Document

LP-DOC-040-01 Rev A01


Number:

Document LIFTING PLAN FOR Lifting pipes


Title:

Project Title: 14 TurboPumps Stations

Tag No’s
(if applicable)

Contractor: PEG ENGINEERING & CONTRACTING

Contractor
Document No:
Rev 00

A01 Issued for review 19/11/2019 M.Dosseri Hasanain Sahi Asaad Disheer

Rev. Revision Description Date Originated Reviewed Approved

LP-DOC-040-01
Hook Block

Double chain Sling


L=8 , SWL 15T

Required
Taglines

must have a minimum angle of 60⁰


Double chain Sling
L=8 , SWL 15T

2 Shackles 8 T 60⁰
Pipe Lifting Clamp = 6T Pipe Lifting Clamp = 6T

Pipe 5 T

12 M
Main Boom 18.1M
Crane Kato-NK500

8M
pipes pile

2M Hook Block

R=10
5.5M
Double chain sling
15T

Load 8M
Transfer

Pipe lifting Clamp 6 Tons Pipe lifting


R=10 Clamp 6 Tons
Pipe W=5 Tons

12M
1M

7.2M
7.2M

KATO-NK500 Ground Bearing pressure

DIN 75% Crane Weight 39T


Configrations T Load 5T
Outriggers Base 7.2x5.5m *Hook Block 0.5T
Main Boom 18.1M *Tackles 0.3T
Radius 10M
Capacity 11.40T Mat Demensions 1.2 x 1.2M

Total Load 5.8T 39.4 x0.75 = 29.55


*Load 5T 29.55+5+0.5+0.3= 35.35
* Hook Block 0.5T 35.35/1.44=24.54 T/m2
*Tackles 0.3T
%of the capacity 50%
ffifilU�l llfTING CAPACITY ( 1 )
*B$1757:1981
Based on " DIN 15019-2 NOTE: 360° full working range is available with
* 75% of tipping loads optional front jack.
With fully extended outrigger-over side and over rear Without OU t r i g -
·Working
gers over side
radius 10.8m 18.1m 25.4m 32.7m 40.0m & over rear
(m) Boom Boom Boom Boom Boom 10.8m Boom
3.0 : .50.50 28.00 8.00
3.5 42.20
. . 28.00 18:00 6.40
. - 4.0
4.5
. 37.00
3�.00
28.00
28.00
1 a;.oo
18.00
5.10
4.20
5.0 ·30.- 20 28.00 1.8.00 13.00 3.40
55 27.50 25.60 18.00 13.00 2.80
.
6.0 25;()0 23.50 18.00 13.00 . 2.30
6.5 4�·10t 21.80 18.00. 13.QO 7.50 . 1.90
7.0 '. .
20.70 20.00 16.80. 13,QO 7.50 1.60
7.5 18�0 . ·18 .50 15.70 . '
13'00 · 7.50
. 1.25
8.0 '17.40 17.00 14.80 12.30 7;50 . 1.00
8.5 15.65 15.40 14.00 11,.so 7.50

-,)
9.0 14.00 13.85 13.20 11..00 7.50
- 0.5 12.50 12.20 10,SO 7.50
.
10.0 11.40 11.15 1().00 7.30
11.0 . 9.50 9.40 �.10 6.80
12.0 8.00 7.90 8.30 . 6.30
1 3.0 (l.80 6.60 7.40 5.90
14.0 5.80 5.60 6.40 5.50
16.0 4.25 4.00 4.80 4.70
. 18.0 2.80 3.60 4,00
20.0 1.85 2.70 3.25
22.0 1.20 2J',O 2.50
24.0 0.60 1.40 1.90
26.0 0.90 1.40
28.0 0.50 1.00
30.0
. ---- -· 0.65
.
31.0 . 0.50
Parts of I ine 12 7 5 4 3 12
Critical
boom angle 35• ..
(Unit: metric ton)