW 0DUFK  FXPXODWLYHO\  &URUH
6HF87&KGWRN9;09$*,66XEVWDWLRQ +RXVHKROGV KDYH EHHQ HOHFWULÀHG VLQFH ODXQFK RI
6DXEKDJ\DLQZKLFKFURUH+RXVHKROGVKDYHEHHQ
DORQJ ZLWK .9 7UDQVPLVVLRQ OLQH ZLWK 8* &DEOH DW
HOHFWULÀHGGXULQJ)<018-19.
Chandigarh.

149
Annual Report 2018-19

‡ $OO WKH 6WDWHV KDYH DFKLHYHG VDWXUDWLRQ XQGHU with an aggregate amount of EUR 240 million for
6DXEKDJ\D6FKHPHE\SURYLGLQJHOHFWULFLW\FRQQHFWLRQV ÀQDQFLQJ(QHUJ\(IÀFLHQF\SURJUDPLQ$QGKUD3UDGHVK
WR DOO ZLOOLQJ KRXVHKROGV H[FHSW IHZ KRXVHKROGV LQ & Telangana, HVDS projects in Haryana, besides
Chhattiagarh which are located in Bastar araa due to Renewable Energy projects in the country.
/:(LVVXHV
 ,PSOHPHQWDWLRQ RI WKH SURMHFWV ÀQDQFHG XQGHU
6. National Electricity Fund (NEF) WKH DERYH PHQWLRQHG ÀYH OLQHV RI FUHGLW KDV EHHQ

 5(&/LPLWHGLVWKH1RGDO$JHQF\IRURSHUDWLRQDOL]DWLRQ completed.

of the National Electricity Fund (NEF), an Interest In Fiscal 2018, REC has entered into a fourth loan
Subsidy Scheme introduced by Ministry of Power, DJUHHPHQW ZLWK .I: IRU ÀQDQFLDO DVVLVWDQFH RI (XUR
*RYHUQPHQWRI,QGLDWRSURPRWHFDSLWDOLQYHVWPHQWLQ PLOOLRQIRUUHÀQDQFLQJ5HQHZDEOHHQHUJ\SURMHFWV
distribution sector in the country.
10. Training Activities at REC Institute of Power
7. Renewable Energy Projects Management & Training (RECIPMT), Hyderabad
Under the Renewable Energy, REC has sanctioned loan REC Institute of Power Management and Training
assistance of Rs. 11,866.70crore to projects with installed (RECIPMT) earlier known as Central Institute for Rural
JHQHUDWLRQ FDSDFLW\ DJJUHJDWLQJ  0: ZKLFK (OHFWULÀFDWLRQ ZDV HVWDEOLVKHG DW +\GHUDEDG LQ 
LQFOXGHVSULYDWHVHFWRUSURMHFWVRIYDULRXVWHFKQRORJLHV under the aegis of REC Limited (formerly known as Rural
YL]:LQG6RODU6PDOO+\GUR3URMHFWZDVWHWR(QHUJ\ (OHFWULÀFDWLRQ&RUSRUDWLRQ/WG WRFDWHUWRWKHWUDLQLQJ
& Solar pump sets and Rs. 3,200 crore to 3 state sector DQG GHYHORSPHQW QHHGV RI HQJLQHHUV DQG PDQDJHUV
borrowers for meeting their RPO obligations. The total of Power Sector organisations. The programmes
HVWLPDWHG FRVW RI WKH DERYH SURMHFWV LV 5V  are conducted on the state-of-art subjects of Power
FURUH 7KH GLVEXUVHPHQW DFKLHYHG GXULQJ WKH \HDU Generation, Transmission, Distribution and Renewable
LV5VFURUH2XWRIWKHDERYHSURMHFWV energy sources.
REC sanctioned loan assistance of Rs. 25.92 crore to
0:6RODU(QHUJ\SURMHFWDW6RQLWSXUGLVWULFW$VVDP 10.1 National Training Programmes (NTP) under
DDUGJY:
8. North Eastern States
 5(&5(&,307 LV WKH 1RGDO $JHQF\ IRU FRRUGLQDWLRQ
 'XULQJWKHÀQDQFLDO\HDU5(&KDVVDQFWLRQHG
and implementation of National Training Programmes
loan assistance of Rs. 737.48 Lakh to Power Department,
for C&D Employees, under DDUGJY, sponsored by
*RYHUQPHQWRI7ULSXUDXQGHU''8*-<VFKHPH'XULQJ
MOP, GOI. During the year 2018-19, as against the
WKHÀQDQFLDO\HDU5(&KDVPDGHGLVEXUVHPHQW
target of 20,000 C&D category of employees, 16,623
of Rs. 2,845.92 crore (Loan of Rs. 181.17 crore and
were trained.
Subsidy of Rs. 2,664.76 crore) to North Eastern States.
RECIPMT on the request of power utilities, has
9. International Cooperation and Development (IC & D)
conducted 113 batches of C&D Employees Programmes
 5(& KDV DYDLOHG WZR OLQHV RI FUHGLW IURP -DSDQ ZLWKSDUWLFLSDQWVIRU-G991/- .3''+36(%/
,QWHUQDWLRQDO&RRSHUDWLRQ$JHQF\ -,&$ XQGHU2IÀFLDO 7613'&/ DQG 7663'&/ DW YDULRXV ORFDWLRQV XQGHU LWV
'HYHORSPHQW $VVLVWDQFH ZLWK VDQFWLRQHG DPRXQW banner.
DJJUHJDWLQJ -3<  ELOOLRQ IRU ÀQDQFLQJ WKH 5XUDO
10.2 International Programmes:
(OHFWULÀFDWLRQ3URMHFWLQWKH6WDWHVRI$QGKUD3UDGHVK
0DGK\D 3UDGHVK DQG 0DKDUDVKWUD DQG IRU ÀQDQFLQJ  5(&,307LVHPSDQHOOHGE\0LQLVWU\RI([WHUQDO$IIDLUV
the Power Transmission project in the State of Haryana. *RYW RI ,QGLD WR RUJDQLVH WUDLQLQJ SURJUDPPHV LQ
WKH DUHD RI SRZHU VHFWRU XQGHU ,7(&6&$$3  'XULQJ
 5(&KDVDOVRDYDLOHGWKUHHOLQHVRIFUHGLWIURP.I:XQGHU
the year, RECIPMT has organised 8 International
,QGR*HUPDQ %LODWHUDO 'HYHORSPHQW &RRSHUDWLRQ

150
programmesZLWKSDUWLFLSDQWVRQWKHWRSLFVYL] for conduct of Solar Programmes and organised 5
&HUWLÀFDWH&RXUVHLQ3RZHU'LVWULEXWLRQ0DQDJHPHQW programmes on “Solar Roof Top Power Generation”
:HHNV &RQFHSWWR&RPPLVVLRQLQJRI6RODU3RZHU for Distribution Engineers of Telangana State Power
Plants (5 weeks); Design, Erection, O&M and Protection 'LVWULEXWLRQ FRPSDQLHV DW YDULRXV ORFDWLRQV DQG
of EHV Sub-Stations (6 weeks); Financial Management  SURJUDPPHV RQ ´(QWUHSUHQHXU 'HYHORSPHQW
and Accounting Standards for Power Utilities (6 weeks); programmes on Solar PV” for unemployed youth
Management of Power Generation Plants (6 weeks); at RECIPMT Campus. In total, 278 participants were
Planning and Management of Power Transmission trained.
and Distribution System (8 weeks); Emerging Trends in 10.6 Regular National Programmes:
5XUDO (OHFWULÀFDWLRQ  3RZHU 0DQDJHPHQW  ZHHNV 
RECIPMT has organised 21 Regular Training
DQG&HUWLÀFDWH&RXUVHLQ(OHFWULF3RZHU0DQDJHPHQW
3URJUDPPHVIRUWKHSHUVRQQHORIYDULRXV3RZHU8WLOLWLHV
 :HHNV  7KH SDUWLFLSDQWV IURP FRXQWULHV YL]
on different topics such as, Earthing Practices & Safety
$IJKDQLVWDQ $]HUEDLMDQ $QJROD %DQJODGHVK %KXWDQ
Measures in Electrical Installations; Implementation
Botswana, Burundi,Cambodia, Democratic Republic
of GST; Power Transformer – Testing, Commissioning,
of the Congo, Ethiopia, Gambia, Ghana, Guinea,
Protection & Maintenance; Concept to Commissioning
.HQ\D /HEDQRQ 0R]DPELTXH 0DXULWLXV 0RQJROLD
of Solar Power Plants and Grid Enabling; Open Access,
Myanmar,Niger, Nigeria, Rwanda, Seychelles, South
3RZHU7UDGLQJ ([FKDQJH/DWHVW7UHQGVLQ0HWHULQJ
6XGDQ6ZD]LODQG6XGDQ6\ULD6LHUUD/HRQH7DMLNLVWDQ
Billing and Collection; Underground Cables – Design,
7DQ]DQLD7KDLODQG8]EHNLVWDQ9LHWQDPDQG=LPEDEZH
Selection, Laying, Monitoring & Fault Detection;
KDYHDWWHQGHGWKHSURJUDPPHV
Distribution Transformers- Operation & Maintenance
10.3 SAUBHAGYA Programmes: 3UDFWLFHVIRU)DLOXUH0LQLPL]DWLRQ'HVLJQ&RQVWUXFWLRQ
 5(&,307 KDV RUJDQL]HG WUDLQLQJ SURJUDPV XQGHU & Quality Control of EHV Substations; Smart Grid and
6$8%+$*<$''8*-<WRWUDLQVFKHPHLPSOHPHQWHUV Smart Cities; Labour Laws – Employee Compensation
i.e. DISCOM Engineers, Contractors and their workers. & Contract Labour Act- Procedure in Dealing with
7KHVH WUDLQLQJV DUH WR VHQVLWL]H WKHP LQ WDNLQJ FDUH Court Cases; Protection System in EHV Sub-stations
RI ´4XDOLW\ $VSHFWVµ ZKLOH H[HFXWLQJ 6$8%+$*<$ & Lines; Power Purchase Agreement; Gas Insulated
DDUGJY scheme. 27 batches of ToT (1 day program) & Indoor Sub-stations; IND AS (IFRS) Adoption in
ZLWK  SDUWLFLSDQWV ZHUH RUJDQL]HG   EDWFKHV Power Sector; O&M of EHV Sub-Station and Lines
RI )LHOG :RUNHUV 7UDLQLQJ 7ZR GD\V SURJUDP  ZLWK and Quality Assurance; Distribution Loss Reduction
SDUWLFLSDQWVZHUHRUJDQL]HG,QWRWDOZHUH Issues, Challenges and Remedial Measures; Design
participants. Construction & Testing of Distribution Sub- Station and
10.4 Behavioural Skills Programmes: Lines; Power Transmission Lines, Design, Construction
and O&M; Tariff Policy and Submission of ARRs
 5(&,307 KDV RUJDQL]HG XQGHU WKH VSRQVRUVKLS RI
Regulatory Compliance; Operation, Maintenance and
5(& WUDLQLQJ RI  WRS PLGGOH OHYHO H[HFXWLYHV RQ
Protection aspects of Distribution Substation & Lines.
´%HKDYLRXUDOVNLOOVµZLWKREMHFWLYHV L WRPDNHDZDUHRI
$WRWDOQXPEHURISDUWLFLSDQWVDWWHQGHGWKHDERYH
([HFXWLYHVWKHLUSRWHQWLDO LL WRRULHQWRQ%HKDYLRXUDO
programmes.
DVSHFWVDWZRUNSODFHVNLOOGHYHORSPHQWHWFDQG LLL 
WRHQKDQFHSUREOHPVROYLQJDELOLW\7KHSDUWLFLSDWLRQ 10.7 Customized Programmes:
was from Distribution, Generation and Transmission 16 batches of customised programmes were designed
XWLOLWLHV DFURVV WKH FRXQWU\ DQG 5(&,307 RUJDQL]HG and organised suitable to the utility requirements
them as off-site programs (at utility premises). on their request. The programmes conducted are
10.5 Solar Programmes: RQ ´2 0 RI 'LVWULEXWLRQ 6XE6WDWLRQµ IRU - .3''
Jammu & Srinagar (2 batches) and JBVNL, Ranchi
RECIPMT has been empanelled by National Institute
(2 batches) for their Engineers. The programme
of Solar Energy (NISE) as partner training institute
RQ ´%HKDYLRXUDO 7UDLQLQJµ ´6DIHW\ 0DQDJHPHQWµ ´

151
Annual Report 2018-19

Distribution Transformer, Maintenance & Testing” DGGUHVV WKH FRPPXQLW\ VRFLHWDO DQG HQYLURQPHQWDO
(2 batches), “Electrical Safety and Inspection of concerns.
Electrical Installations Under IE Rules” (2 batches),
11.1 Major CSR projects taken up/ ongoing during
´'LVWULEXWLRQ 0HWHULQJ $GYDQFHG 7HFKQRORJLHVµ
ÀQDQFLDO\HDU
(2 batches) for JBVNL Engineers at Ranchi, and
“Earthing Practices & Safety Measures in Electrical ‡ $PSOLI\LQJ WKH PHVVDJH RI 6ZDFKK %KDUDW 0LVVLRQ 
Installations”, “Design, Construction and Quality sustained and safe sanitation practices in addition to
measurement of EHV substation”, “ Power Transformer, the issues around women’s health and empowerment
'HVLJQ 0DQXIDFWXULQJ 6SHFLÀFDWLRQ DQG &RQGLWLRQDO YLDFRPPXQLFDWLRQLQWHUYHQWLRQWLWOHG¶0DLQ.XFK%KL
DQG  3UHGLFWLYH PDLQWHQDQFH RI PDMRU VXEVWDWLRQ .DU6DNWL+RRQ·6HDVRQ
equipment”, “ Protection System in EHV Sub-stations
‡ &RQWULEXWLRQ LQ 6ZDFKK %KDUDW .RVK VHW XS E\
/LQHVµIRU06(7&/([HFXWLYHV(QJLQHHUVDW5(&,307
*RYHUQPHQW RI ,QGLD WR DFKLHYH WKH REMHFWLYH RI
campus. In total, 347 participants were trained under
Swachh and Open Defecation Free India.
customised programmes.
‡ 6XSSRUWLQJ LQVWDOODWLRQ RI ZDWHU $70 PDFKLQHV LQ 
10.8 In-house Training Programmes:
YLOODJHVRI&KDQGUDSXU0DKDUDVKWUDLQEXVVWDWLRQV
RECIPMT also organised 4 in-house programmes for under UPSRTC in Uttar Pradesh and 25 machines in
WKH HPSOR\HHV RI 5(& DQG  (PSOR\HHV KDYH WDNHQ .XPEK 0HOD DW 3UD\DJUDM 8WWDU 3UDGHVK IRU .XPEK
SDUW LQ WKHVH SURJUDPPHV  7KH WRSLFV FRYHUHG DUH 0HOD YLVLWRUV ZKLFK LV EHLQJ UHDOORFDWHG DW GLIIHUHQW
Understanding of SPU’s Grading and REC’s Business YLOODJHV LQ ,QGLD IRU SURYLGLQJ VDIH GULQNLQJ ZDWHU WR
Areas, Sponsored by REC; Loan Documentation, Goods the community.
DQG6HUYLFHV7D[,PSOHPHQWDWLRQDQG/HDGHUVKLSDQG
‡ 6XSSRUWLQJ IRU LQVWDOODWLRQ RI ERUH ZHOO KDQG SXPSV
Communication Skills.
LQ UXUDO YLOODJHV LQ YDULRXV GLVWULFWV LQ %LKDU  8WWDU
10.9 In all, during the year 2018-19, RECIPMT has conducted Pradesh.
 SURJUDPPHV RQ YDULRXV WKHPHVVXEMHFWV DQG
‡ 6XSSO\ DQG ÀWPHQW RI &RFKOHDU ,PSODQWV WR FKLOGUHQ
trained 7,397 personnel with 24,821 man-days of
ZLWKKHDULQJLPSDLUPHQWVDWYDULRXVORFDWLRQVLQ,QGLD
training, in addition to coordinating and monitoring
the National Training Programmes for C&D employees, ‡ &RQVWUXFWLRQ RI EORRG EDQN FXP DGPLQLVWUDWLYH
VSRQVRUHGE\0LQLVWU\RI3RZHU*RYHUQPHQWRI,QGLD block and up-gradation of blood bank equipment at
Ananthapuram, Andhra Pradesh.
11. Sustainable projects under Corporate Social
Responsibility initiative by REC: Progress made ‡ &RQVWUXFWLRQ RI UDGLRWKHUDS\ XQLW LQ 9LUDW +RVSLFH
GXULQJWKHFXUUHQWÀQDQFLDO\HDU in Jabalpur Madhya Pradesh, run under Brahmrishi
Mission Samiti, to support the terminally ill cancer
In line with the REC Corporate Social Responsibility
patients.
& Sustainability Policy, Board of Directors, REC, has
DSSURYHGEXGJHWDU\DOORFDWLRQRI5VFURUHIRU ‡ &RQVWUXFWLRQ RI ,QWHJUDWHG PXVFXODU G\VWURSK\ DQG
&65  6XVWDLQDELOLW\ DFWLYLWLHV IRU WKH ÀQDQFLDO \HDU UHKDELOLWDWLRQ FHQWHU ¶0DQDY 0DQGLU· WKLUG ÁRRU · LQ
2018-19. During the year the total disbursement under Solan, Himachal Pradesh.
&65 6XVWDLQDELOLW\DFWLYLWLHVZDV5VFURUH,Q
‡ 6XSSRUWLQJIRUFRPPXQLW\EDVHGSURJUDPIRUFRQWURO
pursuance of the REC Corporate Social Responsibility
of Sickle cell diseases and Thalassemia in the 30
& Sustainability Policy, REC has undertaken Sustainable
districts of Odisha.
projects under Corporate Social Responsibility
LQLWLDWLYHV LQ SURMHFW PRGH :KLOH LGHQWLI\LQJ &65 ‡ ,QIUDVWUXFWXUH GHYHORSPHQW SURFXUHPHQW RI QHZ
LQLWLDWLYHV5(&KDVDGRSWHGDQLQWHJUDWHGDSSURDFKWR PHGLFDO HTXLSPHQW DQG UHQRYDWLRQ ZRUNV LQ *DQGKL

152
Memorial hospital in Rewa Madhya Pradesh, All India ‡ 6XSSRUWLQJIRULQVWDOODWLRQRIVRODUSRZHUSDQHOVLQWKH
Institute of Medical Sciences (AIIMS) in New Delhi and FDPSXVRI0DGXUDL.DPDUDM8QLYHUVLW\LQ7DPLO1DGX
6ZDPL9LYHNDQDQGD1DWLRQDO,QVWLWXWHRI5HKDELOLWDWLRQ $FKDU\D 1DJDUMXQD 8QLYHUVLW\ LQ $QGKUD 3UDGHVK
Training and Research (SVNIRTAR), Cuttack, Odisha. 6KDKHHG 8GKDP 6LQJK 3DQMDE 8QLYHUVLW\ )HUR]HSXU
3XQMDE&LYLO+RVSLWDO0RJD3XQMDE,QGLDQ,QVWLWXWHRI
‡ 3URYLGLQJ EHWWHU KHDOWK IDFLOLWLHV WR OHSURV\ DIIHFWHG
6FLHQFH%DQJDORUH6DPEDOSXU8QLYHUVLW\2GLVKDDQG
and other poor people by constructing & equipping
IIM Tiruchirappalli in Tamil Nadu.
operation theatre and maternity block in The Leprosy
0LVVLRQ KRVSLWDOV LQ &KDPSD &KKDWWLVJDUK )DL]DEDG ‡ 5XUDOGHYHORSPHQWZRUNVLQYLOODJHVRI$UUDK.RLOZDU
Uttar Pradesh and Vadathorasalur, Tamil Nadu. & Barhara blocks in the backward district of Bhojpur
DQGYLOODJHVLQ6LWDPDUKLGLVWULFW%LKDU
‡ 3URYLGLQJDUWLÀFLDOOLPEVDVVLVWLYHDLGV DSSOLDQFHVWR
persons with special abilities from weaker sections of ‡ ¶1RRQHLVOHIWEHKLQG·WRHPSRZHUORFDOFRPPXQLWLHV
society. regarding food, nutrition and energy around them
QDWXUDOO\DQGHQVXULQJXOWLPDWHXWLOL]DWLRQRIWKHVDPH
‡ 6XSSRUWLQJ MRE RULHQWHG VNLOO GHYHORSPHQW WUDLQLQJ
in Meghalaya and Nagaland.
SURJUDPPHV IRU DSSUR[  \RXWKV LQFOXGLQJ
women from economically weaker sections of society ‡ 3DUW FRQWULEXWLRQ IRU FRQVWUXFWLRQ RI 6WDWXH RI 8QLW\

in across India. 1DWLRQDO0XVHXPDQG*DUGHQLQ6DUGDU6DURYDU'DP


Gujarat.
‡ 3URYLGLQJGHVNVDQGEHQFKHVLQJRYHUQPHQWVFKRROV
‡ $VVLVWDQFHIRUFRPPXQLW\EDVHGLQWHUYHQWLRQVWKURXJK
colleges of Motihari Bihar.
YDULRXV SURMHFWV QDPHO\ 0LVVLRQ 8GD\ 8UMD 6DPWD
‡ ,QIUDVWUXFWXUH VXSSRUW LQ VFKRROV LQ 0DKEXEQDJDU Samwad, Radio Rajasthan, Saathiya Cinema etc. across
$QGKUD 3UDGHVK *KD]LDEDG 8WWDU 3UDGHVK DQG 1HZ India.
Delhi.
‡ 6HWWLQJXSRIHOHFWULFFUHPDWRULXPLQ*KD]LDEDG8WWDU
‡ 3URYLGLQJ VXSSRUW IRU VWXGLHV IRRG DQG RWKHU EDVLF Pradesh.
necessities to 300 tribal children residing and studying
‡ &RQVWUXFWLRQRIPXOWLSXUSRVHKDOOFXPLQGRRUVWDGLXP
LQ .DOLQJD ,QVWLWXWH RI 6RFLDO 6FLHQFHV .,66  LQ
and construction of road in Ukhrul district, Manipur.
Bhubaneshwar Odisha.
‡ 6XSSRUWLQJ IRU VHWWLQJ XS RI PHFKDQL]HG VZHHSLQJ
‡ 3URYLGLQJ KROLVWLF HGXFDWLRQ  UHKDELOLWDWLRQ VHUYLFHV
FROOHFWLRQDQGWUDQVSRUWDWLRQRI0XQLFLSDO6ROLG:DVWH
IRU FKLOGUHQ ZLWK YLVXDO LPSDLUPHQW E\ SURYLGLQJ
in Varanasi, Uttar Pradesh.
WHDFKLQJDLGVLQIUDVWUXFWXUDOGHYHORSPHQWHWFLQ1HZ
Delhi ‡ 6XSSRUWLQJIRUGLVWULEXWLRQVXSSO\RI*LIWPLON PLON 
PLONSURGXFW WRVFKRROFKLOGUHQLQJRYHUQPHQWVFKRROV
‡ 6XSSRUWLQJIRUFRQVWUXFWLRQRIVHDWHUVKHOWHUKRPH
in Jharkhand.
with wellness facility for the care of the elderly in
/DGDNKUHJLRQRI-DPPX .DVKPLU ‡ 6XSSRUWLQJ IRU HVWDEOLVKPHQW RI 9LUWXDO &ODVVURRPV
9&5 DW*RYHUQPHQWVFKRROVLQ.DUQDWDND
‡ &RQWULEXWLRQ LQ 6ZDFKK .XPEK .RVK IRU EHQHÀWV RI
VDQLWDWLRQ ZRUNHUV HQJDJHG LQ .XPEK0HOD 8WWDU ‡ 6HWWLQJ XS HVWDEOLVKLQJ NKDGL VSLQQLQJ ZHDYLQJ DQG
garment unit in Varanasi, Uttar Pradesh.
Pradesh.

153
Annual Report 2018-19

6KUL1DUHQGUD0RGL+RQ·EOH3ULPH0LQVWHUGHGLFDWLQJ3DUH+\GUR(OHFWULF3URMHFW 0: LQ$UXQDFKDO


Pradesh to the Nation on the 9th February 2019.

154
CHAPTER 24

NORTH EASTERN ELECTRIC POWER CORPORATION (NEEPCO) Ltd.


The North Eastern Electric Power Corporation (NEEPCO) Ltd, a ¾ The total income from FY 2018-19 is Rs. 2108.41 Crore.
VFKHGXOH$0LQL5DWQD &DWHJRU\, &36(ZLWKDQDXWKRUL]HG
¾ 7KH 3URÀW EHIRUH 7D[ LV 5V  &URUH IRU WKH
share capital of Rs. 5000.00 Crore, was incorporated on
FY 2018-19.
$SULODVDZKROO\RZQHG*RYHUQPHQWRI,QGLD(QWHUSULVH
XQGHU WKH 0LQLVWU\ RI 3RZHU WR SODQ SURPRWH LQYHVWLJDWH ¾ The Share Capital (Paid up) for the FY 2018-19 is Rs.
VXUYH\ GHVLJQ FRQVWUXFW JHQHUDWH RSHUDWH DQG PDLQWDLQ 3609.81 Crore.
hydro, thermal and solar power stations. At present, NEEPCO’s
¾ The Gross operating margin for FY 2018-19 is Rs. 864.36
WRWDOLQVWDOOHGFDSDFLW\LV0:RXWRIZKLFK0:LV
LQ+\GUR0:LQ7KHUPDODQG0:LQ6RODU396HFWRUV Crore

OPERATIONAL PERFORMANCE (April 2018 to March ¾ The Net Block for the FY 2018-19 is Rs. 6166.30 Crore.
2019): ¾7KH6DOHV7XUQRYHU1HW%ORFN  IRUWKH)<
The generation from NEEPCO’s Power Stations during April’18 is 32.55%.
to Mar’19 is 6104 MU against a MOU (Very Good) Target of
DECLARATION OF COMMERCIAL OPERATION (COD) OF
8300 MU for the year 2018-19. Against an APAF Target 77.54%
NEWLY COMMISSIONED PROJECTS:
for the year 2018-19 under “Very Good” MOU rating, NEEPCO
DFKLHYHG$3$)RIIRUWKH\HDU3ODQW$YDLODELOLW\)DFWRU i) Tuirial Hydro Electric Project (60 MW), Mizoram:
(PAF) for Hydro Plants till Mar’19 is 79.43 % and for Thermal
 &2' RI 7XLULDO 8QLW   ZDV GHFODUHG ZHI 
Plants is 65.89 % for the same period.
DQG8QLWZDVGHFODUHG
Power Station Generation Actual
ii) Pare Hydro Electric Project (110 MW), Arunachal
Target (MU) Generation
2018-19 for (MU) Pradesh:
“Very Good” 2018-19
MOU rating  &2'RI3DUH8QLWZDVGHFODUHGZHIDQG
8QLWZDVGHFODUHGZHI
.RSLOL+(3ODQW 1051 1327
Doyang HE Plant 227 231 BRIEF STATUS OF PROJECTS UNDER CONSTRUCTION:
Ranganadi HE Plant 1250 1052
i) Kameng Hydro Electric Project (600 MW), Arunachal
Tuirial H. E. Project 214 169 Pradesh
Pare H.E. Project 402 347
All major works required for commissioning of the
AGBPP 1450 1639
project in March’2018 were completed by the last week
AGTCCP 650 651
RI)HE·DQGWZRK\GURJHQHUDWLQJVHWVRI0:
TGBPP 650 681
each (Unit-I & Unit-II) were put on trial mechanical run
Monarchak Solar Plant 6 7
RQ  DQG  UHVSHFWLYHO\ +RZHYHU
.DPHQJ+(3URMHFW 2400 Yet to be
leakages in the penstocks were noticed on 12, March
commis-
sioned  ,QVSHFWLRQ RI SHQVWRFNV WR LGHQWLI\PDS DOO WKH
APAF Target (%) 2018-19 for 77.54% SUREOHPSRLQWVZHUHFDUULHGRXWDQGUHFWLÀFDWLRQZRUNV
“Very Good” MOU rating are in progress.
$FWXDO$3$)  DFKLHYHG 74.57%
 N9'&.DPHQJ%DOLSDUD7UDQVPLVVLRQ/LQHKDVEHHQ
during 2018-19
FKDUJHG E\ 3*&,/ %XV, DQG %D\  .9  DW .D+(3
FINANCIAL PERFORMANCE (April 2018 to March 2019): VZLWFK\DUGKDYHDOVREHHQFKDUJHG&RPSOHWHFKDUJLQJ
¾ 7KHUHYHQXHIURPRSHUDWLRQLQWKHFXUUHQWÀQDQFLDO\HDU RIWKH.96ZLWFK\DUG.95HDFWRUV.9$
2018-19 is Rs. 2007.04 Crore. $XWR 7UDQVIRUPHUV DQG  .9 6ZLWFK\DUG KDYH EHHQ
completed.

155
Annual Report 2018-19

Anticipated Commissioning after completion of upstrHDP RI WKH :DK 8PLDP 6W,,, +(3 VWDWHG DERYH
SUHVHQW 3HQVWRFN UHFWLÀFDWLRQ ZRUN LQ 3HQVWRFN, DQG *RYW RI 0HJKDOD\D DOORWWHG WKHVH SURMHFWV WR 1((3&2
3HQVWRFN,,$XJXVW 8QLWV  DQG'HFHPEHU RQ02$VDUHXQGHUÀQDOL]DWLRQ3UHSDUDWLRQ
2019 (Units - 3 & 4).
of Pre-Feasibility Report (PFR) has been taken up.
FUTURE PROJECTS:
COMMERCIAL PERFORMANCE (2018-19):
NEEPCO has planned for enhancing its capacity though some
upcoming Hydro Projects in the State of Meghalaya and has As on 31.03.2019 bills amounting to Rs. 1923.75 crore were
also planned a Renewable Energy Project in Odisha. The UDLVHG GXULQJ  RQ WKH EHQHÀFLDULHV 7KH WRWDO VDOHV
SURMHFWVDUH
during the year was Rs. 1992.54 crore. During this period
1. Wah Umiam St-III HEP (85 MW), Meghalaya: DQ DPRXQW RI 5V  FURUH ZDV UHDOL]HG DV UHYHQXH
$SSURYDO RI 5V  &URUH WRZDUGV SUHLQYHVWPHQW The principal dues outstanding for more than 60 days as on
DFWLYLWLHVIRUWKH3URMHFWZDVREWDLQHGIURPWKH0LQLVWU\
31.03.2019 is Rs. 374.95 crore.
of Power on 05.06.2017. The DPR for the Project is under
VFUXWLQ\ DW &($&:& IRU DFFRUGLQJ 7HFKQR (FRQRPLF $OVR 7DULII RUGHU IRU WKH  0: 7XLULDO +(3 LQ 0L]RUDP ZDV
FOHDUDQFHZKLFKLVH[SHFWHGVKRUWO\2WKHUDFWLYLWLHVOLNH
issued by the Hon’ble CERC.
REWDLQLQJ (QYLURQPHQWDO &OHDUDQFH (&  DUUDQJHPHQW
for construction power, land acquisition, approach road PPA was signed with Chhattisgarh for the state’s allocated
to the Project and obtaining comfort letters from the NE
VKDUHRI0:IURPWKH0:.DPHQJ+(3RQ
States for purchase of power are under process.
33$VZLWKDOOEHQHÀFLDULHVIRUWKHH[LVWLQJSRZHUVWDWLRQVKDYH
2. Wah Umiam St-I HEP (50 MW), & Wah St-II HEP (100 been renewed during the year.
MW), Meghalaya: These projects are located on the

156
CHAPTER 25

POWER SYSTEM OPERATION CORPORATION LTD. (POSOCO)


POSOCO Overview 7KH IXQFWLRQV RI 3262&2 KDYH EHHQ HYROYLQJ ZLWK WKH
integration of power systems, increase in electrical energy
‘‘Power System Operation’ is a mission critical function of
demand, growth in the economy and changes in technology,
QDWLRQDO LPSRUWDQFH IRU VPRRWK HYDFXDWLRQ RI SRZHU IURP
generating stations and supply to the end consumers in the regulations, market design, administration and management
HOHFWULFLW\ VXSSO\ YDOXH FKDLQ 6\VWHP RSHUDWRUV HQVXUH WKH of the power system. POSOCO is a knowledge based
power balance in the interconnected power system on a real RUJDQL]DWLRQDQGLVIXOÀOOLQJYDULRXVRWKHUIXQFWLRQVDVVLJQHG
time basis in a secure and reliable manner. Power System E\WKH*RYWRI,QGLDIURPWLPHWRWLPH3262&2LVIDFLOLWDWLQJ
2SHUDWLRQLQYROYHVWDNLQJFDUHRIWKHRYHUDOOUHOLDELOLW\VHFXULW\ and enabling power sector reforms by Ministry of Power
HFRQRP\DQGHIÀFLHQF\RIWKHSRZHUV\VWHP DQGDOVRJLYLQJUHJXODUIHHGEDFNWRWKH&HQWUDO&RPPLVVLRQ
Authority and Central Transmission Utility on design &
POSOCO has the onerous responsibility of operating the
operational aspects pertaining to Power System and Power
All India synchronous grid, one of the largest and most
Market Operation.
FRPSOH[ LQ WKH ZRUOG HQVXULQJ UHOLDELOLW\ DQG VHFXULW\ ,QGLD
is ranked third in terms of electricity generation, electricity POSOCO is committed to ensuring integrated operation of
FRQVXPSWLRQ LQVWDOOHG JHQHUDWLRQ FDSDFLW\ DQG VL]H RI Regional and National Power Systems to facilitate transfer of
transmission system in the world. The power sector in India electric power within and across the regions and trans-national
KDV VHHQ D WUDQVIRUPDWLRQDO FKDQJH ZLWK SURJUHVVLYH SROLF\ H[FKDQJHRISRZHUZLWKUHOLDELOLW\VHFXULW\DQGHFRQRP\,W
OHYHOUHIRUPVDQGHIIHFWLYHLPSOHPHQWDWLRQRIWKHVDPHLQWKH HQVXUHV LQGHSHQGHQW V\VWHP RSHUDWLRQ DQG SURYLGHV OHYHO
recent years. POSOCO through its National Load Despatch SOD\LQJÀHOGWRDOOVWDNHKROGHUV
&HQWUHV 1/'& DQGÀYH  5HJLRQDO/RDG'HVSDWFK&HQWUHV
(RLDCs), facilitates the inter-state transmission of power to Operational Highlights
XWLOLWLHV DFURVV ,QGLD XOWLPDWHO\ UHDFKLQJ WR RYHU  ELOOLRQ 7KH WUHPHQGRXV SDFH RI H[SDQVLRQ RI WKH JHQHUDWLRQ
people. POSOCO also administers India’s wholesale electricity WUDQVPLVVLRQ DQG GLVWULEXWLRQ LQ WHUPV RI KLJKHU YROWDJHV
PDUNHWWKURXJKFRRUGLQDWLRQZLWKWKRXVDQGVRIHQWLWLHVHYHU\
large footprint and new technologies has strengthened the
GD\IRUEDODQFLQJGHPDQGDQGJHQHUDWLRQHYHU\PLQXWHV
,QGLDQ SRZHU JULG VXSSRUWLQJ WKH *RYHUQPHQW RI ,QGLD·V
in line with the regulations of Central Electricity Regulatory
YLVLRQRQDWWDLQLQJ¶3RZHUIRUDOO·7KHRSHUDWLRQDOKLJKOLJKWVLQ
Commission (CERC).
DUHDVIROORZV
2018-19 2017-18 % Variation Highest ever

All India Energy Met 1288 BU 1205 BU + 6.9 3925 MU on 19th September 2018

All India Highest Demand Met *: *: + 8.7 *:RQWK6HSWHPEHU

All India Hydro Generation 140 BU 134 BU + 4.5 741 MU on 31st August 2018

All India Thermal Generation 1072 BU 1037 BU + 3.3 3088 MU on 15th September 2018
(Coal & Lignite Based)

$OO,QGLD:LQG*HQHUDWLRQ 58 BU 49 BU + 18.4 467 MU on 12th June 2018

All India Solar Generation 36 BU 18 BU + 100 141 MU on 17th March 2019

Energy facilitated through 182 BU 150 BU + 21.3 -


LQWHUUHJLRQDOH[FKDQJH

Cross border interchange 8496 MU 7203 MU + 18 -


([SRUW
Import 4657 MU 5611 MU -17 -
(QHUJ\DSSURYHGWKURXJK 120 BU 105 BU + 14.3 -
Short Term Open Access

157
Annual Report 2018-19

Achievements Participation in Reforms Process


)UHTXHQF\ 3URÀOH  'XULQJ  )UHTXHQF\ UHPDLQHG 3262&2 DFWLYHO\ VXSSRUWHG 0LQLVWU\ RI 3RZHU LQ WKH SROLF\
within Indian Electricity Grid Code (IEGC) band of 49.90-50.05 DQG OHJLVODWLYH SURFHVVHV IRU DPHQGPHQWV WR (OHFWULFLW\ $FW
+]IRURIWLPH)UHTXHQF\UHPDLQHGZLWKLQWKH,(*& 1DWLRQDO(OHFWULFLW\3ROLF\ 7DULII3ROLF\$WWKHUHJXODWRU\OHYHO
band for highest 89.2 % of time on 03rd September, 2018. too, POSOCO was associated for introduction of Spinning
7KHDYHUDJHIUHTXHQF\ZDV+]GXULQJ0RVWRI 5HVHUYHV 3ULPDU\ 5HVSRQVH 1DWLRQDO 2SHQ $FFHVV 5HJLVWU\
WKHGD\VWKHDYHUDJHIUHTXHQF\LVFORVHWRQDWLRQDOUHIHUHQFH Gate Closure, Real Time Markets, Fast Response Ancillary
IUHTXHQF\RI+] 6HUYLFHV/LQNDJHRI'HYLDWLRQ6HWWOHPHQW0HFKDQVLP '60 
Testing of Frequency Response - IEGC mandates periodic SULFH WR PDUNHW GLVFRYHU\ SURFHVV SLORW RQ ÀYH PLQXWH
check-ups of primary frequency response of generating units scheduling and settlement, Security Constrained Economic
DW UHJXODU LQWHUYDO RQFH LQ WZR \HDUV WKURXJK LQGHSHQGHQW Despatch, Cross Border etc.
agencies selected by RLDCs or SLDCs. POSOCO has formulated
Knowledge and Information Dissemination
the terms of reference and procedure for conducting tests to
YHULI\SULPDU\UHVSRQVHRIJHQHUDWLQJXQLWV3262&2LVVXHG $ QXPEHU RI VWXGLHV  VLPXODWLRQV KDYH EHHQ FDUULHG RXW
([SUHVVLRQRI,QWHUHVWRQJOREDOEDVLVIURPLQWHUHVWHGDJHQFLHV LQ WKH UHFHQW SDVW WR XQGHUVWDQG YDULRXV LPSRUWDQW DVSHFWV
on 1st October 2018. Issuance of Request for Proposal to of Indian power system & electricity market, especially, for
shortlisted agencies is in progress. renewable integration. These include inter-alia studies on
Automatic Generation Control (AGC) pilot project - In addition ÁH[LELOLW\ UHTXLUHPHQW GHPDQG SDWWHUQ K\GUR JHQHUDWLRQ
to the pilot project at NTPC Dadri Stg-II operational since Jan RSWLPL]DWLRQJDVJHQHUDWLRQRSWLPL]DWLRQPDUNHWEHKDYLRXU
 WZR PRUH SLORWV ZHUH RSHUDWLRQDOL]HG LQ  7KH analysis, RE integration simulation studies, Renewable Energy
$*&DW173&6LPKDGULDQG173&0DXGDZHUHRSHUDWLRQDOL]HG &HUWLÀFDWH 5(& UDPSLQJFDSDELOLW\RIWKHUPDOSRZHUVWDWLRQV
RQWK1RYHPEHUDQGWK-DQXDU\UHVSHFWLYHO\ HWF7KHZLVGRPJDLQHGIURPDUFKLYHGGDWD RYHUDGHFDGHRI
The implementation of AGC pilot at NTPC Barh & Bongaigaon H[SHULHQFHKDVSURYLGHGXVHIXOLQVLJKWVLQWRWKHSDVWSUHVHQW
plants is currently in progress. The full scale AGC pan-India, DQGOLNHO\IXWXUHRI,QGLDQSRZHUV\VWHP7KHVHVWXGLHVKDYH
SODQQHGE\VKDOOHQDEOHHIÀFLHQF\DQGJULGVHFXULW\LQ JLYHQFRQÀGHQFHWKDWWKH,QGLDQSRZHUV\VWHPLVFDSDEOHRI
the Indian power system, making it ready to handle the 175 integrating large scale renewables in a secure and reliable
*:RIUHQHZDEOHVWDUJHWHGE\ manner.

)DVW 5HVSRQVH $QFLOODU\ 6HUYLFHV )5$6  ² &(5& YLGH RUGHU Grid Resilience
dated 16th July 2018, directed POSOCO to implement pilot
7KH LPSDFW RI FOLPDWH FKDQJH OHDGLQJ WR DGYHUVH ZHDWKHU
SURMHFWIRU)5$6FRYHULQJDOO&HQWUDOVHFWRUK\GURJHQHUDWLQJ
FRQGLWLRQV DQGRU QDWXUDO GLVDVWHUV LQ PDQ\ SRFNHWV DV ZHOO
stations. FRAS is implemented as ‘fast’ tertiary frequency
as the increasing number of high impact low probability
control to handle frequency spikes at hourly boundary for
incidents bring about a need for making the system more
short duration. FRAS was implemented by POSOCO on 26th
resilient. POSOCO-NLDC as the Nodal Agency for Disaster
1RYHPEHU  $ WRWDO RI  K\GUR VWDWLRQV LQ 1RUWKHUQ
0DQDJHPHQW LQ 3RZHU 6HFWRU FRRUGLQDWHG IRU SUHYHQWLYH
Eastern and North-Eastern regions with aggregate capacity of
measures and quick restoration during natural calamities
0:DUHSDUWLFLSDWLQJLQ)5$6$SSUR[WRLQVWUXFWLRQV
VXFKDVÁRRGVLQ.HUDODLQ$XJXVW&\FORQH7LWOLLQ$3
are being issued on daily basis.
Odisha coast in October, 2018 & Cyclone Gaja in Tamil Nadu
Security Constrained Economic Despatch (SCED) - A LQ1RYHPEHU
consultation paper on Security Constrained Economic
Despatch of Inter-state generating stations pan India was Institution Building and Strengthening
prepared by POSOCO which primarily focused on enhancing Human capital management and building sustainable
WKH VFRSH RI RSWLPL]DWLRQ RI ,6*6 VFKHGXOHV LQ ,QGLD 7KH institutions is a key priority area for POSOCO. The trainings
REMHFWLYHRIWKHRSWLPL]DWLRQH[HUFLVHLVWRPLQLPL]HWKHWRWDO FHUWLÀFDWLRQVWRGHYHORSGRPDLQNQRZOHGJHDQGDQDO\WLFDO
generation cost while honouring the technical constraints of abilities of system operators is being ensured. POSOCO is
WKHSRZHUSODQWVDQGWKHJULG&(5&YLGHLWVRUGHURQVW-DQ FROODERUDWLQJZLWKWKH6WDWH/RDG'HVSDWFK&HQWUHVLQYDULRXV
2019, directed POSOCO to implement SCED for all thermal IXQFWLRQDO DUHDV OHDGLQJ WR NQRZOHGJH VKDULQJ DQG RYHUDOO
,6*6 RQ SLORW EDVLV IRU VL[ PRQWKV $FFRUGLQJO\ UHTXLVLWH GHYHORSPHQWRIWKHVHFWRU3262&2LVZHOOSRVLWLRQHGWROHDG
framework and infrastructure for implementation of SCED and the transition to greater renewable energy penetration, in the
its integration with scheduling has been put in place and the ,QGLDQ SRZHU VHFWRU JLYHQ RXU TXDOLW\ UHVRXUFHV H[SHULHQFH
SLORWKDVEHHQRSHUDWLRQDOL]HGRQVW$SULO and technical knowhow.

158
CHAPTER 26

SJVN LIMITED
1.0 About SJVN Beginning with a single Project and single State operation
,QGLD·VODUJHVW0:1DWKSD-KDNUL+\GUR3RZHU6WDWLRQ
SJVN Limited a Mini Ratna, Category-I and Schedule-’A’
in Himachal Pradesh) SJVN is presently implementing
&36( XQGHU DGPLQLVWUDWLYH FRQWURO RI 0LQLVWU\ RI 3RZHU
Hydroelectric Projects in Himachal Pradesh, Uttarakhand in
*RYW RI ,QGLD ZDV LQFRUSRUDWHG RQ 0D\   DV D MRLQW
,QGLDEHVLGHVQHLJKERXULQJFRXQWULHVYL]1HSDODQG%KXWDQ
YHQWXUH RI WKH *RYHUQPHQW RI ,QGLD *RO  DQG *RYHUQPHQW All units of NJHPS are under commercial operation since May
RI +LPDFKDO 3UDGHVK *2+3  WR SODQ SURPRWH GHYHORS DOO   6XEVHTXHQWO\ &RPPHUFLDO RSHUDWLRQ RI  0:
forms of power, both renewable as well as non-renewable 5DPSXU+(3ZDVDFKLHYHGLQ'HFHPEHU'XULQJ)<
DQGDOODQFLOODU\DFWLYLWLHVUHODWHGWKHUHWRLQ,QGLDDQGDEURDG 2018-19, NJHPS and RHPS generated 6507.125 MUs (Gross
LQFOXGLQJ SODQQLQJ LQYHVWLJDWLRQ UHVHDUFK GHVLJQ DQG Generation) and 1828.76 MUs (Gross Generation) up to March
SUHSDUDWLRQ RI SUHOLPLQDU\ IHDVLELOLW\ DQG GHÀQLWH 3URMHFW   UHVSHFWLYHO\ 6-91 DOVR FRPPLVVLRQHG  0:
UHSRUWV FRQVWUXFWLRQ JHQHUDWLRQ FRPSUHKHQVLYH RSHUDWLRQ .KLUYLUH:LQG3RZHU3URMHFWLQ0DKDUDVKWUDRQ0D\
PDLQWHQDQFH5HQRYDWLRQ 0RGHUQL]DWLRQRISRZHUVWDWLRQV 0:&KDUDQDND6RODU3RZHU3URMHFWLQ*XMDUDWRQ0DUFK
and projects, transmission, sale of power generated at stations DQG0:6DGOD:LQG3RZHU3URMHFWGXULQJ)<
in India and abroad.  &RPPHUFLDO FHUWLÀFDWLRQ RI  0: DZDLWHG  'XULQJ )<
.KLUYLUHZLQGSRZHUSODQW6DGOD:LQG3RZHUSODQW
*RYWRI,QGLDWKURXJKDQ,QLWLDO3XEOLF2IIHU ,32 RI6-91LQ
and Charanaka Solar Power Project has generated 62.053 MUs
the month of May, 2010 offered 10.03% of its share to the
(Gross Generation), 29.689 MUs (Gross Generation) & 7.397
SXEOLF DQG ÀQDQFLDO LQVWLWXWLRQV 7KH )LQDQFH 0LQLVWU\ KDV
08V *URVV*HQHUDWLRQ XSWR0DUFKUHVSHFWLYHO\
UHMLJJHG WKH &36( ([FKDQJH 7UDGHG )XQG (7)  DQG 6-91 LV
also included in the Basket of Bharat 22. Present Equity share 6-91KDVSDLGDWRWDOGLYLGHQGRI5V&URUHVIRU)<
holding of Gol, GoHP and public is 61.93 %, 26.85 % and 11.22  RXW RI ZKLFK WRWDO GLYLGHQG SDLG WR *RO *R+3  3XEOLF
UHVSHFWLYHO\DIWHUDOORFDWLRQRIVKDUHVWR(7)DQGEX\EDFN LV 5V  &U 5V  &U DQG 5V  &U UHVSHFWLYHO\
RIIHU7KHSUHVHQWDXWKRUL]HGVKDUHFDSLWDORI6-91LV5V 7KH\HDUZLVHGHWDLOVRIGLYLGHQGSDLGIRUWKHODVWIRXU\HDUVLV
JLYHQDVXQGHU
crore.
(In Rs. Crores)

DIVIDEND DECLARED YEARWISE

Sr. No. Year GoI GoHP Public Total

1 2014-15 279.99 110.78 43.58 434.35

2 2015-16 293.33 116.05 45.65 455.03

3 2016-17 733.32 290.13 114.12 1137.57

4 2017-18 554.89 221.55 88.12 864.56

2.0 Progress Made During 2018-19


7KH3URJUHVVPDGHGXULQJWKH\HDUXSWRLVDVXQGHU

Description Total gross energy generation up Total Target as per MoU for
to 31.03.2019 FY 2018-19
Gross Energy Generation in MUs (Hydro) 8335.89 9075

:LQG3RZHU 08V 91.743 117

Solar Power (MUs) 7.397 8

TOTAL (MU) 8435.03 9200

159
Annual Report 2018-19

3.0 Awards and Achievements

CMD, SJVN conferred with ET Now Award for CEO with HR Orientation and Director (Personnel), SJVN conferred with ET
1RZ:RPHQ6XSHU$FKLHYHU$ZDUG

SJVN Foundation for Corporate Social Responsibility has been conferred with ‘Gold Plate Award’ by HelpAge India. The
award was presented by Former Hon’ble President of India Sh. Pranab Mukherjee to Chairman & Managing Director, SJVN
Sh. Nand Lal Sharma in a function held at India Habitat Centre, New Delhi.

 6-91KDVEHHQDZDUGHGZLWK$TXD)RXQGDWLRQ([FHOOHQFH$ZDUGLQWKHFDWHJRU\RI¶6XVWDLQDEOH'HYHORSPHQWLQ
+\GUR3RZHU6HFWRU 3XEOLF6HFWRU ·GXULQJ;,,:RUOG$TXD&RQJUHVV,QWHUQDWLRQDO&RQIHUHQFH

SJVN has been conferred with the prestigious IPPAI Power Award -2018 under the Category of “Best Hydro Power
*HQHUDWRUµGXULQJWK,QGHSHQGHQW3RZHU3URGXFHUV$VVRFLDWLRQRI,QGLD ,33$, 5HWUHDWDW.DUQDWDND

 6-91/LPLWHGFRQIHUUHGZLWK5DMEKDVKD.LUWL$ZDUGIRUHIIHFWLYH,PSOHPHQWDWLRQRI2IÀFLDO/DQJXDJH3ROLF\IRUWKH\HDU
7KHDZDUGZDVSUHVHQWHGE\+LV([FHOOHQF\9LFH3UHVLGHQWRI,QGLD6KUL9HQNDLDK1DLGXWR6KUL1DQG/DO6KDUPD
Chairman and Managing Director, SJVN.
4.0 Financial Parameters of SJVN
77KHÀQDQFLDOSHUIRUPDQFHRI6-91IRUWKHODVWIRXUÀQDQFLDO\HDUVLVDVXQGHU
(In Rs. Crores)

S. No. Description 2017-18 2016-17 2015-16 2014-15


(Rs. In Crores) (As per IND-AS)
A INCOME DETAILS
I Sales 2229.97 2679.31 2493.96 2817.53
II Other income 357.10 440.59 409.86 438.39
III Total income 2587.07 3119.90 2903.82 3255.92
IV 3URÀWEHIRUHWD[ 1648.37 1873.93 1704.21 2047.25
V 3URÀWDIWHUWD[ 1224.88 1544.14 1407.34 1676.75
VI 'LYLGHQG'HFODUHG 864.56 1137.57 455.03 434.35
VII 7D[RQ'LYLGHQG 176.16 231.59 92.63 89.71
VIII 5HVHUYHVDQG6XUSOXV 6764.91 7347.20 7161.24 6066.41

5.0 Future Plan for Capacity Addition


 6-91KDVGUDZQDFRPSUHKHQVLYHFDSDFLW\DGGLWLRQSODQWRDFKLHYHDWDUJHWRIDSSUR[LPDWHO\0:LQVWDOOHGFDSDFLW\
E\WKH\HDUWRHPHUJHDVDPDMRUFRQWULEXWRULQ3RZHUJHQHUDWLRQ6-91KDVWDNHQXSWKHH[HFXWLRQDQGVXEVHTXHQW
operation and maintenance of the following projects in the states of India & Abroad.
6.0 Current Project Portfolio In India

Sr. No. Name of Project State Capacity (MW)


Under Operation
1 Nathpa Jhakri Hydro Power Station H. P. 1500
2 Rampur Hydro Power Station H. P. 412
3 .KLUYLUH:LQG3RZHU3URMHFW Maharashtra 47.6

160
4 6DGOD:LQG3RZHU3URMHFW &RPPHUFLDOFHUWLÀFDWLRQRI0: Gujarat 50
awaited)
5 Charanaka Solar Power Project Gujarat 5.6
Project Under Implementation
6 Naitwar Mori Hydro Electric Project Uttarakhand 60
7 %X[DU7KHUPDO3RZHU3URMHFW Bihar 1320
Under various stages of clearances/ Survey & Investigation
8 Luhri Hydro Electric Project (LHEP Stage I, LHEP Stage II, Sunni Dam H. P. 6WDJH,0:
HEP) 6WDJH,,0:
Sunni Dam-
0:
9 Dhaulasidh Hydro Electric Project H. P. 66
10 Jangi Thopan Powari HEP H.P 780
11 'HYVDUL+\GUR(OHFWULF3URMHFW Uttarakhand 252
12 Jakhol Sankri Hydro Electric Project Uttarakhand 44

Abroad

Sr. No. Name of Project Country Capacity (MW)


Nepal
1 $UXQ+\GUR3RZHU3URMHFW 8QGHU([HFXWLRQ Nepal 900
Bhutan
2 .KRORQJFKKX+\GUR(OHFWULF3URMHFW 8QGHU([HFX- Bhutan 600
tion)

Transmission Line

Sr. No. Name of Project Length (in ckm)


1 N9GRXEOHFLUFXLWWUDQVPLVVLRQOLQHIRUHYDFXDWLRQRISRZHUIURP0:$UXQ 217
,OO3URMHFWLQ1HSDOXSWR0X]]DIIDUSXU ,QGLD
2 N9'&WUDQVPLVVLRQOLQHIURP1HSDO&RQQHFWLRQ3RLQWWR0X]DIIDUSXU 86

7.0 Industrial Relations LPSURYLQJLQWHU³SHUVRQDOUHODWLRQVDQGDOVRWREULQJ


out the talent of employees and their family members.
5HJXODU LQWHUDFWLRQV DUH KHOG ZLWK WKH UHSUHVHQWDWLYHV
RI YDULRXV $VVRFLDWLRQV8QLRQV 7KH WKUXVW DUHD IRU 8.0 Environment
discussions is related to policies as well as issues
 $W WKLV SRLQW FRXQWULHV ZRUOG RYHU KDYH DVVHPEOHG WR
FRQFHUQLQJ HQKDQFLQJ SURGXFWLRQ HIÀFLHQF\ DQG
decide the practical implementation of Paris Agreement,
LPSURYLQJRUJDQL]DWLRQDOFOLPDWH7KHDERYHDFWLRQVRI
VR WKDW ZH FUHDWH D VXVWDLQDEOH HQYLURQPHQW IRU WKH
WKH0DQDJHPHQWSDYHGWKHZD\IRUFRUGLDODQGEHWWHU
generations to come. SJVN as a responsible company,
employee-employer relations and the industrial relations
has a keen concern to generate clean energy by
during the year. Recreational, cultural and sports
SURPRWLQJ DQG GHYHORSLQJ K\GURSRZHU DQG RWKHU
DFWLYLWLHVDUHEHLQJRUJDQL]HGRQGLIIHUHQWRFFDVLRQVIRU

161
Annual Report 2018-19

renewable sources of energy. Although hydropower is essay competitions, etc., promoting the theme “Beating
touted to be the cleanest source of energy but it has 3ODVWLF 3ROOXWLRQµ ZDV RUJDQL]HG WR FRPPHPRUDWH WKH
VRPHHQYLURQPHQWDOFRQVHTXHQFHV7KHUHIRUHDW6-91 :RUOG(QYLURQPHQW'D\)RUDFOHDQHUDQGJUHHQHU
ZHKDYHEHHQPDNLQJSHUSHWXDOHQGHDYRUVWREHWWHURXU HQYLURQPHQWSODQWDWLRQKDVEHHQFDUULHGRXWDWYDULRXV
HQYLURQPHQWDQGNHHSLWSROOXWLRQIUHH RIÀFHV  SURMHFWV RI 6-91 )XUWKHU 6-91 MRLQHG KDQGV
SJVN has been religiously complying with all the with HP State Pollution Control Board in their campaign
VWLSXODWRU\DQGUHJXODWRU\UHTXLUHPHQWVRQHQYLURQPHQW on Pollution Abating Plants Abhiyan (PAPA), wherein
7KLV DSSOLHV QRW MXVW WR &OHDUDQFHV RQ (QYLURQPHQW RU RXWGRRUVDSOLQJVDQGLQGRRUVDSOLQJVKDYH
Forests, we are also committed to newly introduced been planted. The campaign has bagged Skoch Order-
legislations on e-waste, solid waste management, of-Merit Award in 2018 for qualifying amongst the top
KD]DUGRXV ZDVWH HWF ,Q DGGLWLRQ ZH EHOLHYH LQ HQYLURQPHQWSURMHFWVLQ,QGLD
SURPRWLQJJRRGHQYLURQPHQWDOSUDFWLFHVOLNHWDUJHWLQJ 9.0 Corporate Social Responsibility and Sustainability
HIÀFLHQWXVHRISDSHUUHF\FOLQJ
6-91 EHLQJ D UHVSRQVLEOH FRUSRUDWH FLWL]HQ KDV VLQFH
 5RRIWRS6RODU39N: $& SODQWDW5+36LVFDWHULQJ been implementing CSR programs integral to its core
to the load requirements for operation, control and EXVLQHVV DFWLYLWLHV 7KH &65 SURJUDPV DUH IRFXVHG
LOOXPLQDWLRQ DW %XWWHUÁ\ 9DOYH +RXVH %9+  VLQFH 0D\ RQ LQFOXVLYH JURZWK RI WKH VRFLHWLHV LQ DQG DURXQG LWV
+HQFHWKHUHTXLUHPHQWRIDX[LOLDU\FRQVXPSWLRQ RSHUDWLRQDODUHDV,QFRPSOLDQFHZLWKWKHSURYLVLRQVRI
KDV UHGXFHG (QHUJ\ FRQVHUYDWLRQ PHDVXUHV KDYH the Companies Act, 2013, the CSR and sustainability Plan
been taken at NJHPS by installing solar street lights, for FY 2017-18 of SJVN was adopted with the budget
sensor based lighting system and LED lights at Naitwar
RXWOD\ RI 5V  &U 9DULRXV &65 DFWLYLWLHV KDYH EHHQ
Mori HEP (NMHEP). In the latter project, old heating
FKRVHQ DV SHU WKH DFWLYLWLHV VXJJHVWHG XQGHU 6FKHGXOH
DSSOLDQFHV KDYH EHHQ UHSODFHG ZLWK PRUH HIÀFLHQW  
VII of the Companies Act, 2013. The entire 100%
star rated appliances.
EXGJHWHGIXQGVRI5V&UZHUHXWLOL]HG7KHGHWDLOV
 5+36 KDV LQVWDOOHG DQ DGYDQFHG ZDUQLQJ FXP DOHUW RIWKHSURJUDPVFDUULHGRXWDUHDVXQGHU
V\VWHPRQ5LYHU6DWOXMVRWKDWLQKDELWDQWVSXWWLQJXSRQ
i) Free health care to local communities
LWVEDQNVDUHZDWFKIXORIÁRRGOLNHVLWXDWLRQV7KLVV\VWHP
VKDOODOHUWWKHPZKRDUHOLYLQJZLWKLQÀIWHHQNLORPHWHUV The health and hygiene facilities in most rural
downstream of station tailrace. areas are inadequate and SJVN has supported the
EHWWHUPHQW RI KHDOWKFDUH VHUYLFHV LQ WKHVH DUHDV
 6ROLG ZDVWH JHQHUDWHG DW RXU SURMHFW VLWHV  RIÀFHV
E\FUHDWLQJVXLWDEOHLQIUDVWUXFWXUHDQGGHYHORSLQJ
is segregated in colored dustbins & disposed off in
an outreach program at the doorsteps of rural
DQ HQYLURQPHQWDOO\ VRXQG PDQQHU 7KH VROLG ZDVWH
households by deploying mobile medical units
generated at RHPS Township is being treated for wet
008 XQGHUWKHEDQQHURIWKHC6DWOXM6DQMHHYDQL
ZDVWH E\ NJ FDSDFLW\ 2UJDQLF :DVWH &RQYHUWHU 7KH
6HZD· VHUYLFH LQ WKH VWDWH RI +LPDFKDO 3UDGHVK
YHUPLFRPSRVWLQJ XQLWV DUH DOVR EHLQJ GHYHORSHG
Uttarakhand , Maharashtra and Bihar through
at RHPS & NJHPS. Biodegradable waste generated
from NJHPS canteen is being treated by the installed HelpAge India. The MMUs are equipped with
 NJ %LRPHWKDQDWLRQ 8QLW :DVWH WR HQHUJ\ SODQW TXDOLÀHGPHGLFDOVWDII 0%%6GRFWRUVSKDUPDFLVWV
KDYLQJ FDSDFLW\ RI  0: LV EHLQJ SURSRVHG DW WKH VRFLDOSURWHFWLRQRIÀFHUV DQGEDVLFGLDJQRVWLFWHVW
LGHQWLÀHG ORFDWLRQ RI :DGKDO .LQQDXU 2XU FRUSRUDWH equipments. Till date, 12 MMUs are in operation
RIÀFH EXLOGLQJ KDV D SURYLVLRQ RI  OLWUH UDLQZDWHU LQ YDULRXV SURMHFW DUHDV RI 6-91 7KH WRWDO QR RI
KDUYHVWLQJV\VWHPZKLFKLVXWLOL]HGLQKRUWLFXOWXUH IRU SDWLHQWV UHFHLYLQJ WUHDWPHQW GXULQJ 
recharging of groundwater. Entire biodegradable waste DQGFXPXODWLYHQRRISDWLHQWVKDVFURVVHG
JHQHUDWHG IURP FRUSRUDWH RIÀFH EXLOGLQJ LV SURFHVVHG 5 Lakh.
LQ%LRFRPSRVWHUSODQW WKHFRPSRVWLVXWLOL]HGDVLQ  ,Q DGGLWLRQ WR WKH DERYH WZR 008V RQH HDFK DW
horticulture. NJHPS and RHPS are being operated in project
 6-91 KDV EHHQ VSUHDGLQJ LGHDV RQ HQYLURQPHQW DIIHFWHG DUHD SURYLGLQJ IUHH FRQVXOWDWLRQV DQG
FRQVHUYDWLRQ E\ RUJDQL]LQJ YDULRXV FRPSHWLWLYH medicines by company doctor. The total number of
DFWLYLWLHV (QHUJ\ $ZDUHQHVV 3URJUDPPHV HWF 3DLQWLQJ treatments conducted in the FY 2017-18 through
GHFODPDWLRQ TXL]]HV SKRWRJUDSK\ EHVW IURP ZDVWH Departmental MMU is 1885.

162
SJVN Foundation has also conducted health check items needed for the care of the new born is also
up camps in its project areas through HelpAge SURYLGHG 'XULQJ WKH )<  WRWDO  %3/
,QGLD7KHREMHFWLYHRIRUJDQL]LQJKHDOWKFDPSVLV ZRPHQKDYHEHQHÀWWHGXQGHUWKLVVFKHPH
WRSURYLGHVSHFLDOL]HGPHGLFDOVHUYLFHVLQWKHDUHDV
iv. Skill development programs and Strengthening
of gynaecology, ophthalmology, orthopaedics,
& augmentation of infrastructural and other
SDHGLDWULFVHWFZKLFKDOVRLQFOXGHYDULRXVPHGLFDO
facilities
WHVWV7RWDOFDPSVKDYHEHHQRUJDQL]HGGXULQJ
)<EHQHÀWLQJSDWLHQWV  *RYWRI,QGLDKDVODXQFKHG6NLOO,QGLDLQLWLDWLYHVWR
transform young population as skilled man force
Apart from health camps through HelpAge, 30
WR GULYH HFRQRPLF JURZWK DQG DW WKH VDPH WLPH
KHDOWK FDPSV EDVHG RQ $\XUYHGLF V\VWHP ZHUH
WRLPSURYHHPSOR\DELOLW\,QWKLVGLUHFWLRQ6-91LV
RUJDQL]HG WKURXJK %KDUWL\D 'KDURKDULQ +3
LPSOHPHQWLQJYDULRXV6NLOOGHYHORSPHQWSURJUDPV
EHQHÀWLQJDURXQGSHRSOHIURP6-91SURMHFW
LQLWVSURMHFWDUHDVWRVXSSOHPHQWWKH*RYHUQPHQW·V
areas during 2017-18.
HIIRUWV RI VNLOOLQJ \RXWK 3HRSOH EHQHÀWHG XQGHU
 )LQDQFLDO DVVLVWDQFH RI 5V  ZDV YDULRXVVNLOOGHYHORSPHQWSURJUDPVXQGHUWDNHQE\
H[WHQGHG E\ 6-91 WR 6KLPOD 5RWDU\ &KDULWDEOH 6-91DUHDVXQGHU
7UXVW IRU FRQVWUXFWLRQ DFWLYLWLHV QHDU ,*0& &DQFHU
Hospital to facilitate the cancer patients and their SN Name of program Number of
EHQHÀFLDULHV
attendants.
in FY 2017-18
 $ÀQDQFLDODVVLVWDQFHDPRXQWLQJWR5V
1. ITIs sponsorship for project youth- 117
ZKLFKLQFOXGHV5VIRULQVWUXPHQWVIRU
one to two years duration
JHQHUDO GLDJQRVLV DQG 5V  IRU VXUJLFDO
LQVWUXPHQWV ZDV SURYLGHG WR 9LYHNDQDQG 0HGLFDO 2. 6NLOOGHYHORSPHQWSURJUDPPHRI 2870
,QVWLWXWH D 8QLW RI 9LYHNDQDQG 0HGLFDO 5HVHDUFK one to three months duration
7UXVW 3DODPSXU'LVWW.DQJUD+LPDFKDO3UDGHVK
3. One week training to farmers 1600
ii) Care and close attention to those that need in agriculture and horticulture
special care
$SDUW IURP DERYH 6-91 KDV WDNHQ LQLWLDWLYHV WR GHYHORS VL[
 8QGHU WKH KHDOWK DQG K\JLHQH YHUWLFDO 'LY\DQJ ,7,V LQWR WKH FHQWUH RI H[FHOOHQFH )XUWKHU 5V  &U KDV EHHQ
people get special attention and special CSR released to 4 ITIs (1 crore each).
SURMHFWVDUHLPSOHPHQWHGH[FOXVLYHO\IRUWKHP6-91
Foundation for CSR is funding Indian Association v. Promotion of education
of Muscular Dystrophy (IAMD) for construction of  7KH6-916LOYHU-XELOHH0HULW6FKRODUVKLS6FKHPH
0DQDY0DQGLUDQ,QWHJUDWHG0XVFXODU'\VWURSK\ ZKLFK DLPV DW LQFXOFDWLQJ FRPSHWLWLYH VSLULW
&HQWUHDW6RODQ,QRYHU\HDUVDWRWDORI5V among students was launched in the FY 2012-13.
Lakh has been contributed towards IAMD project. The scheme is open for 12th class meritorious
,Q )< ¥ DQ DPRXQW RI 5V  KDV students for pursuing higher studies in different
EHHQSURYLGHGWR,$0'IRUOD\LQJZDWHUKDUYHVWLQJ streams. Selected students are paid a scholarship
V\VWHP FRQVLVWLQJ RI WZR UDLQ ZDWHU KDUYHVWLQJ RI5VSHUPRQWKWLOOWKHWLPHWKH\FRPSOHWH
tanks, one water supply tank and water treatment WKH FRXUVH  VWXGHQWV KDYH EHHQ DZDUGHG WKH
plant. VFKRODUVKLS XQGHU WKH 6-91 6LOYHU -XELOHH 0HULW
iii) SJVN Empowering Women of Weaker Sections scholarship scheme in the states of HP, Uttrakhand,
Maharashtra, Bihar and Arunachal Pradesh in the
 8QGHUWKH:RPHQDQG&KLOG'HYHORSPHQW : &'  year 2017-18.
VFKHPH D ÀQDQFLDO EHQHÀW RI 5V  LQ WZR
LQVWDOOPHQWV RI 5V  HDFK GXULQJ DQWH Under reward scheme to topper students of
QDWDO DQG SRVWQDWDO SHULRGV  LV H[WHQGHG IRU WKH JRYHUQPHQW VFKRROV ORFDWHG LQ SURMHFW DUHDV RI
SXUSRVH RI SURYLGLQJ KHDOWK\ QRXULVKPHQW WR %3/ SJVN, the topper students of class 8th, 10th and
:RPHQ %HVLGHV WKH GLUHFW ÀQDQFLDO EHQHÀWV D WK RI WKH ORFDO JRYW VFKRROV DUH SURYLGHG FDVK
JLIWSDFNZRUWK5VFRQVLVWLQJRIQXWULWLRQDO UHZDUG ,Q )<   VWXGHQWV ZHUH JLYHQ
food items, soaps and other hygiene related cash reward.

163
Annual Report 2018-19

SJVN haVFRQVHQWHGWRSURYLGHÀQDQFLDODVVLVWDQFH DPRXQW RI 5V  SHU WRLOHW SHU )< ZKLFK FDQ
of Rs.1.85 cr in 6 phases to Shri Dudhiya Baba Sanyas EHUHOHDVHGE\UHVSHFWLYHSURMHFWWRWKHVFKRROIRU
Ashram Rudrapur for construction of hostel building maintenance of toilet (for general maintenance
EHLQJ UXQ DQG PDQDJHG XQGHU WKHVXSHUYLVLRQ RI OLNHUHSDLUFKDQJHRIFLVWHUQVHDWWDSZDVKEDVLQ
Sewa Prakalp Sansthan. The construction of hostel GRRUV ZDWHU WDQNV RWKHU VDQLWDU\ ÀWWLQJ ZKLWH
building aims to accommodate 180 girls. ZDVKLQJ SDLQWLQJ HWF  RQ UHFHLSW RI GXO\ YHULÀHG
FRSLHV RI YRXFKHUV E\ 3ULQFLSDO RI WKH VFKRRO $Q
vi. Infrastructural Development and community
DPRXQW RI 5V  KDV EHHQ VSHQW RQ WKH
assets
maintenance of the toilets during 2017-18.
 6-91·V LQIUD GHYHORSPHQW DFWLYLWLHV XQGHU &65
 6-91 )RXQGDWLRQ IRU &65 KDV SURYLGHG ÀQDQFLDO
ranges from construction of panchayat building,
DVVLVWDQFH RI 5V  WR 8WWUDNKDQG 6WDWH
mahila mandal buildings, toilets, school buildings,
Council for Science and Technology (UCOST),
hospitals, bus stand, cremation grounds and others. 'HKUDGXQ IRU VHWWLQJ XS RI %LRGLYHUVLW\ 3DUN DW
,Q WKH \HDU   DVVHWV KDYH EHHQ FUHDWHG Vigyan Dham, Dehradun under CSR. The work
DQG  DVVHWV DUH XQGHU H[HFXWLRQ 7KHVH ZRUNV consist of surface dressing of area, construction
DUH EHLQJ H[HFXWHG E\ SURMHFWV WKURXJK 9LOODJH of drainage system, horticulture & landscaping,
'HYHORSPHQW $GYLVRU\ &RPPLWWHH 9'$&  ORFDO irrigation system, construction of pond with
contractor and SMC etc. During the FY 2017-18, an fountain and lighting system, construction of green
DPRXQW RI 5V KDV EHHQ VDQFWLRQHG house.
for construction of community assets in MC Shimla.
 028 GDWHG  ZDV VLJQHG ZLWK ((6/ IRU
 6-91 KDV SURYLGHG FRQVHQW WR +33:' 1LUPDQG 5V  IRU LQVWDOODWLRQ RI  VRODU VWUHHW
'LVWW .XOOX +3 IRU ÀQDQFLDO VXSSRUW RI 5V lights and 50 high mast lights in Lucknow (East).
 IRU H[HFXWLQJ WKH ZRUN RI PHWDOOLQJ $SDUW IURP DERYH 028 GDWHG  ZDV
DQG WDUULQJ RI  .P URDG IURP YLOODJH %D\DO VLJQHGZLWK((6/IRU5VIRULQVWDOODWLRQ
EDWFKLQJSODQW WRYLOODJH.R\DO of LED based 25 high mast lights and 325 solar
 6-91 KDV JLYHQ FRQVHQW IRU SURYLGLQJ ÀQDQFLDO street lights in Deoria and Shahjahanpur area. As
DVVLVWDQFHRI5VWR+LPDFKDO6KLNVKD regard installation as on 10.04.2018, 96 solar street
6DPLWL IRU ÀQLVKLQJ DQG VLWH GHYHORSPHQW ZRUN OLJKWVKDYHEHHQLQVWDOOHGLQ/XFNQRZ/('KLJK
of newly constructed hostel building of Saraswati PDVW OLJKWV KDYH EHHQ LQVWDOOHG LQ 6KDKDMKDQSXU
and as regards to installation of solar street lights
Vidya Mandir, Him Rashmi, Vikasnagar.
OLJKWVKDYHEHHQLQVWDOOHGLQ6KDKMDKDQSXU
vii. Sustainable Development
viii. Preservation and promotion of culture and
Rehabilitation of water bodies is an important sports
DFWLYLW\ XQGHU WKH 6XVWDLQDELOLW\ 'HYHORSPHQW
To promote the composite culture of India, SJVN
YHUWLFDO,Q)<ZDWHUVRXUFHVKDYHEHHQ
VXSSRUWV QDWLRQDO DQG UXUDO IHVWLYDOV 'XULQJ )<
UHKDELOLWDWHG IRU UHXVH DQG  DUH XQGHU H[HFXWLRQ
2017-18 an amount of Rs. 53.07 lakh has been
stage.
spent towards the promotion of local culture
Under the Swach Vidyalaya Abhiyan, SJVN DQG VSRUWV 6RPH RI WKH QRWDEOH IHVWLYDOV QDPHO\
has constructed 2421 toilets in the state of HP, ,QWHUQDWLRQDO /DYL 0HOD 6KLPOD 6XPPHU IHVWLYDO
Uttarkhand, Bihar and Maharastra. Further 178 .XOOX'XVVHKUD+DPLU8WVDY.LQQDXU0DKRWVDYHWF
WRLOHWV DUH EHLQJ FRQVWUXFWHG E\ 6DUYD 6KLNVKD were supported,
$EKL\DQ 66$  RI +3 *RYt. at a total cost of
 6-91 KDV SURYLGHG ÀQDQFLDO DVVLVWDQFH RI 5V
Rs.133.50 Lakh, out of which funds of Rs.66 Lakh in
crore for construction of boundary wall, repair and
WZRLQVWDOOPHQWVKDYHEHHQUHOHDVHGWR66$
UHFRQVWUXFWLRQRISDUWVRI%KLPDNDOL7HPSOHFRPSOH[
 $V SHU WKH GLUHFWLYHV RI 023 D PHFKDQLVP ZDV DW6DUDKDQDVDPHDVXUHWRHQVXUHHQYLURQPHQWDO
HYROYHG IRU PDLQWHQDQFH RI WRLOHWV LQ WKH VFKRROV cleanliness in its premises and also for protection
DQGLWZDVGHFLGHGWRNHHSDOXPSVXPPD[LPXP DQGWKHSUHVHUYDWLRQRILWVULFKFXOWXUDOKHULWDJHDQG

164
5V  FURUH IRU RQJRLQJ UHQRYDWLRQUHFRQVWUXFWLRQ During implementation stage of the R&R plan, regular
RI WKH 7DUD 0DWD 7HPSOH FRPSOH[ QHDU 6KLPOD monLWRULQJ RI 5 5 DFWLYLWLHV LV FRQGXFWHG WKURXJK DQ
7KH UHQRYDWLRQXS JUDGDWLRQ ZRUN RI 7DUD 'HYL LV H[WHUQDO LQGHSHQGHQW DJHQF\ WR HQVXUH WLPHO\ H[WHQVLRQ RI
QHDULQJFRPSOHWLRQDQGUHQRYDWLRQXSJUDGDWLRQ 5 5EHQHÀWVWRWKH3$)V6LPLODUO\DIWHUFRPSOHWLRQRI5 5
work at Bhimakali temple is yet to start. DFWLYLWLHVODLGGRZQXQGHU5 5SODQVRFLDOLPSDFWHYDOXDWLRQLV
ix. Assistance during natural disasters FDUULHGRXWE\LQGHSHQGHQWH[WHUQDODJHQF\WRDVVHVVYDULRXV
WDQJLEOHDQGLQWDQJLEOHEHQHÀWVDFFUXHGLQWKHDUHDRIVRFLR
Rs. 1 crore has been contributed towards HP Chief
HFRQRPLFGHYHORSPHQW7KH5 5SODQVKDYHEHHQVXFFHVVIXOO\
0LQLVWHU·V UHOLHI IXQG $ERYH FRQWULEXWLRQ RI 5V
LPSOHPHQWHGLQ0:1DWKSD-KDNUL+\GUR3RZHU6WDWLRQ
25 Lakh towards Chief Minister Relief Fund. Bihar
1-+36  DQG  0: 5DPSXU +\GUR 3RZHU 6WDWLRQ 5+36 
KDV EHHQ PDGH RQ  ,Q DGGLWLRQ 5V
both located in Himachal Pradesh, whereas R&R plan is being
 KDV EHHQ VSHQW WRZDUGV SURFXUHPHQW
LPSOHPHQWHG LQ  0: 1DLWZDU 0RUL +\GUR (OHFWULF 3URMHFW
DQGWUDQVSRUWDWLRQRIUHOLHIPDWHULDOIRUÁRRGUHOLHI
8WWUDNKDQG 6HYHUDOEHQHÀWVXQGHU5 53ODQOLNHSURYLGLQJ
in Bihar.
alternate agricultural land, allotment of constructed houses
Rehabilitation and Resettlement in SJVN in rehabilitation colonies or grant of construction cost to
SJVN, being conscious of its responsibilities towards society, is houseless PAFs, suitable employment to eligible landless PAFs
FRPPLWWHGWRH[HFXWHDQGRSHUDWHSRZHUSURMHFWVLQDVRFLDOO\ RU ÀQDQFLDO DVVLVWDQFH LQ OLHX RI HPSOR\PHQW VXEVLVWHQFH
responsible manner by adopting generous Resettlement DOORZDQFH KDYH EHHQ SURYLGHG WR 3$)V ,Q DGGLWLRQ WR WKHVH
 5HKDELOLWDWLRQ PHDVXUHV IRU WKH EHQHÀW RI SURMHFW EHQHÀWVRWKHUFDSLWDODVVHWVKDYHEHHQFUHDWHGZKLFKLQFOXGH
DIIHFWHG IDPLOLHV 3$)V  DQG E\ LQYHVWLQJ LQ VRFLRHFRQRPLF LQIUDVWUXFWXUH DQG FRPPXQLW\ GHYHORSPHQW IDFLOLWLHV OLNH
GHYHORSPHQW RI FRPPXQLWLHV VR DV WR FRQWLQXDOO\ PLQLPL]H YLOODJHSDWKVURDGVSDQFKD\DWEKDZDQVVFKRROLQIUDVWUXFWXUH
SRWHQWLDOQHJDWLYHLPSDFWVDVZHOODVWRHVWDEOLVKVXVWDLQDEOH playgrounds, drinking water, health & hygiene etc. The local
SRVLWLYHLPSDFWRISURMHFWVRQWKHP farmers around RHPS were adequately compensated for
:HOO EHIRUH DQ\ SURMHFW LV WDNHQ XS IRU H[HFXWLRQ 6RFLDO reduction in crop yield as per the crop compensation policy of
Impact Assessment (SIA) study is carried out to ensure that the WKH*RYHUQPHQWRI+3%HVLGHVWKLVIXQGVRI5V&URUHV
SRWHQWLDO VRFLRHFRQRPLF EHQHÀWV DFFUXHG IURP WKH SURMHFW KDYHEHHQVSHQWXQGHU/RFDO$UHD'HYHORSPHQW)XQG /$') 
RXWZHLJK WKH VRFLDO FRVWV DQG DGYHUVH VRFLDO LPSDFW 3XEOLF IRU FDUU\LQJ RXW YDULRXV LQIUDVWUXFWXUDO GHYHORSPHQW ZRUNV
consultation meetings with the stakeholders are held by the 7KH6RFLDO,PSDFW$VVHVVPHQW6WXG\RI0:/+(3VWDJH,
project authorities to make the local communities aware of (H.P) has been carried out by GoHP empanelled agency.
GHYHORSPHQWDO IDFLOLWLHV WR EH FUHDWHG LQ WKH ÀHOG RI KHDOWK
7KHVRFLDOLPSDFWHYDOXDWLRQVWXGLHVRI5 5SODQLPSOHPHQWHG
education, sanitation, drinking water, approach roads and
in NJHPS and RHPS was carried out by Agro-Economic
RWKHU FRPPXQLW\ DVVHWV RI WKH SURMHFW DQG WKHLU EHQHÀWV WR
WKH VRFLHW\ 6XEVHTXHQWO\ WKH 5 5 SODQ LV GHYLVHG EDVHG 5HVHDUFK &HQWUH $(5&  RI +LPDFKDO 3UDGHVK 8QLYHUVLW\ 7KH
RQ FRQFOXVLYH ÀQGLQJV GHULYHG IURP VRFLR HFRQRPLF VXUYH\ UHSRUWVXEPLWWHGE\$(5&UHYHDOHGWKDW5 5LPSOHPHQWDWLRQ
FDUULHGRXWE\DQLQGHSHQGHQWH[SHUWDJHQF\7KH5 5SODQ in the project-affected areas substantially enhanced socio-
WKXV GHYLVHG DQG DSSURYHG HVVHQWLDOO\ SUHVFULEHVPLWLJDWLRQ HFRQRPLF VWDQGDUGV RI WKH ORFDO SRSXODWLRQ RQ YDULRXV
measures for reconstruction and regeneration of economy of GHYHORSPent parameters.
the PAFs.

165
Annual Report 2018-19

6KUL'96LQJK&0'7+'&,/KDQGLQJRYHU,QWHULP'LYLGHQG&KHTXHWR+RQ·EOH0R6 ,& 3RZHU 15(


*R,6KUL5.6LQJKDW'HOKL

166
CHAPTER 27

THDC INDIA LTD (THDCIL)


7+'& ,QGLD /LPLWHG LV D -RLQW 9HQWXUH RI *RYW RI ,QGLD DQG Tehri Dam Project constructed and owned by THDCIL has won
*RYWRI8WWDU3UDGHVK7KH(TXLW\LVVKDUHGEHWZHHQ*R,DQG the prestigious award of “International Milestone Project” of
*R83LQWKHUDWLRRI7KH&RPSDQ\ZDVLQFRUSRUDWHGLQ-XO\· ,QWHUQDWLRQDO&RPPLVVLRQRI/DUJH'DPV ,&2/' .RWHVKZDU
WRGHYHORSRSHUDWH PDLQWDLQWKH0:7HKUL+\GUR +(3  0:  RI 7+'& ,QGLD /LPLWHG KDV ZRQ ´30, ,QGLD
3RZHU &RPSOH[ DQG RWKHU +\GUR 3URMHFWV 7KH $XWKRULVHG  %HVW 3URMHFW RI WKH \HDU $ZDUGµ .RWHVKZDU +(3 KDV
Share Capital of Corporation is Rs. 4000 Cr. Paid up Capital of also won “5th CIDC Vishwakarma Award-2013”. THDCIL had
the Company as on 31.03.19 is Rs. 3654.87 Cr and Rs. 4 Cr. as been conferred Scope Meritorious Award for Corporate Social
share capital pending allotment. 5HVSRQVLELOLW\ DQG 5HVSRQVLYHQHVV LQ WKH \HDU  7+'&
,QGLD/LPLWHGUHFHLYHG)LUVWDQG6HFRQG3UL]HRI´,QGLUD*DQGKL
THDCIL was conferred ‘Miniratna Category –’I’ status in Oct’09
Rajbhasha Award” on the occasion of Hindi Diwas on 14th
DQGXSJUDGHGWR6FKHGXOH¶$·FRPSDQ\LQ-XO\·E\WKH*RYW
6HSIRUWKH)<DQGWK1RYIRUWKH)<
of India.
 DQG WKLUG SUL]H IRU \HDU  RQ WK 6HSW IURP
7KH  0: 7HKUL +\GUR 3RZHU &RPSOH[ RQ WKH ULYHU President of India. THDC India Limited has been conferred with
%KDJLUDWKL FRPSULVHV RI 7HKUL 'DP  +33  0:  the Gold Trophy & a Citation under Prestigious “SCOPE Award
.RWHVKZDU +(3  0:  DQG 7HKUL 363  0:  7KH IRU ([FHOOHQFHµ IRU RXWVWDQGLQJ FRQWULEXWLRQ WR WKH 3XEOLF
Company successfully commissioned Tehri Dam & HPP (1000 Sector Management in the Institutional Category II (Mini
0:  6WDJH, DQG .RWHVKZDU +(3  0:  LQ  DQG Ratna I & II PSEs)” on 11.04.2016 for the year 2013-14. THDCIL
UHVSHFWLYHO\0:7HKUL363LVXQGHUFRQVWUXFWLRQ UHFHLYHG´*UHHQ7HFK3ODWLQXP+5/HDGHU$ZDUGµDW0XPEDL
and is anticipated to be commissioned by June-22. on 06.05.2016. “CBIP award for best maintained structure to
9LVKQXJDG 3LSDONRWL +\GUR (OHFWULF 3URMHFW  0:  RQ WKH 7HKUL+\GUR3RZHU3ODQWµKDVEHHQUHFHLYHGRQDW
ULYHU $ODNQDQGD LQ 8WWDUDNKDQG LV XQGHU FRQVWUXFWLRQ 7KH Delhi. For outstanding contribution to the Nation by use of
3URMHFWLVIXQGHGE\:RUOG%DQN7KH3URMHFWLVDQWLFLSDWHGWR latest technologies and Smart solutions, THDC India Ltd has
be commissioned by Dec-22. been conferred with “CBIP award for Best Performance Utility
in Hydro Power Sector” on 04.01.2019.
'KXNZDQ  0: 6PDOO +\GUR 3URMHFW 6+3  LQ 'LVWW -KDQVL
(UP) is under construction and scheduled to be commissioned OPERATIONAL PERFORMANCE
by Oct-19. THDCIL at present is generating power from Tehri HPP,
7+'&,/KDVDOVRXSGDWHG'35RI6DQNRVK+(3 0: DQG .RWHVKZDU+(33DWDQ:LQG)DUPDQG'ZDUND:LQG)DUPZLWK
%XQDNKD+(3 0: LQ%KXWDQ%XQDNKD+(3LVSURSRVHG WRWDOLQVWDOOHGFDSDFLW\RI0:+\GUR3RZHUJHQHUDWHGLV
to be implemented in Joint Venture with Bhutanese PSU. VXSSOLHGWREHQHÀFLDU\6WDWHV87RI1RUWKHUQ5HJLRQDQG
:LQG3RZHULVVXSSOLHGWR6WDWHRI*XMDUDW
7RZDUGV GLYHUVLÀFDWLRQ RI WKH &RPSDQ\ LQWR RWKHU HQHUJ\
DUHDV7+'&,/KDVVLJQHG028IRUGHYHORSPHQWRIFRDOEDVHG During the year 2017-18, Tehri Power Station generated 3080
 0: 6XSHU 7KHUPDO 3RZHU 3ODQW DW .KXUMD LQ WKH VWDWH 08 RI HQHUJ\ DJDLQVW D WDUJHW RI  08 DQG .RWHVKZDU
RI 8WWDU 3UDGHVK )XUWKHU &&($ KDV DSSURYHG LQYHVWPHQW HEP generated 1220 MU of energy against a target of 1225
DSSURYDORQ 087KHUHVHUYRLURSHUDWLRQFRPPLWWHGWRSURYLGHZDWHUIRU
drinking to Delhi & UP and for irrigation in the command area.
7+'&,/ KDV DOVR GLYHUVLÀHG LQWR QRQ FRQYHQWLRQDO DQG
renewable sources of energy. THDCIL has successfully During the current FY 2018-19, THDCIL has generated 4687.84
FRPPLVVLRQHG0::LQG3RZHU3ODQWDW3DWDQ*XMDUDWRQ MU of energy against target of 4590 MU. Out of which, 3712.15
DQG0::LQG3RZHU3ODQWDW'HYEKXPL'ZDUND MU, 1213.79 MU, 108.32 MU and 183.51 MU is generated
Gujarat on 31.03.2017. IURP7HKUL+33.+(33DWDQ:)DQG'ZDUND:)UHVSHFWLYHO\

MoU has been signed with Solar Energy Corporation of India During the current FY 2018-19, Production Effeciency
(SECI) on 13.02.2015 for setting up Grid Connected Solar SDUDPHWHU 3$) RI7HKUL+33DQG.+(3VWRRGDWDQG
3RZHU3URMHFWVXSWR0:FDSDFLW\RIZKLFKLWLVSURSRVHG UHVSHFWLYHO\ZKLOHZHLJKWHGDYHUDJHRIWKHVH+\GUR
WRLQLWLDOO\WDNHXS0:LQWKHVWDWHRI.HUDOD Plants was 79.809 % against target of 76.934 %. The Capacity

167
Annual Report 2018-19

8WLOLVDWLRQIDFWRU &8) RI3DWDQ:LQG)DUP :) DQG'ZDUND The Project cost is to be funded with a Debt Equity ratio of
:)VWRRGDWDQGUHVSHFWLYHO\ZKLOHZHLJKWHG 7HUP/RDQIRU5XSHHSRUWLRQRI5V&UVDQFWLRQHG
DYHUDJH RI WKHVH :LQG 3ODQWV ZDV   DJDLQVW WDUJHW RI by SBI Consortium (and drawn Rs. 1227.65 Cr.), which has
25.182 %. EHHQ IXOO\ UHSDLG E\ DYDLOLQJ 5V  &U ORDQ IURP %DQN
of India and balance from Punjab National Bank. For Off-
FINANCIAL PERFORMANCE
6KRUH&RPSRQHQW/RDQ$JUHHPHQWKDVEHHQH[HFXWHGZLWK
The total income of the company during the Year 2017-18 Societe Generale S.A. Bank, France for EURO 83.86 Million on
is Rs. 2228.73 Cr. as compared to Rs. 2235.97 Cr. during the 5th Feb 2015.
3UHYLRXV<HDU  7+'&,/KDVHDUQHGD1HWSURÀWRI5V Project works progressed at slow pace due to fund crisis with
778.74 Cr. during the year 2017-18 as compared to Rs. 711.23 WKH&RQWUDFWRU0V+&&DQGVWULNHE\+&&ZRUNHUV+RZHYHU
&UGXULQJ)<7KH1HW:RUWKRIWKH&RPSDQ\DVRQ THDCIL is making all out efforts to bring the project works
31.03.2018 was Rs. 8511.27 Cr. against Rs. 8100.81 Cr. as on back on track.
31.03.2017.
([FDYDWLRQ ZLWK H[WHQVLYH VWDELOL]DWLRQ PHDVXUHV LQ 6XUJH
COMMERCIAL PERFORMANCE 6KDIWV3HQVWRFN$VVHPEO\&KDPEHU3HQVWRFNV%XWWHUÁ\9DOYH
Chamber, Bus Bar Galleries, Machine Hall and Tail Race Tunnels
7DULIIRUGHURI.RWHVKZDU+(3 0: IRUWKHSHULRG
DQGIRU2XWOHW6ORSH6WDELOL]DWLRQDUHLQSURJUHVV,Q0DFKLQH
and 2014-19 has been issued by Hon’ble CERC on 05.09.2018
+DOO RXW RI WRWDO H[FDYDWLRQ RI  &XP &XPXODWLYH
DQG  UHVSHFWLYHO\ 5HYLHZ 3HWLWLRQV DJDLQVW WKHVH
H[FDYDWLRQ GRQH LV  &XP 3RZHU +RXVH H[FDYDWLRQ LV
RUGHUV ZHUH ÀOHG RQ  DQG  UHVSHFWLYHO\
H[SHFWHGWREHFRPSOHWHGE\-XQH&RQFUHWLQJLQ757V%XV
2UGHURI5HYLHZ3HWLWLRQVDUHNHSWUHVHUYHGE\+RQ·EOH&(5&
%DU *DOOHULHV DQG &RQWURO URRP DUHD LV XQGHU YDULRXV VWDJHV
$QQXDO)L[HG&RVW $)& IRU)<LV5V&U
RI SURJUHVV +RZHYHU H[FDYDWLRQ RI 8QLW KDV DOUHDG\ EHHQ
)RU WKH ÀQDQFLDO \HDU  DV RQ  ELOOV completed.
DPRXQWLQJ WR 5V  &U KDYH EHHQ UDLVHG WRZDUGV VDOH ,Q 3RZHU +RXVH SUHFRPLVVLRQLQJ DFWLYLWLHV LQFOXGLQJ
RI HQHUJ\ 5HYHQXH UHDOL]DWLRQ RI 5V  &U DFKLHYHG Load Testing of both EOT Cranes has been completed. All
GXULQJWKHÀQDQFLDO\HDU$VRQSULQFLSDO 04 Generator Step Up (GSU) Transformers and erection of
outstanding dues for more than 60 days is Rs. 1335.79 Cr. associated accessories has been completed.
Power Purchase Agreements were signed with GUVNL, Gujarat Erection of GIS and GIB works are under progress.
IRU:LQG3RZHU3ODQWVRI0:FDSDFLW\DW3DWDQDQG0:
Febrication of ferrules of Penstock Steel Liner has been
FDSDFLW\ DW 'ZDUND %RWK SODQWV KDYH EHFRPH RSHUDWLRQDO
completed. Supply of Electro-Mechanical equipment is in
6LQFHWKH33$VZHUHVLJQHGSURDFWLYHO\DQGH[SHGLWLRXVO\DQG
SURJUHVV (TXLSPHQW  0DWHULDO ZRUWK 5V  &U KDYH
the plants became operational before 31st March 2017, both
reached at site.
SODQWVEHFDPHHQWLWOHGWRUHFHLYH*HQHUDWLRQ%DVHG,QFHQWLYH
DOVR#5VN:KRIHQHUJ\JHQHUDWHGIURPWKHVHSODQWV Project is targetted to be commissioned by June-22.
([SHQGLWXUHLQFXUUHGRQ7HKUL3633URMHFWWLOO0DUFKLV5V
Power Purchase Agreement has been signed with UPPCL, 2792.49 Cr. including IDC & FC of Rs. 525.44 Cr.
8WWDU3UDGHVKIRU'KXNZDQ6PDOO+\GUR3URMHFW 0: 
Vishnugad Pipakoti HEP (444MW)
PROGRESS OF ONGOING PROJECTS
*RYWRI,QGLDDFFRUGHGLQYHVWPHQWDSSURYDOIRUWKHH[HFXWLRQ
In Uttarakhand: of VPHEP in Aug-08 at a cost of Rs. 2491.58 Cr. including IDC
Tehri Pump Storage Plant (PSP) (1000 MW) & FC of Rs. 366.83 Cr. at March-08 PL.

Construction of project is proposed to be funded with a


,QYHVWPHQW DSSURYDO  ZDV DFFRUGHG LQ -XO\ 5&(, IRU 5V
GHEWHTXLW\ UDWLR RI  7KH HTXLW\ SRUWLRQ   LV WR EH
DW3/$SUZDVDSSURYHGLQ1RY
shared by THDCIL and remaining 50 % is to be shared by
(3&7XUQNH\FRQWUDFWKDVEHHQDZDUGHGWRFRQVRUWLXPRI06 *R,  *R83 LQ WKH UDWLR RI  UHVSHFWLYHO\ )RU IXQGLQJ
Alstom Hydro France and Hindustan Construction Company of debt portion (70 %) of the Project, loan agreement for
RQUG-XQH:RUNRQWKH3URMHFWFRPPHQFHGZHIWK USD 648 million has been signed with International Bank for
July-11. ReconstructioQ 'HYHORSPHQW ,%5' RQWK$XJ

168
&RQWUDFW DJUHHPHQW IRU &LYLO  +0 ZRUNV KDV EHHQ VLJQHG Erection & Commissioning of Barrel Gates, Power Intake Gates
RQ  ZLWK 0V +&& ZLWK FRPSOHWLRQ SHULRG RI  including Trash Rack and Automatic Tilting Gate at Spillway
months. KDYHEHHQFRPSOHWHG
Contract agreement for EM works has been signed on The project is targeted to be commissioned by Oct-19. The
 ZLWK 0V %+(/ ZLWK FRPSOHWLRQ SHULRG RI  H[SHQGLWXUH LQFXUUHG RQ 'KXNZDQ SURMHFW WLOO 0DU LV 5V
months. Model testing of Turbine has been successfully 255.18. Cr including IDC & FC of Rs. 7.43 Cr.
completed in BHEL, Bhopal on 01.08.2015. Design documents
RI7XUELQH*HQHUDWRU([FLWDWLRQV\VWHPDQGYDULRXVDX[LOLDULHV KHURJA STPP-1320 MW:
DUH DSSURYHG %DODQFH 'HVLJQ DQG (QJLQHHULQJ ZRUN LV LQ ‡ 6XEVHTXHQW WR 3,% FOHDUDQFH LQ PHHWLQJ KHOG RQ
progress. &&($KDVDOVRDSSURYHG,QYHVWPHQW$SSURYDO
7KH$ODNQDQGDULYHUKDVEHHQGLYHUWHGRQ7KHPDLQ IRU.KXUMD6XSHU7KHUPDO3RZHU3ODQW 6733 LQ'LVWULFW
SURMHFW ZRUNV LQ SURJUHVV DUH H[FDYDWLRQ RI XQGHUJURXQG Bulandshahar of Uttar Pradesh and Amelia Coal Mine in
GHVLOWLQJ FKDPEHUV H[FDYDWLRQFRQFUHWH RI LQWDNH WXQQHOV District Singraulli, Madhya Pradesh at an estimated cost
GHYHORSPHQWRI7%0SODWIRUPDVVHPEO\RI7%0FRQVWUXFWLRQ of Rs. 11,089.42 Cr. and Rs. 1587.16 Cr. (at Dec-17 PL)
of TBM launching chamber, construction of Power House and UHVSHFWLYHO\RQ
7UDQVIRUPHU KDOO H[FDYDWLRQ RI $GLWV WR 6XUJH 6KDIW  6XUJH
‡ +RQ·EOH 3ULPH 0LQLVWHU KDV DOVR LQDXJXUDWHG .KXUMD
7DQN H[FDYDWLRQ RI GRZQVWUDP 6XUJH 7DQN FRQVWUXFWLRQ
Super Thermal Power Project on 09.03.19.
RI SRUWLRQ RI +57 E\ '%0  H[FDYDWLRQ RI 757 7KH 7%0 LV
scheduled to be commissioned and Trial Run by June-19. ‡ &RVW RI SRZHU WR EH JHQHUDWHG IURP WKLV SURMHFW LV 5V
Project works progressed at slow pace due to fund crisis with XQLW OHYHOLVHG )LUVW\HDUWDULIILVHVWLPDWHGDV5V
WKH&RQWUDFWRU0V+&&DQGVWULNHE\+&&ZRUNHUV+RZHYHU XQLW
THDCIL is making all out efforts to bring the project works ‡ (QYLURQPHQWDO &OHDUDQFH WR WKH SURMHFW DOUHDG\ VWDQGV
back on track. DFFRUGHG:DWHUFRPPLWPHQWIRU&XVHFZDWHUIURP
The project is targetted to be commissioned by Dec-22. 8SSHU *DQJD &DQDO DOUHDG\ REWDLQHG IURP :DWHU
7KHH[SHQGLWXUHLQFXUUHGRQ93+(3SURMHFWWLOO0DULV5V 5HVRXUFHV 'HSDUWPHQW *R83 5HYLVHG &OHDUDQFH IRU
1604.36 Cr. including IDC & FC of Rs. 92.78 Cr. construction of 275 M high Chimney has been obtained
from Airport Authority of India on 19th April-18.
Other Projects:
‡ 3K\VLFDO SRVVHVVLRQ RI WRWDO  $FUHV ODQG
-KHOXP 7DPDN +(3  0:  *RKDQD 7DO +(3  0:  RI
7+'&,/ KDYH EHHQ DIIHFWHG GXH WR +RQ·EOH 6XSUHPH &RXUW including Gram Sabha land has been obtained. Land
RUGHURI$XJ·VWD\LQJHQYLURQPHQW IRUHVWFOHDUDQFHWLOO acquisition process by NHAI, for re-routing of National
further orders. +LJKZD\ 1+ LVLQDGYDQFHVWDJH$IWHUDSSURYDORI
DPR for Railway Siding by Indian Railways, acquisition
In Uttar Pradesh:
of land is under process. Social Impact Studies has been
Dhukwan Small HEP (24MW) awarded and report shall be ready by July-19.

$URXQG&LYLOZRUNVKDYHDOUHDG\EHHQFRPSOHWHG ‡ 2XWRISDFNDJHVWHFKQLFDOELGIRU7XUELQH*HQHUDWRU
In Unit-1, after completion of concreting of Generator barrel, SDFNDJHV DQG 6WHDP *HQHUDWRU SDFNDJHV KDYH
6WDWRUKDVEHHQORZHUHG$VVHPEO\RI5RWRUDW6HUYLFH%D\LV EHHQ RSHQG RQ  DQG  UHVSHFWLYHO\
under progress. In Unit-2, concreting for Generator Barrel is while preparation of tender documents for balance
LQ SURJUHVV :KLOH LQ 8QLW 8OWUDVRQLF 7HVW 8$7  LQFOXGLQJ 05 packages is in progress.
Hydrostatic Test (HST) of Spiral Case has been completed. ‡ VW  QG 8QLW LV SURSRVHG WR EH FRPPLVVLRQHG LQ 
6ZLWFK\DUG &RQWURO 5RRP %XLOGLQJ ZRUNV KDYH EHHQ PRQWKV   PRQWKV UHVSHFWLYHO\ IURP WKH GDWH RI
FRPSOHWHG*HQWHUDWRU7UDQVIRUPHU 8QLW  KDYHEHHQ LQYHVWPHQWDSSURYDO
shifted to their foundations. Embedment work for cable trays
‡ 7KHH[SHnditure incurred till Mar-19 is Rs. 494.57 Cr.
KDYHEHHQFRPSOHWHGLQ%D\ 

169
Annual Report 2018-19

Amelia Coal Mine: 3UHVHQWDWLRQRQÀQDOXSGDWHG'35RI6DQNRVK+(3ZDVPDGH


E\ 7+'&,/ WR &RPPLVVLRQHU 0LQLVWU\ RI :DWHU 5HVRXUFHV
‡ $OORWPHQW 2UGHU RI $PHOLD &RDO 0LQH WR 7+'&,/ KDV
New Delhi on 17.07.17 for international clearance and one
already been issued on 17.01.17. Mining lease for
VHWRI'35VXEPLWWHGWR0R:5$VSHU0R8ZLWK5*R%ÀQDO
$PHOLD &RDO 0LQH LV DOUHDG\ YHVWHG WR 7+'&,/ :KLOH
XSGDWHG'35RI6DQNRVK+(3KDVEHHQSURYLGHGRQ
(QYLURQPHQW&OHDUDQFHLVVXHGLQQDPHRI3ULRUDOORWWHH
As per communication from DHPS, RGoB on 28.02.19 to
shall be transferred in THDCIL name after grant of Ist
update EIA and EMP studies, same are being updated as per
Stage Forest Clearance. VLWHREVHUYDWLRQ
‡ $WRWDORI+DODQG^+D3ULYDWHWHQDQF\ '35IRU%XQDNKD+(3 0: KDVEHHQWHFKQRHFRQRPLFDOO\
ODQG  +D OHDVH KROG 5HYHQXH ODQG  +D concurred by CEA. Final DPR submitted to RGoB has been
5HYHQXHODQGIRU5 5VLWHDQG+D)RUHVWODQG`IRU DSSURYHG E\ WKH FDELQHW RI 5*R% LQ  )HE %XQDNKD +(3
Amelia Coal Mine is under different stages of clearances.  0:  LV SURSRVHG WR EH LPSOHPHQWHG LQ MRLQW YHQWXUH
‡ 6WDJH,)RUHVW&OHDUDQFHIRUGLYHUVLRQRI+DIRUHVW with Druk Green Power Corporation, Bhutan. Modalities for
land has been accorded by MoEF & CC on 12.12.18. An IRUPDWLRQRI-9&DUHEHLQJÀQDOL]HG
amount of Rs. 157.56 Cr. has been deposited in CAMPA )XUWKHUGLVFXVVLRQDWYDULRXVOHYHOVDW0R3DQG0($*R,DUH
account on 28.03.19 against NPV charges, Compensatory being held for implementation of Bunakha HEP.
afforestation and SMC charges.
KERALA SOLAR POWER PROJECT
‡ 0R8IRUGLYHUVLRQVKLIWLQJRIH[LVWLQJ+7OLQHVSDVVLQJ
$V SDUW RI WKH 1DWLRQDO 6RODU 0LVVLRQ RI *RYW RI ,QGLD IRU
through Amelia Coal Mine has been signed with PGCIL KDUQHVVLQJ&OHDQ3RZHU7+'&,/KDVFRPPLWWHGGHYHORSPHQW
on 28th March 2019 and an amount of Rs. 19.14 Cr. has RI0:6RODU393URMHFWVWR015(
been paid.
7+'&,/ 6(&,KDYHVLJQHGDQ0R8RQIRUVHWWLQJ
‡ 7HQGHUGRFXPHQWVIRUVHOHFWLRQRI0LQH'HYHORSHUDQG XS0:6RODU393URMHFWVLQ,QGLD$7ULSDUWLWHDJUHHPHQW
2SHUDWRU 0'2  IRU GHYHORSPHQW DQG RSHUDWLRQ RI DPRQJVW6(&,.HUDOD6WDWH(OHFWULFLW\%RDUG .(6% DQG7+'&,/
Amelia Coal Mine for Rs. 1397.89 Cr. has been prepared ZDV VLJQHG RQ  IRU GHYHORSPHQW RI  0: 6RODU
DQGDUHXQGHUUHYLHZ SURMHFWLQWKH0:6RODU3DUNDW'LVWW.DVDUDJRG.HUDOD
7KHH[SHQGLWXUHLQFXUUHGWLOO0DULV5V&U $IWHU ULJURXV SHUVXDWLRQ E\ 7+'&,/  LQWHUYHQWLRQ RI 0R3
ZLWK.HUDOD6WDWH*RYWIURP$SULOWR'HFIRUDOORFDWLQJ
MAHARASTRA
the land & signing of Power Sale Agreement (PSA) for
THDCIL submitted DPR of Malshej Ghat PSS with enhanced  0: VRODU SDUN LQ 'LVWULFW .DVDUJDG.HUDOD 36$ KDV QRZ
LQVWDOOHGFDSDFLW\RI0:WR*R0+RQWK6HSW7KH EHHQVLJQHGEHWZHHQ.6(% 7+'&,/RQZLWKXSSHU
(,$ VWXGLHV KDYH EHHQ FRPSOHWHG DQG WKH GUDIW (,$  (03 FDSOLPLWRI5VXQLWVXEMHFWWRGLVFRYHU\RIWDULIIWKURXJK
report is ready. FRPSHWLWLYH ELGGLQJ DQG DSSURYDO WKHUHRI IURP .HUDOD 6WDWH
(OHFWULFLW\5HJXODWRU\&RPPLVVLRQ .6(5& 
THDCIL has submitted its consent on implementation of
SURMHFWWKURXJK-9RI7+'&,/13&,/DQG*RYWRI0DKDUDVKWUD /DQG XVH DJUHHPHQW DQG LPSOHPHQWDWLRQ DJUHHPHQW KDYH
ZLWKHTXLW\SDUWLFLSDWLRQRI*RYWRI0DKDUDVKWUDLQWKH also been signed between THDCIL and Renewable Power
new JV. Signing of implementation Agreement is awaited. &RUSRUDWLRQ RI .HUDOD /WG 53&./  RQ WK )HE 5V 
&UKDYHEHHQGHSRVLWHGZLWK53&./E\7+'&,/DVRQHWLPH
PROJECTS - IN BHUTAN
XSIURQWGHYHORSPHQWFKDUJHVRI6RODU3DUN
8QGHU,QGR%KXWDQFRRSHUDWLRQLQSRZHUVHFWRUGHYHORSPHQW $IWHULVVXHRI1,7IRU0:6RODU3URMHFWRQWK)HESUH
7+'&,/ KDV XSGDWHG '35 RI 6DQNRVK +(3  0:  DQG ELG PHHWLQJ LV KHOG RQ  (YDOXDWLRQ RI ELGV LV XQGHU
%XQDNKD+(3 0:) in Bhutan. process and work is likely to be awarded by May-19.

170
CHAPTER 28

DAMODAR VALLEY CORPORATION (DVC)


INTRODUCTION:

'DPRGDU9DOOH\&RUSRUDWLRQWKHÀUVWPDMRU0XOWLSXUSRVH,QWHJUDWHG5LYHU9DOOH\3URMHFWRIWKHFRXQWU\FRQFHLYHGLQOLQHZLWK
7HQQHVVHH9DOOH\$XWKRULW\ 79$ FDPHLQWRH[LVWHQFHRQWK-XO\E\DQ$FWRI&HQWUDO/HJLVODWXUHNHHSLQJLQYLHZRIWKH
LQWHJUDWHGGHYHORSPHQWRI'DPRGDU9DOOH\UHJLRQLQWKH6WDWHVRI%LKDU SUHVHQWO\-KDUNKDQG DQG:HVW%HQJDO

INSTALLED CAPACITY:

7KHUPDO3RZHU*HQHUDWLRQ&DSDFLW\RI'9&DWSUHVHQWLV0: +\GHO3RZHU*HQHUDWLRQ&DSDFLW\LV0:

GENERATION PERFORMANCE:

Performance of Total Thermal Units (7090 MW) & Hydel Units (147.2 MW):

DVC Units FY 2017-18 FY 2018-19


CEA Target Actual Generation
Thermal Generation (MU) 35691 35589 36677
Thermal PLF (%) 56.04 57.30 59.05
Hydel Gen (MU) 267.2 205 186.4

Performance Highlights in 2018-19:

¾ ,Q)<'9&DFKLHYHGKLJKHVWHYHUWKHUPDOJHQHUDWLRQRI08H[FHHGLQJ&($WDUJHWE\08

¾ ,WKDVVXUSDVVHGWKHSUHYLRXVUHFRUGRI08DFKLHYHGLQ)<,WKDVDOVRDFKLHYHGORZHVWHYHU$3&RI
LQ)< SUHYLRXVEHVWZDVLQ)< DQGORZHVWHYHU62&RIPONZKLQ)< SUHYLRXVEHVW
ZDVPONZKLQ)< 

¾ 2QWK$SULO'9&DFKLHYHGKLJKHVWHYHULQVWDQWDQHRXV([%XVJHQHUDWLRQRI0:DW+UVVXUSDVVLQJWKH
SUHYLRXVUHFRUGRI0:'9&DOVRDFKLHYHGKLJKHVWHYHUGDLO\JHQHUDWLRQRI08RQWK$SULOVXUSDVVLQJ
WKHSUHYLRXVUHFRUGRI08

Financial Performance - 2018-19

SL Particulars (Provisional)
April-18 to March-19
Physical
1 Plant Load Factor (%) 59
2 Sale of Power (MU) 36,440
Financial (Rs. Crore)
3 5HYHQXH 3RZHU  $% 16,158
A. Sale of Power 15,558
B. Misc. Income 600
4 5HYHQXH([SHQVHV 17,286
5 3URÀW /RVV IURP3RZHU  -1,128
6 6XUSOXV 'HÀFLW RQ,UULJDWLRQ )ORRG&RQWURO -57
7 1HW3URÀW /RVV   -1,185

171
Annual Report 2018-19

CAPACITY ADDITION PROGRAMME AND ACHIEVEMENTS: ¾ Pump Storage Hydro generating station at Lugu
Pahar (6x250 MW): The project has been contemplated
Performance Highlight in 2018-19:
RQ %RNDUR 5LYHU DW /XJX 3DKDU %RNDUR GLVWULFW RI
¾ Bokaro-A TPS (500 MW): Coal feeding is being done Jharkhand. Pre-feasibility report has been prepared
through Inter-connecting Coal Handling route from E\ 0V :$3&26 /LPLWHG 6WDJH, FOHDUDQFH UHFHLYHG
H[LVWLQJ FRDO KDQGOLQJ V\VWHP RI %736% SODQW%DODQFH from MoEF & CC, GOI. Engagement of consultant for
part of new Coal handling system to feed coal directly preparation of DPR is under consideration.
IURPWUDFNKRSSHULVH[SHFWHGWREHFRPPLVVLRQHGE\
¾50 MWp ground mounted solar PV station at
April 19.
Panchet: In accordance with GOI’s mission towards
¾ Koderma TPS (2x500 MW): Ash pond work UHQHZDEOHHQHUJ\'9&KDVSODQQHGWRVHWXS0:S
recommenced from June 2017 after resolution of law and ground mounted solar PV station at Panchet under
RUGHULVVXHV+RZHYHU%+(/·VVXEFRQWUDFWRU 0V1(&/  Design-Built-Operate & Transfer (DBOT) model through
KDVUHFHQWO\VWRSSHGFRQVWUXFWLRQDFWLYLW\RISHUPDQHQW Open Tendering process.
ash pond owing to non-settlement of commercial issues
TRANSMISSION & DISTRIBUTION (T&D) SYSTEM:
EHWZHHQ%+(/ 1(&/'9&LVLQWKHSURFHVVRIÁRDWLQJ
tender for completion of balance part of permanent ash Transmission and Distribution (T&D) network of DVC is spread
SRQGZRUNZLWKDVK ZDWHUUHFRYHU\V\VWHPDWWKHFRVW RYHU'DPRGDU9DOOH\FRPPDQGDUHDDQGEH\RQG,WLVDFWLQJ
RI%+(/%DODQFHZRUNLVH[SHFWHGWREHFRPSOHWHGE\ DVDEDFNERQHIRUHYDFXDWLRQRISRZHUIURP'9&*HQHUDWLQJ
December 2019. Stations and distribution of the same to the Firm Consumers.
,W DOVR WUDQVPLWV SRZHU WR WKH LQWHUVWDWH EHQHÀFLDULHV HJ
¾ Raghunathpur TPS Ph-I (2x600 MW): Rail linkage
.DUQDWDND.HUDOD'HOKL3XQMDE0DGK\D3UDGHVK-KDUNKDQG
work was started in October 2017. Railway infrastructure
:HVW%HQJDO'LVFRPVDVZHOODVLQWHUQDWLRQDOEHQHÀFLDULHV
ZRUN LV EHLQJ FDUULHG RXW E\ 0V 5,7(6 $V RI QRZ 
e.g. Bangladesh.
.P RXW RI  .P RI UDLO OLQNLQJ ZRUN IRU VLQJOH OLQH
FRQQHFWLYLW\ KDV EHHQ FRPSOHWHG IURP -DLFKDQGL 3DKDU T&D network of DVC comprises of 36 nos. of EHV Sub-stations,
6WDWLRQ -2& WR57363ODQW6LQJOHOLQHFRQQHFWLYLW\IRU QRVRIN95HFHLYLQJ6XEVWDWLRQVDQGQRV6ZLWFK\DUGV
FRDOWUDQVSRUWDWLRQLVH[SHFWHGWREHFRPSOHWHGE\-XQH at the Generating Stations. These are connected through 6014
2019. &LUFXLW.0RI(+9WUDQVPLVVLRQOLQHVDWYDULRXVYROWDJHOHYHOV
DQG&LUFXLW.0RI.9OLQHVIRUGLVWULEXWLRQRISRZHU
¾ Raghunathpur TPS Ph-II: Decision was taken during
DVC Board meeting held on 24.03.2018 to start 7R PDLQWDLQ VWHDG\ DQG UHOLDEOH SRZHU VXSSO\ H[HFXWLRQ RI
GLVFXVVLRQ ZLWK UHVSHFWLYH YHQGRUV IRU UHYLYDO RI WKH T&D projects towards erection and commissioning of 731
contracts short closed earlier and also to undertake Due &LUFXLW.0RIN9OLQH&LUFXLW.0RIN9OLQHDQGRQH
Diligence Study by engagement of a reputed consultant. QR N9 6XEVWDWLRQ DUH LQ SURJUHVV )XUWKHU UHQRYDWLRQ
$FFRUGLQJO\ RQ  0V 'HORLWWH 7RXFKH and augmentation of age old control and protection system
Tohmatsu India LLP was engaged as consultant through including related infrastructure of 10 nos. 220kV Sub-station
open tendering for carrying out “Due Diligence study WKURXJK3RZHU6\VWHP'HYHORSPHQW)XQG 36') UHSODFHPHQW
ZLWK UHVSHFW WR UHYLYDO RI 5736 3K,,µ 'LVFXVVLRQV ZLWK of conductors of old EHV transmission lines, upgradation of
YHQGRUV KDYH DOVR EHHQ KHOG WR ÀUPXS FRQWUDFW SULFH transformation capacity at Sub-stations etc. are being taken
LQUHVSHFWRIFKDQJHGVFHQDULR0V'HORLWWHVXEPLWWHG up to enhance the system stability as well as to take care of the
UHSRUW RQ  LQYLWLQJ FRPPHQWV IURP '9& IRU growth in power demand.
SUHSDUDWLRQ RI ÀQDO UHSRUW &RPPHQWV DQG DGGLWLRQDO 'XULQJ WKH \HDU 7UDQVPLVVLRQ 6\VWHP DYDLODELOLW\ KDV EHHQ
GDWD  LQIRUPDWLRQ VRXJKW E\ 0V 'HORLWWH KDG EHHQ ZKLFKLVZHOODERYHWKH&(5&EHQFKPDUNHQDEOLQJ'9&
SURYLGHG)LQDO5HSRUWIURP0V'HORLWWHLVH[SHFWHGE\ WREHHOLJLEOHIRU7DULIILQFHQWLYHV)XUWKHUIRUSURSHUXSNHHS
April’19. On submission of due diligence report by the RI 6XEVWDWLRQV DQG OLQHV WKHUPDO LPDJLQJ RI HTXLSPHQW
consultant, matter will be placed before DVC Board for lines, DGA of transformer oil, measurement & monitoring of
further decision. 3rd harmonic leakage current, Tan Delta test of equipment etc.

172
LQFOXGLQJSODQQHGPDLQWHQDQFHVWUDWHJLHVKDYHEHHQDGRSWHG ENERGY CONSERVATION:
WRHOHYDWHWKHV\VWHPDYDLODELOLW\
'9& KDV EHHQ PDNLQJ FRQWLQXRXV HIIRUWV WR LQGXFW HIÀFLHQW
7R VWUHQJWKHQ WKH H[LVWLQJ 7 ' QHWZRUN IXUWKHU VWHSV and modern practices in Energy Management System to
like setting up of 220 kV Sub-station at Burdwan including LQFUHDVHWKHDYDLODELOLW\RISRZHUZLWKORZHUFRQVXPSWLRQRI
FRQQHFWLYLW\ ZLWK 3DUXOLD 6XEVWDWLRQ DGGLWLRQ RI N9 FRDORLOZDWHUDQGDX[LOLDU\SRZHUDORQJZLWKLPSURYHPHQWLQ
LQIUDVWUXFWXUHDW.DO\DQHVZDUL6XEVWDWLRQ &7366ZLWFK\DUG unit heat rate.
DQG H[WHQVLRQ RI N9 V\VWHP DW -DPXULD 6XEVWDWLRQ KDYH
7KHIROORZLQJPHDVXUHVKDYHEHHQWDNHQIRUHIÀFLHQW(QHUJ\
EHHQ WDNHQ XS 0RUHRYHU FRQVLGHULQJ WKH VFDUFLW\ RI ODQG
0DQDJHPHQW6\VWHPRIWKH3RZHU3ODQWV
DVC is going to adopt GIS technology for new Sub-stations,
ZKHUHYHU QHFHVVDU\ '9& LV DOVR FRQWHPSODWLQJ WKH XVH RI ‡ &RRUGLQDWLRQ PHHWLQJ DQG PRQWKO\ 2SHUDWLRQ 5HYLHZ
QHZO\GHVLJQHG0XOWL&LUFXLWWRZHUVDW.9 .99ROWDJH PHHWLQJ DWSODQWOHYHO DUHKHOGIRUPRQLWRULQJRIYDULRXV
OHYHO WR FRSH XS ZLWK 5LJKWRI:D\ SUREOHPV ZKHUHYHU HIÀFLHQF\ HQHUJ\FRQVHUYDWLRQSDUDPHWHUVKHDWUDWH
technically feasible. GHYLDWLRQDQDO\VLVDQGUHPHGLDODFWLRQSODQWKHUHRI

2YHUDOOORVVLQWKH7 '6\VWHPLQFOXGLQJ*HQHUDWLQJ6WDWLRQV ‡ 2 0$XGLWLQFOXGLQJ3HUIRUPDQFH(YDOXDWLRQ7HVWDQG


stood at 3.02% during the year. For proper accounting of T&D Fuel Management of DVC TPSs has been carried out by
system loss and taking remedial measures thereof, DVC is in 173& &RQVXOWDQF\ ZLQJ DV SHU WKH GLUHFWLYHV RI 0R3
the process of implementation of ‘System Energy Monitoring *RYWRI,QGLDIRUSHUIRUPDQFHLPSURYHPHQWRIHQHUJ\
DQG$FFRXQWLQJ 6(0$ ·SURMHFWFRYHULQJWKHHQWLUH'9&*ULG consumption. 81% of the recommendations made by
the said Consultant has been implemented in DVC TPSs.
During the year, DVC added 16 new consumers and registered
Rest 9% of the recommendations will be undertaken in
an internal load growth of 75.65 MVA including enhancement
Long Term planning & 10% in short term planning.
RIH[LVWLQJFRQWUDFWGHPDQG
‡ ,QWURGXFWLRQ RI HQHUJ\ HIÀFLHQW HTXLSPHQW OLNH
Relay & Instrument Testing Laboratory:
LQVWDOODWLRQ RI 9DULDEOH )UHTXHQF\ 'ULYH 9)'  LV XQGHU
DVC’s Relay & Instrument Testing Laboratory under Central progress. Commissioning of VFD at Seal Air Fans of
Testing Circle (CTC), Maithon is one of its kind in the Eastern 0HMLD 736 8 KDV EHHQ FRPSOHWHG LQ 8 XQGHU
UHJLRQKDYLQJWHVWLQJIDFLOLWLHVIRU5HOD\VDQG,QVWUXPHQWVDV FRPPLVVLRQLQJDQGLQ8XQGHUSURFHVV
ZHOODVDOOPDMRUHOHFWULFDOHTXLSPHQW VZLWFKJHDU,WDFKLHYHG
‡ (QHUJ\ HIÀFLHQW IDQ EODGH DVVHPEO\ SURFXUHPHQW LV
a new benchmark when its meter testing cell was accredited by
under progress for Cooling Tower fans of Mejia TPS Unit
WKH1$%/LQDFFRUGDQFHZLWKWKHLQWHUQDWLRQDOVWDQGDUG,62
3DUWRIPDWHULDOVUHFHLYHGDWVLWHDQGFRPPLVVLRQLQJ
,(&  ,QKRXVH IDFLOLW\ IRU 'LVVROYHG *DV $QDO\VLV
DFWLYLW\ZLOOEHWDNHQXSVKRUWO\
(DGA) of transformer oil, a useful technique for condition-
monitoring of transformers has also been introduced in CTC. ‡ 7LPHO\ UHSODFHPHQW  VHUYLFLQJ RI %)3 UHFLUFXODWLRQ
7KH GHSDUWPHQW LV SURYLGLQJ WHVWLQJ DQG FRPPLVVLRQLQJ YDOYHVLVFDUULHGRXWWRVDYHHQHUJ\
VHUYLFHVDFURVV'9&DQGDOVRH[WHQGLQJLWVDYDLODEOHVHUYLFHV ‡ $QDO\VLV RI GLIIHUHQW HIÀFLHQF\ SDUDPHWHUV OLNH
WRYDULRXVLQGXVWULHVXWLOLWLHVLQWKHUHJLRQ %RLOHU (IÀFLHQF\ 7XUELQH F\FOH +HDW 5DWH +3 +HDWHU
Communication System: SHUIRUPDQFHHWFDUHUHJXODUO\GRQHDQGGHÀFLWDUHDVDUH
addressed accordingly.
In order to keep pace with modern technologies, DVC has
VXFFHVVIXOO\ODLG.02SWLFDO)LEUH*URXQG:LUH 23*:  ‡ 0HDVXUHV OLNH FRPEXVWLRQ RSWLPL]DWLRQ LPSURYHPHQW
cable through its EHV transmission network. Using this, RI FRQGHQVHU YDFXXP UHGXFWLRQ RI XQEXUQW FDUERQ
6XSHUYLVRU\&RQWURODQG'DWD$FTXLVLWLRQV\VWHP 6&$'$ KDV UHGXFWLRQRIDLUOHDNDJHIURPGXFWV H[SDQVLRQMRLQWV
EHHQ LPSOHPHQWHG LQ 6/'& DW +RZUDK KDYLQJ FRQQHFWLYLW\ DUH EHLQJ WDNHQ WKURXJK LPSURYHG 2 0 SUDFWLFHV WR
ZLWK (5/'& 7ROO\JXQJH DQG '9& 7RZHUV 8QLÀHG 5HDO 7LPH RSWLPL]HV\VWHPHIÀFLHQF\DQG$X[3RZHU&RQVXPSWLRQ
Dynamic State Measurement (URTDSM) for all the Generating ‡ 8QGHU 1DWLRQDO 0LVVLRQ RI (QKDQFHG (QHUJ\ (IÀFLHQF\
Stations including EHV Sub-Station has been successfully 10(((  3HUIRUP $FKLHYH DQG 7UDGH 3$7  KDV EHHQ
established. LPSOHPHQWHG LQ '9& ,Q 3$7 &\FOH, '9& DFKLHYHG

173
Annual Report 2018-19

(QHUJ\6DYLQJ&HUWLÀFDWH (6&HUWV RIQRVIRULWV DW  '9& WKHUPDO SRZHU XQLWV  0:  DERYH 
Durgapur TPS, Mejia TPS, Bokaro ‘B’ TPS & Chandrapura ² 7HQGHU ÁRDWHG IRU HQJDJHPHQW RI (3& YHQGRU IRU
TPS for performing better than the BEE target. LPSOHPHQWDWLRQ RI )*' VFKHPH (YDOXDWLRQ RI %LG KDV
recently been completed. Order will be placed after
‡ '9&KDVUHSODFHGDOOH[LVWLQJWXEHOLJKWV&)/ZLWK/('
DSSURYDORI'9&%RDUG
DWGLIIHUHQWRIÀFHEXLOGLQJVLQGLIIHUHQWÀHOGIRUPDWLRQV
RI :HVW %HQJDO LQ OLQH ZLWK QDWLRQDO /(' SURJUDP ‡ $EDWHPHQWRI12[DW'9&WKHUPDOSRZHUXQLWV 
5HWURÀWWLQJRIWXEHOLJKWV&)/LQGLIIHUHQWRIÀFHEXLOGLQJV 0:  DERYH  ² 7HQGHU ÁRDWHG LQ 2FWREHU  IRU
LQ -KDUNKDQG DUHD LV XQGHU ZD\ DQG LV H[SHFWHG WR EH HQJDJHPHQWRI(3&YHQGRU(YDOXDWLRQRI%LGKDVEHHQ
completed by June, 2019. FRPSOHWHG2UGHUZLOOEHSODFHGDIWHUDSSURYDORI'9&
Board.
‡ (QHUJ\ $XGLW DW '9& +4  RWKHU RIÀFH EXLOGLQJV RI
'9& SURMHFWV LQ :HVW %HQJDO DQG -KDUNKDQG KDV EHHQ ‡ (63DXJPHQWDWLRQRI0HMLD8QLWWR ;0: 
completed. -- NTPC was engaged as consultant for preparation of
'35WHFKQLFDOVSHFLÀFDWLRQHWF173&KDVVXEPLWWHG)5
‡ (QHUJ\ $XGLW KDV EHHQ FDUULHG RXW LQ DOO VHYHQ
 '35 3UHSDUDWLRQ RI 7HFKQLFDO VSHFLÀFDWLRQ LV XQGHU
WKHUPDO SRZHU VWDWLRQV RI '9& E\ ([WHUQDO $JHQFLHV
way.
Implementation of recommendations are in progress.
‡ '9& LV SXWWLQJ PRUH HPSKDVLV RQ XWLOL]DWLRQ RI 'U\
RENOVATION AND MODERNIZATION (R&M) OF POWER
Fly Ash (DFA). DFA is sold to cement, brick and block
STATIONS:
PDQXIDFWXUHUV HWF 3RQG DVK IURP '9& LV XWLOL]HG IRU
‡ '9&KDVÁRDWHG(2,RQIURPSRWHQWLDOYHQGRUV ÀOOLQJRIDEDQGRQHGPLQHVORZO\LQJDUHDVFRQVWUXFWLRQ
IRU5 0RI'7368 %736¶%·8DVNLQJSURSRVDO of roads etc. in compliance of guidelines issued by
WREULQJGRZQ+HDW5DWHZLWKOLIHH[WHQVLRQRI\HDUV 02()  && IURP WLPH WR WLPH '9& DFKLHYHG +LJKHVW
RU PRUH LQFOXGLQJ FRPSOLDQFH RI QHZ HQYLURQPHQWDO HYHUXWLOL]DWLRQRI/07'U\)O\$VKLQ)<
QRUPV(2,RSHQHGRQ7HFKQLFDOHYDOXDWLRQLV JHQHUDWLQJDUHYHQXHRI5V&URUH$VK8WLOL]DWLRQ
under progress. by DVC in FY 2018-19 is 69.81 % which is much higher
‡ %+(/ KDV EHHQ HQWUXVWHG ZLWK 8S JUDGDWLRQ RI & , compared to many utilities.
V\VWHP RI 0HMLD 736 8  0:  DQG WKH VDPH KDV MINING ACTIVITIES:
EHHQWDNHQXSGXULQJRQJRLQJRYHUKDXOLQJRIXQLW
Bermo Mine:
‡ 'LJLWDO 3URFHVVLQJ 8QLW '38  PRGXOH RI & , FRQWURO
0LQLQJ DFWLYLW\ LQ %HUPR 0LQH VWDUWHG LQ  2Q H[SLU\ RI
V\VWHP RI 0HMLD 8 DORQJ ZLWK LWV RSHUDWLQJ V\VWHP
0LQLQJ /HDVH LQ  PLQLQJ DFWLYLW\ KDV EHHQ WHPSRUDULO\
has been upgraded to latest DPU & operating system by
closed. DVC is in the process of obtaining renewal of Mining
BHEL in January 2019.
/HDVH IURP WKH FRQFHUQHG 6WDWH *RYHUQPHQW ZLWK HQKDQFHG
‡ 0V 0(&21 ZDV HQJDJHG DV D FRQVXOWDQW IRU 5/$ peak annual production capacity of 2.62 million tonnes.
VWXG\ SUHSDUDWLRQ RI '35 7HFKQLFDO VSHFLÀFDWLRQ HWF
Khagra Joydev Coal Mine:
IRU 3DQFKHW +\GHO 6WDWLRQ 8QLW 5/$ VWXG\ KDV EHHQ
FRPSOHWHG '35 KDV EHHQ VXEPLWWHG E\ 0V 0(&21 0LQLVWU\RI&RDO*2,DOORWWHG.KDJUD-R\GHYFRDOPLQHWR'9&
DQGLVEHLQJUHYLHZHGE\'9& IRULWV0HMLD7368QLW 7KLVFRDOEORFNKDVDPLQHDEOH
UHVHUYHRIPLOOLRQWRQQHZLWKSHDNDQQXDOFRDOSURGXFWLRQ
‡ 0V 0(&21 KDV EHHQ HQJDJHG DV &RQVXOWDQW IRU 5/$
capacity of 3 million tonnes. Most of the statutory clearances
6WXG\3UHSDUDWLRQRI'35 7HFKQLFDO6SHFLÀFDWLRQIRU
KDYHEHHQUHFHLYHGIRUWKHVDLGPLQH3URFHVVIRUDFTXLVLWLRQ
5 050 8 ZRUN RI 8QLWV     RI 0DLWKRQ +\GHO
RIODQGLVXQGHUZD\0V.KDJUD-R\GHY5HVRXUFHV3YW/WGD
station.
Consortium of GDCL-AMPL-GCL, has been appointed as the
POLLUTION CONTROL MEASURES & COMPLIANCE OF 0LQH 'HYHORSHU FXP 2SHUDWRU IRU XQGHUWDNLQJ SUHPLQLQJ
NEW ENVIRONMENTAL NORMS: DQGPLQLQJDFWLYLWLHVRIWKH.KDJUD-R\GHY&RDO%ORFN0LQLQJ
‡ ,QVWDOODWLRQRI)OXH*DV'HVXOSKXUL]DWLRQ )*' V\VWHPV 2SHUDWLRQLVH[SHFWHGWRFRPPHQFHLQ

174
Tubed Coal Mine: IRU0DLWKRQDQG3DQFKHWUHVHUYRLUVIURPWKHUHVSHFWLYH6WDWH
*RYHUQPHQWV *RYWRI-KDUNKDQG :HVW%HQJDO ,QWKHÀUVW
Ministry of Coal, GOI also allotted Tubed Coal Block to DVC for
SKDVH WRWDO ÁRRG UHVHUYH FDSDFLW\ SODQQHG ZDV  PLOOLRQ
WKHHQGXVHRIFRDOLQLWV0HMLD7368QLW  &KDQGUDSXUD
DFUH IHHW %XW GXH WR QRQDFTXLVLWLRQ RI ODQG ÁRRG UHVHUYH
736 8QLW  ,W KDV D PLQHDEOH UHVHUYH RI  PLOOLRQ WRQQH
FDSDFLW\DFKLHYHGZDVRQO\PLOOLRQDFUHIHHWZKLFKKDV
with peak annual coal production capacity of 6 million tonnes.
IXUWKHU UHGXFHG WR  PLOOLRQ DFUH IHHW GXH WR SURJUHVVLYH
$FTXLVLWLRQ RI ODQG ZLWKLQ FRDO EORFN DUHD KDV EHHQ QRWLÀHG
VLOWDWLRQ DV SHU WKH ODWHVW FDSDFLW\ VXUYH\ UHSRUWV +RZHYHU
E\ *RYW RI ,QGLD DQG YHVWHG WR '9& 6WDWXWRU\ &OHDUDQFHV
HYHQ ZLWK SDUWLDO LPSOHPHQWDWLRQ RI WKH VFKHPH '9& RYHU
YL] (QYLURQPHQWDO &OHDUDQFH )RUHVW &OHDUDQFH HWF DUH LQ
WKH \HDUV KDV EHHQ DEOH WR IXOÀOO LWV SULPDU\ REMHFWLYH RI
WKH SURFHVV RI REWDLQLQJ DSSURYDO IURP FRQFHUQHG 6WDWH
ÁRRG FRQWURO LQ WKH ORZHU YDOOH\ WR D JUHDW H[WHQW )XUWKHU
&HQWUDO*RYHUQPHQWDXWKRULWLHV0V'HYHOHFWR0LQLQJ/WGD
E\ MXGLFLRXV RSHUDWLRQ RI UHVHUYRLUV DOO WKH FRPPLWWHG
Consortium of SICAL-AMPL-GCL, has been appointed as the
requirements in Damodar Valley area like irrigation, municipal
0LQH'HYHORSHUFXP2SHUDWRU0LQLQJ2SHUDWLRQLVH[SHFWHG
LQGXVWULDOZDWHUVXSSO\DUHIXOO\PHWWKXVDFKLHYLQJHIÀFLHQW
to commence in 2019-20.
water resources management.
NON-POWER ACTIVITIES OF DVC:
Water Resources Management activities by DVC during
Flood Control & Developmental activities in Water the year 2018-19 are as under:
Resources Management:
Flood Control:
Introduction:
,Q6RXWK²:HVWPRQVRRQKDGLWVRQVHWRYHUWKHHQWLUH
2XW RI VHYHQ VWRUDJH UHVHUYRLUV RULJLQDOO\ SODQQHG LQ WKH Damodar Valley area on 16.06.2018 and the same withdrew
Damodar Basin, construction of multi-purpose Dams at Tilaiya IURP WKH YDOOH\ RQ  0RQWKO\ VXEFDWFKPHQW ZLVH
 .RQDU  0DLWKRQ  DQG3DQFKHW  ZDV GHSDUWXUHGHYLDWLRQ   IURP QRUPDO UDLQIDOO IRU WKH HQWLUH
FRPSOHWHG LQ ÀUVW VWDJH %XW GHVLJQHG VWRUDJH OHYHOV FRXOG monsoon period of 2018 (June, 2018 to Oct, 2018) was as
QRWEHDFKLHYHGGXHWRFRQVWUDLQWVLQDFTXLULQJUHTXLUHGODQG followV
Name of sub- catchment Jun-18 (%) Jul-18 (%) Aug-18 (%) Sep-18 (%) Oct-18 (%) From Jun-18 to Oct-18 (%)
%DUDNDU:HVW -11.3 -19.6 -28.6 -32.3 -51.2 -27.8
Barakar East -4.9 +1.1 -20.3 -46.9 -52.1 -24.4
'DPRGDU:HVW -7.8 -18.2 -21.4 -37.6 -53.2 -25.4
Damodar East +3.4 +2.2 -24.6 -35.6 -50.6 -21.7
/RZHU9DOOH\:HVW -17.5 +9.9 -23.5 -19.8 -49.5 -15.6
Lower Valley South -15.6 +8.2 -21.2 -19.2 -47.6 -14.6

TherefoUHWKHUHZDVDGHÀFLWRIUDLQIDOOGXULQJWKHPRQVRRQLQDQGWKHUHVHUYRLUVOHYHODW0DLWKRQ 3DQFKHW'DPDWWKH
HQGRIPRQVRRQ  ZHUH5/IW IWUHVSHFWLYHO\ZKLFKZHUHEHORZWKHFRQVHUYDWLRQOHYHO1RPDMRUÁRRG
release was required during the monsoon period.

Irrigation water supply:

2SHUDWLRQDQGPDLQWHQDQFHRI'XUJDSXU%DUUDJHDQG,UULJDWLRQ6\VWHPZDVWUDQVIHUUHGWR*RYWRI:HVW%HQJDOLQWKH\HDU
RQDJHQF\EDVLV'9&UHOHDVHVZDWHUIRULUULJDWLRQIURP0DLWKRQ 3DQFKHWUHVHUYRLUVDVSHUWKHDGYLFHRI0HPEHU6HFUHWDU\
'DPRGDU9DOOH\5HVHUYRLU5HJXODWLRQ&RPPLWWHH '955& EDVHGRQWKHLQGHQWVSODFHGE\*RYWRI:HVW%HQJDOIRU.KDULIDQG
5DELFXOWLYDWLRQLQWKH/RZHU9DOOH\7KRXJKWKHUHLVQRDOORFDWLRQIRU%RURFXOWLYDWLRQLQWKH5HJXODWLRQ0DQXDOIRU'DPRGDU
9DOOH\5HVHUYRLUVVXUSOXVZDWHULIDQ\DYDLODEOHLQWKHUHVHUYRLUVDVRQVW1RYHPEHULVDOORFDWHGIRU%RURFXOWLYDWLRQDIWHU
taking into account all the committed requirements during the dry season.

Kharif Rabi Boro


Year Water Allocated Area Irrigated Water Allocated Area Irrigated Water Allocated Area Irrigated
(lac Acre ft.) (lac acre) (Th. Acft.) (Th. acre) (lac acre ft.) (lac acre)
2018-19 10.82 8.26 Nil* N.A. Nil** N.A.

175
Annual Report 2018-19

 'XHWRKLJKGHÀFLWLQUDLQIDOOGXULQJPRQVRRQDQGDVSHUWKHUHTXHVWRI*RYWRI:HVW%HQJDOZDWHUHDUPDUNHGIRUWKH
5DELTXRWDZDVVXSSOLHGIRU.KDULILUULJDWLRQLQRUGHUWRVDYH.KDULIFURSV

 1RVXUSOXVZDWHUZDVDYDLODEOHIRU%RURLUULJDWLRQ

Municipal & Industrial (M&I) water supply:

'9& DW SUHVHQW VXSSOLHV ZDWHU WR DERXW  DJHQFLHV LQ 6WDWH RI -KDUNKDQG DQG :HVW %HQJDO  IRU PXQLFLSDO DQG LQGXVWULDO
SXUSRVHV7RWDODOORFDWHGTXDQWLW\IRU0 ,XVHVLQ-KDUNKDQGLV0&0\HDU 0*' DQGWKDWLQ:HVW%HQJDOLV0&0
\HDU 0*' 'XULQJWKH\HDUXQGHUUHYLHZDURXQG0&0 0&0RIZDWHUZHUHGUDZQE\WKHFRQVXPHUVLQ:HVW
%HQJDO -KDUNKDQGUHVSHFWLYHO\

Water Investigation and Developmental initiatives:

6WDWXVRIDIHZSURMHFWVWDNHQXSE\'9&DVDSDUWRIGHYHORSPHQWDODFWLYLWLHVLQZDWHUUHVRXUFHVVHFWRUDUHWDEXODWHGEHORZ

Sl. Name of the Project Status


1. Dam Rehabilitation & .RQDU0DLWKRQ 3DQFKHW'DPVKDYHEHHQLQFOXGHGXQGHU'5,35HKDELOLWDWLRQZRUNV
,PSURYHPHQW3URMHFW '5,3 XQGHU&LYLODQG+\GURPHFKDQLFDOSDFNDJHRIDOOWKHWKUHH'DPVDUHXQGHUSURJUHVV
3URJUHVVRIFLYLOZRUNDW.RQDU0DLWKRQ 3DQFKHWDUH UHVSHFWLYHO\
The project is scheduled to be completed in June, 2020.
2. National Hydrology Project DVC has been included in the National Hydrology Project which is grant-in-aid
(NHP) SURMHFW IRU DQ DPRXQW RI 5V  FURUH IXQGHG E\ :RUOG %DQN XQGHU WKH DHJLV RI
0R:50HPRUDQGXPRI$JUHHPHQWEHWZHHQ0R:55' *5DQG'9&ZDVVLJQHG
RQ$QQXDO:RUN3ODQIRU)< KDVEHHQDSSURYHGE\
0R:5:RUNDVSHUWKHDSSURYHG$QQXDO:RUN3ODQLVXQGHUSURJUHVV
$IHZPDMRUZRUNVXQGHUSURJUHVVLQ1+3DUH
(i) Construction of Data Centre
(ii) Real Time Data Acquisition System
(iii) Application of GIS Software
LY  6HGLPHQWDWLRQ6XUYH\IRUWKH'9&UHVHUYRLUV
3. Construction of Balpahari Dam In 134th DVRRC meeting held on 12.05.2016, Chairman, DVRRC requested DVC for
RYHU%DUDNDUULYHULQ'DPRGDU PXOWLUHVHUYRLU VLPXODWLRQ VWXG\ RI UHVHUYRLUV LQ 'DPRGDU%DUDNDU %DVLQ LQFOXGLQJ
Valley area WKHSURSRVHG%DOSDKDULUHVHUYRLU7KHVWXG\ZDVFRPSOHWHGE\'9&LQ$SULOLQ
FRQVXOWDWLRQZLWK%DVLQ3ODQQLQJDQG0DQDJHPHQW2UJDQL]DWLRQ %302 &:&1HZ
'HOKL DQG GUDIW UHSRUW RI WKH VWXG\ ZDV VXEPLWWHG WR DOO VWDNHKROGHUV &:& *R- 
*R:% LQ-XO\IRUWKHLUFRPPHQWV
,QYLHZRIFHUWDLQREVHUYDWLRQVPDGHE\'955&RQWKHDERYHUHSRUWGXULQJLWVWK
Meeting held on 15.12.2017, a follow-up meeting of stakeholders was arranged on
WRÀQDOL]HWKHGHPDQGGDWDLQUHVSHFWRI'DPRGDU9DOOH\ULYHUV\VWHP
Comments of DVC were forwarded to DVRRC in Jan-2018. As intimated by Member
6HFUHWDU\'955&LQWKHWK'955&PHHWLQJKHOGRQFRPPHQWVRI*RYW
RI:HVW%HQJDOZHUHUHFHLYHGLQ1RY+RZHYHULWZDVGHFLGHGWKDWFRPPHQWVRI
*R:%QHHGHGUHYLHZDQGDVVXFK*R:%ZDVUHTXHVWHGWRUHYLHZWKHLUSUHVHQWZDWHU
GHPDQGVDQGVXEPLWWKHÀQDOL]HGGDWDWR'955&E\0DU6XEVHTXHQWO\UHYLVHG
VLPXODWLRQVWXG\ZLOOEHFDUULHGRXWE\'9&XSRQUHFHLSWRIWKHÀQDOL]HGGHPDQGGDWD
from DVRRC.
+RZHYHU FRQVWUXFWLRQ RI WKH SURSRVHG %DOSDKDUL 'DP PD\ EH FRQVLGHUHG RQO\ LI
WHFKQLFDOÀQDQFLDODGPLQLVWUDWLYH DVSHFWV RI DOO WKH VWDNHKROGHUV DUH WDNHQ FDUH DQG
ÀUPHGXS

176
4. Implementation of guide 0RGLÀHG *XLGH &XUYHV GHYHORSHG E\ '9& IRU WKH 'DPRGDU 9DOOH\ UHVHUYRLUV
FXUYHV IRU XQLÀHG FRQWURO LQFOXGLQJWKHQHZ*XLGH&XUYHIRU7HQXJKDW5HVHUYRLURIWKH*R-KDYHEHHQDFFHSWHG
RI UHVHUYRLUV LQ 'DPRGDU by DVRRC in its 134th meeting. As decided in the 135th DVRRC Meeting and as
- Barakar basin including SHUGLUHFWLRQRI0R3*R,WKHSURSRVDOIRULQWHJUDWHGRSHUDWLRQRIYDOOH\UHVHUYRLUV
Tenughat Dam. LQFOXGLQJ7HQXJKDWZDVIRUZDUGHGE\'9&WR0R:55' *5*R,LQ6HS7KH
PDWWHULVXQGHUH[DPLQDWLRQLQ0R:5*R,
5. Construction of Rim &:& 1(,& 6KLOORQJ ZDV HQWUXVWHG WR FDUU\ RXW ´)HDVLELOLW\ 6WXGLHV IRU SURSRVHG
Embankment around Maithon 5LP(PEDQNPHQWDURXQG0DLWKRQUHVHUYRLUµ$SUHOLPLQDU\UHSRUWDV´3UH)HDVLELOLW\
UHVHUYRLU IURP 5/  IW 5HSRUWµKDVEHHQVXEPLWWHGE\&:&LQ1RY7KHUHSRUWKDVEHHQUHYLHZHGE\
WR  IW IRU ÁRRG VWRUDJH '9& WKURXJK D SUHVHQWDWLRQ E\ &:& DW 0DLWKRQ RQ  DQG VXEVHTXHQW
capacity augmentation. GLVFXVVLRQZLWK&:&DXWKRULWLHVDW6KLOORQJRQWK WK0DUFK
$V SHU REVHUYDWLRQ RI '9& WKH VFKHPH LV QRW WHFKQLFDOO\ DQG WHFKQRHFRQRPLFDOO\
DFFHSWDEOHWR'9&&ODULÀFDWLRQLQWKLVUHJDUGKDVEHHQVRXJKWE\'9&DQGZLOOEH
IXUQLVKHGE\&:&DIWHUVRPHPRUHVWXGLHV

ECO-CONSERVATION, AFFORESTATION & SOIL CONSERVATION:

/LNHSUHYLRXV<HDU'9&FRQWLQXHGLWVDFWLYLWLHVLQWKHÀHOGRI´,Q²6LWX6RLO :DWHUFRQVHUYDWLRQµLQWKHYDOOH\DUHDRI´'DPRGDU
%DUDNDUµRQPLFUROHYHOGXULQJ)<%HVLGHVFHUWDLQVWLSXODWHGWHUPVDQGFRQGLWLRQVODLGGRZQLQWKHHQYLURQPHQWDO
FOHDUDQFHLVVXHGE\0R()*RYWRI,QGLDIRUGLIIHUHQW3RZHU3URMHFWVRI'9&DOVRFRPSOLHGE\FRQWLQXLQJWKHHFRFRQVHUYDWLRQ
ZRUNV VR DV WR IDFLOLWDWH KHDOWK\ HQYLURQPHQW LQ WKH VXUURXQGLQJ DUHD RI GLIIHUHQW 3RZHU 6WDWLRQV $FWLYLWLHV OLNH SODQWDWLRQ
RUFKDUGVKHUEDOSODQWDWLRQVDYHQXHSODQWDWLRQSODQWDWLRQLQ DVKGXPSHGDUHDLQWKHSODFHVRIDEDQGRQHGPLQHVFUHDWLRQ
PDLQWHQDQFHRIJUDVVODQGHWFZHUHLPSOHPHQWHGGXULQJWKLVRQJRLQJÀQDQFLDO\HDU´3LVFLFXOWXUHµDQGLWVDOOLHG
DFWLYLWLHVZHUHDOVRFDUULHGRXWE\WKLVGHSDUWPHQWLQWKHPDMRUUHVHUYRLURI'9&WKURXJKLWV$TXDWLF5HVRXUFHZLQJVDW0DLWKRQ
DVZHOODVLQGLIIHUHQWSRZHUSURMHFWDVD&65DFWLYLW\0DLQHPSKDVLVZHUHJLYHQGXULQJWKH\HDUDVIROORZV

 5HQRYDWLRQRIROGZDWHUERGLHVLQUHVSHFWRIVRLO ZDWHUFRQVHUYDWLRQLQVL[GLVWULFWVRI-KDUNKDQGDQGRQHGLVWULFWRI:HVW


Bengal.

 &RQVWUXFWLRQ RI QHZ UDLQ ZDWHU KDUYHVWLQJ VWUXFWXUHV LQ WKH FDWFKPHQW DUHD ZLWK D YLHZ WR HQKDQFH PLFUR LUULJDWLRQ
potential and bringing more area under multiple cropping system along with augmentation of ground water recharge in
WKHFDWFKPHQWDUHD SUHYHQWLRQRIVRLOVXUIDFHHURVLRQ

 5HVWRFNLQJRIGHJUDGHG)RUHVWDUHDLQWKHFDWFKPHQWDUHDRI.RQDU 7LOD\D

 1LQH   QR RI WUDLQLQJ SURJUDPPHV ZHUH FRQGXFWHG IRU *RYHUQPHQW 2IÀFHUV6WDIIV 3URIHVVLRQDOV 1*2V DV SHU WKH
requirement to handle the schemes under the guide lines for National Mission For Sustenance of Agriculture besides two
WUDLQLQJVIRU$JULFXOWXUDO(QJLQHHULQJVWXGHQWVRI%7HFK 07HFKLQWKHÀHOGRILQWHJUDWHG:DWHUVKHG0DQDJHPHQW
7UDLQLQJ3URJUDPPHVRQ3LVFLFXOWXUHZHUHRUJDQL]HGWRPRWLYDWHWKH3URMHFWDIIHFWHGSHRSOHWRDGRSWLWDVDOLYHOLKRRG
measure.

 0XOWLOD\HU*UHHQGHYHORSPHQWZRUNVLQWKHSRZHUSURMHFWVDVSHUJXLGHOLQHRI0LQLVWU\RI(QYLURQPHQW )RUHVW*R,
1HZ'HOKLLQFOXGHV$YHQXHSODQWDWLRQ$VKSRQG3ODQWDWLRQ /DQGVFDSLQJZRUNV6SHFLDODWWHQWLRQZDVJLYHQWRHUHFW
YHJHWDWLYHEDUULHUDURXQGWKHSURSRVHGDVKSRQGDUHDRI.733LQRUGHUWRSURWHFWDGMDFHQWKDELWDWLRQIURPDLUSROOXWLRQ

 'HYHORSPHQW RI 3LVFLFXOWXUH$TXDWLF 5HVRXUFH DURXQG WKH UHVHUYRLU DUHD DV ZHOO DV LQ WKH VXUURXQGLQJ 6,3 YLOODJHV RI
GLIIHUHQWSRZHUSURMHFWRI'9&WKURXJK6SDZQSURGXFWLRQUHOHDVHRIÀQJHUOLQJV'LVWULEXWLRQRI6SDZQWRWKHSURMHFW
DIIHFWHGSHRSOHWUDLQLQJRQUHVHUYRLUDQGRUQDPHQWDOÀVKHULHVDQGPDLQWHQDQFHRIKDWFKHULHVDW0DLWKRQDQG0736DV
&65DFWLYLWLHV

 6RLO7HVWLQJ IHUWLOL]HUUHFRPPHQGDWLRQDQGLVVXHRIVRLOKHDOWKFDUGWRWKHIDUPHUVRIWKHFDWFKPHQWDUHDDVDGYLVRU\
VHUYLFHV

177
Annual Report 2018-19

 +\GURORJLFDOPRQLWRULQJV\VWHPFRQWLQXHGZLWKGDWDFROOHFWLRQDVWRÀQGWKHTXDQWXPRIVRLOHURVLRQLQWKHVPDOOVWUHDPV

 3UHVHUYDWLRQRI1DWXUDO5HVRXUFHVDW7LODL\DDQG.RQDUDUHDLQFOXGLQJPDLQWHQDQFHRIGHHUSDUNDW0DLWKRQDQG&736
XQGHUELRGLYHUVLW\DFWLYLWLHVRIWKH&RUSRUDWLRQ

Areas of Operation:-

Jharkhand +D]DULEDJK&KDWUD*LULGLK'KDQEDG%RNDUR-DPWDUD.RGHUPD'HRJKDUGLVWULFWV
West Bengal Purulia district

7KHGHWDLORIDFKLHYHPHQWVGXULQJDUH

Sl. Parameter Unit Achievement during the


No. Financial year 2018-19
A 6RLO&RQVHUYDWLRQ
1 5HQRYDWLRQRI3RQG Nos. 120
D 1RRISHRSOHEHQHÀWHGWKURXJKSRQGUHQRYDWLRQ DSSUR[ Nos. 1200
E +HFWDUHRIODQGFXOWLYDWHGWKURXJKSRQGUHQRYDWLRQ DSSUR[ Hectare 960
2 &RQVWUXFWLQJRIQHZUDLQZDWHUKDUYHVWLQJVWUXFWXUHV No. of water bodies 35
D 1RRISHRSOHEHQHÀWHGWKURXJKSRQGUHQRYDWLRQ DSSUR[ Nos. 350
E +HFWDUHRIODQGFXOWLYDWHGWKURXJKSRQGUHQRYDWLRQ DSSUR[ Hectare 280
3 6RLO&RQVHUYDWLRQ7UDLQLQJ
a) No. of training programmes Nos. 13
b) No. of Trainees Nos. 355
4 (FR'HYHORSPHQWZRUNVLQWKHSRZHUSURMHFWVDVSHU*XLGHOLQHV
RI0LQLVWU\RI(QYLURQPHQW )RUHVW*R,
1HZ&UHDWLRQJUHHQ%HOWDW.733 Area in Acre 50
Maintenance of other greenery works including landscaping and Area in Sq. Mt 9.8 lakhs
EHDXWLÀFDWLRQZRUNLQDOOWKHSURMHFWRI'9&ERWKDW/RZHU 
Upper Valley
5 $GYLVRU\6HUYLFHVWKURXJK6RLO/DERUDWRU\
1RRI6RLOWHVWLQJDQGIHUWLOL]HUVUHFRPPHQGDWLRQ Nos. 1720
6 Afforestation in DVC catchment area
&UHDWLRQ:RUN Area in Acre 150
$GYDQFHZRUN Area in Acre 50
7 Hydrological & Silt Monitoring of selected watersheds No. of stations 08

Sl. Parameter Unit Achievement during the


No. Financial year 2018-19
B )LVKHULHV 3LVFLFXOWXUH$FWLYLWLHVXQGHUWDNHQE\$TXDWLF
Resource, DVC, Maithon)

1 Spawn production at Maithon & MTPS No. in lakh 1032.5


2 Fingerlings production No. in lakh 35.55
3 Pisciculture in water bodies Nos. 20
4 7UDLQLQJRQ0DQDJHPHQWRI5HVHUYRLU)LVKHULHVVFLHQWLÀF3LVFL- 1RRIEHQHÀFLDULHV 113
FXOWXUHLQ3RQGV7DQNV

5 'LVWULEXWLRQRIVSDZQÀQJHUOLQJVWRWKHEHQHÀFLDULHV 1RRIEHQHÀFLDULHV 1524


EHQHÀWHG

178
CORPORATE SOCIAL RESPONSIBILITY OF DVC:

'DPRGDU9DOOH\&RUSRUDWLRQLVPDQGDWHGWRDGGUHVVWKHLVVXHVRIVRFLDODQGHFRQRPLFGHYHORSPHQWRIWKHSHRSOHDGYHUVHO\
affected for construction of its plants.

7R PLWLJDWH WKH VXIIHULQJ RI WKH SHRSOH DQG WR UHGXFH WKH JDS EHWZHHQ WKH LQGXVWULDO ZRUNHUV DQG WKH YLOODJHUV UHVLGLQJ
DURXQGLWVPDMRUSODQWV'9&ODXQFKHGLWV&65SURJUDPPHGXULQJWKH\HDU7KHSULPDU\REMHFWLYHRI&RUSRUDWH6RFLDO
5HVSRQVLELOLW\ &65 LVVRFLRHFRQRPLFXSOLIWPHQWRIWKHFRPPXQLW\UHVLGLQJZLWKLQ.0UDGLXVRILWVPDMRUSURMHFWV&65ZLQJ
RI'9&SUHVHQWO\RSHUDWHVLQYLOODJHV :HVW%HQJDOYLOODJHV-KDUNKDQGYLOODJHV FRYHULQJGLVWULFWVYL]%DQNXUD
3XUXOLDDQG%XUGZDQLQ:HVW%HQJDODQG'KDQEDG%RNDUR.RGHUPD+D]DULEDJ'LVWULFWVRI-KDUNKDQGZLWKODNKV3RSXODWLRQ

7KHDERYHSURJUDPPHLVPDLQO\GLYLGHGLQWRWZRW\SHVRIDFWLYLWLHV2QHZKLFKDGGUHVVHVWKHLVVXHVRIVRFLDO HFRQRPLF
GHYHORSPHQWRIWKHUXUDOPDVVHV7KHVHDFWLYLWLHVDUHVXVWDLQDEOHDQGFRQWLQXRXVLQQDWXUH8QGHUWKLVDFWLYLW\GLIIHUHQWDUHDV
ZKLFKDUHFRYHUHGLQFOXGHV

¾ Promotion of Primary and Non Formal Education. ¾ Primary Health, Health awareness & Family Welfare.
(Augmenting school infrastructure and addressing the ,PPXQL]DWLRQSURJUDPPH$ZDUHQHVVFDPSVRQYDULRXV
health & hygiene issues of school children) ZDWHUDQGYHFWRUERUQH FRPPXQLFDEOHGLVHDVHVDQG
Family welfare and Eye operation camps
¾ Vocational Training and Self-Employment (Impart- ¾ Development of Agricultural & Non-Farming
LQJVFLHQWLÀFWUDLQLQJWR5XUDO\RXWKRQ&RPSXWHU Activities 6FLHQWLÀFWUDLQLQJLVSURYLGHGRQDJULFXOWXUH
operation, Plumbing, Electrical wiring etc.) DQGDOOLHGDFWLYLWLHV 
¾ Sports, Entertainment and Cultural Activities. ¾ Social Forestry and Fisheries (Distribution of seedlings,
)DUP)RUHVWU\DQGFDJHFXOWXUHRQÀVKHULHV 
¾ Rural Sanitation (sanitation programme under
“Swachh Bharat” mission, mass construction of Toilet
in the rural area).

6HFRQG ZKLFK LV UHODWHG WR LQIUDVWUXFWXUH GHYHORSPHQW SURJUDPPH XQGHU ZKLFK &65 WDNHV XS GLIIHUHQW DFWLYLWLHV IRU
augmentation of rural infrastructure. Under this programme different rural infrastructures like construction of road, school
EXLOGLQJFRPPXQLW\FHQWUHKHDOWKFHQWUHVLUULJDWLRQVWUXFWXUHVLQVWDOODWLRQDQGUHQRYDWLRQRIWXEHZHOOVDQGFRQVWUXFWLRQRI
drinking water wells, tube wells etc are being taken up.

&RUSRUDWLRQKDGHDUPDUNHG5V/DNKIRUVRFLRHFRQRPLFGHYHORSPHQWSURJUDPPHDQG5V/DNKIRULQIUDVWUXFWXUH
GHYHORSPHQWSURJUDPPHIRUWKHÀQDQFLDO\HDU2XWRIWKHWRWDOIXQGDOORFDWHGDQDPRXQWRI5V/DNKKDVEHHQ
VSHQW GXULQJ WKLV ÀQDQFLDO \HDU LH  5V  /DNK WRZDUGV VRFLRHFRQRPLF GHYHORSPHQW SURJUDPPH DQG  /DNK WRZDUGV
LQIUDVWUXFWXUHGHYHORSPHQWSURJUDPPHUHVSHFWLYHO\

E-GOVERNANCE/IT INITIATIVES:

‡ 6\VWHPKDVEHHQGHYHORSHGWRJHQHUDWH6KRUW7HUP2SHQ$FFHVV 672$ DQG%LODWHUDO%LOOVIRU'9&3RZHU&RQVXPHUV

‡ 6RIWZDUH DSSOLFDWLRQ KDV EHHQ GHYHORSHG IRU OHDYH PDQDJHPHQW DQG HPSOR\HHV FODLP XQGHU (PSOR\HHV 6HOI 6HUYLFH
(ESS).

‡ 'HHS'LVFRYHU\,QVSHFWRUDQG'HHS'LVFRYHU\$QDO\VHUKDYHEHHQLQVWDOOHGWRPLQLPL]HWKHF\EHUWKUHDW

‡ 7LHU,,,'DWD&HQWUHHPSDQHOOHGE\0LQLVWU\RI(OHFWURQLFVDQG,QIRUPDWLRQ7HFKQRORJ\ 0HLW< KDVEHHQKLUHG

‡ 'DWDFRQQHFWLYLW\WRÀIW\RQHORFDWLRQVRI'9&KDYHEHHQH[WHQGHGWKURXJK2SWLFDO*URXQG:LUH 23*: 1HWZRUNRI


DVC.

‡ '9&LVUHJXODUO\SURYLGLQJWKHGHVLUHGDFFHVVWR-KDUNKDQGDQG:HVW%HQJDOIRURQOLQHDSSOLFDWLRQDQGWUDFNLQJRIVWDWXV
for new connection under the ease of doing business.

‡ ,PSOHPHQWDWLRQRI1HWZRUN$FFHVV&RQWURO 1$& LVSODQQHGLQ

179
Annual Report 2018-19

6KUL5.6LQJK+RQ·EOH0LQLVWHURI6WDWH ,& 3RZHUDQG1HZ  8QYHLOLQJRIFRPPHPRUDWLYHYROXPHRQJORULRXV\HDUVRI'9&RQ


Renewable Energy, GOI inaugurates Foundation Day Program of DVC WK-XO\E\6KUL5.6LQJK+RQ·EOH0LQLVWHURI6WDWH ,& 3RZHU
DW6FLHQFH&LW\.RONDWDRQWK-XO\ DQG1HZ 5HQHZDEOH(QHUJ\*2,DW.RONDWD

6UL3.0XNKRSDGK\D\&KDLUPDQ'9&UHFHLYLQJWKH5DM%KDVKD.LUWL A Remote Control & Monitoring Room of different Power Plants of


3XUDVNDUIURP+RQ·EOH9LFH3UHVLGHQWRI,QGLDDW1HZ'HOKL '9&LQDXJXUDWHGE\6KUL5.6LQJK+RQ·EOH0LQLVWHURI6WDWH ,& 
on 14th September 2018. Power and New & Renewable Energy, GOI at its H.Q. on
7th July 2018.

180
CHAPTER 29

BHAKRA BEAS MANAGEMENT BOARD (BBMB)


Bhakra Management Board (BMB) was constituted under 9621 million cubic metres. The two power houses, one on the
6HFWLRQ  RI WKH 3XQMDE 5H2UJDQL]DWLRQ $FW  IRU WKH /HIW%DQNDQGWKHRWKHURQWKH5LJKW%DQNKDYHDFRPELQHG
administration, maintenance and operation of Bhakra Nangal LQVWDOOHGFDSDFLW\RI0:7KH*DQJXZDODQG.RWOD3RZHU
Project with effect from Ist October, 1967. The Beas Project +RXVHV IHG IURP 1DQJDO +\GHO &KDQQHO KDYH DQ LQVWDOOHG
:RUNV RQ FRPSOHWLRQ ZHUH WUDQVIHUUHG E\ WKH *RYHUQPHQW FDSDFLW\RI0:7KH%HDV3URMHFW8QLW², %6/3URMHFW 
of India from Beas Construction Board (BCB) to BMB as per GLYHUWV%HDV:DWHULQWRWKH6DWOXM%DVLQUXVKLQJIURPDKHLJKW
Section 80 of the Act and Bhakra Management Board was of 320 metres and generating power at Dehar Power House
renamed as Bhakra Beas Management Board (BBMB) with KDYLQJDQLQVWDOOHGFDSDFLW\RI0:7KLVSURMHFWFRPSULVHV
effect from 15.5.1976. D GLYHUVLRQ GDP DW 3DQGRK  .P ORQJ 3DQGRK%DJJL
7XQQHO.PORQJ6XQGHUQDJDU+\GHO&KDQQHO%DODQFLQJ
FUNCTIONS
5HVHUYRLUDW6XQGHUQDJDU.PORQJ6XQGHUQDJDU6DWOXM
Bhakra Beas Management Board is responsible for the 7XQQHOPHWUH+LJK6XUJH6KDIWDQG0:'HKDU3RZHU
administration, operation & maintenance of Bhakra Nangal +RXVH7KH%HDV'DPDW3RQJLVHDUWKÀOO HDUWKFRUHJUDYHO
Project, Beas Satluj Link Project & Beas Dam including Power shell) dam 132.6 metre high with a gross storage capacity of
Houses and a network of transmission lines & grid sub- PLOOLRQFXELFPHWUHV7KH0:3RQJ3RZHU+RXVHLV
VWDWLRQV7KHIXQFWLRQVRI%KDNUD%HDV0DQDJHPHQW%RDUGDUH located in the stilling basin downstream of penstock tunnels.
‡ $GPLQLVWUDWLRQ 2SHUDWLRQ  0DLQWHQDQFH RI %KDNUD The total installed generating capacity of the BBMB Power
Beas Projects. +RXVHVLV0:DVGHWDLOHGEHORZ
‡ 7KHUHJXODWLRQRIWKHVXSSO\RIZDWHUIURP%KDNUD%HDV Power House Installed Capacity (No. of machines
Projects to the States of Punjab, Haryana and Rajasthan. x Capacity of each in MW)
‡ 7KH UHJXODWLRQ RI WKH VXSSO\ RI SRZHU JHQHUDWHG DW Bhakra (Right Bank) [ 
Bhakra-Beas Projects. Bhakra (Left Bank) [[ 
Ganguwal [[ 
‡ $Q\ RWKHU IXQFWLRQ DV WKH &HQWUDO *RYHUQPHQW PD\
DVVLJQDIWHUFRQVXOWDWLRQZLWKWKH*RYHUQPHQWVRI6WDWHV .RWOD [[ 
of Haryana, Punjab & Rajasthan. Dehar [ 
Pong [ 
‡ 7KH *RYW RI ,QGLD LQ WKH \HDU  KDV HQWUXVWHG
DGGLWLRQDO IXQFWLRQV RI SURYLGLQJ  SHUIRUPLQJ GENERATION AND TRANSMISSION SYSTEM:
HQJLQHHULQJ DQG UHODWHG WHFKQLFDO FRQVXOWDQF\ VHUYLFHV
The generation during 2017-18 was 10881 Million Units
LQÀHOGRI+\GUR(OHFWULF3URMHFWV ,UULJDWLRQ3URMHFWV
against the target of 9360 Million Units. The generation of
The works being managed by BBMB are broadly grouped as BBMB Powerhouses has been more than the targets for the
WKUHHODUJHPXOWLSXUSRVHSURMHFWVYL]%KDNUD1DQJDO3URMHFW year by 16.25%. During 2018-19 the generation from BBMB
Beas Project Unit-I (BSL Project) and Beas Project Unit-II (Beas Powerhouses has been 10190.26 Million Units against the
Dam). target of 9425 Million Units i.e 8.12% higher than the target.

The Bhakra Nangal project comprises the Bhakra Dam, Bhakra 7KH 3RZHUKRXVH ZLVH SODQW DYDLODELOLW\ GXULQJ  KDV
Left Bank & Bhakra Right Bank Power Houses, Nangal Dam, EHHQ%KDNUDOHIW%DQN H[FOXGLQJ508 %KDNUD5LJKW
1DQJDO+\GHO&KDQQHO*DQJXZDO .RWOD3RZHU+RXVHVDQG %DQN*DQJXZDO.RWOD'HKDU
associated transmission system. Bhakra Dam, the majestic and Pong 95.39%.
PRQXPHQW DFURVV WKH ULYHU 6DWOXM LV D KLJK VWUDLJKW JUDYLW\
7KH 3RZHUKRXVH ZLVH SODQW DYDLODELOLW\ IRU WKH \HDU 
FRQFUHWH 'DP ULVLQJ  PHWUHV DERYH WKH GHHSHVW
XSWRKDVEHHQ%KDNUD/HIW%DQN H[FOXGLQJ
IRXQGDWLRQ DQG VSDQQLQJ WKH JRUJH RYHU  PHWUH
508  %KDNUD 5LJKW %DQN  *DQJXZDO  .RWOD
length at the top. Gobind Sagar Lake created by the Dam has
 'HKDU  DQG  3RQJ   2YHUDOO SODQW
168.35 square kilometer area and a gross storage capacity of
DYDLODELOLW\LV

181
Annual Report 2018-19

The Power generation at BBMB Powerhouses is being 7KHÀUVWXnit (Power House Unit-2) was commissioned on 18th
HYDFXDWHG WKURXJK %%0% 3RZHU HYDFXDWLRQ V\VWHP UXQQLQJ July, 2013 after successful R,M&U. Similarly, the second Unit
LQWR&NW.POHQJWKRIN9N9N9DQG (Power House Unit No.5) and the third Unit (Power House
kV transmission lines and 24 Sub-stations. The Bhakra Beas Unit No.4) has also been commissioned on 2nd October, 2013
0DQDJHPHQW%RDUGSRZHUHYDFXDWLRQV\VWHPRSHUDWHVLQDQ DQG  UHVSHFWLYHO\ %DVHG RQ WKH UHSRUW RI &35,
integrated manner in the Northern Grid with its transmission Bangalore of Generator shaft of Unit 5, spare new Generator
QHWZRUN VSUHDG RYHU WKH 6WDWHV RI +LPDFKDO 3UDGHVK 6KDIW DV HDUOLHU RUGHUHG RQ 0V $QGULW] +\GUR  DORQJZLWK
Punjab, Haryana and Delhi. The system is interconnected the new spider rim and other related parts ordered on dated
with transmission system of PGCIL and the states of Punjab,  RQ 0V $QGULW] +\GUR *PEK $XVWULD KDYH EHHQ
+DU\DQD +LPDFKDO 3UDGHVK -DPPX  .DVKPLU 8WWDU UHSODFHGZLWKH[LVWLQJFRPSRQHQWVRI8QLW1RRI%KDNUD/HIW
3UDGHVK 5DMDVWKDQ &KDQGLJDUK DQG 'HOKL 7KH DYDLODELOLW\ Bank Power House.
of transmission system during the year 2017-18 has been The work for the replacement of shaft, spider, rim and other
ZKHUHDVWKH$YDLODELOLW\RIWUDQVPLVVLRQV\VWHPGXULQJ UHODWHGSDUWVDORQJZLWKYDULRXVDFWLYLWLHVKDGEHHQVWDUWHGRQ
2018-19 has been 99.69%. 21.10.2016 and put on commercial run on dated 15.06.2018.
IRRIGATION 7KH8QLWLVUXQQLQJZLWKRXWSXWRI0:

At the time of partition of India, about 80% of the irrigated 7KH VKXWGRZQ RQ WKH QH[W 3RZHU +RXVH 8QLW LH 8QLW 1R
DUHD RI SUHSDUWLWLRQ 3XQMDE ZHQW WR 3DNLVWDQ OHDYLQJ ,QGLD IRU50 8ZRUNVKDVEHHQWDNHQLQÀUVWZHHNRI$SULO
ZLWK YHU\ PHDJUH LUULJDWLRQ UHVRXUFHV 7KH PLJKW\ %KDNUD +RZHYHU ZRUN RI 6WDWRU $VVHPEO\ RI 8QLW 1R KDV DOUHDG\
Nangal and Beas Projects changed the scenario and turned started on 22nd January, 2019 and shall be commissioned
Northern India into Granary of the Nation. The Bhakra Nangal E\1RYHPEHU'HFHPEHU7KH50 8ZRUNVRIWKHODVW
DQG%HDV3URMHFWVKDYHQRWRQO\EURXJKW*UHHQ5HYROXWLRQLQ 5th Unit (Power House Unit No.1) shall be based on
WKH6WDWHVRI3XQMDE+DU\DQDDQG5DMDVWKDQEXWDOVR:KLWH commissioning of fourth unit (Power House Unit No.3). In
5HYROXWLRQE\ZD\RIUHFRUGSURGXFWLRQRIPLON7KH6WDWHVRI case shutdown of this unit is taken in the month of September,
2019, the R,M&U works are anticipated to be completed by
Punjab, Haryana and Rajasthan are being supplied about 28
$SULO0D\
PLOOLRQDFUHIHHWRIZDWHUHYHU\\HDU
Automation of 200kV Sub Station
RENOVATION, MODERNISATION AND UPRATING
(R,M&U) %%0%KDVWDNHQDVLJQLÀFDQWVWHSLQDXWRPDWLRQRI6XEVWDWLRQV
in its Transmission System. Fully automated 220 kV Sub Station
50 8RIROG3RZHU+RXVHVQRWRQO\JLYHVQHZOHDVHRIOLIH
at Barnala with remote operation from 220 kV Sub Station at
WRWKHPDFKLQHVEXWLVDOVRDVLJQLÀFDQWVWHSWRZDUGVPHHWLQJ
Sangrur (40 km from Barnala) has been commissioned recently
the aspirations of the nation by adding low cost green peaking
at a cost of Rs. 1.7 Crore. The Sub Station is now unmanned
power to the system.
with Control Room locked up and no staff is deployed in
%%0% KDV XQGHUWDNHQ DQ DPELWLRXV 50 8 RI LWV H[LVWLQJ VKLIWGXW\7KHEHQHÀWVLQFOXGHUHGXFHG2 0FRVWLQFUHDVHG
hydro generating unit. Through RM&U, BBMB has already system reliability, reduced downtime, remote monitoring of
DGGHG0:RILQFUHPHQWDOFDSDFLW\3UHVHQWO\50 8RI operations etc. Similar work for other Sub Station’s located
5 No. machines of Bhakra Left Bank Power House is under at HIssar, Charkhi Dadri Ballabgarh and Samaypur has been
SURJUHVV$OOWKHÀYHPDFKLQHVZLOOEHXSUDWHGIURP0: initiated.
WR0:HDFK7KUHH8QLWVKDYHDOUHDG\EHHQXSUDWHGIURP
Roof Top Solar Power Stations
WR0:DQGRWKHUWZRXQLWVZLOOEHXSUDWHGE\$SULO
0D\WKXVSURYLGLQJDGGLWLRQDOFDSDFLW\RI0: 7RWDO BBMB has commissioned Grid connected Roof Top Solar
0: 7KHFRQWUDFWVWDQGVDZDUGHGWRWKHFRQVRUWLXPOHG SURMHFWV RI  N:S DW  N9 6XEVWDWLRQV RI -DODQGKDU
E\ 0V 6XPLWRPRV &RUSRUDWLRQ -DSDQ 7RWDO FRVW RI 50 8 -DPDOSXU 1DUHOD 'HOKL DQG RIÀFH EXLOGLQJV DW &KDQGLJDUK
ZRUNVLVFURUHDSSUR[ ,QFOXVLYHRIFRVWRIHTXLSPHQWWR )XUWKHU  0:S URRI WRS VRODU 39 SODQWV DUH DW GLIIHUHQW
be procured by BBMB i.e. Generator Transformers, Numerical VWDJHVRIH[HFXWLRQDWYDULRXVSURMHFWVLWHVDQGVXEVWDWLRQVRI
SURWHFWLRQVFKHPHVDQGH[FOXVLYHRI,'&%DQN)LQDQFH/HJDO BBMB in addition to implementation of Ground Mounted and
charges etc.). Floating Solar Power Plants at Nangal and Talwara.

182
NATIONAL HYDROLOGY PROJECT %%0% VXFFHVVIXOO\ RUJDQL]HG ,VW ,QWHUQDWLRQDO &RQIHUHQFH
RQ 6XVWDLQDEOH :DWHU 0DQDJHPHQW RQ 'HFHPEHU 
Bhakra BeDV0DQDJHPHQW%RDUG %%0% KDVGHYHORSHG5HDO
2018 at Indian School of Business, Mohali under the aegis
Time Decision Support System (RTDSS) setup at the Earth
RI 1DWLRQDO +\GURORJ\ 3URMHFW 0LQLVWU\ RI :DWHU 5HVRXUFHV
5HFHLYLQJ 6WDWLRQ (56  DW &KDQGLJDUK IRU KRXUO\ UHFHSWLRQ 5LYHU'HYHORSPHQW *DQJD5HMXYHQDWLRQ*RYWRI,QGLD7KH
of real time meteorological & hydro-meteorological data, &RQIHUHQFHZDVLQDXJXUDWHGE\$FKDU\D'HY9UDWML+RQ·EOH
LQÁRZIRUHFDVWLQJ LHVKRUW WHUP  GD\VPHGLXPWHUPWR *RYHUQRU +LPDFKDO 3UDGHVK 7KH &RQIHUHQFH VDZ KXJH
GD\VDQGORQJWHUP UHVHUYRLURSHUDWLRQV SODQQLQJDQG SDUWLFLSDWLRQRIUHSUHVHQWDWLYHVIURPLPSOHPHQWLQJ$JHQFLHV
ÁRRG IRUHFDVWLQJ IRU RSWLPXP XWLOL]DWLRQ RI %KDNUD  3RQJ RI 1+3 &HQWUDO6WDWH *RYW DJHQFLHV DFDGHPLD LQGXVWU\
UHVHUYRLUVDQGFDQDOQHWZRUN VWXGHQWV  SDUWLFLSDQWV IURP DEURDG VSUHDG RYHU LQDXJXUDO
session, plenary session, 15 nos. technical sessions held
0LQLVWU\ RI :DWHU 5HVRXUFHV 5LYHU 'HYHORSPHQW  *DQJD
VLPXOWDQHRXVO\ LQ WKUHH KDOOV LQGXVWU\ VHVVLRQ YDOHGLFWRU\
5HMXYHQDWLRQ *RYW RI ,QGLD LQ DVVRFLDWLRQ ZLWK :RUOG %DQN
VHVVLRQ H[KLELWLRQ SRVWHU FRPSHWLWLRQ FXOWXUDO SURJUDPPH
has initiated National Hydrology Project (NHP) in India to HWF 7KRXJKW SURYRNLQJ GLVFXVVLRQV DQG SUHVHQWDWLRQV ZHUH
FDUU\ IRUZDUG WKH ZRUN  REMHFWLYHV RI +\GURORJ\ 3URMHFW KHOGRQYDULRXVDVSHFWVRI6XVWDLQDEOH:DWHU0DQDJHPHQWLH
Phase-II. To this effect, BBMB has been allocated Rs. 30.00 ULYHU EDVLQ SODQQLQJ FRQMXQFWLYH XVH RI VXUIDFH DQG JURXQG
FURUH IRU VWUHQJWKHQLQJ DQG H[SDQVLRQ RI H[LVWLQJ 'DWD ZDWHU FOLPDWH FKDQJH DQG DGDSWLYH PHDVXUHV LQWHJUDWHG
$FTXLVLWLRQ V\VWHP '$6  GHYHORSPHQW RI DOWHUQDWH PRGHOV ZDWHU UHVRXUFHV PDQDJHPHQW K\GURLQIRUPDWLFV LQQRYDWLYH
and technology enhancement along with capacity building in LUULJDWLRQSUDFWLFHVÁRRGPRGHOLQJZDWHUDQGHQHUJ\VHFXULW\
WKHRUJDQLVDWLRQWRDFKLHYHEHWWHr results. sediment management etc.

Bhakra Nangal Dam, Himachal Pradesh

183
Annual Report 2018-19

:&RRO:KLWH/('5RDG/LJKWV

184
CHAPTER 30

BUREAU OF ENERGY EFFICIENCY (BEE)


7KH*RYHUQPHQWRI,QGLDHQDFWHGWKH(QHUJ\&RQVHUYDWLRQ$FW PRQLWRUDQGYHULI\HQHUJ\HIÀFLHQF\UHVXOWVLQLQGLYLGXDO
(&$FW DQGIRULPSOHPHQWLQJYDULRXVSURYLVLRQVLQWKH VHFWRUVDVZHOODVDWWKHQDWLRQDOOHYHO
(&$FW%XUHDXRI(QHUJ\(IÀFLHQF\ %(( ZDVRSHUDWLRQDOLVHG
™ 7R OHYHUDJH PXOWLODWHUDO ELODWHUDO DQG SULYDWH VHFWRU
ZLWK HIIHFW IURP VW 0DUFK  7KH (& $FW SURYLGHV D
support in implementation of programmes and projects
OHJDO IUDPHZRUN IRU HQHUJ\ HIÀFLHQF\ LQLWLDWLYHV LQ WKH
RQHIÀFLHQWXVHRIHQHUJ\DQGLWVFRQVHUYDWLRQ
FRXQWU\7KH$FWKDVPDQGDWRU\DQGSURPRWLRQDOLQLWLDWLYHV
which broadly relates to Designated Consumers, Standards ™ 7R SURPRWH DZDUHQHVV RI HQHUJ\ VDYLQJV DQG HQHUJ\
& Labeling programme for equipment and appliances FRQVHUYDWLRQ
DQG (QHUJ\ &RQVHUYDWLRQ %XLOGLQJ &RGHV (&%&  IRU QHZ
Functions of BEE
commercial buildings and residential buildings. The Bureau
LV VSHDUKHDGLQJ WKH WDVN RI LPSURYLQJ WKH HQHUJ\ HIÀFLHQF\ BEE co-ordinates with designated consumers, designated
LQ YDULRXV VHFWRUV RI WKH HFRQRP\ WKURXJK UHJXODWRU\ DQG DJHQFLHV DQG RWKHU RUJDQL]DWLRQV UHFRJQL]HV LGHQWLÀHV DQG
SURPRWLRQDO PHFKDQLVP %XUHDX RI (QHUJ\ (IÀFLHQF\ FR XWLOL]HVWKHH[LVWLQJUHVRXUFHVDQGLQIUDVWUXFWXUHLQSHUIRUPLQJ
ordinates with designated consumers, designated agencies the functions assigned to it under the EC Act. The EC Act
DQG RWKHU RUJDQL]DWLRQV UHFRJQL]HV LGHQWLÀHV DQG XWLOL]HV SURYLGHVIRUUHJXODWRU\DQGSURPRWLRQDOIXQFWLRQV
WKH H[LVWLQJ UHVRXUFHV DQG LQIUDVWUXFWXUH LQ SHUIRUPLQJ WKH Regulatory functions
functions assigned to it under the EC Act.
7KHPDMRUUHJXODWRU\IXQFWLRQVRI%((LQFOXGH
Mission of BEE
™ 'HYHORS PLQLPXP HQHUJ\ FRQVXPSWLRQ VWDQGDUGV DQG
7KH0LVVLRQRI%XUHDXRI(QHUJ\(IÀFLHQF\ %(( LVWRGHYHORS labeling for equipment and appliances.
policy and strategies with a thrust on self-regulation and
PDUNHWSULQFLSOHVZLWKLQWKHRYHUDOOIUDPHZRUNRIWKH(QHUJ\ ™ 'HYHORS VSHFLÀF HQHUJ\ FRQVHUYDWLRQ EXLOGLQJ FRGHV
&RQVHUYDWLRQ$FW (&$FW ZLWKWKHSULPDU\REMHFWLYHRI (ECBC).
reducing energy intensity of the Indian economy. This will be ™ $FWLYLWLHVIRFXVLQJRQGHVLJQDWHGFRQVXPHUV
DFKLHYHGZLWKDFWLYHSDUWLFLSDWLRQRIDOOVWDNHKROGHUVUHVXOWLQJ
Ń 'HYHORSHQHUJ\FRQVXPSWLRQQRUPV
LQDFFHOHUDWHGDQGVXVWDLQHGDGRSWLRQRIHQHUJ\HIÀFLHQF\LQ
all sectors. Ń &HUWLI\HQHUJ\PDQDJHUVDQGHQHUJ\DXGLWRUV
Objectives and Strategies Ń $FFUHGLWDWLRQRIHQHUJ\DXGLWRUV
7KHSULPDU\REMHFWLYHRI%((LVWRUHGXFHHQHUJ\LQWHQVLW\LQ Ń 'HÀQH WKH PDQQHU DQG SHULRGLFLW\ RI PDQGDWRU\
WKH,QGLDQHFRQRP\,QRUGHUWRWUDQVODWHWKHREMHFWLYHVLQWR energy audits.
UHVXOWRULHQWHGDFWLRQWKHEURDGVWUDWHJLHVRI%((LQFOXGH
Ń 'HYHORSUHSRUWLQJIRUPDWVRQHQHUJ\FRQVXPSWLRQ
™ 7RFRRUGLQDWHSROLFLHVDQGSURJUDPPHVRQHIÀFLHQWXVH and action taken on the recommendations of the
RIHQHUJ\DQGLWVFRQVHUYDWLRQZLWKWKHLQYROYHPHQWRI energy auditors.
stakeholders.
Promotional functions
™ 7R SODQ PDQDJH DQG LPSOHPHQW HQHUJ\ FRQVHUYDWLRQ
7KHPDMRUSURPRWLRQDOIXQFWLRQVRI%((LQFOXGH
SURJUDPPHVDVHQYLVDJHGLQWKH(&$FW
™ Create awareness and disseminate information on
™ 7RDVVXPHOHDGHUVKLSDQGSURYLGHSROLF\IUDPHZRUNDQG
HQHUJ\HIÀFLHQF\DQGFRQVHUYDWLRQ
GLUHFWLRQWRQDWLRQDOHQHUJ\HIÀFLHQF\DQGFRQVHUYDWLRQ
efforts and programmes. ™ $UUDQJH DQG RUJDQL]H WUDLQLQJ RI SHUVRQQHO DQG
VSHFLDOLVWVLQWKHWHFKQLTXHVIRUHIÀFLHQWXVHRIHQHUJ\
™ 7RGHPRQVWUDWHHQHUJ\HIÀFLHQF\GHOLYHU\PHFKDQLVPV
DQGLWVFRQVHUYDWLRQ
DV HQYLVDJHG LQ WKH (& $FW WKURXJK 3ULYDWH3XEOLF
Partnership (PPP). ™ 6WUHQJWKHQFRQVXOWDQF\VHUYLFHV

™ To establish systems and procedures to measure, ™ 3URPRWHUHVHDUFKDQGGHYHORSPHQW

185
Annual Report 2018-19

™ 'HYHORS WHVWLQJ DQG FHUWLÀFDWLRQ SURFHGXUHV DQG (IÀFLHQF\ LQ ,QGLD WKH GHWDLOV RI ZKLFK KDYH EHHQ JLYHQ LQ
promote testing facilities. &KDSWHUUHODWLQJWR(QHUJ\&RQVHUYDWLRQ

™ Formulate and facilitate implementation of pilot projects 1. Standards & Labeling Scheme
and demonstration projects.
 (QHUJ\&RQVHUYDWLRQ%XLOGLQJ&RGH (&%&
™ 3URPRWH XVH RI HQHUJ\ HIÀFLHQW SURFHVVHV HTXLSPHQW
3. Assistance on ECBC to different projects
GHYLFHVDQGV\VWHPV
 (QHUJ\(IÀFLHQF\LQ([LVWLQJ%XLOGLQJV
™ Take steps to encourage preferential treatment for use
RIHQHUJ\HIÀFLHQWHTXLSPHQWRUDSSOLDQFHV 5. Agricultural (Ag DSM) and Municipal (Mu DSM) Demand
Side Management (DSM) Scheme
™ 3URPRWH LQQRYDWLYH ÀQDQFLQJ RI HQHUJ\ HIÀFLHQF\
projects. 6. Strengthening Institutional Capacity of SDAs Scheme

™ *LYH ÀQDQFLDO DVVLVWDQFH WR LQVWLWXWLRQV IRU SURPRWLQJ  &RQWULEXWLRQWR6WDWH(QHUJ\&RQVHUYDWLRQ)XQG 6(&) 
HIÀFLHQWXVHRIHQHUJ\DQGLWVFRQVHUYDWLRQ Scheme

™ 3UHSDUH HGXFDWLRQDO FXUULFXOXP RQ HIÀFLHQW XVH RI  1DWLRQDO(QHUJ\&RQVHUYDWLRQ$ZDUGV


HQHUJ\DQGLWVFRQVHUYDWLRQ  3DLQWLQJ&RPSHWLWLRQRQ(QHUJ\&RQVHUYDWLRQ
™ Implement international co-operation programmes  1DWLRQDO 0LVVLRQ IRU (QKDQFHG (QHUJ\ (IÀFLHQF\
UHODWLQJWRHIÀFLHQWXVHRIHQHUJ\DQGLWVFRQVHUYDWLRQ (NMEEE)
PROJECTS AND PROGRAMMES 11. Student Capacity Building Programme.
%XUHDXRI(QHUJ\(IÀFLHQF\KDVDOUHDG\ODXQFKHGWKHIROORZLQJ  (QHUJ\ (IÀFLHQF\ LQ 6PDOO DQG 0HGLXP (QWHUSULVHV
YROXQWDU\ DQG PDQGDWRU\ 6FKHPHV IRU SURPRWLQJ (QHUJ\ (SMEs)

186
CHAPTER 31

CENTRAL POWER RESEARCH INSTITUTE (CPRI)


The Central Power Research Institute (CPRI) established by ¾ Association with Underwriters Laboratories (UL) for
WKH *RYHUQPHQW RI ,QGLD LQ  ZDV UHRUJDQLVHG LQWR DQ testing of LV equipment
Autonomous Society in 1978 to function as a National Power
Important Events:
5HVHDUFK 2UJDQL]DWLRQ DQG WR VHUYH DV D 1DWLRQDO 7HVWLQJ
DQG&HUWLÀFDWLRQ$XWKRULW\IRUWKHSXUSRVHRIFHUWLÀFDWLRQRI  6ZDFKKDWD 3DNZDGD ZDV REVHUYHG LQ &35, %DQJDORUH
UDWLQJ DQG SHUIRUPDQFH WR HQVXUH DYDLODELOLW\ RI HTXLSPHQW IURP WK WR  VW 0D\   7KH IROORZLQJ DFWLYLWLHV
RIDGHTXDWHTXDOLW\IRUWKHXVHXQGHUFRQGLWLRQVSUHYDOHQWLQ ZHUHFDUULHGRXWRQWKLVRFFDVLRQ
Indian Power Systems. The affairs of the Society are managed
D  &OHDQOLQHVV'ULYHLQDQGDURXQGRIÀFHFDPSXVLQFOXGLQJ
E\ *RYHUQLQJ &RXQFLO ZLWK 6HFUHWDU\ WR WKH *RYHUQPHQW RI
staff colony of CPRI.
,QGLD0LQLVWU\RI3RZHUDVLWV3UHVLGHQW7KH*RYHUQLQJ&RXQFLO
KDVUHSUHVHQWDWLRQIURPYDULRXV0LQLVWULHVRI*RYHUQPHQWRI b) Mass Pledge by Employees
India, Power Utilities, Manufacturers, Academic Institutions
F  $ZDUHQHVV FDPSDLJQ LQ WKH VWDII FRORQ\  YLFLQLW\ ZDV
etc.
done
7KH ,QVWLWXWH KDV LW·V +HDG 2IÀFH DQG PDMRU ODERUDWRULHV DW
d) Segregation of scrap in designated yards.
Bangalore. The Institute has its Units at Bhopal, Hyderabad,
.RUDGL1DJSXU1RLGD.RONDWD *XZDKDWL(VWDEOLVKPHQWRI 2. Shri V.S. Nandakumar, Director General-CPRI and Mr.
new unit at Nashik is under progress. 0.:DGKZDQL$GGLWLRQDO'LUHFWRU67'6&35,%KRSDO
attended 44th Management Committee Meeting of
The core activities of the Institute are :
67/ KHOG DW .(0$ /DERUDWRULHV  =.8 3UDJXH &]HFK
¾ 5HVHDUFK 'HYHORSPHQW Republic, on 14th & 15th May 2018

¾ 7HVWLQJ &HUWLÀFDWLRQ 3. Shri B.A Sawale, Additional Director, STDS-CPRI,


%KRSDODWWHQGHG,(&7&:*PHHWLQJKHOGDW5LJL
¾ Consultancy
6ZLW]HUODQGIURPUGWRWK0D\
¾ Customised Training Programmes
 'LUHFWRU*HQHUDO&35,DWWHQGHGWKHUHYLHZPHHWLQJRQ
¾ Vendor Analysis “Clean Cooking”, chaired by the Hon’ble Minister of
6WDWH ,F IRU3RZHU 15(KHOGDW015(1HZ'HOKL
¾ 7KLUG3DUW\,QVSHFWLRQ6HUYLFHV
on 27th July 2018.
Accreditations:
 6KUL 9LYHN .XPDU 'HZDQJDQ ,$6 -RLQW 6HFUHWDU\ 
¾ $FFUHGLWHGDVSHU,62,(& )LQDQFLDO $GYLVHU 0LQLVWU\ RI 3RZHU 1HZ 'HOKL WRRN D
¾ Member of Short Circuit Testing Liaison (STL) Group UHYLHZPHHWLQJRI&35,ZLWK'LUHFWRU*HQHUDO&35,DQG
RWKHUVHQLRURIÀFHUVRI&35,DW&35,%DQJDORUHRQWK
¾ &RUSRUDWH 0HPEHU LQ '/06 8$ 'HYLFH /DQJXDJH -XO\7KHPHHWLQJZDVIROORZHGZLWKDYLVLWWRVRPH
0HVVDJH 6SHFLÀFDWLRQ 8VHU $VVRFLDWLRQ  DQG 8&$ ,8*
Laboratories.
(Utility Communication Architecture International User
Group) 6. The 82nd Standing Committee Meeting was held at
CPRI, Bangalore, on 1st October 2018. The Grid Tied
¾ ,62&HUWLÀFDWLRQIRU5HVHDUFKDQG&RQVXOWDQF\
,QYHUWHUDQG6390RGXOH7HVWIDFLOLW\DW(QHUJ\(IÀFLHQF\
DFWLYLWLHV
 5HQHZDEOH (QHUJ\ 'LYLVLRQ &35, %DQJDORUH ZDV
¾ $FFUHGLWHGE\,QWHUWHN$67$8. LQDXJXUDWHGE\6KUL6DQMLY1DQGDQ6DKDL,$6$GGLWLRQDO
Secretary, Ministry of Power in the presence of Shri
¾ $FFUHGLWHG E\ ,10(752 %UD]LO IRU 'LVWULEXWLRQ
9LYHN.Xmar Dewangan, IAS, Joint Secretary & Financial
Transformers

187
Annual Report 2018-19

$GYLVHU0LQLVWU\RI3RZHUDQG6KUL5DM3DO,(6(FRQRPLF  2QWKHVSRW VWXG\ YLVLW RI 3DUOLDPHQWDU\ 6WDQGLQJ


$GYLVHU0LQLVWU\RI3RZHUDQG'LUHFWRU*HQHUDO&35,RQ &RPPLWWHH RQ (QHUJ\ FRQVLVWLQJ RI 'U .DPEKDPSDWL
1st October 2018. Haribabu-Chairperson and Hon’ble Members from Lok
Sabha & Rajya Sabha on the subject of ‘Contribution of
 &35, %DQJDORUH REVHUYHG ´9LJLODQFH $ZDUHQHVV :HHN
&35,LQ'HYHORSPHQWRI3RZHU6HFWRU·ZDVKHOGDW&35,
µ IURP WK 2FWREHU WR UG 1RYHPEHU   $ Bangalore, on 23rd January 2019.
pledge was taken by all the employees of the Institute
 6KUL 5 . 6LQJK 8QLRQ 0LQLVWHU RI 6WDWH ,&  IRU 3RZHU
on 29th October 2018. In this connection, an essay
DQG 1HZ  5HQHZDEOH (QHUJ\ *RYHUQPHQW RI ,QGLD
competition on the subject “Eradicate Corruption-Build
laid the foundation stone of new unit, Regional
a New India” was held for the interested employees
Testing Laboratory of Central Power Research Institute
RQ VW 1RYHPEHU   7KH FRQFOXGLQJ IXQFWLRQ ZDV
(CPRI) at Nashik, Maharashtra, on 30th January 2019.
RUJDQL]HGRQQG1RYHPEHU
The occasion was graced by Shri Chandrashekhar
 &35, %DQJDORUH REVHUYHG ¶5DVKWUL\D (NWD 'LZDVµ .ULVKQDUDR %DZDQNXOH 0LQLVWHU IRU (QHUJ\   1HZ   
(National Unity Day) to commemorate the birth 5HQHZDEOH   (QHUJ\   DQG  6WDWH  ([FLVH  *RYHUQPHQW
DQQLYHUVDU\RI6DUGDU9DOODEKEKDL3DWHORQVW2FWREHU of Maharashtra, Shri Hemant Tukaram Godse, Member
2018. of Parliament (Lok Sabha), Nashik Constituency and Shri
5DM 3DO ,(6 (FRQRPLF $GYLVHU 0LQLVWU\ RI 3RZHU 1HZ
9. Shri V.S. Nandakumar, Director General-CPRI and Shri S. 'HOKL'LUHFWRU*HQHUDO&35,DQGRWKHUVHQLRURIÀFHUV
Sudhakara Reddy, Additional Director CPRI, Bangalore of CPRI were also present on the occasion.
participated in the 66th Short Circuit Testing Liaison (STL)
Technical Committee Meeting held in CESI at Milan, Italy,
RQWK WK1RYHPEHU

 6HFUHWDU\ 3RZHU  UHYLHZHG WKH DFWLYLWLHV RI &35, DW D


PHHWLQJ KHOG RQ WK 1RYHPEHU  DW %DQJDORUH
ZKLFKZDVDWWHQGHGE\VHQLRURIÀFHUVRI&35,

11. LED lighting test facility was inaugurated at CPRI,


%DQJDORUH E\ 6KUL $MD\ .XPDU %KDOOD ,$6 6HFUHWDU\
3RZHU LQWKHSUHVHQFHRI6KUL6DQMLY1DQGDQ6DKDL,$6
$GGLWLRQDO6HFUHWDU\0R36KUL9LYHN.XPDU'HZDQJDQ
IAS, Joint Secretary & FA, MoP, Shri Raj Pal, IES, Economic
$GYLVHU 0R3 6KUL $EKD\ %DNUH 'LUHFWRU *HQHUDO %((
and DG-CPRI, on 27th NoYHPEer 2018.

14. Annual Customer Meet- 2018:

The Institute organised the Annual Customer Meet-


2018, at CPRI, Bangalore, on 24th August 2018. About
 6HQLRU 5HSUHVHQWDWLYHV IURP 8WLOLWLHV DQG ,QGXVWULHV
across the country participated in the Meet.

15. State Level Painting Competition on Energy


Conservation -2018:

 7KH 6WDWH /HYHO 3DLQWLQJ &RPSHWLWLRQ  RQ (QHUJ\


&RQVHUYDWLRQ ZDV KHOG LQ WKH SUHPLVHV RI &HQWUH IRU
CollDERUDWLYH DQG $GYDQFHG 5HVHDUFK &&$5  &35,
%DQJDORUHRQWK1RYHPEHU

188
Important Consultancy Activities: 2018 to 1st June, 2018 and from 4th June, 2018 to 15th
June, 2018
‡ 0HWDOOXUJLFDO $QDO\VLV RI %RLOHU 7XEHV /7  IRU 0V
NTPC-Sail Power Co. Ltd., CPP-II, Durgapur Steel Plant, ‡ 1DWLRQDO 6HPLQDU RQ ´'HYHORSPHQWV DQG :UHFNV
Durgapur in Overhead Transmission line Components and
Accessories”
‡ &RQGLWLRQ 0RQLWRULQJ 'LDJQRVWLF WHVWLQJ RQ 3RZHU
7UDQVIRUPHUV   /LJKWLQJ $UUHVWHUV IRU 0V 13&,/  1DWLRQDO 6HPLQDU RQ ´'HYHORSPHQWV DQG :UHFNV
Tarapur Atomic Power Station 1&2, Tarapur, BOISAR, LQ 2YHUKHDG 7UDQVPLVVLRQ OLQH &RPSRQHQWV  DQG
Maharashtra Accessories” held at CPRI, Bangalore, on 12th October
2018
‡ 5/$LQVSHFWLRQRIWXUELQHDQG*HQHUDWRUVKDIWIRU.6(%
6DEDULJLUL+\GURSODQW8QLW6DEDULJLUL ‡ Two days National Conference on “Switchgear and
Controlgear”
‡ (QHUJ\DXGLWZRUNVIRU7KHUPDO3RZHU3ODQW0V*05
:DURUD1DJSXU0DKDUDVKWUD Two days National Conference on “Switchgear and
Controlgear” was organised at CPRI, Bangalore, on 6th
‡ (YDOXDWLRQRISHUIRUPDQFHWHVWLQJRI[0:FRROLQJ
& 7th December 2018, by High Power Laboratory, CPRI,
WRZHUV IRU .DQWL %LMOH 8WSDGDQ 1LJDP /WG .%81/ 
Bangalore
0X]DIIDUSXU7KHUPDO3RZHU3ODQW.DQWL0X]DIIDUSXU
‡ 7ZRGD\V1DWLRQDO&RQIHUHQFHRQ´5HFHQW7UHQGVLQ
‡ 3URWHFWLRQ $XGLW RI  N9 
Overhead Transmission line towers & Its accessories”
N9  N9 VXEVWDWLRQV IRU  N9
$XUDQJDEDG VXEVWDWLRQ DQG  N9 3DGJKH Two days National Conference on “Recent Trends in
VXEVWDWLRQIRU0V3*&,/:5, 2YHUKHDG 7UDQVPLVVLRQ OLQH WRZHUV  ,WV DFFHVVRULHVµ
was organised at CPRI, Bangalore, on 20th & 21st
‡ &RUURVLRQ PDSSLQJ RI ZDWHU ZDOO WXEHV 8QLW PZ
'HFHPEHU  E\ 0HFKDQLFDO (QJLQHHULQJ 'LYLVLRQ
Boiler for NTPC, Ramagondam
CPRI, Bangalore
Important Conferences/Seminars/ Workshops organized:
‡ ,QWHUQDWLRQDO &RQIHUHQFH RQ ´+LJK 9ROWDJH
‡ National Conference on “Latest Trends in Switchgear Engineering and Technology (ICHVET- 2019)”
& Control Gear – Smart Technologies”,
UHVRL, CPRI, Hyderabad, in technical co-sponsorship
National Conference on “Latest Trends in Switchgear & with IEEE, Hyderabad Section, organised International
Control Gear – Smart Technologies”, held at Hotel Noor- Conference on “High Voltage Engineering and
Us-Sabha Palace, Bhopal, on 23rd & 24th February 2018 Technology (ICHVET- 2019)”, at Hotel The Manohar, Old
Begumpet Road, Hyderabad, on 7th & 8th February
‡ Training program on “Awareness of Cyber Security 2019.
for Power Utility Engineers”
‡ 10th International Conference on “Power Cable
Training program on “Awareness of Cyber Security for Technology, CABLETECH -2019”
Power Utility Engineers”, held at RTL-CPRI, Noida, on
13th February 2018  &DEOHV 'LDJQRVWLFV'LYLVLRQ&35,%HQJDOXUXRUJDQL]HG
10th International Conference on “Power Cable
‡ 7UDLQLQJSURJUDPPHRQ´3ODQWRSWLPL]DWLRQµ Technology, CABLETECH -2019”, at CPRI, Bengaluru, on
27th & 28th February 2019.
 7UDLQLQJSURJUDPPHFRQGXFWHGRQ´3ODQWRSWLPL]DWLRQµ
IRU0V$VWRQH(QHUJ\3YW/WGDW=3&+:$1*(736 Participation in Exhibitions
=LPEDEZH E\ &35, RIÀFHUV  DW =3& +:$1*( 736
Zimbabwe, from 18th May to 18th June, 2018, 21st May, ELECRAMA 2018:- CPRI participated in ELECRAMA 2018, held

189
Annual Report 2018-19

DW.QRZOHGJH3DUN,,*UHDWHU12,'$IURPWKWRWK0DUFK ii. Research Scheme on Power (RSoP)


2018. Honourable Vice-president of India Sri. Venkaiah Naidu
LLL ,QKRXVH5HVHDUFK 'HYHORSPHQW6FKHPH ,+5'
inaugurated ELECRAMA 2018 and Sri Suresh Prabhu, Union
Minister of Commerce and Industry addressed the Inaugural 6SRQVRUHG 3URMHFWV E\ RWKHU 0LQLVWU\ 'HSDUWPHQW
gathering. CPRI stamped its presence by setting up a stall and ,QVWLWXWLRQV2UJDQL]DWLRQV HWF DUH DOVR WDNHQ XS E\ &35,
VKRZFDVHG&35,VHUYLFHVDWWKH([KLELWLRQ RIÀFLDOV

India Sourcing Fair, Russia:- CPRI participated in the India Tests conducted for Overseas Customers
6RXUFLQJ )DLU D  GD\ HYHQW KHOG DW 6W 3HWHUVEXUJ 5XVVLD
IURPWKWRQG0DUFK7KH3RZHU3DYLOLRQ0LQLVWU\ ‡ 6KRUW FLUFXLW WHVW ,PSXOVH WHVW  7HPSHUDWXUH ULVH
RI 3RZHU *RYHUQPHQW RI ,QGLD VKRZFDVHG ,QGLD·V 3RZHU WHVW FRQGXFWHG RQ D  N9$  N9 6LQJOH
Potential at the three day India Sourcing Fair -2018, held at St SKDVH WUDQVIRUPHU E  N9$  N9 6LQJOH
Petersburg, Russia from 20th to 22nd March, 2018. SKDVH WUDQVIRUPHU F N9$  N9 VLQJOH
SKDVH WUDQVIRUPHU IRU 0V &RQÀGHQFH (OHFWULF /WG
INDIAN TECHNOLOGY CONGRESS- 2018: CPRI participated Dhaka-1215, Bangladesh, at STDS-CPRI, Bhopal, on 12th
in Indian Technology Congress (ITC)- 2018 was held in April 2018.
1,0+$16 &RQYHQWLRQ &HQWUH %DQJDORUH RQ WK DQG WK
6HSWHPEHU  ZLWK WKH WKHPH ´7HFKQRORJ\ )LUVW 0DNLQJ ‡ 7HPSHUDWXUHULVHWHVWRQ09$N93RZHU
,QGLD,QQRYDWH([FHO*OREDOO\DQG3URVSHUµ 7UDQVIRUPHUIRU0V(QHUJ\SDF(QJLQHHULQJ/WG'KDND
Bangladesh conducted at STDS-CPRI, Bhopal, on 26th &
PowerEx Asia, Thailand: Central Power Research Institute 27th April 2018.
&35, SDUWLFLSDWHGLQ3RZHU([$VLD([KLELWLRQRUJDQL]HG
DW ,PSDFW H[KLELWLRQ FHQWUH %DQJNRN 7KDLODQG IURP WK WR ‡ $ELOLW\ WR ZLWKVWDQG WKH G\QDPLF HIIHFWV RI VKRUW
WK6HSWHPEHU&35,RIÀFHUVZHUHGHSXWHGIRUPDQQLQJ circuit test & Temperature-rise tests carried out on
the stall. CPRI stamped it’s presence by setting up a Stall and N9$N9 N9$N97KUHH3KDVH
SURPRWHG&35,VHUYLFHVDWWKH([KLELWLRQ 'LVWULEXWLRQ 7UDQVIRUPHUV IRU 0V 3UHFLVH (OHFWULF
Manufacturing Co. Ltd., Thailand, at Short Circuit
Vibrant Gujarat Trade Show Laboratory, CPRI, Bangalore, from 9th to 16th May 2018.

Central Power Research Institute (CPRI) participated in Vibrant ‡ $ELOLW\WRZLWKVWDQGWKHG\QDPLFHIIHFWVRIVKRUWFLUFXLW


*XMDUDW*OREDO7UDGH6KRZ²RUJDQL]HGDW7KH([KLELWLRQ WHVW  FDUULHG RXW RQ N9$ N9  N9$
Centre, Gandhinagar, Gujarat from 18th to 22nd January 2019, N9 7KUHH 3KDVH 'LVWULEXWLRQ 7UDQVIRUPHUV RI
XQGHUWKHLQWHJUDWHGSRZHUSDYLOLRQ 0V(OHFWURSDF(QJLQHHULQJ/WG'KDND%DQJODGHVKRQ
19th & 20th February 2019.
Research & Development (R&D) related activities:
Visit of overseas Team to CPRI
CPRI is the Coordinating Nodal Agency for selection, initiation,
H[HFXWLRQ UHYLHZ RI 5HVHDUFK DQG 'HYHORSPHQW VFKHPHV LQ ‡ 0U 0RKDPPHG 2 %DKDPGDQ &KLHI 6WUDWHJ\ DQG
India under Ministry of Power (MoP). CPRI has been entrusted %XVLQHVV 'HYHORSPHQW 2IÀFHU 0U 1DVVHU $OTDKWDQL
with the responsibility of administering the R&D Schemes of ,QGXVWULDO /DERUDWRULHV 0DQDJHU 0U +DPDG $OID\H]
0R3DVGHWDLOHGEHORZ &RQVXOWDQW RI 0V *&& (OHFWULFDO (TXLSPHQW 7HVWLQJ
L 5 '8QGHU1DWLRQDO3HUVSHFWLYH3ODQ 133 6FKHPH Laboratory and Mr. Fahad Saleh Al-Ismail, Consultant,
3ULPH(QHUJ\IRU3RZHU(QJLQHHULQJ6HUYLFHV'DPPDP
a. Projects by IITs, IISc., NITs, Industries & CPRI
6DXGL$UDELDYLVLWHG&35,%DQJDORUHIURPQGWRWK
 E 3URMHFWXQGHU8FKKDWDU$YLVKNDU<RMDQD, 8$<, August 2018.

 F 3URMHFW XQGHU ,PSDFWLQJ 5HVHDUFK ,QQRYDWLRQ DQG ‡ 0U $QGUH\ 6KRUQLNRY DQG 0U 'PLWUL\ 2UHNKRY RI
Technology-I (IMPRINT-I) 5XVVLDQ &LWL]HQV DQG 'U $VKRN 6LQJK &KLHI RI ,QGLD

190
Operations Massa LLC., Russia and Mr. Ramappa and Mr. 9 Modern Tower Test Facility at UHVRL – CPRI, Hyderabad
$QXS RI 0V 0HKUX (OHFWULFDOV %KLZDGL ,QGLD  YLVLWHG
9 Insulating Oil Test Facility at UHVRL – CPRI, Hyderabad
CPRI, Bangalore on 13th August 2018.
9 Regional Testing Lab. at Nashik, Maharashtra,
Other important projects under implementation:
Comprising of test facility for Transformer, Energy Meter
9 (OHFWURPDJQHWLF ,QWHUIHUHQFH (0, (OHFWURPDJQHWLF and Insulating Oil
Compatibility (EMC) Test Facility-CPRI, Bangalore
9 Temperature Rise Test facility (40 kA) at CPRI, Bangalore
9 Motor Test facility (55 kVA) at CPRI, Bangalore
9 Smart Grid Research Laboratory at CPRI, Bangalore
9 Upgradation of High Power Laboratory from 2500 MVA
9 5HORFDWLRQ RI 7KHUPDO 5HVHDUFK &HQWUH&35, .RUDGL
to 7500 MVA at CPRI, Bangalore
Nagpur
9 On-line Short Circuit Test Facility (350 MVA) at UHVRL,
Hyderabad

191
Annual Report 2018-19

NPTI (Power System Training Institute), Bengaluru

192
CHAPTER 32

NATIONAL POWER TRAINING INSTITUTE (NPTI)


National Power Training Institute (NPTI), an ISO 9001 & ISO D. Western Region
 RUJDQL]DWLRQ XQGHU 0LQLVWU\ RI 3RZHU *RYW RI ,QGLD
LV D 1DWLRQDO $SH[ ERG\ IRU 7UDLQLQJ DQG +XPDQ 5HVRXUFHV   137, :HVWHUQ5HJLRQ 1DJSXU
'HYHORSPHQW LQ 3RZHU 6HFWRU ZLWK LWV &RUSRUDWH 2IÀFH DW 7ZR   QHZ ,QVWLWXWHV DUH XQGHU FRQVWUXFWLRQ DW 6KLYSXUL
)DULGDEDG137,KDGEHHQSURYLGLQJLWVGHGLFDWHGVHUYLFHIRU 0DGK\D3UDGHVK $ODSSX]KD.HUDOD
PRUHWKDQÀYHGHFDGHV137,KDVWUDLQHGRYHU3RZHU
3URIHVVLRQDOV LQ UHJXODU 3URJUDPV RYHU WKH ODVW  GHFDGHV Manpower Training and Academic Programs
NPTI is the world’s leading integrated power training institute.
NPTI conducts the following industry interfaced academic
NPTI is the only institute of its kind with a wide geographical
SURJUDPV ZLWK WKH REMHFWLYH WR FUHDWH D SRRO RI FRPPLWWHG
VSUHDG DQG FRYHULQJ D ZLGH JDPXW RI WUDLQLQJ SURJUDPV LQ
and competent professionals equipped with appropriate
3RZHU6HFWRU137,·VFRPPLWWHGIDFXOW\LVSURYLGLQJH[FHOOHQW
WHFKQLFDOVNLOOVWRVWHHUWKH,QGLDQ3RZHU6HFWRU
training in the Power Sector, which is the most important sector
DPRQJ YDULRXV LQIUDVWUXFWXUH VHFWRUV $ QXPEHU RI WUDLQLQJ ‡ 2QH<HDU3RVW*UDGXDWH'LSORPD&RXUVH 3*'& LQ
programs for national as-well-as transnational customers Power Plant Engineering
KDYH EHHQ FRQGXFWHG 7KHVH SURJUDPV KDYH EHQHÀWHG WKH
H[HFXWLYHV IURP GLIIHUHQW RUJDQL]DWLRQV 7UDLQLQJ SURYLGHG ‡ 2QH<HDU3RVW*UDGXDWH'LSORPD&RXUVH 3*'& LQ
E\ 137, RQ *HQHUDWLRQ 6LPXODWRUV KDV LPSURYHG 3ODQW /RDG Power System Operation
)DFWRU RI *HQHUDWLQJ 8QLWV KDV LQFUHDVHG WKH DYDLODELOLW\
‡ 2QH<HDU3RVW*UDGXDWH'LSORPD&RXUVH 3*'& LQ
of Transmission & Distribution Systems and has decreased
Renewable Energy & Grid Interface Technologies
Aggregate Technical & Commercial Losses. Thus the training
SURYLGHG E\ 137, SURYLGHV FRPSHWHQW KXPDQ UHVRXUFHV IRU ‡ 2QH<HDU3RVW*UDGXDWH'LSORPD&RXUVH 3*'& LQ
the power sector. Smart Grid Technologies

NPTI operates on an all India basis with manpower strength of ‡ 2QH<HDU3RVW'LSORPD&RXUVH 3'& LQ7KHUPDO3RZHU
LQFOXGLQJRIÀFHUVWKURXJKLWVQLQH,QVWLWXWHVLQGLIIHUHQW Plant Engineering
]RQHVRIWKHFRXQWU\DVSHUGHWDLOVEHORZ
‡ 2QH<HDU3RVW*UDGXDWH'LSORPD&RXUVH 3*'& LQ6XE
A. Northern Region Transmission & Distribution Systems

  137,&RUSRUDWH2IÀFH)DULGDEDG ‡ 2QH<HDU*UDGXDWH(QJLQHHU&RXUVHLQ7KHUPDO

2. NPTI (Northern Region), Badarpur, New Delhi ‡ 1LQH0RQWKV3RVW*UDGXDWH'LSORPD&RXUVH 3*'& LQ


Hydro Power Plant Engg.
3. NPTI (Hydro Power Training Centre), Nangal
‡ 6L[ 0RQWKV 3RVW *UDGXDWH 'LSORPD &RXUVH 3*'&  LQ
B. Southern Region
Transmission and Distribution Systems
4. NPTI (Power System Training Institute), Bengaluru
‡ 6L[0RQWKV3RVW'LSORPD&RXUVH 3'& LQ+\GUR3RZHU
5. NPTI (Hot Line Training Centre), Bengaluru Plant Engineering

  137, 6RXWKHUQ5HJLRQ 1H\YHOL ‡ 6LPXODWRU7UDLQLQJ3URJUDPVLQ7KHUPDO&&*7+\GUR 


Load Despatch
C. Eastern & North Eastern Region
,QDGGLWLRQWRWKHDERYHVHYHUDOORQJWHUPPHGLXPWHUPDQG
7. NPTI (Eastern Region), Durgapur short-term training programs in the areas of Thermal, Hydro,
Transmission & Distribution, Management and Regulatory
8. NPTI (North Eastern Region), Guwahati
DIIDLUV HWF DUH EHLQJ FRQGXFWHG LQ WKH YDULRXV ,QVWLWXWHV RI

193
Annual Report 2018-19

NPTI. CuVWRPL]HGWUDLQLQJSURJUDPVIRUYDULRXV3RZHU8WLOLWLHV Hot Line Training Centre


DUHDOVRRUJDQL]HGURXQGWKH\HDU137,DOVRFRQGXFWVYDULRXV
A facility has been created at NPTI’s Hot Line Training Centre,
WUDLQLQJ SURJUDPV WR HQVXUH DYDLODELOLW\ RI SURSHUO\ WUDLQHG
%HQJDOXUX IRU /LYH /LQH 0DLQWHQDQFH RI 7UDQVPLVVLRQ /LQHV
SHUVRQQHOFRYHULQJWKHV\OODEXVDVSHU,QGLDQ(OHFWULFLW\5XOHV
XSWR  N9 ÀUVW RI LWV NLQG LQ $VLD  ZKLFK HQDEOHV WUDLQHG
137,KDVVWDUWHGFROODERUDWLYHSURJUDPVZLWKYDULRXVXWLOLWLHV personnel to attend to maintenance requirements without
academic institutions in order to facilitate training in upcoming power interruptions. Facilities for water washing of sub-station
new areas of power sectors both in terms of technology HTXLSPHQWVDUHDOVRDYDLODEOH7KLVLQVWLWXWHLVRQHRILWVNLQGLQ
the Asian sub continent.
GHYHORSPHQW DQG +XPDQ 5HVRXUFH &DSDFLW\ %XLOGLQJ
DGGLWLRQXSJUDGDWLRQ WR PHHW WKH 1DWLRQDO 0LVVLRQ RI *RYW Placement
RI,QGLDDQGDOVRWRHQVXUHHIÀFLHQWRSHUDWLRQRI7UDQVPLVVLRQ
'LVWULEXWLRQ DQG *HQHUDWLQJ 3ODQWV &RQYHQWLRQDO DQG 1RQ Students of Post Graduate Diploma Course and Post Diploma
FRQYHQWLRQDO  &RXUVHV DUH ÀQGLQJ SODFHPHQW LQ UHSXWHG FRPSDQLHV OLNH
$GDQL$UFHORU0LWWDO$PDUD5DMD$QGULW]+\GUR$OVWRP$=
NPTI has also been catering to the Training Needs of Power Group, Balco, Bhushan Steel, Bajaj Energy, BSES, C&O Group,
6HFWRU 2UJDQL]DWLRQV DQG 3URFHVV ,QGXVWULHV VXFK DV 6WHHO &/3&\DQ(PHUVRQ(VVDU-6:-LQGDO.9..DPDFKL3RZHU
&HPHQW $OXPLQXP )HUWLOL]HUV 5HÀQHULHV YL] $&& $(& .DONLWHFK/ 77$7$HWF
APGENCO, BBMB, BHEL, BSES, CEA, CESC, DPL, DVC, ECIL,
Achievements during 2018-19
)$&7 *$,/ +,1'$/&2 +3*&/ ,))&2 ,2&/ ,5('$ .3&/
.5,%+&2033*&/1$/&21((3&21)/1+3&1/&-891/ 137,SURYLGHGWUDLQLQJWRWUDLQHHVIRUDWRWDOWUDLQHH
173& 2+3& 23*&/ 32:(5*5,' 55981/ 6$,/ 7+'& week of 65,395 till 31.03.2019
UPRVUN etc.
Induction Training
Power Training Simulators
137,KDVEHHQSURYLGLQJLQGXFWLRQWUDLQLQJWRIUHVK*UDGXDWH
137,KDVD0:7KHUPDO3RZHU3ODQW7UDLQLQJ6LPXODWRUDW (QJLQHHUV([HFXWLYHVIURPYDULRXV3RZHU6HFWRU2UJDQL]DWLRQV
)DULGDEDG,QVWLWXWHDQG0:7KHUPDO3RZHU3ODQW7UDLQLQJ Central Electricity Authority, JBVNL, Power Transmission
6LPXODWRU DW 1DJSXU ,QVWLWXWH IRU LPSDUWLQJ VSHFLDOL]HG VNLOOV Corporation of Uttarakhand Ltd., Rajasthan Rajya Vidyut
WRRSHUDWLRQSHUVRQQHODFURVVWKHFRXQWU\$0: [ Utpadan Nigam Ltd., Dakshin Haryana Bijli Vitran Nigam
0:*DV7XUELQHVDQG[0:6WHDP7XUELQH )XOO6FRSH Ltd., UP Rajya Vidyut Utpadan Nigam Ltd., Chhattisgarh State
Power Generation Corporation Ltd., Bokaro Power Supply
Combined Cycle Gas Turbine Replica Simulator commissioned
&RUSRUDWLRQ /WG $YDQWKD 3RZHU  ,QIUDVWUXFWXUH /WG 7DWD
DW 137, &RUSRUDWH 2IÀFH )DULGDEDG LV XWLOLVHG IRU WUDLQLQJ
Power Company Ltd., LANCO Power, GMR Energy Ltd., Lanco
&&*7 RSHUDWLRQ SHUVRQQHO $ +LJKÀGHOLW\ /RDG 'LVSDWFK
Infratech Ltd., Lanco Vidarbha Thermal Power Ltd., & Udupi
Operator Training Simulator replicating the National Grid is
3RZHU&RUSRUDWLRQ/WG6WHUOLWH*ULG/WG&/3 , 3YW/WG/ 7
also being used to impart training to System Operators at
Power Ltd., Torrent Power Ltd. etc.
PSTI, Bengaluru. Training is also imparted to Hydro Operation
3HUVRQQHORQWKH0:+\GUR6LPXODWRUFRPPLVVLRQHGDW Other Important Activities
HPTC, Nangal.
6\VWHP2SHUDWRU&HUWLÀFDWLRQ([DPLQDWLRQ
6L[   0XOWLIXQFWLRQDO WUDLQLQJ 6LPXODWRUV DUH EHLQJ
NPTI’s Power System Training Institute (PSTI) has been
established shortly replicating the real-time operation of 210
FRQGXFWLQJ &HUWLÀFDWLRQ RI 3RZHU 6\VWHP 2SHUDWRUV VLQFH
0:0: )*(&RPELQHG&\FOH3RZHU3ODQW0:
 7UDLQLQJ &RXUVHV DW 137, &RUSRUDWH 2IÀFH )DULGDEDG
Hydro, SCADA & Smart Grid together with Smart Power Flow and Power System Training Institute (PSTI), Bengaluru equip
Controllers in an Integrated framework of System comprising the System operators with necessary inputs to take up the
Thermal, Hydro, Gas along with Renewables. 6\VWHP2SHUDWLRQ&HUWLÀFDWLRQ([DP

$ 0: 6XSHUFULWLFDO 7KHUPDO 6LPXODWRU KDV DOVR EHHQ %DVLF/HYHO2Q/LQH6\VWHP2SHUDWRU&HUWLÀFDWLRQH[DPVDUH


FRPPLVVLRQHGLQ137,&RUSRUDWH2IÀce, Faridabad. being conductHGVLQFH1RYHPEHUHYHU\\HDUDWYDULRXV

194
centres across the country. A total of 1195 System Operators ‡ 5HIUHVKHUWUDLQLQJ3URJUDPVIRU:%6(7&/
ZHUH FHUWLÀHG DJDLQVW IRU WKH %DVLF /HYHO &HUWLÀFDWLRQ
([DPLQDWLRQV6SHFLDOLVWFRXUVHVRQ¶5HJXODWRU\)UDPHZRUNLQ ‡ 9DULRXV WUDLQLQJ SURJUDPV XQGHU 6XU\DPLWUD DQG
Power Sector’, ‘Power System Reliability’, ‘Renewable Energy Varunmitra are being conducted.
Sources and Grid Integration’, ‘Power System Logistics’
‡ 2QH GD\ 6WDNH +ROGHU 0HHW RI 3RZHU 6HFWRU ZDV
and ‘Power Market Specialist’ are being conducted both at
conducted at Faridabad & Bhubaneswar.
&RUSRUDWH2IÀFH)DULGDEDGDQG367,%HQJDOXUX([DPLQDWLRQV
RQ DOO WKH VSHFLDOLVW OHYHO VXEMHFWV DUH EHLQJ FRQGXFWHG 2Q ‡ 7ZR 'D\V 1DWLRQDO :RUNVKRS RQ ´6PDUW 3RZHU )ORZ
/LQHH[DPLQDWLRQVIRU6SHFLDOLVW/HYHO&HUWLÀFDWLRQKDYHEHHQ Controller for Smarter Grid Applications”.
conducteG$VPDQ\DV6\VWHP2SHUDWRUVZHUHFHUWLÀHG
‡ 7ZR GD\V 1DWLRQDO :RUNVKRS RQ /DUJH 5HQHZDEOH
Consultancy Services Energy Grid Integration Challenges and Operational
Strategies was conducted at NPTI, Faridabad.
137,LVSURYLGLQJ3URMHFW0DQDJHPHQW$JHQF\ 30$ VHUYLFHV
IRU''8*-< ,3'63URMHFW:RUNVIRU1(6&2 :(6&28WLOLW\ ‡ 7ZRGD\V1DWLRQDO:RUNVKRSRQ5HJXODWRU\)UDPHZRUN
areas of OPTCL, Odisha & IPDS PMA works for Assam Power LQ (OHFWULFLW\ ,QGXVWU\ LQ ,QGLD &KDOOHQJHV *RYHUQDQFH
Distribution Company Ltd., Assam. & Future Roadmap was conducted at Ranchi.

Recently, NPTI has been awarded the TPIA works under ‡ 2QH 'D\ 1DWLRQDO &RQIHUHQFH RQ ´6PDUW 'LVWULEXWLRQ
Saubhagya Scheme by U.P. Power Corporation. ,QIUDVWUXFWXUH$Q (IÀFLHQW  5HOLDEOH 7HFKQRORJ\ IRU
$VVHW0DQDJHPHQWµZDVFRQGXFWHGDW.RONDWD
Major Training Activities
‡ 7KUHH GD\V 1DWLRQDO :RUNVKRS RQ ´5HFHQW 7UHQGV LQ
‡ 7KLUGEDWFKRI$VVLVWDQW'LUHFWRUVRI&($LVXQGHUJRLQJ Power System Protection’ conducted in association with
Induction Training. PRDC at PSTI, Bengaluru.

‡ 7KHQGEDWFKRI(QJLQHHUVIURP$''&KDYHXQGHUJRQH ‡ )XQFWLRQDO 7UDLQLQJ RQ 3URMHFW 0JPW  (QJJ 'HVLJQ


training on “Electrical Protection System” of Lines & Towers” for Senior Engineers of Maharashtra
State Transmission Corporation Ltd.
‡ 8UMD6DUWKLIRU%6(65DMGKDQL3RZHU/LPLWHG/LQHPDQ
Training is in Progress also Uttam Urja Sarthi EHV E-Learning Programs
Lineman Training is being conducted.
137, LV FRQGXFWLQJ 2Q/LQH &HUWLÀFDWLRQ SURJUDP RQ 6RODU
‡ )RXU ZHHNV )DPLOLDUL]DWLRQ SURJUDP RQ FROG OLQH (QHUJ\ 7HFKQRORJ\ )XQGDPHQWDO  $SSOLFDWLRQV DQG
$FWLYLWLHVIRUSHUVRQQHORI0V7UDQVUDLO&RPSDQ\IURP E- Mobility and Charging Infrastructre
TOGO and BENIN of East Africa.
MoUs
‡ 2QOLQH5HQHZDEOH(QHUJ\0DQDJHPHQW&HQWUHV 5(0& 
NPTI has signed MoUs with AMU, NIT-Jaipur for training and
WUDLQLQJ IRU 6\VWHP 2SHUDWRUV 6/'&V 5/'&V 1/'&
FDSDFLW\EXLOGLQJDFWLYLWLHV
RPCs) on “RE Grid Integration”. Commenced on 15th
1RYHPEHU Vision Ahead

‡ ,QGXFWLRQ7UDLQLQJLQ3RZHU6\VWHPIRU(QJLQHHUVIURP ‡ 7RHQKDQFHH[LVWLQJVNLOOVHWVLQXSFRPLQJWHFKQRORJLHVWR
Power Transmission Corporation of Uttarakhand Ltd SUHSDUHHIÀFLHQWPDQSRZHUDQGPD[LPL]HHPSOR\PHQW
(PTCUL). opportunities.

‡ ,QGXFWLRQ 7UDLQLQJ 3URJUDP IRU -U /LQHPDQ)LWWHU DQG ‡ 7R DOLJQ WKH SURJUDPV ZLWK WKH 0LQLVWU\ RI 3RZHU·V
Switch Board Operator of JBVNL, JUSNL & JUVNL. REMHFWLYHV DQG HPHUJLQJ 1DWLRQDO (OHFWULFLW\ 3ODQ IRU
2017-22 & 2022-27.
‡ ,QGXFWLRQ 7UDLQLQJ 3URJUDP IRU 3*&,/ .DQWL %LMOHH
Utpadan Nigam Ltd., Bharatiya Rail Bijlee Company Ltd., ‡ 7REULQJDERXWFRPSOHWHDZDUHQHVVWRSHUVRQQHOLQWKH
1DELQDJDU3RZHU*HQHUDWLRQ&RPSDQ\3YW/WG

195
Annual Report 2018-19

SRZHU VHFWRU DERXW 0R3 LQLWLDWLYHV VXFK DV ''8*-< *ULG'HFHQWUDOL]HG*HQHUDWLRQ 'LVWULEXWLRQ'HPDQG
,3'68'$<[3RZHUIRU$OOHWF Side Management (DSM), Peak Load Management with
upcoming Electric Vehicle Charging Stations, etc.
‡ 7R FRQGXFW 6NLOO GHYHORSPHQW 3URJUDPV LQ DOO DUHDV
of Generation, Transmission, Distribution, Equipment ‡ 7RFRQGXFW3URJUDPVRQ3ROLF\ 5HJXODWRU\)UDPHZRUN
Manufacturing and Power Trading including Renewable &RPPHUFLDO $VSHFWV (QHUJ\ &RQVHUYDWLRQ DQG (QHUJ\
(QHUJ\6RXUFHVWRDFKLHYHWKH0LQLVWU\RI3RZHU·VWDUJHW
(IÀFLHQF\ 3RZHU 0DUNHWV $YDLODELOLW\ %DVHG 7DULII 
RIWUDLQLQJDQGVNLOOGHYHORSPHQWRI0DQSRZHU
&RQFHSW RI 'HYLDWLRQ 6HWWOHPHQW 0HFKDQLVP 2SHQ
‡ 7R support Country’s Smart City Program, Rural Access in Power Sector etc.
GHYHORSPHQW WKURXJK 7UDLQLQJ 3URJUDPV RQ 6PDUW

9LVLWRI'LJQLWDULHVIURP0LQLVWU\RI3RZHURQ-XQHDW137,&RUSRUDWH2IÀFH)DULGDEDG

196
CHAPTER 33

PUBLIC GRIEVANCES
Ministry of Power *ULHYDQFH2IÀFHULVIXQFWLRQDOLQ&($,QFDVHRIQRQIXOÀOOPHQW
RIDQ\VHUYLFHFRPPLWPHQWWKHFOLHQWVFDQDSSURDFK*ULHYDQFH
3XEOLF*ULHYDQFH 3* &HOORIWKH0LQLVWU\LVHQWUXVWHGZLWKWKH
2IÀFHU DQG  RU 6HFUHWDU\ &($ DW QG )ORRU 6HZD %KDZDQ
UHVSRQVLELOLW\ RI UHGUHVVDO RI SXEOLF JULHYDQFHV ,Q SXUVXDQFH
5.3XUDP1HZ'HOKL
RI WKLV D OLQN RI &3*5$03* RQOLQH SRUWDO RI 'HSDUWPHQW
RI $GPLQLVWUDWLYH 5HIRUPV  3XEOLF *ULHYDQFHV '$5 3*  'XULQJWKH\HDURQOLQH*ULHYDQFHSHWLWLRQVKDYH
KDV EHHQ SURYLGHG RQ WKH ZHEVLWH RI 0LQLVWU\ RI 3RZHU $OO EHHQGLVSRVHGRIRXWRISHWLWLRQVUHFHLYHGDQGEURXJKW
JULHYDQFHSHWLWLRQVUHFHLYHGLQWKH0LQLVWU\DUHH[DPLQHGDQG IRUZDUG IURP SUHYLRXV \HDU 7KH GLVSRVDO UDWH IRU WKH \HDU
IRUZDUGHGWRWKHFRQFHUQHG'LYLVLRQV2UJDQLVDWLRQVIRUWKHLU 2018-19 is 93.75%.
UHGUHVVDO$VSHUWKHJXLGHOLQHVRI'$5 3*WKHJULHYDQFHVDUH
normally to be redressed within a month. PAO

,Q FRPSOLDQFH RI ¶0LQLPXP *RYHUQPHQW  0D[LPXP Sh. C. Maheshwaran, Controller of Accounts has been
*RYHUQDQFH·DQGWRHQVXUHHIIHFWLYHDQGWLPHO\UHVROXWLRQRI GHVLJQDWHGDV1RGDO2IÀFHU*ULHYDQFH2IÀFHULQUR2R&KLHI
3XEOLF *ULHYDQFHV WLPH OLPLW IRU DFWLRQ RQ WKH SDUW RI QRGDO &RQWUROOHURI$FFRXQWV0R3RZHU1HZ'HOKL
cell in the Ministry has been reduced to 10-15 days from 30- NTPC
GD\VLQ&LWL]HQ·V&OLHQWV·&KDUWHU &&& RIWKH0LQLVWU\
173&KDVDSXEOLFJULHYDQFHUHGUHVVDOPHFKDQLVPLQSODFHIRU
*ULHYDQFHUHGUHVVDOLVLQFOXGHGDVRQHRIWKHPDLQREMHFWLYHVRI
GHDOLQJZLWKJULHYDQFHVRISXEOLFDWODUJH*ULHYDQFHRIÀFHUV
3UR$FWLYH*RYHUQDQFHDQG7LPHO\LPSOHPHQWDWLRQ 35$*$7, 
KDYHDOVREHHQDSSRLQWHGLQDOO3URMHFWV5HJLRQDO2IÀFHV
DQ LQIRUPDWLRQ WHFKQRORJ\ HQDEOHG JULHYDQFH UHGUHVVDO
SODWIRUPODXQFKHGE\WKH+RQ·EOH30*ULHYDQFHVSHQGLQJIRU 'HSDUWPHQW RI $GPLQLVWUDWLYH 5HIRUPV  3XEOLF *ULHYDQFHV
PRUHWKDQDPRQWKDUHUHJXODUO\UHYLHZHGPRQLWRUHGDWWKH KDYH DOVR ODXQFKHG D VSHFLDO 3XEOLF *ULHYDQFH 3*  SRUWDO
OHYHO RI -RLQW 6HFUHWDU\ $GPLQ*ULHYDQFHV  WKURXJK UHJXODU IRU KDQGOLQJ SXEOLF JULHYDQFHV LQ HIÀFLHQW DQG WLPH ERXQG
PHHWLQJV ZLWK 'LYLVLRQDO +HDGV RI WKH 0LQLVWU\ DV ZHOO DV PDQQHU 173& LV UHYLHZLQJ JULHYDQFHV UHFHLYHG WKURXJK WKH
'LUHFWRU *ULHYDQFHV  RI WKH RUJDQL]DWLRQV XQGHU WKH FRQWURO 3*3RUWDORIWKH*RYHUQPHQWRI,QGLDIRUUHVROYLQJWKHVDPHLQ
of the Ministry. time bound manner.

7KH 0LQLVWU\ KDV DOVR JLYHQ VSHFLDO IRFXV RQ DQDO\]LQJ WKH NHPC
URRW FDXVHV RI FLWL]HQV· JULHYDQFHV DQG WR DGGUHVV WKHVH
A Grievance Policy & Procedures has come into existence
WKURXJKV\VWHPLFFKDQJHV)RUH[DPSOHWKHRUJDQL]DWLRQVDUH
in NHPC in the year 1979.
H[SHFWHGWRFDWHJRUL]HWKHQDWXUHRIWKHJULHYDQFHLHZDJHV
pension, arrears of delay in compensation for land acquired or 7KH *ULHYDQFH 3ROLF\  3URFHGXUH RI 1+3& SURYLGHV IRU
UHFUXLWPHQWRUWUDQVIHUIRUHIIHFWLYHDQGWLPHO\GLVSRVDO7KLV FRQVWLWXWLRQ RI D *ULHYDQFH 5HGUHVVDO $XWKRULW\ IRU WKH
will help in focusing on quality of disposal and redressal of UHGUHVVDORIJULHYDQFHVRIWKHHPSOR\HHV
SXEOLFJULHYDQFHVLQDWLPHERXQGPDQQHU
*ULHYDQFH 5HGUHVVDO $XWKRULW\ DOVR IXQFWLRQV DV 3XEOLF
'XULQJWKH\HDURQOLQH*ULHYDQFHSHWLWLRQVKDYH *ULHYDQFHV5HGUHVVDO0DFKLQHU\
EHHQGLVSRVHGRIRXWRISHWLWLRQVUHFHLYHGDQGEURXJKW
IRUZDUG IURP SUHYLRXV \HDU 7KH GLVSRVDO UDWH IRU WKH \HDU 3XEOLF JULHYDQFHV DUH PRQLWRUHG WKURXJK ZHE SRUWDO RQ
2018-19 is 94.2%. ´&HQWUDOL]HG3XEOLF*ULHYDQFH5HGUHVVDO 0RQLWRULQJ6\VWHPµ
linked with MoP.
CEA
2Q GLVSRVDO RI JULHYDQFH E\ 1+3& LQWLPDWLRQ LV VHQW WR WKH
7KH $XWKRULW\ KDV ZHOO TXDOLÀHG DQG GHGLFDWHG SHUVRQQHO FRQFHUQHGLQGLYLGXDO 0LQLVWU\RI3RZHUDQGVWDWXVWKHUHRILV
WR ORRN DIWHU YDULRXV VHUYLFHV DQG IXQFWLRQDO DFWLYLWLHV 7KH updated in the system.
FOLHQWV FDQ H[SHFW SURPSW UHVSRQVH LQFOXGLQJ WKH GHWDLOV RI
DQ\IRUPDOLWLHVUHTXLUHGWREHIXOÀOOHGE\WKHP$*ULHYDQFH POWERGRID
Redressal system headed by a Chief Engineer, designated as ,Q 32:(5*5,' WKH JULHYDQFHV RI WKH FLWL]HQV RQ DQ\

197
Annual Report 2018-19

LVVXH SHUWDLQLQJ WR 32:(5*5,' DUH SURPSWO\ FRQVLGHUHG 7KHFRQWDFWGHWDLOVRIWKH([HFXWLYH'LUHFWRU 30', 3XEOLF
for redressal within the broad parameters of guidelines *ULHYDQFH&HOO DUHSODFHGRQWKHZHEVLWHZZZGGXJM\JRYLQ
HQXPHUDWHG E\ *RYW RI ,QGLD 32:(5*5,' KDV GHVLJQDWHG
$ VXPPDU\ RI WKH JULHYDQFHV KDQGOHG LQ WKH ÀQDQFLDO \HDU
QRGDORIÀFHUVDWFRUSRUDWH 5HJLRQDORIÀFHVIRUV\VWHPDWLF
LVJLYHQEHORZ
 SURPSW UHGUHVVDO RI WKH JULHYDQFHV RI WKH FLWL]HQV ZLWKLQ
VWLSXODWHG WLPH IUDPHV 7KH LVVXHV RI SXEOLF JULHYDQFHV Sl. No Particulars Nos.
JHQHUDOO\SHUWDLQWRODQGFURSFRPSHQVDWLRQIRUOLQHWRZHU
FRQVWUXFWLRQ GRQH E\ 32:(5*5,' 7KH JULHYDQFHV DUH 1 *ULHYDQFHVUHFHLYHGIURPSXEOLFXSWR 282
31.03.2019
UHIHUUHG WR 32:(5*5,' YLD 0LQLVWU\ RI 3RZHU 3UHVLGHQWV
6HFUHWDULDW'$53*HWFIURP´3*SRUWDOµGHYHORSHGE\'HSW 2 *ULHYDQFHVWDNHQXSZLWK6WDWHV'LV- 259
RI $GPLQLVWUDWLYH 5HIRUPV  3XEOLF *ULHYDQFHV #SJSRUWDO coms& disposed up to 31.03.2019.
JRYLQ 7KLV LV D *RYW RI ,QGLD 3RUWDO DLPHG DW SURYLGLQJ WKH
FLWL]HQVZLWKDSODWIRUPIRUUHGUHVVDORIWKHLUJULHYDQFHV 3 *ULHYDQFHVLQWKHSURFHVVRIUHGUHVVDOE\ 23
6WDWHV3RZHU8WLOLWLHVDVRQ
PFC

3)& KDV D *ULHYDQFH 5HGUHVVDO 6\VWHP IRU GHDOLQJ ZLWK 24X7 CONTROL CENTRE FOR SAUBHAGYA
JULHYDQFHVRIWKHSXEOLFDWODUJH7KHV\VWHPVDUHGXO\QRWLÀHG 6WDWHVKDYHGHFODUHGVDWXUDWLRQRIKRXVHKROGHOHFWULÀFDWLRQ7R
DQG WKH 1RGDO 2IÀFHUV HQVXUH TXLFN UHGUHVVDO RI JULHYDQFHV IDFLOLWDWHDQ\OHIWRXWXQHOHFWULÀHG+RXVHKROGLQWKH&RXQWU\
ZLWKLQ WKH SHUPLVVLEOH WLPH IUDPH 3)& KDV DOVR QRWLÀHG D[&RQWURO&HQWUHZLWK7ROO)UHH1RKDV
&LWL]HQ·V&KDUWHUWRHQVXUHWUDQVSDUHQF\LQLWVZRUNDFWLYLWLHV been established in REC Limited.
7KH&KDUWHULVDYDLODEOHRQWKHZHEVLWHRI3)&WRIDFLOLWDWHHDV\
access. &LWL]HQV IRU HOHFWULÀFDWLRQ RI WKHLU KRXVHV LQ DQ\ SDUW RI WKH
country may inform the Control Centre on the Toll Free Number
REC 1800-121-5555 furnishing their particulars. The details of the
$ 3XEOLF *ULHYDQFH &HOO KDV EHHQ VHW XS LQ 5(& /LPLWHG IRU 8QHOHFWULÀHG +RXVHKROG LV EHLQJ WDNHQ XS ZLWK UHVSHFWLYH
WKH SXUSRVHV RI UHGUHVVLQJ JULHYDQFHV SHUWDLQLQJ WR UXUDO 6WDWH3RZHU ',6&20 IRU SURYLGLQJ HOHFWULFLW\ FRQQHFWLRQ DW
HOHFWULÀFDWLRQ UHFHLYHG IURP WKH SXEOLF 7KH JULHYDQFHV DUH the earliest.
UHGUHVVHGLQDWLPHERXQGPDQQHU7KH*ULHYDQFH&HOOKDQGOHV $SDUWIURPKRXVHKROGHOHFWULÀFDWLRQDQ\JULHYDQFHUHODWHGWR
&HQWUDOL]HG3XEOLF*ULHYDQFH5HGUHVVDQG0RQLWRULQJ6\VWHP HOHFWULFLW\LVDOVREHLQJWDNHQXSZLWKUHVSHFWLYH6WDWH3RZHU
&3*5$06  SRUWDO ² WKH SODWIRUP IRU FLWL]HQV IRU ORGJLQJ Discoms for speedy and timely redressal through the 24X7
WKHLU JULHYDQFHV 7KH &3*5$06 SRUWDO LV GHYHORSHG DQG
Control Centre.
PDLQWDLQHG E\ WKH 'HSDUWPHQW RI $GPLQLVWUDWLYH 5HIRUPV 
3XEOLF*ULHYDQFHV '$53* *RYHUQPHQWRI,QGLD NEEPCO

7KH3XEOLF*ULHYDQFH&HOOLVKHDGHGE\WKH([HFXWLYH'LUHFWRU DURING THE YEAR 2018 - 19


30',  3XEOLF *ULHYDQFH &HOO  7KH FRQWDFW GHWDLOV DUH
 7RWDOQXPEHURIJULHYDQFHV
PHQWLRQHGEHORZ
UHFHLYHG 7LOOVW0DU·    WKLUW\IRXU
7KH([HFXWLYH'LUHFWRU 30', 3XEOLF*ULHYDQFH&HOO
 7RWDOQXPEHURIJULHYDQFHV
5(& /LPLWHG )RUPHUO\ 5XUDO (OHFWULÀFDWLRQ &RUSRUDWLRQ UHGUHVVHG     WKLUW\WKUHH
Limited)
7KHJULHYDQFHVUHFHLYHGDUHUHGUHVVHGDQGGLVSRVHGRIZLWKLQ
&RUH6FRSH&RPSOH[/RGKL5RDG
a few days of receipt. Furthermore, a separate Independent
New Delhi – 110003 Employee Cell has been established in NEEPCO for looking into
Contact No. - 011-24362215 WKHJULHYDQFHVRIHPSOR\HHVGXHWRWUDQVIHUVDQGSURPRWLRQV
based on the recommendations of the Department of
)D[1R
$GPLQLVWUDWLYH 5HIRUPV  3XEOLF *ULHYDQFHV '$5 3* 
(PDLOERVKFRRUGLQDWLRQ#JPDLOFRP 0LQLVWU\RI3RZHU*RYHUQPHQWRI,QGLD

198
SJVNL SHWLWLRQHUV RU WKURXJK &HQWUDOL]HG 3XEOLF *ULHYDQFH 5HGUHVV
DQG 0RQLWRULQJ 6\VWHP &3*5$0 3* 3RUWDO IRUZDUGHG
7KH RUJDQL]DWLRQ KDV D GHVLJQDWHG 3XEOLF *ULHYDQFH 2IÀFHU
E\ '$53* 023 '233: DQG 3UHVLGHQW 6HFUHWDULDW 3XEOLF
DW LWV &RUSRUDWH &HQWHU 'XULQJ WKH )< \HDU  WZHOYH
*ULHYDQFH2IÀFHU'9&JRHVWKURXJKWKHUHSUHVHQWDWLRQVDQG
JULHYDQFHV ZHUH UHFHLYHG 7KHVH JULHYDQFHV SHUWDLQHG WR
FRPHV WR D SULPD IDFLH RSLQLRQ UHJDUGLQJ WKH JUDYLW\ RI WKH
VHUYLFH PDWWHUV RI WKH LQVHUYLFH UHWLUHG HPSOR\HHV DQG
PDWWHU LQYROYHG DQG VHQG LW WR WKH FRQFHUQHG GHSDUWPHQW
resettlement & rehabilitation aspects of project affected
IRU LWV UHSO\UHGUHVVDO LQ D WLPH ERXQG PDQQHU 7KH UHSO\ VR
SHRSOH 2XW RI WKHVH  JULHYDQFHV ZHUH UHGUHVVHG DQG
UHFHLYHGLQUHJDUGWRWKHJULHYDQFHSHWLWLRQLVFRQVLGHUHGDQG
disposed of. Resolution of two cases under process.
SODFHGEHIRUHWKHDSSURSULDWHDXWKRULW\IRUÀQDOGLVSRVDO,Q
THDC this year 158 cases were disposed till March, 2019.

7KH V\VWHP RI SXEOLF JULHYDQFH UHGUHVVDO PHFKDQLVP LV IXOO\ BBMB
established and well maintained by THDC India Limited. The
website of Corporation contains all details like designation, %%0% KDV GHYLVHG  D SURSHU SURFHGXUH IRU UHGUHVVDO RI
DGGUHVV SKRQH HPDLO HWF RI 'LUHFWRU 3XEOLF *ULHYDQFH  DV GrieYDQFHVRIWKHHPSOR\HHV6(+4VIRUWKH$GPLQLVWUDWLRQ
ZHOO DV 3XEOLF *ULHYDQFH 5HGUHVVDO 2IÀFHUV RI HDFK SURMHFW  of all Chief Engineers of BBMB, Dy.CAO, Nangal for the
unit nominated by the management. $GPLQLVWUDWLRQRI)$ &$2%%0%DQG'LUHFWRU+5'IRU%RDUG
6HFWW %%0% &KDQGLJDUK DUH DFWLQJ DV *ULHYDQFH 2IÀFHUV WR
THDCIL ensure proper and time bound redressal of public OLVWHQDQGUHGUHVVWKHJULHYDQFHVRIHPSOR\HHVSXEOLF6SHFLDO
JULHYDQFHV ORGJHG RQ WKH ZHEVLWH RI &HQWUDOL]HG 3XEOLF 6HFUHWDU\ %%0% LV DFWLQJ DV 'LUHFWRU*ULHYDQFHV IRU %%0%
*ULHYDQFH5HGUHVVDQG0RQLWRULQJ6\VWHP &3*5$06 ZKLFK
DV D ZKROH 7KH VDLG *ULHYDQFH RIÀFHUV KDYH HDUPDUNHG ÀUVW
are being forwarded through PG Portal to the dedicated
:HGQHVGD\RIHYHU\PRQWKWRPHHWWKHDJJULHYHGHPSOR\HHV
ZLQGRZ RI 7+'&,/ 7KHVH JULHYDQFHV DUH IRUZDUGHG IURP
SXEOLF1RWLFHKDVDOVREHHQGLVSOD\HGLQWKHRIÀFHRIHYHU\
3023UHVLGHQW6HFUHWDULDW'HSWWRI$GPLQLVWUDWLYH5HIRUPV
*ULHYDQFHRIÀFHU
DQG3XEOLF*ULHYDQFHV '$53* 0LQLVWU\RI3RZHUHWF$SDUW
from CPGRAMS portal of DARPG, THDCIL has also its own BEE
RQOLQHV\VWHPWKURXJKZKLFKFLWL]HQVFDQORGJHWKHLURQOLQH
FRPSODLQWVJULHYDQFHV 7KHUH LV QR VHSDUDWH *ULHYDQFH 5HGUHVVDO &HOO LQ %XUHDX RI
(QHUJ\ (IÀFLHQF\ *ULHYDQFHV LI DQ\ DUH EHLQJ GHDOW E\ WKH
7+'& ,QGLD /LPLWHG UHFHLYHG  SXEOLF JULHYDQFHV GXULQJ Administration Section of BEE.
WKH \HDU  DQG DOO ZHUH UHSOLHG  SHQGLQJ JULHYDQFHV
UHFHLYHGLQWKH\HDUZHUHDOVRUHSOLHGLQ\HDU7KXV CPRI
JULHYDQFHVZHUHUHSOLHGLQWKH\HDUDQGQRJULHYDQFH
Central Power Research Institute has a separate cell for
remained pending of 2017 & 2018. For the period from
UHGUHVVLQJ WKH VWDII DQG SXEOLF JULHYDQFHV 7KH *ULHYDQFH
-DQXDU\ WR 0DUFK 7+'&,/ UHFHLYHG  JULHYDQFHV RXW RI
Redressal Mechanism is part and parcel of the machinery of
which 02 were replied and 01 is pending as on 31.03.19.
&35,DGPLQLVWUDWLRQ7KHUROHRI3XEOLFDQG6WDII*ULHYDQFHFHOO
DVC is primarily to assist the management in redressing the Staff
DQG3XEOLFJULHYDQFHSHWLWLRQV7KHJULHYDQFHUHFHLYHGE\WKH
'9& KDV D IRUPDO ODLG RXW JULHYDQFH UHGUHVVDO PHFKDQLVP
FHOODUHIRUZDUGHGWRWKHFRQFHUQHGVHFWLRQGLYLVLRQZKRDUH
'9&KDVGHYHORSHGDQRUJDQL]DWLRQDOIUDPHZRUNLQOLQHZLWK
GHDOLQJZLWKVXEVWDQWLYHIXQFWLRQOLQNHGZLWKWKHJULHYDQFHIRU
WKH JXLGHOLQHV RI *RYW RI ,QGLD WR HQVXUH IDVW GLVSRVDO RI
redressal under intimation to the complainant. The complaints
JULHYDQFHV7KHUHLVHIIHFWLYHLQWHUQDOJULHYDQFHPDFKLQHU\IRU
DUHHLWKHUUHFHLYHGLQSHUVRQE\SRVW)D[HPHGLDRUWKURXJK
its employees at all DVC establishments.
online CPGRAMS portal. CPRI web portal has direct link to
'9&UHFHLYHVWKHSXEOLFJULHYDQFHHLWKHUGLUHFWO\IURPJULHYDQFH CPGRAMS portal www.CPGRAMS.IN. The CPGRAMS offers

199
Annual Report 2018-19

WR WKH VWDII DQG SXEOLF WKH IDFLOLW\ RI ORGJLQJ RQOLQH JULHYDQFHV RQOLQH UHPLQGHUV DQG RQOLQH YLHZ RI FXUUHQW VWDWXV RI WKH
JULHYDQFHV7KHJXLGHOLQHLQGHHGLVWKDWWKH&35,GHDOZLWKHYHU\JULHYDQFHLQDIDLUREMHFWLYHDQGMXVWPDQQHU7KHPRQLWRULQJ
RIJULHYDQFHVUHFHLYHGDQGGLVSRVHGRIE\&35,XQGHU3XEOLF 6WDII*ULHYDQFHVFHOOLVRQDUHJXODUEDVLV

'XULQJWKH\HDU&35,KDVUHGUHVVHGVHYHUDOJULHYDQFHSHWLWLRQVLQFOXGLQJRQOLQHJULHYDQFHSHWLWLRQVERWKIURPWKH
staff and general public on matters related to pension, recruitment and promotion policies, medical and staff welfare measures.
6XJJHVWLRQVFRPPHQWVPDGHE\WKHJHQHUDOSXEOLFKDYHEHHQDSSUHFLDWHGDQGUHSOLHG

7KHIROORZLQJDUHWKHGHWDLOVRIDSSOLFDWLRQVUHFHLYHGIURP-DQXDU\WR0DUFK

Grievance B/F Balance Receipt During Total Receipts Cases Disposed Closing Yet to Assess
Source the Period of During the Balance as on
Period 31/03/19

/RFDO,QWHUQHW 3 8 11 10 1 0

Pension 0 4 4 3 1 0

PMO 1 9 10 10 0 0

Total 4 21 25 23 2 0

NPTI

7R UHGUHVV WKH JULHYDQFHV LQ DFFRUGDQFH ZLWK WKH LQVWUXFWLRQV RI 'HSWW RI $GPLQLVWUDWLYH 5HIRUPV  3XEOLF *ULHYDQFHV
'U0DQMX0DP'LUHFWRU &$036 &RUSRUDWH2IÀFHLVIXQFWLRQLQJDV&KLHI*ULHYDQFH2IÀFHUDQG6KUL15+DOGHU'\'LUHFWRU
DV'\&KLHI*ULHYDQFH2IÀFHURI137,&RUSRUDWH2IÀFHDQGLWV,QVWLWXWHV$SDUWIURPWKLV*ULHYDQFH2IÀFHUVDUHGHVLJQDWHG
at all the Regional Institutes of NPTI. During the period of 1st April, 2018 to 31st March, 2019 as many as 29 cases relating to
VHUYLFHPDWWHUVDQGRWKHULVVXHVZHUHUHSRUWHGRXWRIZKLFKDOOKDYHEHHQGLVSRVHGRII*ULHYDQFH5HGUHVVDO0HFKDQLVPKDV
been uploaded on NPTI website.

200
CHAPTER 34

RIGHT TO INFORMATION ACT, 2005


Ministry of Power NTPC
Under the RTI Act, 2005, the Ministry of Power has designated NTPC Limited has implemented RTI Act, 2005 in true spirit
8QGHU 6HFUHWDULHV6HFWLRQ 2IÀFHUV DV &3,2V DQG 'LUHFWRUV VLQFHLWVLQFHSWLRQ,QRUGHUWRLPSOHPHQWWKHVDPHHIIHFWLYHO\
Deputy Secretaries as First Appellate Authorities. RTI NTPC has a RTI Cell at Corporate Centre, headed by the Central
DSSOLFDWLRQVDSSHDOV DUH UHFHLYHG PDQXDOO\ DV ZHOO DV RQOLQH 3XEOLF,QIRUPDWLRQ2IÀFHU &3,2 $VVLVWDQW3XEOLF,QIRUPDWLRQ
LQ WKH 0LQLVWU\ 7KH 0LQLVWU\ DQG LWV RUJDQL]DWLRQV368V DUH 2IÀFHUV $3,2V  KDYH DOVR EHHQ DSSRLQWHG DW DOO SURMHFWV
linked with ‘RTI MIS’ online portal of DoPT for processing of VWDWLRQVRIÀFHVRI173&7KHUHLVDQ$SSHOODWH$XWKRULW\ZKR
57, DSSOLFDWLRQV)LUVW $SSHDOV ,W KDV QRW RQO\ UHGXFHG WKH independently disposes off the appeals.
WLPHSHULRGWRSURYLGHWKHLQIRUPDWLRQEXWKDVLQFUHDVHGWKH In compliance with Section 4 of the RTI Act, RTI manual is
transparency in dealing with RTI applications and appeals. updated on NTPC website annually. From FY 2015-16 NTPC
0RUH WKDQ  YDOLG 57, DSSOLFDWLRQV DQG DSSUR[LPDWHO\ has also started accepting online RTI applications and First
 $SSHDOV KDYH EHHQ UHFHLYHG LQ WKH 0LQLVWU\ GXULQJ WKH Appeals through Online RTI Portal of DoPT.
ÀQDQFLDO\HDUWLOO0DUFKKDYHEHHQIRUZDUGHG
During the year 2018-19 (till 31st March 2019), 1,515
WUDQVIHUUHG WR FRQFHUQHG 'LYLVLRQV2UJDQL]DWLRQV RI WKH
DSSOLFDWLRQV ZHUH UHFHLYHG XQGHU WKH 57, $FW RXW RI ZKLFK
Ministry for further action. The Annual Returns (2017-18) as
 LQFOXVLYHRIWKRVHVXEPLWWHGHDUOLHUWKDQ$SU· KDYH
UHTXLUHG XV    RI WKH 57, $FW  KDYH EHHQ ÀOHG RQ
been replied.
CIC website. As required under Section 4(1) (b) of the RTI Act,
 SURDFWLYHVXR PRWR GLVFORVXUHV DUH XSORDGHG RQ WKH NHPC
57, SRUWDO RI WKH 0LQLVWU\ E\ WKH FRQFHUQHG GLYLVLRQV RI WKH ,QFRPSOLDQFHZLWKWKHSURYLVLRQVRIWKH5LJKWWR,QIRUPDWLRQ
0LQLVWU\)XUWKHUWKHDXGLWRI¶VXRPRWXSURDFWLYHGLVFORVXUH· $FW1+3&/LPLWHGSURYLGHGYDULRXVGRFXPHQWVUHFRUGV
of the Ministry is under process by Indian Institute of Public on its website during the year.
Administration, I.P. Estate. New Delhi. To enable nationwide access to information, NHPC has
CEA GHVLJQDWHG D &HQWUDO 3XEOLF ,QIRUPDWLRQ 2IÀFHU &3,2  DQ
$SSHOODWH$XWKRULW\7UDQVSDUHQF\2IÀFHUDW&RUSRUDWH2IÀFH
STATUS OF RTI APPLICATIONS FOR THE PERIOD 01.04.2018
OHYHODQG$VVLVWDQW3XEOLF,QIRUPDWLRQ2IÀFHUVDWHDFKRIWKH
TO 31.03.2019 in CEA.
3RZHU6WDWLRQV3URMHFWV5HJLRQDO2IÀFHVXQLWV
Requests Transferred Total Cases Total
During 2018-19 (up to 31.03.2019), 519 nos. applications,
/ Appeals cases Fresh ap- transferred Requests/
received plication to other Appeals 65 nos. 1st stage appeals and 5 nos. of 2nd stage appeals were
from MoP/ received Public accepted UHFHLYHG XQGHU 57, $FW RXW RI ZKLFK  QRV DSSOLFDWLRQV
other Public Authorities 64 nos. 1st stage appeals and 5 nos. of 2nd stage appeals
Authorities KDYHDOUHDG\EHHQUHSOLHGDQGGLVSRVHGRIIUHVSHFWLYHO\
NHPC has already been linked with DoPT RTI online portal from
Requests 345 207 3 508
01st January, 2016 & thereby accepting online applications
since then.
Appeals 0 64 2 62
POWERGRID
PAO 32:(5*5,' D *RYHUQPHQW RI ,QGLD (QWHUSULVH KDV WDNHQ
6L[FDVHVRI57,ZHUHUHFHLYHGDQGDOOZHUHUHSOLHGGXULQJWKH FRQFUHWH DFWLRQV WR SURYLGH LQIRUPDWLRQ WR WKH FLWL]HQV RI
SHULRGIURPWR6K5DM.XPDU$URUD6U the country in accordance with the RTI Act 2005. Public
$FFRXQWV2IÀFHUDQG0V9&KLWUD6U$FFRXQWV2IÀFHUKDYH ,QIRUPDWLRQ 2IÀFHUV DQG $SSHOODWH $XWKRULWLHV KDYH EHHQ
designated at Corporate Centre and Regional Head Quarters
EHHQ GHVLJQDWHG DV 3XEOLF ,QIRUPDWLRQ 2IÀFHUV IRU 'HOKL
DQGRWKHURIÀFHVXQGHUWKHSURYLVLRQVRIWKH57,$FW$V
DQG %DQJDORUH RIÀFH DQG 6K & 0DKHVKZDUDQ &RQWUROOHU
part of compliance of information in line with Section 4(1)(b)
of Accounts designated as Appellate Authority for any RTI
LVDOVRDYDLODEOHRQ32:(RGRID website.
matters.

201
Annual Report 2018-19

)XUWKHUIRUHIIHFWLYHSURFHVVLQJPRQLWRULQJDQGPDQDJHPHQW directions of Central Information Commission (CIC) regarding


of RTI’s and Appeals, web based online RTI portal has been ÀOLQJ RI RQOLQH 4XDUWHUO\ 5HWXUQV IRU WKH )<  8SWR
GHYHORSHG LQ 32:(5*5,' 7KH 57, SRUWDO LV H[SHFWHG WR March, 2019).
IDFLOLWDWHWLPHO\UHSO\RI57,$SSHDOWRDSSOLFDQWVE\UHDOWLPH
)XUWKHU LQ RUGHU WR VWUHQJWKHQ FRPSOLDQFH RI WKH SURYLVLRQV
PRQLWRULQJRIDOO57,·V$SSHDOV$OVRWKHSRUWDOIDFLOLWDWHVLQ
of disclosures as contained in Section 4 of the RTI Act, 2005,
JHQHUDWLRQ RI YDULRXV 57, UHSRUWV DV SHU UHTXLUHPHQW RI &,&
PFC has placed the requisite information on the website of the
9LJLODQFH LQWHUQDOFRQVXPSWLRQDQGDOVRWRDQDO\]HPHDVXUHV
company.
RI V\VWHP  SURFHVVHV LPSURYHPHQWV DV DQG ZKHQ UHTXLUHG
7KH .QRZOHGJH EDQN IDFLOLW\ LQ WKH 57, ZHE SRUWDO IDFLOLWDWHV %HVLGHVWKHDERYH3)&LVDOVROLQNHGZLWKWKHRQOLQH57,3RUWDO
DOOFRQFHUQHGWRDFFHVVVKDUHLPSRUWDQWLQIRUPDWLRQUHSOLHV RI*RYWRI,QGLD'HSDUWPHQWRI3HUVRQQHO 7UDLQLQJ
and latest RTI circulars and guidelines. REC
PFC An independent RTI Cell has been set up in REC for
PFC has implemented the Right to Information Act, 2005 implementation of RTI Act, 2005 and coordinating the work
WR SURYLGH LQIRUPDWLRQ WR WKH FLWL]HQV RI ,QGLD DQG DOVR WR relating to receipt of applications and furnishing information
maintain accountability and transparency in the working of the thereto. The RTI Cell also coordinate with the work relating to
company. The Company has designated a Public Information )LUVW$SSHDODQG6HFRQG$SSHDOÀOHGEHIRUHWKH)LUVW$SSHOODWH
2IÀFHU 3,2  DQG $SSHOODWH $XWKRULW\ DW LWV UHJLVWHUHG RIÀFH Authority and Central Information Commission and take steps
IRU HIIHFWLYH LPSOHPHQWDWLRQ RI WKH 57, $FW 7KH UHOHYDQW towards disposal of appeals.
LQIRUPDWLRQGLVFORVXUHVDUHDOVRPDGHDYDLODEOHRQWKHRIÀFLDO RTI Handbook (both in English and Hindi) has been placed on
website (www.pfcindia.com) of the company. During the FY REC website. The status of RTI Applications & Appeals for the
DOODSSOLFDWLRQVUHFHLYHGXQGHUWKH57,$FWZHUH \HDULVJLYHQEHORZ
duly processed and replied to. PFC has also complied with the

Sl. No. Particulars (Nos.)


(01.04.2018 to 31.03.2019)

1. $SSOLFDWLRQVUHFHLYHG 553

2. Applications disposed off 530

3. )LUVW$SSHDOVUHFHLYHGE\$SSHOODWH$XWKRULW\5(& 33

4. First Appeals disposed off by Appellate Authority, REC 31

5. 6HFRQG$SSHDOVUHFHLYHGIURP&,& 01

6. Second Appeals disposed off by CIC 01

7KHGHWDLOVRI'HSDUWPHQWDO$SSHOODWH$XWKRULW\3XEOLF,QIRUPDWLRQ2IÀFHUDUHDVEHORZ

Sl. Particulars Address


No.

1. Departmental 6KUL$VKRN$ZDVWKL([HFXWLYH 5(&/LPLWHG )RUPHUO\5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ


Appellate Authority 'LUHFWRU $GPQ*HQ /LPLWHG 6&23(&RPSOH[/RGKL5RDG1HZ
'HOKL3KRQH 2 )D[1R

2. Public Information 6KUL6KDYLQGHU/DO%DWWD 5(&/LPLWHG )RUPHUO\5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ


2IÀFHURI5(& General Manager (Law) /LPLWHG 6&23(&RPSOH[/RGKL5RDG1HZ
'HOKL3KRQH 2 )D[1R

202
NEEPCO THDC

NEEPCO has implemented the Right to Information Act, 2005 7KH &RPSDQ\ KDV WDNHQ FRQFUHWH DFWLRQ WR SURYLGH
in the true earnestness keeping in conformity with the spirit LQIRUPDWLRQ WR WKH &LWL]HQV RI WKH &RXQWU\ E\ RQOLQH OLQNLQJ
RIWKH$FWWRSURPRWHWUDQVSDUHQF\DQGHIÀFLHQF\LQLWVGD\WR of RTI application, appeals & reply with “RTIMIS Portal” to
GD\DFWLYLWLHVDQGSXEOLFGHDOLQJV$QXPEHURIRIÀFLDOVRIWKH FRPSO\ZLWK5LJKWWR,QIRUPDWLRQ$FW1RGDO2IÀFHU 12 
&RUSRUDWLRQKDYHEHHQDVVLJQHGWKHMRERI&3,23,2$3,2 )LUVW$SSHOODWH$XWKRULW\ )$$ &HQWUDO,QIRUPDWLRQ2IÀFHU
&3,2   DOO 3XEOLF ,QIRUPDWLRQ 2IÀFHU 3,2  DQG $VVLVWDQW
7KH &RUSRUDWLRQ SXEOLVKHV LQ LWV RIÀFLDO ZHEVLWH DOO UHOHYDQW 3XEOLF,QIRUPDWLRQ2IÀFHU $3,2 DUHOLQNHGWRWKLVSRUWDOIRU
LQIRUPDWLRQ XQGHU SURYLVLRQV RI 6HFWLRQ    E  RI WKH 57, UHFHLYLQJDSSOLFDWLRQDQGSURYLGLQJLQIRUPDWLRQRQOLQH
Act, 2005.
'XULQJWKH\HDUWRWDO 2QHKXQGUHGDQGWKLUW\VL[ 
The Corporation also has been linked to the online system DSSOLFDWLRQV ZHUH UHFHLYHG IURP &LWL]HQV DFURVV WKH &RXQWU\
namely RTI Request & Appeal Management Information VHHNLQJ LQIRUPDWLRQ RI YDULRXV QDWXUH 7KH LQIRUPDWLRQ ZDV
Systems, “RTIMIS” Portal. Through this portal, on-line RTI PDGHDYDLODEOHWRWKHPLQWLPHDVSHUWKHSURYLVLRQRIWKH57,
Applications to the Corporation are directly marked to the Act-2005.
GHVLJQDWHG1RGDO2IÀFHU57,ZKRIRUZDUGVWKHVDPHWRWKH 5HJDUGLQJ DSSHDOV GXULQJ WKH \HDU  WZHOYH  
UHVSHFWLYH &3,2V RI 1((3&2 $OO WKH LQIRUPDWLRQV UHJDUGLQJ DSSHDOV KDYH EHHQ UHFHLYHG E\ WKH )LUVW $SSHOODWH $XWKRULW\
processing of the application, soft copy of application, period DQGDIWHUH[DPLQDWLRQDOOWKHDSSHDOVKDYHEHHQGLVSRVHGRII
RISHQGHQF\ÀQDOGLVSRVDORIWKHFDVHVHWFDUHVWRUHGRQOLQH by the Appellate Authority timely.
in the CPIO’s account. %HVLGHVGXULQJWKH\HDUWZR  DSSHDOVKDYHEHHQ
The RTI applications handled by the Corporation during ÀOHGEHIRUH&HQWUDO,QIRUPDWLRQ&RPPLVVLRQ &,& 1HZ'HOKL
the current Financial Year 2018-19 (i.e. from 01.04.2018 till and same were disposed off by the Commission.
 DUHDVVKRZQKHUHXQGHU DVC
1. Number of DSSOLFDWLRQVUHSOLHG   In order to strengthen the system of RTI implementation in
DVC, a RTI Cell has since been set up in Secretariat Department,
 $SSOLFDWLRQ)HHVUHFHLYHG  5V
'9& +4 .RONDWD 7KH 57, &HOO DFWV DV D QRGDO SRLQW IRU DOO
 $GGLWLRQDO)HHVUHFHLYHG  5V RTI implementation issues within DVC, HQ as well as in the
 1XPEHURIDSSHDOVZLWK)LUVW   ÀHOGIRUPDWLRQVRI'9&KHDGHGE\&3,2'9&+4DVD1RGDO
Appellate authority 2IÀFHU 57, ZLWKRQHGHVLJQDWHG$SSHOODWH$XWKRULW\LQ'9&
.RONDWDDQGWHQ&HQWUDO3XEOLF,QIRUPDWLRQ2IÀFHUV &3,2V DW
Satisfactory dissemination of information as sought by the RTI
ÀHOGOHYHORILWVPDMRUSURMHFWV
DFWLYLVWLVHYLGHQWIURPWKHDERYHGHWDLOVDQGWKH&RUSRUDWLRQ
RTI application status during the period w.e.f. 01.04.2018 to
WDNHV D SOHGJH WR PDNH WKH V\VWHP PRUH HIÀFLHQW LQ WKH
31.03.2019 of DVC Head Quarter & 10 no. Field Projects are
coming days.
DVXQGHU
SJVNL
Sl. Name of the RTI RTI RTI
SJVN has complied with all statutory returns and guidelines No. Project application application application
on the Right to Information Act, 2005. The Various details as Received Rejected Dispose of
(no.) (no.) (no.)
UHTXLUHGXQGHUWKH$FWDUHKRVWHGRQZHEVLWHZZZVMYQQLF
LQ,QDGGLWLRQWRWKHVHYDULRXVRWKHUGRFXPHQWVVXFKDVWKH 1. Head Quarter 328 12 316
Annual Reports, Delegation of Powers & Code of Conduct etc. 2. Field Projects 152 32 120
DUHDOVRDYDLODEOHRQWKHZHEVLWH
3. Total 480 44 436
In order to make the RTI application disposal system more
7KHIROORZLQJVDOLHQWSRLQWVDUHZRUWKPHQWLRQLQJ
HIÀFLHQWEHVLGHVWKHGHVLJQDWHG3XEOLF,QIRUPDWLRQ2IÀFHUDW
1. DVC has been aligned with the online RTI MIS portal
WKH&RUSRUDWH+HDG4XDUWHUVRWKHUVHQLRU2IÀFHUVDWSURMHFW
QHWZRUNDFWLYDWHGE\'R37ZHIDXQLYHUVDO
VLWHV DUH DOVR GHVLJQDWHG DV 3XEOLF ,QIRUPDWLRQ RIÀFHUV 7KH
access point for submitting RTI requests through
GHWDLOVRIVDPHLVDYDLODEOHRQ6-91ZHEVLWH
internet.

203
Annual Report 2018-19

 '9&KDVJLYHQVSHFLDOHPSKDVLVRQ
L  6XRPRWRGLVFORVXUHVRILQIRUPDWLRQLQSXEOLFGRPDLQLQLWVZHEVLWHZZZGYFJRYLQ/LQN57,RQDSURDFWLYHEDVLVWLPHWR
time at regXODULQWHUYDOVWRXSKROGWUDQVSDUHQF\DQGWRHDV\DFFHVVWRWKHSXEOLF

BBMB
7KH QHFHVVDU\ LQIUDVWUXFWXUH KDV EHHQ SURYLGHG IRU 2SHUDWLRQDOL]DWLRQ RI WKH $FW %%0% GHVLJQDWHG QLQH $VVLVWDQW 3XEOLF
,QIRUPDWLRQ2IÀFHUV $3,2V DQGHLJKW3XEOLF,QIRUPDWLRQ2IÀFHUV 3,2V DWGLIIHUHQWORFDWLRQV,QOLQHZLWKUHTXLUHPHQWVRIWKH
$FWDQGHLJKW$SSHOODWH$XWKRULWLHVKDYHDOVREHHQGHVLJQDWHG7KHRIÀFLDO:HEVLWHRI%%0% ZZZEEPETRYLQ GHSLFWVRIÀFLDO
GHVLJQDWLRQVDGGUHVVHVDQGSKRQHQRVRIWKHVHRIÀFHUV&RPSUHKHQVLYHGHWDLOVUHJDUGLQJWKHSURFHGXUHLQUHVSHFWRIDSSO\LQJ
IRULQIRUPDWLRQKDYHEHHQJLYHQRQWKHZHEVLWH7KHLQIRUPDWLRQUHJDUGLQJ1RPDQXDOVZKLFKKDYHEHHQSUHSDUHGDVSHU
SURYLVLRQVRI6HFWLRQ  ' RIWKH57,$FW 3URDFWLYHGLVFORVXUH LVDOVRDYDLODEOHRQWKHZHEVLWH7KHLQIRUPDWLRQLVUHJXODUO\
XSGDWHGIURPWLPHWRWLPHDVSHUSURYLVLRQVRIWKH57,$FW7KHTXDQWXPRIDSSOLFDWLRQVUHFHLYHGXQGHUWKH$FWDSSHDOVPDGH
RWKHUUHODWHGGHWDLOVDUHJLYHQEHORZ

Sr. No. of No. of Decision where applications for information rejected Number of cases Amount
No requests decisions where disciplinary of
received 1RRIWLPHVYDULRXVSURYLVLRQVZHUHLQYRNHG action was taken Charges
DJDLQVWDQ\RIÀFHU collected
in respect of (Rs.)
administration of
this Act.
Sec. 8 (1) Other Section
a b c d e f g h i j 9 11 24 Other
1 477 477 Nil Nil Nil Nil 

BEE
,QFRPSOLDQFHZLWKWKH5LJKWWR,QIRUPDWLRQ$FW%((KDVXSORDGHGWKH3URDFWLYH'LVFORVXUHVXQGHUVHFWLRQ  E RI57,
$FWRQ%((·VZHEVLWH$OOWKHDSSOLFDWLRQVUHFHLYHGDUHDWWHQGHGWRDQGWKHLQIRUPDWLRQIXUQLVKHGWRWKHDSSOLFDQWVDVSHU
WKHSURYLVLRQVRIWKH$FW
CPRI
&35,KDVDQRUJDQL]HG57,DSSOLFDWLRQUHVSRQVHV\VWHPKDYLQJRQH&3,2RQH$3,2DQGRQH$SSHOODQW$XWKRULW\UHJLVWHUHG
under Min. of Power as well as RTI website.
&35,KDVXSGDWHGLWVZHEVLWHZLWKDOOWKHGHWDLOVRIRIÀFHUV RIÀFHDVSHUWKHJXLGHOLQHVRI57,$FWXQGHUVHFWLRQZLWK
suomoto disclosure. This website is updated on daily basis.
7KHIROORZLQJLVWKHGDWDRIDSSOLFDWLRQVUHFHLYHGDQGUHSOLHVVHQWXQGHUWKHDFWGXULQJWKHSHULRGIURPVW-DQXDU\WR
VW0DUFK

No. of Directly received Applications Applications Applications Applications Rejected


Applications applications forwarded by forwarded by transferred to other under the various
received MOP others departments clauses of Section-8 RTI
109 89 18 2 3 11

$OOWKHDSSOLFDWLRQVUHFHLYHGDUHUHSOLHGZLWKLQWKHVSHFLÀHGSHULRG
NPTI
8QGHUWKH5LJKWWR,QIRUPDWLRQ$FW3XEOLF,QIRUPDWLRQ2IÀFHUDQG$VVWW3XEOLF,QIRUPDWLRQ2IÀFHUVKDYHEHHQDSSRLQWHGIRU
&RUSRUDWH2IÀFHDQGWKH,QVWLWXWHVRI137,UHVSHFWLYHO\'XULQJWKHSHULRGRIVW$SULOWRVW0DUFKDVPDQ\DV
requests were receLYHGIRUSURYLGLQJLQIRUPDWLRQHWFRXWRIZKLFKDOOUHTXHVWVKDYHEHHQVHWWOHGDVSHUUXOHV

204
CHAPTER 35.1

IMPLEMENTATION OF OFFICIAL LANGUAGE


Ministry of Power Agartala, National power Training Institute Headquarters,
Faridabad, Powergrid Corporation of India Limited, Liasion
0LQLVWU\ RI 3RZHU LWV DWWDFKHG RIÀFH DQG 3XEOLF 6HFWRU
2IÀFH 0XPEDL 173& *DQGKDU *DV )LHOG %KDUXFK 173&
Undertakings, Autonomous Bodies, Board and Institutions Ltd., Barh Super Thermal Power Station, Patna, Powergrid
XQGHU WKH DGPLQLVWUDWLYH FRQWURO RI WKH 0LQLVWU\ RI 3RZHU &RUSRUDWLRQ RI ,QGLD /LPLWHG (DVWHUQ 5HJLRQ 2IÀFH 3DWQD
FRQWLQXHG WKHLU HIIRUWV LQ HQVXULQJ HIIHFWLYH LPSOHPHQWDWLRQ ZHUH LQVSHFWHG E\ WKH &RPPLWWHH RI 3DUOLDPHQW RQ 2IÀFLDO
RI WKH 2IÀFLDO /DQJXDJH SROLF\ RI WKH *RYHUQPHQW DQG /DQJXDJH 2IÀFHUV RI WKH 0LQLVWU\ DOVR SDUWLFLSDWHG LQ WKH
SURPRWLQJWKHSURJUHVVLYHXVHRI+LQGLLQGD\WRGD\DFWLYLWLHV inspection meetings of the Committee of Parliament on
RIWKH0LQLVWU\2IÀFHV 2IÀFLDO /DQJXDJH 'XULQJ WKH \HDU  2IÀFHV KDYH EHHQ
QRWLÀHGXQGHUWKH5XOH  RIWKH2IÀFLDO/DQJXDJH5XOHV
7KH0LQLVWU\HQVXUHGFRPSOLDQFHRIWKH2IÀFLDO/DQJXDJH$FW
1976.
DQGWKH2IÀFLDO/DQJXDJH5XOHVLQWKH0LQLVWU\DQG
RIÀFHVXQGHULWVDGPLQLVWUDWLYHFRQWURO Meeting of Hindi Salahkar Samiti of Ministry of Power was
organised on 11th April, 2018 under the Chairmanship of the
,Q FRPSOLDQFH ZLWK WKH 2IÀFLDO /DQJXDJH 3ROLF\ +LQGL Hon’ble Minister of State for Power and New and Renewable
fortnight was organised from 04st Sept. 2018 to 18th Sept. 2018. Energy (Independent Charge).
During this period, Noting & Drafting Competition, Poetry
Three Electronic Display Boards depicting “Aaj ka Shabd” in
Competition, Debate Competition, Hindi Typing Competition, Hindi and English was installed in the Ministry of Power to
Hindi Stenography Competition, Hindi Dictation Competition, HQULFK +LQGL YRFDEXODU\ RI WKH RIÀFLDOV RI WKH 0LQLVWU\ 7KH
Hindi Prashna Manch and Competition for doing original Board also portrays the thought of the Day in Hindi for
ZRUN LQ +LQGL E\ RIÀFHUV DQG HPSOR\HHV ZHUH RUJDQLVHG PRWLYDWLQJWKHHPSOR\HHVLQWKHLUGD\WRGD\OLIHDQGWRDWWDLQ
IRU WKH RIÀFHUV DQG HPSOR\HHV RI WKH 0LQLVWU\ 2IÀFHUV DQG inspiration.
staff of the Ministry participated in these competitions with
4XDUWHUO\0HHWLQJVRIWKH2IÀFLDO/DQJXDJH,PSOHPHQWDWLRQ
JUHDW HQWKXVLDVP :LQQHUV ZHUH JLYHQ FHUWLÀFDWHV DQG FDVK Committee of the Ministry of Power were organised regularly.
SUL]HV7RUHYLHZWKHSURJUHVVLYHXVHRI+LQGLLQWKHDWWDFKHG Action was taken on important decisions taken in these
RIÀFHV %RDUG 2UJDQLVDWLRQV DQG 3XEOLF 6HFWRU 8QGHUWDNLQJ PHHWLQJV+LQGLZRUNVKRSVZHUHRUJDQLVHGIRUPRWLYDWLQJWKH
XQGHUWKHDGPLQLVWUDWLYHFRQWURORIWKH0LQLVWU\RIÀFHVYL] RIÀFHUVDQGHPSOR\HHVIRUGRLQJWKHLURIÀFLDOZRUNLQ+LQGL
%%0% +HDGTXDUWHUV &KDQGLJDUK 32:(5*5,'*XUXJUDP ¶*ORVVDU\ RI $GPLQLVWUDWLYH 7HUPV· SXEOLVKHG E\ &RPPLVVLRQ
REC Headquarters, New Delhi, NPTI Faridabad, NHPC Limited, IRU6FLHQWLÀF 7HFKQLFDO7HUPLQRORJ\ZHUHGLVWULEXWHGDPRQJ
Faridabad, PFC Limited Headquarter, New Delhi, Central WKHRIÀFHUVDQGHPSOR\HHVRIWKH0LQLVWU\
Electricity Regulatory Commission, New Delhi, BEE, New Delhi, CEA
'9& +HDGTXDUWHUV .RONDWD 1HHSFR +HDGTXDUWHUV 6KLOORQJ
1. OFFICIAL LANGUAGE POLICY AND ACHIEVEMENTS
POSOCO Headquarters, New Delhi, NTPC Headquarters, New
Delhi, CEA, New Delhi and CPRI Headquarters, Bangalore were  (UVWZKLOH&($ZDVQRWLÀHGLQWKHRIÀFLDO*D]HWWHRIWKH
inspected. *RYW RI ,QGLD LQ SXUVXDQFH RI VXEUXOH  RI UXOH  RI
WKH2IÀFLDO/DQJXDJH5XOHVDQGZRUNWREHGRQH
'XULQJWKH\HDUXQGHUUHYLHZFLWLHVYL].ROGDP+\GURHOHFWULF LQ+LQGLE\WKHRIÀFLDOVKDYLQJSURÀFLHQF\LQ+LQGLXQGHU
3RZHU3URMHFW173&%LODVSXU7+'&,QGLD/LPLWHG.DXVKDPEL the sub rule 4 of 8.
*KD]LDEDG &HQWUDO(OHFWULFLW\5HJXODWRU\ &RPPLVVLRQ 1HZ
The targets assigned by the Rajbhasha cell of Ministry of
Delhi, THDC India Limited, Tehri, National Power Training
Home Affairs for the year 2018-19 for implementation of
Institute (NPTI), Badarpur, New Delhi, Powergrid Corporation
WKHRIÀFLDOODQJXDJHSROLF\ZHUHDFKLHYHG
of India Limited, Dadri, Uttar Pradesh, Powergrid Corporation
of India Limited, Hyderabad, National Thermal Power Following activities were carried out during the year.
&RUSRUDWLRQ 6LPKDGUL 9LVDNKDSDWQDP ([HFXWLYH (QJLQHHU L 'XULQJ WKH \HDU DOO WKH ZRUN LQ  VSHFLÀHG GLYLVLRQV
Bhakra Beas Management Board, Delhi, NTPC, Chennai, sections with Administration and Accounts Sections
Powergrid, Madurai, NTPC Limited, Bongaigaon, Assam, VXFKDVQRWLQJGUDIWLQJLVVXHRIRIÀFHRUGHUVOHWWHUVHWF
North-Eastern Electric Power Corporation Limited (NEEPC0), were carried out in Rajbhasa Hindi.

205
Annual Report 2018-19

 (IIRUWV ZHUH DOVR PDGH WR FDUU\ RXW PD[LPXP ZRUN LQ   6K3UDWHHN6ULYDVWDY$'3&'
+LQGLLQDOOGLYLVLRQVVHFWLRQV&($   6K5DMHHY.XPDU0LWWDO''733'
LL $OO WKH OHWWHUV UHFHLYHG LQ +LQGL ZHUH UHSOLHG LQ +LQGL   6K6DW\DQGUD.XPDU'RWWDQ''363$,,
RQO\ 7KXV WKH 5XOH  RI 2IÀFLDO /DQJXDJH $FW ZDV 10. Smt. Suman Bala, DD,TPM-I
implemented.
 6PW3RRQDP.XPDUL$629LJLODQFH
 'XULQJ WKH ÀQDQFLDO \HDU  DYHUDJH +LQGL
5. Hindi Week Celebrations
FRUUHVSRQGHQFHV ZDV  DSSUR[LPDWHO\ 4XDUWHUO\
percentage of Hindi correspondence during the year  +LQGL)RUWQLJKWZDVRUJDQL]HGLQWKH&HQWUDO(OHFWULFLW\
was as follows- Authority from 4.9.2018 to 18.9.2018. On 4.9.2018, Hindi
Fortnight was inaugurated by lightening the lamp and
Letters sent in % of Hindi letters Ganpati Vandana under the Chairmanship of Chairman,
Hindi &HQWUDO (OHFWULFLW\ $XWKRULW\ 7KHUH ZHUH PDQ\ RIÀFHUV
1st Quarter 19845 94  HPSOR\HHV SUHVHQW LQ WKH $XWKRULW\ LQFOXGLQJ DOO
the Members, Secretary and Chief Engineers. On this
2nd Quarter 20923 93
occasion, a cultural programme including poetry and
3rd Quarter 17563 96.3 workshop on ‘Hindi Literature and Indian Nationalism’
4th Quarter 17860 94.8 ZDVDOVRRUJDQL]HGLQZKLFK/HFWXUHVDQGSRHPVZHUH
read by a guest lecturer, Dr. Anand Bardhan, Associate
 4XDUWHUO\ 0HHWLQJV RI 2IÀFLDO /DQJXDJH Professor, Delhi Research and Management Institute,
Implementation Committee 18- A, Satsanga Vihar Marg, Qutub Institutional Area,
 'XULQJ WKH \HDU IROORZLQJ WKUHH PHHWLQJV RI 2IÀFLDO New Delhi-67.
/DQJXDJH,PSOHPHQWDWLRQ&RPPLWWHHZHUHKHOG During the Hindi fortnight, four competitions were
- 1st meeting - 04 May, 2018 RUJDQL]HGVXFFHVVIXOO\QDPH+LQGLHVVD\ZULWLQJ+LQGL
notation and drafting, Hindi Article writing and general
- 2nd meeting - 09 Aug, 2018 ODQJXDJH FRPSHWLWLRQ RI 2IÀFLDO /DQJXDJH 5XOHV  $FW
 UGPHHWLQJ1RY DQG+LQGL/DQJXDJH/LWHUDWXUHUHVSHFWLYHO\ 

- 4th meeting - 19 Feb, 2019 6. Conducting Hindi Workshop

During these meetings action were taken for strict  7KLV RIÀFH LV UHJXODUO\ FRQGXFWLQJ ZRUNVKRSV IRU
LPSOHPHQWDWLRQRIRIÀFLDOODQJXDJHSROLF\ SURSDJDWLRQ RI 2IÀFLDO /DQJXDJH 3ROLF\ ,Q RUGHU WR
PLQLPL]H WKH GLIÀFXOWLHV IDFHG E\ &($ RIÀFHUV ZRUNLQJ
3. Issuance of Reports in bilingual form LQ&($FRPSOH[DQGWRLQFUHDVHXVHRI+LQGLLQWKHRIÀFH
During the year, following reports were issued in a series of workshops on regular basis were held during
bilingual form. the year and a total of four such workshops were held.

1. Out come Budget. 7. Purchase of Hindi Books/publication

2. Annual Report  7KLV RIÀFH KDV D OLEUDU\ +LQGL %RRNV DUH SURFXUHG
UHJXODUO\LQWKHOLEUDU\GXULQJHDFKÀQDQFLDO\HDU+LQGL
4. Implementation of Hindi Promotion Schemes 1HZV SDSHUV  +LQGL PDJD]LQHV WRR DUH UHJXODUO\
 ,QDFFRUGDQFHZLWKWKH+RPH0LQLVWU\2IÀFLDO/DQJXDJH purchased in the library.
'HSDUWPHQW 2IÀFH 0HPRUDQGXP 1R 8. Facility to work in bilingual on PC
RO . GDWHGDQGWKHLQFHQWLYH
scheme for doing work in Hindi was implemented.  7KLVRIÀFHLVUHJXODUO\SURFXULQJXSGDWLQJ3&VRIWZDUH
VRWKDWWKHRIÀFHUVRIÀFLDOVFDQZRUNLQ+LQGLELOLQJXDO
In accordance with the recommendation of Selection IRUP$WSUHVHQWWKLVRIÀFHKDVIDFLOLW\WRZRUNLQ%LOLQJXDO
FRPPLWWHHIROORZLQJRIÀFHUVHPSOR\HHVZHUHDZDUGHG 0LFURVRIWRIÀFHVRIWZDUH
1. Sh. R.P Singh, DD, PCD (Hindi Dictation)
9. Publication of in-house magazine
2. Sh. Digambar Singh, SSA, Adm.-II
 ,Q WKH +LQGL $GYLVRU\ &RPPLWWHH KHOG RQ 
  6K3DQNDM.XPDUVWHQR$GP,,
¶6DQMLYDQL· D VRFLDO QRYHO RI 0V 8VKD 9HUPD $VVLVW
  6K/RNHVK.XPDU0HHQD$' 'LUHFWRU 2/  &($ ZDV UHOHDVHG E\ +RQ·EOH 6KUL 5.
5. Sh. Ram Babu, SSA, FM Singh, Minister of State (IC, Power and New & Renewable
  6K5DP$YWDU6U6HF$VVLVW Energy).

206
PAO RI 72/,& 2  )DULGDEDG ZHUH RUJDQL]HG UHJXODUO\  LQ WKH
&RUSRUDWH2IÀFHLQZKLFKSURJUHVVLYHXVHRI2IÀFLDO/DQJXDJH
$OOWKHFRPPXQLFDWLRQUHFHLYHGLQ+LQGLDUHHQWHUWDLQHGDQG
ZDV UHYLHZHG E\ WKH &KDLUPDQ DQG 0DQDJLQJ 'LUHFWRU LQ
replied.
WKH SUHVHQFH RI 'LUHFWRUV 'XULQJ WKH UHYLHZ SHULRG PDQ\
NTPC SURJUDPPHV OLNH +LQGL .DY\D 6DQJRVKWKL 7HFKQLFDO 6HPLQDU
6HYHUDOLQLWLDWLYHVZHUHWDNHQIRUWKHSURJUHVVLYHXVHRI+LQGL on Hindi in Digital Bharat, Hindi Fortnight, Hindi Competitions,
LQ GD\ WR GD\ RIÀFLDO ZRUN DQG LPSOHPHQWDWLRQ RI 2IÀFLDO +LQGL 3XVWDN 3DWKDQ 6DSWDK +LQGL .DYL 6DPPHODQ $NKLO
Language Policy of the Union in NTPC. The compliance Bhartiya Rajbhasha Sammelan, Hindi Language and Hindi
RI 2IÀFLDO /DQJXDJH SROLF\ LQ LWV·V SURMHFWV DQG UHJLRQDO Typing Training programmes along with Hindi workshops and
headquarters was inspected and need based suggestions Departmental Computer workshops were organised in the
ZHUHJLYHQWRWKHUHVSHFWLYH+HDGVRIRIÀFHVLQWKLVUHJDUG FRUSRUDWLRQ IRU WKH SURSDJDWLRQ RI 2IÀFLDO /DQJXDJH +LQGL
,QDGGLWLRQ5DMEKDVKDPDJD]LQHVWLWOHG¶5DMEKDVKD-\RWL·DQG
4XDUWHUO\ PHHWLQJV RI 2IÀFLDO /DQJXDJH ,PSOHPHQWDWLRQ ‘Nagar Saurabh’ were also published.
&RPPLWWHH 2/,& ZHUHKHOG LQZKLFKH[WHQVLYHGLVFXVVLRQV
took place on the use of Hindi and the ways and means to $WWUDFWLYH LQFHQWLYH VFKHPHV IRU HPSOR\HHV KDYH EHHQ
EULQJ DERXW IXUWKHU LPSURYHPHQWV 6LPLODU 2/,& PHHWLQJV LPSOHPHQWHG DV SHU WKH JRYHUQPHQW JXLGHOLQHV IRU WKH
ZHUHKHOGDWUHJXODULQWHUYDOVLQVWDWLRQVSURMHFWVRIÀFHV SURPRWLRQ RI +LQGL E\ FRQWULEXWLQJ DUWLFOHZULWHXSV LQ
5DMEKDVKDPDJD]LQHVHQFRXUDJLQJUHDGLQJ+LQGLERRNVDQG
+LQGL 'LYDV ZDV FHOHEUDWHG RQ WK 6HSWHPEHU  DQG writing noting and drafting in Hindi etc.
+LQGL )RUWQLJKW ZDV RUJDQL]HG IURP  6HSWHPEHU 
at Corporate Centre as well as regional headquarters and 7KH 6XE &RPPLWWHH RI 'UDIW DQG (YLGHQFH RI 3DUOLDPHQW RQ
SURMHFWVVWDWLRQVWRFUHDWHDZDUHQHVVDPRQJWKHHPSOR\HHV 2IÀFLDO/DQJXDJHKHOG5DMEKDVKD,QVSHFWLRQ0HHWLQJRIRXU
DVVRFLDWHV DQG WKHLU IDPLO\ PHPEHUV WKURXJK YDULRXV &RUSRUDWH 2IÀFH DQG RWKHU  1LQH 2IÀFHV  XQGHU 72/,& 2 
FRPSHWLWLRQVSURJUDPV´9LG\XW6ZDUµ173&·VELDQQXDO+LQGL Faridabad at Delhi on 8th December, 2018. The Committee
PDJD]LQHZDVSXEOLVKHGWRSURPRWHFUHDWLYHZULWLQJLQ+LQGL DSSUHFLDWHGWKHHIIRUWVPDGHE\RXURIÀFHLQWKHSURJUHVVLYH
$QQXDOFRQIHUHQFHRI+LQGL2IÀFHUVZDVKHOGLQ2FWREHU XVHRI+LQGL,QVSHFWLRQVZHUHFDUULHGRXWDW3RZHU6WDWLRQV
WRUHYLHZWKHSURJUHVVRI5DMEKDVKDLQ173&DQGWRFKDON 3URMHFWV5HJLRQDO 2IÀFHV DQG LQ YDULRXV GHSDUWPHQWV RI WKH
out action plan for 2018-19. &RUSRUDWH2IÀFHE\RXU6HQLRU([HFXWLYHVDVZHOO

(PSOR\HHV ZHUH PRWLYDWHG WR XVH RI +LQGL LQ RIÀFLDO ZRUN ,QDGGLWLRQ2XU72/,& 2 )DULGDEDGUHFHLYHG´6HFRQG3UL]Hµ
by Hindi workshops, Unicode Hindi Computer Training, LQ UHJLRQ ´$µ IRU RXWVWDQGLQJ ZRUN LQ WKH ÀHOG RI 5DMEKDVKD
.DYL 6DPPHODQ +LQGL 'UDPD DQG +LQGL LQFHQWLYH VFKHPHV implementation for the year 2017-18 from Ministry of
Hindi webpage was updated with important information of +RPH $IIDLUV 7KLV DZDUG ZDV UHFHLYHG E\ *HQHUDO 0DQDJHU
Rajbhasha for employees. 5DMEKDVKD  IURP 6K .LUHQ 5LMLMX 8QLRQ 0LQLVWHU RI 6WDWH
IRU +RPH $IIDLUV *RYW RI ,QGLD RQ  1RYHPEHU  DW
7KHVHFRQGVXEFRPPLWWHHRI3DUOLDPHQWRQ2IÀFLDO/DQJXDJH Chandigarh in a function organised by Ministry of Home
had inspected its regional headquarters Secunderabad, Patna Affairs.
DQG6LQJUDXOL%DGDUSXUDQG)DULGDEDGVWDWLRQVUHYLHZHGWKH
progress of Rajbhasha implementation and appreciated its 2XU 7ROLF 2  )DULGDEGDG UHFHLYH ´6HFRQG 3UL]Hµ LQ UHJLRQ ¶$·
efforts. IRURXWVWDQGLQJZRUNLQWKHÀHOGRI5DMEKDVKD,PSOHPHQWDWLRQ
by the Ministry of Home Affairs for the year 2017-18 .This
NHPC DZDUGZDVUHFHLYHGIURP+RQ·EOH8QLRQ0LQLVWHURI6WDWHIRU
7KH 3URYLVLRQV RI WKH 2IÀFLDO /DQJXDJH $FW DQG 5XOHV ZHUH +RPH$IIDLUV6K.LUHQ5LMLMXE\*HQHUDO0DQDJHU 5DMEKDVKD 
strictly complied with during the year in the Corporation. 1+3& LQ WKH IXQFWLRQ RUJDQLVHG RQ  1RYHPEHU  DW
(IIRUWVZHUHPDGHWRLPSURYHWKHSURJUHVVLYHXVHRI2IÀFLDO Chandigarh.
/DQJXDJH LQ DFFRUGDQFH ZLWK WKH SROLF\ RI *RYHUQPHQW RI POWERGRID
India.
%HLQJ D ÁDJVKLS *RYW FRPSDQ\ 32:(5*5,' LV VHQVLWLYH
Quarterly meetings of the OLIC & half yearly meetings WRZDUGVLWVUHVSRQVLELOLWLHVKHULWDJHVRFLDODQGFXOWXUDOYDOXHV

207
Annual Report 2018-19

,QSXUVXDQFHRI*RYWRI,QGLD·V5DMEKDVKDSROLF\WRSURPRWH RIÀFHV DUH DPRQJVW D IHZ WR QDPH %HVLGHV 32:(5*5,'·V


,QGLDQ ODQJXDJHV DQG 5DMEKDVKD ´+LQGLµ 32:(5*5,' KDV HIIRUWV ZHUH DOVR DSSODXGHG GXULQJ YDULRXV LQVSHFWLRQV DQG
made all round efforts to integrate and promote use of Hindi in discussions done by Hon’ble Committee of Parliament on
LWVZRUNVDWDOOOHYHOV32:(5*5,'KDVSURYHGLWVFRPPLWPHQW 2IÀFLDO/DQJXDJHRQGLIIHUHQWRFFDVLRQV
to ensure the implementation of Rajbhasha policy and to
PFC
DFKLHYH WKH JRDO DV ODLG RXW LQ WKH 5DMEKDVKD $QQXDO 7DUJHW
JLYHQE\'HSDUWPHQWRI2IÀFLDO/DQJXDJH It is a matter of great pride that PFC has been awarded the
)LUVW3UL]HLQ3XEOLF6HFWRU&DWHJRU\LQ5HJLRQ¶$·RI¶5DMEKDVKD
7R HQVXUH WKH LQFUHDVHG XVH RI 2IÀFLDO ODQJXDJH YDULRXV
.LUWL 3XUDVNDU· IRU WKH \HDU  E\ 5DMEKDVKD 9LEKDJ
DFWLYLWLHVVXFKDV$QQXYDG$EKD\DDV.DU\DNUDP:RUNVKRSV
Ministry of Home Affairs for its concerted efforts made in
7UDLQLQJV PRWLYDWLRQDO SURJUDPPHV DUH RUJDQL]HG DW HYHU\
LPSOHPHQWDWLRQRI2IÀFLDO/DQJXDJH3ROLF\&0'3)&UHFHLYHG
XQLWRI32:(5*5,'&RPSXWHUWUDLQLQJVDUHEHLQJLPSDUWHG
the prestigious award from Hon’ble Vice President of India, Sh.
to enhance the working knowledge in Hindi on computers.
M. Venkaiah Naidu.
+LQGLFODVVHVDUHDOVREHLQJRUJDQL]HGIRUQRQ+LQGLVSHDNLQJ
employees through Hindi Teaching Scheme. Lectures on +LQGL $GYLVRU\ &RPPLWWHH PHHWLQJ ZDV KHOG RQ WK $SULO
KHULWDJHVRFLDODQGFXOWXUDOFRQFHUQVDUHDOVREHLQJGHOLYHUHG 2018 under the Chairmanship of Hon’ble Minister of State
by eminent scholars on regular basis to change the mindset of ,& 3RZHU6KUL5.6LQJK7KHHQWLUH&RRUGLQDWLRQZRUNZDV
the employees for working in Hindi increasingly. JLYHQ WR 3)& E\ 0R3 ZKLFK ZDV VXFFHVVIXOO\ DFFRPSOLVKHG
3)&·V4XDUWHUO\0DJD]LQH¶8UMD'HHSWL·DQGDERRN¶$SS'HHSR
9DULRXV DFWLYLWLHV DUH XQGHUWDNHQ WR SXEOLFL]H +LQGL (YHU\
%KDY·ZULWWHQE\D3)&HPSOR\HHZHUHDOVRUHOHDVHGLQWKHVDLG
year, Akhil Bhartiya Rajbhasha Sammelans and technical
meeting by the Hon’ble Minister.
FRQIHUHQFHVLQ+LQGL.DYL6DPPHODQV 3RHWU\VHVVLRQV 3OD\V
SXEOLFDWLRQRI+LQGL0DJD]LQH¶*5,''$53$1·SXEOLFDWLRQRI 0HHWLQJVRIWKH2IÀFLDO/DQJXDJH,PSOHPHQWDWLRQ&RPPLWWHH
PRQWKO\DUWLFOHVLQ+LQGLYLDHPDLOVDUHPRVWSURPLQHQWDPRQJ (OLIC) were organised in each quarter under the chairmanship
WKHVH $OVR YDULRXV FRPSHWLWLRQV WKURXJKRXW WKH \HDU ZLWK of CMD, PFC. Departmental Hindi meetings were also
special emphasis during Hindi Pakhwada, Vigilance Awareness RUJDQL]HGDWWKHXQLWOHYHO2QWK0D\RQH6DQJRVKWKL
:HHN 6ZDFKFKKWD 3DNKZDGD HWF DORQJ ZLWK GHSDUWPHQWDO ZDV RUJDQL]HG 7KH 7RSLF RI 6DQJRVKWKL ZDV ¶-HHYDQ 6KDLO\
meetings as well as OLIC meetings are also being conducted. 6H 8WSDQQ 5RJRQ VH %DFKDR 0HLQ <RJD .L %KXPLND· LQ
32:(5*5,' KDV HVWDEOLVKHG RQH RI WKH EHVW +LQGL OLEUDULHV which 43 Employees participated. Classes of Yogabhyas with
DPRQJ 3XEOLF 6HFWRU ZKHUH SRSXODUOLWHUDU\ 0DJD]LQHV DQG LQVWUXFWLRQV LQ +LQGL ZHUH DOVR RUJDQL]HG IRU VHYHUDO PRQWK
1HZV3DSHUVKDYHEHHQPDGHDYDLODEOHIRUWKHHPSOR\HHV VLQFH RUJDQL]HG <RJD 'D\ LQ -XQH  2Q WKH RFFDVLRQ RI
3)&)RXQGDWLRQGD\RQWK-XO\D.DYL6DPPHODQZDV
$WWUDFWLYHLQFHQWLYHVFKHPHVIRUHPSOR\HHVZRUNLQJLQ+LQGL
RUJDQL]HGZKHUHLQUHQRZQHGSRHWVUHFLWHGWKHLUSRHPV
KDYH EHHQ LPSOHPHQWHG DV SHU WKH JRYHUQPHQW JXLGHOLQHV
$OVRYDULRXVDZDUGDQGUHZDUGVFKHPHVKDYHEHHQLQWURGXFHG Hindi Day and Hindi Month were celebrated on 14th
WRHQFRXUDJHHPSOR\HHVWRDFWLYHO\SDUWLFLSDWHLQSURPRWLRQ September and from 14th September to 13th October,
RI+LQGLE\JLYLQJDUWLFOHVZULWHXSVIRULQKRXVHPDJD]LQHV  UHVSHFWLYHO\ WR FUHDWH D +LQGL RULHQWHG HQYLURQPHQW LQ
reading library books etc. the Corporation. During the Hindi Month, apart from other
DFWLYLWLHVYDULRXVFRPSHWLWLRQVOLNH¶9DUWDQL6KRGKDQ·¶.DKDQL
7KH HIIRUW PDGH E\ 32:(5*5,' KDV EHHQ DSSODXGHG LQ
%XQR·¶.DY\D3DWK·DQG¶&KDOWL.D1DDP*DGL·ZHUHRUJDQL]HG
VHYHUDOIRUXPVGXULQJWKH\HDU9DULRXVDZDUGVZHUH
In all, 149 employees participated in the competitions. During
JLYHQE\7RZQ2IÀFLDO/DQJXDJH,PSOHPHQWDWLRQ&RPPLWWHH
WKH ¶9LJLODQFH $ZDUHQHVV :HHN· WKUHH FRPSHWLWLRQV ZHUH
(TOLIC) and Rajbhasha Vibhag, Ministry of Home Affairs,
RUJDQLVHG LQ +LQGL DOVR 8QGHU YDULRXV 5DMEKDVKD ,QFHQWLYH
*RYW RI ,QGLD UHJDUGLQJ EHVW ,PSOHPHQWDWLRQ RI 2IÀFLDO
Schemes for the year 2017-18, 165 employees were awarded.
/DQJXDJH )LUVW SUL]H IURP 72/,& 9DGRGDUD WR 32:(5*5,'
9DGRGDUD RIÀFH )LUVW IURP 72/,& .RONDWD )LUVW IURP 72/,& +LQGLZRUNVKRSVZHUHRUJDQL]HGIRUH[HFXWLYHV XSWR
'HOKL6HFRQGIURP72/,&%DQJDORUH7KLUGSUL]HVIURP72/,& WKH OHYHO RI ([HFXWLYH 'LUHFWRU  WR LPSURYH WKHLU HIÀFLHQF\
6HFXQGHUDEDG DQG GLIIHUHQW SUL]HV WR *KD]LDEDG 0DSXVD LQ GRLQJ WKHLU GD\ WR GD\ RIÀFLDO ZRUN LQ +LQGL 2QH +LQGL
'XUJDSXU7KULVVXU$UVXU0DGXUDL7LUXFKLUDSSDOOL32:(5*5,' ¶.DQWKDVWK· 3UDVKLNVKDQ .DU\DVKDOD ZDV DOVR RUJDQL]HG LQ

208
which 39 employees participated. Internal inspections in the  WR  ZKHUH YDULRXV FRPSHWLWLRQV
form of personal contact programme were conducted, with ZHUHRUJDQL]HG 7KH SDUWLFLSDWLRQ RI HPSOR\HHV LQ DOO WKH
DYLHZWRGLVFXVVDQGÀQGRXWWKHDUHDVIRULPSURYHPHQWWR HYHQWVFRPSHWLWLRQV ZDV HQFRXUDJLQJ DQG FDVK SUL]HV ZHUH
ZRUNLQ+LQGLE\UHVSHFWLYHXQLWVDQGJXLGHGWKHPDFFRUGLQJO\ also awarded to winners in different categories to encourage
Inspection of RO (South), Chennai, PFC was done by the ODUJHUSDUWLFLSDWLRQDVDOVRWRPRWLYDWHHPSOR\HHVWRLQFUHDVH
RIÀFLDOVRI0LQLVWU\RI3RZHUZKRDSSUHFLDWHGWKHZRUNGRQH use of Hindi in their day to day working. A member of Hindi
in Hindi in PFC. $GYLVRU\&RPPLWWHHDQGRIÀFLDOVRI+LQGL'LYLVLRQRI0LQLVWU\
RI 3RZHU ZHUH DOVR LQYLWHG WR 5(& &RUSRUDWH 2IÀFH RQ WKLV
Annual Programme for the year 2018-19 was circulated
DXVSLFLRXV RFFDVLRQ +LQGL )RUWQLJKW ZDV DOVR RUJDQL]HG RQ
amongst all the employees and the same was discussed in
WKH VDLG GDWHV LQ DOO 5HJLRQDO6WDWH RIÀFHV RI WKH FRPSDQ\
WKH 2IÀFLDO /DQJXDJH ,PSOHPHQWDWLRQ &RPPLWWHH 0HHWLQJ
RECIPMT.
held on 28.06.2018.Annual Report of the Corporation was
SXEOLVKHG LQ ELOLQJXDO IRUP 7ZR LVVXHV LQFOXGLQJ ¶<RJ (YDP $WZRGD\$OO,QGLD&RQIHUHQFHRQ5DMEKDVKDZDVRUJDQL]HG
5DMEKDVKD9LVKHVKDQN·RI&RUSRUDWLRQ·VKRXVHPDJD]LQH¶8UMD DW6KLOORQJGXULQJ1RYHPEHUIRUWKH1RGDO+LQGL
Deepti’ were also published. MoU for the year 2018-19 was 2IÀFHUV
signed in bilingual form by Secretary, MoP and CMD, PFC.
,QWHUQDO LQVSHFWLRQV RI GLIIHUHQW GLYLVLRQV DQG 52V62V ZHUH
7ZR+LQGL%RRNVQDPHO\¶3UHP&KDQG.L6KUHVKWK.DKDQL\D· FDUULHG RXW WR DVVHVV WKH SURJUHVVLYH XVH RI +LQGL LQ RIÀFLDO
DQG¶%KDUWL\D9HHUDQJDQDR.L*DDWKD·ZHUHDOVRGLVWULEXWHGWR ZRUN $ WHDP RI RIÀFLDOV RI 0LQLVWU\ RI 3RZHU DOVR UHYLHZHG
DOOHPSOR\HHV$WZRGD\V¶5DMEKDVKD6DPPHODQ·ZDVRUJDQL]H WKH VWDWXV RI 2IÀFLDO /DQJXDJH LPSOHPHQWDWLRQ LQ 5HJLRQDO
LQWKHPRQWKRI6HSWHPEHULQZKLFK([HFXWLYHVIURP 2IÀFHV RI &KHQQDL 3DQFKNXOD .RONDWD DQG 6KLOORQJ 7KHVH
'*0 WR (' OHYHO KDG SDUWLFLSDWHG     &0' 3)& DQG RWKHU LQVSHFWLRQVKDYHLQFXOFDWHGDVSLULWRIDZDUHQHVVDPRQJWKH
Directors were also present. employees to do more work in Hindi.

2Q WKH HYH RI 6DPDSDQ 6DPDURK RI ¶+LQGL 0DK· D &XOWXUDO REC has been publishing Hindi Journal ‘Urjayan’ containing
3URJUDPPH ZDV RUJDQL]HG RQ  2FWREHU  LQ ZKLFK interesting and useful articles as well as literary writings of
(PSOR\HHVRI3)&SUHVHQWHGD&XOWXUDO3URJUDPPHLQFOXVLYH WKHHPSOR\HHV,QRUGHUWRPRWLYDWH+LQGLZULWHXSVDUWLFOHV
RI'DQFH6RQJV.DY\D3DWKDQG1DWLNDHWF7KH3URJUDPPH SRHPV HWF IRU WKH PDJD]LQH WKH &RPSDQ\ KDV D SROLF\ WR
was highly appreciated by all. DZDUG FDVK LQFHQWLYHV WR WKH SDUWLFLSDQWV $SDUW IURP WKLV D
bilingual internal newsletter ‘Watts up’ is also being published.
$OOWKHVHHIIRUWVZHUHPRWLYDWLRQDOWRROVLQFUHDWLQJSRVVLELOLWLHV
RIEHWWHUDQGSURJUHVVLYHXVHRI+LQGLLQWKH&RUSRUDWLRQ NEEPCO

REC The Corporation is making all out efforts to implement


HIIHFWLYHO\WKH2IÀFLDO/DQJXDJH3ROLF\RIWKH*RYHUQPHQWRI
3URJUHVVDFKLHYHGGXULQJWKHFXUUHQWÀQDQFLDO\HDU
,QGLDDWLWV&RUSRUDWH2IÀFHDVZHOODV3ODQW3URMHFWVDQGRWKHU
7R XSKROG WKH 2IÀFLDO /DQJXDJH 3ROLF\ RI WKH *RYHUQPHQW RIÀFHV(IIRUWVZHUHPDGHWRLVVXHSDSHUVUHIHUUHGWRLQ6HFWLRQ
RXU FRPSDQ\ FRQVLVWHQWO\ VWULYHG WR PHHW WKH WDUJHWV JLYHQ    RI WKH 2IÀFLDO /DQJXDJH $FW LQ ELOLQJXDO (PSOR\HHV
in the annual programme 2018-19 issued by the Department SRVWHGDWGLIIHUHQWRIÀFHV3URMHFWVZHUHQRPLQDWHGIRU+LQGL
RI2IÀFLDO/DQJXDJH0LQLVWU\RI+RPH$IIDLUV*RYWRI,QGLD Prabodh, Praveen & Pragya training courses. Cash Awards
GXULQJWKH\HDUXQGHUUHYLHZ ZHUHJLYHQWRWKHHPSOR\HHVIRUSDVVLQJ+LQGLH[DPLQDWLRQV
2IÀFLDO /DQJXDJH ,PSOHPHQWDWLRQ &RPPLWWHHV V  as per eligibility. To facilitate the employees for doing their
DUH FRQVWLWXWHG LQ 5(& RIÀFHV WR HQVXUH WKH HIIHFWLYH RIÀFLDO ZRUN LQ +LQGL 27 (Twenty Seven) Hindi workshops
LPSOHPHQWDWLRQ RI 2IÀFLDO /DQJXDJH LQ FRPSOLDQFH ZLWK WKH ZHUH RUJDQL]HG DQG 501 RIÀFHUV  HPSOR\HHV ZHUH WUDLQHG
2IÀFLDO/DQJXDJH$FWDQG2IÀFLDO/DQJXDJH5XOHV LQ WKH ZRUNVKRSV 7UDLQLQJ PDWHULDOV ZHUH SURYLGHG WR WKH
+LQGL :RUNVKRSV ZHUH RUJDQLVHG LQ DOO 5(& RIÀFHV WR JLYH HPSOR\HHV GXULQJ WKH :RUNVKRS ,Q WKH +RXVH -RXUQDO 
KDQGVRQH[SRVXUHWRSDUWLFLSDQWVLQYDULRXVIDFHWVRIXVHRI ‘NEEPCO NEWS’ YDOXDEOH LQIRUPDWLRQ UHODWLQJ WR XVH RI
Hindi. +LQGLZHUHSURYLGHG$PRQWKO\QHZVOHWWHU“NEEPCO NEWS
FLASH” is published regularly in bilingual i.e. in Hindi &
+LQGL )RUWQLJKW ZDV RUJDQL]HG LQ &RUSRUDWH 2IÀFH IURP (QJOLVK1((3&2ZHEVLWHLVDOVRDYDLODEOHLQ+LQGL.H\ZRUGV

209
Annual Report 2018-19

LQ+LQGLZLWK(QJOLVKHTXLYDOHQWZHUHGLVSOD\HGHYHU\GD\RQ in PSU category to SJVN for its outstanding performance in


the Digital Board under the programme “Today’s Word” in LPSOHPHQWDWLRQRI2IÀFLDO/DQJXDJHGXULQJWKH\HDU
RUGHUWRHQULFKWKH+LQGLYRFDEXODU\RIWKHHPSOR\HHV
THDC
Rajbhasha (Hindi) Pakhwara ZDV REVHUYHG DQG “Hindi
THDC India Limited has made consistent efforts to enhance
Divas” ZDV FHOHEUDWHG DW WKH &RUSRUDWH RIÀFH DV ZHOO DV LQ
WKHSURJUHVVLYHXVHRI+LQGLLQGD\WRGD\RIÀFLDOZRUNLQJDV
WKH 3ODQWV3URMHFWV DQG RWKHU RIÀFHV RI WKH &RUSRUDWLRQ
SHUJXLGHOLQHVRIWKH2IÀFLDO/DQJXDJH3ROLF\RI*RYHUQPHQW
to create awareness and to encourage the employees for
of India. During the reporting period, quarterly meetings of the
GRLQJWKHLURIÀFLDOZRUNVLQ+LQGL9DULRXVFRPSHWLWLRQVZHUH
2IÀFLDO /DQJXDJH ,PSOHPHQWDWLRQ &RPPLWWHHV LQ &RUSRUDWH
FRQGXFWHGLQ+LQGLDQGDWWUDFWLYHSUL]HVZHUHDZDUGHGWRWKH
2IÀFH5LVKLNHVKDQG6XERUGLQDWH8QLWV2IÀFHVZHUHKHOGDW
participants. Hindi patrika“NEEPCO JYOTI”, “Ratandeep”,
UHJXODU LQWHUYDO XQGHU WKH &KDLUPDQVKLS RI 2IÀFH +HDG ,Q
“Panyor Pravah”, “Aalok Jyoti”, “Aarohi”, “Kopili Darpan”,
RUGHU WR PRWLYDWH RIÀFHUV DQG HPSOR\HHV +LQGL ZRUNVKRSV
“NEEPCO Tarang” & “Pragati aur Prayash” were published
and 07 nos. Hindi competitions were also conducted in each
UHVSHFWLYHO\ IURP +4 &RRUGLQDWLRQ RIÀFH 1(: '(/+,
TXDUWHULQWKH&RUSRUDWH2IÀFHDVZHOODVLQ8QLWV2IÀFHV
RHEP, TGBP, AGBPP, KHEP, Guwahati & AGTCCPP. An
H[KLELWLRQ ZDV DOVR RUJDQL]HG DW &RUSRUDWH RIÀFH ZKHUH WKH Hindi Month was celebrated from 01- 28 September-2018
DFKLHYHPHQWV PDGH LQ WKH XVH RI 2IÀFLDO /DQJXDJH +LQGL LQ LQ WKH &RUSRUDWH 2IÀFH 5LVKLNHVK DQG   +LQGL 'D\ ZDV
WKH &RUSRUDWLRQ ZHUH GLVSOD\HG 8QGHU ,QFHQWLYH 6FKHPH celebrated on 14th September-2018. During Hindi Month,
QXPEHURIRIÀFHUVHPSOR\HHVZHUHDZDUGHG&DVK$ZDUGIRU YDULRXVFRPSHWLWLRQVZHUHRUJDQL]HGIRUWKHHPSOR\HHV7KH
ZULWLQJQRWLQJGUDIWLQJLQ+LQGL YDOHGLFWRU\IXQFWLRQVRI+LQGLPRQWKZDVRUJDQL]HGRQWK
6HSWHPEHU7KHSURJUDPZDVFKDLUHGE\6KUL*.)DUDOLD
NEEPCO OLIC meetings DUH RUJDQL]HG UHJXODUO\ ,Q WKH
+RQ·EOH 0HPEHU RI +LQGL $GYLVRU\ &RPPLWWHH 0LQLVWU\
PHHWLQJ UHYLHZ ZDV PDGH RQ WKH ,PSOHPHQWDWLRQ ZRUN RI
RI 3RZHU *RYW RI ,QGLD 3UL]HV ZHUH GLVWULEXWHG WR ZLQQLQJ
5DMEDKDVKD DQG YDOXDEOH VXJJHVWLRQV ZHUH SURYLGHG IRU LWV
participants of the competitions. In addition, employees were
HIIHFWLYHLPSOHPHQWDWLRQ
DOVR DZDUGHG XQGHU YDULRXV LQFHQWLYH VFKHPHV XQGHUWDNHQ
The Corporation was awarded Second PrizeE\7RZQ2IÀFLDO E\ 2IÀFLDO /DQJXDJH 'HSWW +LQGL 3DNKZDGD  +LQGL :HHN
Language Implementation Committee (TOLIC), Shillong  +LQGL 'D\ 3URJUDPPHV ZHUH FRQGXFWHG DV SHU QXPEHU RI
FRQVHFXWLYHVLQFHWZR\HDUVIRUFRPPHQGDEOHZRUNVGRQHLQ PDQSRZHULQWKH8QLWV2IÀFHVLQWKHVDPHPDQQHUDV+LQGL
WKH,PSOHPHQWDWLRQRIRIÀFLDO/DQJXDJH3ROLF\ PRQWKZDVRUJDQL]HGE\WKH&RUSRUDWH2IÀFH

SJVNL 7R SURSDJDWH +LQGL ODQJXDJH E\ WKH ZD\ RI MRFRVLW\ ´.DYL
6DPPHODQVµZHUHRUJDQLVHGLQ.RWHVKZDUDQG7HKULXQLWVRQ
,QRUGHUWRHQVXUHWKHLPSOHPHQWDWLRQRIWKH2IÀFLDO/DQJXDJH
WK$SU WK-XOUHVSHFWLYHO\,QDGGLWLRQ´.DYL
3ROLF\ RI WKH *RYW RI ,QGLD DOO SRVVLEOH HIIRUWV KDYH EHHQ
6DPPHODQVµ ZHUH DOVR RUJDQL]HG RQ WKH RFFDVLRQ RI WK
PDGHE\WKHFRPSDQ\WRDFKLHYHWKHWDUJHWVDVVSHFLÀHGE\
%LUWK $QQLYHUVDU\ RI 0DKDWPD *DQGKL DW &RUSRUDWH 2IÀFH
WKH'HSDUWPHQWRI2IÀFLDO/DQJXDJH
5LVKLNHVKDQG8QLW2IÀFH7HKULRQVW2FWREHU WK
8QGHU VHFWLRQ  L  RI 2IÀFLDO /DQJXDJH $FW FHQW SHUFHQW 2FWREHU UHVSHFWLYHO\ 3RHWV ZHUH LQYLWHG IURP GLIIHUHQW
GRFXPHQWV ZHUH LVVXHG ELOLQJXDOO\  DOO WKH OHWWHUV UHFHLYHG ORFDWLRQV RI WKH FRXQWU\ LQ WKH .DYL 6DPPHODQV 7KH\ ÀOOHG
in Hindi were replied to in Hindi. Company’s website is QHZ]HDODQGHQWKXVLDVPDPRQJWKHRIÀFHUVDQGHPSOR\HHV
already in bilingual form and it is updated from time to time. with their poems of Hasya, Veer and Shringar Ras.
7R HQFRXUDJH H[HFXWLYHV DQG QRQH[HFXWLYHV WR GR WKHLU
:LWK WKH REMHFWLYH WR LQFUHDVH +LQGL UHDGHUV +LQGL +RXVH
HQWLUHZRUNLQ+LQGLQXPEHURILQFHQWLYHVFKHPHVDUHXQGHU
Journal ‘THDC Pehal’ is being published continuously with 03
implementation.
HGLWLRQVHYHU\\HDUZLWKLQWHUHVWLQJDQGNQRZOHGJHHQKDQFLQJ
'XULQJWKH\HDU+LQGLZRUNVKRSVVHPLQDUV+LQGLFRPSHWLWLRQV material. In order to facilitate bilingual functioning, Hindi
LQ6FKRROV &ROOHJHV.DYL6DPPHODQ0HHWLQJRI72/,&ZHUH VRIWZDUH  IRQWV KDYH EHHQ LQVWDOOHG LQ DOO WKH FRPSXWHUV 
RUJDQL]HGDVXVXDO laptops of the Corporation and the contents are also being
*RYWRI,QGLD0LQLVWU\RI+RPH$IIDLUV'HSDUWPHQWRI2IÀFLDO displayed bilingual on the website of the Corporation.
/DQJXDJH KDV DZDUGHG 5DMEKDVKD .LUWL 3XUVNDU 7KLUG SUL]H  5DMEKDVKD+HDGLVSURYLGHGRQ+LQGLSDJHRI2IÀFLDOZHEVLWH

210
RI WKH &RUSRUDWLRQ ZKHUHLQ LQIRUPDWLRQ UHODWHG WR 2IÀFLDO emSR\HHVKDYHDFTXLUHGZRUNLQJNQRZOHGJHRI+LQGLWKHUHE\
language is uploaded. DFKLHYLQJ WKH WDUJHW RI  +LQGL WUDLQHG HPSOR\HHV VHW E\
2IÀFLDO /DQJXDJH 'HSDUWPHQW *RYW RI ,QGLD %HVLGH WKLV
7KH GRFXPHQWV UHODWHG WR 6HFWLRQ    KDYH EHHQ LVVXHG
 HPSOR\HHV KDYH EHHQ QRPLQDWHG LQ WKH VHVVLRQ
bilingual in the Corporation and also recorded to increase the
January-May, 2019.
percentage of correspondences in Hindi. In order to inspect
WKH SURJUHVV RI +LQGL LPSOHPHQWDWLRQ DOO RIÀFHV  XQLWV RI ,WLVUHDVRQDEOHWRPHQWLRQWKDW'9&KDVEHHQQRWLÀHGXQGHU
WKH&RUSRUDWLRQKDYHEHHQLQVSHFWHGE\WKHRIÀFLDOVRI+LQGL 6HFWLRQ    RI 2IÀFLDO /DQJXDJH 5XOH  IRU GLVSRVLQJ
VHFWLRQIURPWLPHWRWLPH2IÀFLDOODQJXDJHLQVSHFWLRQVRI1&5 LWVDOORIÀFLDOZRUNLQ+LQGLYLGH*D]HWWHRI,QGLD1RWLÀFDWLRQ
2IÀFH.DXVKDPELDQG8QLW2IÀFH7HKULZHUHDOVRFRQGXFWHG 1R+LQGL 'DWHG ²  $V D UHVXOW RI
E\ WKH 6HFRQG 6XE&RPPLWWHH RI 3DUOLDPHQWDU\ 2IÀFLDO regular training in Hindi, there has been a remarkable increase
Language Committee on 15th May-2018 & 9th June-2018 LQLPSOHPHQWDWLRQRIVHFWLRQ  RI2IÀFLDO/DQJXDJH$FWDQG
UHVSHFWLYHO\7KHFRPPLWWHHDSSUHFLDWHGWKHLPSOHPHQWDWLRQ 5XOHRIWKH2IÀFLDO/DQJXDJH5XOHVLQ'9&
RIWKHRIÀFLDOODQJXDJHLQWKH&RUSRUDWLRQDQGDOVRVXJJHVWHG 6HSDUDWH ZRUNVKRSV ZHUH RUJDQLVHG IRU RIÀFHUV DQG VWDII WR
LWVYDOXDEOHVXJJHVWLRQV GHYHORSWKHLUZRUNLQJNQRZOHGJHUHTXLUHGIRULPSOHPHQWDWLRQ
&RUSRUDWH 2IÀFH 5LVKLNHVK DQG 8QLW RIÀFH 7HKUL RI WKH RI RIÀFLDO ODQJXDJH SROLF\  ,Q WKHVH ZRUNVKRSV SDUWLFLSDQWV
Corporation are discharging the responsibility of Chairmanship ZHQWWKURXJKWKHURXWLQHH[HUFLVHVIRUGD\WRGD\RIÀFLDOZRUN
RI7RZQ2IÀFLDO/DQJXDJH,PSOHPHQWDWLRQ&RPPLWWHH 72/,&  LQRIÀFLDOODQJXDJH
+DULGZDU  72/,& 7HKUL  9DULRXV DFWLYLWLHV  SURJUDPV RI $SDUWIURPWKLV HLJKW VSHFLDO2IÀFLDOODQJXDJHZRUNVKRSV
72/,& ZHUH RUJDQL]HG DW UHJXODU LQWHUYDOV GXULQJ WKH \HDU regarding the use of Unicode on Computers were organised in
such as half yearly meetings, Hindi Coordinator’s Seminars, which 252 employees took part.
+LQGL &RPSHWLWLRQV DQG +LQGL :RUNVKRSV $OO DFWLYLWLHV DQG
+LQGL 'LZDV3DNKZDUD ZDV DOVR FHOHEUDWHG GXULQJ WKH \HDU
SURJUDPVKDYHEHHQXSORDGHGRQWKHZHEVLWHRI7RZQ2IÀFLDO
LQZKLFKVHYHUDOFRPSHWLWLRQVUHODWHGWRRIÀFLDOODQJXDJH
Language Implementation Committee, prepared by the
OLNH([WHPSRUH$PSOLÀFDWLRQ+LQGL1RWLQJ 'UDIWLQJ+LQGL
'HSDUWPHQWRI2IÀFLDO/DQJXDJH&RUSRUDWH2IÀFH5LVKLNHVK
Typing, Recitation & Antyakshri were organised to inspire
ZDVFRQIHUUHGWKHÀUVWSUL]HIRUWKH\HDUXQGHUWKH
HPSOR\HHV IRU H[HFXWLQJ WKHLU RIÀFLDO ZRUNV LQ +LQGL  $
5DMEKDVKD9DM\DQWL6FKHPHRI72/,&7KLVDZDUGZDVUHFHLYHG
large number of non-Hindi and Hindi speaking employees
in 27th Half yearly meeting of TOLIC held on 24.01.19 at IIT,
participated in these competitions and successful participants
5RRUNHH1XPEHURI2IÀFHUVDQG(PSOR\HHVZHUHDZDUGHGE\
ZHUH JLYHQ SUL]HV 'XULQJ WKH 3DNKZDUD D VSHHFK IURP WKH
72/,&IRUWKHLUEHVWSHUIRUPDQFHLQWKHVHYHUDOFRPSHWLWLRQV
desk of the Chairman was distributed to inspire the employees
conducted under aegis of TOLIC.
RIWKH&RUSRUDWLRQWRGLVSRVHRIWKHLUPD[LPXPZRUNLQ+LQGL
DVC Being a cultural programme, a music programme was also
organised by playback singer Smt. Arti Mukherjee during the
7KH 2IÀFLDO /DQJXDJH &HOO RI '9& LV GHYRWHG WRZDUGV WKH
RFFDVVLRQ$:DOO+RDUGLQJEHDULQJDTXRWDWLRQLQ+LQGLZDV
LPSOHPHQWDWLRQ RI GLIIHUHQW 2IÀFLDO /DQJXDJH SURJUDPPHV
inaugurated by the Chairman, DVC as usual.
NHHSLQJLQYLHZWKHGLUHFWLYHVUHFHLYHGIURPWKH'HSDUWPHQW
RI2IÀFLDO/DQJXDJH0LQLVWU\RI+RPH$IIDLUVDQG0LQLVWU\RI 'XULQJ WKH SHULRG XQGHU UHYLHZ '9& UHFHLYHG ´5DMEKDVKD
3RZHU*RYHUQPHQWRI,QGLDIRUWKHSURJUHVVLYHXVHRI+LQGLLQ .LUWLµ 3XUDVNDU 6HFRQG 3UL]H  IRU LWV H[FHOOHQW SHUIRUPDQFH
WKHRIÀFLDOZRUNRIWKH&RUSRUDWLRQ LQ 2IÀFLDO /DQJXDJH DFWLYLWLHV LQ WKH HQWLUH ¶&· UHJLRQ 7KH
&KDLUPDQ '9& UHFHLYHG WKH DZDUG IURP WKH +RQ·EOH 9LFH
DVC has established training centre for imparting Hindi
President of India on 14.09.2018 in Vigyan Bhawan, New
knowledge among the employees which is being run at
'HOKL$SDUWIURPDERYHDFKLHYHPHQW%RNDUR7KHUPDO3RZHU
+HDGTXDUWHUVDVZHOODVLQÀHOGIRUPDWLRQVLQFROODERUDWLRQZLWK
6WDWLRQ'9&UHFHLYHGQG3UL]HLQHDVWHUQUHJLRQFRYHULQJWKH
+LQGL7HDFKLQJ6FKHPH*RYWRI,QGLDHPSOR\HHVTXDOLÀHG
VWDWHVRI:HVW%HQJDO2GLVKD%LKDU-KDUNKDQGDQG$QGDPDQ
IRU3UDYHHQDQG3UDJ\DH[DPLQDWLRQVDW+HDGTXDUWHUVGXULQJ
 1LFREDU ,VODQGV IRU H[HFHOOHQW LPSOHPHQWDWLRQ RI 2IÀFLDO
WKH SHULRG XQGHU UHYLHZ 6RPH RI WKH HPSOR\HHV KDYH DOVR /DQJXDJH3ROLFLHVRI*R,7KHDZDUGZDVKDQGHGRYHUWR'9&
acquired knowledge in Hindi through correspondence course. E\+RQ·EOH8QLRQ0LQLVWHURI6WDWHIRU+RPH$IIDLUV6KUL.LUDQ
Out of total 571 employees (engaged in secretarial work) 530 Rijiju on 10.03.2018 at Gyan Bhawan, Patna.

211
Annual Report 2018-19

The Corporation is ushering towards meeting new benchmarks “Rajbhasha Visheshank”. Some compilations to facilitate the
LQ LPSOHPHQWLQJ 2IÀFLDO /DQJXDJH LQ '9& E\ SXUFKDVLQJ XVHRI+LQGLYL]$GPLQLVWUDWLYH1RWLQJV¶7DTQLNL6KDEGDYDOL·
+LQGL %RRNV RUJDQL]LQJ 4XDUWHUO\ 0HHWLQJ SDUWLFLSDLWLJ LQ DQG ¶5DMEKDVKD 6KD\DN 3XVWDN· KDYH EHHQ SXEOLVKHG DQG
TOLIC meeting, making scheduled inspections in different GLVWULEXWHGWRDOOWKHRIÀFHV)RUWKH\HDU%%0%KDV
XQLWVLPSOHPHQWLQJLQFHQWLYHVFKHPHVLQOLQHZLWKGLUHFWLYHV EHHQDZDUGHG5DMEKDVKD.LUWL3XUXVNDU 6HFRQG IRUH[FHOOHQW
UHFHLYHGIURP2IÀFLDO/DQJXDJH'HSDUWPHQW*R,SXEOLVKLQJ SHUIRUPDQFHLQ,PSOHPHQWDWLRQRI2IÀFLDO/DQJXDJH3ROLF\RI
+RXVH PDJD]LQH ´'9& 3UDYDKµ DQG SURYLGLQJ WUDLQLQJ RQ WKH*RYHUQPHQWE\*RYWRI,QGLD0LQLVWU\RI+RPH$IIDLUV
Voice Typing. 'HSDUWPHQWRI2IÀFLDO/DQJXDJHRQGDWHG%HVLGHV
WKUHHVXERUGLQDWHRIÀFHVRI%%0%DOVRJRW)LUVW6HFRQGDQG
BBMB
7KLUG 3UL]HV IRU ,PSOHPHQWDWLRQ RI 2IÀFLDO /DQJXDJH +LQGL
Special efforts are made by BBMB for implementation of during 2017-18. . BBMB’s house journal ‘BBMB Samachar’
2IÀFLDO /DQJXDJH 3ROLF\ RI WKH 8QLRQ $OO WKH GRFXPHQWV EDJJHG)LUVW3UL]HIRUWKH\HDUIURP7RZQ2IÀFLDO
XQGHU VHFWLRQ    RI WKH 2IÀFLDO /DQJXDJH $FW DUH LVVXHG Language Implementation Committee, Chandigarh.
ELOLQJXDOO\ DQG OHWWHUV UHFHLYHG LQ +LQGL RU VLJQHG LQ +LQGL
BEE
DUHLQYDULDEO\UHSOLHGLQ+LQGL$OVR(IIRUWVDUHPDGHWRUHSO\
English letters, in Hindi. At present about 97% correspondence +LQGL3DNKZDUDZDVRUJDQL]HGLQ%((GXULQJ6HSWHPEHU
RI%RDUG6HFUHWDULDWHZLWKUHJLRQ¶$·RIÀFHVZLWKUHJLRQ  'XULQJ WKH 3DNKZDUD VHYHQ FRPSHWLWLRQV QDPHO\
¶%·RIÀFHVDQGFRUUHVSRQGHQFHZLWKUHJLRQ¶&·LVEHLQJ Essay competition, Noting & Drafting competition, Dictation
GRQHLQ+LQGL$OOWKHLQIRUPDWLRQLQ%%0%ZHEVLWHLVDYDLODEOH IRU RIÀFHUV  VWDII +LQGL 'LFWDWLRQ FRPSHWLWLRQ IRU &ODVV,9
bilingually. HPSOR\HHVDQGFRPSHWLWLRQLQ*HQHUDO.QRZOHGJHUHJDUGLQJ
XVH RI RIÀFLDO ODQJXDJH +LQGL +LQGL 3RHP 5HFLWDWLRQ DQG
2IÀFLDO /DQJXDJH ,PSOHPHQWDWLRQ &RPPLWWHHV KDYH EHHQ 6ORJDQ FRPSHWLWLRQ RQ HQHUJ\ HIÀFLHQF\ ZHUH RUJDQL]HG
constituted in the Board Secretariate and its subordinate (LJKW SUL]HV YL] ÀUVW SUL]H VHFRQG SUL]H WKLUG SUL]H DQG
RIÀFHV DQG WKHLU TXDUWHUO\ PHHWLQJV DUH UHJXODUO\ KHOG LQ )LYH FRQVRODWLRQ SUL]HV ZHUH JLYHQ WR WKH ZLQQHUV RI WKH
ZKLFK UHSRUWV LQ UHVSHFW RI SURJUHVVLYH XVH RI +LQGL DUH FRPSHWLWLRQV&HUWLÀFDWHVDQGSUL]HVZHUHJLYHQRQWKHFORVLQJ
UHYLHZHG,Q%RDUG6HFUHWDULDWHDERXWQRWLQJVDUHEHLQJ ceremony of Hindi Pakhwara by Director General (BEE).
GRQHLQ+LQGL+LQGLZRUNVKRSVDUHRUJDQL]HGLQHYHU\TXDUWHU
Hindi workshops were held on 26th June, 2018, 27th
DQG VXERUGLQDWH RIÀFHV DUH UHJXODU LQVSHFWHG E\ WKH %RDUG
September, 2018, 26th December, 2018 and 19th February,
6HFUHWDULDWH DJDLQVW WKH WDUJHW À[HG E\ WKH *RYHUQPHQW RI
2019 each for two hours with participation of 22, 15, 18 and
India.
SDUWLFLSDQWVUHVSHFWLYHO\'HHSNQRZOHGJHDQGH[SHULHQFHV
%LOLQJXDOZRUNLQJIDFLOLWLHVDUHSURYLGHGRQDOOWKHFRPSXWHUV RI WKH ([SHUW *XHVW 6SHDNHUV ZKR QRW RQO\ VKDUHG WKHLU
7UDLQLQJ LQ +LQGL VKRUWKDQGW\SLQJ KDV EHHQ LPSDUWHG WR DOO YLHZVDQGNQRZOHGJHEXWDOVRKHOSHGWRVROYHWKHSUREOHPV
VWHQRW\SLVWVFOHUNV being faced by the participants in doing their day to day
RIÀFLDO ZRUN LQ +LQGL DV SHU WKH UHTXLUHPHQW RI WKH 2IÀFLDO
Hindi Library has been set up in the Board Secretariat. During
Language Act. Participation in these workshops had helped
WKLV \HDU WRWDO ERRNV DPRXQWLQJ WR 5V  KDYH EHHQ
HQRUPRXVO\LQLQFUHDVLQJWKHXVHRI+LQGLLQWKHRIÀFLDOZRUN
purchased and whole amount is spent on Hindi books only.
After participating in these workshops employees had started
+LQGLIRUWQLJKWZDVRUJDQL]HGLQDOOWKHRIÀFHVLQWKHPRQWK W\SLQJQRWHVWKURXJK8QLFRGHLQ+LQGLLQWKHÀOHV1RRIOHWWHUV
RI6HSWHPEHUGXULQJZKLFKYDULRXV+LQGLFRPSHWLWLRQV sent to ‘A’ & ‘B’ regions in Hindi are increasing in each quarter.
were organised in order to create awareness amongst the %HVLGHV WKLV 4XDUWHUO\ PHHWLQJV WR UHYLHZ WKH SURJUHVVLYH
HPSOR\HHV WR ZRUN LQ +LQGL 0RUHRYHU  HPSOR\HHV GRLQJ use of Hindi were held regularly under the Chairmanship of
considerable work in Hindi during the year are encouraged Director General (BEE).
with casKDZDUGVDOVR$´+DV\D.DYL6DPPHODQµZDVRUJDQL]HG
7KH VHFRQG LVVXH RI LQKRXVH PDJD]LQH ´%DFKDWNH6LWDUHµ RI
DORQJZLWKWKHSUL]HGLVWULEXWLRQFHUHPRQ\RQQG1RYHPEHU
%(( ZDV SXEOLVKHG LQ 1RYHPEHU  ZKRVH FRSLHV ZHUH
2018.
SURYLGHG WR DOO WKH RIÀFHUV DQG VWDII RI %XUHDX ,Q DGGLWLRQ
$OO PDJD]LQHVMRXUQDOV RI %%0% DUH SXEOLVKHG ELOLQJXDOO\ FRSLHVRIWKHPDJD]LQHZHUHDOVRVHQWWRDOOWKH0LQLVWULHVDQG
-XO\6HSWHPEHU LVVXH RI WKH PDJD]LQH LV SXEOLVKHG DV State Designated Agencies.

212
CPRI  2IÀFLDO/DQJXDJH,QVSHFWLRQV

5HPDUNDEOH DFKLHYHPHQWV RI WKH ,QVWLWXWH LQ WKH ÀHOG RI  2IÀFHUV RI 2/023  DORQJ ZLWK 3HUVRQDO $VVLVWDQW
2IÀFLDO/DQJXDJH,PSOHPHQWDWLRQ LQVSHFWHGWKH&35,%HQJDOXUXRQWK1RYHPEHU
to assess the status of Hindi Implementation as per the
1. Seminars and Workshops :
2IÀFLDO/DQJXDJH3ROLF\RIWKH8QLRQ
D  7KHRIÀFLDO/DQJXDJHRIWKH8QLRQ$&RQVWLWXWLRQDO
4. Publications:
perspective :
a. Annual Report - The Annual Report of the Institute for
$ +LQGL ZRUNVKRS RQ ´7KH RIÀFLDO /DQJXDJH RI WKH
the year 2017-18 is published in bilingual.
8QLRQ$&RQVWLWXWLRQDOSHUVSHFWLYHµZDVRUJDQL]HGIRU
the Additional Directors, Joint Directors and all Senior b. CPRI News -7KHIRXULVVXHVRIWKHTXDUWHUO\PDJD]LQH
2IÀFHUV RI WKH ,QVWLWXWH RQ WK $SULO  DW &35, RIWKH,QVWLWXWH´&35,1HZVµKDYHEHHQEURXJKWRXWLQ
Bengaluru. The faculty for the workshop was Dr. H.S. bilingual,
Rana, Principal Director, Institute of Public Administration, c. Rajbhasha Samachar : The 5th edition of Rajbhasha
%DQJDORUH$URXQGVHQLRUOHYHORIÀFHUVSDUWLFLSDWHG 6DPDFKDU ZKLFK JLYHV D UHSRUW RI WKH UHPDUNDEOH
in this workshop. DFKLHYHPHQWV RI WKH ,QVWLWXWH LQ WKH ÀHOG RI RIÀFLDO
b) Table Workshops : language implementation during the year 2017 – 18 was
brought out.
 ,QIRUPDWLRQ  3XEOLFLW\ 'LYLVLRQ  6HFXULW\  3XUFKDVH
'LYLVLRQ(OHFWULFDO$SSOLDQFHV7HFKQRORJ\'LYLVLRQ+HDW d. STDS Darpan - The 19th edition of the In-house
Run Test Lab, Short Circuit Lab. of CPRI, Bengaluru were PDJD]LQH ´67'6 'DUSDQµ RI WKH ,QVWLWXWH·V %KRSDO 8QLW
inspected regarding O.L. Implementation and a follow up was published.
table workshop was conducted to guide the employees 5. Noting and Drafting in Hindi
UHJDUGLQJXVHRI+LQGLLQRIÀFLDOZRUN SUHVHQWDWLRQRI
 8QGHU LQFHQWLYH VFKHPHV 1RWLQJ DQG 'UDIWLQJ
statistical data of Hindi correspondence, and ensuring
FRPSHWLWLRQLVLQYRJXHLQWKH,QVWLWXWHIRUZKLFK&DVK
that Name plates, Name boards, Sign Boards, Stamps,
DZDUGZLOOEHJLYHQRQWKHRFFDVLRQRIWKH+LQGL'LYDV
Visiting Cards were in Hindi. As a result of this, Electrical
celebration.
$SSOLDQFHV 7HFKQRORJ\ 'LYLVLRQ  ZHQW IRU SULQWLQJ WKH
VHFRQG ORW RI ÀOHV LQ ZKLFK DOO WKH PDWWHU LQ WKH &RYHU 6. Annual Technical Article Competition
SDJHZHUHSULQWHGLQELOLQJXDO1RZELOLQJXDOÀOHFRYHUV
 7RSURPRWH+LQGLZULWLQJLQ7HFKQLFDOÀHOGWKH,QVWLWXWH
are being used by the Lab. LV RUJDQL]LQJ DQ $QQXDO 7HFKQLFDO $UWLFOH &RPSHWLWLRQ
2. Hindi Month and Hindi Divas : for the past 23 years for the Scientists of all Central
*RYW 2UJDQL]DWLRQV 7KH EHVW WKUHH DUWLFOHV ZHUH
 7KH+LQGL0RQWKZDVREVHUYHGIURPWK$XJXVW
DZDUGHGSUL]HVRQ+LQGL'LYDVFHOHEUDWLRQKHOGRQWK
to 25th September 2018. Various competitions such as
September 2018 at CPRI, Bangalore.
QXL]$QWKDNVKDUL9RFDEXODU\DQG6SHOOLQJV&URVVZRUG
3X]]OH*HQHUDO.QRZOHGJH :ULWWHQ 6RQJ+XPRURXV 7. Web Site :
&RQYHUVDWLRQ 7HFKQLFDO $UWLFOH &RPSOHWLRQV  ZHUH  7KHZHEVLWHRIWKH,QVWLWXWHLVDYDLODEOHLQ%LOLQJXDODQG
RUJDQL]HG DV D SDUW RI WKH +LQGL 0RQWK FHOHEUDWLRQ is updated from time to time.
+LQGL 'LYDV ZDV FHOHEUDWHG RQ WK 6HSWHPEHU 
6PW-DKDQ]HE$NKWDU3ULQFLSDO&RPPLVVLRQHURI,QFRPH 8. TOLIC Activities:
7D[0LQLVWU\RI)LQDQFH*RYWRI,QGLDZDVLQYLWHGDVWKH  &35, KDV EHHQ DZDUGHG )LUVW 3UL]H IRU WKH RXWVWDQGLQJ
&KLHI *XHVW RI WKH IXQFWLRQ 3UL]HV ZHUH GLVWULEXWHG WR SHUIRUPDQFHLQWKH,PSOHPHQWDWLRQRI2IÀFLDO/DQJXDJH
WKH ZLQQHUV RI YDULRXV FRPSHWLWLRQV RUJDQL]HG GXULQJ GXULQJ WKH \HDU   7KH DZDUG ZDV UHFHLYHG E\
the Hindi Month. A cultural programme was presented 6KUL%6ULGKDU&KLHI$GPLQLVWUDWLYH2IÀFHU&35,GXULQJ
on this occasion by the In-house talent of CPRI which TOLIC meeting held on 4th January 2019, at Bangalore
was appreciated by one and all. G.P.O.

213
Annual Report 2018-19

NPTI ‡ ,QRUGHUWRDVVHVVWKHSURJUHVVLYHXVHRI+LQGLDW137,
&RUSRUDWH2IÀFHDQGLWV,QVWLWXWHVSHULRGLFLQVSHFWLRQV
‡ 137, DQd its Training Institutes are implementing the
are carried out.
YDULRXVSURYLVLRQVRIWKHRIÀFLDOODQJXDJHSROLF\RIWKH
*RYHUQPHQW3URJUHVVLYHXVDJHRI+LQGLLQ2IÀFLDOZRUN ‡ ,QFRPSOLDQFHZLWKWKH2IÀFLDO/DQJXDJH3ROLF\D´+LQGL
is being used. 3DNKZDGDµZDVFHOHEUDWHGLQ137,&RUSRUDWH2IÀFHDQG
its Institutes from 1-14 September, 2018. In order to
‡ ,Q FRPSOLDQFH ZLWK WKH FRQVWLWXWLRQDO DQG VWDWXWRU\
VWHS XS WKH XVH RI +LQGL LQ RIÀFLDO ZRUN FRPSHWLWLRQV
requirements, all documents required to be
in Hindi Essay writing, Hindi debate, Hindi Poetry, Hindi
issued bilingually are being adhered to. Similarly
QRWLQJ DQG GUDIWLQJ HWF ZHUH RUJDQL]HG 2IÀFHUV
FRPPXQLFDWLRQVUHFHLYHGLQ+LQGLDUHUHSOLHGLQ+LQGL
employees took part in the competitions and winners
‡ 0HHWLQJV RI 2IÀFLDO /DQJXDJH ,PSOHPHQWDWLRQ ZHUHFRQIHUUHGZLWKFHUWLÀFDWHVFDVKDZDUGV
&RPPLWWHH DW 137, &RUSRUDWH 2IÀFH DQG 7UDLQLQJ
‡ ,QRUGHUWRFUHDWHDFRQGXFLYHDQGLQVSLULQJDWPRVSKHUH
,QVWLWXWHVDUHFRQYHQHGUHJXODUO\ IRU WKH LPSOHPHQWDWLRQ RI WKH 2IÀFLDO /DQJXDJH 3ROLF\
‡ &DVK $ZDUG 6FKHPH VXFK DV ,QFHQWLYH 6FKHPH IRU ´+LQGL :RUNVKRSVµ ZHUH RUJDQL]HG DW 137, &RUSRUDWH
RULJLQDOQRWLQJGUDIWLQJLQ+LQGLKDVEHHQLPSOHPHQWHG 2IÀFHDQGLWVLQVWLWXWHV
'XULQJ WKH \HDU XQGHU UHSRUW  RIÀFHUV6WDII RI 137, ‡ 6LQFHODVWWKUHH\HDUVGXULQJWKH+LQGL:HHNSURJUDPV
&RUSRUDWH 2IÀFH DQG LWV ,QVWLWXWHV KDYH EHHQ DZDUGHG for children and women of NPTI staff are also being
under this scheme. RUJDQL]HG

214
CHAPTER 35.2

VIGILANCE ACTIVITIES / DISCIPLINARY CASES


Ministry of Power 7KH DZDUGHHV ZHUH IDFLOLWDWHG ZLWK FHUWLÀFDWHSUL]H LQ
D SURJUDPPH KHOG RQ  ZKHUH 6HFUHWDU\
1. Vigilance wing of Ministry of Power deals with the
0LQLVWU\RI3RZHUGLVWULEXWHGWKHSUL]HVWRWKHZLQQHUV
FRPSODLQW DJDLQVW RIÀFHUVRIÀFLDOV RI WKH 0LQLVWU\ RI
3RZHU DQG %RDUG OHYHO RIÀFHUV RI WKH 368V DQG RWKHU 3. In the scenario of constant security threats to assets
RIÀFHVXQGHUDGPLQLVWUDWLYHFRQWURORIWKH0LQLVWU\$OO of Power Sector units under Ministry of Power, the
WKH FRPSODLQWV UHFHLYHG LQ WKH VHFWLRQ DUH UHJLVWHUHG FRPSOLDQFH WR WKH VHFXULW\ LQVWUXFWLRQVDGYLVRULHV
LQ WKH 0LQLVWU\6HFWLRQ WKURXJK (RIÀFH V\VWHP $IWHU UHFHLYHGIURPYDULRXVDJHQFLHVIURPWLPHWRWLPHZHUH
H[DPLQLQJ WKH FRPSODLQWV UHODWLQJ WR %RDUG OHYHO also ensured through appropriate communication
RIÀFHUV RI 368V UHSRUWV DUH VXEPLWWHG WR &9& 302 with the concerned authorities. The possible threat of
&DELQHW6HFUHWDULDW'237DVWKHFDVHPD\EH)XUWKHU 0RELOH SKRQH LQ YLWDO LQVWDOODWLRQ DUHDV ZDV H[DPLQHG
FRPSODLQWVUHFHLYHGIURP&9&XQGHU&9&$FW3,'3,DUH LQ D PHHWLQJ WDNHQ ZLWK DOO &92VVHFXULW\ RIÀFHUV RI
also handled on priority basis to report to CVC within PSUs of Power Sector on 07.03.2018. Subsequently
WKH VSHFLÀHG SHULRG 3HQGLQJ FRPSODLQW FDVHV DUH Committee under the Chairmanship of CVO, NTPC was
monitored on regular basis. IRUPHGZLWKDYLHZWRGRWKHGHWDLOHGWKUHDWSHUFHSWLRQ
analysis of installations under Power Sector in all the
 7KH ´9LJLODQFH $ZDUHQHVV :HHN µ ZDV REVHUYHG three categories i.e. Thermal, Hydro and Transmission.
in Ministry of Power between 29th October 2018 to 7KH UHSRUWV RI WKH &RPPLWWHH KDV EHHQ UHFHLYHG DQG
UG 1RYHPEHU  7KLV \HDU WKH WKHPH RI 9LJLODQFH the recommendations are being shared with all the
$ZDUHQHVV:HHNZDV´(UDGLFDWH&RUUXSWLRQ%XLOGD1HZ stakeholders.
India”.
CEA
 7KH9LJLODQFH$ZDUHQHVV:HHNZDVFHOHEUDWHGZLWKIXOO 7KH 9LJLODQFH 'LYLVLRQ KHDGHG E\ &KLHI 9LJLODQFH 2IÀFHU
HDUQHVW ]HDO DQG JUHDW HQWKXVLDVP 'XULQJ REVHUYDQFH &92  GHDOV ZLWK YDULRXV IDFHWV RI YLJLODQFH PHFKDQLVP DQG
RI 9LJLODQFH $ZDUHQHVV :HHN WKH HPSOR\HH RI WKH IXQFWLRQV IRU FDUU\LQJ RXW LQYHVWLJDWLRQV LQWR FRPSODLQWV
Ministry, their family members including children also VXJJHVWLQJ FRUUHFWLYH PHDVXUHV IRU LPSURYLQJ WKH FRQWURO
SDUWLFLSDWHGLQYDULRXVSURJUDPHVKHOGDWWKHSUHPLVHVRI system, compliance of laid down procedures and also for
the Shram Shakti Bhawan, New Delhi. On this occasion, FDUU\LQJRXWSUHYHQWLYHYLJLODQFHH[HUFLVHV
a pledge to maintain integrity and transparency in all
VSKHUHV RI ZRUN ZDV DGPLQLVWHUHG WR WKH 2IÀFHUV DQG  $V SDUW RI SUHYHQWLYH YLJLODQFH WKH 9LJLODQFH 'LYLVLRQ
Staff of the Ministry by Secretary (Power), Shri Ajay IDFLOLWDWHVLQHQVXULQJMREURWDWLRQLQVHQVLWLYHSRVWV7KH
.XPDU%KDOODRQ0RQGD\WKHWK2FWREHU 9LJLODQFH 'LYLVLRQ KDV DOVR WDNHQ VWHSV WR HQVXUH WKDW
Essay & Debate Competition for the employee and website of CEA plays an important role in increasing
Painting Competition for the children of employee of transparency in its functions. Vigilance Awareness
WKH0LQLVWU\ZHUHRUJDQL]HGRQWKDQGVW2FWREHU :HHN ZDV REVHUYHG LQ &HQWUDO (OHFWULFLW\
UHVSHFWLYHO\7KHWRSLFIRU(VVD\ZDV´&RUUXSWLRQ$ $XWKRULW\ DQG LWV 6XERUGLQDWH 2IÀFHV IURP 
threat to Democracy” and the topic of Debate was WR   7KH 9LJLODQFH $ZDUHQHVV :HHN ZDV
´&RUUXSWLRQLVWKHELJJHVWHYLOLQRXUVRFLHW\µ3DLQWLQJ celebrated to highlight the theme “Eradicate Corruption
Competition for the children of employee of the Ministry – Build a New India”.
ZHUH RUJDQL]HG RQ QG 1RYHPEHU  7KH WRSLF IRU  &RPSODLQWV RWKHU WKDQ DQRQ\PRXVSVHXGRQ\PRXV
painting competition was “Fight against Corruption”. ZHUH WDNHQ XS IRU LQYHVWLJDWLRQ SURPSWO\ DQG DIWHU
)XUWKHU D 1XNNDG 1DWDN RQ YLJLODQFH WKHPH ZDV DOVR FRPSOHWLRQ RI LQYHVWLJDWLRQV UHSRUWV VXEPLWWHG WR WKH
RUJDQL]HGRQQG1RYHPEHU3UL]HVZHUHDZDUGHG prescribed competent authority. As on 31.03.2019, one
WRWKHEHVWÀYHSDUWLFLSDQWVLQHDFKFDWHJRU\VHSDUDWHO\ disciplinary case against a Data Entry Operator (retired),

215
Annual Report 2018-19

CEA is under process and is to be forwarded to Ministry Vigilance work during 2018-19
of Power shortly for onward transmission to the Union
5HJDUGLQJ ,QYHVWLJDWLRQ RI &RPSODLQWV GXULQJ WKH \HDU
3XEOLF 6HUYLFH &RPPLVVLRQ IRU VHHNLQJ DGYLFH RI WKH
 D WRWDO  FRPSODLQWV ZHUH LQYHVWLJDWHG  RXW RI
&RPPLVVLRQ DV SHU 5XOH  RI WKH &HQWUDO &LYLO 6HUYLFHV
WKHVHFRPSODLQWVKDYHEHHQÀQDOL]HGZKLOHWKHUHPDLQLQJ
(Pension) Rules, 1972. Prescribed periodical returns
 DUH XQGHU YDULRXV VWDJHV RI LQYHVWLJDWLRQ  $SSURSULDWH
were sent to Ministry of Power and Central Vigilance
GLVFLSOLQDU\DFWLRQKDVDOVREHHQLQLWLDWHGRXWRILQYHVWLJDWLRQ
Commission in time.
SURFHVV DJDLQVW WKH LQYROYHG HPSOR\HHV DORQJ ZLWK V\VWHP
PAO LPSURYHPHQWVZKHUHYHUIRXQGQHFHVVDU\6XUSULVH&KHFNV
One Vigilance or disciplinary case is pending or contemplated ZHUH FRQGXFWHG GXULQJ WKH SHULRG DQG UHFRYHU\ RI 5XSHHV
DJDLQVWD6U$FFRXQWV2IÀFHU  ZDV HIIHFWHG DJDLQVW YDULRXV GLVFUHSDQFLHV
GHWHFWHGGXULQJLQYHVWLJDWLRQ'XULQJWKHODVW\HDUDWRWDORI
NTPC
3UHYHQWLYH9LJLODQFH:RUNVKRSVZHUHFRQGXFWHGDWYDULRXV
NTPC has a Vigilance Department headed by Chief Vigilance SURMHFWVSODFHVLQZKLFKHPSOR\HHVSDUWLFLSDWHG
2IÀFHURIWKHUDQNRI-RLQW6HFUHWDU\*2,ZKRLVDQRPLQHH
Vigilance Awareness Week-2018
of the Central Vigilance Commission. Vigilance set up in NTPC
FRPSULVHVRI9LJLODQFH([HFXWLYHV 9(V LQ&RUSRUDWH&HQWUHV 9LJLODQFH $ZDUHQHVV :HHN ZDV REVHUYHG LQ 173& LWV
and Projects. In Projects, the VEs report to the Project Head in Subsidiaries & Joint Venture companies from 29th October
DGPLQLVWUDWLYHPDWWHUVEXWLQIXQFWLRQDOPDWWHUVWKH\UHSRUWWR WR UG 1RYHPEHU  7KH REVHUYDQFH RI WKH 9LJLODQFH
&KLHI9LJLODQFH2IÀFHU7KH&RUSRUDWH9LJLODQFHFRQVLVWVRI $ZDUHQHVV :HHN FRPPHQFHG ZLWK WKH  ,QWHJULW\ 3OHGJH
&HOOV QDPHO\ ,QYHVWLJDWLRQ  3URFHVVLQJ &HOO 'HSDUWPHQWDO WDNHQE\HPSOR\HHVDFURVVWKHFRXQWU\DWDPRQWK
3URFHHGLQJV &HOO 7HFKQLFDO ([DPLQDWLRQ &HOO DQG 0,6 &HOO 2FWREHU·  VWHHUHG E\ WKH  UHVSHFWLYH KHDGV RI 3URMHFWV
7KHVH &HOOV GHDO ZLWK YDULRXV IDFHWV RI YLJLODQFH PHFKDQLVP 6WDWLRQV5HJLRQV2IÀFHV &RUSRUDWH&HQWUH7KHEHJLQQLQJ
7KHYLJLODQFHZRUNVRIHDFK5HJLRQQDPHO\(5,(5,,:5, RI 9LJLODQFH $ZDUHQHVV :HHN EHFDPH D VSHFLDO HYHQW IRU
:5,, 15 '%) 65 DQG +\GUR 5HJLRQ KDYH EHHQ VHSDUDWHO\ NTPC as Hon’ble Central Vigilance Commissioner addressed
DVVLJQHGWRRQH9LJLODQFH([HFXWLYHRI$*05DQNIRUVSHHGLHU its employees on 29.10.18. During his address, he spoke about
GLVSRVDORIYLJLODQFHFDVHV the need for promoting Transparency, Accountability and
,QWHJULW\LQSXEOLFOLIHDQGH[KRUWHGWKH173&WHDPWREHFRPH
Integrity Pact has been implemented in NTPC since 2009.
a ‘Model PSU. ‘
3UHVHQWO\ WHQGHUV KDYLQJ HVWLPDWHG YDOXH RI 5V &URUH
H[FOXGLQJ WD[HV DQG GXWLHV  DQG DERYH DUH FRYHUHG XQGHU 7KHHYHQWV DFWLYLWLHVDFURVV173&ZHUHRUJDQLVHGIRFXVLQJ
WKH,QWHJULW\3DFW$VSHUWKHSURYLVLRQVRI6HFWLRQ  RI RQ WKH WKHPH RI 9$: ´(UDGLFDWH &RUUXSWLRQ  %XLOG D
WKH &RPSDQLHV $FW  )UDXG 3UHYHQWLRQ 3ROLF\ KDV EHHQ New India”. To ensure wider participation of students &
implemented in NTPC and suspected fraud cases, referred by FLWL]HQV HYHQWV  DFWLYLWLHV ZHUH RUJDQL]HG DW 6FKRROV DQG
WKH 1RGDO 2IÀFHUV WR 9LJLODQFH 'HSDUWPHQW DUH LQYHVWLJDWHG Colleges and Gram Sabhas in the rural areas’ & seminars in
LPPHGLDWHO\ WR DYRLG VWRS IUDXGXOHQW EHKDYLRUV DV GHÀQHG WKHXUEDQDUHDVZHUHRUJDQL]HGLQWKHYLFLQLW\RIRXU6WDWLRQV
LQ ´)UDXG 3UHYHQWLRQ 3ROLF\µ  :KLVWOH %ORZHU 3ROLF\ KDV DOVR 3URMHFWV2IÀFHV &RUSRUDWH &HQWUH 6SHFLDO IRFXV ZDV JLYHQ
been in place at NTPC as per SEBI guideline to strengthen a WRWKHFLWLHVDVVLJQHGWR173&IRURXWUHDFKDFWLYLWLHVQDPHO\
FXOWXUHRIWUDQVSDUHQF\DQGWUXVWLQWKHRUJDQL]DWLRQSURYLGLQJ 1HZ 'HOKL 9DUDQDVL )DUDNND .RUED  7DOFKHU  )RU JHQHUDO
HPSOR\HHVZLWKDIUDPHZRUNSURFHGXUHIRUUHVSRQVLEOHDQG awareness, the FM Radio medium was also used to air the CVC
VHFXUH UHSRUWLQJ RI LPSURSHU DFWLYLWLHV ZKLVWOH EORZLQJ  message against corruption at New Delhi, Patna, Hyderabad &
within the company and to protect employees wishing to Visakhapatnam.
UDLVH D FRQFHUQ DERXW LPSURSHU DFWLYLW\VHULRXV LUUHJXODULWLHV
7KH$FWLYLWLHVGXULQJ9$:ZHUHRUJDQL]HGDFURVV,QGLD
within the Company. A complaint handling policy is also in
FRYHULQJ  VWDWHV LQYROYLQJ PRUH WKDQ  VWXGHQWV 
SODFHZKLFKLVGHVLJQHGWRSURYLGHJXLGDQFHRQWKHPDQQHU
FLWL]HQVEHVLGHVHPSOR\HHVRI173&LWV6XEVLGLDULHV 
LQ ZKLFK 173& UHFHLYHV DQG KDQGOHV FRPSODLQWV DJDLQVW LWV
Joint Ventures.
employeHVVXSSOLHUVFRQWUDFWRUVHWF

216
:LWKWKHFROOHFWLYHHIIRUWVRI7HDP173&PDLQWKUXVWZDVJLYHQ NHPC
WRRXWUHDFKDFWLYLWLHV7RWDOVFKRROVDQGFROOHJHVZHUH
7KH9LJLODQFHZLQJDW1+3&LVKHDGHGE\&KLHI9LJLODQFH2IÀFHU
reached out during the week. Besides holding debates and
(CVO), appointed by the Ministry of Power and supported by
essay competitions in these educational institutions, around
'HSXW\ &92 RI WKH OHYHO RI *HQHUDO 0DQDJHU&KLHI *HQHUDO
30 Integrity Clubs were made functional. 67 Gram Sabhas were 0DQDJHU IURP 1+3& DQG RWKHU 9LJLODQFH RIÀFHUV ERWK DW
RUJDQLVHGZLWKDOPRVWSOXVSDUWLFLSDQWVZRUNVKRSV &RUSRUDWH 2IÀFH DQG DW SURMHFW  XQLW OHYHO DV SHU VWUXFWXUH
seminars were conducted with 4500 plus participants. 22400 GHÀQHGE\&HQWUDO9LJLODQFH&RPPLVVLRQ &9& 
FLWL]HQVLQFOXGLQJHPSOR\HHVWRRNWKHHSOHGJHZKLOHDURXQG
1+3&·V 9LJLODQFH 'LYLVLRQ DW &RUSRUDWH 2IÀFH KDV EHHQ
SOXVFLWL]HQVZHUHPRWLYDWHGIRUWDNLQJRUDOSOHGJH
JUDQWHG ,62   FHUWLÀFDWLRQ IRU LPSOHPHQWDWLRQ RI
:LGH SXEOLFLW\ WR WKHVH HYHQWV ZDV JLYHQ  DFURVV FLWLHV QHDU 4XDOLW\ 0DQDJHPHQW 6\VWHP E\ 0V %,6 %XUHDX RI ,QGLDQ
173&HVWDEOLVKPHQWVYL]'HOKL1&5/XFNQRZ3DWQD9DUDQDVL 6WDQGDUG   $OO WKH SURFHGXUHV KDYH EHHQ GRFXPHQWHG DQG
Dehradun, Raipur, Mumbai, Bhubaneswar, Hyderabad and system of monitoring of Vigilance complaints and disciplinary
5DQFKL WKURXJK QHZVSDSHU DGYHUWLVHPHQWV GLVWULEXWLRQ RI FDVHVKDVEHHQLPSOHPHQWHGWRDYRLGGHOD\V
pamphlets etc.
The Corporate Vigilance in association with the Vigilance of
System improvement measures undertaken during 2018-19 WKH8QLWV 3URMHFW9LJLODQFH2IÀFHUV²392V PDNHVFRQWLQXRXV
HIIRUW LQ LGHQWLI\LQJ DQG VXJJHVWLQJ LPSURYHPHQWV LQ WKH
‡ 0DMRU 6\VWHP LPSURYHPHQW LQLWLDWLYH ZLWK UHJDUG
V\VWHPV DQG SURFHGXUHV SUHYDOHQW LQ WKH &RUSRUDWLRQ  7KH
to security issues at NTPC Coal Mines was taken
UHTXLUHPHQWV RI V\VWHPLF LPSURYHPHQWV DUH DGGUHVVHG E\
up by Corporate Vigilance to ensure no pilferage
issuing Circulars on anomalies noticed during regular &
 WKHIW RI FRDO IURP 173& 0LQHV ,Q WKLV UHJDUG WKH
VXUSULVHLQVSHFWLRQVDQGH[DPLQDWLRQVRIRWKHUUHSRUWVFDUULHG
recommendations of the cross functional committee
RXWE\WKH9LJLODQFH2IÀFHUV
KDYHEHHQDSSURYHGE\&92DQG&0'DQGWKHVDPH
KDYHEHHQSXWLQSODFHIURP$SULO Planned and surprise inspections are being conducted by the
9LJLODQFH'HSDUWPHQWDWUHJXODULQWHUYDOV$FWLRQDEOHSRLQWV
‡ 8QLIRUP JXLGHOLQHV IRU '*5 VSRQVRUHG VHFXULW\
LGHQWLÀHG E\ WKH 3URMHFW 9LJLODQFH 2IÀFHUV DUH LQWLPDWHG
FRQWUDFWVRSHUDWHGDW173&XQLWVKDYHEHHQÀQDOL]HG
WR FRQFHUQHG +HDGV RI 3URMHFWV3RZHU 6WDWLRQV5HJLRQDO
DQGLVVXHGIRULPSOHPHQWDWLRQLQ1RYHPEHU
2IÀFHV8QLWV IURP WLPH WR WLPH IRU LPSOHPHQWLQJ QHFHVVDU\
‡ 2Q UHFRPPHQGDWLRQV RI 9LJLODQFH GHSDUWPHQW FRUUHFWLRQV  ,Q DGGLWLRQ WR DERYH LQWHQVLYH H[DPLQDWLRQV RI
Corporate contracts has issued a circular modifying ZRUNVDUHFDUULHGRXWE\&KLHI7HFKQLFDO([DPLQHU &7( RIWKH
WKH JXLGHOLQHV IRU (YDOXDWLRQ RI ELGV UHODWLQJ WR &9&WLPHWRWLPH,QWHQVLYHH[DPLQDWLRQVRIZRUNVRQ&7(·V
abnormally high and low quoted rates by the pattern, at Projects and Power Stations are also carried out by
Agencies. 9LJLODQFH'LYLVLRQ

‡ 9DULRXV V\VWHP LPSURYHPHQW PHDVXUHV KDYH DOVR 1+3& KDV DGRSWHG YDULRXV PHDVXUHV RI OHYHUDJLQJ RI
been suggested by Vigilance relating to TA claims WHFKQRORJ\LQGD\WRGD\ZRUNLQJSDUWLFXODUO\WKRVHLQYROYLQJ
E\HPSOR\HHVOLNH+RWHO%RRNLQJWKURXJK7UDYHO6%7 ÀQDQFLDOWUDQVDFWLRQVPDWWHUV,Q1+3&WKHUHLVDQHOHFWURQLF
6WDQGDUGL]DWLRQRI+RWHOVLQ%²&ODVVFLWLHVSD\PHQW V\VWHP RI ÀOOLQJ DQG VXEPLVVLRQ RI DSSOLFDWLRQ IRUPV E\
of Hotel Bills through Online Mode etc. A system HPSOR\HHV  $OO SD\PHQWV WR YHQGRUV FRQWUDFWRUV DQG
RI LVVXLQJ 6%, WUDYHO FDUG WR H[HFXWLYHV IRU SD\PHQW employees are made through electronic system. Updation
of hotel bills has already been implemented in this RI RQOLQH YLJLODQFH VWDWXV LQ UHVSHFW RI VHQLRU ([HFXWLYHV RI
regard. 1+3& ( DQG DERYH LQFOXGLQJ %RDUG /HYHO ([HFXWLYHV  LV
EHLQJ GRQH LQ WKH ZHE SRUWDO GHYHORSHG E\ 'HSDUWPHQW RI
‡ $ PRQWKO\ SXEOLFDWLRQ RI 9LJLODQFH LQ KRXVH
Personnel & Training..
HÁ\HU QDPHG ´9,*GRPµ KDV EHHQ LQWURGXFHG
IURP 1RYHPEHU  IRU VKDULQJ YLJLODQFH UHODWHG As a part of transparent procurement system and in
OHDUQLQJVNQRZOHGJe with employees. compliance with guidelines issued by CVC, NHPC has opted

217
Annual Report 2018-19

e-procurement solution across the organisation, since 2012. LQFXOFDWHGZLWKLQWKHRUJDQL]DWLRQ%HVLGHVWKLV32:(5*5,'


3UHVHQWO\ WKH ZRUNV  VXSSO\ KDYLQJ HVWLPDWHG FRVW RI KDV DOVR IRUPXODWHG WKH :KLVWOH %ORZHU 3ROLF\ DQG )UDXG
Rs. 2.0 lacs or more are tendered through e-procurement 3UHYHQWLRQ3ROLF\
V\VWHP  (5HYHUVH DXFWLRQ LV DQRWKHU LPSRUWDQW WRRO ZKLFK
7KHRUJDQL]DWLRQKDVDOVRDGRSWHGWKH,QWHJULW\3DFWVLQFH
KDVEHHQDGRSWHGE\1+3&LQLWVFRUSRUDWHRIÀFHZHI$SULO
LQ ZKLFK WHQGHUV KDYLQJ HVWLPDWHG YDOXH RI DERYH ` 1 crore
2016 for tenders with estimated cost more than Rs. 5 crores
DUHFRYHUHG3DFNDJHVKDYLQJHVWLPDWHGFRVWDERYH` 1 Crore
IRU (OHFWUR 0HFKDQLFDO ( 0   +\GUR 0HFKDQLFDO +0 
DUHFRYHUHGXQGHUWKH,3SURJUDPDQG,QGHSHQGHQW([WHUQDO
FRQWUDFWV 6RODU :LQG 3URMHFWV DQG SURFXUHPHQW RI JRRGV
0RQLWRUVDUHQRPLQDWHGIRUSDFNDJHVKDYLQJHVWLPDWHGFRVW
where procurement is not of urgent nature.
DERYH` 100 Crore.
Further, Integrity pact has been implemented successfully for
32:(5*5,' 9LJLODQFH SHUIRUPV YDULRXV 9LJLODQFH )XQFWLRQV
DOO WKH SURFXUHPHQW ZRUNV RI WKH YDOXH RI 5V  ODFV DQG
VXFK DV 3UHYHQWLYH 3UHGLFWLYH 3URDFWLYH 3DUWLFLSDWLYH
PRUHIRUSURFXUHPHQWRIJRRGVRIWKHYDOXHRI5VODFVRU
'HWHFWLYHDQG3XQLWLYH9LJLODQFH+RZHYHUWKHSULPH)RFXVRI
PRUHDQGIRUSURFXUHPHQWRIVHUYLFHVRIWKHYDOXHRI5V
9LJLODQFH'HSDUWPHQWLVRQ3UHYHQWLYHDQG3UHGLFWLYHYLJLODQFH
lacs and more as per guidelines of CVC.
DQGVXJJHVWLQJ6\VWHP,PSURYHPHQWVWRWKHPDQDJHPHQWLQ
POWERGRID YDULRXVVSKHUHV

7KH 32:(5*5,' 9LJLODQFH 'HSDUWPHQW LV KHDGHG E\ &KLHI $VDQLPSRUWDQWWRRORI3UHYHQWLYH9LJLODQFH,QVSHFWLRQVDUH


9LJLODQFH2IÀFHURIWKHUDQNRI-RLQW6HFUHWDU\ZKRIXQFWLRQV FRQGXFWHGE\WKH'HSDUWPHQWDWYDULRXVORFDWLRQVWKRXJKRXW
DVWKHH[WHQGHGDUPRIWKH&HQWUDO9LJLODQFH&RPPLVVLRQLQ WKH\HDU'XULQJWKHUHOHYDQWSHULRG6XUSULVHLQVSHFWLRQV
RUGHU WR DVVLVW WKH PDQDJHPHQW LQ WKH PDWWHU RI YLJLODQFH and 59 CTE Type inspections and 39 Process-on-line
IXQFWLRQLQJ&9232:(5*5,'LQWXUQLVDVVLVWHGE\'HSXW\ inspections were conducted by Vigilance Department.
&92 RI WKH UDQN RI (' VL[WHHQ H[HFXWLYHV DW WKH &RUSRUDWH
,Q 3URFHVV 2QOLQH LQVSHFWLRQV FULWLFDO DUHDV RI WKH 3URMHFWV
&HQWUH DQG WKLUW\ IRXU H[HFXWLYHV DW WKH 5HJLRQDO OHYHO  7KH
Schemes are inspected and checked at the initial stage of
9LJLODQFH 'HSDUWPHQW DW &RUSRUDWH &HQWUH RI 32:(5*5,'
H[HFXWLRQ DQG DQ\ VKRUWFRPLQJV REVHUYHG WKHUHRQ DUH
KDVEHHQGLYLGHGLQWRWKUHHZLQJVLHWKH,QYHVWLJDWLRQ:LQJ
UHIHUUHG WR WKH VLWH IRU LPPHGLDWH FRUUHFWLYH PHDVXUHV
9LJLODQFH  'LVFLSOLQDU\ 3URFHHGLQJV :LQJ DQG 7HFKQLFDO
Surprise inspections are conducted primarily based on
:LQJ
Source Information. CTE type Inspections are conducted in
,QWRGD\·VZRUOGJRRG*RYHUQDQFHSOD\VDYHU\VLJQLÀFDQWUROH consonance with the format of inspections of Chief Technical
LQGHWHUPLQLQJWKHVXFFHVVRIDQRUJDQL]DWLRQ7DNLQJFXHIURP ([DPLQHU&9&&7(7\SHLQVSHFWLRQVFRYHUERWK3UHDZDUG
it in day to day management, emphasis has been laid upon DVZHOODV3RVWDZDUGDFWLYLWLHVRIWKHVHOHFWHGZRUNSURMHFWV
factors like Transparency, Integrity, Accountability, Fairness, 3XUVXDQW WR 9LJLODQFH LQVSHFWLRQV DQG LWV REVHUYDWLRQV DQG
Equity and adherence to Rules, Regulations and laws of the UHFRPPHQGDWLRQVWRWKHPDQDJHPHQW6\VWHP,PSURYHPHQWV
ODQG32:(5*5,'KDVVWULYHQWRLQFXOFDWHWKHVHIDFHWVLQLWV DUH WDNHQ XS  &RQWLQXRXV LPSURYHPHQW LQ 6\VWHPV DQG
day to day functioning. Procedures has always remained one of the hallmarks of the
Company.
7KH 9LJLODQFH 'HSDUWPHQW RI 32:(5*5,' LQ WDQGHP ZLWK
PDQDJHPHQW KDV DOZD\V HQGHDYRUHG WR LPSURYH 9LJLODQFH 'XULQJWKHUHOHYDQWSHULRGFRPSODLQWVZHUHUHFHLYHGIURP
$GPLQLVWUDWLRQLQWKHRUJDQL]DWLRQDVSHUWKHGLUHFWLYHVRIWKH GLIIHUHQW VRXUFHV DQG WDNHQ XS IRU YHULÀFDWLRQLQYHVWLJDWLRQ
Central Vigilance Commission and Ministry of Power regarding )XUWKHU GXULQJ WKH UHOHYDQW SHULRG  'HSDUWPHQWDO
OHYHUDJLQJRIWHFKQRORJ\IURPWLPHWRWLPH$VSDUWRIWKLV proceedings were initiated. As part of Capacity Building,
HSD\PHQWV HSURFXUHPHQW HUHYHUVH DXFWLRQ HELOOLQJ DV :RUNVKRSVRQ3UHYHQWLYH9LJLODQFH(WKLFVDQGWKH57,$FWDUH
DOVR VXEYHQGRU UHJLVWUDWLRQ DQG XSORDGLQJ RI HYDOXDWLRQ conducted at the Corporate Centre as well as in the Regions
criterion on the website, online inspection system, Vigilance IRU WKH QRQYLJLODQFH RIÀFLDOV 'XULQJ WKH SHULRG -DQ· WR
Inspection Management System, Online Property Return 'HF3UHYHQWLYHZRUNVKRSVZHUHFRQGXFWHGIRUQRQ
6\VWHP DV ZHOO DV 'RFXPHQW 7UDFNLQJ 6\VWHP KDYH EHHQ YLJLODQFHH[HFXWLYHV

218
The Transfer Policy foUWKHH[HFXWLYHVLVLQSODFHDQGWUDQVIHU ‡ :H KDYH FRQQHFWHG WR PRUH WKDQ  VWXGHQWV RI
URWDWLRQ LV EHLQJ GRQH E\ WKH 0DQDJHPHQW RI 32:(5*5,' WKH VFKRROV PRVWO\ JRYW VFKRROV ZKHUH LQ ZH KDYH
regularly. Besides this, from time to time Vigilance Department distributed school edition of the newspaper specially
is pursuing with the management to transfer the personnel designed with the message of CVC.
ZKLFKDUHZRUNLQJRQVHQVLWLYHSRVWVDQGDOVRWKRVHRIÀFLDOV
-RXUQDORI9LJLODQFHGHSDUWPHQWRI32:(5*5,' &$1'285 
which are in Agreed List and ODI List.
was released this year also during the closing ceremony of
In order to spread awareness towards company’s rules and 9LJLODQFH$ZDUHQHVV:HHNDWLWV&RUSRUDWH&HQWUH,QOLQHZLWK
SURFHGXUHV SURSHUW\ UHWXUQV DQG RWKHU LVVXHV UHOHYDQW WR *R*UHHQ,QLWLDWLYHRIWKH&RPSDQ\LWZDVUHOHDVHGLQGLJLWDO
3UHYHQWLYH9LJLODQFHEXON606DQGHPDLODUHUHJXODUO\VHQW form (e-CANDOUR). Sh. Pratyush Sinha graced the closing
to all the employees of the corporation time to time. FHUHPRQ\RIWKH9$:

7KH YLJLODQFH ZRUN RI WKH RUJDQL]DWLRQ LV EHLQJ UHYLHZHG Systems Improvement made-
LQWHUQDOO\E\WKH%RDUGRI'LUHFWRUVDQGH[WHUQDOO\E\&9&DQG
I. Issuing dispatch instructions after ensuring the OSM
0LQLVWU\RI3RZHU7KH%RDUGRI'LUHFWRUVRI32:(5*5,'KDG
LQVXUDQFH FRYHU DQG LQGHPQLW\ ERQG  ,W KDV EHHQ
UHYLHZHGWKHZRUNRI9LJLODQFHRQ
REVHUYHG WKDW WKHUH DUH PDQ\ LQVWDQFHV ZKHUH WKH
$V SHU WKH 'LUHFWLYH RI WKH &HQWUDO 9LJLODQFH &RPPLVVLRQ GLVSDWFK LQVWUXFWLRQV LQ UHVSHFW RI RZQHUHPSOR\HU
WKLV \HDU DOVR WKH 9LJLODQFH $ZDUHQHVV :HHN ZDV RUJDQL]HG supplied materials are being issued to supplier by
LQ32:(5*5,'IURPWK2FWREHUWRUG1RYHPEHULQ Project Manager or issuing authority (PESM) without
line with the theme for this year “Eradicate Corruption – Build HQVXULQJWKH260LQVXUDQFHFRYHUDQGLQGHPQLW\ERQG
D1HZ,QGLDµ,QOLQHZLWKWKHGLUHFWLYHVRI&9&32:(5*5,'LV $FLUFXODU5HIQR&&3 6',GDWHG
REVHUYLQJ 9LJLODQFH DZDUHQHVV ZHHN ZLWK IXOO YLJRU 7KRXJK issued by CC-CS in this regard.
WKH9LJLODQFH$ZDUHQHVV:HHNZDVVFKHGXOHGGXULQJ
II. During inspection of pile foundation work, it was
WREXW9$:FHOHEUDWLRQVLQWKHFRPSDQ\VWDUWHG
found that there were some ambiguities in SFQP of
IURP WKH QG RI 2FWREHU   32:(5*5,' LV ORFDWHG LQ
pile foundation work in transmission line. Due to
more than 350 locations across the country and has footprints
WKHVH FRQWUDGLFWLRQV WKHUH DUH SRVVLELOLWLHV RI HUURU
LQPRUHWKDQFRXQWULHV'LIIHUHQWDFWLYLWLHVZHUHXQGHUWDNHQ
irregularities in implementation of SFQP at site.
DWDOOWKHHVWDEOLVKPHQWVRI32:(5*5,'
,,, ([FOXVLRQ RI :$5 FODXVH DV H[WHQVLRQ FRYHU LQ 7UDQVLW
‡ ,QWHJULW\ 3OHGJH ZDV FRQGXFWHG DFURVV DOO RIÀFHV RI
Insurance policy for indigenous equipment. Deletion of
32:(5*5,'DQGLWKDVEHHQH[WHQGHGWRDOOWKHVWDNH
“NIL Deductibles clause under Insurance Requirements”.
KROGHUV$WRWDORIDURXQGHPSOR\HHVDQGFLWL]HQV
took the Integrity Pledge. ,9 0HWKRGRORJ\IRUÀ[LQJKLULQJFKDUJHVIRU32:(5*5,'
RZQHG7HVWLQJ,QVWUXPHQWV7 3V
‡ :HKDYHRUJDQL]HGDQXPEHURIDFWLYLWLHVLQPRUHWKDQ
350 schools and colleges where the number of students 9 5HOHDVH RI ,QWHUHVW %HDULQJ ,QLWLDO $GYDQFH DIWHU WKH
LQYROYHGLVPRUHWKDQ stipulated period.

‡ :DONDWKRQ KDV EHHQ FRQGXFWHG LQ DURXQG  9, ,W KDV EHHQ DGYLVHG DQG DSSURYHG WKDW H5$ VKDOO QRW
establishments wherein all the employees along with be conducted in packages for “Implementation of FQP
WKHLUIDPLOLHVKDYHSDUWLFLSDWHG WKURXJK WKLUG SDUW\µ $ &LUFXODU  5HI QR &&
3 6H5$GDWHGKDVEHHQLVVXHGE\&&
‡ 1XNNDG1DWDNKDVEHHQRUJDQL]HGLQSURPLQHQWSODFHV
CS for this.
LQYROYLQJPRUHWKDQSHRSOH
VII. During the presentation by ESMD department on
‡ 6HPLQDUV:RUNVKRSV KDYH EHHQ FRQGXFWHG ZKHUHLQ
´*XLGHOLQHV IRU &URS7UHH FRPSHQVDWLRQµ KHOG DW WK
HPLQHQWSHUVRQDOLWLHVKDYHEHHQLQYLWHGIRUDWDONLQOLQH
ÁRRU RQ GDWH &92 KDV DGYLVHG WR IUDPH DQ
ZLWKWKHWKHPHRI9$:
uniform Notice format for crop & trees and circulate
‡ *UDP6DEKDVKDYHEHHQFRQGXFWHGWRXFKLQJPRUHWKDQ WRDOOUHJLRQVLQRUGHUWRKDYHDXQLTXHIRUPDWDOORYHU
15000 YLOODJHUVRIRXUFRXQWU\ 32:(5*RID.

219
Annual Report 2018-19

PFC WKHLU RQOLQH HGLWLRQV 9LJLODQFH 8QLW DOVR SURYLGHG


link on intranet and PFC website to take e-Pledge
'XULQJWKHÀQDQFLDO\HDUWKH9LJLODQFH8QLWKDVWDNHQ
on Integrity and 271 employees took e-pledge on
WKHIROORZLQJPHDVXUHVRQSUHYHQWLYHYLJLODQFH
integrity.
1. Achievements:
E 6ORJDQ ZULWLQJ &RPSHWLWLRQ (VVD\ :ULWLQJ
a. Inspection (surprise and periodic) of different units Competition, Pictoral Theme representation
of the corporation were carried out. Competition were organised on the subjects related
E 8VHRI,QIRUPDWLRQWHFKQRORJ\DVDQHIIHFWLYHWRRO to Vigilance. These competitions were open to all
IRUSURYLGLQJRQOLQHVHUYLFHVWRDOOWKHVWDNHKROGHUV regular employees of this Corporation including
DQGWRHQKDQFHRUJDQL]DWLRQDOHIÀFLHQF\9LJLODQFH WKRVH SRVWHG LQ WKH UHJLRQDO RIÀFHV 7KH DLP RI
Unit established an online key job responsibility WKHVHFRPSHWLWLRQVZDVWRVWLPXODWHWKHFUHDWLYLW\
system. imagination and originality of the employees to
HQDEOH WKHP WR FRPH RXW ZLWK LQQRYDWLYH LGHDV
F $ QXPEHU RI FRPSUHKHQVLYH PDQXDOVSROLFLHV
DERXW GHDOLQJ ZLWK *RRG *RYHUQDQFH $ RQH GD\
RQ GLIIHUHQW DUHDV RI FRPSDQ\·V DFWLYLWLHV ZHUH
workshop on the topic related to theme of Vigilance
UHYLHZHG
awareness week-2018 was also organised by the
G )XUWKHUWKHGHWDLOHGLQYHVWLJDWLRQZDVFDUULHGRXWLQ &RUSRUDWLRQZLWKHPLQHQWSHUVRQDOLW\IRUWKHEHQHÀW
thirteen cases of registered complaints. of employees, in which more than 37 employees
2. Review: participated. The Vigilance Awareness week 2018
was successfully concluded with distribution of
 7KHSHUIRUPDQFHRI9LJLODQFH8QLWZDVUHYLHZHGE\WKH
SUL]HVWRWKHZLQQHUV
Central Vigilance Commission, Ministry of Power, Board
of Directors and CMD of PFC in addition to regular REC
UHYLHZVXQGHUWDNHQE\WKH&923)&DVSHUSUHVFULEHG 3URJUHVVPDGHGXULQJWKHÀQDQFLDO\HDU
norms.
5(&FRQVWDQWO\HQGHDYRXUHGWRRSWLPL]HSURELW\DQGLQWHJULW\
3. Vigilance Awareness Week: among employees and to promote transparency, fairness and
D ,Q DFFRUGDQFH ZLWK &9& GLUHFWLYHV 3RZHU )LQDQFH DFFRXQWDELOLW\LQDOORSHUDWLRQDODUHDV5(&9LJLODQFH'LYLVLRQ
&RUSRUDWLRQ/LPLWHGREVHUYHG9LJLODQFH$ZDUHQHVV PDLQO\DLPVDW´3UHYHQWLYH9LJLODQFHµE\UHYLHZLQJRISROLFLHV
:HHN IURP  WR 7KH DFWLYLWLHV URWDWLRQWUDQVIHUV RI HPSOR\HHV KROGLQJ VHQVLWLYH SRVWV
WKDW ZHUH RUJDQL]HG GXULQJ WKH ZHHN ZHUH DLPHG UHYLHZRI$XGLW5HSRUWVUHYLHZRISURMHFWVWHQGHUVFRQWUDFWV
WR VHQVLWL]LQJ WKH HPSOR\HHV RI WKH &RUSRUDWLRQ DZDUGHG LQVSHFWLRQV RI 5HJLRQDO 2IÀFHV UHYLHZ RI $QQXDO
DERXWHIÀFLHQF\DQGREMHFWLYLW\LQJRYHUQDQFH2Q Property Returns (APRs), etc. In this regard, following major
the occasion E-pamphlets and Resolution of the DFWLYLWLHVKDYHEHHQFDUULHGRXW
*RYHUQPHQW RI ,QGLD RQ 3,'3, JXLGHOLQHV UHODWLQJ ¾ ,Q FRPSOLDQFH ZLWK WKH LQVWUXFWLRQV RI &9&0R3 WKH
to whistle blower mechanism were sent through PDWWHU RI URWDWLRQDO WUDQVIHUV IURP WKH LGHQWLÀHG
the e-mail to the employees of the Corporation. VHQVLWLYHSRVWVLVFRQVWDQWO\EHLQJSXUVXHG
7KH EDQQHUV VKRZLQJ REVHUYDQFH RI WKH 9LJLODQFH
¾ Prescribed periodical statistical returns were also sent to
$ZDUHQHVV :HHN ZHUH GLVSOD\HG DW WKH SULPH
CVC and MOP on time.
ORFDWLRQV LQ DQG RXWVLGH WKH RIÀFH SUHPLVHV
)XUWKHUWKHPHRI9LJLODQFH$ZDUHQHVV:HHN ¾ 5HJXODU UHYLHZ RI $XGLW 5HSRUWV ,QWHUQDO 6WDWXWRU\ 
– i.e, “Eradicate Corruption – Build a New India” was CAG Audit Reports were done.
also displayed on desktops of all the employees ¾ 5HYLHZ RI SURMHFWVWHQGHUVFRQWUDFWV DZDUGHG DQG
RI WKH FRUSRUDWLRQ  3XEOLFLW\ RI WKH HYHQW ZDV ZKHUHYHU GHYLDWLRQV DUH REVHUYHG WKH PDWWHU LV WDNHQ
also done through social media such as facebook, XSZLWKFRQFHUQHGGLYLVLRQVZKLFKOHGWRVWUHQJWKHQLQJ
twitter, Instagram, radio and newspapers including RIDSSUDLVDOV\VWHPJXLGHOLQHV

220
¾ )LHOG LQVSHFWLRQV RI 5HJLRQDO 2IÀFHV DQG VFUXWLQ\ RI Innovative move
APRs were done.
Integrity Club: REC under CSR has set up 29Integrity Clubs
¾ 7KHWKUXVWRQOHYHUDJLQJRIWHFKQRORJ\ZDVFRQWLQXHG LQ YDULRXV SDUWV RI FRXQWU\ 5(& DOVR RUJDQL]HG GLIIHUHQW
with the result that information relating to loans, DFWLYLWLHV IRU WKH VWXGHQWV RI 5(& ,QWHJULW\ &OXEV VHW XS DOO
schemes, tenders, third party bills etc. are online. RYHU ,QGLD WR HQFRXUDJH WKHP WR FROOHFWLYHO\ SDUWLFLSDWH LQ
ÀJKWDJDLQVWFRUUXSWLRQ7KHSXUSRVHRISURPRWLQJ,QWHJULW\
¾ ,W ZDV HQVXUHG WKDW LQIRUPDWLRQSROLFLHV OLNH WHQGHUV
&OXEVLQ6FKRROVE\5(&LVWRLQFXOFDWHPRUDOYDOXHVLQWRWKH
UHTXLVLWH IRUPV VWDWXV RI ORDQ DSSOLFDWLRQVWKLUG SDUW\
minds of young children so that they grow up to become
SD\PHQWV)DLU3UDFWLFH&RGH3UHYHQWLRQRI)UDXG3ROLF\
VRFLDOO\ DQG PRUDOO\ UHVSRQVLEOH FLWL]HQV RI WKH FRXQWU\ DQG
&65*XLGHOLQHV:KLVWOH%ORZHU3ROLF\HWFDUHDYDLODEOH
DOVR WR GHYHORS WKHP WR FROOHFWLYH ÀJKW DJDLQVW WKH PHQDFH
on REC’s website.
RI FRUUXSWLRQ LQ ,QGLD  'XULQJ WKH \HDU DFWLYLWLHV OLNH ORJR
¾ 6K 3 9 5DR ([ ,56 ZDV DSSRLQWHG DV ,QGHSHQGHQW designing competition, project competition on cleanliness
([WHUQDO0RQLWRU ,(0 IRU5(& LWV6XEVLGLDULHV in my neighborhood, poem writing competition, paragraph
writing competition etc. among integrity club schools.
¾ ([DPLQDWLRQRI3D\)L[DWLRQRI5(&([HFXWLYHV
Magic Show: 9LJLODQFH 'LYLVLRQ RUJDQLVHG 0DJLF 6KRZ LQ
¾ )ROORZ XS IRU UHFWLÀFDWLRQ LQ 5HFUXLWPHQW 3ROLF\ DQG VFKRROVFROOHJHDQG6&23(&RPSOH[/RGKL5RDG1HZ
Recruitments. Delhi. Through this programme, message of Community
¾ ([DPLQDWLRQ RI ORDQV DZDUGHG WR ,QGHSHQGHQW 3RZHU 0RELOL]DWLRQDQGXQLWLQJDJDLQVW&RUUXSWLRQLQDQLQQRYDWLYH
3URGXFHUV ,33 DQGFRQWUDFWVDZDUGHGE\,7'LYLVLRQ & interesting way was communicated and was appreciated by
one and all.
As per instructions of Ministry of Power, almost all tenders
DERYH 5V ODNK ZHUH SURFHVVHG WKURXJK (3URFXUHPHQW Disciplinary Cases:
PRGH  (5HYHUVH $XFWLRQ LV DOVR LQ SURFHVV LQ FDVHV ZKHUH $VRQGDWHQRGLVFLSOLQDU\FDVHSURFHHGLQJLVSHQGLQJLQ5(&
HVWLPDWHG YDOXH RI SURFXUHPHQW DQG TXRWHG SULFHV H[FHHG
7KH SHUIRUPDQFH RI WKH 9LJLODQFH 'LYLVLRQ ZDV UHYLHZHG
certain parameters.
periodically by the CVC, Board of Directors and CMD in addition
Observance of Vigilance Awareness Week: WRUHJXODUUHYLHZVXQGHUWDNHQE\WKH&92LQDFFRUGDQFHZLWK
the prescribed norms.
5(& /LPLWHG REVHUYHG 9LJLODQFH $ZDUHQHVV :HHN IURP WK
2FWREHUWRUG1RYHPEHU'XULQJWKHZHHN5(& NEEPCO
DGPLQLVWHUHG,QWHJULW\3OHGJHFRQGXFWHG3DUDJUDSK:ULWLQJ 'XULQJ WKH SHULRG IURP  WR  1((3&2
-XVW D 0LQXWH 3DLQWLQJ DQG 3RHP :ULWLQJ &RPSHWLWLRQV IRU 9LJLODQFH'HSDUWPHQWDGRSWHGYDULRXV9LJLODQFH0HFKDQLVP
HPSOR\HHVDQGWKHLUIDPLO\PHPEHUVDQGRUJDQL]HGRQHGD\ XQGHU WKH GLUHFWLYHV DQG JXLGHOLQHV LVVXHG IURP WKH &HQWUDO
workshop on “ERP Audit and Data Analytics” on 01.11.2018 9LJLODQFH&RPPLVVLRQ &9& IURPWLPHWRWLPH)RUH[FOXVLYH
and another day workshop on “Contracts & Procurement” and independent functioning of Vigilance department,
RQ  ,QWUD6FKRRO 3DUDJUDSK :ULWLQJ &RPSHWLWLRQV 1((3&2 HQVXUHG WUDQVSDUHQF\ REMHFWLYLW\ DQG TXDOLW\ LQ
ZHUH RUJDQL]HG DW WKUHH 6FKRROV LQ 'HOKL RQ WK 2FWREHU YLJLODQFH IXQFWLRQLQJ &RPSODLQWV UHFHLYHG IURP YDULRXV
DQGDOO,QGLDOHYHO,QWHU6FKRRO3RHP&RPSHWLWLRQZHUH VRXUFHVRWKHUWKDQDQRQ\PRXVSVHXGRQ\PRXVZHUHWDNHQXS
also organised. Inter-College Debate Competition was also IRUSURPSWLQYHVWLJDWLRQDQGWKHVDPHKDYHEHHQGLVSRVHGRII
RUJDQL]HG DW 'DXODW 5DP &ROOHJH 'HOKL RQ VW 2FWREHU in accordance with the time frame prescribed by the CVC. As
2018 wherein students of more than 30 colleges of Delhi RQ (LJKW FRPSODLQWVZHUHSHQGLQJDQGGXULQJ
SDUWLFLSDWHGDQGZLQQLQJVWXGHQWVZHUHDZDUGHGSUL]HV$SDUW the year 03 (Three) new complaints were added. Altogether
IURPWKLVDFWLYLWLHVZHUHDOVRRUJDQL]HGDW5HJLRQDO2IÀFHVRI  (OHYHQ  QRV FRPSODLQWV ZHUH XQGHU LQYHVWLJDWLRQ GXULQJ
REC all across India and subsidiaries of REC. Panel discussions WKH\HDURXWRIZKLFK 6HYHQ QRRIFRPSODLQWVKDYHEHHQ
VHPLQDUVZHUHDOVRRUJDQL]HGDWFHUWDLQ5HJLRQDO2IÀFHVDQG disposed of and remaining 04 (Four) nos. were pending for
RECIPMT, Hyderabad. ÀQDOL]DWLRQDVRQ(PSKDVLVZDVJLYHQWRWKHDVSHFW

221
Annual Report 2018-19

RISUHYHQWLYHYLJLODQFHWRVWUHDPOLQHWKHUXOHVDQGSURFHGXUHV Preventive Vigilance:


and making all efforts to arrest the loopholes detected during
During the year. Vigilance Deptt. has conducted 35 periodic
LQYHVWLJDWLRQRIYDULRXVFDVHV 
VXUSULVH&7(W\SHLQVSHFWLRQVLQGLIIHUHQWÀHOGVLQGLIIHUHQW
During this period 113 (One hundred thirteen) nos. of FDWHJRULHV 7KH DFWLRQDEOH SRLQWV REVHUYHG GXULQJ WKH
LQVSHFWLRQVKDYHEHHQFRQGXFWHGDWGLIIHUHQWSODQWVSURMHFWV course of inspections were brought to the knowledge of the
E\ VLWH YLJLODQFH RIÀFLDOV DV ZHOO DV E\ YLJLODQFH RIÀFLDOV FRQFHUQHGRIÀFLDOVDQG0DQDJHPHQWZKHUHYHUQHFHVVDU\IRU
RI WKH +4 LQFOXGLQJ &92 5HJDUGLQJ LPSURYLQJ YLJLODQFH VXLWDEOH FRUUHFWLYH PHDVXUHV )XUWKHU WKH WHQXUH RI RIÀFHUV
DGPLQLVWUDWLRQ E\ OHYHUDJLQJ WHFKQRORJ\ LPSOHPHQWDWLRQ RQ VHQVLWLYH SRVWV LV EHLQJ FRQWLQXRXVO\ PRQLWRUHG $W WKH
RI HSURFXUHPHQW HSD\PHQW UHJLVWHULQJ RQOLQH YLJLODQFH EHJLQQLQJRIFXUUHQWÀQDQFLDO\HDURIÀFLDOVZHUHRFFXS\LQJ
FRPSODLQWV   DQG XSORDGLQJ RI $QQXDO ,PPRYDEOH 3URSHUW\ VHQVLWLYH SRVWV IRU PRUH WKDQ  \HDUV DQG GXH WR SHUVLVWHQW
5HWXUQV $,35V RI([HFXWLYHVLQWKH1((3&2·V:HEVLWHKDYH LQWHUYHQWLRQ E\ 9LJLODQFH 'HSWW  RIÀFLDOV ZHUH WUDQVIHUUHG
EHHQPDWHULDOL]HG IURP WKHVH SRVWV WLOO GDWH +RZHYHU GXH WR LQFOXVLRQ RI IHZ
PRUHRIÀFHUVRFFXS\LQJVHQVLWLYHSRVWVIRUPRUHWKDQ\HDUV
)XUWKHU &7(&9& KDV FDUULHG RXW LQWHQVLYH H[DPLQDWLRQ RQ
GXULQJWKLVQXPEHULVDVRQ7KH0DQDJHPHQW
WZRPDMRUZRUNVLQUHVSHFWRI7XLULDO+(30L]RUDPDQG3DUH
VKDOOORRNLQWRWUDQVIHURIWKHVHRIÀFLDOV
+(3 $UXQDFKDO 3UDGHVK 7KH SDUDV UDLVHG E\ WKH &7( KDYH
been attended from time to time and as a result of the CTE’s Systemic Improvements:
LQVSHFWLRQ VR IDU DQ DPRXQW RI 5V  RQO\ KDV
All payments are made digitally including, payments to
DOUHDG\EHHQUHFRYHUHGIURPWKH&RQWUDFWRULQ7XLULDO+(3
FRQWUDFWRUVHWF(UHYHUVHDXFWLRQ H5$ KDVEHHQLQWURGXFHG
$SDUWIURPVXJJHVWLQJYDULRXVV\VWHPLPSURYHPHQWPHDVXUHV in SJVN. Also SJVN has already introduced e-tendering in
the important CVC circulars and OMs issued during this period DOO SURFXUHPHQWV YDOXHG DW 5V ODNKV DQG DERYH 6WUXFWXUHG
KDYHDOVREHHQFLUFXODWHGWRDOOFRQFHUQHGWRLPSURYHRYHUDOO UHYLHZPHHWLQJDUHUHJXODUO\FRQGXFWHGE\WKH&92ZLWK&0'
system in the Corporation. DQGWKH%RDUGLVLQIRUPHGRI9LJLODQFHDFWLYLWLHVRQKDOI\HDUO\
basis.
 6HYHQKXQGUHGQLQHW\ QRVRI$QQXDO3URSHUW\5HWXUQV
$35V  RI WKH HPSOR\HHV KDYH EHHQ VFUXWLQL]HG GXULQJ WKH Disposal of Complaints:
SHULRGIURPWR9LJLODQFHFOHDUDQFHV
7KHFRPSODLQWVUHFHLYHGLQWKH9LJLODQFH'HSDUWPHQWGXULQJ
UHTXLUHG WR WKH RIÀFLDOV IRU YDULRXV SXUSRVHV OLNH '3&
WKH SHULRG IURP YDULRXV VRXUFHV ZHUH GLVSRVHGRII DIWHU
SURPRWLRQUHJXODUL]DWLRQIRUHLJQYLVLWRXWVLGHHPSOR\PHQW
SURSHU LQYHVWLJDWLRQ ZLWKLQ WKH SUHVFULEHG WLPH OLQH $SDUW
UHWLUHPHQW UHVLJQDWLRQ UHOHDVH RI WHUPLQDO EHQHÀW HWF ZHUH
IURPFRPSODLQWVUHFHLYHGIURPRWKHUVRXUFHVIURP0R3DQG
JLYHQDVDQGZKHQVRXJKWIRU
FRPSODLQWVZHUHUHFHLYHGIURP&9&ZKLFKZHUHSURFHVVHG
7KH &92 KDV DWWHQGHG YDULRXV PHHWLQJV GXULQJ WKH SHULRG as per their merit and within stipulated time frame.
XQGHUUHSRUWDVFRQYHQHGE\WKH&HQWUDO9LJLODQFH&RPPLVVLRQ
Vigilance Clearance:
&9&  DQG WKH 0LQLVWU\ RI 3RZHU 0R3  *RYW RI ,QGLD 7KH
´9LJLODQFH$ZDUHQHVV:HHNµZDVREVHUYHGLQWKH&RUSRUDWLRQ During the year, Annual Property Returns of 253 employees
ZHIWR ZHUH VFUXWLQL]HG XS WR   9LJLODQFH FOHDUDQFHV
ZHUH LVVXHG WR  HPSOR\HHV RI GLIIHUHQW OHYHO IRUYDULRXV
SJVNL
purposes like promotion, outside employment, retirement,
9LJLODQFH 'HSDUWPHQW RI 6-91 KDV EHHQ VWULYLQJ WR EULQJ 12&IRURIÀFLDO SULYDWHIRUHLJQYLVLWHWF%HVLGHVWKHDERYH
DERXWREMHFWLYLW\IDLUQHVVWUDQVSDUHQF\DQGDFFRXQWDELOLW\LQ RQOLQHYLJLODQFHVWDWXVRIEHORZERDUGOHYHOHPSOR\HHVKDYH
DOO PDWWHUV ZLWK D YLHZ WR SURPRWLQJ IRU EHWWHU JRYHUQDQFH been uploaded both on DoPT and SJVN web portals as per
and corruption-free and healthy work culture. Various routine requirement and the same are being updated periodically.
YLJLODQFHDGPLQLVWUDWLYHPDWWHUVDFWLYLWLHVDUHEHLQJFDUULHG
Disciplinary Cases:
RXWLQ6-91EDVHGRQGLUHFWLYHVLVVXHGIURPWLPHWRWLPHE\
the Ministry of Power and Central Vigilance Commission. The 3XUVXDQWWR&9&·VVHFRQGVWDJHDGYLFHLQDFDVHRQHRIÀFHUKDV
GHWDLOVRIDFWLYLWLHVWDNHQXSGXULQJWKH\HDUDUHDVXQGHU been imposed major penalty of “Reduction to a lower stage

222
in the time scale of pay for four years” and Minor Penalty of LQYHVWLJDWLRQ 2XW RI WKHVH  FDVHV KDYH EHHQ FORVHG DQG
´FHQVXUHµDJDLQVWWKUHHRIÀFHUV,QDQRWKHUFDVHWKUHHRIÀFHUV enquiry is under progress in 03 cases.
KDV EHHQ LVVXHG ZDUQLQJ LQ OLQH ZLWK &9& DGYLFH )XUWKHU LQ
Letter issued on Systemic Improvements : Vigilance
D FDVH WZR RIÀFHUV KDYH EHHQ H[RQHUDWHG RQH RIÀFHU KDV
Department issued 12 numbers of letters for Systemic
been issued warning and minor penalty of “censure” has been
,PSURYHPHQW UHODWLQJ WR YDULRXV FDVHV GXULQJ WKH ÀQDQFLDO
LPSRVHG WR WKUHH RIÀFHUV DV SHU WKH LQYHVWLJDWLRQ UHSRUW RI
year 2018-19.
9LJLODQFH 'HSWW LQ OLQH ZLWK &9& DGYLFH DQG DV GHFLGHG E\
disciplinary authorities. Training in Vigilance Matters: During the F.Y 2018-19,
9LJLODQFH H[HFXWLYHV DWWHQGHG  7UDLQLQJ 3URJUDPPHV
Vigilance Awareness Week:
SHUWDLQLQJ WR 9LJLODQFH 0DQDJHPHQW  3UHYHQWLYH YLJLODQFH
$VSHUWKHGLUHFWLYHRI&HQWUDO9LJLODQFH&RPPLVVLRQ9LJLODQFH 9DULRXV:RUNVKRSV6HPLQDUVDUHEHLQJFDUULHGRXWE\+5'
$ZDUHQHVV ZHHN ZDV REVHUYHG ZHI WK 2FWREHU WR UG deptt, THDCIL to create awareness amongst the employees
1RYHPEHULQDOOXQLWVFHQWHUVRI6-91RQWKHWKHPH UHJDUGLQJYLJLODQFHUHODWHGPDWWHU
´(UDGLFDWHFRUUXSWLRQ³%XLOGD1HZ,QGLDµ$OHFWXUHE\&92
Vigilance Awareness Week, 2018:- Vigilance Awareness
WR VHQVLWL]H WKH HPSOR\HHV DJDLQVW FRUUXSWLRQ ZDV GHOLYHUHG
:HHNZDVREVHUYHGE\7+'&,QGLD/LPLWHGIURP
IRU HPSOR\HHV RI 1-+36 -KDNUL 7KH SURJUDPPHV RUJDQL]HG
WR  ZLWK WKH WKHPH IRU WKLV \HDU VSHFLÀHG E\ &9&
GXULQJ9$:UHFHLYHGZLGHFRYHUDJHRIPHGLD,QDOOWKH
“Eradicate Corruption-Build a New India”. On the occasion,
DFWLYLWLHVHQFRPSDVVHGVFKRROVFROOHJHVGLVWULFWVDQG
Vigilance department published a Booklet on Do’s and Don’ts
DSSUR[LPDWHO\VWXGHQWVDQGVFKRROFROOHJHVWDIIEHVLGHV
6\VWHPLF,PSURYHPHQWVWRFUHDWHDZDUHQHVVDPRQJVWWKH
SJVN’s employees and their families.
RIÀFLDOV3RVWHUV%DQQHUVRQ$QWL&RUUXSWLRQ5HVROXWLRQRI
THDC *RYW RI ,QGLD RQ 3,'3, JXLGHOLQHV UHODWLQJ WR ZKLVWOH EORZHU
PHFKDQLVPZHUHSXEOLVKHG GLVWULEXWHGWRHQWLUHRIÀFHVRI
9LJLODQFH GLYLVLRQ KDV DGRSWHG 3UHYHQWLYH DQG 3URDFWLYH
THDCIL for display.
approach to create incorruptibility in the functional areas. The
VWUDWHJ\RISUHYHQWLYHYLJLODQFHLVGUDZQDQGLPSOHPHQWHGIRU DVC
DQHQYLURQPHQWRILQWHJULW\DQGWRDGGYDOXHVWRWKHV\VWHP
Vigilance Department in Damodar Valley Corporation is
for increasing transparency and accountability. The approach
IXQFWLRQLQJ XQGHU WKH RYHUDOO VXSHUYLVLRQ DQG FRQWURO RI
RI SUHYHQWLYH YLJLODQFH LQFOXGHV D FRPELQDWLRQ RI PHDVXUHV
&KLHI 9LJLODQFH 2IÀFHU ZLWK DQ DLP WR HQVXUH WUDQVSDUHQF\
OLNH WKH UHYLHZ RI UXOHV  SROLFLHV SDUWLFXODUO\ FRQFHUQLQJ
REMHFWLYLW\ DQG TXDOLW\ LQ YLJLODQFH IXQFWLRQLQJ 7KH GHWDLOV
procurement and recruitment, awareness measures and
RIYDULRXVDFWLYLWLHVWDNHQXSGXULQJWKHSHULRGDUHIXUQLVKHG
IRFXVLQJ RQ VSHFLÀF IXQFWLRQDO DUHDV &7( 7\SH 5HJXODU
EHORZ
&KHFNV6XUSULVH,QVSHFWLRQKDYHEHHQFRQGXFWHG6\VWHPVDUH
EHLQJVWUHDPOLQHGLQFRQVXOWDWLRQZLWKUHVSHFWLYHGHSDUWPHQW 1. Inspection of works, services, contracts etc. and
to bring transparency and curb possibilities of corruption. scrutiny of Audit Reports:
During the period, 46 Nos. of Surprise Inspection & 18 Nos Total 43 Surprise checks and 65 Periodic/Planned
of CTE Type Inspection were carried out. The time schedule inspections were carried out during this period.
laid down by the Central Vigilance Commission for conducting Actionable points emerged in course of inspections were
HQTXLULHV DQG LQYHVWLJDWLRQ ZDV E\ DQG ODUJH DGKHUHG WR EURXJKWWRWKHQRWLFHRIWKHFRQFHUQHG+2'V+23VDQG
Agreed list in consultation with CMD and SP (CBI) Dehra Dun RWKHURIÀFLDOVIRUVXLWDEOHFRUUHFWLYHDQGDGPLQLVWUDWLYH
IRU WKH \HDU  KDV EHHQ UHYLHZHG DQG ÀQDOL]HG /LVW RI actions.
2IÀFHUVRI'RXEWIXO,QWHJULW\IRUWKH<HDUKDVDOVREHHQ
 6FUXWLQ\ DQG H[DPLQDWLRQV RI Audit Reports (Internal)
ÀQDOL]HG
for the period 2016-2017 has been taken up.
Status of Registered Complaints : (01.01.2018 to
2. Disposal of Complaints:
31.03.2019)
 7RWDO  FRPSODLQWV KDYH EHHQ UHFHLYHG GXULQJ WKH
9LJLODQFH 'HSDUWPHQW UHJLVWHUHG  FRPSODLQWVFDVHV IRU
SHULRG DPRQJVW ZKLFK  QRV KDYH EHHQ GLVSRVHG

223
Annual Report 2018-19

of and rHVW FRPSODLQWV DUH DW WKH YDULRXV VWDJHV RI 8 Systemic Improvement:
LQYHVWLJDWLRQ
 2Q WKH DGYLFH RI WKH YLJLODQFH GHSWW YDULRXV V\VWHPLF
3. Vigilance Clearance and Scrutiny of APR: LPSURYHPHQW KDG WDNHQ SODFH LQ WKH PDWWHU RI ZRUNV
 9LJLODQFHFOHDUDQFHVIRUYDULRXVSXUSRVHVYL]3URPRWLRQ VHUYLFHV SXUFKDVH FRQWUDFWV ZRUNV DZDUGHG RQ
8S JUDGDWLRQ UHVLJQDWLRQ RXWVLGH HPSOR\PHQW nomination basis, receipt and processing of bills and
GHSXWDWLRQUHWLUHPHQW YROXQWDU\VXSHUDQQXDWLRQ DQG prescribed timeline for release of payments to the
IRU REWDLQLQJ 12& IRU RIÀFLDO  SULYDWH IRUHLJQ YLVLW FRQWUDFWRUVVXSSOLHUVVHUYLFH SURYLGHUV GLVSRVDO RI
etc were accorded to RIÀFLDOV$QQXDO3URSHUW\ VFUDSV  QRQPRYLQJ LWHPV URWDWLRQDO WUDQVIHU RI
Returns (APR)RIDURXQG2IÀFLDOVZHUHVFUXWLQL]HG RIÀFLDOVKROGLQJVHQVLWLYHSRVWVHWF
4. Disciplinary Cases: BBMB
During this period Major Penalty Proceedings were The Vigilance Administration in Bhakra Beas Management
LQLWLDWHG DJDLQVW  WHQ  RIÀFLDOV RI WKH &RUSRUDWLRQ %RDUGFRPSULVHVRID&KLHI9LJLODQFH2IÀFHU &92 &926-91/
Further, on conclusion of departmental proceedings
is holding Additional Charge of CVO, BBMB, Any complaint(s)
PDMRU SHQDOW\ KDYH EHHQ LPSRVHG XSRQ  IRXU 
UHFHLYHGLVJRWLQYHVWLJDWHGE\WKH92DQGEDVHGRQÀQGLQJ
RIÀFHUV
UHFRUGDSSURSULDWHDFWLRQLVUHFRPPHQGHGZLWKWKHDSSURYDO
5. Structured Meeting with Chairman: of CVO.
 $VSHUPDQGDWHGSURYLVLRQVTXDUWHUO\VWUXFWXUHGPHHWLQJ 7KH9LJLODQFH2UJDQL]DWLRQLQ%%0%LVGRLQJHDUQHVWHIIRUWV
ZLWK &KDLUPDQ  %RDUG 0HPEHUV DQG RWKHU 6HQLRU to inculcate the following discipline among all the employees
2IÀFLDOVZHUHKHOGLQUHJXODULQWHUYDOV'LVFXVVLRQVZHUH
RI%%0%DVDPHDVXUHRISUHYHQWLYHYLJLODQFH
held on the Agenda note and minutes of the meetings
issued for follow up action and implementation. L  7RFKHFNDQGFRQWUROWKHYHU\WHQGHQF\RQRQH·VSDUWWR
delay the matters.
 0HHWLQJZLWKWKH&%,RIÀFLDOV
LL  7R UHFRUG VSHDNLQJ RUGHUV LQ FOHDU WHUPV RQ WKH ÀOHV
 6HYHUDOPHHWLQJZLWKWKH&%,RIÀFLDOVZHUHKHOGRQWKH
JLYLQJPHULWVRIWKHRUGHUV
LVVXHVKDYLQJFRPPRQLQWHUHVW$JUHHG/LVWVIRUWKH\HDU
KDGEHHQÀQDOL]HGLQFRQVXOWDWLRQZLWK&%, LLL  7RDYRLGGHFLVLRQEHLQJLQÁXHQFHGE\WKRVHZKRPLJKW
7. Vigilance Awareness Week (VAW): KDYHDQD[HWRJULQG

 9LJLODQFH $ZDUHQHVV :HHN 9$:  WKURXJKRXW LY  7REHDOZD\VUHFHSWLYHWRDQ\VXJJHVWLRQE\DFROOHDJXH


'DPRGDU 9DOOH\ &RUSRUDWLRQ '9&  ZDV REVHUYHG ZLWK VXSHULRURUDVXERUGLQDWHZKLFKPD\UHVXOWLQVDYLQJWR
effect from 29.10.2018 to 03.11.2018 with the theme WKHH[FKHTXHU
”Eradicate Corruption - Build a New India ¼Hkz"Vkpkj
Y  7REHÀUPLQFRQYLFWLRQWKDWLQWHJULW\LVWREHVDIHJXDUGHG
feVkvks & u;k Hkkjr cukvks½µ$VSDUWRIRXWUHDFKDFWLYLWLHV
DQGDQ\SULFHSDLGLQWKLVUHJDUGLVLQVLJQLÀFDQW
QRV RI DFWLYLWLHV YL] OHFWXUHVGHEDWHV VORJDQ HVVD\
TXL]SDLQWLQJFRPSHWLWLRQVZHUHFDUULHGRXWDWGLIIHUHQW YL  ,GHQWLÀFDWLRQDQGIRFXVRQVHQVLWLYHSRVWVUHJXODUDQG
schools, colleges, and institutions of Kolkata, Asansol VXUSULVHFKHFNVLQVSHFWLRQRIVXFKVSRUWV
& HazaribagFLW\WRZQ RWKHUSURMHFWVRI'9&
YLL  ,GHQWLÀFDWLRQ RI RIÀFLDOV VXVSHFWHG RI FRUUXSWLRQ DQG
 7ZR   :RUNVKRSV ZHUH RUJDQL]HG DW '9& +TUV SURSHUVFUXWLQ\RISHUVRQQHOZKRDUHSRVWHGLQVHQVLWLYH
on ”Public Procurement Principles and Effective SRVWV ZKLFK LQYROYH SXEOLF GHDOLQJ HVWDEOLVKPHQW DQG
Contract Management” and “Drafting of Charge purchase related work and ensure their rotation after
Sheet, Conduct of Departmental Inquiry & Role of
HYHU\\HDUVDVSHU&9&JXLGHOLQHV
,QTXLU\3UHVHQWLQJ2IÀFHUµ. The said workshops were
DGGUHVVHGE\6UL5DPDFKDQGUDQ9HQNDWDUDPDQL([&7( YLLL  7R NHHS D ZDWFKIXO H\H RQ DOO EUHHGLQJ SODFHV RI
CVC and SUL6XUMLW6LQJK(['LUHFWRU&9& &', corruption.

224
L[  7R H[SRVH ZLWKRXW IHDU WKRVH LQYROYHG LQ DFWV RI VHOI BEE
JUDWLÀFDWLRQ
During the year 2018-19, there was no major complaint
[  7RWDNHSULGHLQKXPEOHOLYLQJDQGDFWVRIKRQHVW\ UHFHLYHGDQGQRGLVFLSOLQDU\FDVHLQLWLDWHG

[L  7R IROORZ WKH UXOHV SURFHGXUHV LQVWUXFWLRQV PDQXDOV CPRI


etc. meticulously.
¶9LJLODQFH 9LVLRQ· RI &35, LV SUHYHQWLYH RYHU SXQLWLYH
[LL  7RDYRLGGUDZLQJLOORJLFDODQGGXELRXVLQIHUHQFHVVRDV DFWLRQV WR HQIRUFH PHDQLQJIXO ZRUNDEOH DQG REMHFWLYH
WRGHULYHXQGXHEHQHÀWVZKHQHYHUDQDPELJXLW\LQUXOHV V\VWHPVSURFHGXUHV WR GHYHORS WUXVW DQG WUDQVSDUHQF\ LQ
in encountered. DOO WUDQVDFWLRQV WR SUHYHQW ÀQDQFLDO RU RWKHU ORVVHV GXH WR
any malpractices, to promote pride and self-esteem of the
[LLL  $JUHHGOLVW OLVWRIGRXEWIXOLQWHJULW\DUHSUHSDUHGDQG
2UJDQL]DWLRQDQGLWVHPSOR\HHVDQGWLPHERXQGDFWLRQLQDOO
LWLVHQVXUHGWKDWRIÀFHURIÀFLDOVRIGRXEWIXOLQWHJULW\DUH
VSKHUHVRIDFWLYLWLHV
QRWSRVWHGRQVHQVLWLYHSRVWV
6HYHUDO V\VWHP ,PSURYHPHQWV KDYH XQGHUWDNHQ ZLWK ,7
[LY  ([SHGLWH WKH LQTXLULHV WKHLU IROORZXS DFWLRQ WR JHW
usage and web enabled technologies like display of Status of
GHFLVLRQIURPSDUHQW6WDWHV6WDWH(OHFWULFLW\%RDUGV
ERRNLQJRIWHVWGDWHVLVDYDLODEOHLQ&35,ZHEVLWH7HFKQRORJ\
[Y  ,PSOHPHQWDWLRQRIGLVFLSOLQDU\DFWLRQVZLWKRXWDQ\GHOD\ communication with customers through emails, payment
ZKHUHYHU%%0%LWVHOIFDQWDNHWKHVDPH of test and consultancy fees through wire transfer, RTGS,
[YL  9DULRXV DGYLVRU\ KDYH EHHQ LVVXHG IRU V\VWHP e-tendering, posting of Formats for submission of research
LPSURYHPHQWLQ%%0% proposals, project reports in CPRI website. Transparency in all
WKHWHFKQLFDOÀQDQFLDODQGDGPLQLVWUDWLYHDFWLYLWLHVRI&35,LV
[YLL  3UHYHQWLYH FLUFXODU IRU LPSURYLQJ DZDUHQHVV DV ZHOO DV
ensured.
V\VWHP LPSURYHPHQW LQ ZRUNLQJ RI %%0% ZHUH DOVR
taken up from time to time. NPTI

 'XULQJ WKH \HDU   WR   9LJLODQFH $ZDUHQHVV ZHHN ZDV REVHUYHG DW 137, &RUSRUDWH
 FRPSODLQWV ZHUH UHFHLYHG  1RV FRPSODLQWV KDYH 2IÀFH DQG DOO WKH LQVWLWXWHV IURP WK 2FWREHU WR UG
been disposed off and remaining 5 complaints are under 1RYHPEHU  ZLWK WKH 7KHPH ´(UDGLFDWH &RUUXSWLRQ
LQYHVWLJDWLRQ %XLOGD1HZ,QGLDµ'XULQJWKHZHHNQXPEHURIDFWLYLWLHVZDV
RUJDQL]HGVWDUWLQJIURPSOHGJHWDNLQJWRFRQGXFWLQJZRUNVKRS
 %HVLGHV DERYH 9LJLODQFH $ZDUHQHVV :HHN ²  ZDV
RQ YLJLODQFH DZDUHQHVV DQG RUJDQL]LQJ GHEDWH FRPSHWLWLRQ
REVHUYHG ZHI   WR  LQ %%0%
In the pledge taking ceremony held on 29.10.2018 Prof. (Dr.)
RIÀFHVDW&KDQGLJDUKDVZHOODVDW3URMHFW6WDWLRQV$Q
5DMHQGUD.XPDU3DQGH\'LUHFWRU*HQHUDO137,DGPLQLVWHUHG
LQWHUDFWLYHVHVVLRQRQ´(UDGLFDWH&RUUXSWLRQ%XLOGD1HZ
WKH SOHGJH WR DOO WKH RIÀFHUV DQG VWDII RI 137, &RUSRUDWH
India” was also conducted on 01.11.2018 at Chandigarh
2IÀFH )DULGDEDG DQG 137, 367,  %HQJDOXUX WKURXJK 9LGHR
and Nangal.
Conferencing.

225
Annual Report 2018-19

7DLORULQJ7UDLQLQJ3URJUDPIRUZRPHQXQGHU6NLOO'HYHORSPHQWDFWLYLWLHVE\'9&

226
CHAPTER 35.3

ACTIVITIES RELATING TO WOMEN EMPLOYEES


Ministry of Power NTPC
There are 48 women employees in the Ministry of Power. The
Group Total Number Percentage
UHSUHVHQWDWLRQ RI ZRPHQ HPSOR\HHV DW YDULRXV OHYHOV LQ WKH Employees on Of Women Of overall
0LQLVWU\RI3RZHUDVRQLVLQGLFDWHGEHORZ 31st March 2019 employees staff
strength
Group Total Employees No. of Percentage of
(as on Women overall staff
A 12692 786 6.2
31.03.2019) Employees strength
A 61 12 19.6 B 3805 285 7.5
B 118 28 23.7
C 3167 171 5.4
C 42 06 14.2
C(MTS) 57 02 3.5 D 575 47 8.2
Total 278 48 17.2
Total 20239 1289 6.4
(PSOR\PHQW RI ZRPHQ LQ YDULRXV JUDGHV LQ WKH 0LQLVWU\ RI
3RZHU LV GHSHQGHQW XSRQ WKH QRPLQDWLRQV UHFHLYHG IURP
NHPC
DOP&T and the recruiting agencies such as the Union Public
6HUYLFH&RPPLVVLRQ6WDII6HOHFWLRQ&RPPLVVLRQHWF 1+3& SURYLGHV FRQGXFLYH ZRUNLQJ HQYLURQPHQW WR DOO LWV
$ &RPSODLQWV &RPPLWWHH H[LVWV LQ WKH 0LQLVWU\ RI 3RZHU WR IHPDOHHPSOR\HHVDQGVWULYHVWRHQVXUHJHQGHUHTXDOLW\DWDOO
ORRN LQWR WKH FRPSODLQWV RI VH[XDO KDUDVVPHQW PDGH E\ WKH OHYHOV1+3&SURYLGHVDWSDUZRUNLQJFRQGLWLRQVSUHYDOHQWLQ
women employees of the Ministry. The Committee is currently the industry to female employees in respect of work, leisure
FKDLUHGE\'HSXW\6HFUHWDU\/HYHO2IÀFHU KHDOWK DQG K\JLHQH )XUWKHU RXU RUJDQL]DWLRQ HQVXUHV WKDW
WKHUHLVQRKRVWLOHHQYLURQPHQWWRZDUGVZRPHQDWZRUNSODFH
Welfare of Minorities
DQGQRZRPHQHPSOR\HHKDVDQ\JURXQGVWREHOLHYHWKDWVKH
7KH VFKHPHV DV UHFRPPHQGHG E\ WKH *RYHUQPHQW IRU WKH
LVLQDGLVDGYDQWDJHRXVSRVLWLRQUHJDUGLQJKHUHPSOR\PHQW
welfare of the Minorities from time to time, are implemented,
7KH YDULRXV EHQHÀWV DQG IDFLOLWLHV SURYLGHG WR :RPHQ
from time to time.
HPSOR\HHVLQ1+3&/WGDUHEULHIHGDVEHORZ
CEA
I. Maternity Leave
Group Total No. of Women Percentage of
Employees as employees in overall staff  0DWHUQLW\ /HDYH LV JUDQWHG WR IHPDOH HPSOR\HHV IRU D
on 31.03.2019 position strength period up to 180 days to take care of the new born and
A 370 52 14.05 GD\VLQFDVHRIPLVFDUULDJHDERUWLRQ

B 140 40 28.57 II Child Care Leave (CCL) for Women Employees


C 233 27 11.58  &KLOGFDUHOHDYHZLWKSD\PD[LPXPXSWRGD\VIRU
TOTAL 743 119 16.01 women employees for taking care of upto two children
PAO upto the age of 18 years (no age limit in respect of child
with minimum disability of 40 %) for rearing or to look
Group Total Employees Number Percentage of DIWHUDQ\RIWKHLUQHHGVOLNHH[DPLQDWLRQVLFNQHVVHWF
as on of women overall staff
31/12/2018 employees strength III. Special Child Care Leave on adoption of a child.
A 2 - -  6SHFLDO FKLOG FDUH OHDYH LV JUDQWHG WR IDFLOLWDWH IHPDOH
B 43 9 20.93 HPSOR\HHVZLWKOHVVWKDQWZRVXUYLYLQJFKLOGUHQXSWRD
SHULRGRIGD\VIURPWKHGDWHRIYDOLGOHJDODGRSWLRQ
C 23 3 13.04
to take care of their legally adopted child up to one year
Total 68 12 17.64 of age.

227
Annual Report 2018-19

IV. Conduct, Discipline & Appeal Rules. Representation of women in employment is as under:

NHPC Conduct, Discipline and Appeal Rules, includes Group Total Number Percentage
UXOHV SURKLELWLQJ VH[XDO KDUDVVPHQW DQG SURYLGH IRU Employees of Women of overall
as on employees staff (Women
appropriate penalties against offender.
31.03.2019 employees)
V. Complaints Committee for handling harassment strength
related grievances of women employees. A 2880 225 7.81
 ,QDFFRUGDQFHZLWKWKH6H[XDO+DUDVVPHQWDW:RUNSODFH B 815 94 11.53
3UHYHQWLRQ 3URKLELWLRQ DQG 5HGUHVVDO  $FW 1+3& KDV
C 2166 194 8.96
D &RPSODLQWV &RPPLWWHH IRU KDQGOLQJ FRPSODLQWV 
JULHYDQFHVRIIHPDOHHPSOR\HHVFRQFHUQLQJKDUDVVPHQW ' ([FOXGLQJ 833 179
Sweepers) 21.49
DWZRUNSODFHDW&RUSRUDWH2IÀFHDQGDWDOOLWV3URMHFWV
3RZHU6WDWLRQV5HJLRQDO2IÀFHVDQG8QLWV7KHVDPHLV Sweepers 59 19 32.20
DGHTXDWHO\SXEOLFL]HGDWDOOLWVXQLWV
Total 6753 711 10.53
VI. Crèche Facility:
POWERGRID
 &UqFKH IDFLOLW\ KDV EHHQ SURYLGHG WR HPSOR\HHV DW
$V RQ 0DUFK   WKHUH DUH  :RPHQ (PSOR\HHV
&RUSRUDWH 2IÀFH 7KH &UqFKH LV KDYLQJ WKH IDFLOLWLHV RI
ZRUNLQJDWGLIIHUHQWOHYHOVLQWKHFRUSRUDWLRQ'HWDLOVDUHJLYHQ
storage, heating, cooking food for infants, nannies to
EHORZ
take care of infants etc.
Group Total no. of No. of Percentage of
VII. Declaration of Parents/ Parents-in -Laws as Employees Women Staff Strength
dependents. as on Employees
31/03/2019
 1+3&DOVRSURYLGHVWKHRSWLRQWRLWVIHPDOHHPSOR\HHV
A 4300 368 8.56
WRGHFODUHKHUSDUHQWV3DUHQWVLQ/DZVDVGHSHQGHQWV
B 2072 162 7.82
IRUDYDLOLQJ0HGLFDOEHQHÀWV
C 2764 141 5.10
VIII. WIPS Cell. D 81 10 12.35
Total 9217 681 7.39
 :RPHQ LQ 3XEOLF 6HFWRU )RUXP :,36  KDYH EHHQ
FRQVWLWXWHGDW&RUSRUDWH2IÀFHWRLQVSLUHDQGSURPRWH ,Q YLHZ RI WKH SULQFLSOH RI JHQGHU HTXDOLW\ DV HQVKULQHG LQ
the integrated growth of women in NHPC and enhance WKH ,QGLDQ &RQVWLWXWLRQ YDULRXV VWHSV KDYH EHHQ DGRSWHG
WKHLUHIIHFWLYHQHVVLQHPSOR\PHQW IRUSRVLWLYHGLVFULPLQDWLRQLQIDYRURIZRPHQLQ32:(5*5,'
HQVXULQJWKHLUDGYDQFHPHQWLQGLIIHUHQWVSKHUHV%HVLGHWKLV
IX. Special Dispensation in Attendance:
a complaint committee under the chairmanship of a woman
 /DWHFRPLQJEH\RQGDPWRDPLVDOORZHG H[HFXWLYHKDVEHHQVHWXSWRHQVXUHDSSURSULDWHHQYLURQPHQW
four times in a month to all employees subject to DWZRUNSODFHIRUZRPHQ7KH6H[XDO+DUDVVPHQWRI:RPHQ
compensation on the same day for corresponding DW:RUNSODFH 3UHYHQWLRQ3URKLELWLRQDQG5HGUHVVDO $FW
SHULRG DIWHU  KUV KRZHYHU LQ UHVSHFW RI ZRPHQ has been brought to the notice of all concerned in Corporation
HPSOR\HHVVLWWLQJODWHLQWKHHYHQLQJLVUHVWULFWHGXSWR IRUSUHYHQWLRQRIVH[XDOKDUDVVPHQWRIZRUNLQJZRPHQ,WLV
ensured that there is no discrimination against women on
18.00 hours only for compensating the late coming in
any count. In order to create awareness regarding female
the morning.
HPSOR\HHV· ULJKWV H[FOXVLYH DGHTXDWH WUDLQLQJ SURJUDPV RQ
X.  5HSUHVHQWDWLRQRIZRPHQHPSOR\HHVRQVHOHFWLRQERDUG ZRPHQHPSRZHUPHQWDQGGHYHORSPHQWLQFOXGLQJSURJUDPV
FRPPLWWHH FRQVWLWXWHG IRU SURPRWLRQ UHFUXLWPHQW RI RQ JHQGHU VHQVLWL]DWLRQ DUH RUJDQL]HG 7KH &RUSRUDWLRQ DOVR
employees. encourages female employees to freely participate in all

228
DFWLYLWLHV OLNH PHHWLQJV FRQIHUHQFHV VHPLQDUV H[KLELWLRQV UHGUHVVDORIFRPSODLQW V DJDLQVWVH[XDOKDUDVVPHQWRIZRPHQ
FRPSHWLWLRQVWUDLQLQJHWFZKLFKKHOSLQWKHLULQWHJUDWLRQ:H HPSOR\HHV7KHFRPPLWWHHLVKHDGHGE\DVHQLRUODG\RIÀFHU
KDYHPDGHDOOSRVVLEOHHIIRUWVVRWKDWDFRQJHQLDODWPRVSKHUH RI WKH &RPSDQ\ DQG LQFOXGHV UHSUHVHQWDWLYH IURP DQ 1*2
can be created to enable women employees to perform their DVRQHRILWVPHPEHUV$QWLVH[XDOKDUDVVPHQWVWDQFHRIWKH
duties with honor, dignity and without fear. Company is also outlined in REC (Conduct, Discipline and
Appeal) Rules.
:H KDYH PDGH HIIRUWV WR HQVXUH WKDW DGHTXDWH QXPEHUV RI
IHPDOHDUHUHFUXLWHGZKHQHYHUZHUHVRUWHGWRVXFKDFWLYLWLHV 5(& KDV VHYHUDO OHDYH SROLFLHV PDWFKLQJ WKH VWDWXWRU\
$SDUW IURP JLYLQJ HPSOR\PHQW LW LV HQVXUHG DGHTXDWH SURYLVLRQV UHJDUGLQJ 0DWHUQLW\ /HDYH DQG DOVR &KLOG &DUH
UHSUHVHQWDWLRQLVJLYHQWRIHPDOHHPSOR\HHVZKLOHQRPLQDWLQJ /HDYHIRUWDNLQJFDUHRIFKLOGUHQGXULQJWKHLUJURZLQJXS\HDUV
HPSOR\HHVIRUH[WHUQDODQGLQWHUQDOWUDLQLQJSURJUDPV 6DIHW\ DQG H[SORLWDWLRQ IUHH HQYLURQPHQW LV HQVXUHG E\ ZD\
RI ZHOO GRFXPHQWHG SROLFLHV UHJDUGLQJ SUHYHQWLRQ RI VH[XDO
PFC
KDUDVVPHQWDWZRUNSODFH(TXDORSSRUWXQLWLHVDUHSURYLGHG
The Corporation has women in important and critical functional IRU WKH ZRPHQ HPSOR\HHV LQ WKHLU FDUHHU DGYDQFHPHQW
DUHDV:RPHQUHSUHVHQWDWLRQVKDYHJRQHDFURVVKLHUDUFKLFDO :RPHQ LQ WKH &RUSRUDWLRQ KDYH UHDFKHG WKH KLJKHVW OHYHOV
OHYHOV 7KH &RPSDQ\ SURYLGHV HTXDO JURZWK RSSRUWXQLWLHV of Management positions. There is also a women cell
IRUWKHZRPHQLQOLQHZLWK*RYWRI,QGLDSKLORVRSK\RQWKH functioning in the form of a self-help group of women. They
subject. The women are adequately represented, with 20.60% meet periodically and organise get together and picnics which
of the total work force. DUHÀQDQFLDOO\VXSSRUWHGE\WKH0DQDJHPHQW

Group Total Employees Number Percentage of Out of the total work force in the Company the representation
(as on of Women overall staff of women is 16.02%.
31.03.2019) Employees strength
Group Total Number Percentage of
A 479 100 20.88 Employees as of Women overall staff
on 31.03.2019 employees strength
B 6 0 0.00
A 346 55 15.90
C 14 3 21.43
B 75 16 21.33
D 1 0 0.00
C 9 0 0
Total 500 103 20.60
D 57 7 12.28

PFC as part of its social responsibility makes all efforts to TOTAL 487 78 16.02
HQVXUHFRPSOLDQFHRIWKH'LUHFWLYHVDQGJXLGHOLQHVLVVXHGE\
WKH*RYHUQPHQWRI,QGLDIURPWLPHWRWLPHSHUWDLQLQJWRWKH NEEPCO
ZHOIDUH RI IHPDOH HPSOR\HHV $ FRPPLWWHH WR H[DPLQH WKH Representation of women is indicated in the format given
FDVHVUHODWHGWRVH[XDOKDUDVVPHQWLVLQSODFH below:
REC Group Total Number Percentage
Representation of Women in REC Employees as of Women of overall
on 31/03/19 employees staff strength
7KH &RPSDQ\ SURYLGHV HTXDO RSSRUWXQLWLHV IRU HPSOR\PHQW
of women and takes care of their safety and welfare while A 697 62
in employment. REC has in place gender neutral and
B 620 123
women friendly practices and policies which supports equal
RSSRUWXQLWLHV DQG SURWHFWLRQ DJDLQVW H[SORLWDWLRQ RI ZRPHQ C 678 124 16.82
HPSOR\HHV DW WKH ZRUN SODFH ,Q OLQH ZLWK WKH SURYLVLRQV RI
6H[XDO +DUDVVPHQW RI :RPHQ DW ZRUNSODFH 3UHYHQWLRQ D 56 36
Prohibition &Redressal) Act, 2013, an “Internal Complaints Total 2051 345
Committee’ has been constituted in the Company for

229
Annual Report 2018-19

SJVNL $:RPHQ&HOOZRUNVIRUWKHZHOIDUHRIWKHZRPHQHPSOR\HHV
It constitutes women employees of different grades and meets
Representation of women in staff strength is given
periodically.
below : -
,QRUGHUWRHQVXUHÀWQHVVRIZRPHQHPSOR\HHVRIFRUSRUDWLRQ
Group Total Employees as Number Percentage of
&RUSRUDWH :HOIDUH GHSDUWPHQW LV FRQGXFWLQJ GDLO\ <RJD
on 31.03.2019 of Women overall staff
employees strength SURJUDPPHDW2IÀFHU&OXE &RPPXQLW\&HQWUH7+'&,/KDV
Total 7RWDO  160 10.13 % of also conducted meditation workshop from 20 Feb to 27 Feb
(1475 Direct Recruited total staff DW2IÀFHU&OXEWKURXJKUHSXWHG7UDLQHUV0DVWHUV
(DR) & Absorbed and strength
7KH ´:RPHQ &HOOµ ZRUNV IRU WKH ZHOIDUH DQG UHGUHVVDO RI
104 Deputationist
from GoHP) JULHYDQFHV RI ZRPHQ HPSOR\HHV LI DQ\  $SDUW IURP WKLV D
QXPEHURIVSRUWVDQGFXOWXUDODFWLYLWLHVDUHRUJDQL]HGURXQG
‡ ,Q SXUVXDQFH WR WKH 6H[XDO KDUDVVPHQW RI :RPHQ
WKH \HDU H[SOLFLWO\ IRU WKH ZRPHQ HPSOR\HHV DQG VSRXVH
DW :RUNSODFH 3UHYHQWLRQ 3URKLELWLRQ  5HGUHVVDO 
RI HPSOR\HHV OLNH %DGPLQWRQ &DURP +HDOWK  :HOOQHVV
$FW  ,QWHUQDO &RPSODLQW &RPPLWWHHV KDYH EHHQ
SURJUDPHWF:RPHQWHDPRI7+'&,/HPHUJHG:LQQHURIWKH
FRQVWLWXWHGDW&RUSRUDWH2IÀFHDVZHOODV3URMHFW6LWHV
ICPSU Badminton Tournament held under the aegis of Power
‡ 6-91 JLYHV XWPRVW LPSRUWDQFH WR WKH HPSRZHUPHQW Sports Control Board.
DQG RYHUDOO ZHOO EHLQJ RI LWV ZRPHQ HPSOR\HHV 0RUH
DVC
WKDQ   RI ZRPHQ HPSOR\HHV KDYH EHHQ LPSDUWHG
training on Neuro-linguistic Programming, Leadership :RPHQHPSOR\HHVFRQVWLWXWHDERXWDVRQ
'HYHORSPHQWKHDOWK 6WUHVV0DQDJHPHQWDQG*HQGHU of DVC work force. Measures for empowerment and
6HQVWLYLW\HWFWKURXJK2UJDQL]DWLRQVRI1DWLRQDOUHSXWH GHYHORSPHQWSROLF\RIJHQGHUVHQVLWL]DWLRQDUHDGRSWHG
like ASCI, IIMs, IMI, MDI etc.
Group Total Number Percentage
‡ 6-91 DOVR HQFRXUDJHV LWV ZRPHQ HPSOR\HHV WR employees of women of overall
SDUWLFLSDWH LQ YDULRXV 5HFUHDWLRQDO &XOWXUDO DQG as on employees staff
6SRUWV (YHQWV WKHUHE\ UHVXOWLQJ LQ HQKDQFHG FRUGLDO 31.03.2019 strength
relationships. Group A 2552 122 4.78
‡ 6-91ZRPHQHPSOR\HHVKDYHEHHQH[WHQGHGWKHEHQHÀW Group B 3772 240 6.36
RIPDWHUQLW\OHDYHFKLOGFDUHOHDYHEHVLGHVUHOD[DWLRQLQ
Group 'C' & 'D' 1097 132 12.03
RIÀFHWLPLQJV
Total 7421 494 6.66
THDC

5HSUHVHQWDWLRQRIZRPHQLQ7+'&,/LVLQGLFDWHGLQWDEOHEHORZ '9&DVDOLIHWLPHPHPEHURI:RPHQLQ3XEOLF6HFWRU :,36 


under aegis of Standing Conference of Public Enterprises
Group Total Employees Number Percentage (SCOPE) for the growth of women in public sector, has formed
(as on of Women of overall WKH :,36 FHOO DV SHU JXLGHOLQHV RI '23( 0LQLVWU\ RI +HDY\
31.03.2019) Employees staff
strength Industries and public enterprises, GOI.

Total 1891 116 6.13 ,QWKHODVWQDWLRQDOPHHWRIWKH:,36'9&KDVEHHQDZDUGHG


ZLWKUHFRJQLWLRQIRUDFWLYHDQGRYHUZKHOPLQJSDUWLFLSDWLRQRI
Brief write up about the activities
LWVZRPHQHPSOR\HHVDPRQJVW:,36HDVWHUQUHJLRQ
7+'&,QGLD/LPLWHGEHOLHYHVWKDW:RPHQ(PSOR\HHVDUHHTXDO
,QWHUQDWLRQDO:RPHQ·V'D\ZDVFHOHEUDWHGLQDOOWKH3URMHFWV
SDUWQHUVLQWKHJURZWKRIWKH2UJDQL]DWLRQ9DULRXVDFWLYLWLHV
of DVC on 08.03.2019.
IRU ZRPHQ HPSOR\HHV KDYH EHHQ RUJDQL]HG LQ WKH )LQDQFLDO
Year 2018-2019, which includes workshops and a specially DVC has constituted an internal complaints committee, at
designed training program for women. This year corporate LWV DOO $GPLQLVWUDWLYH XQLWV LQ OLQH ZLWK ´6H[XDO KDUDVVPHQW
welfare department has conducted work shop on “Health and RI ZRPHQ DW ZRUN SODFH XQGHU SUHYHQWLRQ SURKLELWLRQ DQG
Nutrition” by Dr. Surekha, Dean Academics, AIIMS, Rishikesh. redressal Act, 2013”.

230
BBMB :RPHQ DW :RUNSODFH  UHSRUWHG FDVHV LI DQ\ LQ &35,
RIFRPPLVVLRQ RIDFWVRIVH[XDOKDUDVVPHQWRIZRPHQ
5HSUHVHQWDWLRQRIZRPHQLQ%%0%LVLQGLFDWHGEHORZ
and submits its report to the disciplinary authority
Group Total Employees Number Percentage of recommending action to be taken against the accused
of Women overall staff employees. The womens cell also looks into any other
employees strength FRPSODLQWVE\:RPHQHPSOR\HHVLQZRUNSODFH
A 497 46 9.26 The chairperson of womens cell also recommends to
B 995 152 15.28 the management of CPRI the sponsoring of women
C 3395 302 8.90 employees to attend women related conferences and
arrange talks pertaining to women related matters. One
D 3528 418 11.85
RI WKH ZRPHQ RIÀFHUV ZDV GHSXWHG WR DWWHQG WKH 7ZR
Total 8415 918 10.91 GD\V :RUNVKRS RQ ¶7KH 6H[XDO +DUDVVPHQW RI :RPHQ
DW:RUNSODFH 3UHYHQWLRQ3URKLELWLRQDQG5HGUHVVDO $FW
%%0%FHOHEUDWHG,QWHUQDWLRQDO:RPHQ·V'D\WRDSSUHFLDWHDQG
· RUJDQL]HG E\ ,QVWLWXWH RI 3XEOLF $GPLQLVWUDWLRQ
UHVSHFW ZRPHQ·V UROH LQ VRFLHW\ 0RWLYDWLRQDO VSHHFK DERXW
Bangalore, on 5th & 6th March 2018. Felicitations were
ZRPHQ HPSRZHUPHQW DQG JHQGHU HTXDOLW\ ZHUH GHOLYHUHG
arranged by the womens cell to superannuating women
and attended by all women employees at Chandigarh. BBMB employees of the Institute during the year 2018.
LV FRPPLWWHG WR SURYLGH VDIH ZRUNLQJ HQYLURQPHQW WR LWV
ZRPHQHPSOR\HHV6H[XDOKDUDVVPHQWFRPPLWWHHVKDYHEHHQ  7KHUHZDVQRFDVHRIVH[XDOKDUDVVPHQWUHSRUWHGGXULQJ
FRQVWLWXWHGDWYDULRXVOHYHOVWRHQVXUHUHGUHVVDORIJULHYDQFHV the year 2018-19 (for the period from 1st January 2018 to
of women. For the welfare of women employees of BBMB, a 31 March 2019).
st

&UHFKHKDVEHHQSURYLGHGWRORRNDIWHUWKHZDUGVRIZRPHQ 1XPEHU RI :RPHQ (PSOR\HHV LQ WKH ,QVWLWXWH DV RQ 0DUFK
employees of BBMB. 2019
BEE Group Total Employees Number Percentage of
5HSUHVHQWDWLRQRIZRPHQDVRQLVJLYHQEHORZ as on 31.03.2019 of Women overall staff
employ- strength
Group Total Employee Number Percentage of ees as on
as on 31.03.2019 of Women overall staff 31.03.2019
Employees strength A 185 28 15.14
A 13 02 15.38 B 142 22 15.49
B 09 04 44.44 C 196 27 13.78
C 01 - -
Total 523 77 14.72
D -- - -
Total 23 06 26.08 NPTI

The Group-wise number of women employees is shown in the


CPRI
7DEOHEHORZ
7KH:RPHQ·V&HOOORRNVDIWHU
Group Total No. of Percentage
‡ :HOIDUHRIWKHZRPHQHPSOR\HHVRIWKHRUJDQL]DWLRQ employees as women of overall
on 31.03.2019 employees staff
‡ $GGUHVVHV WKH LVVXHV JULHYDQFHV FRQFHUQLQJ ZRPHQ strength
employees and facilitates redressal of the same
Group ‘A’ 88 9 10.22
‡ 0DQDJHV WKH &UHFKH LQ &35, FRORQ\ DQG SURYLGHV Group ‘B’ 35 18 51.42
necessary guidelines for its smooth functioning
Group ‘C’ 101 11 10.89
 7KH LQWHUQDO FRPSODLQWV  FRPPLWWHH RI :RPHQV &HOO (including
LQYHVWLJDWHV DVSHU&35,·V,QWHUQDO3ROLF\IRU3UHYHQWLRQ MTS)
PrRKLELWLRQ DQG 5HGUHVVDO RI 6H[XDO +DUDVVPHQW RI Total 224 38 16.96

231
Annual Report 2018-19

7XLULDO+\GUR3RZHU3URMHFW0L]RUDP

232
CHAPTER 35.4

PERSONS WITH DISABILITIES (PwDs)

Ministry of Power

0LQLVWU\RI3RZHUSURYLGHVUHVHUYDWLRQIRUWKH3HUVRQVZLWK'LVDELOLWLHVLQDSSRLQWPHQWVLQDFFRUGDQFHZLWKWKHLQVWUXFWLRQV
LVVXHG E\ *RYHUQPHQW IURP WLPH WR WLPH 7KH LPSOHPHQWDWLRQ RI WKH UHVHUYDWLRQ SROLF\ IRU 3HUVRQV ZLWK 'LVDELOLWLHV LQ WKH
0LQLVWU\DQGYDULRXVRUJDQLVDWLRQVXQGHULWVDGPLQLVWUDWLYHFRQWUROLVPRQLWRUHGE\'LUHFWRU 6&67 RIWKH0LQLVWU\

7KHUHSUHVHQWDWLRQRI3HUVRQVZLWK'LVDELOLWLHVLQWKH0LQLVWU\DVRQLVDVXQGHU

Persons with Disabilities


Group Total Employees Employees Percentage of Persons with
(as on 31.03.2019) Disabilities employees
VD HD OD Total

A 61 0 0 0 0 0.0

B 118 0 0 2 2 1.6

C 42 0 0 0 0 0.0

C (MTS) 57 1 0 2 3 5.2

Total 278 1 0 4 5 1.7

9'³9LVXDOO\'LVDEOHG +DQGLFDSSHG

+'³+HDULQJ'LVDEOHG +DQGLFDSSHG

2'³2UWKRSHGLFDOO\'LVDEOHG +DQGLFDSSHG

CEA

Total Employees as on Physically Challenged Employees Percentage of Physically


Group
31.03.2019 Challenged
VD HD OD Total
A 370 - 01 05 06 1.62
B 140 - 01 05 06 4.28
C 233 03 - 01 04 1.71
TOTAL 743 03 02 11 16 2.15

PAO
Representation of Persons with Disabled employees may be indicated in the format given below:-

Group Total Employees as on Persons with Disabilities Percentage of Persons with


31/12/2018 Employees Disabilities Employees

VD HD OD Total

A 2 - - - - -

B 43 - - 2 2 4.65

C 23 - - - - -

Total 68 - - 2 2 2.94

233
Annual Report 2018-19

NTPC

Physically
Group Total Employees as on Challenged employees Percentage of Physically
31st March 2019 Challenged employees
OH VH HH Total

A 12692 128 12 13 153 1.2

B 3805 47 6 12 65 1.7

C 3167 93 59 55 207 6.5

D 575 33 21 30 84 14.6

Total 20239 301 98 109 509 2.5

NHPC

Physically challenged employees


Total Employees as Percentage of physically
Group
on 31.03.2019 challenged employees
VD HD OD Total

A 2880 10 2 66 78 2.71

B 815 0 1 28 29 3.56

C 2166 0 1 7 8 0.37

' ([FOXGLQJ
833 1 0 6 7 0.84
Sweepers)

Sweepers 59 0 0 0 0 0

Total 6753 11 4 107 122 1.81

7KHUHVHUYDWLRQDQGUHOD[DWLRQLVSURYLGHGWR3K\VLFDOO\&KDOOHQJHG(PSOR\HHVLQGLUHFWUHFUXLWPHQWVDVSHUJXLGHOLQHVLVVXHG
by DoPT0LQLVWU\RI6RFLDO-XVWLFH (PSRZHUPHQWIURPWLPHWRWLPH,QDGGLWLRQIROORZLQJZHOIDUHVFKHPHVDQGDYDLODEOH
IRUWKHP

*UDQWRI)LQDQFLDO$VVLVWDQFHIRUYRFDWLRQDO7UDLQLQJWRWKRVHZKRJHWSK\VLFDOO\KDQGLFDSSHGZKLOHLQVHUYLFH

Reimbursement of charges for purchase of hearing aid is allowed to the employees and their dependents and reimbursement
RI&RVWRI$UWLÀFLDO/LPEVRQFDVHWRFDVHEDVLV

5HVWULFWLRQRIDJHLVQRWDSSOLFDEOHLQUHVSHFWRISK\VLFDOO\PHQWDOO\UHWDUGHGFKLOGUHQIRUFRQVLGHULQJKLPKHUDVDGHSHQGHQW
IRUPHGLFDOFODLPVWUHDWPHQW

3K\VLFDOO\FKDOOHQJHGHPSOR\HHVDQGHPSOR\HHVZKRKDYHGLVDEOHGFKLOGPD\EHH[HPSWHGIURPWKHURWDWLRQDOWUDQVIHUVXEMHFW
WRDGPLQLVWUDWLYHFRQVWUDLQWV

/LIHWLPHPHGLFDOIDFLOLW\WRWKHPHQWDOO\RUSK\VLFDOO\WRWDOO\LQYDOLGGHSHQGHQWFKLOGUHQKDYLQJRUPRUHRIRQHRUPRUH
GLVDELOLWLHVLQUHVSHFWRIUHWLUHGGHFHDVHGHPSOR\HHVXQGHU1+3&5HWLUHG(PSOR\HHV·+HDOWK6FKHPH

234
POWERGRID

As on March 31, 201WKHUHDUH3K\VLFDOO\&KDOOHQJHG(PSOR\HHVZRUNLQJDWGLIIHUHQWOHYHOVLQWKHFRUSRUDWLRQ'HWDLOVDUH


JLYHQEHORZ

Total Physically Challenged Employees


Percentageof
Group Employees as Visually Hearing Orthopaedic Personswith
on Handicapped Handicapped Handicapped Total disabilities
31/03/2019 (VH) (HH) (OH)
A 4300 5 20 64 89 2.07
B 2072 30 30 1.45
C 2764 7 13 63 83 3.00
D 81 1 1 2 2.47
Total 9217 13 33 158 204 2.21

$ERYHGDWDLQFOXGHVUHJXODUPDQSRZHULQ32:(5*5,'WKURXJKHQPDVVHWUDQVIHURIHPSOR\HHVE\SURFHVVRIDEVRUSWLRQIURP
YDULRXVFRQVWLWXHQWRUJDQL]DWLRQVGXULQJLWVIRUPDWLRQDVZHOODVDOOUHFUXLWPHQWFDUULHGRXWE\32:(5*5,'

32:(5*5,'EHOLHYHVLQSURYLGLQJHTXDORSSRUWXQLWLHVWRDOOHPSOR\HHVLQFOXGLQJGLVDEOHGHPSOR\HHV$VVXFKRSSRUWXQLWLHV
DWZRUNDUHSURYLGHGZLWKRXWDQ\SUHMXGLFHWRSHUVRQVZLWKGLVDELOLWLHV 3Z'V EHFDXVHWKH\DUHDEOHWRSHUIRUPDOOMREVWKDWDUH
handled by their able bodies counterparts. As such, there is no discrimination in the allotment of work assignment.

7KH SURYLVLRQV RI JRYHUQPHQW GLUHFWLYHV UHODWLQJ WR 3HUVRQV ZLWK GLVDELOLWLHV DUH FRPSOLHG ZLWK LQ WKH &RUSRUDWLRQ 7KH
UHVHUYDWLRQ DQG YDULRXV UHOD[DWLRQ DQG FRQFHVVLRQ DUH DOORZHG WR WKHP IRU UHFUXLWPHQW DQG SURPRWLRQ DV DSSOLFDEOH  :H
KDYHDOVRPDGHHIIRUWVWRSURPRWHWKHZHOIDUHRISHUVRQVZLWKGLVDELOLWLHVLQSURYLGLQJIDFLOLWLHVDVDSSOLFDEOHOLNHUHVLGHQWLDO
DFFRPPRGDWLRQH[HPSWLRQIURPSD\PHQWRISURIHVVLRQDOWD[SURYLVLRQRIPHGLFDOHTXLSPHQW·VJHQHUDOPHGLFDODVVLVWDQFHDV
ZHOODVSURYLVLRQIRUVSHFLDOFDXVDOOHDYHIRUVSHFLÀFUHTXLUHPHQWVUHODWLQJWRGLVDELOLWLHVRIRIÀFLDOV7KHVHIDFLOLWLHVDUHSURYLGHG
WRWKHPVRWKDWWKH\FDQSHUIRUPWKHLUGXWLHVHIÀFLHQWO\%HVLGHVWKLVDUUDQJHPHQWVKDYHEHHQPDGHWRHQVXUHEDUULHUIUHH
HQYLURQPHQWLQ32:(5*5,'DQG$XGLRV\VWHPLQWKHOLIWVRI&RUSRUDWLRQ·VEXLOGLQJVKDYHEHHQSURYLGHG7KH/LDLVRQ2IÀFHU
KDVEHHQQRPLQDWHGLQHDFK5HJLRQDQG&RUSRUDWH&HQWUHWRORRNDIWHUWKHZHOIDUHRISHUVRQVZLWKGLVDELOLWLHV7KHUHVHUYDWLRQ
rosters are maintained for direct recruitment and promotion as applicable which are subject to scrutiny of Ministry of Power.
7KHYDFDQFLHVIRUSHUVRQVZLWKGLVDELOLWLHVDUHQRWLÀHGDVSHUUHVHUYDWLRQURVWHUVPDLQWDLQHGIRUHDFKJURXSRISRVWVDWWKHUDWH
RIRIQXPEHURIYDFDQFLHV5HVHUYDWLRQLVDOVRSURYLGHGWRSHUVRQVZLWKGLVDELOLWLHVLQSURPRWLRQDWWKHUDWHRIDVSHU
JRYHUQPHQWGLUHFWLYHV

PFC

Representation of PWD employees in PFC is given below:-

Group Total Employees as on Persons with Disabilities Percentage of overall staff


31.03.2019 (PWDs) Employees strength

A 479 13 2.71

B 6 0 0.00

C 14 0 0.00

D 1 1 100.00

Total 500 13 2.80

3)&DVDSDUWRILWVVRFLDOUHVSRQVLELOLW\PDNHVDOOHIIRUWVWRHQVXUHFRPSOLDQFHRIWKH'LUHFWLYHVDQG*XLGHOLQHVLVVXHGE\WKH
*RYHUQPHQW RI ,QGLD IURP WLPH WR WLPH SHUWDLQLQJ WR WKH ZHOIDUH RI 3HUVRQV ZLWK GLVDELOLWLHV 7KH VWHSV WDNHQ LQFOXGH GXH

235
Annual Report 2018-19

UHVHUYDWLRQV DQG UHOD[DWLRQ DV DSSOLFDEOH XQGHU WKH YDULRXV GLUHFWLYHV IRU GLUHFW UHFUXLWPHQW DV ZHOO DV IRU SURPRWLRQV 3)&
SURYLGHGWKHQHFHVVDU\SURYLVLRQVRQDOOÁRRUVIRUIDFLOLWDWLQJHDV\DFFHVVWRSHUVRQVZLWKGLVDELOLWLHVDQGQDPHVDUHHQJUDYHGLQ
%UDLOOHVFULSWIRUWKHFRPIRUWRIYLVXDOO\GLVDEOHGSHUVRQV$OLDLVRQRIÀFHUKDVEHHQDSSRLQWHGWRORRNLQWRPDWWHURIUHVHUYDWLRQV
REC
Representation of Physically Challenged Employees:
The Corporation has been following the laid down norms for employing the PhysicallyHandicapped employees in its totality
and spirit.
'HWDLOVRIWKHQXPEHURI3K\VLFDOO\&KDOOHQJHGHPSOR\HHVHPSOR\HGLQWKH&RPSDQ\DUHDVXQGHU

Total Employees as Persons with Disabilities Employees Percentage of persons with


Group
on 31.03.2019 OH VH HH Total disabilities employees

A 346 10 0 1 11 3.18

B 75 0 0 0 0 0

C 9 0 1 0 1 11.11

D 57 0 1 0 1 1.75

TOTAL 487 10 2 1 13 2.67

NEEPCO
5HSUHVHQWDWLRQRI3K\VLFDOO\&KDOOHQJHG(PSOR\HHVLVLQGLFDWHGLQWKHIRUPDWJLYHQEHORZ

Total Employees as on Total Physically Challenged Employees


Group Percentage of Physically
Employees as on 31/03/19
challenged employees
VH HH OH Total
A 697 4 3 5 12

B 620 4 3 5 12

C 678 8 6 3 17 2.39
D 56 0 2 6 8

Total 2051 16 14 19 49

SJVNL
5HSUHVHQWDWLRQRI'LY\DQJ(PSOR\HHVLQVWDIIVWUHQJWKLVJLYHQEHORZ

Group Total Employees as on 31.03.2019 Divyang Employees Percentage of Divyang employees

VH HH OH Total

Total 7RWDO  'LUHFW5HFUXLWHG 8 7 17 32 2.17 (% of Direct Recruited (DR) &


(DR) & Absorbed and 104 Absorbed i.e. 1475 employees)
Deputationist from GoHP)

7KHUHFUXLWPHQWRI'LY\DQJ3HUVRQVLVGRQHDVSHUJXLGHOLQHVIURP*RYWRI,QGLD3URSHUFDWHJRU\ZLVH5RVWHUVDUHPDLQWDLQHG
DQGLQFDVHRIEDFNORJ6SHFLDO5HFUXLWPHQW'ULYHLVDOVRUHVRUWHGWR,QDGGLWLRQWRWKHUHVHUYDWLRQRI3RVWVIRU6&672%&LQ
GLUHFWUHFUXLWPHQWSRVWVDUHUHVHUYHGIRU'LY\DQJV5HOD[DWLRQVDQGFRQFHVVLRQVDUHDOVRH[WHQGHGDVSHUWKHJXLGHOLQHVRI
WKH*RYWRI,QGLD7KHFDQGLGDWHVDUHH[HPSWHGIURPSD\PHQWRIDSSOLFDWLRQIHH7KH/LDLVRQ2IÀFHU6&67DOVRDFWVDV/LDLVRQ
2IÀFHU 'LY\DQJ 

236
THDC
Representation of Physically Challenged Employees in THDCIL is indicated in table below:

Total Employees (as on


Person with Disabilities
31.03.2019) Percentage of
Group VD HD OD person with
(Visual Hearing (Orthopedically Total Disabilities
Disabled) Disabled) Disabled)
Total 1891 05 07 21 33 1.74
Brief write up about the activities
7KHFRPSDQ\FRQVLGHUVSHUVRQVZLWK'LVDELOLW\DVRQHRIWKHEXLOGLQJEORFNVRIWKH2UJDQL]DWLRQDQGKDVDOZD\VZRUNHGIRU
WKH HIIHFWLYH LPSOHPHQWDWLRQ RI SUHVLGHQWLDO GLUHFWLYHV LVVXHG IURP WLPH WR WLPH IRU WKHLU ZHOIDUH DQG UHSUHVHQWDWLRQ LQ WKH
2UJDQL]DWLRQ)RUWKHLPSOHPHQWDWLRQRI8QLWHG1DWLRQV&RQYHQWLRQRQWKHULJKWRI3HUVRQVZLWK'LVDELOLWLHV 81&53' WKH
&RUSRUDWLRQ SURYLGHV DFFHVVLELOLW\ WR GLIIHUHQW EXLOGLQJV IRU SHUVRQV ZLWK GLVDELOLWLHV XQGHU 6HFWLRQ RI WKH SHUVRQV ZLWK
'LVDELOLWLHV (TXDO2SSRUWXQLWLHVSURWHFWLRQVRIULJKWDQGIXOOSDUWLFLSDWLRQ $FW$SDUWIURPDERYH3HUVRQVZLWK'LVDELOLWLHV
DUHSURYLGHGHTXDORSSRUWXQLW\WRSDUWLFLSDWHLQWKH6SRUWVDQG&XOWXUDODFWLYLWLHVDQGRWKHUFRPSHWLWLRQVRUJDQL]HGURXQGWKH
\HDU/LDLVRQ2IÀFHUVKDYHEHHQQRPLQDWHG8QLWZLVHWRLGHQWLI\WKHLUSUREOHPVDQGLPSOHPHQWDWLRQRIYDULRXVZHOIDUHDFWLYLWLHV
for them. The Company recruited 01 No. candidate from differently abled person (OH-category) in Group-A through open
$GYHUWLVHPHQW
DVC
Persons with Disabilities

Persons with Disabilities


Group Total employees as on Employees Percentage of Persons with
31.03.2019 Disabilities Employees
VD HD OD Total
Group A 2552 0 0 20 20 0.78
Group B 3772 03 1 25 29 0.77
Group 'C' & 'D' 1097 01 0 05 06 0.55
Total 7421 04 1 50 55 0.74
,W KDV EHHQ HQVXUHG ZKLOH DOORFDWLQJ ZRUN WKDW SK\VLFDOO\ &KDOOHQJHG HPSOR\HHV ZLWK GXH FRQVLGHUDWLRQ KDYH PLQLPXP
LQFRQYHQLHQFHLQGLVFKDUJLQJWKHLURIÀFLDOUHVSRQVLELOLWLHV7KH*2,SURYLVLRQVIRUFKDOOHQJHGHPSOR\HHVDUHFRPSOLHGZLWKOLNH
special transport allowance.
BBMB
Representation of Physically Challenged Employees in BBMB is shown below:

Group Total Employees Physically Challenged Employees Percentage of physically


challenged employees

VH HH OH Total

A 497 - - 2 2 0.40

B 995 - - 10 10 1.01

C 3395 2 - 34 36 1.06

D 3528 3 4 34 41 1.16

Total 8415 5 4 80 89 1.06

237
Annual Report 2018-19

%%0% GLVFKDUJHV LWV IXQFWLRQV DV ODLG GRZQ LQ 6HFWLRQ    RI WKH 3XQMDE 5HRUJDQL]DWLRQ $FW  IRU ZKLFK VWDII IRU WKH
RSHUDWLRQDQGPDLQWHQDQFHRI%%0%ZRUNLVSURYLGHGE\SDUWQHU6WDWHV6(%VRQWUDQVIHUEDVLV+RZHYHULQWKHHYHQWRILQDELOLW\
RISDUWQHU6WDWHV6(%VWRSURYLGHWKHUHTXLVLWHVWDII%%0%UHVRUWVWRGLUHFWUHFUXLWPHQWDQGSURPRWLRQLQUHVSHFWRI*URXS&
 ' HPSOR\HHV RQO\ %%0% &ODVV,,,  &ODVV,9 (PSOR\HHV 5HJXODWLRQV   &ODVV, &ODVV,, RIÀFHUV 5HJXODWLRQ 
ZHUHDSSURYHGE\WKH&HQWUDO*RYW$VSHUROG5HJXODWLRQRIWKHVH5HJXODWLRQVWKHPHPEHUVEHORQJLQJWR6&67%&([
VHUYLFHPHQ3K\VLFDOO\KDQGLFDSSHGSHUVRQVDQGGHSHQGHQWRIGHFHDVHGHPSOR\HHVLQWKHVHUYLFHKDGWKHUHVHUYDWLRQDQGDOO
RWKHUFRQFHVVLRQVDVSUHVFULEHGE\3XQMDE*RYHUQPHQWIURPWLPHWRWLPH1RZWKHDIRUHVDLG5HJXODWLRQKDVEHHQDPHQGHG
E\*D]HWWH1RWLÀFDWLRQRI*RYWRI,QGLDGDWHG0D\YLGHZKLFK&HQWUDO*RYW5HVHUYDWLRQ3ROLF\LVDSSOLFDEOHLQ%%0%
+HQFH%%0%LVIROORZLQJ&HQWUDO*RYW5HVHUYDWLRQ3ROLF\VLQFH0D\DQGDFFRUGLQJO\GXHUHSUHVHQWDWLRQLVJLYHQWR3:'
LQGLUHFWUHFUXLWPHQWDVSHUWKHSURYLVLRQVSUHVFULEHGLQ&HQWUDO*RYW5HVHUYDWLRQ3ROLF\
BEE
5HSUHVHQWDWLRQRI3K\VLFDOO\&KDOOHQJHG(PSOR\HHVLQ%((DVRQLVDVIROORZV

Total Employee as on Physically Challenged Employees Percentage of Physically


Group
31.03.2019 Challenged Employees
VH HH OH Total
A 13 - - 01 01 7.69
B 09 - - 01 01 11.11
C 01 - - - - -
D -- - - - - -
Total 23 - - 02 02 8.69

CPRI
6PW6UHHGHYL--RLQW'LUHFWRU&35,%DQJDORUHVHUYHGDV/LDLVRQ2IÀFHUIRU3:'FDWHJRU\LQ&35,GXULQJWKH\HDU
2018-19 (for the period from 1st January 2018 to 31st March 2019)

Total Employees as on Persons with Disabilities Percentage of Persons with


Group Employees
31.03.2019 Disabilities employees
VD HD OD Total
A 185 - 1 5 6 3.24
B 142 1 - 2 3 2.11
C 196 1 2 3 6 3.06
Total 523 2 3 10 15 2.87

NPTI
The GroupZLVHQXPEHURISK\VLFDOO\FKDOOHQJHGHPSOR\HHVLVJLYHQLQWKHWDEOHEHORZ

Group Physically challenged Employees Percentage of physically


Total Employees as on 31/03/2019
VD HD OD Total challenged employees

Group ‘A’ 88 - - 2 2 2.27


Group ‘B’ 35 - - 1 1 2.85
Group
101 1 1 4 6 5.94
‘C’(including MTS)
Total 224 1 1 7 9 4.01

238
CHAPTER 35.5

RECREATIONAL ACTIVITIES:
Ministry of Power
The Recreation club was constituted in Ministry of Power after 6. Shri Manoj Shaw Treasurer
a fair Election. The composition of elected Recreation Club
7. Ms. Nishi Rani Member
0HPEHUVZHUHDVXQGHU
8. Shri Y.S. Rawat Member
 6K5DMHVK.XPDU  3UHVLGHQW
9. Shri Raman Member
2. Shri I.J. Virmani Vice President
10. Ms. Bhawna Member
 6KUL$QLO.XPDU6KDUPD *HQHUDO6HFUHWDU\
During the year (2018-2019), MOP Sports teams
 6KUL5DYLQGHU7DQZDU 6SRUWV6HFUHWDU\
KDYH SDUWLFLSDWHG LQ YDULRXV LQWHU &368,QWHU 0LQLVWU\
 6KUL1DYHHQ6DUDQ  &XOWXUDO6HFUHWDU\ 7RXUQDPHQWDQGDFKLHYHGGLVWLQFWLRQLQIROORZLQJHYHQWV

Name of Tournament Place of Event Name of Participants Name of the Event Position secured
Inter-CPSU Bridge Tournament Bangalore Players name
organized by POSOCO under Shri Anil Kumar Sharma
aegis of Power Sports Control Shri Mahender Pal. Singh Team event 1st Position
Board Shri Ramesh Kumar (Gold Medal).
Shri Joginder Kumar
Shri Vijay Pal Singh
Shri Babu Chand Prasad
Shri I.J. Virmani, Manager
All India Civil Services Inter-Min- Delhi Shri Rahul Individual 1st position
istry Wrestling Tournament (Gold Medal)
Inter-CPSU Carrom Tourna- Shillong Shri Paritosh Gupta Carrom Doubles 1st Position
ment Men/Women organized by Shri M.P. Chamoli (Men)
NEEPCO under aegis of Power
Sports Control Board Shri Rajesh Kumar Carrom Team Event 3rd Position
Shri Paritosh Gupta (Men)
Shri M.P. Chamoli
Shri Kamal Kishore
Shri Om Parkash
Shri Ravinder Tanwar
Shri A.K. Gupta
Inter-CPSU Athletic Tournament Nangal Shri Rahul Naggar Short put 3rd Position
organized by BBMB under aegis Ms. Jinny Bhardwaj High Jump 3rd Position
of Power Sports Control Board
Inter-Ministry Badminton Tourna- Delhi Shri Suraj Pandey Badminton 2nd Position
ment organized by CCSCSB

BeVLGHVVHFXULQJWRSSRVLWLRQVLQWKHDERYHWRXUQDPHQWV IQ DGGLWLRQ WR DERYH WKH 5HFUHDWLRQ &OXE KDG DOVR
the Ministry of Power Team had also participated in the RUJDQL]HG D &XOWXUDO 7RXU LQ WKH PRQWK RI 6HSWHPEHU
following Sports tournaments under the aegis of Power GXULQJ WKH *RYHUQPHQW +ROLGD\V IRU WKH HPSOR\HHV
Sports Control Board and CCSCSB and their family members to Rajasthan (Udaipur,
(i) Cricket (Played Semi Finals under CCSCSB) &KLWWRUJDUK.XPEDOJDUK)RUW ZHIVW6HSWHPEHUWR
(ii) Chess 23rd September, 2018. The tour enhanced the sense
 LLL .KDEDGGL of responsibility, closeness & togetherness amongst the

 LY 9ROOHyball RIÀFHUVDQGHPSOR\HHVLQWKHLULQWHUSHUVRQDOUHODWLRQV
The Cultural Tour was also appreciated by all participants.
 Y  7DEOH7HQQLV

239
Annual Report 2018-19

CEA 3 Athletics Team:

7KHHPSOR\HHVRI&($DUHDFWLYHO\SDUWLFLSDWLQJLQWKHUHFUHDWLRQ  &($:RPHQ$WKOHWLFV7HDPKDVZRQWKH%URQ]H0HGDO
DFWLYLWLHVRI6SRUWV0XVLF 'DQFHDQGWDNHSDUWLQWKH$OO,QGLD LQ WKH [ PWU 5HOD\ 5DFH LQ WKH &368 $WKOHWLFV
&LYLO6HUYLFHV,QWHU0LQLVWU\,QWHU&3687RXUQDPHQWVHWF)RU Tournament 2019 held at BBMB, Nangal(Punjab). The
WKH\HDUWKHVSRUWVWHDPSDUWLFLSDWHGLQVRPH$,&6 WHDPPHPEHUVDUHDVXQGHU
LQWHU&368,QWHU0LQLVWU\7RXUQDPHQWV7KHDFKLHYHPHQWVDUH
1. Smt. Usha Nayal, ASO
DVXQGHU
  6PW6DEDEMLW.DXU+HDG'·PDQ
1. Carom Team:
3. Smt. Deepika, MTS
The CEA Carom team for men was participated in the
,QWHU&368 &DURP 7RXUQDPHQW RUJDQL]HG E\ 1((3&2 4. Smt. Deepa Sharma, Steno.
from 4.12.2018 to 09.12.2018 at Shillong. The CEA
4. Chess Team:
Carom team has won the Runners-up Trophy in Doubles
HYHQWVWSRVLWLRQLQ6LQJOHVHYHQW7KHWHDPPHPEHUV Shri Gurujit Medhi, DD, NERPC, Shillong has won the
QDPHLVJLYHQXQGHU %URQ]H0HGDOLQWKH&368&KHVV7RXUQDPHQWKHOG
DW 1DWKSD -KDNUL +3  0DQDJHU 6KUL 'LJHPEHU 6LQJK
1. Shri Manmohan Singh Rawat, Team Coach
SSA.
2. Shri Chandra Shekhar, Chief Engg.
5. Badminton
  6KUL$MD\.XPDU$U\D'\'LUHFWRU
 6KUL$VKZDQL.XPDU$62$GP &RRUG 6HFWLRQ&($KDV
  6KUL6XPHHW.XPDU'\'LUHFWRU represented the Central Secretariat Badminton Team in
5. Shri Narayan Dutt, PPS WKH$OO,QGLD&LYLO6HUYLFHV%DGPLQWRQ7RXUQDPHQW
19(A National Status) held at Pune from 14-20 February,
  6KUL5DMHVK.XPDU3URI$VVWW 2019.
  6KUL5DYLQGUD0.XQGDLNDU'ULYHU  6KUL $VKZDQL .XPDU KDV DOVR VHOHFWHG DV %DGPLQWRQ
2. Volley Ball Team: &RQYHQHU IRU ,QWHU0LQLVWU\ %DGPLQWRQ 7RXUQDPHQW
WRE\&HQWUDO&LYLO6HUYLFHV&XOWXUDO 6SRUWV
The CEA Volley ball team of CEA for men was participated
Board, DoPT, New Delhi.
in the Inter-Ministry VolleyballTournament 2018-19
RUJDQL]HG E\ &&6&6% DW 9LQD\ 0DUJ 6SRUWV &RPSOH[ NTPC
New Delhi held in January, 2019. CEA team has won
In almost all the projects of NTPC including Corporate Centre
3rd position in team championship. The name of team
WKHUH DUH YLEUDQW ZHOIDUH ERGLHV YL] 5HFUHDWLRQDO &HQWUHV
PHPEHUVDUHDVXQGHU
2IÀFHU·V&OXEVDQG0DKLOD6DPLWLVZKLFKFDUU\RXWPXOWLIDULRXV
1. Anish, LDC-----------------------(Captain) DFWLYLWLHVWKURXJKRXWWKH\HDU

2. Digember Singh, SSA--------(Manager-cum-Player) $VDSDUWRIWKHLUDQQXDODFWLYLWLHV0DKLOD6DPLWLVGRZHOIDUH


DFWLYLWLHV IRU QHHG\  XQGHU SULYLOHJHG DQG DOVR FRQGXFW
  5DPHVK.XPDU66$
YDULRXV ZRUNVKRSV  FRPSHWLWLRQVFDNH PDNLQJ VRIW WR\V
4. Sunnyman, LDC making, Madhubani painting, cooking etc.
5. Mausam, LDC NTPC conducted “Medha Pratiyogita” for Children of NTPC
6. Brahm Singh, LDC (PSOR\HHVDFURVVWKHFRXQWU\DQGDOVR´(OHFWURQ4XL]µIRUWKH
student of leading professional Institute across the country.
  .ULVKQD0HHQD6WHQR
5HFUHDWLRQDO &HQWUHV DQG 2IÀFHUV FOXEV DUH HTXLSSHG ZLWK
Shri Anish, LDC, CEA has represented the Central
Billiards Room, Gymnasium, Library, Canteen, Card room, Chess
6HFUHWDULDW9ROOH\EDOO7HDPLQWKH$OO,QGLD&LYLO6HUYLFHV
URRP7DEOHWHQQLVURRP%DGPLQWRQ7HQQLVFRXUWVZLPPLQJ
Volleyball Tournament 2018-19(A National Status) held
SRROV HWF 5HJXODU KREE\ FODVVHV YL] GDQFH DUW WDHNZRQGR
at Chandigarh from 25.02.2019 to 01.03.2019.
etc. are conducted by these bodies throughout the year. Apart

240
froPWKHVHGDLO\DFWLYLWLHV6XPPHU&DPSVIRUNLGV 3HUVRQDOLW\ POWERGRID
GHYHORSPHQWWKHDWUHZRUNVKRSHWF 'HSDUWPHQWDOVSRUWVYL]
32:(5*5,' VWULYHV WR FUHDWH HPSOR\HHIULHQGO\ ZRUNSODFHV
Cricket, Volleyball, throw ball competition etc. are conducted
PLQGIXORIWKHEDODQFHEHWZHHQZRUNDQGSHUVRQDOOLYHVZKHUH
regularly by these bodies.
D GLYHUVH ZRUNIRUFH FDQ IXOO\ GHPRQVWUDWH WKHLU FDSDELOLWLHV
Annual picnics, celebration of New Year, Holi, Diwali, and As part of our efforts to create a corporate culture in which
FXOWXUDO SURJUDPV DUH RUJDQL]HG E\ WKHVH ZHOIDUH ERGLHV LQ employees can work in the best of physical and mental health
UHVSHFWLYHSURMHFWV ZLWK WKH REMHFWLYHV RI JHQHUDWLQJ KLJK SURGXFWLYLW\ KLJK
TXDOLW\RXWSXWQHZYDOXHFUHDWLRQDVZHOODVDOORZLQJGLYHUVH
1DWLRQDOIHVWLYDOVGLIIHUHQWFXOWXUDOSURJUDPV.DYL6DPPHODQV
employees to work with enthusiasm.
WKHDWUHSHUIRUPDQFHDUHRUJDQL]HGDWFRUSRUDWHFHQWUHDVZHOO
as different NTPC projects annually with great enthusiasm. 32:(5*5,'KDVEHHQZRUNLQJWRZDUGVH[SDQGLQJSURJUDPV
that help employees to maintain the balance between work
At NTPC projects, parks and play grounds are maintained well
DQGSHUVRQDOOLIHWKURXJKWKHFUHDWLRQRISURJUDPVSURYLGLQJ
IRUEHQHÀWRIERWK\RXQJDQGROG
EHQHÀWV OLNH 32:(5*5,' (PSOR\HH :HOIDUH $VVRFLDWLRQ
NHPC 3(:$ 0DKLOD6DPLWLVLQVXEVWDWLRQ5HJLRQDO+HDGTXDUWHUV
7R HQVXUH D TXDOLW\ OLYLQJ IRU WKH HPSOR\HHV UHVLGHQWLDO & Corporate Centre.
WRZQVKLSV DUH H[LVWLQJ LQ 1+3& &RUSRUDWH 2IÀFH3URMHFWV &XOWXUDOSURJUDPPHVDQGUHFUHDWLRQDODFWLYLWLHVDUHFRQGXFWHG
3RZHU 6WDWLRQV 7R IXUWKHU DGG YDOXH WR WKH TXDOLW\ RI OLIH SHULRGLFDOO\IRUSURPRWLQJKHDOWK\FRPPXQLW\OLYLQJOLNH.DYL
ZHOOHTXLSSHG0HGLFDO+HDOWK&HQWUH5HFUHDWLRQ&HQWUHDQG 6DPPHODQV1XNNDG1DWDNV3OD\VHWFDQGFHOHEUDWLQJYDULRXV
&RPPXQLW\&HQWUHZLWKDOOWKHIDFLOLWLHVDUHH[LVWLQJZLWKLQWKH occasions like Diwali get-together, Holi Milan, New Year,
township. Raising Day, etc.
)XUWKHU 1+3& WHDPV KDYH EHHQ WDNLQJ SDUW LQ GLIIHUHQW 7KH&RPSDQ\KDVDOVREHHQRUJDQL]LQJ,QWUD ,QWHU5HJLRQDO
GLVFLSOLQHV LQ YDULRXV WRXUQDPHQWV DQG FXOWXUDO PHHWV 6SRUWV &RPSHWLWLRQV IRU .DEDGGL &ULFNHW 9ROOH\EDOO &KHVV
RUJDQL]HG E\ 3RZHU 6SRUWV &RQWURO %RDUG 36&%  ,Q WKH )< Badminton etc. and regularly participating in the Inter-PSU
2018-19, NHPC participated in Inter Power Sector CPSU Sports Meet. It is pertinent to mention that our employee, Shri
WRXUQDPHQW RUJDQL]HG XQGHU WKH DHJLV RI 36&% ZKLFK J. Mukherjee bagged 1st position in National Games under
included Athletics, Carrara, Volleyball, Table Tennis, Cricket, scheme of sports and games for persons with disabilities
.DEDGGL&KHVV%ULGJHDQG%DGPLQWRQ1+3&VHFXUHGDZDUG in Table Tennis conducted by Ministry of Youth Affairs and
winning positions in Athletics Chess 2nd position in Men’s Sports. Further he also represented Indian Team in the
HYHQW UGSRVLWLRQLQ:RPHQ·VHYHQW%ULGJHUGSRVLWLRQ International Paralympic Table Tennis Championship held at
DQG%DGPLQWRQVWSRVLWLRQLQPHQ·VGRXEOHQGSRVLWLRQ Amman (JordRQ DQGZRQ%URQ]H0HGDOLQ6LQJOHHYHQWV
LQ 0HQ·V WHDP HYHQW  UG SRVLWLRQ LQ ZRPHQ·V WHDP HYHQW
PFC
in Badminton, NHPC also successfully hosted the Inter CPSU
.DEDGGL7RXUQDPHQWLQ)<DW*XZDKDWL 3)& LV FRPPLWWHG WRZDUGV KROLVWLF SHUVRQDOLW\ GHYHORSPHQW
of its employees through facilities like Gymnasium, Library,
5HFUHDWLRQDOFXOWXUDODQGVSRUWVDFWLYLWLHVDUHEHLQJRUJDQL]HG
7DEOH7HQQLVDQGSDUWLFLSDWLRQRIHPSOR\HHVLQYDULRXVVSRUWV
GXULQJ GLIIHUHQW RFFDVLRQV IRU LPSURYLQJ LQWHUSHUVRQDO
FXOWXUDODQGOLWHUDU\DFWLYLWLHV
relations and also to bring out the talent of employees and
WKHLUIDPLO\PHPEHUV1+3&RUJDQL]HG9DVDQW0HODDQ As a member of Power Sports Control Board, PFC has been
HYHQW ZKLFK ZLWQHVVHV FXOWXUDO DVVLPLODWLRQ DQG EXLOGLQJ RI RUJDQL]LQJ DQ ,QWHU&368 7RXUQDPHQW HYHU\ \HDU IRU WKH
FDPDUDGHULH DPRQJVW 1+3& HPSOR\HHV :LQQHUV RI YDULRXV employees of PSCB member organisations. Last year, PFC
RUJDQL]HG UG ,QWHU&368 %DGPLQWRQ 7RXUQDPHQW LQ
1+3& $ZDUGV 6FKHPH   XQGHU YDULRXV FDWHJRULHV
&KHQQDLXQGHUWKHDHJLVRI36&%(PSOR\HHVRI3)&H[KLELWHG
DV %HVW 3RZHU 6WDWLRQ %HVW &RQVWUXFWLRQ 3URMHFW ([HPSODU\
DQ HQWKXVLDVWLF SDUWLFLSDWLRQ LQ YDULRXV ,QWHU&368 VSRUWV
Commitment, Star of NHPC and Star student for Class X and
tournaments such as Cricket, Table Tennis, Carrom, Chess,
Class XII were awarded during the NHPC Day 2018 celebration.
HWF RUJDQL]HG E\ WKH 36&% PHPEHU RUJDQLVDWLRQV 7KH

241
Annual Report 2018-19

SDUWLFLSDWLRQLQWKHVHVSRUWVUHVXOWVLQDJUHDWHUOHYHORIWHDP 9DULRXV HYHQWV DUH KHOG DPRQJVW WKH HPSOR\HHV DQG WKHLU
VSLULWDQGÀWQHVVDPRQJWKHHPSOR\HHV wards under the Cultural, Sports and Art etc. from time to
time. Celebrations on Foundation Day of the Corporation and
(PSOR\HHV DOVR H[SORUH WKHLU ORYH IRU ZULWLQJ SKRWRJUDSK\
GXULQJRWKHUORFDOIHVWLYDOVDUHKHOGLQWKHVH3URMHFWVXQGHUWKH
HWFWKURXJKDFWLYHHQJDJHPHQWZLWK¶8UMD'HHSWL·²DTXDUWHUO\
DHJLVRIWKHUHVSHFWLYH5HFUHDWLRQ&OXE
SDSHUPDJD]LQHRI3)&(QWULHVVHOHFWHGIRUWKHPDJD]LQHDUH
DOVRUHZDUGHGLQWKHIRUPRIFDVKLQFHQWLYHWRWKHHPSOR\HHV The Corporation being a member of the Power Sports Central
to encourage them for frequent engagement with the Board participated in different Inter CPSU Tournaments such
UHFUHDWLRQDODFWLYLWLHVDQGSURPRWLRQRIWKHRIÀFLDOODQJXDJH as Badminton, Table Tennis, Chess, Carrom, Bridge, Cricket etc.
The NEEPCO Chess Team (Men) participated in the Inter CPSU
3)& DOVR RUJDQLVHG YDULRXV DFWLYLWLHV VXFK DV 6WUHHW 3OD\V
Chess Tournament held during 12th to 14th December 2018
6SHHFK FRPSHWLWLRQV 6ORJDQ :ULWLQJ FRPSHWLWLRQV XQGHU
DW-KDNULDQGHPHUJHGDVWKH¶:LQQHUV·LQWKH2SHQFDWHJRU\
6ZDFKKWD 3DNKZDGDV 6ZDFKKWD +L 6HYD &DPSDLJQ DQG
DQGDVZHOODVWKH7HDPHYHQW
Communal Harmony Campaign during the year.
The Corporation also hosts Inter CPSU Tournament in any of
To ensure healthy lifestyle and strong team skills, PFC
WKHDERYHPHQWLRQHGVSRUWVIURPWLPHWRWLPHGHSHQGLQJRQ
RUJDQL]HG\RJDWDONVDQGWHDPEXLOGLQJZRUNVKRSVGXULQJWKH
WKH36&%FDOHQGDUDJUHHGWRE\PHPEHURUJDQL]DWLRQVGXULQJ
year for its employees.
WKH DQQXDO PHHWLQJ RI WKH ([HFXWLYH &RPPLWWHH RI 36&%
REC 'XULQJWKH&RUSRUDWLRQKDGRUJDQL]HGWKHVW,QWHU
5(&EHOLHYHVLQWKHSULQFLSOHWKDWKHDOWK\DQGDJLOHERG\DQG CPSU Carrom Tournament during 4th to 8th December 2018
PLQG OHDGV WR LQFUHDVHG DQG LPSURYHG OHYHO RI HPSOR\HH at Shillong which witnessed the participation of 9 (nine) Mens’
SHUIRUPDQFH ,W XQGHUWDNHV VHYHUDO LQLWLDWLYHV IRU LQFXOFDWLQJ 7HDPV DQG  VHYHQ  :RPHQV· 7HDPV 1((3&2 ZDV WKH VW
KHDOWK\OLYLQJKDELWVDQGSURYLGLQJSHULRGLFDOEUHDNIURPZRUN Runner’s Up and Second Runner’s Up in the Men’s Singles, 2nd
WRHPSOR\HHVWRUHOD[WKHERG\DQGPLQG$WYDULRXVORFDWLRQV 5XQQHU·V8SLQWKH0HQ·V'RXEOHVDQGHPHUJHGDV¶:LQQHUV·
it has set up well equipped Gymnasiums where the employees LQWKH7HDP(YHQW1((3&2ZDVDOVRWKH:LQQHUDQG6HFRQG
FDQ ZRUN RXW DQG PDLQWDLQ WKHLU ÀWQHVV OHYHOV 7R LQFXOFDWH 5XQQHU·V 8S LQ ERWK WKH :RPHQ·V 6LQJOHV DQG 'RXEOHV DQG
WKH VSLULW RI WHDP ZRUN DQG SK\VLFDO ÀWQHVV HPSOR\HHV DUH HPHUJHGDV¶:LQQHUV·LQWKH7HDP(YHQW
HQFRXUDJHGWRWDNHSDUWLQYDULRXVVSRUWVHYHQWVOLNH&DUURP 7KH &RUSRUDWLRQ DOVR VSRQVRUV ORFDO )RRWEDOO 7RXUQDPHQW
&KHVV &ULFNHW %DGPLQWRQ 7DEOH 7HQQLV .DEDGGL RUJDQLVHG 6SRUWLQJHYHQWVRUJDQL]HGE\GLIIHUHQWVSRUWLQJERGLHVLQWKH
LQ KRXVH DQG DOVR E\ RWKHU &368V 7KH\ DUH DOVR SURYLGHG North Eastern Region.
IDFLOLWLHV RI H[FXUVLRQ WULSV3LFQLFV ZKHUH HPSOR\HHV DORQJ
7KH&RUSRUDWLRQRUJDQL]HV,QWHU3URMHFW&XOWXUDO&RPSHWLWLRQV
with their spouse and children can go out to nearby locations
DPRQJVWGLIIHUHQW3URMHFWV3ODQWVRIWKHFRPSDQ\RQWKHEDVLV
ZKLFKHQFRXUDJHVWHDPVSLULWDQGDOVRRIIHUVUHOD[DWLRQ7KH
RI FRPSHWLWLRQV KHOG LQ UHVSHFWLYH 3URMHFWV3ODQWV WR VHOHFW
H[SHQVHVIRUWKHVDPHDUHSDUWO\ERUQHE\WKH&RPSDQ\
ZLQQHUVWRUHSUHVHQWWKDWSDUWLFXODU3URMHFW3ODQW
For enhancing the mental ability of the employees, the
7KHRUJDQL]DWLRQKDVHVWDEOLVKHGZHOOQHVVFHQWHUVZLWKPXOWL
&RPSDQ\ HQFRXUDJHV WKHP WR WDNH SDUW LQ YDULRXV TXL]]HV
J\PIDFLOLW\LQDOO3URMHFWV3ODQWVRIWKH&RUSRUDWLRQ0HGLFDO
SDSHU SUHVHQWDWLRQ DQG EXVLQHVV VLPXODWLRQV FRPSHWLWLRQV 
&DPSV+HDOWK&KHFNXSH[SHUWWDONVRQKHDOWKLVVXHVLQFOXGLQJ
games conducted by reputed institutions.
KROGLQJRI<RJD&DPSVDUHDOVRRUJDQL]HGLQGLIIHUHQW2IÀFHV
'XULQJ WKH ÀQDQFLDO \HDU  5(& KRVWHG ,QWHU &368 3URMHFWV3ODQWV
Table Tennis Tournament where 11CPSUs teams participated
SJVNL
including the teams from MoP and CEA from January 22, 2019
to January 25, 2019 at Thyagaraj Stadium, New Delhi. 6RPH RI WKH VHYHUH KHDOWK SUREOHPV WKDW ZH FXUUHQWO\ IDFH
LQFOXGH REHVLW\ GLDELOLWLHV DQG FDUGLRYDVFXODU GLVHDVH 7KHUH
NEEPCO
has been increasing trend towards sedentary lifestyle which
,Q RUGHU WR SURYLGH UHFUHDWLRQDO IDFLOLWLHV WR WKH HPSOR\HHV KDV EHHQ LGHQWLÀHG DV D PDMRU FRQWULEXWRU WRZDUGV WKHVH
and their family members, NEEPCO Recreational Club has alarming health as well as social problem.
been established in all O & M Projects of the Corporation.
To curb these disturbing trends, there is need to make physical

242
DFWLYLW\IXQVDIHDQGDFFHVVLEOHE\PDNLQJRSSRUWXQLW\UHDGLO\ 7KHUHDUHYDULRXV&OXEVRSHUDWLQJDW7+'&,/YL]7+'&2IÀFHU
DYDLODEOH 3K\VLFDO DFWLYLW\ DORQH FDQ UHGXFH LQWUDDEGRPLQDO &OXE 7+'& /DGLHV :HOIDUH $VVRFLDWLRQ 7+'& 0DQRUDQMDQ
YLVFHUDOIDWZKLFKLVEHOLHYHGWREHWKHPRVWGDQJHURXVNLQG &OXE7+'&0DKLOD0DQGDO'DO7KHVH&OXEVFDUU\RXWYDULRXV
DFWLYLWLHVOLNH4XL]&RPSHWLWLRQ3DLQWLQJ&RPSHWLWLRQ&RRNHU\
Key insights:
&RPSHWLWLRQDQG6SRUWVDFWLYLWLHVHWFFRYHULQJHDFKDQGHYHU\
L 6SRUWVDQGDFWLYHUHFUHDWLRQLVDVRXUFHRIHQMR\PHQWIRU employee of THDCIL.
most participants particularly youth.
$W 7+'&,/ 3DUNV  3OD\JURXQG KDYH EHHQ GHYHORSHG ZLWK
LL ,QGRRU DV ZHOO RXWGRRU UHFUHDWLRQ DFWLYLWLHV OLNH FDURP YDULRXVHTXLSPHQWVYL]-KRRODOLNHVZLQJVOLGHVHWFIRUWKH
chess, table tennis, badminton, kabaddi, cricket, football, EHQHÀW RI HPSOR\HHV  WKHLU ZDUGV *\PQDVLXP IDFLOLW\ LV
ELOOLDUGV VQRRNHUDUHEHLQJRUJDQL]HGWKURXJKVSRUWV DYDLODEOHDW%KLODQJDQD%KDZDQ7+'&2IÀFHU·VFOXEDQG7+'&
councils. Inter-departmental as well as Inter Project Manoranjan club, which are being used by the employees &
WRXUQDPHQWV DUH EHLQJ RUJDQL]HG DW IDFLOLWLHV DYDLODEOH their families. Volley Ball court, Badminton court, (Indoor and
DWRXU8QLWV3URMHFWV 2XWGRRU  /DZQ 7HQQLV &RXUW .DEEDGGL  9ROOH\EDOO *URXQG
KDYH EHHQ GHYHORSHG ZKHUHLQ UHJXODU PDWFKHV WDNHV SODFH
iii. Annual athletic meet is being hosted by Corporate
$ )RRWEDOO JURXQG LQ WKH FRORQ\ KDV EHHQ GHYHORSHG IRU
&HQWHU 6KLPOD HYHU\ \HDU ZKHUHLQ HPSOR\HHV DFWLYHO\
conducting football matches.
participate.
DVC
LY *\PQDVLXPKDVEHHQVHWXSDWSURMHFWVLWHV
/LNH SUHYLRXV \HDUV $OO 9DOOH\ 6SRUWV LQ YDULRXV GLVFLSOLQHV
THDC
were conducted in different projects. Most of the employees
7+'&,/ EHOLHYHV LQ DFKLHYLQJ 2UJDQL]DWLRQDO ([FHOOHQFH DFWLYHO\ SDUWLFLSDWH LQ VSRUWV ZLWK IXOO LQWHUHVW  (PSOR\HHV
through Human Resources and follows “People First” approach  ORFDO SHRSOH DOVR SDUWLFLSDWH LQ RUJDQL]DWLRQ RI WKH
WROHYHUDJHWKHSRWHQWLDORILWVHPSOR\HHVLQIXUWKHUDQFHRILWV tournaments. Altogether, it brings a sense of team spirit,
EXVLQHVVSODQDQGLQFOXGLQJHYHU\OHYHOHPSOR\HHWRSURYLGH GHYHORSV FRRSHUDWLRQ DPRQJ WKHP KHOSLQJ JRRG LQGXVWULDO
them with ample recreational opportunities. A large Nos. of atmosphere etc.
UHFUHDWLRQDO DFWLYLWLHV DUH EHLQJ FDUULHG RXW WKURXJKRXW WKH All Valley Cricket, Football, Badminton, Table Tennis, Athletics,
\HDUDVSHU6SRUWV:HOIDUHFDOHQGDU7ROLVWDIHZDUH Volleyball, Chess and Bridge tournaments were conducted.
‡ 6hooting Camp
DVC is also member of All India Electrical Sports Control
‡ 6ZLPPLQJ&ODVVHVDQG+RUVH5LGLQJ Board (AIESCB) and Power Sports Control Board (PSCB). DVC
‡ &XOWXUDO3URJUDPPHE\7+'&0DKLOD0DQGDO'DO WHDPVSDUWLFLSDWHGLQYDULRXVWRXUQDPHQWVRUJDQLVHGE\WKRVH
‡ &XOWXUDOSURJUDPPHGXULQJIRXQGDWLRQ'D\ Boards.

‡ /LIH 6W\OH 0DQDJHPHQW 6WUHVV 0DQDJHPHQW XQGHU $OOWKHSURMHFWVLQ'9&KDYH5HFUHDWLRQ&OXE6WDWLRQFOXEIRU


health & wellness programme, in which conducted WKHHPSOR\HHVLQZKLFKFXOWXUDOSURJUDPPHVRFLDODFWLYLWLHV
workshop on “Health and Nutrition” through AIIMS are a regular phenomenon.
Rishikesh BBMB

‡ 'LZDOL0HOD 9DULRXV UHFUHDWLRQDO IDFLOLWLHV KDYH EHHQ SURYLGHG DW %%0%
SURMHFWV  RWKHU VWDWLRQV IRU WKH ZHOIDUH RI HPSOR\HHV :HOO
‡ 'XVVKHUD²5DYDDQ'DKDQ
HTXLSSHG2IÀFHUVFOXEDQGVWDIIFOXEKDYHEHHQSURYLGHGDW
‡ 6DQNVKLSWD5DPOHHOD the project stations with facilities for indoor games as well as
outdoor games. Facility of Open Air Gym and Indoor stadium
‡ 2QH\HDU<RJD3URJUDPPH
KDVEHHQSURYLGHGWRWKHUHVLGHQWRI1DQJDO7RZQVKLS5HJXODU
‡ %ORRG'RQDWLRQ&DPS ,QWUD%%0%WRXUQDPHQWVLQUHVSHFWRIYDULRXVVSRUWVDUHKHOG
IURP WLPH WR WLPH DQG VHOHFWHG WHDPV DUH HYHQ GHSXWHG WR
‡ 3DLQWLQJ&RPSHWLWLRQ
participate in inter-power utility tournaments. Other cultural
‡ ,QWHUQDWLRQDO <RJD 'D\ ZLWK FXOWXUDO SURJUDP EDVHG programmes are also held in association with SPICMACAY
Yoga

243
Annual Report 2018-19

0RUHRYHUZHOOGHYHORSHGSDUNVKDYHEHHQSURYLGHGLQ%%0% of Haryana and UT, Chandigarh for the year 2018.


FRORQLHVIRUUHOD[DWLRQDQGUHFUHDWLRQ These awards were presented by Hon’ble Smt. Sumitra
The Awards won by BBMB during the year 2018-19 upto Mahajan, Speaker of Lok Sabha, in the august presence
31.03.2019: RI6K5.6LQJK+RQ·EOH0LQLVWHURI6WDWH ,QGHSHQGHQW
&KDUJH  IRU 3RZHU 1HZ DQG 5HQHZDEOH (QHUJ\ *RYW
1. Professional Awards: of India, at a function held at Vigyan Bhawan, New
¾ BBMB has been selected as the winner under the 'HOKL RQ WKH 1DWLRQDO (QHUJ\ &RQVHUYDWLRQ 'D\ RQ
category “Best Hydro Power Generator” by IPPAI. The 14th Dec. 2018.
DZDUG FHUHPRQ\ ZDV KHOG RQ WK 1RYHPEHU  DW 4. Sports Awards:
%HOJXQGL%HOJDXP.DUQDWDND
 ,QDGGLWLRQWRDERYHFDWHJRULHV%%0%H[FHOOHGHTXDOO\
¾ BBMB has been awarded for CBIP Award 2019 in the well in WKH ÀHOG RI 6SRUWV and has won the following
category of “Best Maintained Project (fully completed 3UL]HV
and functional for more than 10 years)”.
¾ BBMB won Volleyball Tournament organised by Damodar
BBMB has also been awarded for CBIP Award 2019 in Valley Corporation at Malthon Township, Dhanbad.
the category of “Best Performing Utility in Hydro Power
Sector”. ¾ %%0% ZRQ .DEDGGL 7RXUQDPHQW RUJDQLVHG E\ 3RZHU
Grid Corporation of India Ltd. at Hyderabad.
2. Hindi Awards:
¾ %%0% ZRQ $WKOHWLF 0HQ  :RPHQ 7RXUQDPHQW
¾ %KDNUD'DP$GPLQLVWUDWLRQKDVEHHQDZDUGHG)LUVW3UL]H organised by BBMB at Nangal Township.
E\WKH2IÀFLDO/DQJXDJH'HSDUWPHQW0LQLVWU\RI+RPH
DIIDLUV*RYWRI,QGLDIRUGRLQJPD[LPXPRIÀFLDOZRUNLQ ¾ In the meeting of Power Sports Control Board held at
Hindi in “B” region. Delhi, BBMB has been awarded the best organiser award
for conducting the Athletic Meet.
¾ Bhakra Beas Management Board was selected by the
'HSDUWPHQW RI 2IÀFLDO /DQJXDJH IRU 6HFRQG 3UL]H LQ ¾ %%0%%ULGJHWHDPLQLQGLYLGXDOFDWHJRU\ZRQ%URQ]H
%RDUGV·$XWRQRPRXV %RGLHV· FDWHJRU\ LQ UHJLRQ ´%µ Medal in Inter Central Power Sector undertaking Bridge
XQGHU5DMEKDVKD.LUWL3XUDVNDUIRUWKH\HDU7KH 7RXUQDPHQWKHOGIURPWKWRVW1RYHPEHUDW
DZDUGZDVJLYHQE\+RQ·EOH9LFH3UHVLGHQWRI,QGLDRQ Bangalore.
WK 6HSWHPEHU  LQ D SUL]H GLVWULEXWLRQ IXQFWLRQ ¾ %%0%·V PHQ WHDP VWRRG ÀUVW LQ ,QWHU &HQWUDO 3RZHU
held in Vigyan Bhawan, New Delhi. Sector undertaking badminton tournament. This
¾ )RU ,PSOHPHQWDWLRQ RI 2IÀFLDO /DQJXDJH LQ ´%µ UHJLRQ WRXUQDPHQWZDVKHOGIURPWKWRWK1RYHPEHU
%%0%KDVFUHDWHGKLVWRU\E\ZLQQLQJÀUVWVHFRQGDQG in Chennai.
WKLUGSUL]HVLQWKHFDWHJRU\RIVXERUGLQDWHRIÀFHV7KHVH ¾ BBMB Volleyball team won the Gold Medal in Inter
DZDUGV KDYH EHHQ ZRQ E\ WKH &KLHI (QJLQHHU %KDNUD Central Power Sector undertaking Volleyball tournament
Dam, Nangal, Chief Engineer, Transmission System, held from 19th to 21st December, 2018 at Rishikesh.
Chandigarh and Chief Engineer, System Operation, ¾ BBMB attained runner up position in the 19th Inter
Chandigarh. &368 &ULFNHW 7RXUQDPHQW RUJDQL]HG E\ 3RZHU *ULG
 7KHSUL]HVZHUHJLYHQE\6K.LUHQ5LMLMX+RQ·EOH0LQLVWHU Corporation of India at Gurgarm on 09.02.2019.
RI 6WDWH IRU +RPH $IIDLUV *RYW RI ,QGLD LQ D SUL]H NPTI
distribution function held at Chandigarh on 19.11.2018.
Indoor and outdoor sports and games facilities such as
3. Painting Competition Award: Basketball, Volleyball, Badminton, Tennis, Table Tennis,
¾ %%0% KDV EHHQ DZDUGHG WZR 1DWLRQDO 3UL]HV IRU ´%HVW &DUURPV HWF KDYH EHHQ GHYHORSHG DQG VWXGHQWVWUDLQHHV
6WDWH/HYHO1RGDO2IÀFHU&DWHJRU\µDQG´%HVW87/HYHO DUH HQFRXUDJHG WR DYDLO WKHVH IDFLOLWLHV 6WDWHRIWKHDUW
1RGDO2IÀFHU&DWHJRU\µIRUDFKLHYLQJKLJKHVWSHUFHQWDJH *\PQDVLXPIDFLOLWLHVDUHDOVRDYDLODEOHDW137,LQVWLWXWHV<RJD
of students participation in painting competition on classes are also conducted to keep the students physically and
(QHUJ\ &RQVHUYDWLRQ E\ VFKRRO FKLOGUHQ RI WKH VWDWH PHQWDOO\ÀW

244
CHAPTER 35.6

WELFARE OF SCHEDULED CASTES, SCHEDULED TRIBES AND OTHER


BACKWARD CLASSES
Ministry of Power

$Q6&67&HOOKDVEHHQIXQFWLRQLQJLQWKH0LQLVWU\VLQFHWKHHDUO\QLQHWLHVXQGHUWKHGLUHFWFRQWURORIWKH'LUHFWRU'6 6&67 
ZKRLVDOVRWKH/LDLVRQ2IÀFHUIRU6FKHGXOHG&DVWHVDQG6FKHGXOHG7ULEHV6&67&HOODVVLVWVWKH/LDLVRQ2IÀFHUVIRU6&V67V 
2%&V7KH&HOOPRQLWRUVWKHLPSOHPHQWDWLRQRIUHVHUYDWLRQSROLFLHVRIWKH*RYHUQPHQWRI,QGLDLQUHVSHFWRI6FKHGXOHG&DVWHV
6FKHGXOHG 7ULEHV 2WKHU %DFNZDUG &ODVVHV 3HUVRQV ZLWK 'LVDELOLWLHV 0LQRULW\ &RPPXQLW\ ([6HUYLFHPHQ DQG (FRQRPLFDOO\
:HDNHU6HFWLRQLQWKH0LQLVWU\DVZHOODV$XWRQRPRXV%RGLHV&368VXQGHUWKHDGPLQLVWUDWLYHFRQWURORIWKH0LQLVWU\RI3RZHU

The total strength of employees and representation of Scheduled Castes, Scheduled Tribes and Other Backward Classes in the
0LQLVWU\RI3RZHUDVRQLVLQGLFDWHGEHORZ

Total number of Representation


Group Employees (as on SCs SC% STs ST% OBC OBC%
31.03.19)

Group A 61 14 22.9 3 4.9 3 4.9

Group B 118 21 17.7 3 2.5 22 18.6

Group C 42 12 28.5 3 7.1 3 7.1

GroupC 57 29 50.8 4 7.0 6 10.5


(MTS)
TOTAL 278 76 27.34 13 4.6 34 12.2

CEA

Representation of SC/ST/OBC
Total Employees as on
Group
31.03.2019 SCs SCs% STs STs% OBCs OBCs%

A 370 60 16.21 22 5.94 34 9.18

B 140 30 21.42 11 7.85 26 18.57

C 233 60 25.75 09 3.86 38 16.30

TOTAL 743 150 20.18 42 5.65 98 13.18

PAO

Representation of SC/ST/OBC may be indicated in proforma given below:-

Representation
Total Employees
Group
(as on 31/12/2018) SCs SC% STs ST% OBC OBC%

A 2 1 50.00 - - - -

B 43 5 11.62 2 4.65 1 2.32

C 23 3 13.04 2 8.69 3 13.04

Total 68 9 13.23 4 5.88 4 5.88

245
Annual Report 2018-19

NTPC

Representation
Total Employees (as
Group
on 31st March 2019) SCs SC% STs ST% OBC OBC%
A 12692 1776 14.0 703 5.5 2427 19.1
B 3805 641 16.8 360 9.5 380 10.0
C 3167 464 14.7 229 7.2 973 30.7
D 575 149 25.9 73 12.7 115 20.0
Total 20239 3030 15.0 1365 6.7 3895 19.2

NTPC awarded as the Best Performing Utility of the Country in Thermal Power Sector by CBIP on 4th January, 2019 at a
IXQFWLRQKHOGLQ1HZ'HOKL&0'173&6KUL*XUGHHS6LQJKUHFHLYHGWKHDZDUGIURP+RQ·EOH0LQLVWHURI6WDWH ,QGHSHQGHQW
Charge) for Power and New & Renewable Energy in presence of Secretary (Power), Director (HR) Shri Saptarshi Roy and
'LUHFWRU &RPPHUFLDO 6KUL$.*XSWD

Hon’ble Minister of State (Independent Charge) for Power Hon’ble Prime Minister and Hon’ble Minister of State
and New & Renewable Energy addressing Indian Power Sec- (Independent Charge) for Power and New & Renewable
WRURQ3RZHU3ODQW)OH[LELOLW\3DYLQJZD\IRUJUHHQJULGDW Energy in foundation laying function of Patratu Super
PMI, NTPC 7KHUPDO3RZHU3URMHFW6LQGUL)HUWLOL]HU)DFWRU\DQG$,,06RI
'HYJKDULQ-KDUNKDQG

246
NHPC

5HSUHVHQWDWLRQRI6&672%&VDVRQ

Total Employees as on Representation


Group
31.03.2019 SCs SCs% STs STs% OBCs OBCs%
A 2880 443 15.38 199 6.91 589 20.45
B 815 128 15.71 57 6.99 169 20.74
C 2166 218 10.06 103 4.76 119 5.49
' ([FOXGLQJ 833 124 14.89 61 7.32 45 5.40
Sweepers)
Sweepers 59 51 86.44 1 1.69 0 0
Total 6753 964 14.25 421 6.23 922 13.65

Welfare of SC/ST and Other Backward Classes:

1+3&LVWDNLQJFDUHRIVRFLRHFRQRPLFGHYHORSPHQWVRI6&672%&DQGZHDNHUFDWHJRU\VHFWLRQVRIWKHVRFLHWLHVDWYDULRXV
3URMHFWV3RZHU6WDWLRQVLWXDWHGLQUHPRWHDUHDVRIWKH2UJDQL]DWLRQ

1+3&SURYLGHVEXGJHWDOORFDWLRQIRU6FKRROVDQG&ROOHJHVDWYDULRXV6&672%&SRSXODWHGORFDWLRQVRIWKH1+3&3URMHFWV
3RZHU 6WDWLRQV 7KH 0HGLFDO IDFLOLWLHV DUH DOVR EHLQJ SURYLGHG WR DOO WKH ZHDNHU VHFWLRQV DQG 6&672%& SHRSOH ZKHUH LW LV
QHFHVVDU\'XULQJQDWXUDOFDODPLWLHVHSLGHPLF1+3&LVKHOSLQJLQGLIIHUHQWZD\VDQGRUJDQL]LQJPHGLFDOFDPSVDOVR

6FKRODUVKLS WR 6&67 VWXGHQWV LV SURYLGHG XQGHU &65 &RQGXFWDQFH RI WUDLQLQJ SURJUDPPH RI 6&672%& (PSOR\HHV IRU
DZDUHQHVVRIJXLGHOLQHVSHUWDLQLQJWR67672%&HWFRQUHJXODUEDVLV5HVHUYDWLRQDQGUHOD[DWLRQLVSURYLGHGWR6&V67VDQG
2%&VLQGLUHFWUHFUXLWPHQWDVSHUJXLGHOLQHVLVVXHGE\*2,IURPWLPHWRWLPH5HVHUYDWLRQ UHOD[DWLRQLVDOVRSURYLGHGWR6&
67LQSURPRWLRQDVSHU*2,JXLGHOLQHV7KH2UJDQL]DWLRQKROGVSHULRGLFDOPHHWLQJVZLWK6&67(PSOR\HHV$6&67&HOOLVVHW
XSIRUWKH:HOIDUHRI6&V67VDQG2%&V6HSDUDWH/LDLVRQ2IÀFHUVDUHWKHUHIRU6&67DQG2%&

POWERGRID

Details are given below:

Group Total Employees Representation


(as on 31.03.2019) SC SC% ST ST% OBC OBC%
A 4300 607 14.12 272 6.33 978 22.74
B 2072 281 13.56 180 8.69 413 19.93
C 2764 440 15.92 282 10.20 982 35.53
D 81 17 20.99 7 8.64 22 27.16
TOTAL 9217 1345 14.59 741 8.04 2395 25.98

$ERYHGDWDLQFOXGHVUHJXODUPDQSRZHULQ32:(5*5,'WKURXJKHQPDVVHWUDQVIHURIHPSOR\HHVE\SURFHVVRIDEVRUSWLRQIURP
YDULRXVFRQVWLWXHQWRUJDQL]DWLRQVGXULQJLWVIRUPDWLRQDVZHOODVDOOUHFUXLWPHQWFDUULHGRXWE\32:(5*5,'

32:(5*5,' LV FRPPLWWHG WR LPSOHPHQW WKH UHVHUYDWLRQ SROLF\ LQ UHFUXLWPHQW DQG SURPRWLRQ DV SHU *RYW GLUHFWLYHV IRU
IXOÀOOPHQW RI UHVHUYDWLRQ IRU 6FKHGXOHG FDVWHV 6FKHGXOHG 7ULEHV DQG 2WKHU %DFNZDUG FODVVHV 1&/  7R DFKLHYH SUHVFULEHG
SHUFHQWDJHRIUHVHUYDWLRQRIVXFKFDWHJRU\LQUHFUXLWPHQWDQGHQVXUHWKDWUHVHUYHGFDWHJRU\DUHQRWGHSULYHGRIUHVHUYDWLRQ
YDULRXVUHOD[DWLRQVDVDGPLVVLEOHDUHSURYLGHGWR6&V67VDQG2%&V 1&/ HWFLQDOOUHFUXLWPHQWLQ&RUSRUDWLRQ

%HVLGHVSURYLGLQJHPSOR\PHQWSHULRGLFDOWUDLQLQJLVDOVRLPSDUWHGIRUWKHVHFDWHJRULHVRIHPSOR\HHVLQRUGHUWRHPSRZHU
WKHP KDQGOLQJ NH\ UHVSRQVLELOLWLHV ([FOXVLYH UHIUHVKHU DQG DZDUHQHVV SURJUDPPHV DUH RUJDQL]HG IRU UHVHUYHG FDWHJRU\
HPSOR\HHVDW&RUSRUDWH&HQWUHDQG5HJLRQDO2IÀFHVWRDFTXDLQWWKHPZLWKUHVHUYDWLRQSROLFLHVZHOIDUHJXLGHOLQHVFRPSDQ\

247
Annual Report 2018-19

SROLF\RQUHFUXLWPHQWV\VWHPVDQGSURFHVVHVHWF7KHDZDUHQHVVSURJUDPPHVH[FOXVLYHO\IRUUHVHUYHGFDWHJRU\HPSOR\HHVDUH
FRQGXFWHGWRDFTXDLQWWKHPZLWKSURYLVLRQVRIUHVHUYDWLRQSROLF\

PFC

122)(03/2<((6$1'7+(180%(52)6&672%&(03/2<((6$6210DUFK

Total Employees as on Persons with Disabilities (PWDs) Employees


Group
31.03.2019 SCs SC% STs ST% OBC OBC%
A 479 83 17.33 28 5.85 81 16.91
B 6 01 16.67 1 16.67 0 0.00
C 14 3 21.43 1 7.14 3 21.43
D 1 0 0.00 0 0.00 0 0.00
Total 500 87 17.40 30 6.00 84 16.80

3)&DVDSDUWRILWVVRFLDOUHVSRQVLELOLW\PDNHVDOOHIIRUWVWRHQVXUHFRPSOLDQFHRIWKH'LUHFWLYHVDQG*XLGHOLQHVLVVXHGE\WKH
*RYHUQPHQW RI ,QGLD IURP WLPH WR WLPH SHUWDLQLQJ WR WKH ZHOIDUH RI 6& 67 2%& HPSOR\HHV 7KH VWHSV WDNHQ LQFOXGH GXH
UHVHUYDWLRQVDQGUHOD[DWLRQDVDSSOLFDEOHXQGHUWKHYDULRXVGLUHFWLYHVIRUGLUHFWUHFUXLWPHQWDVZHOODVIRUSURPRWLRQV$VHSDUDWH
/LDLVRQRIÀFHUKDVEHHQDSSRLQWHGWRORRNLQWRWKHPDWWHURIUHVHUYDWLRQV

REC

Representation of SC/ST/013C as on 31.03.2019:

,W LV VWDWHG WKDW 5(& VWULFWO\ IROORZV WKH SUHVFULEHG UHVHUYDWLRQ QRUPV LQ UHJDUG WR 6&672%& DV ODLG GRZQ E\ WKH &HQWUDO
*RYHUQPHQW'HWDLOVRIWKHQXPEHURI6&672%&HPSOR\HHVHPSOR\HGLQWKHFRPSDQ\DUHDVXQGHU

Total Representation
Employees
Group No. of SC % of total No. of ST % of total No. of OBC % of total
(as on
31.03.2019) employees employees employees employees employees employees

A 346 34 9.83 13 3.76 62 17.92


B 75 12 16.00 02 2.67 2 2.67
C 9 01 11.11 0 0 1 11.11
D 57 17 29.82 1 1.75 3 5.26
Total 487 64 13.14 16 3.29 68 13.96

NEEPCO

5HSUHVHQWDWLRQRI6&672%&LVLQGLFDWHGLQ3HUIRUPDJLYHQEHORZ

Total Employees as Representation


Group
on 31/03/19
SCs SC% STs ST% OBC OBC% Minorities Minorities%
A 697 85 12.2 135 19.37 140 20.09 106 15.21
B 620 27 4.35 203 32.74 106 17.10 138 22.26
C 678 50 7.37 335 49.41 111 16.37 211 31.12
D 56 0 0 51 91.07 3 5.36 38 67.86
Total 2051 162 7.9 724 35.3 360 17.55 493 24.04

248
SJVNL

5HSUHVHQWDWLRQRI6&672%&LVJLYHQEHORZ

Representation (% w.r.t. DR & absorbed employees i.e.


Group Total Employees (as on 31.03.2019) 1434)

SCs SC % STs ST% OBC OBC%


Total 7RWDO  306 20.75 97 6.58 184 12.47
(1475 Direct Recruited (DR) &
Absorbed and 104
Deputationist from GoHP)

3ROLF\RI*RYWRI,QGLDUHJDUGLQJWKHUHVHUYDWLRQIRU6&V67VDQG2%&VLQUHFUXLWPHQWLVEHLQJIROORZHGLQ6-91$VSHUWKH
UHVHUYDWLRQSROLF\RIWKH*RYWRI,QGLDFHUWDLQSHUFHQWDJHVRISRVWVDUHUHVHUYHGIRU6&V67DQG2%&V,QRUGHUWRGHWHUPLQHWKH
QXPEHURI9DFDQFLHVIRU6&V67VDQG2%&VLQDSDUWLFXODUUHFUXLWPHQW5HVHUYDWLRQ5RVWHUVKDYHEHHQSUHVFULEHG5HOD[DWLRQV
DQGFRQFHVVLRQVWR6&V67VDQG2%&VLVDOVREHLQJJLYHQLQ6-91DVSHUWKH*RYWJXLGHOLQHVLQFOXGLQJTXDUWHUDOORWPHQWLQLWV
township.

THDC

Representation of SC/ST/OBC in THDCIL is indicated in table below:-

Representation
Total Employees (as on
Group
31.03.2019
SC SC% ST ST% OBC OBC%

Total 1891 261 13.80 28 1.48 160 8.46

Brief write up about the activities

GuidHOLQHV LVVXHG E\ *RYW RI ,QGLD IURP WLPH WR WLPH RQ LPSOHPHQWDWLRQ RI UHVHUYDWLRQ SROLF\ ZHOIDUH WUDLQLQJ JULHYDQFH
UHGUHVVDOHWFDUHVWULFWO\IROORZHG/LDLVRQ2IÀFHUVDUHQRPLQDWHGXQLWZLVHWRLGHQWLI\WKHLUSUREOHPVDQGLPSOHPHQWDWLRQRI
YDULRXVZHOIDUHDFWLYLWLHVIRUWKHP3HULRGLFPHHWLQJRI/LDLVRQ2IÀFHUVDQG6&672%&DQGPLQRULWLHV:HOIDUH$VVRFLDWLRQZHUH
KHOG $ *ULHYDQFH FHOO IRU 6&672%& DQG PLQRULWLHV H[LVWV WR UHGUHVV WKHLU JULHYDQFHV (IIRUWV DUH PDGH WR DUUDQJH WUDLQLQJ
SURJUDPPHV WR HTXLS WKHP ZLWK XSWR GDWH LQIRUPDWLRQ RQ 5HVHUYDWLRQ 3ROLF\ DQG RWKHU VHUYLFHV FRQGLWLRQV 7KH &RPSDQ\
recruited 05 Nos. candidates from SC category in Group-C. 06 Nos. candidates from SC Category, 03 Nos. candidates in ST
FDWHJRU\DQG1RVFDQGLGDWHVIURP2%&FDWHJRU\LQFOXGLQJ1RGLIIHUHQWO\DEOHG 2+FDWHJRU\ KDYHEHHQUHFUXLWHGLQ
*URXS$7KHUHFUXLWPHQWZDVPDGHWKURXJKRSHQ$GYHUWLVHPHQW

MINORITIES WELFARE

32:(5*5,' EHLQJ D &HQWUDO 3XEOLF 6HFWRU (QWHUSULVH LV FRQVFLRXV RI LWV REOLJDWLRQV WR SURPRWH ZHOIDUH RI PLQRULWLHV 7KH
*RYHUQPHQW·VGLUHFWLYHVRQJLYLQJGXHFRQVLGHUDWLRQVWRPLQRULWLHVLQUHFUXLWPHQWDUHVFUXSXORXVO\IROORZHGLQWKH&RUSRUDWLRQ
7KHVH LQVWUXFWLRQV LQFOXGH DVVRFLDWLRQ RI RQH PHPEHU EHORQJLQJ WR PLQRULW\ FRPPXQLW\ LQ 6HOHFWLRQ %RDUGV &RPPLWWHHV
DGYHUWLVHPHQWIRUYDFDQFLHVLQODQJXDJHVSRNHQE\ODUJHQXPEHURISHRSOHFLUFXODWLRQRIYDFDQF\LQORFDOODQJXDJHLQORFDO
areas where the population of minority is concentrated etc., also, submission of Annual Reports regarding recruitment of
0LQRULWLHV SUHVFULEHG E\ *RYHUQPHQW ZLWKLQ WLPH OLPLW VHW IRU WKLV SXUSRVH 7KH HPSOR\HHV RI WKH &RUSRUDWLRQ EHORQJ WR
different minority communities. Their integration into mainstream workforce is ensured by way of their participation in all
EXVLQHVVDFWLYLWLHV7KHUHLVQRGLVFULPLQDWLRQRQDFFRXQWRIWKHLUPLQRULW\VWDWXV$OOHPSOR\HHVDUHWUHDWHGDWSDULQWHUPVRI
SURYLGLQJIDFLOLWLHV like residential accommodation, promotion, training, transfer etc.

249
Annual Report 2018-19

DVC

Total No. Representation


Group of Employees as on
31.03.2019 SCs SC% ST ST% OBCs OBC%

Group – A 2552 471 18.46 152 5.96 567 22.22


Group - B 3772 736 19.51 213 5.65 777 20.60
Group – C & D 1097 371 33.82 141 12.85 217 19.78
Total 7421 1578 21.26 506 6.82 1561 21.03

6SHFLDOUHFRJQLWLRQKDVEHHQJUDQWHGWRWKH(PSOR\HHV'HSUHVVHG&ODVV/HDJXH ('&/ ZKLFKLVERG\RI6&67HPSOR\HHV

$OOW\SHVRIVXSSRUWKDYHEHHQH[WHQGHGWR('&/E\&RUSRUDWLRQLQDUUDQJLQJYDULRXVSURJUDPPHVZKLFKDUHEHLQJXQGHUWDNHQ
by them and close to their social and cultural philosophy.

(PSOR\HHVIURP('&/DUHUHSUHVHQWLQJLQDOOWKHFRPPLWWHHVRIWKHFRUSRUDWLRQFRQVWLWXWHGIRUZHOIDUHRIWKHHPSOR\HHVYL]
Housing Committee, JPCL etc.

5HJXODUTXDUWHUO\PHHWLQJRI('&/ZLWK'9&0DQDJHPHQWLVFRQGXFWHGWRDGGUHVVWKHLVVXHVDQGJULHYDQFHVRIHPSOR\HHV
EHORQJWR6&67

BBMB

5HSUHVHQWDWLRQRI6&672%&LVLQGLFDWHGEHORZ

Representation
Group Total Employees
SCs SC% STs ST% OBC OBC%

A 497 0 0.00 3 0.60 31 6,24

B 995 198 19.90 3 0.30 100 10.05

C 3395 809 23.83 11 0.32 463 13.64

D 3528 1161 32.91 10 0.28 472 13.38

Total 8415 2168 25.76 27 0.32 1066 12.67

%%0% GLVFKDUJHV LWV IXQFWLRQV DV ODLG GRZQ LQ 6HFWLRQ    RI WKH 3XQMDE 5HRUJDQL]DWLRQ $FW  IRU ZKLFK VWDII IRU WKH
RSHUDWLRQ DQG PDLQWHQDQFH RI %%0% ZRUN LV SURYLGHG E\ SDUWQHU 6WDWHV6(%V RQ WUDQVIHU EDVLV +RZHYHU LQ WKH HYHQW RI
LQDELOLW\RISDUWQHU6WDWHV6(%VWRSURYLGHWKHUHTXLVLWHVWDII%%0%UHVRUWVWRGLUHFWUHFUXLWPHQWDQGSURPRWLRQLQUHVSHFWRI
*URXS& 'HPSOR\HHVRQO\%%0%&ODVV,,, &ODVV,9(PSOR\HHV5HJXODWLRQV &ODVV, &ODVV,,RIÀFHUV5HJXODWLRQ
ZHUHDSSURYHGE\WKH&HQWUDO*RYW$VSHUROG5HJXODWLRQRIWKHVH5HJXODWLRQVWKHPHPEHUVEHORQJLQJWR6&67%&
([VHUYLFHPHQ3K\VLFDOO\KDQGLFDSSHGSHUVRQVDQGGHSHQGHQWRIGHFHDVHGHPSOR\HHVLQWKHVHUYLFHKDGWKHUHVHUYDWLRQDQG
DOORWKHUFRQFHVVLRQVDVSUHVFULEHGE\3XQMDE*RYWIURPWLPHWRWLPH1RZWKHDIRUHVDLG5HJXODWLRQKDVEHHQDPHQGHGE\
*D]HWWH1RWLÀFDWLRQRI*RYWRI,QGLDGDWHG0D\YLGHZKLFK&HQWUDO*RYW5HVHUYDWLRQ3ROLF\LVDSSOLFDEOHLQ%%0%+HQFH
%%0%LVIROORZLQJ&HQWUDO*RYHUQPHQW5HVHUYDWLRQ3ROLF\VLQFH0D\DQGDFFRUGLQJO\GXHUHSUHVHQWDWLRQFRQFHVVLRQVDQG
UHVHUYDWLRQVLQVHUYLFHLVSURYLGHGWR6&672%&VDVSUHVFULEHGLQ&HQWUDO*RYHUQPHQW5HVHUYDWLRQ3ROLF\

)RUSURYLGLQJJHQHUDOZHOIDUHPHDVXUHVIRU6FKHGXOHG&DVWHVHPSOR\HHVWKHLQVWUXFWLRQVKDYHEHHQLVVXHGWRDOOÀHOGRIÀFHV
UHTXHVWLQJWKHPWRSURYLGHWKHIROORZLQJIDFLOLWLHVLIVRGHPDQGHGE\WKH0HPEHUVRI6FKHGXOHG&DVWHVRQWKHRFFDVLRQRI
%LUWKGD\RI'U%5$PEHGNDU0DKDULVKL%DOPLNL-LDQG6UL*XUX5DYLGDVV-L

250
L  %XVIDFLOLWLHVIRU6KREKD<DWUDDWWRNHQFKDUJHVRI5HSHU.P

 LL  $XGLWRULXPIRUIXQFWLRQRQDERYHRFFDVLRQVIUHHRIFKDUJH

iii) 50% concession on the rent of Community Centre hired for the marriage or daughters of BBMB Group-D employees
EHORQJLQJWR6&%&67FDWHJRULHV

LY  &RQFHVVLRQRILQWXLWLRQIHHIRUWKHVHFRQGFKLOGRI*URXS'HPSOR\HHLQFOXGLQJ6&67%& 

 ,QVWUXFWLRQVKDYHEHHQLVVXHGWRDOO+2'VWKDWWKH+HDGVRIRUJDQL]DWLRQVDQGVHQLRURIÀFLDOVVKRXOGPHHWWKHLU6&67
RIÀFHUVVWDIIRQFHLQPRQWKRUSDUWLFXODUO\RQRFFDVLRQVOLNH'U%5$PEHGNDUMD\DQWL0DKDULVKL%DOPLNL-D\DQWLHWF

BEE

5HSUHVHQWDWLRQRI6&672%&DVRQLVDVIROORZV

Representation
Total employee as on
Group
31.03.2019 SCs SC% STs ST% OBC OBC%

A 13 01 7.69% - - - -

B 09 - - - - - -

C 01 - - - - - -

D -- - - - - - -

Total 23 01 4.34% - - - -

CPRI

6PW-6UHHGHYL-RLQW'LUHFWRUDQG6KUL'5HYDQQD-RLQW'LUHFWRU&35,%DQJDORUHVHUYHGDV/LDLVRQ2IÀFHUVIRU6&67
and OBC categories respectively in CPRI, during the year 2018-19 (for the period from 1st January 2018 to 31st March
2019)

Representation of SCs/STs/OBCs as on 31st March 2019:

Representations
Total Employees as
Group SCs SC% STs ST% OBCs % of Minorities % of Minorities
on 31.03.2019
OBC

A 185 43 23.24 19 10.27 33 17.84 15 8.11

B 142 31 21.83 22 15.49 22 15.49 17 11.97

C 196 59 30.10 19 9.69 43 21.94 10 5.10

Total 523 133 25.43 60 11.47 98 18.74 42 8.03

‡ 'U%5$PEHGNDU·VWK%LUWK$QQLYHUVDU\ZDVFHOHEUDWHGDW&35,%DQJDORUHRQWK$SULO$QRIÀFLDOIXQFWLRQ
ZDVRUJDQL]HGWRFRPPHPRUDWHWKH%LUWK$QQLYHUVDU\RI'U%5$PEHGNDUDW&35,%DQJDORUHRQWK6HSWHPEHU
6KUL+DULUDP$3URJUHVVLYH7KLQNHUZDVWKH&KLHI*XHVWDQGWKHIXQFWLRQZDVSUHVLGHGE\6KUL961DQGDNXPDU'LUHFWRU
General- CPRI.

‡ ,QWKLVFRQQHFWLRQWKHEORRGGRQDWLRQFDPSLQDVVRFLDWLRQZLWK0V.&*HQHUDO+RVSLWDO0DOOHVKZDUDP%DQJDORUHZDV
RUJDQL]HGRQWK$XJXVW0HULWVFKRODUVKLSVIRUWKHFKLOGUHQRI&35,HPSOR\HHVZKRKDYHVFRUHGWKHKLJKHVWPDUNV
LQWKH;6WDQGDUGDQG,,38&SXEOLFH[DPLQDWLRQLQWKHFDWHJRULHVRI6&67 *HQHUDOLQFOXGLQJ2%&ZHUHGLVWULEXWHG

251
Annual Report 2018-19

NPTI

7KH*URXSZLVHQXPEHURI6FKHGXOHG&DVWHV 6& 6FKHGXOHG7ULEHV 67 2WKHU%DFNZDUG&DVWHV 2%& LVJLYHQLQWKHWDEOH


EHORZ

Total Employees (as on No. of Employees


Group
31/03/2019
SC SC% ST ST% OBC OBC%

Group ‘A’ 88 19 21.59 03 3.40 12 13.63

Group ‘B’ 35 06 17.14 02 5.71 03 8.57

Group ‘C’ (Including


101 35 34.65 11 10.89 14 13.86
MTS)

Total 224 60 26.78 16 7.14 29 12.94

NHPC Hydro, Teesta V Dam

252
CHAPTER 36

E-GOVERNANCE /INFORMATION TECHNOLOGY (IT) INITIATIVES


Ministry of Power 9 Unnat Jyoti by Affordable LEDs for All (UJALA)-
+HOSV  FXVWRPHUV WR VDYH PRUH ZKLOH FXWWLQJ
 ([FHOOHQFHLQSURYLGLQJFLWL]HQFHQWULFGHOLYHU\WKURXJK
down energy needs and emissions. Adoption for
H*RYHUQDQFH
HQHUJ\HIÀFLHQWSURGXFWVDFURVVSXEOLFSULYDWHDQG
 :HE3RUWDOVDQG0RELOH$SSVRI0LQLVWU\RI3RZHUDUH residential facilities nationally.
DYDLODEOH RQOLQH LQ SXEOLF GRPDLQ IDFLOLWDWLQJ FLWL]HQ
FHQWULF GHOLYHU\ WKURXJK H*RYHUQDQFH 'DWD UHODWHG WR 9 DEEP (%LGGLQJ 3RUWDO 'LVFRYHU\ RI (IÀFLHQW
SRZHUVHFWRUDUHDYDLODEOHRQOLQHDQGLVDFFHVVLEOH[ (OHFWULFLW\ 3ULFH ´'((3 'LVFRYHU\ RI (IÀFLHQW
XVLQJFRPSXWHUVDQGPRELOHGHYLFHVKDYLQJLQWHUQHW (OHFWULFLW\ 3ULFH  H%LGGLQJ  H5HYHUVH $XFWLRQ
FRQQHFWLYLW\  $OO SRUWDOV DQG 0RELOH $SSV IDFLOLWDWH SRUWDOµIRUSURFXUHPHQWRIVKRUWWHUPPHGLXPWHUP
dissemination of information regarding power sector for (1-5 years) purchase of power by DISCOMs.
decision making, future planning, ease of doing business 9 ¶H7UDQV· ZHE SODWIRUP IRU HELGGLQJ DQG HUHYHUVH
DQGHDVHRIOLYLQJ DXFWLRQIRU7DULII%DVHG&RPSHWLWLYH%LGGLQJ 7%&% 
‡ 3RUWDOVPRELOHDSSVPDGHDYDLODEOHIRUHHQDEOHPHQW in transmission projects.
and information dissemination of various schemes/ 9 ‘TARANG’ (Transmission App for Real Time
projects of Ministry of Power as mentioned below : 0RQLWRULQJ  *URZWK  0RELOH $SS  :HE 3RUWDO
9 DDUGJY – Deen Dayal Upadhyaya Gram Jyoti For Real time Monitoring and Growth to monitor the
<RMDQDHOHFWULÀFDWLRQRIHYHU\YLOODJHLQ,QGLD progress of transmission system in the country.
3RUWDOKDVGHWDLOLQIRUPDWLRQRQYDULRXVZRUNEHLQJ 9 PRAAPTI  3D\PHQW 5DWLÀFDWLRQ DQG $QDO\VLV LQ
done under the scheme. Power procurement for bringing Transparency in
9 Saubhagya - Pradhan Mantri Sahaj Bijli Har Ghar LQYRLFLQJRIJHQHUDWRUV
<RMDQD7RSURYLGHHOHFWULFLW\WRDOOKRXVHKROG3RUWDO 9 Ash Track/LQNLQJÁ\DVKXVHUVDQGSRZHUSODQWVIRU
KDVGHWDLOLQIRUPDWLRQRQYDULRXVZRUNGRQHXQGHU
better ash utilisation.
the scheme.
2. National Power Portal (NPP)
9 Vidyut Pravah - Power demand met and price at
(QHUJ\([FKDQJHLVDYDLODEOHRQQDWLRQDODQG6WDWH ‡ 1DWLRQDO 3RZHU 3RUWDO KWWSVQSSJRYLQ  LV D XQLÀHG
wise. system for Indian Power Sector to facilitate online
GDWD FDSWXUH GDLO\ PRQWKO\ DQQXDOO\  IURP YDULRXV
9 URJA MITRA  (PSRZHULQJ FLWL]HQV E\ UHDO WLPH
generation, transmission and distribution utilities in the
information sharing on power outage information to
country. NPP also disseminates Information on capacity,
XUEDQUXUDO SRZHU FRQVXPHUV DFURVV ,QGLD WKURXJK
GHPDQGVXSSO\FRQVXPSWLRQWKURXJKYDULRXVDQDO\]HG
SMS.
reports, graphs, statistics at all India, region and state
9 Rural Feeder Monitoring Scheme - To monitor the OHYHO DQG IRU WKH FHQWUDO VWDWH DQG SULYDWH VHFWRU
power supply in rural areas of the country. Data can Stakeholders of NPP includes Generation, Transmission
EH DFFHVV RQ UHDO WLPH EDVLV WKURXJK ZHE VHUYLFHV DQG'LVWULEXWLRQXWLOLWLHVLQJRYHUQPHQWDVZHOODVSULYDWH
Linked to National Power Portal. VHFWRU $SH[ %RGLHV RWKHU JRYHUQPHQW RUJDQL]DWLRQV
9 “URJA” (Urban Jyoti Abhiyaan) - Integrated Power and public users.
'HYHORSPHQW 6FKHPH ,3'6  IRU VWUHQJWKHQLQJ RI ‡ 7KH 3RUWDO KDV EHHQ FRQFHSWXDOL]HG GHVLJQHG DQG
sub-transmission and distribution network, metering GHYHORSHGZLWKWKHKHOSRI1DWLRQDO,QIRUPDWLFV&HQWUH
RIGLVWULEXWLRQWUDQVIRUPHUVIHHGHUV (NIC) using Open Source Technologies and is hosted on
9 Ujwal DISCOM Assurance Yojana (UDAY) - UDAY National Cloud of NIC. Central Electricity Authority is the
SURYLGHVIRUWKHÀQDQFLDOWXUQDURXQGDQGUHYLYDORI Nodal agency for implementation of NPP.
Power Distribution companies (DISCOMs). Portal ‡ 133LVLQWHJUDWHGZLWKDVVRFLDWHGV\VWHPVRI&($3)&
SURYLGHV GHWDLO LQIRUPDWLRQ RQ YDULRXV SDUDPHWHUV 5(& DQG RWKHU PDMRU XWLOLWLHV DQG LV VHUYLQJ DV VLQJOH
abouWWKH6WDWH'LVFRP DXWKHQWLF VRXUFH RI SRZHU VHFWRU LQIRUPDWLRQ WR DSH[

253
Annual Report 2018-19

bodies, utilities for the purpose of analysis, planning, ZLWKUHVSHFWWR&\EHU6HFXULW\WR6WDWHV87V8WLOLWLHVLQ


monitoring as well as for public users. 3RZHU6HFWRUDQGRUJDQL]DWLRQVXQGHUWKLV0LQLVWU\IRU
QHFHVVDU\FRPSOLDQFH5HJXODUUHYLHZPHHWLQJVDUHDOVR
‡ 7KHV\VWHPLVDYDLODEOH[DQGHQVXUHVHIIHFWLYHDQG
RUJDQL]HG
WLPHO\FROOHFWLRQRIGDWD,WVWDQGDUGL]HVGDWDSDUDPHWHUV
DQG IRUPDWV IRU VHDPOHVV H[FKDQJH RI GDWD EHWZHHQ ‡ 6HFWRUDO&(57VKDYHDOUHDG\IRUPXODWHGÀQDOL]HGPRGHO
133DQGUHVSHFWLYHV\VWHPVDWXWLOLWLHV,WIDFLOLWDWHVGDWD Cyber Crisis Management Plan (CCMP) for each sector
FROOHFWLRQ DW VRXUFH PLQLPL]HV PDQXDO GDWD HQWU\ DQG like Generation, Transmission and Distribution. These
RSWLPL]HVFRVWE\PDLQWDLQLQJFRPPRQ,7LQIUDVWUXFWXUH &&03V DUH DW YDULRXV VWDJHV RI LPSOHPHQWDWLRQ 7KH
6WDWHV87V8WLOLWLHVKDYHEHHQDGYLVHGWRQRPLQDWH&KLHI
‡ 7KH 133 'DVKERDUG SURYLGHV YLVXDOL]DWLRQ RI DQDO\]HG
,QIRUPDWLRQ 6HFXULW\ 2IÀFHU &,62  $V UHTXHVWHG E\
information about the sector through GIS enabled
0HLW<0LQLVWU\RI3RZHUKDVLVVXHGDGYLVRU\IRUVHWWLQJ
QDYLJDWLRQ DQG FKDUW ZLQGRZV RQ FDSDFLW\ JHQHUDWLRQ
up of Computer Security Incident Response Team (CSIRT)
transmission, distribution at national, state, DISCOM,
DW6WDWH8WLOLW\OHYHO$WWKHFHQWUH,QIRUPDWLRQ6KDULQJ
WRZQ IHHGHU OHYHO DQG VFKHPH EDVHG IXQGLQJ WR
and Analysis Centre (ISAC-Power) has been hosted on
VWDWHV 7KH V\VWHP DOVR IDFLOLWDWHV YDULRXV W\SHV RI
the website of CEA as the Information Resource pooling
statutory reports required to be published regularly.
and sharing platform on cyber security in power sector.
7KH 'DVKERDUG VHUYHV DV D VLQJOH SRLQW LQWHUIDFH IRU
all Power Sector Apps launched earlier by the Ministry 5. Promotion of Digital Payments
such as TARANG, UJALA, VIDYUT PRAVAH, SAUBHAGYA,
‡ $V SDUW RI *RYHUQPHQW RI ,QGLD·V  KLJK SULRULW\ IRU
URJA, MERIT ORDER DESPATCH.
promotion of digital payment in the country amongst
3. Social Media Activities FLWL]HQV 0LQLVWU\ RI 3RZHU KDV WDNHQ YDULRXV VWHSV IRU
making payment of electricity bill by consumers across
 0LQLVWU\RI3RZHULVDFWLYHO\HQJDJLQJZLWKWKHFLWL]HQV
the country through digital means in coordination
IRUGLVVHPLQDWLQJWKHDFKLHYHPHQWVDQGDFWLYLWLHVFDUULHG
ZLWK 6WDWHV87V',6&20V LQ JRYHUQPHQW DQG SULYDWH
out by Ministry. Updated information on power sector
VHFWRU 0RVW RI WKH 6WDWHV87V',6&20V KDYH RQ
are regularly posted on these social media platforms.
boarded Bharat Bill Payment System (BBPS) for digital
0LQLVWU\ KDV YHULÀHG DFFRXQWV RQ ERWK )DFHERRN DQG
SD\PHQW IDFLOLWDWLRQ %+,083, DQG %KDUDW 45 &RGH
Twitter. Ministry’s Facebook page has more than 95,961
for facilitating digital payment of electricity bill are also
followers & likes and similarly more than 2,01,000
being promoted on high priority.
followers on Twitter.
‡ $VDUHVXOWRIFRQJUXHQWHIIRUWVWRWDOGLJLWDOWUDQVDFWLRQV
4. Cyber Security Measures
DFKLHYHG E\ 0LQLVWU\ RI 3RZHU LQ )<  LV 
‡ &\EHU6HFXULW\PHDVXUHVDQGEHVWSUDFWLFHVDVDGYLVHG FURUHZKLFKLVDOPRVWKLJKHUWKDQWKDWDFKLHYHGLQ
by CERT-In, NCIIPC and MHA adopted by Ministry of 2017-18.
3RZHU KDV SUHYHQWHG DQ\ NLQG RI F\EHU DWWDFN RQ WKH
‡ 'XULQJ WKH VSHFLDO FDPSDLJQ LQLWLDWHG E\ 302 IRU
website of this Ministry, inspite of widespread attempts
promotion of digital payments in 100 smart cities across
made by cyber attackers on many Indian websites.
WKH FRXQWU\ DSSUR[LPDWHO\  RI GLJLWDO SD\PHQW
‡ )RXU &RPSXWHU (PHUJHQF\ 5HVSRQVH 7HDPV &(57V  WUDQVDFWLRQV KDYH  EHHQ UHFRUGHG  LQ SRZHU VHFWRU LQ
namely CERT- Transmission, CERT-Distribution, CERT- these smart cities.
+\GUR DQG &(577KHUPDO VHW XS LV DFWLYHO\ PRQLWRULQJ
 ,PSOHPHQWDWLRQRIH2IÀFH
and taking necessary steps to protect the power sector
from any kind of cyber attacks. Cyber Security Mock  H2IÀFH KWWSSRZHUPLQHRIÀFHJRYLQ  LV IXQFWLRQDO
Drills and Cyber Audit of IT infrastructure are also being LQWKLV0LQLVWU\ZLWKDQREMHFWLYHWRIDFLOLWDWHSDSHUOHVV
carried out by the Sectoral CERTs in consultation with HQYLURQPHQWDQGHOHFWURQLFZRUNÁRZ0LQLVWU\RI3RZHU
CERT-In. ZDVDZDUGHG&HUWLÀFDWHRI$SSUHFLDWLRQLQUHFRJQLWLRQ
of the commendable work done in implementation of
‡ 0LQLVWU\RI3RZHUFRRUGLQDWHVWKHDGYLVRULHVJXLGHOLQHV
2IÀFHRQWK0DUFK018.
of CERT-In, NCIIPC, Ministry of Home Affairs and MeitY

254
7. National Mission on Power Electronics Technology - dissemination in respect of power sector were
(NaMPET-III)- Phase-III. QRPLQDWHG IRU 'LJLWDO ,QGLD $ZDUG DQG H*RYHUQDQFH
Award. Ministry of Power website is bilingual and is
 *RYHUQPHQW RI ,QGLD KDV DSSURYHG 1DWLRQDO
UHDG\IRU*,*:FRPSOLDQFH
Mission on Power Electronics Technology-Phase-III
‡ 6XSSRUW RQ XSGDWLRQ RI JHQHULF ZHE SRUWDOV DQG
web based applications like e-Samiksha, VIP letter
Monitoring System, ACC Vacancy Monitoring System,
35$*$7,SRUWDO&HQWUDOLVHG3XEOLF*ULHYDQFH5HGUHVVDO
System and Pensioners’ Portal, Right to Information Act
57,  3URDFWLYH GLVFORVXUHV DQG $QQXDO 5HWXUQ 6\VWHP
Centralised Public Procurement Portal (CPPP) is being
SURYLGHGUHJXODUO\

‡ ,7'LYLVLRQRIWKH0LQLVWU\LQFRRUGLQDWLRQZLWK1DWLRQDO
Informatics Centre (NIC) Cell, Ministry of Power
LPSOHPHQWHG YDULRXV ,QIRUPDWLRQ  &RPPXQLFDWLRQ
7HFKQRORJ\ ,&7  HQDEOHG DFWLYLWLHV LQ WKH 0LQLVWU\ DV
PHQWLRQHGEHORZ
ƒ 'HVLJQ 'HYHORSPHQW  ,PSOHPHQWDWLRQ RI
7RWDO1RRIH)LOHVSURFHVVHG0RUHWKDQ H*RYHUQDQFH3URMHFWVDQGUHODWHGWUDLQLQJ
ƒ 'HVLJQ'HYHORSPHQW +RVWLQJRI:HEVLWHV
'UDIWV&UHDWHG0RUHWKDQ
ƒ 0DLQWHQDQFH DQG ,PSOHPHQWDWLRQ RI :HE
6HQLRU 2IÀFHUV KDYH EHHQ JLYHQ 931 DFFHVV WR RSHUDWH
3RUWDOV :HE %DVHG $SSOLFDWLRQV DQG 0RELOH
HRIÀFH RXWVLGH 1,& 1HWZRUN DOVR (2IÀFH KDV DOVR EHHQ
Apps.
LPSOHPHQWHG LQ RUJDQL]DWLRQV XQGHU 0LQLVWU\  &($ %%0%
BEE, PGCIL and CERC. ƒ Presence on Social Media
ƒ Compliance of Cyber Security Guidelines
1D03(7,,, SURJUDPPHIRUDSHULRGRIÀYH\HDUVZLWK
ƒ Maintenance of Local Area Network (LAN) and
effect from 30.01.2019. Ministry of Power is a Member
,QWHUQHW6HUYLFHV
of the National Steering Committee for NaMPET-
,,, 7KH SURMHFW HQYLVDJHV 5HVHDUFK  'HYHORSPHQW ƒ Video Conferencing
GHSOR\PHQWGHPRQVWUDWLRQ DQG WHFKQRORJ\ WUDQVIHU 10. Support for maintenance and Hosting of Web Sites
IRU SURGXFWLRQFRPPHUFLDOL]DWLRQ RI 3RZHU (OHFWURQLFV of Ministry and Associated Organizations
Technology, being implemented through a network of
Academic Institutes, R&D laboratories and Industries. ‡ 1HFHVVDU\VXSSRUWIRUKRVWLQJDQGXSGDWLRQRIZHEVLWH
RI0LQLVWU\DQGRUJDQL]DWLRQVXQGHUWKLV0LQLVWU\LQ1,&
8. Smart India Hackathon (SIH) Data Centre.
Ministry of Power participated in the Smart India ‡ 7KHZHEVLWHVWKGFFRLQIRUXPRIUHJXODWRUVJRYLQDSWHO
Hackathon (SIH-2018) and (SIH-2019) which is a JRYLQKDYHEHHQPLJUDWHGWR´0HJKUDMµ1DWLRQDO&ORXG
VRIWZDUH DQG KDUGZDUH GHYHORSPHQW FRPSHWLWLRQ of NIC.
RUJDQL]HGE\0LQLVWU\RI+XPDQ5HVRXUFHV'HYHORSPHQW
where problems are posed to technology students for 11. Other Information Communication Technology (ICT)
LQQRYDWLYH VROXWLRQV &DVK $ZDUG ZHUH JLYHQ WR WKH enabled activities
winner by Ministry of Power. ‡ 2QOLQH 6WDWLRQDU\ 5HTXLVLWLRQ 6\VWHP ²  LQWHQGV
9. Implementation and Maintenance of Web Portals were submitted during 2018-19.
and Web Based Applications. ‡ 63$552: 6PDUW 3HUIRUPDQFH $SSUDLVDO 5HSRUW
5HFRUGLQJ2Q/LQH:LQGRZ 6\VWHP 35,60 3URSHUW\
‡ 0LQLVWU\ RI 3RZHU :HEVLWH 1DWLRQDO 3RZHU 3RUWDO
& Resource Information System Management)
133  DQG 0RELOH $SSV GHYHORSHG IRU LQIRUPDWLRQ

255
Annual Report 2018-19

‡ &RPS''2SD\UROOSDFNDJHDQGPLJUDWLRQWR3)06 NTPC
‡ H9LVLWRU 6\VWHP ²1XPEHU RI YLVLWRUV HQWU\ IRU 0R3 LQ NTPC has implemented Enterprise Resource Planning (ERP)
Shram Shakti Bhawan during the FY 2018-19 is 6484 as DSSOLFDWLRQWRLQWHJUDWHDOOLWVEXVLQHVVIXQFWLRQVWRLPSURYH
per the report from eVisitor Portal. LQIRUPDWLRQ DYDLODELOLW\ WUDQVSDUHQF\ DQG GHFLVLRQ PDNLQJ
3URFHVV,QWHJUDWLRQGDWDV\VWHPKDVEHHQGHYHORSHGWRFDSWXUH
‡ $DGKDU (QDEOHG %LRPHWULF $WWHQGDQFH 6\VWHP $(%$6 
display and analyse the plant performance parameters on real
- The Attendance web portal is being updated regularly
WLPHEDVLV(53KDVEHHQXSJUDGHGWRWKHODWHVWYHUVLRQ
DQGUHTXLUHGLQIRUPDWLRQLVSURYLGHGWR$GPLQLVWUDWLRQ
'LYLVLRQ IRU PRQLWRULQJ WKH DWWHQGDQFH RI 0LQLVWU\ Non-ERP applications in other areas such as Engineering
RIÀFLDOV 0DLQWHQDQFH RI $DGKDU (QDEOHG %LRPHWULF 'UDZLQJV DSSURYDO 4XDOLW\ &RQWURO 0DQDJHPHQW +RVSLWDO
$WWHQGDQFH GHYLFHV IRU RIÀFLDOV LQ WKUHH 0LQLVWULHV RI Management, Guest House Management, Right to information
%KDZDQ LV EHLQJ HQVXUHG 5HJLVWHUHG 'HYLFHV 5'  DQG6HFXULW\&RQWUROKDYHEHHQLPSOHPHQWHG
VHUYLFHV KDYH EHHQ HQDEOHG LQ $(%$6 GHYLFHV DV SHU 173& SODQWV DQG RIÀFHV DFURVV ,QGLD DUH FRQQHFWHG WR
guidelines of UIDAI. &RUSRUDWH 2IÀFH DQG 'DWD &HQWUH WKURXJK KLJK VSHHG
‡ -HHYDQ 3UDPDQ 3RUWDO  ,W IDFLOLWDWHV  UHWLUHG RIÀFLDOV WR MPLS (Multi-Protocol Label Switching) to facilitate seamless
JHQHUDWH WKHLU /LIH FHUWLÀFDWHV XVLQJ  -HHYDQ 3UDPDQ communication. The progress of ongoing projects and issues
portal based on Aadhar number authentication. RIWKHUXQQLQJSRZHUVWDWLRQVDUHGLVFXVVHGUHJXODUO\RYHUKLJK
GHÀQLWLRQ 9LGHR &RQIHUHQFLQJ V\VWHP DW 3URMHFW 0RQLWRULQJ
12. Maintenance of Local Area Network (LAN) and
&HQWUHRI&RUSRUDWH2IÀFH173&KDVLWVRZQPDLOLQJVROXWLRQ
Internet Services with main and backup systems.
‡ 1HWZRUN 2SHUDWLRQ &HQWUH 12&  RI 6KUDP 6KDNWL $ YHQGRU SRUWDO ZDV GHYHORSHG WR IDFLOLWDWH YHQGRUV WR JHW
Bhawan is operational at NIC Cell, Ministry of Power registered, bid and track their bill for payment without any
ZKLFK SURYLGHV /$1,QWHUQHW IDFLOLW\ WR  DERXW  SK\VLFDO LQWHUDFWLRQ 7KH VDPH LV QRZ DYDLODEOH RQ D PRELOH
FOLHQWV FRYHULQJ DOO IRXU PLQLVWULHV ORFDWHG LQ 6KUDP App as well.
6KDNWL %KDZDQ 1HFHVVDU\ VXSSRUW ZDV SURYLGHG WR
these clients for LAN and internet facility. LAN set up Security of digital assets of NTPC is top most priority and
KDV EHHQ H[WHQGHG  IRU 0LQLVWU\ RI 6NLOO 'HYHORSPHQW KHQFH D [ 6HFXULW\ 2SHUDWLRQ &HQWUH 62&  ZDV VWDUWHG
and Entrepreneurship in Shram Shakti Bhawan. 5RXQGWKHFORFNPRQLWRULQJRIDOOH[WHUQDODQGLQWHUQDOGDWD
WUDIÀF LV EHLQJ PRQLWRUHG WKURXJK 62& DQG ODWHVW WKUHDW
‡ :L)L $FFHVV 3RLQWV RYHU 1,& 1HWZRUN ZHUH LQVWDOOHG PDQDJHPHQWWRROVKDYHEHHQGHSOR\HGWRSUHYHQWDQ\F\EHU
DQGPDLQWDLQHGWRSURYLGH:LÀFRQQHFWLYLW\WR0LQLVWU\ attack or data theft.
RIÀFLDOVIRUHDVHRIZRUNDQGHQKDQFLQJHIÀFLHQF\
173&KDVLWVRZQ'LVDVWHU5HFRYHU\6LWH%RWKWKHGDWDFHQWUH
13. Video Conferencing facility at Ministry DQGGLVDVWHUUHFRYHU\FHQWUHDUHQRZ,62FHUWLÀHG
‡ +RQ·EOH 3ULPH 0LQLVWHU LQWHUDFWHG ZLWK EHQHÀFLDULHV RI NTPC has initiated the process of switching to Paperless
DDUGJY from remote locations using Video Conferencing 2IÀFH$OODSSURYDOVDQGHQWLUHSURFHVVIURPSURFXUHPHQWWR
facility. The facility is also being successfully used during SD\PHQWDUHHQYLVDJHGWREHSDSHUOHVV
Video Conferencing on PRAGATI chaired by Hon’ble
NHPC
Prime Minister.
NHPC makes use of information and communication
‡ +RQ·EOH026 ,& IRU3RZHU 15(LQWHUDFWHGZLWK0HGLD
WHFKQRORJLHVIRUWKHH[HFXWLRQDQGPDQDJHPHQWRISURMHFWV
from remote locations from National Media Center on
and power stations. NHPC considers information technology
WKH RFFDVLRQ RI IRXU \HDU DFKLHYHPHQWV RI 0LQLVWU\ RI
WR EH D VWUDWHJLF WRRO WR LPSURYH RYHUDOO SURGXFWLYLW\ DQG
3RZHURYHU9LGHR&RQIHUHQFLQJ
HIÀFLHQF\1+3&KDVVXFFHVVIXOO\LPSOHPHQWHGDQ(QWHUSULVH
‡ 7KH9LGHR&RQIHUHQFLQJIDFLOLW\DYDLODEOHLQWKH0LQLVWU\ Resource Planning (ERP) software solution to help in managing
ZDV H[WHQVLYHO\ XVHG E\ +RQ·EOH 026 ,&  IRU 3RZHU RSWLPXP XWLOL]DWLRQ RI JHQHUDWLQJ DVVHWV DFFHOHUDWHG
 15( DQG VHQLRU RIÀFHUV RI WKH 0LQLVWU\ WR FRQGXFW GHYHORSPHQW RI FRQVWUXFWLRQ SURMHFWV WKHUHE\ LPSURYLQJ
YDULRXV1DWLRQDODQG,QWHUQDWLRQDOPHHWLQJVDQGUHYLHZ TXDOLW\SURGXFWLYLW\DQGSURÀWDELOLW\RIWKHRUJDQL]DWLRQ
RISURJUHVVRIYDULRXVVFKHPHVSURMHFWVRI0LQLVWU\RI 1+3& KDV YHU\ HODERUDWH ,QIRUPDWLRQ 7HFKQRORJ\ DQG
Power. Communication infrastructure and all the sites are now

256
connected witKWKH&RUSRUDWH2IÀFHWKURXJKPXOWLPRGHIDLO ‡ ,PSOHPHQWDWLRQRI9/$1
VDIHFRPPXQLFDWLRQVOLQNVXVLQJ03/6¥93196$7.X%DQG
‡ 1+3& KDV LGHQWLÀHG WKH LQVWDOOHG &OOV DQG VKDUHG ZLWK
%URDGEDQGWHFKQRORJLHV$KLJKVSHHGZLUHOHVVQHWZRUN :L
CISO MoP for onward sharing with NCIIPC to declare as
)L  KDV DOVR EHHQ LQVWDOOHG DW 1+3& &RUSRUDWH RIÀFH 1+3&
Protected system
KDVSUHVHQWO\FRORFDWHGNH\VHUYHUV DW7,(5,OO'DWD&HQWUHV
RI%61/DW)DULGDEDGDQG1DWLRQDO,QIRUPDWLFV&HQWUH6HUYLFH ‡ 9$37DW3RZHU6WDWLRQVDV3LORW3URMHFW
,QFRUSRUDWHG 1,&6,  DW 1HZ 'HOKL 'LVDVWHU 5HFRYHU\ '5  ‡ ,PSOHPHQWDWLRQ RI ,606  FHUWLÀFDWLRQ LV
VLWHLVDOVRRSHUDWLRQDODW1+3&RIÀFHDW.RONDWD,7 &\EHU underway.
Security policy is also in place to manage the Information
 7R PHHW WKH RUJDQL]DWLRQ UHTXLUHPHQW UHODWHG WR
Technology (IT) system to ensure optimum and secure
Information Technology. Following are the new key
XWLOL]DWLRQRIWKHDVVHWVRZQHGE\1+3&
DSSOLFDWLRQV GHYHORSHG DQG LPSOHPHQWHG GXULQJ
,)6 (53 KDV EHHQ LPSOHPHQWHG LQ 1+3& LQ FHQWUDOL]HG 
HQYLURQPHQW DQG WKH GDWD IRU WKH HQWLUH &RUSRUDWLRQ
‡ 0R8 7DUJHW 2QOLQH +506 DQG LQWHJUDWLRQ ZLWK
pertaining to ERP resides in single Oracle database. IFS ERP
)LQDQFH 'LYLVLRQ FRQVLVWLQJ RI RQOLQH HPSOR\HH GDWD
LV EHLQJ DFFHVVHG UHPRWHO\ IURP DOO ORFDWLRQV YL] &RUSRUDWH
DGPLQLVWUDWLRQ7$77$H[LWSURFHGXUHVWDOHQWPDQDJH
2IÀFH5HJLRQDORIÀFHV3URMHFWV3RZHUVWDWLRQVWRUXQWKH,)6
management etc.
DSSOLFDWLRQ WKURXJK DERYH FRPPXQLFDWLRQ QHWZRUN $OO NH\
EXVLQHVVIXQFWLRQVYL])LQDQFH+53URFXUHPHQW &RQWUDFWV ‡ 0DQDJHPHQW 'DVKERDUG IRU PRQLWRULQJ $FWLYLWLHV DQG
,QYHQWRU\ 3URMHFW 0DQDJHPHQW 3RZHU 3ODQW 2SHUDWLRQ DQG YDULRXV0,65HSRUWV
Maintenance Energy Sales and Accounting, Quality Assurance
‡ 5HOLHI:V  &DOFXODWLRQWRIDFLOLWDWH(PSOR\HHV
HWFKDYHEHHQLPSOHPHQWHGLQWKH,)6(536\VWHP(PSOR\HH
6HOI6HUYLFH (66 LVDOVRLPSOHPHQWHGDFURVVWKH&RUSRUDWLRQ ‡ /DQG5HFRUG0DQDJHPHQW
catering to all employees of the Corporation, ‡ $SSOLFDWLRQVXEPLVVLRQIRU2XWVLGH(PSOR\PHQW
A host of other software applications has been implemented ‡ $GRSWLRQRI,1'$6LQ1+3&
FRYHULQJ NH\ EXVLQHVV IXQFWLRQV DQG SURYLGLQJ VHUYLFHV OLNH
(PDLO 9RLFH 9LGHR &RQIHUHQFLQJ :HEFDVWLQJ 'HVNWRS POWERGRID
YLUWXDOL]DWLRQ HWF OHYHUDJLQJ WKH ,7  &RPPXQLFDWLRQ 32:(5*5,' KDV DOUHDG\ LQKRXVH GHYHORSHG GLJLWL]HG WRROV
,QIUDVWUXFWXUH $ ELOLQJXDO RIÀFLDO ZHEVLWH RI 1+3& ZLWK IRUPDQ\RILWVIXQFWLRQVVXFKDVUHFUXLWPHQWYLJLODQFHKXPDQ
VWDWHRIWKHDUW WHFKQRORJ\ FDQ EH DFFHVVHG DV KWWSZZZ UHVRXUFHGHYHORSPHQWELOOSD\PHQWHWF
nhpcindia.com. In addition, NHPC has its own integrated
32:(5*5,'KDVLQWURGXFHGDZHEEDVHG9LJLODQFH&RPSODLQW
LQWUDQHW ZKLFK SOD\V SLYRWDO UROH LQ GLVSOD\LQJ LQIRUPDWLRQ
Handling System for proper monitoring and speedy disposal
RI YDULRXV GLYLVLRQV RI &RUSRUDWH 2IÀFH  3URMHFWV , 5HJLRQDO
of the cases.
2IÀFHVIRUZLGHYLHZLQJWKURXJKRXWWKH&RUSRUDWLRQWKURXJK
:$16$+$-6(:$SRUWDOKDVEHHQXSJUDGHGDQGLPSURYHG )XUWKHU WR H[SHGLWH GD\ WR GD\ RSHUDWLRQ RI 32:(5*5,'
WR PDNH LW PRUH HPSOR\HHV IULHQGO\ VR WKDW XVHUV FDQ KDYH ZLWK LQFUHDVHG WUDQVSDUHQF\ 32:(5*5,' KDV LPSOHPHQWHG
easy access to their personal information etc. (QWHUSULVH5HVRXUFH3ODQQLQJ (53 DFURVVWKHRUJDQL]DWLRQ

Company has successfully reduced paper consumption, To promote a culture of Recognition, Feedback, Learning &
DFKLHYHGVWDQGDUGL]DWLRQRIGDWDDQGDFFXUDF\RILQIRUPDWLRQ .QRZOHGJH 0DQDJHPHQW WKH XSJUDGHG 32:(5*5,' +5'
WR D ODUJH H[WHQW ZLWK ZHOOSODQQHG ,QIRUPDWLRQ 7HFKQRORJ\ web portal has hosted following benchmark web applications
IDFLOLWLHV $V SHU *RYHUQPHQW RI ,QGLD GLUHFWLYHV WKH which are unique in the entire PSUs
procurement process through e-procurement (Electronic A. Online HRD Portal >'LJLWL]LQJWKHOHDUQLQJSURFHVVHV
Tender) System has also been successfully implemented. for Online Training Feedback System, Online Training
NHPC has been nominated as Sectoral CERT - nodal agency of ([HPSWLRQV$SSOLFDWLRQIRU2SHQ3URJUDPPHLQ3UHPLHUH
CERT and designated as CERT-Hydro for hydro sector by MOP. ,QVWLWXWHVDQG,QGLYLGXDO(PSOR\HH&RPSHWHQFLHV

7R FRPSO\ YDULRXV UHJXODWRU\ UHTXLUHPHQWV DQG XSNHHS WKH B. Employee e-recognition > Capturing Success Stories
,7,QIUDVWUXFWXUHIROORZLQJPDMRULQLWLDWLYHVKDVEHHQWDNHQE\ WR ÀJXUH LQ 32:(5*5,'  .QRZOHGJH 3RUWDO
1+3&GXULQJ > Nomination for Mega Performance Awards It

257
Annual Report 2018-19

SURYLGHV D VLPSOLÀHG ZHE IRUP IRU HUHFRJQLWLRQ RI DV D EDFNERQH RI &RUSRUDWLRQ·V LQWHUQDO DQG H[WHUQDO
employees for outstanding work done. In case the communications.
HPSOR\HH JLYLQJ WKH UHFRJQLWLRQ UHFRPPHQGV WKDW
3.0 Augmentation of IT Infrastructure: In order to keep
WKLV LV DPHJD DFKLHYHPHQW DQGGHVHUYHV32:(5*5,'
pace with the demand for high speed computing and
Mega Performance Awards then the employee who is
to comply with regulatory requirements, PFC keeps
UHFRJQL]HGLVUHTXLUHGWRXSORDGKLVVXFFHVVVWRU\LQD
on updating its IT infrastructure on regular basis. PFC
SGI ÀOH ZKLFK VKDOO ÀJXUH LQ 32:(5*5,' NQRZOHGJH
KDV HQKDQFHG WKH IROORZLQJ ,&7 LQIUDVWUXFWXUH VHUYLFHV
portal and shall also go for consideration of the Awards
during the period April-December, 2018.
&RPPLWWHHIRU32:(5*5,'0HJD3HUIRUPDQFH$ZDUGV
‡ $QHZVHWRIVHUYHUVDQGVWRUDJHKDVEHHQLQVWDOOHG
C. Feedback Portal > Submit suggestions and feedbacks
to cater to the performance demanding ERP
WRGHSDUWPHQWVIRUV\VWHPVDQGSURFHVVLPSURYHPHQWV
database.
D. Launch of PAL Android Mobile App to facilitate
‡ 7R HQKDQFH WKH VHFXULW\ RI WKH EDQNLQJ FKDQQHO
training of employees.
the Snorkel system has been integrated to the ERP
E.  $ZHEDSSOLFDWLRQWR9LHZ3ULQW)XQFWLRQDO%HKDYLRUDO system, to ensure safe transmission of banking data
Managerial, Leadership Competencies captured as a to the bank unaltered.
part of competency based Training Needs Assessment
‡ 7KH ,7 GDWD FHQWUH LV DXJPHQWHG ZLWK QHZ DJH
in compliance to People Capability Maturity Model
VHUYHUVDQG66'WHFKQRORJ\EDVHG6$1VWRUDJHWR
(PCMM).
KRVWYDULRXVDSSOLFDWLRQVGDWDEDVHV
PFC
‡ $W 3)& &RUSRUDWH 2IÀFH WKH YLGHR FRQIHUHQFLQJ
INFORMATION TECHNOLOGY IDFLOLW\KDVEHHQPRGHUQLVHGZLWKDQ,3EDVHGYLGHR
conferencing setup.
1.0 Objective:3)&LVIRVWHULQJFUHDWLYHDQGLQQRYDWLYHXVHRI
LQIRUPDWLRQWHFKQRORJ\WRSURYLGHHIIHFWLYHVWHZDUGVKLS 4.0 Development and Implementation of New
RILQIRUPDWLRQDFFHVVDQGHQVXUHVWRSURYLGHDVHFXUH Applications: More demand for computerisation and
reliable technology infrastructure along with quality WUDQVIRUPDWLRQ UHTXLUHPHQWV KDYH EHHQ PHW WKURXJK
FXVWRPHURULHQWHGVHUYLFHVDQGVXSSRUWVRDVWRPHHW introduction of new software applications which are
WKHHYHUFKDQJLQJEXVLQHVVQHHGV$FFRUGLQJO\3)&KDV GHYHORSHGLQKRXVHGXULQJWKHSHULRG$SULO'HFHPEHU
XQGHUWDNHQPDQ\,QIRUPDWLRQ7HFKQRORJ\ ,7 LQLWLDWLYHV 2018.
WR KHOS VWUHDPOLQH RSHUDWLRQV UHGXFH FRVWV LPSURYH
‡ 3)&·VÀQDQFLDOVRIWZDUHV\VWHPKDVEHHQPLJUDWHG
HIÀFLHQF\ RSWLPLVH UHVRXUFH XWLOL]DWLRQ DQG GHYRWH
to comply with IND-AS accounting standard.
WDOHQW WR FRUH EXVLQHVV WR HQDEOH EHWWHU VHUYLFHV DQG
relationship with stakeholders. ‡ 2QOLQH +XPDQ 5HVRXUFH 0DQDJHPHQW 6\VWHP
(HRMS).
2.0 State-of-the-art Datacentre:  ,Q RUGHU WR SURYLGH
continuous technological support through reliable ‡ %RUURZHU.<& .QRZ<RXU&XVWRPHU 6\VWHP
infrastructures, established a state-of-the-art Datacentre ‡ 2QOLQH3D\PHQWJDWHZD\LQ5HFUXLWPHQW6\VWHP
RSHUDWLRQDO [ KRXVLQJ 'DWDEDVH $SSOLFDWLRQV
‡ 2QOLQH6\VWHPIRUGHWHUPLQDWLRQRIHOLJLELOLW\IRUD
1HWZRUN 06 ([FKDQJH (PDLO (QWHUSULVH $QWLYLUXV
Solar Power Project borrower.
6HUYHUVKRVWHGRQ5DFNPRXQWHG6HUYHUVZLWKIXOOSRZHU
GDWDUHGXQGDQF\SURWHFWLRQV\VWHPV&RPSUHKHQVLYH ‡ 2QOLQH 6\VWHP IRU /HQGHUV (QJLQHHU /(  /HQGHUV
1HWZRUN6HFXULW\V\VWHPZLWKWZRVWDJHÀUHZDOOLQJIRU Insurance Agent (LIA) Empanelment, Project
VHUYHU]RQHDQGZLWK,QWUXVLRQ'HWHFWLRQ 3UHYHQWLRQ Assignment, Monitoring and submission of project
V\VWHP $QWLYLUXV ,QWHUQHW FRQWHQW ÀOWHULQJ V\VWHPV progress report.
are put in place to strengthen the information system
‡ 2QOLQHV\VWHPIRUFRQÀUPDWLRQRI/HWWHURI&RPIRUW
security.
(LoC) issued by PFC.
 1HWZRUN HQYLURQPHQW RI *LJDELW /RFDO $UHD 1HWZRUN
‡ ,PSOHPHQWDWLRQ RI &RPSUHKHQVLYH /RDQ 6HFXULW\
ZLWKÀEUHEDFNERQHZLWK/D\HUVZLWFKLQJWHFKQRORJLHV
Management System.
DQG([FKDQJHHPDLOVHUYHUVLPSOHPHQWHGDW3)&VHUYHV

258
6KUL 5DMHHY 6KDUPD &0' 3)& UHFHLYLQJ WKH SUHVWLJLRXV &%,3 $ZDUG  IRU ´%HVW 3RZHU )LQDQFH &RPSDQ\µ IURP +RQ·EOH
8QLRQ0LQLVWHURI6WDWH ,& IRU3RZHU 15(6KUL5.6LQJKDWDIXQFWLRQRUJDQL]HGDW6&23(&RQYHQWLRQ&HQWUH1HZ'HOKL
2WKHUGLJQLWDULHVSUHVHQWRQWKLVRFFDVLRQZHUH6KUL$.%KDOOD6HFUHWDU\ 3RZHU 6KUL&*DQJRSDGK\D\'LUHFWRU 3URMHFWV 
3)& 6KUL3.6LQJK'LUHFWRU &RPPHUFLDO 3)&

REC KDV EHHQ FRPSOHWHO\ UHYDPSHG ZLWK ODWHVW QHWZRUN


GHYLFHVHQKDQFHPHQWRI%DQGZLGWKKLJKDYDLODELOLW\
3URJUHVVPDGHGXULQJÀQDQFLDO\HDU
DQGWKHDGYDQFHGIHDWXUHV WRPHHWWKHGHPDQGLQJ
1. Implementation of latest version of ERP running requirement of operation).
in REC since July 2009:5(&KDVXSJUDGHGH[LVWLQJ
4. Video Conferencing: The Video conferencing
H%XVLQHVV (53 2UDFOH H%L] VXLWH  L ODXQFKHG RQ
IDFLOLW\ KDV EHHQ UHYDPSHG DQG WKLV EULGJHEDVHG
 WRWKHODWHVWYHUVLRQ5DORQJZLWK
PXOWLFRQIHUHQFLQJ IDFLOLW\ LV EHLQJ XVHG H[WHQVLYHO\
replacement of ERP hardware. The new ERP supports
DFURVVDOORIÀFHVDQGVXEVLGLDULHVIRUPHHWLQJVERDUG
GST and latest accounting standard (Ind-AS) and
meeting (with recording facility), conference with
KDV DGYDQFHG IHDWXUHV ZKLFK KDV IDFLOLWDWHG IXUWKHU
H[WHUQDODJHQFLHVWUDLQLQJLQFOXGLQJ5(&,307HWF
automation of business operation of the Corporation
DQG LQWHJUDWLRQ WR RWKHU V\VWHPV OLNH H2IÀFH HWF 5. Implementation of IT Framework as per RBI
7KHSURMHFWKDVJRQHOLYHLQ-XO\&RUHEXVLQHVV Master Direction :
IXQFWLRQRIWKH&RPSDQ\DUHGULYHQE\2UDFOH(53
5(&KDVLPSOHPHQWHG,7VHFXULW\GLUHFWLYHVRI0DVWHU
 5(& KDV LPSOHPHQWHG VWDWHRIDUW (OHFWURQLF 2IÀFH Direction of IT Framework as per RBI Guidelines
VROXWLRQ RI RSHQWH[W 'RFXPHQWXP DSSOLFDWLRQ IRU LQYROYLQJWKHIROORZLQJ
WUDQVIRUPDWLRQ RI 5(& WR SDSHUOHVV HQYLURQPHQW
D *DS DQDO\VLV VWXG\ ZLWK FXUUHQW ,&7 6HWXS YLV
7KHV\VWHPUXQVLQSULYDWHFORXGHQYLURQPHQWDQGLV
DYLV 5%, PDVWHU GLUHFWLRQV RQ ,7 IUDPHZRUN
FRQWLQXRXVO\LPSURYHGE\DGGLQJQHZIHDWXUHV
Roadmap assessment and reporting to Board.
3. Up gradation of REC WAN Network with
E )RUPXODWLRQRIUROHVDQGUHVSRQVLELOLWLHVUHYLHZ
enhanced Bandwidth: 2UJDQL]DWLRQ ZLGH 03/6
RIH[LVWLQJSROLFLHVSURFHGXUHVDQGIRUPXODWLRQ
VPN network infrastructure (operational since 2008)
of new policies.

259
Annual Report 2018-19

c. Constitution of ITSC committee consisting of NEEPCO


,QGHSHQGHQW 'LUHFWRU &,2 &72 DQG ([WHUQDO
,QIRUPDWLRQ 7HFKQRORJ\ LV D PDMRU HQDEOHU WR DFKLHYH WKH
&RQVXOWDQW 0V.30* 
EXVLQHVV JRDOV RI DQ RUJDQL]DWLRQ .HHSLQJ WKLV LQ YLHZ
d. REC now comply with Master Direction of IT NEEPCO is constantly trying to introduce, upgrade and
Framework issued by RBI for NBFC sector. procure hardware and software technologies to meet with the
REMHFWLYH RI KDYLQJ DQ HIIHFWLYH DQG WUDQVSDUHQW V\VWHP IRU
6. As a step towards Digital transformation, an On-
EHWWHUPDQDJHPHQWFRQWURODQGJRYHUQDQFH
Line portal for Loan proposals submission has been
GHYHORSHG WR IDFLOLWDWH ERUURZHUV WR VXEPLW ORDQ $Q,7URDGPDSLVDOUHDG\LQSODFHWRSURYLGHJXLGDQFHRQWKH
application on-line from public domain. most suitable hardware, network, software solutions, security
DQGEDFNXSSURFHGXUHV$ZLGHDUHD03/6QHWZRUN :$1 KDV
7. Revamping of REC Corporate Intranet / Internet EHHQVHWXSFRQQHFWLQJDOOWKHRIÀFHVDQGSURMHFWVLWHVIRUHDV\
Website: 5(& &RUSRUDWH :HEVLWH  ,QWUDQHW SRUWDO DQG VPRRWK DFFHVVLELOLW\ RI WKHVH ORFDWLRQV XWLOL]LQJ OHDVHG
KDYH EHHQ FRPSOHWHO\ UHYDPSHG WR PDNH LW XVHU OLQHVIDFLOLW\IRUERWKGDWDDQGYRLFHFRQQHFWLYLW\$OVRLQDIHZ
IULHQGO\ G\QDPLF LQWHUDFWLYH DQG DFFHVVLEOH IURP ORFDWLRQV 96$7V DUH XVHG IRU 'DWD  YRLFH FRPPXQLFDWLRQV
PRELOH GHYLFHV IURP SXEOLF GRPDLQ 7KH ZHEVLWH RI &XUUHQWO\DW&RUSRUDWH2IÀFHDPESVLQWHUQHWOHDVHGOLQH
5(& LV 674& FHUWLÀHG DQG FRPSO\ WR *XLGHOLQHV IRU has been subscribed from PGCIL with a redundant link of 10
,QGLDQ*RYHUQPHQWZHEVLWH *,*:  mbps from BSNL.
8. Towards transparency, in procurement: All $PRQJ WKH PDMRU LQLWLDWLYHV WKH SURFHVV WR DFTXLUH DQG
SURFXUHPHQW RI JRRGV DQG VHUYLFHV RI YDOXH LPSOHPHQWDQ(53$SSOLFDWLRQFRYHULQJPRVWRIWKHIXQFWLRQDO
DERYH 5V ODNKV LV EHLQJ GRQH RQOLQH WKURXJK DQ areas of the Corporation has been initiated. The tendering
E-procurement system. The system complies to SURFHVV IRU (53 LPSOHPHQWDWLRQ LV XQGHU HYDOXDWLRQ VWDJH
H5HYHUVH $XFWLRQ DV SHU &9& JXLGHOLQHV DQG 5(& 7KH REMHFWLYH RI (53 LPSOHPHQWDWLRQ SODQ LV WR DXWRPDWH
Procurement guidelines. Procurement of Goods and WKH FRUH DFWLYLWLHV RI WKH &RUSRUDWLRQ QDPHO\ )LQDQFH DQG
VHUYLFHV LV DOVR GRQH IURP *RYW  (PDUNHW *(0  Accounts, Stores Management and Materials Management. As
SRUWDO060(YHQGRUV,QDGGLWLRQ5(&KDVGHSOR\HG SDUWRIWKH(53LQLWLDWLYHVWUHQJWKHQLQJRIWKHFRPPXQLFDWLRQ
DQXPEHURILQKRXVHGHYHORSHGV\VWHPVDVSDUWRI,7 network is being addressed on a priority basics. Preparation of
LQLWLDWLYHVWRZDUGVDFKLHYLQJEHWWHUHJRYHUQDQFH 0DVWHU 'DWD IRU 0DWHULDO FRGLÀFDWLRQ DQG SUHSDUDWLRQ RI +5
PDVWHUGDWDIRULQSXWWRWKH(536\VWHPLVLQWKHÀQDOVWDJH
9. Primary Data Centre (PDC) and Disaster Recovery
of completion.
Center (DRC)  %RWK 3'& DQG '5& RI 5(&DUH ,62
,(&FHUWLÀHGDQGDOVRFRPSO\WR1DWLRQDO 2QOLQH /HDYH PRGXOH RI +506 KDV EHHQ LPSOHPHQWHG IURP
&\EHU6HFXULW\3ROLF\RI*RYWRI,QGLD5(&KDVDOVR 1st of January, 2019. Besides, online Annual Performance
LPSOHPHQWHG'DWD/HDNDJH SUHYHQWLRQ '/3 V\VWHP $SSUDLVDO5HSRUWLQJ 6\VWHP $3$5  7UDLQLQJ ,QIRUPDWLRQ
DW'&'5IRUSUHYHQWLQJVKDULQJRIFRQÀGHQWLDODQG Management System and Online Risk Management System
critical information outside the corporate network. and Asset Management system has been implemented in
1((3&27KH1((3&2ZHEVLWHLVUHYDPSHG
 5(& QHWZRUN LV ,3Y FRPSOLDQW DV SHU GLUHFWLYH RI
*RYHUQPHQWRI,QGLD As per Ministry guidelines, the GePNIC e-Procurement System
is implemented throughout all the sites of NEEPCO. Further, as
11. Promoting Government of India initiatives: REC SHU0LQLVWU\JXLGHOLQHVSURFXUHPHQWIURP*H0 *RYHUQPHQW
IDFLOLWDWHVDQGSURPRWHVWKH,7LQLWLDWLYHVRI*RYWRI e-Market Place) portal is initiated.
,QGLD OLNH 0\*RY H*RYHUQDQFH '3( JXLGHOLQHV RQ
During the year 2018-19, Video Conferencing facility is
digital mode of payments etc., within the Corporation.
H[WHQGHGWR$VVDP*DVEDVHG3RZHU3ODQW
12. Providing training and Computing facility to
SJVNL
Employees: Computer to Employee population ratio
LV,7'LYLVLRQDOVRRUJDQL]HVDQGLPSDUWYDULRXV 1) ERP
training programs to upgrade Computer skills of the  0DMRU EXVLQHVV IXQFWLRQV FRYHUHG LQ (53 ODQGVFDSH RI
employees of the Company. 6-91 DUH ÀQDQFLQJ  $FFRXQWLQJ 3ODQW 0DLQWHQDQFH

260
Human resource management including Payroll and WKH\HDUKDVDOVREHHQH[HFXWHGWKURXJK305
HPSOR\HH 6HOI6HUYLFH (66  0DWHULDOV 0DQDJHPHQW module.
Procurement and Contracts Management, Project 2.3 Development of PMR for E8-E9 :
Management, Commercial & Billing and E-tendering
System. 7KHRQOLQH305PRGXOHIRU((KDVEHHQGHYHORSHG
and implemented in the year 2018 for PMR 2017-18.
2) IFS Package for Finance & Accounts, Payroll and
MMS 3.0 Development of Website:

The package manages Financial accounting for all units 1HZ :HEVLWH ZLWK QHZ IHDWXUHV KDV EHHQ GHYHORSHG
of SJVN centrally and also facilitates consolidation of Same has been deployed on NIC Cloud after Security
DFFRXQWV DW \HDU HQG EHVLGH SURFHVVLQJ FHQWUDOL]HG $XGLWFOHDUDQFHJLYHQE\WKH&(57LQHPSDQHOOHGDJHQF\
salary. DQGDYDLODEOHDWKWWSWKGFFRLQ&RQWHQWVRI:HEVLWH
are regularly being updated.
3) Other Softwares used in SJVN to leverage technology:
4.0 Development of Software for Gate pass :
‡ 2QOLQHUHFUXLWPHQW6\VWHP
7KHZHEEDVHGVRIWZDUHDSSOLFDWLRQIRUYLVLWRUSDVVHVWR
‡ 2QOLQH $QQXDO 3URSHUW\ UHWXUQ V\VWHP 3HUIRUPDQFH YLVLW 7HKUL 'DP DQG 3RZHU +RXVH KDV EHHQ GHYHORSHG
Management System DQG GHSOR\HG DIWHU LQFRUSRUDWLQJ WKH VXJJHVWLRQV 
‡ 2QOLQHYLJLODQFH&OHDUDQFHV\VWHP PRGLÀFDWLRQVE\WKHXVHUV
‡ &RQWUDFW/DERXU,QIRUPDWLRQ3RUWDO 5.0 Installation and Implementation of Network
‡ 0RELOH $SSV IRU *HQHUDWLRQ GDWD DQG 6DWOXM ULYHU Attached Storage(NAS) :
discharge data NAS is installed and is being used to store the data of
‡ (SURFXUHPHQW V\VWHP VHUYLFHV DYDLOHG IURP 0V YDULRXVXVHUVRIDOOWKHGHSDUWPHQWV6SDFHLQWKH1$6
e-procurement Technologies) has been allocated to each user.

‡ $XWRGHVN3URGXFWV%HQWOH\67$$'3UR 6.0 Cyber Security

‡ 0,.(  0XOWLJURXQG] 6RIWZDUH SDFNDJH $16<6 6.1 Crisis Management Plan:
3ULPDYHUD/LEV\V%LRPHWULF$WWHQGDQFH6\VWHPHWF The Cyber Crisis Management Plan of THDCIL has
THDC been prepared to counter the cyber-attack and cyber
terrorism. This describes the framework for cyber
1.0 Development and implementation of GST module in incident response and coordination within THDCIL and
FMS application: RWKHU*RYHUQPHQWDJHQFLHV
7KH)06DSSOLFDWLRQKDVEHHQPRGLÀHGDQGQHZPRGXOH 6.2 Cyber Security Awareness :
RI*67KDVEHHQGHYHORSHGDQGLPSOHPHQWHGDVSHUWKH
requirement. 7UDLQLQJ SURJUDP RQ ´&,62 GHHS 'LYHµ RUJDQL]HG E\
1DWLRQDOH*RYHUQDQFHGLYLVLRQZDVDWWHQGHGE\7+'&,/
2.0 HRMS: RIÀFLDOV 2WKHU RIÀFLDOV KDYH DOVR EHHQ QRPLQDWHG IRU
2.1 Leave Module: the same program.
 /HDYH 0RGXOH FRYHULQJ DOO W\SHV RI OHDYH KDYH EHHQ 6.3 Security Audit of software application:
GHYHORSHG DQG LPSOHPHQWHG LQ 7+'&,/ LQ WKH H[LVWLQJ The work of security audit of HRMS, FMS, Quarterly
DSSOLFDWLRQ RI +506 1RZ WKH OHDYH LV EHLQJ DSSOLHG Vigilance Clearance and Incident Report System has
RQOLQH DQG PDQXDO V\VWHP KDYH EHHQ GLVFRQWLQXHG been awarded. The security audit of these applications
/HDYHPRGXOHLVDOVRLQWHJUDWHGZLWK)06DSSOLFDWLRQ has been started from 20.3.19.
2.2 Implementation of online PMR for FY 2017-18 from 6.4 Procurement of Desktops:
E2 to E7:
,Q WKH ÀUVW SKDVH  FRPSXWHUV KDYH EHHQ SURFXUHG
 2QOLQH 305 0RGXOH IRU H[HFXWLYHV ((  KDV EHHQ DJDLQVW%(5DQGVDPHKDYHEHHQLVVXHGWRWKHXVHUVRI
implemented. Complete cycle (from submission, mid different department. Further Purchase Order (PO) for
\HDU UHYLHZ WR DFFHSWDQFH DQG GLVFORVXUH  RI 305 IRU Procurement of 126 nos. of computers through GEM

261
Annual Report 2018-19

SRUWDOKDVEHHQLVVXHGDQGGHOLYHU\LVH[SHFWHGLQODVW ƒ Introduction of ERP system in BBMB has been initiated.


week of April-19. ƒ An app for BBMB employees named as Jan Shakti has
6.5 0R8 7DUJHW IRU  ´2QOLQH PRGXOHV IRU ([LW EHHQ GHYHORSHG IRU DFFHVVLQJ SHUVRQDORIÀFLDO GDWD
3URFHGXUH DQG 7DOHQW 0DQDJHPHQWµ KDYH EHHQ 6DODU\GHWDLOV*3)GHWDLOVHWFDQGHPSOR\HHVKDYHEHHQ
GHYHORSHGLQ+506DSSOLFDWLRQ using the app. .
6.6 Process for the submission of online application form for ƒ Video conferencing being held for conducting meetings
the recruitment of Engineer Trainee through GATE-2018 between Top management and Head of Departments.
has been successfully completed. The data submitted by ƒ 3HQVLRQ PRQLWRULQJ'RFXPHQWV 7UDFNLQJ 6\VWHP
Applicants has been complied and processed along with GHYHORSHG DQG KDV EHHQ LPSOHPHQWHG LQ DOO RIÀFHV RI
Gate-2018 result. BBMB.
6.7 Online Annual Property Return module in HRMS ƒ 9LVLWRU 3DVV 0DQDJHPHQW 6RIWZDUH GHYHORSHG DQG
DSSOLFDWLRQ KDV EHHQ GHYHORSHG DQG PDGH DYDLODEOH implemented.
to the users for submission of annual property return
ƒ 2QOLQH *3) DGYDQFH DSSOLFDWLRQ 6RIWZDUH LV EHLQJ
IRUWKH\HDU7KH$35KDVEHHQÀOOHGWKURXJKWKLV
GHYHORSHG
module for the year 2018.
ƒ Procurement from GeM Portal enabled and Buyers
H2IÀFH7+'&,/LVJUDGXDOO\PRYLQJWRZDUGVWKHSDSHUOHVV
accounts, Consignees and Paying Authorities accounts
ZRUNLQJIRULPSURYLQJHIÀFLHQF\FRQVLVWHQF\DQGHIIHFWLYHQHVV
KDYHEHHQFUHDWHGRQ*H03RUWDO
LQ WKH UHVSRQVHV IURP LQGLYLGXDO  GHSDUWPHQW LQ KDQGOLQJ
WKH OHWWHUV  QRWHV DQG ÀOHV 7KH HRIÀFH GHYHORSHG E\ 1,& ƒ 'DWD &HQWUDOL]DWLRQ FRPSOHWHG IRU GHFHQWUDOL]HG GDWD
shall be implemented. The necessary infrastructure to host IURP IRXU ORFDWLRQV IRU YDULRXV DSSOLFDWLRQ VRIWZDUH
the application and database has been completed. Phase- packages like Payroll, Financial Accounting, Budgeting
wise training to users at Rishikesh has also been completed. etc.,
The MOU has also been signed with CDAC for e-sign and the ƒ MIS for Legal Cases.
implementation is in process.
ƒ 6DODU\&HQWUDOL]DWLRQ
BBMB
CPRI
ƒ %%0%KDVLPSOHPHQWHGWKHHWHQGHULQJHSURFXUHPHQW
‡ &35, KDV VXFFHVVIXOO\ LPSOHPHQWHG HRIÀFH IRU /HDYH
system on ASP mode which encompasses all stakeholders
Management System and Tour Management System
LQ WKH WHQGHULQJSURFXUHPHQW SURFHVV $OO WKH WHQGHUV
E\ YDULRXV RIÀFHV RI %%0% DERYH D WKUHVKROG YDOXH RI ‡ &35,LVDFWLYHLQVRFLDOPHGLDVXFKDV)DFHERRNWZLWWHU
5V ODFV DUH LQYLWHG WKURXJK HSURFXUHPHQWH ‡ 2QOLQH WHVW ERRNLQJ IDFLOLW\ KDV EHHQ LPSOHPHQWHG IRU
tendering system. The e-auction system has also been Distribution Transformers
LPSOHPHQWHG LQ YDULRXV RIÀFHV RI %%0% DQG PDQ\
‡ 2QOLQH DSSOLFDWLRQV IRU 5HFUXLWPHQW KDYH EHHQ
HDXFWLRQVKDYHEHHQVDWLVIDFWRULO\FRPSOHWHG
introduced
ƒ H5HYHUVH DXFWLRQ LPSOHPHQWHG IRU WHQGHUV ZLWK
NPTI
WKUHVKROGYDOXH5V2QHFURUH
137, KDV VWDUWHG YDULRXV DFWLYLWLHV IRU (JRYHUQDQFH
ƒ 7KHLPSOHPHQWDWLRQRIHRIÀFHLQ%RDUG2IÀFHKDVEHHQ
&RPSXWHUL]DWLRQDQGQHWZRUNLQJRI137,&RUSRUDWHRIÀFHDQG
done w.e.f 02.04.2018 and it has been initiated in other
UHVSHFWLYH,QVWLWXWHVLVEHLQJGHYHORSHG
Chief Engineers offces.
6WDWHRIWKHDUW :HEVLWH DQG 0RELOH $SSOLFDWLRQV DUH DOVR
ƒ The Information Security Management System (ISMS)
EHLQJ GHYHORSHG (RIÀFH (SURFXUHPHQW (PDLO VHUYLFHV
SROLFLHV DQG SURFHGXUHV KDYH EHHQ HYROYHG DQG KDYH
XQGHU (*RYHUQDQFH LQLWLDWLYHV DUH EHLQJ WDNHQ IURP 1,&
been implemented for protection of IT assets. The
6RFLDO0HGLDDFWLYLWLHV WZLWWHUDQGIDFHERRN DUHEHLQJXVHG
desktop computers of BBMB are the latest, running with
IRU EHWWHU LQWHUDFWLRQ ZLWK YDULRXV VWDNHKROGHUV $SDUW IURP
HLWKHU:LQGRZV3URIHVVLRQDO:LQGRZV3URIHVVLRQDO
WKLV  WZRQHZRQOLQHFRXUVHVKDYHEHHQODXQFKHG
:LQGRZV3URIHVVLRQDO26

262
CHAPTER 37

REGION-WISE INSTALLED CAPACITY


ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS LOCATED IN
THE REGIONS OF MAIN LAND AND ISLANDS
(As on 31.03.2019)
(UTILITIES)

Modewise breakup
Owner-
Grand
Region ship/ Thermal RES *
Nuclear Hydro Total
Sector (MNRE)
Coal Lignite Gas Diesel Total
North- State 16344.00 250.00 2879.20 0.00 19473.20 0.00 8697.55 699.56 28870.31
ern
3ULYDWH 21680.83 1080.00 558.00 0.00 23318.83 0.00 2514.00 13120.46 38953.29
Region
Central 12335.37 250.00 2344.06 0.00 14929.43 1620.00 8496.22 379.00 25424.65
Sub Total 50360.20 1580.00 5781.26 0.00 57721.46 1620.00 19707.77 14199.02 93248.25
Western State 21560.00 1040.00 2849.82 0.00 25449.82 0.00 5446.50 547.89 31444.21
Region
3ULYDWH 34745.67 500.00 4676.00 0.00 39921.67 0.00 481.00 21864.76 62267.43
Central 16502.95 0.00 3280.67 0.00 19783.62 1840.00 1620.00 666.30 23909.92
Sub Total 72808.62 1540.00 10806.49 0.00 85155.11 1840.00 7547.50 23078.94 117621.55
South- State 19932.50 0.00 791.98 287.88 21012.36 0.00 11774.83 586.88 33374.07
ern
3ULYDWH 11874.50 250.00 5322.10 273.70 17720.30 0.00 0.00 37491.40 55211.70
Region
Central 11235.02 2890.00 359.58 0.00 14484.60 3320.00 0.00 541.90 18346.50
Sub Total 43042.02 3140.00 6473.66 561.58 53217.26 3320.00 11774.83 38620.18 106932.27
Eastern State 6240.00 0.00 100.00 0.00 6340.00 0.00 3537.92 275.11 10153.03
Region
3ULYDWH 6387.00 0.00 0.00 0.00 6387.00 0.00 399.00 1116.37 7902.37
Central 14836.64 0.00 0.00 0.00 14836.64 0.00 1005.20 10.00 15851.84
Sub Total 27463.64 0.00 100.00 0.00 27563.64 0.00 4942.12 1401.48 33907.24
North State 0.00 0.00 497.71 36.00 533.71 0.00 422.00 233.25 1188.95
Eastern
3ULYDWH 0.00 0.00 24.50 0.00 24.50 0.00 0.00 61.04 85.54
Region
Central 770.02 0.00 1253.60 0.00 2023.62 0.00 1005.00 30.00 3058.62
Sub Total 770.02 0.00 1775.81 36.00 2581.83 0.00 1427.00 324.29 4333.11
Islands State 0.00 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.38 7.38
Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10 5.10
Sub Total 0.00 0.00 0.00 40.05 40.05 0.00 0.00 17.73 57.78
ALL State 64076.50 1290.00 7118.71 363.93 72849.13 0.00 29878.80 2347.93 105075.86
INDIA
3ULYDWH 74688.00 1830.00 10580.60 273.70 87372.30 0.00 3394.00 73661.40 164427.70
Central 55680.00 3140.00 7237.91 0.00 66057.91 6780.00 12126.42 1632.30 86596.63
Total 194444.50 6260.00 24937.22 637.63 226279.34 6780.00 45399.22 77641.63 356100.19

263
Annual Report 2018-19

Figures at decimal may not tally due to rounding off


Abbreviation:- 6+3 6PDOO +\GUR 3URMHFW •  0:  %3 %LRPDVV 3RZHU 8 , 8UEDQ  ,QGXVWULDO :DVWH 3RZHU
5(6 5HQHZDEOH(QHUJ\6RXUFHV
Note : -5(6LQFOXGH6+3%38 ,6RODUDQG:LQG(QHUJ\,QVWDOOHGFDSDFLW\LQUHVSHFWRI5(6 015( DVRQ
$VSHUODWHVWLQIRUPDWLRQDYDLODEOHZLWK015(
*Break up of RES all India as on 31.03.2019 is given below (in MW) :

Small Wind Power Bio-Power Solar Power Total


Hydro Power BM Power/ Waste to Energy Capacity
Cogen.
4593.15 35625.97 9103.50 138.30 28180.71 77641.63

A. Capacity Added during Mar., 2019 3652 MW


8QLW 0: RI1$%,1$*$5733KDVEHHQFRPPLVVLRQHGDQGVKDUHKDVEHHQDGGHGWRWKHFHQWUDOVHFWRURI
EHQHÀFLDU\VWDWHVRI(5       
8QLW 0: RI%21*$,*$21733KDVEHHQFRPPLVVLRQHGDQGVKDUHKDVEHHQDGGHGWRWKHFHQWUDOVHFWRU
RIEHQHÀFLDU\VWDWHVRI1(5        
8QLW 0: RI8&+3,1'$733KDVEHHQFRPPLVVLRQHGDQGDGGHGWRSULYDWHVHFWRURI&KKDWWLVJDUK
8QLW 0: RI&++$%5$733KDVEHHQFRPPLVVLRQHGDQGDGGHGWRVWDWHVHFWRURI5DMDVWKDQ
8QLW 0: RI6+5((6,1*$-,733KDVEHHQFRPPLVVLRQHGDQGDGGHGWRVWDWHVHFWRURI0DGK\D3UDGHVK
8QLW 0: RI',6+(5*$5+733KDVEHHQFRPPLVVLRQHGDQGDGGHGWRSULYDWHVHFWRURI:HVW%HQJDO
8QLW 0: RI62/$3856736KDVEHHQFRPPLVVLRQHGDQGVKDUHKDVEHHQDGGHGWRWKHFHQWUDOVHFWRURI
EHQHÀFLDU\VWDWHVRI:5
8QLW 0: RI*$'$5:$5$733KDVEHHQFRPPLVVLRQHGDQGVKDUHKDVEHHQDGGHGWRWKHFHQWUDOVHFWRURI
EHQHÀFLDU\VWDWHVRI:5
B. Capacity Retired during Mar., 2019 300 MW
88 8RI.27+$*8'(0736   0: KDVEHHQUHWLUHGIURPVWDWHVHFWRURI7HODQJDQD

C. Capacity removed due to change from Conventional to RES during Mar., 2019 0 MW

D. Net Capacity Added during Mar., 2019 A-B-C 3352 MW

6HFWRUZLVHEUHDNXSRI5(6FDSDFLW\DVVKRZQLVSURYLVLRQDO
Share of installed capacity of BBMB Stations is included in state sector of partner states.

264
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTs
LOCATED IN NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
(As on 31.03.2019)
Modewise breakup
Owner-
Grand
Region ship/ Thermal
RES Total
Sector Nuclear Hydro
(MNRE)
Coal Lignite Gas Diesel Total

Delhi State 135.00 0.00 1800.40 0.00 1935.40 0.00 0.00 0.00 1935.40

3ULYDWH 869.22 0.00 108.00 0.00 977.22 0.00 0.00 178.89 1156.11

Central 3112.72 0.00 207.01 0.00 3319.73 102.83 723.09 0.00 4145.65

Sub- 4116.94 0.00 2115.41 0.00 6232.35 102.83 723.09 178.89 7237.16
Total

Haryana State 2720.00 0.00 150.00 0.00 2870.00 0.00 1102.82 69.30 4042.12

3ULYDWH 4080.78 0.00 0.00 0.00 4080.78 0.00 200.00 345.12 4625.90

Central 1294.72 0.00 535.61 0.00 1830.34 100.94 663.70181 5.00 2599.98

Sub- 8095.50 0.00 685.61 0.00 8781.12 100.94 1966.52 419.42 11267.99
Total

Himachal State 0.00 0.00 0.00 0.00 0.00 0.00 694.60 256.61 951.21
Pradesh
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 992.00 626.68 1618.68

Central 183.40 0.00 62.01 0.00 245.41 28.95 1223.88 0.00 1498.24

Sub- 183.40 0.00 62.01 0.00 245.41 28.95 2910.48 883.29 4068.13
Total

Jammu State 0.00 0.00 175.00 0.00 175.00 0.00 1230.00 129.03 1534.03
& Kash-
mir 3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.83 64.83

Central 506.39 0.00 129.07 0.00 635.47 67.98 1091.88 0.00 1795.33

Sub- 506.39 0.00 304.07 0.00 810.47 67.98 2321.88 193.86 3394.19
Total

Punjab State 1760.00 0.00 150.00 0.00 1910.00 0.00 2597.70 127.80 4635.50

3ULYDWH 5115.50 0.00 0.00 0.00 5115.50 0.00 288.00 1154.62 6558.12

Central 854.58 0.00 264.01 0.00 1118.59 196.81 923.42 0.00 2238.82

Sub- 7730.08 0.00 414.01 0.00 8144.09 196.81 3809.12 1282.42 13432.44
Total

265
Annual Report 2018-19

Ra- State 6260.00 250.00 603.80 0.00 7113.80 0.00 1096.18 23.85 8233.83
jasthan
3ULYDWH 2802.00 1080.00 0.00 0.00 3882.00 0.00 104.00 7301.81 11287.81

Central 956.25 250.00 221.10 0.00 1427.35 556.74 739.01 344.00 3067.10

Sub- 10018.25 1580.00 824.90 0.00 12423.15 556.74 1939.19 7669.66 22588.74
Total

Uttar State 5469.00 0.00 0.00 0.00 5469.00 0.00 724.10 25.10 6218.20
Pradesh
3ULYDWH 8714.33 0.00 0.00 0.00 8714.33 0.00 842.00 2887.60 12443.93

Central 3796.39 0.00 549.49 0.00 4345.88 289.48 1802.53 30.00 6467.89

Sub- 17979.72 0.00 549.49 0.00 18529.21 289.48 3368.63 2942.70 25130.02
Total

Uttara- State 0.00 0.00 0.00 0.00 0.00 0.00 1252.15 67.87 1320.02
khand
3ULYDWH 99.00 0.00 450.00 0.00 549.00 0.00 88.00 526.20 1163.20

Central 343.24 0.00 69.66 0.00 412.90 31.24 475.54 0.00 919.68

Sub- 442.24 0.00 519.66 0.00 961.90 31.24 1815.69 594.07 3402.90
Total

Chandi- State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
garh
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.71 34.71

Central 38.15 0.00 15.03 0.00 53.17 8.01 101.71 0.00 162.89

Sub- 38.15 0.00 15.03 0.00 53.17 8.01 101.71 34.71 197.60
Total

Central - Unallo- 1249.53 0.00 291.05 0.00 1540.58 237.03 751.45 0.00 2529.07
cated

Total State 16344.00 250.00 2879.20 0.00 19473.20 0.00 8697.55 699.56 28870.31
(North-
ern
Region)

3ULYDWH 21680.83 1080.00 558.00 0.00 23318.83 0.00 2514.00 13120.46 38953.29

Central 12335.37 250.00 2344.06 0.00 14929.43 1620.00 8496.22 379.00 25424.65

Grand 50360.20 1580.00 5781.26 0.00 57721.46 1620.00 19707.77 14199.02 93248.25
Total

266
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTs
LOCATED IN WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
(As on 31.03.2019)
Modewise breakup
Owner-
Region ship/ Thermal Grand Total
RES
Sector Nuclear Hydro
(MNRE)
Coal Lignite Gas Diesel Total

Goa State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05

3ULYDWH 0.00 0.00 48.00 0.00 48.00 0.00 0.00 3.92 51.92

Central 469.59 0.00 19.67 0.00 489.26 26.00 0.00 0.00 515.26

Sub- 469.59 0.00 67.67 0.00 537.26 26.00 0.00 3.97 567.23
Total

Daman State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
& Diu
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.47 14.47

Central 141.41 0.00 43.34 0.00 184.75 7.00 0.00 0.00 191.75

Sub- 141.41 0.00 43.34 0.00 184.75 7.00 0.00 14.47 206.22
Total

Gujarat State 3710.00 1040.00 2177.82 0.00 6927.82 0.00 772.00 64.70 7764.52

3ULYDWH 7265.67 500.00 3960.00 0.00 11725.67 0.00 0.00 8331.80 20057.47

Central 3242.43 0.00 424.00 0.00 3666.43 559.00 0.00 243.30 4468.73

Sub- 14218.10 1540.00 6561.82 0.00 22319.92 559.00 772.00 8639.80 32290.72
Total

Madhya State 5400.00 0.00 0.00 0.00 5400.00 0.00 1703.66 83.96 7187.62
Pradesh
3ULYDWH 6174.00 0.00 100.00 0.00 6274.00 0.00 0.00 4180.40 10454.40

Central 3342.38 0.00 257.00 0.00 3599.38 273.00 1520.00 300.00 5692.38

Sub- 14916.38 0.00 357.00 0.00 15273.38 273.00 3223.66 4564.36 23334.40
Total

Chhattis- State 2280.00 0.00 0.00 0.00 2280.00 0.00 120.00 11.05 2411.05
garh
3ULYDWH 8850.00 0.00 0.00 0.00 8850.00 0.00 0.00 524.30 9374.30

Central 2110.75 0.00 0.00 0.00 2110.75 48.00 100.00 0.00 2258.75

Sub- 13240.75 0.00 0.00 0.00 13240.75 48.00 220.00 535.35 14044.10
Total

267
Annual Report 2018-19

Maha- State 10170.00 0.00 672.00 0.00 10842.00 0.00 2850.84 388.13 14080.97
rashtra
3ULYDWH 12456.00 0.00 568.00 0.00 13024.00 0.00 481.00 8804.41 22309.41

Central 4667.80 0.00 2272.73 0.00 6940.53 690.00 0.00 123.00 7753.53

Sub- 27293.80 0.00 3512.73 0.00 30806.53 690.00 3331.84 9315.53 44143.90
Total

Dadra & State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Nagar
Naveli 3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.46 5.46

Central 195.60 0.00 66.34 0.00 261.94 9.00 0.00 0.00 270.94

Sub- 195.60 0.00 66.34 0.00 261.94 9.00 0.00 5.46 276.40
Total

Central - Unallo- 2333.00 0.00 197.59 0.00 2530.59 228.00 0.00 0.00 2758.59
cated

Total State 21560.00 1040.00 2849.82 0.00 25449.82 0.00 5446.50 547.89 31444.21
(Western
Region)

3ULYDWH 34745.67 500.00 4676.00 0.00 39921.67 0.00 481.00 21864.76 62267.43

Central 16502.95 0.00 3280.67 0.00 19783.62 1840.00 1620.00 666.30 23909.92

Grand 72808.62 1540.00 10806.49 0.00 85155.11 1840.00 7547.50 23078.94 117621.55
Total

268
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTs
LOCATED IN SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
(As on 31.03.2019)
Modewise breakup
Owner-
Region ship/ Thermal Grand Total
RES
Sector Nuclear Hydro
(MNRE)
Coal Lignite Gas Diesel Total

Andhra State 5010.00 0.00 235.40 0.00 5245.40 0.00 1673.60 56.18 6975.18
Pradesh
3ULYDWH 3873.88 0.00 3813.18 36.80 7723.86 0.00 0.00 7433.42 15157.28

Central 1546.83 127.73 0.00 0.00 1674.56 127.27 0.00 250.00 2051.83

Sub- 10430.71 127.73 4048.58 36.80 14643.82 127.27 1673.60 7739.60 24184.29
Total

Telan- State 5582.50 0.00 0.00 0.00 5582.50 0.00 2479.93 41.22 8103.65
gana
3ULYDWH 839.45 0.00 831.82 0.00 1671.27 0.00 0.00 3936.44 5607.71

Central 1806.85 149.27 0.00 0.00 1956.12 148.73 0.00 10.00 2114.85

Sub- 8228.80 149.27 831.82 0.00 9209.89 148.73 2479.93 3987.66 15826.21
Total

Karna- State 5020.00 0.00 0.00 127.92 5147.92 0.00 3586.60 193.89 8928.41
taka
3ULYDWH 1958.50 0.00 0.00 25.20 1983.70 0.00 0.00 13635.91 15619.61

Central 2427.80 401.40 0.00 0.00 2829.20 698.00 0.00 0.00 3527.20

Sub- 9406.30 401.40 0.00 153.12 9960.82 698.00 3586.60 13829.79 28075.21
Total

Kerala State 0.00 0.00 0.00 159.96 159.96 0.00 1856.50 172.90 2189.36

3ULYDWH 615.00 0.00 174.00 0.00 789.00 0.00 0.00 190.21 979.21

Central 861.42 281.80 359.58 0.00 1502.80 362.00 0.00 50.00 1914.80

Sub- 1476.42 281.80 533.58 159.96 2451.76 362.00 1856.50 413.11 5083.37
Total

Tamil State 4320.00 0.00 524.08 0.00 4844.08 0.00 2178.20 122.70 7144.98
Nadu
3ULYDWH 4587.67 250.00 503.10 211.70 5552.47 0.00 0.00 12292.28 17844.75

Central 3025.32 1364.20 0.00 0.00 4389.52 1448.00 0.00 231.90 6069.42

Sub- 11932.99 1614.20 1027.18 211.70 14786.07 1448.00 2178.20 12646.88 31059.15
Total

269
Annual Report 2018-19

NLC State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 0.00 100.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00

Sub- 0.00 100.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00
Total

Puduch- State 0.00 0.00 32.50 0.00 32.50 0.00 0.00 0.00 32.50
erry
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.14 3.14

Central 140.80 107.60 0.00 0.00 248.40 86.00 0.00 0.00 334.40

Sub- 140.80 107.60 32.50 0.00 280.90 86.00 0.00 3.14 370.04
Total

Central - Unallo- 1426.00 358.00 0.00 0.00 1784.00 450.00 0.00 0.00 2234.00
cated

Total State 19932.50 0.00 791.98 287.88 21012.36 0.00 11774.83 586.88 33374.07
(South-
ern 3ULYDWH 11874.50 250.00 5322.10 273.70 17720.30 0.00 0.00 37491.40 55211.70
Region)
Central 11235.02 2890.00 359.58 0.00 14484.60 3320.00 0.00 541.90 18346.50

Grand 43042.02 3140.00 6473.66 561.58 53217.26 3320.00 11774.83 38620.18 106932.27
Total

270
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTs
LOCATED IN EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
(As on 31.03.2019)
Modewise breakup
Owner-
Region ship/ Thermal Grand Total
RES
Sector Nuclear Hydro
(MNRE)
Coal Lignite Gas Diesel Total

Bihar State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.70 70.70

3ULYDWH 281.00 0.00 0.00 0.00 281.00 0.00 0.00 255.45 536.45

Central 3849.33 0.00 0.00 0.00 3849.33 0.00 110.00 0.00 3959.32

Sub- 4130.33 0.00 0.00 0.00 4130.33 0.00 110.00 326.15 4566.47
Total

Jharkhand State 420.00 0.00 0.00 0.00 420.00 0.00 130.00 4.05 554.05

3ULYDWH 730.00 0.00 0.00 0.00 730.00 0.00 0.00 34.95 764.95

Central 393.74 0.00 0.00 0.00 393.74 0.00 61.00 0.00 454.74

Sub- 1543.74 0.00 0.00 0.00 1543.74 0.00 191.00 39.00 1773.74
Total

West Ben- State 5400.00 0.00 100.00 0.00 5500.00 0.00 986.00 121.95 6607.95
gal
3ULYDWH 2437.00 0.00 0.00 0.00 2437.00 0.00 0.00 352.50 2789.50

Central 760.77 0.00 0.00 0.00 760.77 0.00 410.00 0.00 1170.77

Sub- 8597.77 0.00 100.00 0.00 8697.77 0.00 1396.00 474.45 10568.22
Total

DVC State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 6985.04 0.00 0.00 0.00 6985.04 0.00 186.20 0.00 7171.24

Sub- 6985.04 0.00 0.00 0.00 6985.04 0.00 186.20 0.00 7171.24
Total

Odisha State 420.00 0.00 0.00 0.00 420.00 0.00 2061.92 26.30 2508.22

3ULYDWH 2939.00 0.00 0.00 0.00 2939.00 0.00 0.00 473.46 3412.46

Central 1633.90 0.00 0.00 0.00 1633.90 0.00 89.00 10.00 1732.90

Sub- 4992.90 0.00 0.00 0.00 4992.90 0.00 2150.92 509.76 7653.58
Total

271
Annual Report 2018-19

Sikkim State 0.00 0.00 0.00 0.00 0.00 0.00 360.00 52.11 412.11

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 399.00 0.01 399.01

Central 87.03 0.00 0.00 0.00 87.03 0.00 64.00 0.00 151.03

Sub- 87.03 0.00 0.00 0.00 87.03 0.00 823.00 52.12 962.15
Total

Central - Unallocated 1126.83 0.00 0.00 0.00 1126.83 0.00 85.01 0.00 1211.84

Total State 6240.00 0.00 100.00 0.00 6340.00 0.00 3537.92 275.11 10153.03
(Eastern
Region) 3ULYDWH 6387.00 0.00 0.00 0.00 6387.00 0.00 399.00 1116.37 7902.37

Central 14836.64 0.00 0.00 0.00 14836.64 0.00 1005.20 10.00 15851.84

Grand 27463.64 0.00 100.00 0.00 27563.64 0.00 4942.12 1401.48 33907.24
Total

272
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTs
LOCATED IN NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
(As on 31.03.2019)
Modewise breakup
Owner-
Region ship/ Thermal Grand Total
RES
Sector Nuclear Hydro
(MNRE)
Coal Lignite Gas Diesel Total

Assam State 0.00 0.00 328.21 0.00 328.21 0.00 100.00 5.01 433.22

3ULYDWH 0.00 0.00 24.50 0.00 24.50 0.00 0.00 26.50 51.00

Central 408.52 0.00 435.56 0.00 844.08 0.00 357.08 25.00 1226.16

Sub- 408.52 0.00 788.27 0.00 1196.79 0.00 457.08 56.51 1710.38
Total

Arunachal State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107.11 107.11
Pradesh
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.39 29.39

Central 37.05 0.00 46.82 0.00 83.87 0.00 116.55 0.00 200.42

Sub- 37.05 0.00 46.82 0.00 83.87 0.00 116.55 136.50 336.92
Total

Megha- State 0.00 0.00 0.00 0.00 0.00 0.00 322.00 32.53 354.53
laya
3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.12 0.12

Central 45.60 0.00 109.69 0.00 155.29 0.00 72.27 0.00 227.56

Sub- 45.60 0.00 109.69 0.00 155.29 0.00 394.27 32.65 582.21
Total

Tripura State 0.00 0.00 169.50 0.00 169.50 0.00 0.00 16.01 185.51

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.09

Central 56.10 0.00 436.95 0.00 493.05 0.00 68.49 5.00 566.54

Sub- 56.10 0.00 606.45 0.00 662.55 0.00 68.49 21.10 752.14
Total

Manipur State 0.00 0.00 0.00 36.00 36.00 0.00 0.00 5.45 41.45

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.44 3.44

Central 47.10 0.00 71.57 0.00 118.67 0.00 95.34 0.00 214.01

Sub- 47.10 0.00 71.57 36.00 154.67 0.00 95.34 8.89 258.90
Total

Nagaland State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.67 30.67

273
Annual Report 2018-19

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

Central 32.10 0.00 48.93 0.00 81.03 0.00 57.33 0.00 138.36

Sub- 32.10 0.00 48.93 0.00 81.03 0.00 57.33 31.67 170.03
Total

Mizoram State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.47 36.47

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 0.50

Central 31.05 0.00 40.46 0.00 71.51 0.00 97.94 0.00 169.45

Sub- 31.05 0.00 40.46 0.00 71.51 0.00 97.94 36.97 206.42
Total

Central - Unallocated 112.50 0.00 63.62 0.00 176.12 0.00 140.00 0.00 316.12

Total State 0.00 0.00 497.71 36.00 533.71 0.00 422.00 233.25 1188.95
(North-
Eastern 3ULYDWH 0.00 0.00 24.50 0.00 24.50 0.00 0.00 61.04 85.54
Region)
Central 770.02 0.00 1253.60 0.00 2023.62 0.00 1005.00 30.00 3058.62

Grand 770.02 0.00 1775.81 36.00 2581.83 0.00 1427.00 324.29 4333.11
Total

274
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTs
LOCATED IN ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
(As on 31.03.2019)

Modewise breakup

Owner-
Region ship/ Thermal Grand Total
Sector RES *
Nuclear Hydro
(MNRE)
Coal Lignite Gas Diesel Total

Andaman State 0.00 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30
& Nicobar

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.63 6.63

Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10 5.10

Sub- 0.00 0.00 0.00 40.05 40.05 0.00 0.00 16.98 57.03
Total

lakshad- State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
weep

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.75

Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Sub- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.75
Total

Total (Is- State 0.00 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30
lands)

3ULYDWH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.38 7.38

Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10 5.10

Grand 0.00 0.00 0.00 40.05 40.05 0.00 0.00 17.73 57.78
Total

275
Annual Report 2018-19

NEEPCO’S POWER PLANTS UNDER OPERATION:

Sl. No. Name of the Plant State Installed Capacity (MW) Year of Commissioning

HYDRO

0:0D\
0:-XO\
1 .RSLOL+\GUR(OHFWULF3ODQW Assam 275
0:-XO\
0:-XO\

2 Doyang Hydro Electric Plant. Nagaland 75 July 2000

3 Ranganadi Hydro Electric Plant. Arunachal Pradesh 405 March 2002

8QLW2FWREHU
4 Tuirial Hydro Electric Project 0L]RUDP 60
8QLW-DQXDU\

5 Pare Hydro Electric Project Arunachal Pradesh 110 May 2018

Hydro Total 925

THERMAL

*7*
6 Assam Gas Based power Plant. Assam 291 67*

-XQH 0: 
Agartala Gas Turbine Combined Cy- July & Sept’2015
7 Tripura 135
cle Plant. 0:

*7*'HF·
8 Tripura Gas Based Power Project Tripura 101
67*0DU·

Thermal Total 527

SOLAR

*ULG ,QWHUDFWLYH 6RODU 3RZHU 3ODQW


9 Tripura 5 February 2015
Monarchak

Thermal Total 5

TOTAL 1457

276
CHAPTER 38

OFFICE OF THE CHIEF CONTROLLER OF ACCOUNTS

The Secretary (PRZHU LVWKH&KLHI$FFRXQWLQJ$XWKRULW\RIWKH0LQLVWU\7KHRIÀFHRIFKLHI&RQWUROOHURI$FFRXQWVIXQFWLRQV


XQGHURYHUDOOVXSHUYLVLRQRI-RLQW6HFUHWDU\ )LQDQFH$GYLVHU7KHRIÀFHLVKHDGHGE\WKH&KLHI&RQWUROOHURI$FFRXQWVZLWK
RQH&RQWUROOHURI$FFRXQWVDQGVHYHQ3D\ $FFRXQW2IÀFHUVUHVSRQVLEOHIRUPDNLQJDOOWKHSD\PHQWVH[SHQGLWXUHFRQWURO 
EDQNLQJDUUDQJHPHQWV,QWHUQDO$XGLWDQG$FFRXQWLQJRIDOOWKHUHFHLSWVSD\PHQWV2XWRIWKHVHRQH3D\DQG$FFRXQWV2IÀFH
LVVWDWLRQHGLQ%HQJDOXUX7KH3ULQFLSDO$FFRXQWV2IÀFHLVUHVSRQVLEOHIRUFRQVROLGDWLRQRIPRQWKO\DFFRXQWVRIDOOWKH3D\ 
$FFRXQWV2IÀFHVDQGVXEPLVVLRQRIPRQWKO\DFFRXQWVRIWKH0LQLVWU\WR&RQWUROOHU*HQHUDORI$FFRXQWV &*$ 'HSDUWPHQWRI
([SHQGLWXUH0LQLVWU\RI)LQDQFHSUHSDUDWLRQRI$SSURSULDWLRQ$FFRXQWV6WDWHPHQWRI&HQWUDO7UDQVDFWLRQV 6&7 DQG)LQDQFH
DFFRXQWVRQDQQXDOEDVLVIRUVXEPLVVLRQWRWKH&*$,WLVDOVRUHVSRQVLEOHIRUWKHFRPSLODWLRQRIYDULRXVGDWDDQGJHQHUDWLRQRI
reports for submission to Ministry of Power, Ministry of Finance, and CGA etc.

7KH 2IÀFH RI &KLHI &RQWUROOHU RI $FFRXQWV DOVR EULQJ RXW DQ DQQXDO DFFRXQWLQJ ERRNOHW FDOOHG $FFRXQWV DW D *ODQFH ZKLFK
FRQWDLQVGHWDLOVRIWRWDOWUDQVDFWLRQV 5HFHLSWV([SHQGLWXUH,QYHVWPHQWVDQG/RDQV RIWKH0LQLVWU\DQGLWVYDULRXVRUJDQL]DWLRQ
,WJLYHVDEULHIRYHUYLHZRIDFFRXQWLQJWUHQGV7KHRIÀFHLVDOVRUHVSRQVLEOHIRUSUHSDULQJWKH5HFHLSW%XGJHWRIWKH0LQLVWU\

Internal Audit Wing

7KH,QWHUQDO$XGLW:LQJIDFLOLWDWHVWKHH[HFXWLYHIRUDGRSWLRQRIVRXQGSURFHGXUHUXOHDQGUHJXODULWLHVDQGÀQDQFLDOSURSULHW\RI
WUDQVDFWLRQVRIDFFRXQWV7KLV:LQJDGYLVHV''2VDQG*UDQWHH,QVWLWXWLRQVIRUFRUUHFWLPSOHPHQWDWLRQRIUXOHVDQGPDLQWHQDQFH
RIUHFRUGV7KH,QWHUQDO$XGLW:LQJDOVRFRQGXFWVDXGLWRI'HHQ'D\DO8SDGK\D\*UDP-\RWL<RMQD ''8*-< ,QWHJUDWHG3RZHU
'HYHORSPHQW6FKHPH ,3'6 3RZHU6\VWHP'HYHORSPHQW)XQG 36') DQG7UDQVPLVVLRQ/LQH6FKHPHRI- .$3DQG6LNNLP
3HUIRUPDQFHRIWKH,QWHUQDO$XGLW:LQJGXULQJWKH\HDULVDVXQGHU

No. of Units No. of Paras Raised No. of Paras Settled Total No. of Paras
Outstanding

Audit Target Audit Done

23 20 55 66 507

AUDIT OBSERVATIONS
7KH2UJDQL]DWLRQZLVH%UHDNXSRIRXWVWDQGLQJ$XGLW2EVHUYDWLRQ ,QVSHFWLRQ5HSRUWVLVVXHGXSWRLVDVXQGHU

Sl.No 1DPHRIRUJDQL]DWLRQ2IÀFH No. of Inspection No. of Paras Outstanding


Reports Issued (Including old Paras)
01 Ministry of Power 02 48
02 Central Electrical Authority 16 141
03 Appellate Tribunal for Electricity 01 05
04 Grantee Institutions 09 106
05 Special Audits 13 94
06 5**9<''8*-<6FKHPH 27 27
07 R-APDRP Scheme 24 24
08 3D\ $FFRXQWV2IÀFHUV 06 55
09 PSDF Scheme 04 04
10 Transmission Line 03 03
Total 105 507

277
Annual Report 2018-19

STATUS OF OUTSTANDING PARA AS ON 31st Dec, 2018


Sl.No 2IÀFH Opening Balance as Para Added Total Para Closing Balance as
on 1.4.2018 Settled on 31.12.18
Ministry of Power
01 MoP USGAD 20 9 29 0 29
02 0R3 )7(2( 19 0 19 0 19
Total of MoP 39 9 48 0 48
Central Electricity Authority
01 CEA (HQ) 31 0 31 0 31
02 RPSO, MUMBAI 6 0 6 0 6
03 RPSO, DELHI 5 0 5 0 5
04 5362.2/.$7$ 3 0 3 0 3
05 RPSO, BANGALORE 11 0 11 0 11
06 RIO, MUMBAI 9 0 9 0 9
07 RIO, N.DELHI 8 0 8 1 7
08 5,2.2/.$7$ 8 0 8 0 8
09 RIO, CHENNAI 11 0 11 0 11
10 RIO, SHILONG 5 0 5 2 3
11 NRPC, N.DELHI 12 3 15 4 11
12 :53&080%$, 3 0 3 0 3
13 SRPC, BANGALORE 1 0 1 0 1
14 (53&.2/.$7$ 15 0 15 0 15
15 NERPC, SHILONG 5 0 5 0 5
16 DEPTT. of CANTEEN 12 0 12 0 12
Total of CEA 145 3 148 7 141
Appellate Tribunals For Electricity
01 ATE (APTEL) 5 5 10 5 5
GRANTEE INSTITUTIONS
01 BBMB, NANGAL 4 0 4 0 4
02 JERC, GURGAON 10 0 10 0 10
03 NPTI, FARIDABAD 13 8 21 9 12
04 CPRI, BANGALORE 15 0 15 0 15
05 FOR, DELHI 12 0 12 0 12
06 BEE, N.DELHI 16 0 16 0 16
07 CERC, N.DELHI 21 6 27 12 15
08 CPRI, UHVRL Hyderabad 13 0 13 3 10
09 CPRI Bhopal 12 0 12 0 12
Total of Grantee 116 14 130 24 106
SPECIAL AUDITS
01 REC (AG& SP) &RGGVY 5 0 5 0 5
02 BEE (BLY) 1 0 1 0 1
03 BEE (NMEEE) 11 0 11 0 11

278
04 BBMB (CHANDIGARH) 10 0 10 0 10
05 THDC 9 0 9 4 5
06 NEEPCO SHILONG 15 0 15 10 5
07 PFC (HQ) New Delhi 8 3 11 0 11
08 LOHARINAG PALA 9 0 9 0 9
09 NHPC FARIDABAD 7 0 7 0 7
10 BTPS 1 0 1 0 1
11 NLDC 6 4 10 0 10
12 REC (HQ) new Delhi 12 8 20 3 17
13 NEF (REC) New Delhi 4 2 6 4 2
Total of Special Audits 98 17 115 21 94

OFFICE OF CHIEF CONTROLLER OF ACCOUNTS


Sl.No 2IÀFH Opening Balance Added Total Dropped Closing Balance
01 Pr.AO ADMIN 15 0 15 0 15
02 3U$2$F 8 0 8 0 8
03 PAO (Sectt.) 11 0 11 0 11
04 PAO (BMCC) 5 0 5 1 4
05 PAO (CEA), N.DELHI 14 1 15 7 8
06 PAO (CEA), BEN- 9 0 9 0 9
GALURU
Total of O/o CHIEF CON- 62 1 63 8 55
TROLLER OF ACCOUNTS

RGGVY/DDUGJY
Sl.No 2IÀFH Opening Balance Added Total Dropped Closing Balance
01 5**9<''8*-< 27 0 27 0 27
Total 27 0 27 0 27

RAPDRP SCHEME
Sl.No 2IÀFH Opening Balance Added Total Dropped Closing Balance
01 5$3'53,3'6 24 0 24 0 24
Total 24 0 24 0 24

PSDF SCHEME
Sl.No 2IÀFH Opening Balance Added Total Dropped Closing Balance
01 PSDF 4 0 4 0 4
Total 4 0 4 0 4

Transmission Line SCHEME


Sl.No 2IÀFH Opening Balance Added Total Dropped Closing Balance
01 Transmission Line 3 0 3 0 4
3*&,/- .$3DQG6LNNLP
3 0 3 0 3

279
Annual Report 2018-19

Consolidated Report of Outstanding Paras Dropped between 01.04.2018 to 31.03.2019


(as on 31-03-2019)
Compliance and Special Audit 63
Opening Balance as on 01.04.2018
5**9<''8*-<6FKHPH 8QLWV 0
Compliance and Special Audit 445 R-APDRP 0
5**9<''8*-<6FKHPH 8QLWV 32 PSDF 0
R-APDRP 31 Transmission Line 0
PSDF 8 Total 63
Transmission Line 2 Closing balance as on 31.03.2019
Total 518
Compliance and Special Audit 449*
Added between 01.04.2018 to 31.03.2019
5**9<''8*-<6FKHPH 8QLWV 27
Compliance and Special Audit 35 R-APDRP 24
5**9<''8*-<6FKHPH 8QLWV 1 PSDF 4
R-APDRP 1 Transmission Line 3
PSDF 2 Total 507
Transmission Line 1 7KHGDWDLVWHQWDWLYHDVWKHDXGLWUHSRUWRI3U$FFRXQWV2IÀFH
Total 40 $GPQ DQG3$26HFWWKDYHEHHQSXWXSIRUDSSURYDO

6ULQDJDU/HK.DUJLO'UDVV7UDQVPLVVLRQ6\VWHP

280
CHAPTER 39

AUDIT OBSERVATIONS OF C&AG


Summary of the Reports of C&AG of India pertaining to ÀOHG EHIRUH &HQWUDO (OHFWULFLW\ 5HJXODWRU\ &RPPLVVLRQ
the Ministry of Power (CERC) for the period 2009-2014. CERC disallowed (May
1. Report No. 4 of 2018  WKHFDSLWDOL]DWLRQDVWKHH[SHQGLWXUHZDVLQFXUUHG
after the cut-off date. CERC also noted that NTPC failed
Para No. 17.1(Report No. 4/2018) WRLQLWLDWHSURDFWLYHVWHSVWRFRPSOHWHWKHSURFXUHPHQW
Irregular payment of Compensatory Allowance RIVSDUHVZLWKLQWKHFXWRIIGDWH$UHYLHZSHWLWLRQÀOHG
by NTPC in this regard was also disposed (April 2013)
The Bhakra Beas Management Board (BBMB) in its E\ &(5& RQ VLPLODU JURXQGV 6XEVHTXHQWO\ 173& ÀOHG
143rd meeting held on 19 July 1991 decided to adopt an appeal before Appellate Tribunal for Electricity
the Punjab State Electricity Board (PSEB) - now Punjab (ATE), which upheld (April 2014) the decision of CERC.
State Power Corporation Limited-PSPCL - pay scales, as $7( REVHUYHG WKDW ZKHQ LW ZDV NQRZQ WKDW WKH VSDUHV
UHYLVHGIURPWLPHWRWLPHDVWKHSD\VFDOHVIRUDOOWKH FRXOG QRW EH GHOLYHUHG EHIRUH WKH FXWRII GDWH 173&
employees working in BBMB. The BBMB also decided FRXOG KDYH PRYHG DQ DSSOLFDWLRQ EHIRUH &(5& XQGHU
WKDW DOORZDQFHVFRQFHVVLRQV VDQFWLRQHG E\ 36(% IURP 5HJXODWLRQRI7DULII5HJXODWLRQVIRUH[WHQVLRQRI
time to time would be adopted by it in future. the cut-off date, which was not done.
 $WHVWFKHFNRIYDULRXVDOORZDQFHVSDLGWRWKHHPSOR\HHV  3DUD1R 5HSRUW1R
in eight units of BBMB brought out that the employees
were drawing Compensatory Allowance in addition to  ([WUDH[SHQGLWXUHRQZDWHUE\163&/%KLODL
WKHSD\DQGDOORZDQFHVDVSHUWKHSD\VFDOHVDOORZDQFHV  173&6$,/ 3RZHU &RPSDQ\ 3ULYDWH /LPLWHG 163&/ RU
of PSEB. Though the compensatory allowance was being &RPSDQ\  UHTXHVWHG :DWHU 5HVRXUFHV  'HSDUWPHQW
paid to the employees of BBMB before adoption of pay :5'   *RYHUQPHQW  RI  &KKDWWLVJDUK  *R&   IRU
scales of PSEB, its continued payment after July 1991 was allotment of 0.6 TMC (17 million cum) water per annum
LUUHJXODU363&/KDGDOVRFODULÀHG -XO\ WKDWWKHUH IRU WKH %KLODL ([SDQVLRQ 3URMHFW 33,,,  [ 0:
ZDVQRSURYLVLRQWRDOORZFRPSHQVDWRU\DOORZDQFHWRLWV power plant). An agreement was entered into between
HPSOR\HHV7KHLUUHJXODUH[SHQGLWXUHWRZDUGVSD\PHQW NSPCL and GoC (7 August 2008) for drawing 1415840
of compensatory allowance during 2014-15 to 2015-16 FXPRIZDWHUSHUPRQWKIURP7DQGXOD:DWHU5HVRXUFHV
LQ WKH HLJKW XQLWV FRYHUHG LQ DXGLW ZRUNHG RXW WR  for a period of thirty years from the date of signing
crore. of the agreement. As per clause 2 of the agreement,
2. Report No. 11 of 2018 NSPCL was required to pay for at least 90 per cent
(15.29 million cum) of the contracted quantity of water,
Para No.10.1 (Report No.11/2018) HYHQLIWKHDFWXDOTXDQWLW\GUDZQZDVORZHU
Loss due to disallowance of Capital Expenditure Audit observed that:
 $V SHU 7DULII 5HJXODWLRQV  FDSLWDO H[SHQGLWXUH i. Commercial operation of the plant started in 2009-10.
actually incurred after the date of commercial 7KH DYHUDJH ZDWHU FRQVXPSWLRQ ZDV  SHU FHQW RI
operation and up to the cut-off date, on procurement the contracted quantity during the period 2010-11 to
of initial spares as per the original scope of work was 2016-17. In fact, in 2016-17, there was a steep decline in
DOORZHG IRU FDSLWDOL]DWLRQ 173& /LPLWHG 173&  VHW XS water consumption from 11.97 million cum in 2015-16
6WDJH,,, RQH XQLW RI  0:  RI )HUR]H *DQGKL to 10.60 million cum, which the Management attributed
Unchahar Thermal Power Station, the commercial WR LWV VSHFLDO GULYH WR  VDYH  ZDWHU  UHVRXUFHV  163&/
operation of which was declared on 01 January 2007. KRZHYHUSDLGZDWHUFKDUJHVIRUSHUFHQWRIWKH
In line with the tariff regulations, the cut-off date for contracted quantity for the entire period.
capitalisation against this project was 31 March 2008.
,QLWLDOVSDUHVLISURFXUHGE\0DUFKZRXOGKDYH ii. Coal and water are key input requirements for thermal
EHHQHOLJLEOHIRUFDSLWDOL]DWLRQ power generation. Coal is required to raise steam
in boilers which turns the turbine. Requirement of
Audit noticed that NTPC procured the initial spares additional water would depend upon additional coal
YDOXLQJFURUHODWHGXULQJDQGDQG DYDLODELOLW\ 7KH 6WDQGLQJ /LQNDJH &RPPLWWHH 6/&  RI
FODLPHGFDSLWDOL]DWLRQRIWKHVDPHLQWKHWDULIISHWLWLRQ Ministry of Coal, for Power, Cement and Sponge Iron,

281
Annual Report 2018-19

in their meeting held on 31 May 2013, decided that Sensing business potential in data transmission through
fresh applications for coal linkages from power sector WKH VSDUH ÀEHUV LQ 23*: WKH &RPSDQ\ GLYHUVLÀHG
would be kept in abeyance for a period of two years into telecom business in October 1998. The backbone
LQYLHZRIWKHKXJHJDSLQVXSSO\DQGGHPDQGRIFRDO telecommunication network is built by installing the
:LWK FKDQFHV RI DGGLWLRQDO FRDO OLQNDJHV UHPRWH WKH necessary equipment (routers, transponders, repeaters
XWLOLVDWLRQ RI H[FHVV FRQWUDFWHG ZDWHU IRU DOWHUQDWH XVH HWF  DORQJ WKH ÀEHU URXWH $V RI 6HSWHPEHU  WKH
was also unlikely. Company has installed about 41988 km of telecom
Para No. 10.3 (Report No. 11/2018) QHWZRUN DQG SURYLGHG FRQQHFWLYLW\ WR DERXW  323V
(Point of Presence) including all metros, major cities and
Performance of Telecom Business
towns, remote areas of North East Region (NER) and
Power Grid Corporation of India Limited (Company) -DPPXDQG.DVKPLU
is the largest electric power transmission utility of the
FRXQWU\ 7KH &RPSDQ\ KDG ODLG RSWLFDO ÀEHU FDEOHV RQ 3. Report No. 18 of 2018
its power transmission lines since 1996 to track real-time
data for Load Dispatch and Communication purposes (i) Para No. 1.1.3
for monitoring the power transmission system. This
Number of CPSEs and Government Controlled other
was done by replacing one of the earth wires in the
Companies
transmission lines with a special cable known as Optical
*URXQG:LUH 23*: ZKLFKVHUYHVWKHSXUSRVHRIHDUWK As on 31 March 2017, there were 636 CPSEs under
ZLUHDVZHOODVRSWLFDOÀEHU7KXVHOHFWULFLW\LVWUDQVPLWWHG
the audit jurisdiction of the CAG. These include 438
WKURXJKWKHRYHUKHDGPHWDOZLUHVZKLOHUHDOWLPHGDWD
*RYHUQPHQW &RPSDQLHV  6WDWXWRU\ &RUSRUDWLRQV 
from sub-stations etc. is transmitted electronically
DQG  *RYHUQPHQW &RQWUROOHG 2WKHU &RPSDQLHV 2I
WKURXJK 23*: VWUXQJ DORQJVLGH WKH PHWDO ZLUHV 7KH
WKHVHÀQDQFLDOSHUIRUPDQFHRI&36(VLVFRYHUHGLQ
23*:KDGÀEHUVRXWRIZKLFKVL[ÀEHUVDUHUHTXLUHG
IRUORDGGHVSDWFKIXQFWLRQVZKLOHWKHEDODQFHÀEHUVDUH this report and the nature of these CPSEs is indicated in
DYDLOable for transmission of data. TableEHORZ

Nature of the CPSE’s Total Number of CPSEs covered in the Report Number of CPSEs not
number covered in the Report
Accounts up Accounts up to Total
to 2016-17
2015-16 2014-15
*RYHUQPHQW 438 376 21 3 400 38
Companies
Statutory 6 6 0 0 6 0
Corporations
Total number of
&RPSDQLHV 444 382 21 3 406 38
Corporations
*RYHUQPHQW
Controlled 192 168 3 2 173 19
other Companies
Total 636 550 24 5 579 57

(ii) Para No. 1.2.1.2


Disinvestment (CPSEs didn’t comply with guidelines of buy back shares.
 'XULQJ  WKH &HQWUDO *RYHUQPHQW UHDOLVHG ` 46,246.58 crore against a budgeted receipt of ` 56,500 crore on
GLVLQYHVWPHQWLQ&36(V7KHUHDOLVHGDPRXQWFRQVLVWHGRI` FURUHIURP&36(([FKDQJH7UDGHG)XQG &36((7) 
` FURUHIURPGLVLQYHVWPHQWRIVWUDWHJLFKROGLQJVRI6SHFLÀHG8QGHUWDNLQJRIWKH8QLW7UXVWRI,QGLD
 6887, LQYHVWPHQWDQGEDODQFH` FURUHIURPGLVLQYHVWPHQWRIKROGLQJVLQ&36(V

282
The guidelines on capital restructuring of CPSEs issued (vi) Para No. 3.2.2
E\ WKH 'HSDUWPHQW RI ,QYHVWPHQW  3XEOLF $VVHW CPSEs not having required no. of Independent
Management (DIPAM), Ministry of Finance in May 2016 Directors.
HQYLVDJHGWKDWHYHU\&36(KDYLQJQHWZRUWKRIDWOHDVW
 7KH SUHVHQFH RI LQGHSHQGHQW UHSUHVHQWDWLYHV RQ WKH
` FURUHDQGFDVKDQGEDQNEDODQFHRIRYHU` 1,000
%RDUG FDSDEOH RI WDNLQJ DQ LQGHSHQGHQW YLHZ RQ WKH
FURUHVKRXOGH[HUFLVHWKHRSWLRQWREX\EDFNLWVVKDUHV
decisions of the management is widely considered as
(iii) Para No. 1.3.2 a means of protecting the interests of shareholders
and other stakeholders. In terms of Section 149 (4) of
Dividend payout by CPSEs.
the Companies Act 2013, Rule 4 of Chapter XI of the
 7KHUH ZHUH  &36(V ZKLFK GHFODUHG GLYLGHQGV LQ &RPSDQLHV $SSRLQWPHQWDQG4XDOLÀFDWLRQRI'LUHFWRUV 
7KHGLYLGHQGVGHFODUHGDVDSHUFHQWDJHRIQHW Rules, 2014, Clause 49 (II) (A) (2) of Listing Agreement,
SURÀW HDUQHG E\ WKH &36(V LQFUHDVHG IURP  SHU Regulation 17 (1) (b) of SEBI (Listing Obligations and
cent in 2015-16 to 54.16 per cent in 2016-17. In absolute Disclosure Requirements) Regulations 2015 and Para
WHUPVWKHGLYLGHQGVGHFODUHGE\WKH&36(VLQ 3.14 of the DPE guidelines, where the Chairman of the
increased by ` FURUHFRPSDUHGWRSUHYLRXV\HDU %RDUG LV D QRQH[HFXWLYH GLUHFWRU DW OHDVW RQHWKLUG RI
the Board should comprise independent directors and,
 2XWRIDWRWDOGLYLGHQGRI` 82,491 crore declared by 111 LQ FDVH KH LV DQ H[HFXWLYH GLUHFWRU DW OHDVW KDOI RI WKH
&36(VIRUWKH\HDUGLYLGHQGUHFHLYHGUHFHLYDEOH %RDUGVKRXOGFRPSULVHLQGHSHQGHQWGLUHFWRUV+RZHYHU
E\ &HQWUDO *RYHUQPHQW ZDV ` 47,226 crore. The return as per Clause 49 (II) (B) (1), ‘independent director’ shall
RQ DJJUHJDWH LQYHVWPHQW RI ` 3,24,270 crore made by PHDQ D QRQH[HFXWLYH GLUHFWRU RWKHU WKDQ D QRPLQHH
WKH &HQWUDO *RYHUQPHQW LQ HTXLW\ FDSLWDO RI  &36(V director of the company.
was 14.57 per cent as compared to 13.68 per cent during
(vii) Para No. 3.2.3
6LPLODUO\&36(VUHFHLYHG` 17,799 crore as
GLYLGHQG RQ SDLG XS FDSLWDO RI ` 23,844 crore on the CPSEs not having a Woman Director in the Board
equity holdings in other CPSEs. Section 149 (1) of the Companies Act, 2013, Rule 3
of Chapter XI of the Companies (Appointment and
(iv) Para No. 2.5.4
4XDOLÀFDWLRQRI'LUHFWRUV 5XOHVDQG&ODXVH ,, 
Comments of the CAG issued as supplement to (A) (1) of the Listing Agreement and Regulation 17 (1) (a)
the statutory auditors’ reports on Government of SEBI (Listing Obligations and Disclosure Requirements)
Companies/Government Controlled Other Regulations 2015 stipulates that the Board of Directors
Companies. RIWKHFRPSDQ\VKDOOKDYHDWOHDVWRQHZRPDQ'LUHFWRU
in its Board.
 ,Q &DVK )ORZ 6WDWHPHQW FDVK RXWÁRZ RI  FURUH
(viii) Para No.3.3.1
towards bank deposits with more than 12 months’
maturity (including impact of interest accrued) was Appointment letter of Independent Directors not
LQFOXGHGLQ¶&DVK)ORZIURP2SHUDWLQJDFWLYLWLHV·LQVWHDG issued by CPEs
RI ¶&DVK )ORZ IURP ,QYHVWLQJ $FWLYLWLHV· ZKLFK ZDV Clause 49 (II) (B) (4) (a) of the Listing Agreement (April
contrary to the requirements of IND AS 7 – Statement of 2014) stipulates that the company shall issue a formal
Cash Flows. letter of appointment to independent directors in the
PDQQHUDVSURYLGHGLQWKH&RPSDQLHV$FW$VSHU
(v) Para No. 3.2.1
schedule IV of the Companies Act 2013, the appointment
CPSEs where Non Executive Directors of the Board is RI,QGHSHQGHQW'LUHFWRUVVKDOOEHIRUPDOL]HGWKURXJKD
less than 50%. letter of appointment which shall set out the terms and
conditions of appointment.
 7KH%RDUGLVWKHPRVWVLJQLÀFDQWLQVWUXPHQWRIFRUSRUDWH
JRYHUQDQFH&ODXVH ,,  $   RI/LVWLQJ$JUHHPHQW (ix) Para No. 3.3.4
and Regulation 17 (1)(a) of SEBI (Listing Obligations and Independent Directors who didn’t attend some of
Disclosure Requirements) Regulations 2015 stipulates the meeting
WKDWWKH%RDUGRI'LUHFWRUVRIWKHFRPSDQ\VKDOOKDYHDQ Schedule IV (III) (3) of the Companies Act, 2013 states
RSWLPXP FRPELQDWLRQ RI H[HFXWLYH DQG QRQH[HFXWLYH WKDW,QGHSHQGHQW'LUHFWRUVVKRXOGVWULYHWRDWWHQGDOOWKH
directors with not less than 50 per cent of the Board of meetings of Board of Directors and Board Committees
'LUHFWRUVFRPSULVLQJQRQH[HFXWLYHGLUHFWRUV RIZKLFKKHVKHZDV a member.

283
Annual Report 2018-19

Table: Independent Directors who did not attend some of the meetings

Sl. Name of the CPSE No. of Independent Directors No. of Independent Directors
No. who did not attend some who did not attend some Board
Board meetings committee meetings
1 NMDC Ltd 3 -

2 .,2&//WG 2 2

3 NLC India Ltd 2 1

4 Madras Fertilisers ltd 3 1

5 Hindustan Photo Films (Manufacturing) 1 -


Company Ltd

6 Bharat Electronics Ltd 4 1

7 IRCON International Ltd 2 2

8 Indian Railway Finance Corporation 1 1

9 Mahanagar Telephone Nigam Ltd 2 -

10 Steel Authority of India ltd 2 1

11 Coal India Ltd 3 2

12 National Aluminium Company Ltd 5 1

13 Hindustan Copper Ltd 2 1

14 Shipping Corporation of India Ltd 1 -

15 Rashtriya Chemicals & Fertilisers Ltd 2 -

16 Oil & Natural Gas Corporation Ltd 1 2

17 Bharat Petroleum Corporation Ltd 2 2

18 NBCC (India) Ltd 3 4

19 ,QGLD7RXULVP'HYHORSPHQW&RUSRUDWLRQ 1 -
Ltd

20 State Trading Corporation of India Ltd 3 2

21 GAIL (India) Ltd 2 -

22 Engineers India ltd 4 4

23 IFCI Ltd 3 1

24 NTPC Ltd 3 2

25 Power Grid Corporation of India Ltd 1 -

26 %KDUDW+HDY\(OHFWULFDOV/WG 6 1

27 NHPC Ltd 4 2

28 5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ/WG 1 1

29 MOIL Ltd 3 2

284
(x) Para No.3.3.5 of SEBI (Listing Obligations and Disclosure Requirements)
Regulations, 2015 require that Independent Directors
Independent Directors who didn’t attend General
shall meet at least once in a year, without the presence
Meeting.
of non-independent directors and members of the
Schedule IV (III) (5) of the Companies Act, 2013 states Management. Table indicates CPSEs where no separate
WKDW,QGHSHQGHQW'LUHFWRUVVKDOOVWULYHWRDWWHQGDOOWKH PHHWLQJZDVFRQGXFWHG
General meetings of the Company. Table indicates the
Table : CPSEs where separate meetings of Independent
listed CPSEs where Independent directors did not attend
Directors not conducted
WKHJHQHUDOPHHWLQJVRIWKH&RPSDQ\
Table : Independent Directors who did not attend General Sl. No. Name of the CPSE
meetings 1 Madras Fertilisers ltd
2 Hindustan Organic Chemicals Ltd
Sl. Name of the CPSE No. of
No. Independent 3 Power Grid Corporation of India Ltd
Directors who
(xii) Para No.3.3.6.3
did not attend
General meetings CPSEs where required issues not reviewed.
1 .,2&//WG 5 Schedule IV (VII)(3) of the Companies Act, 2013, Clause
2 Dredging Corporation of India 1 49 II B (6) (b) of Listing Agreement and Regulation
Ltd 25 (4) of SEBI (Listing Obligations and Disclosure
3 NLC India Ltd 2 Requirements) Regulations 2015 requires that the
4 Madras Fertilisers ltd 1 ,QGHSHQGHQW'LUHFWRUVLQVHSDUDWHPHHWLQJVKDOOUHYLHZ
(a) Performance of non-independent directors and the
5 Hindustan Photo Films 1
(Manufacturing) Company Ltd Board as a whole (b) Performance of Chairperson and
F $VVHVVWKHÁRZRILQIRUPDWLRQEHWZHHQPDQDJHPHQW
6 Bharat Electronics Ltd 1
and board of directors that is necessary for the Board
7 Mahanagar Telephone Nigam 2 WR HIIHFWLYHO\ DQG UHDVRQDEO\ SHUIRUP WKHLU GXWLHV ,Q
Ltd WKH &36(V JLYHQ LQ 7DEOH WKRXJK VHSDUDWH PHHWLQJ RI
8 Steel Authority of India ltd 1 ,QGHSHQGHQW'LUHFWRUVZHUHKHOGWKHDERYHLVVXHVZHUH
9 National Aluminium Company 2 QRWUHYLHZHGLQVXFKPHHWLQJV
Ltd
Table : CPSEs where required issues not reviewed
10 Hindustan Organic Chemicals 3
Ltd Sl. No. Name of the CPSE
11 NBCC (India) Ltd 1 1 .,2&//WG
12 State Trading Corporation of 1 2 7KH)HUWLOLVHUVDQG&KHPLFDOV7UDYDQFRUHOWG
India Ltd
3 BEML Ltd
13 GAIL (India) Ltd 1
4 IRCON International Ltd
14 IFCI Ltd 2
5 Indian Railway Finance Corporation
15 %KDUDW+HDY\(OHFWULFDOV/WG 1
6 Mahanagar Telephone Nigam Ltd
16 NHPC Ltd 1
7 Steel Authority of India ltd
17 MOIL Ltd 1
8 Coal India Ltd
18 +RXVLQJ 8UEDQ'HYHORSPHQW 1
Corporation Ltd 9 National Aluminium Company Ltd

(xi) Para No.3.3.6.1 10 Hindustan Copper Ltd


11 Andrew Yule & Co Ltd
CPSEs where separate meeting of Independent
Directors not conducted. 12 Oil & Natural Gas Corporation Ltd
13 NBCC (India) Ltd
Schedule IV (VII) (1) of the Companies Act, 2013, Clause
49 II B (6) (a) of Listing Agreement and Regulation 25 (3) 14 MMTC Ltd

285
Annual Report 2018-19

18 of SEBI (Listing Obligations and Disclosure


15 State Trading Corporation of India Ltd
Requirements) Regulations 2015 stipulate that there
16 Indian Oil Corporation ltd shall be an Audit Committee with a minimum of three
17 GAIL (India) Ltd directors as members of which two-thirds shall be
18 Engineers India ltd Independent Directors.
19 National Fertilisers Ltd Two-thirds of the members of the Audit Committee
20 NTPC Ltd were not Independent Directors in respect of the CPSEs
DVGHWDLOHGLQ7DEOHEHORZ
21 Power Finance Corporation Ltd
22 5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ/WG CPSEs where Audit Committees did not consist of two-
third Independent Directors
23 SJVN Ltd
24 MOIL Ltd Sl. No. Name of the CPSE

(xiii) Para No. 3.3.7 1 HMT Ltd


2 0DQJDORUH5HÀQHU\DQG3HWURFKHPLFDOV/WG
CPSEs where the Board didn’t evaluate performance
of Independent Directors. 3 Indian Railway Finance Corporation
4 ITI Ltd
Clause 49 II B (5) of Listing Agreement, Regulation
5 Balmer Lawrie & Co Ltd
17 (10) of SEBI (Listing Obligations and Disclosure
Requirements) Regulations, 2015 and Schedule IV 6 Power Finance Corporation Ltd
(VIII) of the Companies Act, 2013 stipulates that the (xvi) Para No.3.6.3.1
HQWLUH %RDUG RI 'LUHFWRUV H[FOXGLQJ WKH 'LUHFWRUV
 ,QHIÀFLHQWTXRUXPLQ$XGLW&RPPLWWHHPHHWLQJ
EHLQJ HYDOXDWHG  VKDOO HYDOXDWH WKH SHUIRUPDQFH RI
Independent Directors and on the basis of report of Clause 49 (III) (B) of the Listing Agreement and
VXFK HYDOXDWLRQ LW VKDOO EH GHWHUPLQHG ZKHWKHU WR Regulation 18 (2) (a) and (b) of SEBI (Listing Obligations
H[WHQG RU FRQWLQXH WKH WHUP RI DSSRLQWPHQW RI WKH and Disclosure Requirements) Regulations 2015
Independent Director. stipulate that the Audit Committee should meet at
least four times in a year and not more than 120 days
(xiv) Para No.3.5 shall elapse between two meetings. The quorum shall
CPSEs where vacancy of Independent Directors not be either two members or one- third of members of the
ÀOOHGLQWLPH $XGLW&RPPLWWHHZKLFKHYHULVJUHDWHUEXWDPLQLPXP
of two Independent Directors must be present.
 7LPHO\ÀOOLQJXSRIYDFDQFLHVLQWKHSRVWVRI'LUHFWRUV
HQVXUHVWKHDYDLODELOLW\RIUHTXLUHGVNLOODQGH[SHUWLVHLQ (xvii) Para No. 3.6.7.1
WKHPDQDJHPHQWRIWKHFRPSDQ\$Q\GHOD\LQÀOOLQJRI  &36(VZKHUHÀQGLQJRI&$*QRWUHYLHZHGE\$XGLW
YDFDQFLHVPD\KDPSHUWKHHIIHFWLYHQHVVRIWKHGHFLVLRQ Committee.
making process. Schedule IV (Para VI (2)- Resignation
All the CPSEs are subject to the audit of CAG of India
RUUHPRYDO RI&RPSDQLHV$FW&ODXVH ,,  ' 
as per the statutory mandate. Section 143 (6) of the
(4) of the listing agreement and Regulation 25 (6) of
Companies Act, 2013, authorises CAG to carry out
SEBI (Listing Obligations and Disclosure Requirements)
VXSSOHPHQWDU\ DXGLW RI DFFRXQWV RI *RYHUQPHQW
5HJXODWLRQV  VWLSXODWH WKDW YDFDQF\ DULVLQJ RXW
Companies. Further, section 177 (4) (iii) of the
RIUHVLJQDWLRQRUUHPRYDORIDQ,QGHSHQGHQW'LUHFWRU &RPSDQLHV $FW  SURYLGHV WKDW $XGLW &RPPLWWHH
VKRXOGEHÀOOHGXSDWWKHHDUOLHVWEXWQRWODWHUWKDQWKH VKDOO H[DPLQH WKH ÀQDQFLDO VWDWHPHQWV DQG $XGLWRUV·
LPPHGLDWHQH[WERDUGPHHWLQJRUWKUHHPRQWKVIURP Report thereon. Thus, in case of CPSEs, it is the
WKHGDWHRIVXFKYDFDQF\ZKLFKHYHULVODWHU UHVSRQVLELOLW\ RI WKH $XGLW &RPPLWWHH WR UHYLHZ WKH
(xv) Para No.3.6.1 ÀQGLQJVRIWKH&$*

CPSEs where Audit Committee didn’t consist of (xviii) Para No.4.5.2.1


2/3rd Independent Directors. Shortfall of actual CSR expenditure vis-a-vis
prescribe amount
Section 177 (1) and (2) of the Companies Act, 2013,
Clause 49 (III) (A) of listing agreement and Regulation  6HFWLRQ    RI WKH &RPSDQLHV $FW  VSHFLÀHG

286
that WKH %RDUG RI HYHU\ FRPSDQ\ VKRXOG HQVXUH WKDW DQG&RPSDQLHV$FWWRWKHH[WHQWWKHVDPHZHUH
WKHFRPSDQ\VSHQWLQHYHU\ÀQDQFLDO\HDUDWOHDVWWZR within the ambit of CPSEs and compliance of DPE
SHU FHQW RI WKH DYHUDJH QHW SURÀWV RI WKH FRPSDQ\ JXLGHOLQHVKDYLQJÀQDQFLDOLPSOLFDWLRQV
made during the three immediately preceding  $VSHU6HFXULWLHVDQG([FKDQJH%RDUGRI,QGLD /LVWLQJ
ÀQDQFLDO \HDUV LQ SXUVXDQFH RI LWV &RUSRUDWH 6RFLDO Obligations and Disclosure Requirements) Regulations,
5HVSRQVLELOLW\3ROLF\SURYLGHGWKDWXQGHU&ODXVH R RI  DQG '3( JXLGHOLQHV RQ &RUSRUDWH *RYHUQDQFH
sub-section (3) of section 134, if the company failed to for CPSEs 2010, Board of Directors of CPSEs should
spend such amount, the Board should specify reasons consist of 50 percent Independent Directors. In this
for not spending in its report. regard Sections 149(4) and 149(1) of the Companies
(xix) Para No. 4.5.3.6 $FWDOVRUHTXLUHHYHU\OLVWHGSXEOLFFRPSDQ\WR
KDYHDWOHDVWRQHWKLUGRIWKHWRWDOQXPEHURI'LUHFWRUV
Administrative Overheads
as Independent Directors and at least one woman
As per Rule 4(6) of CSR Rules 2014 Companies could 'LUHFWRU UHVSHFWLYHO\ ,Q WKLV UHJDUG LW ZDV REVHUYHG
build CSR capacities of their own personnel as well that The Board of Directors of PFC, PGCIL, BPCL,
as those of their Implementing agencies through BEL and CONCOR were not represented by required
Institutions, with established track records of at least number of Independent Directors during 2015-16
WKUHH ÀQDQFLDO \HDUV EXW VXFK H[SHQGLWXUH LQFOXGLQJ and 2016-17 while Hindustan Petroleum Corporation
H[SHQGLWXUH RQ DGPLQLVWUDWLYH RYHUKHDGV VKRXOG QRW Limited (HPCL) and Engineers India Limited (EIL) did
H[FHHG  SHU FHQW RI WRWDO &65 H[SHQGLWXUH RI WKH QRWKDYHUHTXLUHGQXPEHURI,QGHSHQGHQW'LUHFWRUVRQ
FRPSDQ\LQRQHÀQDQFLDO\HDU its Board during 2015-16.
(xx) Para No.5.7.3 (xxii) Para No.5.7.5
Benchmarking with national and international Non-Compliance of guidelines of MSME
peers
As per MOU guidelines 2015-16, CPSEs were required
As per MOU guidelines 2015-16 and 2016-17, CPSEs to comply with the Public Procurement Policy for Micro,
ZHUHWRSURYLGHLQIRUPDWLRQRQQDWLRQDOLQWHUQDWLRQDO Small and Medium Enterprises (MSMEs) Order dated
EHQFKPDUNV SHUWDLQLQJ WR ÀQDQFLDOQRQÀQDQFLDO 25.04.2012. Non-compliance of this would be penalised
SDUDPHWHUV DV DSSOLFDEOH 7KH 0LQLVWU\'HSDUWPHQW XS WR RQH PDUN 7KH DERYH RUGHU DOVR UHTXLUHG WKDW
ZDV DOVR UHTXLUHG WR JLYH D EDFNJURXQG QRWH RQ WKH from 2015-16 onwards, at least 20 percent of CPSEs
performance of the sector as well as CPSE along with requirement should be procured from MSME. Audit
applicable benchmarks while sending the MOU for 2015- REVHUYHG WKDW 3)& 3*&,/ DQG 0DKDQDJDU 7HOHSKRQH
16 for consideration of the IMC. MOU guidelines 2016- 1LJDP /LPLWHG 071/  GLG QRW DFKLHYH WKH DERYH
17 also required benchmarking of MOU parameter of target during 2015-16.
1DYUDWQD&36(VDWOHDVWZLWKEHVWSHUIRUPLQJFRPSDQ\
(xxiii) Para No.5.7.7
LQSULYDWHVHFWRUDWQDWLRQDOOHYHO$XGLWREVHUYHGWKDW
3*&,/ GLG QRW FDUU\ RXW EHQFKPDUNLQJ H[HUFLVH LQ Non-laying of MoU before Parliament
2016-17 with comparable global transmission utilities. DPE encourages hosting of the MOU of the CPSEs on
(xxi) Para No.5.7.4 WKHLU UHVSHFWLYH ZHEVLWHV ,W ZDV KRZHYHU REVHUYHG
that PFC, HAL and SCI did not host their MOU for both
Commitment from administrative Ministry- 2015-16 and 2016-17 on their websites. Similarly, REC
Independent Directors and MTNL did not host MOU 2015-16 and MOU 2016-
MOU guidelines 2015-16 stipulated that considering UHVSHFWLYHO\RQWKHLUZHEVLWH
WKH LPSRUWDQFH RI ,QGHSHQGHQW 'LUHFWRUV VSHFLÀF PFC and SCI stated (September 2017) that MOU were
FRPPLWPHQW IURP WKH $GPLQLVWUDWLYH 0LQLVWULHV QRW KRVWHG RQ ZHEVLWHV RQ DFFRXQW RI FRQÀGHQWLDOLW\
'HSDUWPHQWV UHJDUGLQJ WLPHO\ DFWLRQ RQ ÀOOLQJ XS of business targets. PFC, REC, HAL and MTNL stated
SRVLWLRQRIQRQRIÀFLDOGLUHFWRUVRQWKH%RDUGRI&36( 6HSWHPEHU 1RYHPEHU   WKDW ZHE KRVWLQJ RI
concerned would be incorporated in MOU of the CPSEs MOU was not mandatory.
FRQFHUQHG ZKHUHYHU DSSOLFDEOH 7KH 028 JXLGHOLQHV
(xxiv) Para No. 6.5
SURYLGHGDQDGGLWLRQDOHOLJLELOLW\FULWHULRQIRU
¶([FHOOHQW·UDWLQJZKHUHE\&36(VZHUHDVNHGWRDGKHUH  :KHUH -9V VKDUH KROGLQJ LV OHVV WKDQ  SDLG XS
to the compliances ofSURYLVLRQVRI/LVWLQJ$JUHHPHQW capital and in case of unincorporated JVs the C&AG

287
Annual Report 2018-19

has no power to conduct audit on accounts of such (xxvii) Para No.6.7.2


JVs. CPSEs not submitting status of JVs on half yearly
 7KLV DXGLW FRYHUHG &36(V FDWHJRUL]HG DV 0DKDUDWQD basis to DPE
1DYUDWQD DQG 0LQLUDWQD 7KHUH ZHUH  &36(V  '3( KDG VWLSXODWHG -DQXDU\   WKDW WKH 1DYUDWQD
FDWHJRUL]HGDV0DKDUDWQD1DYUDWQDDQG0LQLUDWQDE\ &36(VZRXOGVXEPLWFRPSUHKHQVLYHOLVWRI-9VIRUPHG
the Department of Public Enterprises (May 2017). Out and status thereof to DPE on a half-yearly basis.
RIWKLV&36(VGLGQRWKDYHDQ\-9DQGDFFRUGLQJO\ +RZHYHUDXGLWREVHUYHGWKDWQRQHRIWKH0DKDUDWQD
&36(V 0DKDUDWQD1DYUDWQDDQG0LQLUDWQD  1DYUDWQD&36(VKDGFRPSOLHGZLWKWKHVHJXLGHOLQHV
ZHUHFRYHUHGXQGHUWKLVUHYLHZ
(xxviii)Para No 6.7.3
(xxv) Para No. 6.6
Performance of JVs
JVs set up by Central Public Sector Undertakings
Out of 234 incorporated JVs (i) 76 JVs were earning
 7KHUHDUH-9VLQZKLFK&36(VLQYHVWHG SURÀW LL -9VZHUHFRQWLQXRXVO\LQFXUULQJORVVHVDQG
crore in the form of share capital and 73968.54 crore LLL -9VHDUQHGSURÀWRQO\LQWKH\HDUEXW
in the form of loans, debentures etc. The JVs consisted KDYH DFFXPXODWHG ORVVHV ,Q UHVSHFW RI UHPDLQLQJ 
of both those incorporated under the Companies Act -9VLQIRUPDWLRQZDV\HWWREHUHFHLYHGIURP&36(V
and the Indian partnership Act as well as those not
incorporated. There were 234 incorporated JVs and (xxix) Para No.7.5.1
127 unincorporated JVs. There were 58 incorporated Mandatory procurement from MSEs
-9VLQZKLFKPRUHWKDQRQH&36(KDGLQYHVWHGVKDUH
As per clause 3 of Public Procurement Policy Order,
capital.
2012, CPSEs were mandatorily required to procure a
(xxvi) Para No. 6.7.1 minimum of 20 per cent of their total procurement from
 3ODQQLQJ)RUPDWLRQ RI -RLQW 9HQWXUH VHOHFWLRQ RI -9 MSEs 1 April 2015. Clause 4 of the policy earmarked a
3DUWQHUV $WWHQGDQFH RI OHVV QR RI 2IÀFLDO 'LUHFWRUV sub target of 20 per cent (i.e., 4 per cent of the total
'3( YLGH 20 QR   )LQ GDWHG -DQXDU\  SURFXUHPHQW SURFXUHPHQWIURP06(VRZQHGE\6&
inter alia stipulated that ST entrepreneurs.

(i) Selection of the partner and its process should be Compliance with this clause was checked in the 18
transparent and all such proposals should be presented VHOHFWHG&36(VDQGWKHIROORZLQJZHUHREVHUYHG
to the Board. D  $VSHUWKHLQIRUPDWLRQSURYLGHGE\WKH&36(VRXWRI
LL  $W OHDVW WZR QRQRIÀFLDO SDUW WLPH GLUHFWRUV VKRXOG VHOHFWHG&36(VKDGDFKLHYHGWKHWDUJHWRIPLQLPXP
be present in the meeting of the Board of Directors of 20 per cent of their total procurement from MSEs
wherein the proposal for JV formation was appraised. during 2015-16 and 2016-17 (mandatory period).

(iii) Board should ensure adequate representation in the E  2Q IXUWKHU H[DPLQDWLRQ LW ZDV REVHUYHG WKDW WKH
Management and operation of its JVs in proportion to 'HYHORSPHQW &RPPLVVLRQHU 060(  KDG FODULÀHG
its contribution. (March 2016) to all CPSEs that the cost of any item
FRXOG QRW EH H[FOXGHG ZKLOH FRPSXWLQJ WKH WRWDO
The CPSEs selected their JV partners (i) as per procurement made by them during the year.
GLUHFWLYHV RI *RYHUQPHQW LL  WKURXJK RSHQ WHQGHU
LLL  WKURXJK FKRLFH RXW RI IHZ SURVSHFWLYH SDUWQHUV (xxx) Para No. 7.5.2
LGHQWLÀHG E\ &36( LWVHOI DQG LY  RQ QRPLQDWLRQ Outstanding dues payable to MSEs
basis to a single party. Further, in some cases, CPSEs
As per section 15 of the MSME Act 2006 where any
PDGH LQYHVWPHQW LQ DOUHDG\ H[LVWLQJ -9V 2XW RI 
06( VXSSOLHU VXSSOLHV JRRGV RU UHQGHUV VHUYLFHV
incorporated JVs (including JVs formed by more than
to a buyer, the buyer should make payment on or
RQH&36( LQIRUPDWLRQLQWKLVUHJDUGZDVDYDLODEOHIRU
before the date agreed upon between the buyer and
251 JVs. Out of these 251 JVs, selection of JV partner in
WKH VXSSOLHU SURYLGHG WKDW LQ QR FDVH WKH SHULRG
-9VZDVDVSHUGLUHFWLYHVRI*RYHUQPHQWLQ-9V
DJUHHGXSRQVKRXOGH[FHHGGD\VIURPWKHGDWHRI
through Open tender, in 75 JVs through choice out of
DFFHSWDQFH7KH$FWIXUWKHUSURYLGHVWKDWLIWKHEX\HU
IHZSURVSHFWLYHSDUWQHUVLGHQWLÀHGE\&36(LQ-9V
fails to make payment of the amount to the supplier,
RQ QRPLQDWLRQ EDVLV DQG LQ  FDVHV LQYHVWPHQW ZDV
the buyer would be liable to pay compound interest
PDGHE\&36(VLQDOUHDG\H[LVWLQJ-9V

288
from the appointed dD\)XUWKHUWKHQRWLÀFDWLRQGDWHG or other consideration arising in the course of the
4 September 2015 of Ministry of Corporate Affairs RUGLQDU\ DFWLYLWLHV RI DQ HQWHUSULVH IURP WKH VDOH RI
made it mandatory for all CPSEs to disclose the details JRRGV IURP WKH UHQGHULQJ RI VHUYLFHV DQG IURP WKH
RIWUDGHSD\DEOHVWR06(VLQWKHQRWHVWRWKHLUÀQDQFLDO use by others of enterprise resources yielding interest,
statements. UR\DOWLHVDQGGLYLGHQGV
(xxxi) Para No.8.5 (xxxiv) Para No. 8.10
 5HYLHZRIÀUVWWLPHDGRSWLRQRI,QG$6 Impact of adoption of Ind AS on total value of
Assets
Ind AS 101 – First time adoption of Ind AS prescribes
the procedures that a company is required to follow  7RWDOYDOXHRIDVVHWVDUHLPSDFWHGXSRQLPSOHPHQWDWLRQ
ZKLOHDGRSWLQJ,QG$6IRUWKHÀUVWWLPH:KLOHDGRSWLQJ of Ind AS due to difference in methods of accounting
,QG $6 IRU WKH ÀUVW WLPH WKH ÀQDQFLDO UHVXOWV VKDOO prescribed compared to IGAAP under Ind AS 16
LQFOXGHDUHFRQFLOLDWLRQRILWVHTXLW\DQGQHWSURÀWORVV - Property, Plant and Equipment (PPE), Ind AS 38 -
DVSHU,QG$6WRHTXLW\DQGQHWSURÀWORVVDVSHU,*$$3 LQWDQJLEOH DVVHWV ,QG $6   )LQDQFLDO ,QVWUXPHQWV
to enable the stakeholders to understand the material Presentation, Ind AS 109 - Financial Instruments and
adjustments to the Balance Sheet and Statement of ,QG$6,QYHVWPHQW3URSHUW\,QG$6SHUWDLQLQJ
3URÀWDQG/RVVEHFDXVHRIWUDQVLWLRQIURPWKHSUHYLRXV WRÀUVWWLPHDGRSWLRQRI,QG$6SHUPLWWHGWKHÀUVWWLPH
IGAAP to Ind AS. DGRSWHUWRHOHFWWRFRQWLQXHZLWKWKHFDUU\LQJYDOXHIRU
all of its PPE as recognised in the Financial Statements
 7KH XQGHUO\LQJ SULQFLSOH RI ,QG $6  LV WKDW D ÀUVW
measured under IGAAP as at the date of transition to
WLPHDGRSWHUVKRXOGSUHSDUHÀQDQFLDOVWDWHPHQWVDVLI
,QG$6DQGWKHFDUU\LQJYDOXHDVLWVGHHPHGFRVWRQWKH
LWKDGDOZD\VDSSOLHG,QG$6+RZHYHULWSHUPLWWHGWZR
date of transition after making necessary adjustments
W\SHVRIH[FHSWLRQWRWKHSULQFLSOHRIIXOOUHWURVSHFWLYH
IRUGHFRPPLVVLRQLQJOLDELOLWLHV7KLVH[HPSWLRQFRXOG
DSSOLFDWLRQ RI ,QG $6 QDPHO\ PDQGDWRU\ H[FHSWLRQV
DOVREHXVHGIRUYDOXDWLRQRILQWDQJLEOHDVVHWVXQGHU,QG
DQG YROXQWDU\ H[FHSWLRQV 7KH PDQGDWRU\ H[FHSWLRQV
$6,QWDQJLEOHDVVHWVDQG,QG$6,QYHVWPHQW
UHODWHG WR UHWURVSHFWLYH DSSOLFDWLRQ RI VRPH DVSHFWV
property.
RI ,QG $6   (YHQWV DIWHU WKH 5HSRUWLQJ 3HULRG
Ind AS 109 - Financial Instruments and Ind AS 110 - (xxxv) Para No. 8.11
Consolidated Financial Statements. Impact of adoption of Ind AS on Net worth
(xxxii) Para No.8.7  1HWZRUWKLVWKHGLIIHUHQFHEHWZHHQWKHYDOXHRIDVVHWV
 ,PSDFWRQ3URÀWDIWHU7D[ and the liabilities of a company. Net worth (equity) is
DUULYHG DW E\ UHGXFLQJ IURP WKH DJJUHJDWH YDOXH RI
 5HYLHZRILPSOHPHQWDWLRQRI,QG$6LQDXGLWLQGLFDWHG
WKHSDLGXSVKDUHFDSLWDOIUHHUHVHUYHVDQGVHFXULWLHV
WKDWWKHUHZDVLQFUHDVHLQSURÀWVRI&36(VLQGHIHQFH
SUHPLXPDFFRXQWWKHDJJUHJDWHYDOXHRIDFFXPXODWHG
sector, infrastructure sector, power sector and shipping
ORVVHV GHIHUUHG H[SHQGLWXUH DQG PLVFHOODQHRXV
VHFWRU FRQVHTXHQW WR DGRSWLRQ RI ,QG $6 +RZHYHU
H[SHQGLWXUH QRW ZULWWHQ RII )UHH UHVHUYHV GR QRW
3URÀWV RI &36(V LQ FRPPXQLFDWLRQV VHFWRU HQHUJ\
LQFOXGH UHVHUYHV FUHDWHG RXW RI UHYDOXDWLRQ RI DVVHWV
VHFWRUIHUWLOL]HUVVHFWRUPHWDOVHFWRUDQGPLQLQJVHFWRU
write- back of depreciation and amalgamation.
had decreased.
Adoption of Ind AS mandates preparation and
(xxxiii)Para No. 8.9
presentation of an opening Ind AS Balance Sheet at the
Impact of adoption of Ind AS on booking of date of transition to Ind ASs. The accounting policies
Revenue that an entity uses in its opening Ind AS Balance Sheet
 ,QG $6   5HYHQXH LV WKH DSSOLFDEOH ,QG $6 IRU may differ from those that it used for the same date
DFFRXQWLQJ RI UHYHQXHV 7KH GHÀQLWLRQ RI ¶UHYHQXH· XVLQJ,*$$3$VSHUSURYLVLRQVRI,QG$6²)LUVWWLPH
XQGHU,QG$6FRYHUVDOOHFRQRPLFEHQHÀWVWKDWDULVH adoption of Ind AS, any differences between carrying
LQ WKH RUGLQDU\ FRXUVH RI DFWLYLWLHV RI DQ HQWLW\ ZKLFK amounts of assets and liabilities as of 01 April 2015
results in increase in net worth, other than increases compared with those presented in the IGAAP Balance
relating to contributions from net worth participants. 6KHHW DV RI  0DUFK  DUH WR EH UHFRJQL]HG LQ
5HYHQXHDVSHU,*$$3 $6²5HYHQXH5HFRJQLWLRQ  net worth under retained earnings within the Ind AS
KRZHYHULVGHÀQHGDVJURVVLQÁRZRIFDVKUHFHLYDEOHV Balance Sheet.

289
Annual Report 2018-19

Status of pending C&AG paras as on 31/03/2019:

Sl. Report Para Particulars ATN Status Remarks


No. Ref. No.
1. Report Performance Audit on Capacity Replied to Under Secretary, No further communi-
No. 10 of Addition in Hydro Power Sector 0R3*2,YLGH/HWWHU1R1((- FDWLRQREVHUYDWLRQ
2012-13 by CPSEs. 3&2,& $GDWHG UHFHLYHGIURP0R3VLQFH
 1((3&2,& $ last reply submitted.
GDWHG HPDLOHG
on 16.05.2017
2. %ORFNDJHRIH[SHQGLWXUHDPRXQW- /HWWHUQR1((3&2,& $
ing to Rs. 113.99 crore –Siang GDWHG 1((3&2
Upper Hydro Electric Project. ,& $GDWHG
WRWKH6U$23'&$,.RONDWD
Inspection Report (C&AG) for FY 2015-16

3. Non-disposal of Material /HWWHUQR1((3&2,& $


amounting to Rs. 81.86 lakhs GDWHGWRWKH6U$2
3'&$,.RONDWD
4. Under Insurance of Contractors’ /HWWHUQR1((3&2,& $
All Risk policies in respect of GDWHGWRWKH6U$2
.D+(3 3'&$,.RONDWD
5. Land lying abandoned at Teju. Land /HWWHUQR1((3&2,& $
allotted for Damwe Hydro Project in GDWHGWRWKH6U$2
Arunachal Pradesh but as the pro- 3'&$,.RONDWD No further commu-
ject was withdrawn from the Cor- QLFDWLRQREVHUYDWLRQ
SRUDWLRQWKHODQGLVO\LQJYDFDQW UHFHLYHGIURP3'&$²,
6. Non-completion of additional /HWWHUQR1((3&2,& $ since last reply submitted.
capitalisation as per schedule of GDWHGWRWKH6U$2
Tariff Order. 3'&$,.RONDWD
7. Increase of Project Cost by Rs. /HWWHUQR1((3&2,& $
701.80 crore and higher electricity GDWHGWRWKH6U$2
cost per unit –Pare Project. 3'&$,.RONDWD
3.1.3 :K\GHVLJQHQHUJ\UHYLHZZDV /HWWHUQR1((3&2,& $
Report
not done in HEPs when the actual GDWHGWRWKH6U$2
41 of
energy produced is consistently 3'&$,.RONDWD
2015
8. less or more than design energy.
(Perfor-
5.2.1 :KDWPHDVXUHVKDYHEHHQ 1((3&2,& $
mance
XQGHUWDNHQE\&368V023IRU dated 22.08.17 to the Sr. A. O., PDCA-
Audit)
UHFRYHU\RIRXWVWDQGLQJGXHV" ,.RONDWD
9. Report 11.4 Failure of the management in /HWWHUQR1((3&2,& $ & $*YLGHWKHLUOHWWHU
15 of ensuring accuracy of important GDWHGWRWKH 1R&RRUG
2016 GDWDVXEPLWWHGIRUÀ[DWLRQRI Under Secretary, GOI, MOP 1((3&2&RUS&2.RO
tariff resulted in loss of Rs. 28.32 (' + *:+,5
crore. [Loss of Rs.28.32 crore due 15 dated 21.10.2016
WRXQGHUUHFRYHU\RIIXHOFRVW@ has treated the same
as settled so far as the
Inspection Report (2012-
13) is concerned.
)XUWKHUYHWWLQJUHPDUNV
were requested by C&AG
as intimated by US, MOP,
1HZ'HOKLYLGHWKHLU
OHWWHU1R+,
dated 29.12.2016.

290
10. Report 6KRUWIDOOLQGLYLGHQGGHFODUHGE\ /HWWHUQR1((3&2,& $ No further communi-
No. *RYHUQPHQW&RPSDQLHVLQ GDWHGWRWKH8QGHU FDWLRQREVHUYDWLRQ
 2016. Secretary, GOI, MOP UHFHLYHGIURP023VLQFH
last reply submitted.
11. Inspec- Part– Loss of Rs. 272.2 crore due to
tion IIA XQGHUUHFRYHU\RI)XHO&RVWDQG
Report 1 )L[HGFRVWDW$*%33
(C&AG)
for FY
2016-17
THER-
MAL No further communi-
FDWLRQREVHUYDWLRQ
UHFHLYHGIURP3'&$²,
12. 2 Loss of Rs. 30.83 crore due to
since last reply submitted.
QRQUHFRYHU\RIFRVWRIJDVXVHG
for Gas Booster Station at AGBPP
13. Part– Delay in commissioning of Com-
IIB ELQHG&\FOH([WHQVLRQ3URMHFWLQ
1 $*7&&3DQGQRQUHFRYHU\RI/'
RI5VFURUHVIURP0V7KHUPD[
Ltd.
14. 2 /RVVRIUHYHQXHRI5VFURUH & $*YLGH/HWWHU
GXHWRH[FHVVDX[LOLDU\FRQVXPS- 1R&RRUG
tion 1((3&2$*%7&&3 
15. 3 Loss of Rs. 7.69 crore due to $*%3,5'DWHG
Unscheduled Interchange. 26.11.2018 has treated
the same as settled.
16. 4 Disallowance of additional No further communi-
H[SHQGLWXUHRI5VFURUHE\ FDWLRQREVHUYDWLRQ
&(5&IRUWDULIIÀ[DWLRQRI&RP- UHFHLYHGIURP3'&$²,
ELQH&\FOH([WHQVLRQ3URMHFW since last reply submitted.
17. 5 $YRLGDEOHSD\PHQWRI5V
ODNKWR0V3UDJDWL(QJLQHHULQJ
3YW/WGGXHWR$UELWUDWLRQ$ZDUG
18. 6 $YRLGDEOHH[SHQGLWXUHRQ+RWHO
Accommodation
19. 7 Non-disposal of Mark V Control
3DQHOYDOXLQJ5VODNKDW & $*YLGH/HWWHU
AGTCCP 1R&RRUG
20. 8 2YHUGUDZDORIQRQ$30JDVDQG 1((3&2$*%7&&3 
H[FHVVSD\PHQWRI5VFURUH $*%3,5'DWHG
to GAIL 26.11.2018 has treated
21. 9 Non-disposal of Idle assets of the same as settled.
Rs.7.96 crore with consequential
QRQUHDOL]DWLRQRIGLVSRVDOYDOXH
at AGBP
22. 10 Blockage of fund to the tune of
Rs. 20.99 Lakh towards purchase
of store and spare.

291
Annual Report 2018-19

23 PART- 8QIUXLWIXO([SHQGLWXUHRI5V
IIA crore for acceleration of Hydro-
1 Mechanical work.
24 2 Loss of Rs. 9.83 crore due to No further communi-
SURORQJHGXQSODQQHGVWRUDJHRI FDWLRQREVHUYDWLRQ
Electro-Mechanical materials at site. UHFHLYHGIURP3'&$²,
25 3 $GGLWLRQDOH[SHQGLWXUHRI5V since last reply submitted.
core on purchase of construction
power during the period April 2016
WR0DUFKDW.DPHQJ+(3
Inspection Report (C&AG) for FY 2016-17 HYDRO

26. 4 2YHUSD\PHQWRI5VFRUH
due to acceptance of Contractor’s & $*YLGH/HWWHU
claim beyond contractual terms 1R&RRUG
IRUGHZDWHULQJRIH[FHVVLQJUHVV 1((3&2,5'DW-
of underground water in respect ed 25.03.2019 has treated
RIFLYLOZRUNRIXQGHUJURXQGFRQ- the same as settled.
struction under Package-II.
27. PART $GGLWLRQDO([SHQGLWXUHRI5V
–IIB 252.20 crore due to acceptance
1 of higher transportation rate on
account of additional lead.
28. 2 8QIUXLWIXOH[SHQGLWXUHRI5V
crore up to March 2017 due to
FRQWLQXDWLRQRI'ULOOLQJ'LYLVLRQ
at Lanka. & $*YLGH/HWWHU
29. 3 Failure to take appropriate steps 1R&RRUG
against the contractor under 1((3&2,5'DW-
SDFNDJHUHVXOWHGLQWRRYHUDOO ed 07.01.2019 has treated
delay in completion of the Pare the same as settled.
Hydro Electric Project.
30. 4 $GGLWLRQDO([SHQGLWXUHRI5V
3.78 crore on account of payment
WRZDUGVFRQVWUXFWLRQRI5LYHU
'LYHUVLRQ:RUNV &RIIHU'DP 
EH\RQGFRQWUDFWXDOSURYLVLRQV
under package-I.
31 PART /RVVRIUHYHQXHDQGH[WUD
-IIA H[SHQGLWXUHWRWKHWXQHRI
1 Rs.1000.69 crore due to lack of
Inspection Report (C&AG) for FY 2017-18

VXSHUYLVLRQLQ3HQVWRFNZRUN
under Hydro-mechanical package
RI.DPHQJ+(3
32 Indecision in foreclosing the
contract with respect to Tuirial
Hydro Electric Project leading to
H[WUDEXUGHQRI5VFURUH Reply under process
WRZDUGVLGOHFODLPVRIYDULRXV
contracts.
33 PART 1RQUHFRYHU\RI5VFURUH
–IIB IURP0V7H[PDFR/LPLWHG
1 against 407.345 MT of unused
steel materials.
34 2 ,QIUXFWXRXVH[SHQGLWXUHWRZDUGV
WZR*ULG,QWHUDFWLYH6RODU39
Projects.

292