Existing structure Details

Existing
S.No Str. Type Super Str. Type Span Widrh Feasable foundation system
chainage
1 295.250 MNB RCC TGirder 3 x 17.00 8.50 Pile foundation

Pier - Pile foundation Abutment -


2 303.860 MNB RCC TGirder 1 x 17.10+1 x 19.30 8.50 Open foundation

3 308.380 MNB RCC Solidslab 4 x 7.00 8.80 Raft

4 315.080 MJB RCC T Girder 9×20.00 8.00 Pile foundation

5 320.380 MNB RCC Solidslab 1 x 12.50 14.50(Skew) Raft


Stone Masonry
6 322.320 MJB 7×14.00 6.50 Pile foundation
Semi Circular Arch
7 325.300 MNB RCC Solidslab 3 x 7.40 8.40 Raft
8 328.790 MNB RCC Solidslab 2 x 7.40 12.00 Raft
9 330.420 MNB RCC Solidslab 2 x 8.70 12.00 Raft
Pile foundation is feasible for higher spans.
StoneMasonryParaboli
10 331.760 MNB 4 x 9.50 6.50 Since the soil is brownish clay type at banks of
cArch the river, sand and pebbles on the river bed.

11 333.700 MNB RCC Solidslab 2 x 9.20 12.10 Raft


12 337.900 MNB RCC Solidslab 1 x 10.40 12.00 Raft

VUP
13 -
Locations - - - Pile foundation
Remarks

Very week soil in middle of


the river. For abutments
the depth of foundation
may be 5 to 6 m as per soil
condition oberved on site

Silty Sand and pebbles on


river bed, On river banks
Moorum and redish clay
type soil
-
Sand and pebbles on river
bed, Red soil
-
-
-
Already new bridge
constructed on right side
of the existing old arch
bridge. The configuration
of the bridge is 5x10.4C/C
of EJ Outer to Outer width
- 12m . Superstructure -
RCC Solid slab .
Substructure - RCC Soild
wall type with open
foundation

-
-

Soil strata observed on site


is claey sand, moorum and
black soil. Open may be
possible with higher depth
of foundation