Professional Documents
Culture Documents
Prestress Design Sheet
Prestress Design Sheet
shrinkage loss
7 = 0.00035
14 = 0.0025
90 = 0.00015
infinite = 0
Relaxation loss
creep loss
differential shrinkage
force = 329.082478
line of action force from top of slab = 0.1
temperature stresses
Force=(E)*(A)*(alpha)*(change in temp)
mm2
N/mm2
N/mm2
m
m
m
m
page 12,
IRS CBC
page 34,
after 28days = 672 hours IRC - 112
N/mm2
page 12,
IRS CBC
m
m
m2
page 92,
IRS CBC, CL 17.4.3.4
N/mm2
N/mm2
N/mm2
KN
m
N/mm2
page 60,
N/mm2 IRS 112, CL 7.8(5)
/ oC
m
m
M
Depth of I girder= 1.15
Depth of compposite section= 1.35
Mid-Span I section on
Distance from A.Y Y from CG A.Y^2 I self I @ CG
soffit (Y) 1.4
m m^3 m m^4 m^4 m^4 1.2
1.075 0.121 0.471 0.025 0.000 0.025
0.967 0.021 0.363 0.003 0.000 0.003 1
0.6 0.154 -0.004 0.000 0.014 0.014 0.8
0.233 0.003 -0.371 0.002 0.000 0.002
0.6
0.1 0.011 -0.504 0.028 0.000 0.028
0.309 0.057 0.072 m^4 0.4
0.2
C.G. = 0.604 m
0
0 0.1 0.2 0.3 0.4 0.5 0.6
m^2
m^4
m
m
m
m^3
m^3
x
starting point 0.875
Distance from
soffit (Y)
A.Y Y from CG A.Y^2 I self I @ CG Mid-Span Compo
m m^3 m m^4 m^4 m^4 1.6
1.25 0.58 0.340 0.053 0.002 0.055 1.4
1.075 0.12 0.165 0.003 0.000 0.003
1.2
0.967 0.02 0.057 0.000 0.000 0.000
0.6 0.15 -0.310 0.025 0.014 0.038 1
0.233 0.00 -0.677 0.005 0.000 0.005
0.8
0.1 0.01 -0.810 0.072 0.000 0.073
0.88 0.158 0.174 m^4 0.6
0.4
0.2
0
0 0.5 1 1.5
0.8
0.6
0.4
C.G. = 0.910
0.2
m^2 0
0 0.5 1 1.5
m^4
m
m
m
m
m^3
m^3
m^3
x
starting point 0.1
Distance from
A.Y Y from CG A.Y^2 I self I @ CG
End-Span I section on
soffit (Y)
1.4
m m^3 m m^4 m^4 m^4
1.075 0.121 0.475 0.025 0.000 0.026 1.2
0.967 0.004 0.367 0.001 0.000 0.001 1
0.6 0.264 0.000 0.000 0.023 0.023
0.233 0.000 -0.367 0.000 0.000 0.000 0.8
0.1 0.011 -0.500 0.027 0.000 0.028 0.6
0.400 0.053 0.077 m^4
0.4
C.G. = 0.600 m 0.2
0
m^2 0 0.1 0.2 0.3 0.4 0.5 0.6
m^4
m
m
m
m^3
m^3
x
starting point 0.875
Distance from A.Y Y from CG A.Y^2 I self I @ CG End-Span Composite
soffit (Y)
1.6
m m^3 m m^4 m^4 m^4
1.25 0.58 0.385 0.068 0.002 0.070 1.4
1.075 0.12 0.210 0.005 0.000 0.005 1.2
0.967 0.00 0.102 0.000 0.000 0.000
1
0.6 0.26 -0.265 0.031 0.023 0.054
0.8
0.233 0.00 -0.632 0.000 0.000 0.000
0.1 0.01 -0.765 0.064 0.000 0.065 0.6
0.97 0.168 0.194 m^4 0.4
0.2
C.G. = 0.865
0
0 0.5 1 1.5 2
m^2
m^4
m
m
m
m
m^3
m^3
m^3
x
top and bottom flange will remain starting point 0.1
same, other section will change wrt to
their location
Distance from
A.Y Y from CG A.Y^2 I self I @ CG
Transition
soffit (Y) -Span I section only
m m^3 m m^4 m^4 m^4
1.075 0.121 0.474 0.025 0.000 0.025 1.4
0.967 0.013 0.366 0.002 0.000 0.002 1.2
0.6 0.195 -0.001 0.000 0.017 0.017 1
0.233 0.002 -0.368 0.001 0.000 0.001
0.8
0.1 0.011 -0.501 0.028 0.000 0.028
0.341 0.056 0.074 m^4 0.6
0.4
C.G. = 0.601 m 0.2
0
m^2 0 0.1 0.2 0.3 0.4 0.5 0.6
m^4
m
m
m
m^3
m^3
x
starting point 0.875
Distance from
A.Y Y from CG A.Y^2 I self I @ CG Transition
soffit (Y)
-Span Composite
m m^3 m m^4 m^4 m^4
1.25 0.58 0.358 0.059 0.002 0.061 1.6
1.075 0.12 0.183 0.004 0.000 0.004 1.4
0.967 0.01 0.075 0.000 0.000 0.000 1.2
0.6 0.20 -0.292 0.028 0.017 0.045 1
0.233 0.00 -0.659 0.003 0.000 0.003 0.8
0.1 0.01 -0.792 0.069 0.000 0.069 0.6
0.92 0.163 0.182 m^4
0.4
0.2
C.G. = 0.892
0
0 0.5 1 1.5 2
m^2
m^4
m
m
m
m
m^3
m^3
m^3
y
an I section only
y
0
id-Span Composite
1 1.5 2 2.5
1 1.5 2 2.5
y
0
y
0
pan Composite
1 1.5 2 2.5
y
0
nsition
n I section only
nsition
an Composite
1 1.5 2 2.5
graph
x-width y-depth
1 0.1 0
2 0.65 0
3 0.65 0.2
4 0.535 0.3
5 0.535 0.9
6 0.75 1
7 0.75 1.15
8 0 1.15
9 0 1
10 0.215 0.9
11 0.215 0.3
12 0.1 0.2
13 0.1 0
graph
x-width y-depth
1 0.875 0
2 1.425 0
3 1.425 0.2
4 1.31 0.3
5 1.31 0.9
6 1.525 1
7 1.525 1.15
8 0.775 1.15
9 1.525 1.15
10 2.3 1.15
11 2.3 1.35
12 0 1.35
13 0 1.15
14 0.775 1.15
15 0.775 1
16 0.99 0.9
17 0.99 0.3
18 0.875 0.2
19 0.875 0
graph
x-width y-depth
1 0.1 0
2 0.65 0
3 0.65 0.2
4 0.65 0.3
5 0.65 0.96
6 0.75 1
7 0.75 1.15
8 0 1.15
9 0 1
10 0.1 0.96
11 0.1 0.3
12 0.1 0.2
13 0.1 0
graph
x-width y-depth
1 0.875 0
2 1.425 0
3 1.425 0.2
4 1.425 0.3
5 1.425 0.96
6 1.525 1
7 1.525 1.15
8 0.775 1.15
9 1.525 1.15
10 2.3 1.15
11 2.3 1.35
12 0 1.35
13 0 1.15
14 0.775 1.15
15 0.775 1
16 0.875 0.96
17 0.875 0.3
18 0.875 0.2
19 0.875 0
graph
x-width y-depth
1 0.1 0
2 0.65 0
3 0.65 0.2
4 0.578125 0.3
5 0.578125 0.9225
6 0.75 1
7 0.75 1.15
8 0 1.15
9 0 1
10 0.171875 0.9225
11 0.171875 0.3
12 0.1 0.2
13 0.1 0
graph
x-width y-depth
1 0.875 0
2 1.425 0
3 1.425 0.2
4 1.353125 0.3
5 1.353125 0.9225
6 1.525 1
7 1.525 1.15
8 0.775 1.15
9 1.525 1.15
10 2.3 1.15
11 2.3 1.35
12 0 1.35
13 0 1.15
14 0.775 1.15
15 0.775 1
16 0.946875 0.9225
17 0.946875 0.3
18 0.875 0.2
19 0.875 0
Depth of I girder= 1.15 m
Depth of compposite section= 1.35 m
Total length of I girder= 17.57 m
Clear span for Sf and BM calculation= 16.97 m
1.20
1.00
0.80
0.60
0.40
0.20
0.00
0 2 4 6 8 10 12 14
0.98 y=4*e*x*(L-x)/(L^2)
0.065 dy/dx=4*e*(L-2*x)/L^2
0.345
0.41
4*L/10 5*L/10 6*L/10 7*L/10 8*L/10 9*L/10 D end
6.788 8.485 10.182 11.879 13.576 15.273 15.62 16.97
0.59 0.57 0.59 0.64 0.72 0.84 0.86 0.98
1.12 0.00 -1.12 -2.24 -3.36 -4.49 -4.71 4.95
0.72 y=4*e*x*(L-x)/(L^2)
0.048 dy/dx=4*e*(L-2*x)/L^2
0.252
0.3
4*L/10 5*L/10 6*L/10 7*L/10 8*L/10 9*L/10 D end
6.788 8.485 10.182 11.879 13.576 15.273 15.62 16.97
0.43 0.42 0.43 0.47 0.53 0.61 0.63 0.72
0.82 0.00 -0.82 -1.64 -2.46 -3.28 -3.44 3.66
0.46 y=4*e*x*(L-x)/(L^2)
0.03 dy/dx=4*e*(L-2*x)/L^2
0.16
0.19
4*L/10 5*L/10 6*L/10 7*L/10 8*L/10 9*L/10 D end
6.788 8.485 10.182 11.879 13.576 15.273 15.62 16.97
0.28 0.27 0.28 0.30 0.34 0.39 0.41 0.46
0.52 0.00 -0.52 -1.04 -1.56 -2.08 -2.19 2.29
0.2 y=4*e*x*(L-x)/(L^2)
0.013 dy/dx=4*e*(L-2*x)/L^2
0.067
0.08
4*L/10 5*L/10 6*L/10 7*L/10 8*L/10 9*L/10 D end
6.788 8.485 10.182 11.879 13.576 15.273 15.62 16.97
0.12 0.12 0.12 0.13 0.15 0.17 0.18 0.20
0.22 0.00 -0.22 -0.44 -0.65 -0.87 -0.92 0.99
Cable 1
Cabel 2
Cabel 3
Cabel $
10 12 14 16 18
maybe increase length by 5% or something
check with actual increase required like
from end to mid portion by direct straight
line and
by taking 5 steps
compare these two results and provide
according percentage increase accordingly