Dear Sir,
We have noticed that water table is higher than normal after excavation done at Gude road for the
purpose of removing the top soil and filling materials to improve the road subgrade.
For that matter, we are interesting to know what measures or methodologies have you opted or
you think will be technically deployed to lower the water table and allow the works proceed. This
should be immediately done to allow the Contractor to proceed without any delay.
Thank you.
CC: 1. Director,
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
The following issues were observed during site visit by the Team from World
Bank, PORALG, Client, UWP Consulting SA/UWP Consulting Tanzania/JMK
International Joint Venture and Contractors:-
For Package 1
Social and Environmental issues need serious actions from the begging.
This has to be considered in case of Contracts of Laborers (Code of
Conduct) and at site in general.
Basing on the comments and discussions done during the visit, I am reminding
you to take into account the discrepancies and improve so that DMDP project
can well move to its intended purpose.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Please refer to the captioned heading above and the last site meeting of
04/01/2018.
We are in the position to remind you that, the completion date of works
for package 1 was scheduled on 22 January, 2018 as per Contract. But
the extended time of one month was granted to the Contractor and
effected the completion date to be on 27th Feb, 2018.
We are now asking you to act upon so that the package one project
especially office and laboratory building is handed over to the Client as
per extended time.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
PACKAGE 5
SCHOOL PREMISES
Please refer to the above subject matter and your letter with ref. no.
51312/6/01/02/013 ng dated on 20th February, 2018.
Thank you.
PO-RALG
Please refer to the captioned heading above and the last site visit done at
Zimbili road.
We did a joint site visit at Zimbili road and found that the existing 4 cells box
culvert has been scoured, the apron and two wing walls at the outlet side have
broken due to heavy rains continuing to rain in since the month of March, 2018
up todate.
Since the box culvert was not included in the BOQ during the design stage of
Zimbili road, therefore, the Contractor must be instructed to take measures
however possible so that people can well pass through from one side to other
side.
We also look forward for your advice on the permanent solution to make sure
that at the completion of Zimbili road there won’t be any problem again.
I hope you will act accordingly.
Thank you.
Please refer to the captioned heading above and the last site visit done at
Zimbili road.
We did a joint site visit at Zimbili road and found that the existing 4 cells box
culvert has been scoured, the apron and two wing walls at the outlet side have
broken due to heavy rains continuing to rain in since the month of March, 2018
up todate.
Since the box culvert was not included in the BOQ during the design stage of
Zimbili road, therefore, the Contractor must be instructed to take measures
however possible so that people can well pass through from one side to other
side.
We also look forward for your advice on the permanent solution to make sure
that at the completion of Zimbili road there won’t be any problem again.
I hope you will act accordingly.
Thank you.
Eng John Magori
For Municipal Director
Ilala Municipal Council
CC: 1. The Director,
Ilala Municipal Council
2. The Projects Coordinator,
PO-RALG
3. The Project Coordinator
Ilala Municipal Council
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
Please refer to the captioned heading above and the previous discussions
concerning the replacement of Chief Resident Engineer.
We did a joint site visit at Zimbili road and found that the existing 4 cells box
culvert has been scoured, the apron and two wing walls at the outlet side have
broken due to heavy rains continuing to rain in since the month of March, 2018
up todate.
Since the box culvert was not included in the BOQ during the design stage of
Zimbili road, therefore, the Contractor must be instructed to take measures
however possible so that people can well pass through from one side to other
side.
We also look forward for your advice on the permanent solution to make sure
that at the completion of Zimbili road there won’t be any problem again.
I hope you will act accordingly.
Thank you.
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Please refer to the captioned heading above and the last site meeting of
04/01/2018.
We are in the position to remind you that, the completion date of works
for package 1 was scheduled on 22 January, 2018 as per Contract. But
the extended time of one month was granted to the Contractor and
effected the completion date to be on 27th Feb, 2018.
We are now asking you to act upon so that the package one project
especially office and laboratory building is handed over to the Client as
per extended time.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Please refer to the heading above and the site meeting held on 15 th May, 2018
at Package 4 Gongola Mboto Ward.
One of the raised agenda during the last site meeting in the discussion was the
obstacles along the roads and other areas required to be developed or upgraded
by the Contractors in total.
But also, we agreed that you will instruct or remind all Contractors to prepare
and send to you the list of obstacles with their corresponding chainages so that
will be easy to the Valuer to work on them.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Please reference is made to the heading above and the discussion done in the
last site meeting of package 4.
Some of PAPS seen to demolish their properties along the roads which
Contractors are doing construction works while others delay in a sense that
they are still waiting their compensation. In actual fact, most of them they were
paid and they are required to vacate the areas required and allow the
Contractors to proceed with works.
Basing on our last site meeting discussion, I am attaching herewith the list of
PAPS who were paid already and are not expected their properties to be found
unremoved.
I hope you will make follow up as we discussed and agreed in the last site
meetings to ensure that those who paid are giving the room. Otherwise, do not
hesitate for further assistance from the Client.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Please reference is made to the heading above and the Certificate of completion
of the works issued to the Contractor M/S China Railway Seventh Group.
Some of PAPS seen to demolish their properties along the roads which
Contractors are doing construction works while others delay in a sense that
they are still waiting their compensation. In actual fact, most of them they were
paid and they are required to vacate the areas required and allow the
Contractors to proceed with works.
Basing on our last site meeting discussion, I am attaching herewith the list of
PAPS who were paid already and are not expected their properties to be found
unremoved.
I hope you will make follow up as we discussed and agreed in the last site
meetings to ensure that those who paid are giving the room. Otherwise, do not
hesitate for further assistance from the Client.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Please refer to the heading above and the last Site meeting.
You are reminding to make follow up and instruct Contractors to mobilize all
the required key Staffs and equipment as stated in their Contracts in GCC 9 so
that all works can be done with accordance to the proper stated methodologies.
I hope you will act accordingly by also ensuring the quality of works especially
which have done without proper methodologies.
Thank you.
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
As you are aware that, in package 5 at Kiwalani Ward there are three (3) market
structures required to be constructed as per contract. We have been waiting for
compensation money from higher level of our Government so that the exercises
can be done at the same time finding another means of how we can resolve it.
Meanwhile, we have made several discussions with the local people who are
doing business at Bombom Market to vacate the market and give room for
development. The area was jointly inspected and checked before by
representative from Client, Contractor and Consultant its dimensions and
seems to suit with the available design.
Near by the market area there is an area along the road where by, we discussed
and agreed with the business people to use it for temporary while the
construction is going on.
You are now required to survey that area and advice on how can be levelled and
allow the business people to vacate the old market required to be developed.
Thank you.
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
The Technical Team from World Bank, PORALG, Ilala Municipal Council,
Consultant, Technical Assistant, and Contractors was done the joint site
inspection on 24th August, 2018 through DMDP project to determine the
progress in general.
Several issues were raised, discussed and instructed to CSC for more
actions as follows;
The Team cautioned the CSC to strictly make closely and serious
supervision to Contractors so that to accomplish all works in time
and in quality.
The Team advised the CSC to instruct the Contractor have more
groups of work in different sections so that to fast track the work
because more time have lost/elapsed.
The Contractor has only one motor grader on site, Key staff are not
enough ‘’ Social Expert not employed’’, in general the Contractor
not fully mobilised. CSC was instructed to ask all Contractors to
submit their list of Key Staff with their CVs as well as their work
Contracts to the Client/ PORALG as soon as possible.
Generally, the Team instructed the CSC and TAs to submit their list of
Key Staff to Client/ PORALG for further action too.
Therefore, from these basis, the CSC is required to act upon those
challenges and weakness as shown so that the project to be completed in
time as well as in quality.
Thank you.
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
The following are some matters which need early actions to be taken as
shown in packages 2, 3 & 5; -
For Package 5;
On 4th September, the Team from TA and Client’s side did the site visit at
package 5 and observed some issues which need early action to be taken
by the Contractor before rain season starts; -
At Bush, Mnara and Gude roads, the Contractor has excavated the
roads and start filling up pavement layers but there is a need of
providing the quick protections to the excavated road sides either
by constructing side drains or whatever to avoid erosion in which if
it rains can cause fallen of nearby buildings and lead to
unnecessary claims from the owners.
To date, the Contractor has not yet started the construction of
Bombom market regardless that there is a free site to start
construction for more than 3 months now with no reason.
Most of the site sections found not busy, only one motor grader
found moving around for the whole site. This leads to delay of
works and completion time in general. The Contractor will not be
entitled to claim for extension of time basing to all of these delays.
For all roads already started construction, there are water ponds
with water changed colour to green and not moving because there
are no side drains provided to allow surface and subsurface water
to flow and leave the road pavement layers safe. The ponding water
has started wetting the pavement layers which is endangering the
road.
Thank you.
RE: Confirmation on Intention to Carry on the Structural Supervion of Building on Plot No 19 Block 49FLUR BIBI TITI
MOHAMED Street Ilala Municipality DSM.
The heading above refers to your letter with no reference number dated on 06 th Julay,2018 regarding the Intention
carry on the construction of your building at Plot no. 19 Block 49 FLUR BIBI TITI MOHAMED.
We have inspected your site and seen the existing structure physically is still fit, and it is at first floor level with
erected starter bars for columns. But relaying on your Structural Engineer’s commitment and advice, we are allowing
you to proceed with your construction by basing on the following conditions; -
Make sure that you follow the Building Permit no. 2292 dated on 30.07.2012 conditions issued by Ilala
Municipal Council.
Make sure that there is safety at your site during construction,
Make sure that you follow all the construction regulations.
The Ilala Municipal Council will cancel your Building permit if you won’t obey and observe the said above and granted
Building Permit conditions.
Be guided accordingly.
John Magori
Ilala MunicipalCouncil
Ilala MunicipalCouncil
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
The following are some matters which need early actions to be taken as
shown in packages 2, 3 & 5; -
For Package 1
For Package 5;
On 4th September, the Team from TA and Client’s side did the site visit at
package 5 and observed some issues which need early action to be taken
by the Contractor before rain season starts; -
At Bush, Mnara and Gude roads, the Contractor has excavated the
roads and start filling up pavement layers but there is a need of
providing the quick protections to the excavated road sides either
by constructing side drains or whatever to avoid erosion in which if
it rains can cause fallen of nearby buildings and lead to
unnecessary claims from the owners.
To date, the Contractor has not yet started the construction of
Bombom market regardless that there is a free site to start
construction for more than 3 months now with no reason.
Most of the site sections found not busy, only one motor grader
found moving around for the whole site. This leads to delay of
works and completion time in general. The Contractor will not be
entitled to claim for extension of time basing to all of these delays.
For all roads already started construction, there are water ponds
with water changed colour to green and not moving because there
are no side drains provided to allow surface and subsurface water
to flow and leave the road pavement layers safe. The ponding water
has started wetting the pavement layers which is endangering the
road.
Thank you.
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Reference has made to the heading above and the joint inspection done by a
team from Consultant, Contractor and Client.
The team observed the following defects during site inspection at Package1:-
Therefore, you are required to immediately instruct the Contractor to rectify all
observed snags and defects within one month and the team will do inspection.
Thank you.
Eng John Magori
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
SUB: Observations after Inspection done by CAG and IMC on two different
days at Package 1
Reference has made to the heading above and the joint inspection done by a
team from CAG, Consultant, Contractor and Client, also refer to our letter
dated on 17th Aug, 2018 Ref. number IMC/HD.20/2.
The Inspection team observed that still there are snags and defects at package
1 in which the major works were completed on 27 th February, 2018 and Project
Manager issued the Certificate of Completion such that is in the Defect Liability
Period. Regardless that, another team did inspection on 17 th August, 2018 and
required you to instruct the Contractor M/S China Railway Seventh Group to
attended and rectify all snags and defects, still the following defects and snags
were found on 12th September, 2018 during CAG inspection and auditing;
I. Non supply and fixing of more than 30 pcs of kerb stone at the office
building near the generator house,
II. Poor finishing of the part floor inside the generator house
III. Failure to put terrazzo floor on the part which is on the floor top of the
main office building
IV. Security guard house was not yet installed with electricity and its
facilities
V. Poor finishing on the places where the roof top stairs were fixed
VI. Most of the roads under package 1 were not installed with all required
road signs.
VII. Some office furniture and equipment were not yet supplied as required
on the contract agreement.
Therefore, we strictly require you again to instruct the Contractor to attend and
rectify all the observed defects and snags immediately and the re-inspection has
scheduled to be done on 29th September, 2018.
Thank you.
PO-RALG
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
As we all aware that the package 1 project is now at Defect Liability Period
since 27th February, 2018, you are required to prepare and submit final
account and as built drawings to the Client so that to know exactly the
general status of the project financially to date.
You are also not required to proceed with unapproved additional works by
Client until you submit the required financial status and as built drawings for
package 1 and being instructed otherwise.
Thank you.
Dear Sir,
Please refer to the above captioned subject and the verbal information delivered
to you on 19th January, 2019 concerning the accident occurred to Mr. Kelvin
Nderanga worked at Nyanza Road Works package 6 Ukonga Ward.
Immediately after the incidence Nyanza Road Works took the patient to nearby
Health Care Dispensary at Ukonga for treatment and there he referred to
Muhimbili National Hospital.
Elizabeth Thomas
Cc
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
We have verified and scrutinized the submitted quotation for relocating the
obstructing structure along Bush road and seen that is reasonable. Therefore,
you are given approval to proceed with the exercise accordingly basing to the
signed agreement without resulting any claim later on from the owner or any
side.
Thank you.
DMDP Engineer
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
We have scrutinized and verified the submitted quotation for relocating the
obstructing structures along Chunge road and seen that is reasonable.
Therefore, you are given approval to proceed with the exercise accordingly
basing to the submitted estimates and signed agreement without resulting any
claim later on from the owner or any side.
Thank you.
Tafadhali husika na kichwa cha habari hapo juu pia rejea ushauri na
maelekezo yako kutokana na kikao cha pamoja ofisini kwako cha tarehe……
Nawasilisha.
………………………………………….
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
I have come notice that some of the quantities for the on-going packages 4, 5 &
6 have deviated from the original contract. It is alerting that, the immediate
review should be undertaken to focus on the available budget.
Therefore, you are reminded to undertake the quantity review and advice the
Client effectively before the project cost exceed the original and available
budget.
Thank you.
P.O.BOX 8151,
DAR ES SALAAM.
Dear Sir,
Reference has made to the above subject and your letter Ref. No.
51312/5/01/02/031/fm dated 10th July, 2019.
Based to the evaluation report done by our DMDP Valuer for some of the
obstructions remaining at the corridors of Limbanga and Chunge roads which
hinders the completion of the works, we are confirming to you that, the
Contractor should proceed with the exercise of compensating the owners of
obstructions/properties as agreed before that, he will be paid either in the
relocation or day works items depending on your advice.
Therefore, you are required to instruct the Contractor to proceed with the
exercise of paying the PAPs (TZS 58,078,946.24) as submitted so that the
progress works can be quickly resumed.
Thank you.
2128805
P.O. Box 20950,
FAX NO. 2121486 11883 Dar es Salaam
Dear Sir,
Reference has made to the 2 sec August, 2019 joint meeting with TARURA CEO and the
above heading.
We regret to inform you that we are not happy with your performance basing to the
following general and specific facts;
I. Contractors on site are not well supervised in terms of quality control, pushing
them to complete their works in time and be active on works as per their
Contracts. This has resulted most of the works to lag behind the Contracts time
of completion.
II. Your Client had been instructed you several time through letters and meetings
to act on different matters like preparation or producing proper and important
reports (regarding your supervision works example Final Draft report for
package 1 and the whole status), to take Contractual actions to Contractors
who are not performing with no concrete reasons, but at the end you are failing
to do so or you do differently.
III. It has also noted that, within your Staff, only few are active in a manner that
you are not able to supervise effectively the available works and leading to poor
and unsatisfactorily products as well Contractors not completing their works on
time as stipulated in the Contracts.
Basing to these weaknesses mentioned above, we are again cautioning and needing
you to resume your activeness in supervision before the Client think of suspending
your Contract as stipulated in Clause GCC18 of your Contract.
Be guided accordingly.
Thank you.
Jumanne K. Shauri
Ilala Municipal Director
Dear Sir,
Basing to discussion and agreement done in the joint meeting with PORALG and TAs
team we proposed the date of commencement to be 15th August, 2019.
Therefore, we are informing and making formal communication to you so that you can
write to the respective Contractors the Commencement and Possession letters as far
as their Contract regulations as concern.
Be guided accordingly.
Thank you.
John Magori
For:MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Dear Sir,
Basing to the discussion and agreement done in the joint meeting with PORALG and
TAs team held at DMDP office on 19th August, 2019, it was agreed that, the Project
Manager should arrange Prior Final inspection for all works at packages 4 and 6 and
immediately produce a report with snag lists including if any pending works.
After there, the team will quickly arrange joint inspection basing to that report and
come up with decision.
But, also the joint meeting of 19th August, 2019, agreed that the quick assessment for
the whole works at package 5 should be done to determine the general status of the
project.
Since the exercise for package 5 was started on 20th August, 2019 and the result is
required to be presented on 30 th August, 2019, you are also required to present the
report for Prior inspection of packages 4 and 6 in order to be discussed in the joint
meeting before 31st August, 2019 so that we would have way forward.
Be guided accordingly.
Thank you.
John Magori
For:MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Cc: Ilala Municipal Director,
DMDP Coordinator PO-RALG
DMDP Coordinator IMC
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
Dear Sir,
Basing to the discussion and agreement done in the joint meeting with PORALG and
TAs team held at DMDP office on 19th August, 2019, it was agreed that, the Project
Manager should arrange Prior Final inspection for all works at packages 4 and 6 and
immediately produce a report with snag lists including if any pending works.
After there, the team will quickly arrange joint inspection basing to that report and
come up with decision.
But, also the joint meeting of 19th August, 2019, agreed that the quick assessment for
the whole works at package 5 should be done to determine the general status of the
project.
Since the exercise for package 5 was started on 20th August, 2019 and the result is
required to be presented on 30 th August, 2019, you are also required to present the
report for Prior inspection of packages 4 and 6 in order to be discussed in the joint
meeting before 31st August, 2019 so that we would have way forward.
Be guided accordingly.
Thank you.
John Magori
For:MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Cc: Ilala Municipal Director,
DMDP Coordinator PO-RALG
DMDP Coordinator IMC
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
Dear Sir,
We acknowledge to you that, the final report submitted to the Client has been received
and has some important information which have either not well elaborated or have not
included.
The missing important information in the Final Report are such as Environmental and
Social issues as well as Laboratory Equipment details which need to be well
incorporate for the purposes operation and maintenance.
Therefore, you are required to check through and improve the Final Report and re-
mind the Contractor for the supply of additional laboratory equipment the deadline
was said to be 15th September, 2019.
Be guided accordingly.
Thank you.
JUMANNE K SHAURI
MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Dear Sir,
Reference has made to the joint meeting held at PO-RALG Mellenium Tower office Dar
Es Salaam with your presence on 10 th September, 2019 regarding tender documents
for Package 7 Ulongoni- Bangulo- Kinyerezi.
We are reminding you to submit the tender documents as you were instructed in the
joint meeting mentioned above before or on 20 th September, 2019 so that tendering
process can start this month of September, 2019.
You are also reminding to include all components as one package for two bridges and
a road of 7.5km. All documents for Environmental and Social issues as you were
instructed are important.
Be guided accordingly.
Thank you.
JUMANNE K SHAURI
MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Dear Sir,
Reference has made to the above subject and the IPC No 13 submitted to us for re
checking and sign.
We have gone through it and found that, Bill item eptember, 2019 so that tendering
process can start this month of September, 2019.
You are also reminding to include all components as one package for two bridges and
a road of 7.5km. All documents for Environmental and Social issues as you were
instructed are important.
Be guided accordingly.
Thank you.
JUMANNE K SHAURI
MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Dear Sir,
Reference has made to the above subject and your letter with ref. no.
51312/501/02/027/pm of 13th May, 2019.
We have received your letter as stated above attached with quotation amounting to
Tshs. 3,616,000.00 the cost for relocating 3 gates at Chunge road chainage 1+250
LHS which are obstructing the walkway.
Be guided accordingly.
Thank you.
John Magori
For: MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Dear Sir,
Reference has made to the above subject and your letter with ref. no.
51312/6/01/01/052/fm of 17th September, 2019.
We have received your letter proposing to Re-pack some of the works in package 5
which have not yet completed and would not be completed within the extended time
offered to the Contractor.
Based to the facts analyzed to your letter, we have no objection and we ask you
to instruct the Contractor to complete all pending works as you proposed, and
make sure the Contract has to be smoothly completed.
Be guided accordingly.
Thank you.
JUMANNE K. SHAURI
MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
OFISI YA MKURUGENZI
SIMU NA. 2128800
1 MTAA WA MISSION
2128805
S.L.P 20950,
FAX NO. 2121486
DAR ES SALAAM.
KATIBU MKUU
OR - TAMISEMI
S.L.P 1923 ,
41185 DODOMA.
Tafadhali rejea barua yako kumb Na. CAH.491/492/01/47 ya tarehe 18/04/2019 kuhusu
somo tajwa hapo juu.
i. Nyaraka zote zinazohusu zabuni hiyo ziliwasilishwa Benki ya Dunia kwa ajili ya
uchunguzi kwa kushirikiana na Kitengo cha DMDP chini ya Ofisi ya Rais, TAMISEMI.
Mnamo tarehe 02 Mei, 2019, Halmashauri ya Manispaa ya Ilala ilipokea barua kutoka
Benki ya Dunia baada ya kukamilisha uchunguzi wao; ikionyesha kuridhika na hatua
zilizochukuliwa na Manispaa ya Ilala za kufanya uchunguzi wa tuhuma hizo kufuatana na
taratibu za Benki hiyo za kushughulikia malalamiko ya manunuzi, namna ilivyofanya
rejea kwenye Kanzi data ‘’Data base’’ ya Wakandarasi waliosimamishwa wakati
malalamiko yao yakichunguzwa na wale waliofungiwa kushiriki zabuni kwa makosa
mbalimbali kupitia orodha rasmi ya Benki ya Dunia , AfDB Group, na PPRA na pia
hitimisho letu lilivyojiridhisha kuwa kampuni inayolalamikiwa iitwayo M/s Chongqing
International Construction Corporation (CICO) haijasimamishwa au kufungiwa kushiriki
kwenye mchakato zabuni ya aina yeyote ile.
Aidha, Barua hiyo kutoka Benki ya Dunia inaielekeza Halmashauri kuondolewa kwa zuio
lililokuwa limewekwa juu zabuni hiyo wakati wa uchunguzi, na hivyo kuendelea na
mchakato wa zabuni tajwa kwa haraka ili kuikamilisha.
Pamoja na barua hii, naambatisha nakala ya barua kutoka Benki ya Dunia kwa ajili ya
rejea yako.
Nawasilisha.
Elizabeth Thomas
Kaimu Mkurugenzi
OFISI YA MKURUGENZI
1 MTAA WA MISSION
S.L.P 20950,
KATIBU MKUU,
OR – TAMISEMI 3RD & 4TH FLOOR MELLENIUM
TOWER BUILDING,
S.L.P 34314,
Halmashauri ya Manispaa ya Ilala ikiwa ni moja kati ya Manispaa za Jiji la Dar Es Salaam
zinazotekeleza mradi wa DMDP chini ya Ofisi ya RAIS – TAMISEMI, imepokea maombi
kuhusu kukumbushia madai ya malipo kutoka kwa Wakandarasi wanaotekeleza ujenzi wa miradi
ya DMDP kama ifuatavyo
II. Mkandarasi M/s Group Six anayetekeleza mradi wa ujenzi wa miundombinu ya barabara,
Masoko na Vyoo Package 5 Kata ya Kiwalani malipo yake yaliidhinishwa tarehe
14/08/2019 IPC Na. 12 Tsh. 723,547,130.94.
III. Mtaalam Mshauri ‘’Technical Assistant ‘’ M/s LEA Associates South Asia (Pvt) malipo
yake yaliidhinishwa tarehe 28/08/2019 IPC Na. 22 USD 12,890.36 na IPC Na. 23 USD
12,778.77.
IV. Mhandisi Mshauri ‘’Consultant Engineers‘’ M/s UWP Consulting (Pty) malipo yake
yaliidhinishwa tarehe 24/07/2019 IPC Na. 36 USD 88,826.69.
V. Mkandarasi M/s China Railway Seventh Group Package 3 Mifereji Bonde la Mto Yombo
malipo yake yaliidhinishwa tarehe 20/08/2019 IPC Na. 01 malipo ya awali ‘’Advance
Payment’’ USD 916,037.92.
VI. Mkandarasi M/s Chongqing International Cooporation ltd Package 2 Mifereji Bonde la
Mto Msimbazi malipo yake yaliidhinishwa tarehe 20/08/2019 IPC Na. 01 malipo ya
awali ‘’Advance Payment’’ Tzs 2,176,235,891.61.
Jumanne K. Shauri
Mkurugenzi wa Manispaa ya Ilala
Halmashauri Manispaa ya Ilala
TAREHE: 26/09/2019
Mhandisi Ujenzi
IMC/DMDP/D.1/1
Dear Sir,
Reference has made to the above subject and some joint meetings held two
weeks ago.
We are reminding you to make follow up and push the two Contractors in
Package 2 and 3 respectively to prepare and submit their Program of Works
which will match with the available corridors as we jointly inspected and
agreed. For Package 2 Msibazi River Basin drains; Mafuriko drains 1.23km,
Tenge Liwiti drain 0.96km, Buguruni Kisiwani drain 1.5km, Bonde la Sungura
main drain at ch. 0+000 – 0+120 is free, 0+120 -0+700 is obstructed, 0+700
-0+840 is free, Bonde la Sungura small drain 1 at ch. 0+000 – 0+040 is free,
Bonde la Sungura small drain 2 at ch. 0+000 – 0+104 is obstructed, Tembo
Mgwaza main drain at ch. 0+000 – 0+880 is free, ch. 0+880 – 1020 is
obstructed and Tembo Mgwaza small drain at ch. 0+000 – 0+200 is free. A total
of free corridor to work is 4.95km which is 80% of the free corridor.
For Package 3 Yombo River Basin drains; Food Security no.1 at ch. 0+000 –
0+400 is free & 0+400 – 0+700 end of drain is obstructed, Food Security no.2
at ch. 0+000 – 1+300 is free, 1+300 – 2+700 is obstructed although we have
paid 80% and are demolishing up to 15 th Oct, 2019 95% free corridor will be
there, Mpogo River at ch.0+000 – 4+700 is obstructed and evaluation was done
we are making follow to get money for compensation, Minazi mirefu drain at
ch. 0+000 - 0+200 is obstructed by 40% & ch 0+200 – 0+700 is free so 90% the
drain is free. The issue of detention pond, we jointly agreed that you will do
setting out so that everyone can see clearly the area to be utilized and decision
to be made quickly by the owners and client side.
+654
Generally, we are working for the obstruction for the sections seen to be
obstructed and up to December, 2019 all obstructions will be completely
removed.
Therefore, you are asking to instruct all Contractors to updated and submit
their program of works basing to the available corridors and they are required
to start their physical works and mobilize the full equipment and staff as per
their Contracts.
Be guided accordingly.
Thank you.
John Magori
For;MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
IMC/DMDP/U-1/2/ 14
Dear Sir,
Reference has made to the above subject and some joint meetings held two weeks ago.
We are reminding you to make follow up and push the two Contractors in Package 2
and 3 respectively to prepare and submit their Program of Works which will match
with the available corridors as we jointly inspected and agreed. For Package 2 Msibazi
River Basin drains; Mafuriko drains 1.23km, Tenge Liwiti drain 0.96km, Buguruni
Kisiwani drain 1.5km, Bonde la Sungura main drain at ch. 0+000 – 0+120 is free,
0+120 -0+700 is obstructed, 0+700 -0+840 is free, Bonde la Sungura small drain 1 at
ch. 0+000 – 0+040 is free, Bonde la Sungura small drain 2 at ch. 0+000 – 0+104 is
obstructed, Tembo Mgwaza main drain at ch. 0+000 – 0+880 is free, ch. 0+880 – 1020
is obstructed and Tembo Mgwaza small drai at ch. 0+000 – 0+200 is free. A total of
free corridor to work is 4.95km which is 80% of the free corridor.
Utekelezaji wa mradi wa DMDP unaoendelea katika Kata zenu unajumuisha uwekaji wa taa za
solar ambazo tayari zimekwisha wekwa katika barabara za Dispensary, School, Zimbili,
Kampala, Chunge na Limbanga. Taa hizo za barabarani zimekaguliwa kwa mara ya kwanza
nyakati za usiku na kuonekana zinawaka vizuri na kupunguza adha giza.
Hata hivyo, wakati taa hizo zinawekwa kumetokea changamoto kwa baadhi ya wananchi wasio
waaminufu kuziiba pamoja na sola zake jambo ambalo lilipelekea Wakandarasi kuweka ulinzi
kwa kipindi chote wakati zikiwekwa. Kutokana na hali hiyo, ni vyema sasa maeneo tajwa hapo
juu ambapo uwekaji umekamilika mkaweka ulinzi pamoja na kuwajulisha wananchi wao
wenyewe kuwa walinzi wa taa hizo na miundombinu mingine yote iliyoboreshwa ili kuwasaidia
kama ilivyokusudiwa.
Pia, utekelezaji bado unaendelea kwa maeneo mengine yote ambapo mradi wa DMDP
unatekelezwa.
Nawaletea kwaajili ya ushirikiano na utekelezaji.
TAREHE: O1/10/2019
Yote hayo, ni lazima Mtumishi wa Idara ya Ujenzi aweze kufika eneo la kazi
ama eneo linalotakiwa kufanyika kazi ya ujenzi ili aweze kupima na kuandaa
makisio ama kufanya ukaguzi wa kazi hizo za ujenzi.
WATUMISHI
VITENDEA KAZI
Idara ya Ujenzi haina gari hata moja ambalo linatembea kwa zaidi ya
miezi sita sasa.
Idara ya ujenzi haina Ofisi hasa Ofisi ya Mkuu wa Idara ya Ujenzi na
kwaajili kutunzia kumbukumbu (Masijala ya nyaraka).
Idara ya Ujenzi haina vifaa vya kupima ubora wa vifaa vya ujenzi ama
ujenzi uliokwisha fanyika kama vile ‘’Rebound harmar machine’’ kwaajili
ya kupima uimara wa majengo yaliyojengwa.
CHANGAMOTO
OMBI
MAPENDEKEZO
Utendaji kazi kwa sasa si mzuri kwa kuwa Watumishi wengi waliopo kwa
sasa ni wale wenye sifa ya Fundi Sanifu Wasaidizi ‘’Auxillary
Technicians’’ ambao hata kuandaa taarifa ni shida,
Usimamizi wa miradi inayoendelea haufanyiki kikamilifu kutokana na
upungufu wa Wataalam Wahandisi,
Upatikanaji wa Makisio ‘’BOQs’’ yanapohitajika huchelewa kutokana na
kukosekana kwa usafiri,
Majengo ya watu binafsi yanayojengwa kwenye maeneo ya Halmashauri
hayakaguliwi wala kufuatiliwa kikamilifu kutokana na upungufu wa
Watumishi wenye sifa na kukosa usafiri jambo ambalo linaweza
kupelekea kujengwa chini ya viwango na kuja kuanguka na kusababisha
madhara ama vifo kwa awananchi,
Ongezeko la ujenzi holela wa maghorofa Mitaani bila vibali vya ujenzi na
usimamizi hafifu.
HITIMISHO
TAREHE: O4/10/2019
IMC/DMDP/D.1/1
Dear Sir,
Reference has made to the above subject and the joint site visit which was
done on 5th October, 2019 to all on going sites.
As we visited at Zimbili road and found an accident caused by rain water due
to incomplete side drain which was abandoned by Contractor and rain water
crossed to the local people’s houses as a result of block fencing wall felt and
crushed 3 motor vehicles which were parked.
We are reminding you to make follow up and instruct the Contractor to take
immediate measures to protect the possibility of more effects to happen to the
people due because rain is continuing, to make follow up for the remedial or
reconstruct the fencing wall felt and the repair of the 3 motor vehicles crushed.
Also, we remind you to instruct all Contractors to move around their areas or
road sites and check where the rain water is stagnated to avoid flooding to the
people.
Be guided accordingly.
Thank you.
John Magori
For;MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
IMC/DMDP/D.1/1
Dear Sir,
We have observed that in the IPC no. 14 requested for payment more amount
which exceed the original allocated budget have been certified; see bill items
Part B Bush road paid to 130.1%, Part C Gude road paid to 176.35, Part E
Mbilinyi road paid to 129.8%, Part G Jamaka road paid to 113.3%, Part H
Zahanati road paid to 143.4%, Part K Binti Musa road paid to 125% and Part L
Bethel road paid to 198%.
We remind you too that, the budgets for this package and other packages are
constrained so please make sure all works have to be completed within the set
budgets. (I have attached a copy for IPC no.14)
Be guided accordingly.
Thank you.
John Magori
For;MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
IMC/DMDP/U.1/2/100
Dear Sir,
Reference has made to the above subject, joint inspection done by (Client, CSC
& Contractor) on 10th October, 2019 and the call made to you by Eng.
Ndyamkama on 12th October, 2109.
It was found that, the side drain which was constructed from Limbanga road
and it was suppose to direct storm water to the major drain, was left hanging
and lead storm water to be uncontrollable as a result people come up with
complains.
Be guided accordingly.
Thank you.
John Magori
For; MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Dear Sir,
We have come to reliaze that, some of the items in the BOQs for ongoing
packages were grouped such in that were tendered in Lumpsum regardless
that all activities should be paid as measured works.
For that sense, we are worring that items 1.1 to 1.3 of Other Community based
Facilities (Kigilagila sub-ward 1.1, Minazi Mirefu sub-ward 1.2 & Yombo sub-
ward 1.3 Buildings) which their costs indicated in the BOQ as lumpsum
amounts at the end will not reflect VALUE FOR MONEY. (Refer Package 5).
Be guided accordingly.
Thank you.
John Magori
For; MUNICIPAL DIRECTOR
ILALA MNICIPAL COUNCIL
Cc: Municipal Director- Ilala
: DMDP Projects Coordinator – PO RALG
: DMDP Coordinator - IMC
HALMASHAURI YA MANISPAA YA ILALA
Hata hivyo, tarehe 11/10/2019 na 15/10/2019 vilifanyika vikao vya pamoja kwa
kushirikisha uongozi wa Serikali ya Mtaa na Mheshimiwa Diwani ili kupata suluhu
ambapo wananchi zaidi ya 14 walihudhuria na kuelimishwa umuhimu wa kujengwa
mfereji huo.
Kwenye kikao hicho, Wananchi walitoa malalamiko na madai yao kama ifuatavyo;-
Hata hivyo, walipewa elimu ya umuhimu wa kujengwa mfereji huo kwa haraka ili
kuondoa adha ya maji kuingia kwenye makazi yao hasa vipindi hivi vya mvua, pia
walijulishwa kuwa si vyema mfereji huo kutojengwa haraka kwa kigezo cha kusubiri
fedha za fidia na hatimaye kubakia hoja ya kuonyeshwa ni kiasi gani kila mmoja
anastahili kuja kulipwa kama fidia pamoja na Halmashauri kuwapa mikataba.
Hivyo, basi naleta kwako suala la wananchi kuhitaji kuonyeshwa fidia zao kuwa
watastahili kiasi gani ili ushauri kulingana na taratibu za Uthamini wa Ardhi pamoja
na kushauri kuhusu kupewa Mikataba na Halmashauri. Ushauri huo ni vizuri
uelekezwe kwa Mkurugenzi wa Manispaa ili mgogoro huo utatuliwe na mfereji uweze
kujengwa mapema.
Kwa kuwa uejnzi wa daraja hilo unakaribia kuanza kabla ya mwezi Disemba,
2019, ni vyema ukalishughulikia suala hilo mapema.
Ujenzi wa Mifereji ya maji ya mvua kwenye Bonde la mto Msimbazi km 6.14 unaofanywa na
Mkandarasi M/s Chongqing International Construction Corporation (CICO) kazi imeanza
kwenye mfereji wa Mafuriko Ilala tangu tarehe 15.08.2019 inatakiwa kukamilika ndani ya miezi
15 ya Mkataba,
Ujenzi wa Mifereji ya maji ya mvua kwenye Bonde la mto Yombo km 9.82 unaofanywa na
Mkandarasi M/s China Railway Seventh Group (CRSG) kazi imeanza kwenye mfereji wa
Mafuriko Ilala tangu tarehe 15.08.2019 inatakiwa kukamilika ndani ya miezi 15 ya Mkataba,
Wakandarasi M/s Nyanza Road Works na M/S Group Six wa package 6 na 5 waliomba malipo
ya kazi zilizoidhinishwa na Mhandisi Mshauri M/s UWP Consulting kwa IPC No. 15, 16 & 17
na IPC No. 12, 13 & 14 kwa takribani miezi 3 sasa hawajalipwa na Kimkataba Mkandarasi
alitakiwa kulipwa ndani ya siku 28 tangu kuidhinishwa na Mhandisi Mshauri kifungu cha
Mkataba ‘’GCC 41.1’’.
Kutokana na hali hii naleta kwako ombi la kutusaidia kufanya ufuatiliaji wa malipo hayo ili
Wakandarasi waweze kukamilisha miradi hii kama ilivyopangwa na kuepuka kuomba malipo za
ziada ‘’Interest’’ kwa kucheleweshewa malipo yao ikizingatiwa kuwa Mhandisi Mshauri
amewasilisha barua kumb. Na 51312/6/01/01/02/055/pm ya tarehe 16/10/2019 ya kusudio la
Wakandarasi kususia kazi. Hata hivyo, nilimwandikia Katibu Mkuu Tamisemi barua Kumb. Na.
IMC/DMDP/D.1/1/46 ya tarehe 19 Septemba, 2019 kumjulisha pia hali ilivyo (Naambatisha
nakala za barua hizo kwaajili ya rejea yako).
Naomba kuwasilisha.
JUMANNE K. SHAURI
Mkurugenzi wa Manispaa
Halmashauri ya Manispaa ya Ilala
OFISI YA MKURUGENZI
SIMU NA. 2128800
1 MTAA WA MISSION
2128805
S.L.P 20950,
FAX NO. 2121486
DAR ES SALAAM.
KATIBU MKUU
OR - TAMISEMI
S.L.P 1923 ,
41185 DODOMA.
Utekelezaji huo unafanyika kupitia miradi ya DMDP, Mfuko wa barabara Road Fund na kwa kutumia
fedha za Makusanyo ya Ndani ‘’Own Source’’.
Hata hivyo, kutokana na ufinyu wa bajeti katika maeneo yote hayo ya vyanzo vya fedha, Halmshauri
imeshindwa kuweka lami baadhi ya barabara muhimu zenye urefu wa km 15.49 ambazo wakazi na
wafanyabiashara wakubwa wanapata adha sana wakati wa vipi vya jua hali inakuwa ni ya vumbi na
wakati wa vipindi vya mvua hali inakuwa na mashimo ya maji na makorongo.
Kutokana na adha hiyo, Viongozi mbalimbali wa maeneo hayo wamekuwa wakiomba msaada
kutengenezewa akiwemo Mheshimiwa Mbunge Jimbo la Ilala na wengine kwa kuzingatia kuwa
wakazi na wafanyabiashara wa maeneo hayo ndio hulipa kodi ya Serikali kwa kiwango kikubwa
kutokana na umuhimu wa maeneo hayo.
TAREHE: 06/12/2019
‘JUSTIFICATION FOR OMITING SOME WORKS ON PARKAGE 5 AND MOVING THEM TO PACKAGE 3’’
Pamoja na mawasiliano mbalimbali na vikao vya pamoja vya Wataalamu Wahandisi kutoka TAMISEMI
kitengo cha Mradi wa DMDP, Halmashauri, TARURA, Mhandisi Mshauri UWP, TA na Mkandarasi
anayetekeleza mradi wa package 5 M/s Group Six International Ltd.
1:0 UTANGULIZI
Ujenzi wa barabara kiwango cha Lami km 11.59 kwa namba zipo barabara kumi nne (14),
Ujenzi wa Masoko matatu (3) na maeneo mawili (2) ya kupumzikia Umma
Ujenzi wa vyoo vya Umma vitatu (3)
Ujenzi wa Vioski vya maji safi
Ununuzi wa magari ya taka ngumu na Ujenzi wa Vizimba vya kukusanyia taka ngumu, kazi zote
zikiwa na gharama ya Tsh 21,250,224,647.
Utekelezaji wa mradi huu ulianza tarehe 31 Octoba , 2017 na kutakiwa kukamilika ndani ya miezi kumi
na tano (15), hata hivyo Mkandarasi alipoanza utekelezaji, changamoto zilijitokeza kwa kuonekana
uwepo wa maji mengi kwenye tabaka la ardhi karibu na usawa wa ardhi ‘High water table’ hali ambayo
wakati wa usanifu wa mradi haikuwa imeonekana na kuhusishwa kwenye usanifu ‘unforeseen soil
condition’ uwepo wa maji mengi hasa wakati wa kuchimba tabaka la juu ili kuanza ujenzi ulipelekea
Mhandisi Mshauri M/s UWP kufanya usanifu mpya ‘Review of Design’ na kumwelekeza Mkandarasi
kuweka mawe ‘Rock fill’ kwenye baadhi ya maeneo yaliyokuwa na maji mengi na yanatitia ‘High water
table and soil gripping’ pamoja na kutumia mifereji ya kupitisha maji chini kwa chini ‘ Sub – Soil Drains’ .
Changamoto nyingine kwenye utekelezaji wa package 5 ilikuwa na kuwepo kwa vizuizi ‘PAPS’ wafidiwa
ambao walikuwa bado hawajalipwa ili kupisha utekelezaji wa Mradi kwa kuwa Halmshauri ilikuwa bado
haijapokea fedha za kulipa fidia, moja ya maeneo yaliyohitaji fidia ni maeneo ya kujengwa Masoko,
Vyoo vya Umma na Community Parks.
Kutokana na Changamoto hizo, muda wa utekelezaji wa mradi wa miezi 15 uliisha bila Mradi kukamilika
na kulazimika kumuongezea Mkandarasi muda wa miezi 4.5 ambapo bado Mkandarasi hakuweza
kumaliza kazi na kuongezewa tena miezi 2.5 lakini pia hakuweza kumaliza kazi na mwezi septemba, 2019
aliongezewa miezi miwili (2) na kutakiwa kukamilisha kazi zote ifikapo mwezi Octoba, 2019.
Aidha, kutokana na kwamba Barabara za Zahanati, Pepsi na Bombom zinaingiliana na ujenzi wa Mfereji
mkubwa uliopo kwenye package 3 unaotekelezwa na Mkandarasi M/s China Railway Seventh Group
ambao ujenzi wake umeanza mwezi Agosti, 2019, kazi hizi haziwezi kufanyika kama Mfereji wa huo
‘’Food Security two (IL2) drain’’ haujakamilika.
Ujenzi huu wa Mfereji wa Food Security two (IL2) wakati wa usanifu wa Mradi wa DMDP ulitakiwa
kuanza kabla ya ujenzi wa barabara hizo zilizopo package 5, kwa sababu hiyo imebidi barabara hizo
zisubiri ujenzi wa mfereji huo ujengwe suala ambalo linapelekea Mkandarasi wa package 5 kusimamisha
kazi akisubiri Mkandarasi wa package 3 kukamilisha kazi yake.
I. Kazi zote ambazo Mkandarasi M/s Group six hajaanza kuzitekeleza (hajazifanya) ambazo ni
Ujenzi wa barabara ya Zahanati, Bombom na Pepsi, Ujenzi wa choo 1 na ‘Community Parks 2
asizifanye.
II. Kazi zote ambazo Mkandarasi wa package 5 M/s Group six hajazifanya ziondolewe kwenye
Mkataba wake. Hata hivyo Mkandarasi M/s Group Six alishaandika barua kuomba kazi zote
ambazo zitamchelewesha na hasa zinazozuiliwa na utekelezaji wa package 3 kwenye utekelezaji
wake ziondolewe kwenye Mkataba wake.
III. Kazi zote ambazo zimeondolewa kwenye Mkataba wa M/s Group Six package 5 zijumuishwe
kwenye package 3 inayotekelezwa na Mkandarasi M/s China Railway Seventh Group, na ifanyike
‘addendum’ kwenye mkataba wa package 3 ikionyesha kazi za awali pamoja na zilizoongezwa.
Baada ya zoezi la kutambua kazi zinazoondolewa kutoka package 5 kwenda package 3 addendum
iliandaliwa na kuwasilishwa kwa Mwajiri, TAMISEMI na Benki ya Dunia inayoonyesha kazi zilizoongezwa
kwenye mradi wa package 3. Baada ya mabadiliko haya ambapo kumekuwa na kazi za nyongeza na kazi
zilizohamishwa, kwa sasa gharama ya mradi wa package 5 haitazidi gharama ya awali ya Mkataba.
2:0 SABABU ZA KUONDOA KAZI HIZO KWENYE MKATABA WA PACKAGE 5 NA KUZIJUMUISHA KWENYE
MKATABA WA PACKAGE 3.
i. Muda wa utekelezaji wa package 5 umeisha licha ya kuongezwa muda mara 4 mpaka sasa, na
kazi ambazo hazijaguswa na Mkandarasi wa package 5 haziwezi kuendelea mpaka hapo
Mkandarasi wa parkage 3 atakapokuwa amekamilisha utekelezaji wa mkataba wake.
ii. Mkandarasi wa package 5 ili aweze kutekeleza kazi ambazo hajazigusa analazimika kusubiri
Mkandarasi wa package 3 kumaliza ujenzi wa mfereji wa Flood Security unaopita kwenye
barabara hizo, jambo ambalo itampasa mwajiri kumlipa gharama ya kuendelea kuwepo ‘site’,
faida pamoja na fidia, suala ambalo litamwongezea Mwajiri gharama ambazo zinaweza
kuepukwa kwa kufanya marejeo ya Mkataba‘Addendum’ ili kazi hizo zifanywe na Mkandarasi
wa parkage 3.
iii. Kazi zote mbili parkage 5 na parkage 3 zipo maeneo yanayokaribiana na Mkandarasi wa package
3 yupo eneo husika na anaendelea na kazi
iv. Mkandarasi wa parkage 5 M/s Group six alishaomba kazi zinazoingiliana na package 3
ziondolewe kwake kwa vile haitawezekana Mkandarasi wa package 3 amalize ndipo yeye
amalize kazi.
USHAURI NA MAPENDEKEZO
Nawasilisha.
Municipal Director
Ilala Municipal Council
Refer the heading above and our letter with reference number 51312/3/1/01/02/011/pm dated 19 th
November, 2019
The Zimbili Bridge need urgent Construction, because it is in critical condition and at any time it can be
broken if immediate measure will not taken
After CICO completed the emergency work on zimbili bridge, they closed the bridge off with concrete
bollards to ensure that only right passenger vehicles can cross the bridge, but the Public shift the
concrete bollard to allow heavy duty vehicles to cross the bridge, this situation is dangerous to the
existence of the Bridge, and if this situation continues the bridge will collapse at any time (t).
In order to rescue the situation and to avoid the Severe effect that may occur for the current use of the
bridge and the coming rainy season we recommend that the work should be done by CICO under
urgency.
The reason to propose Construction of Zimbili Bridge to be done by CICO as additional work is as
follows:-
i. The location of the ongoing work (package 2) is in proximity with the location of the Bridge
(Zimbili Bridge) .
ii. The Work shall be done under urgency due to critical condition of the bridge; the structure is
unsafe and can cause serious damage to the user. (see the photo)
iii. The fund to be used to finance the Project comes from the remaining funds from other
completed projects
iv. The work is not on the current approved World Bank package and there is no specific budget
allocated except to spend the remaining funds on the other project after getting approval from
world Bank.
v. The Contractor is undertaking similar works and he has already mobilized with plant and
equipment on the same area.
vi. The Bridge can easily be accommodated and completed within the ongoing package 2 contract
period
To avoid possible consequences of communication breakdown that may occur if the Culvert eventually
collapses, you are advised to authorize additional work to CICO based on the reason above, and we have
revealed that the contractor has adequate experience on construction of bridges of similar size
Yours faithfully
Peter Mare
Municipal Director
SUBJECT: RE PACKING OF THE WORK FROM PACKAGE 5, AND ADDITIONAL WORK TO PACKAGE 3:
The Contractor group six is working on package 5 project; his contract period has expired despite having
been extended four times to date. In the light of this, the expert session from TAMISEMI, Council,
TARURA, Consultant Engineer – UWP and Contractor Group six sat down and agreed to re - pack some of
the work from package 5 due to the following reasons:-
i. The period for Contract for package 5 has expired despite being extended four time so far, and
the work not implemented by Contractor cannot continue until package 3 contractor has
completed his work
ii. For a package 5 contractor to implement the remaining works he has to wait for a package 3
contractor to complete the construction of a flood security, this can require the Employer to
pay the contractor (Group Six) the cost of remaining to the site as well as compensation, and
give the employer the cost that would be inevitable by doing the packaging so that the work
could be done by package 3 contractor
iii. The contractor for package 5 Group Six Company has agreed to the re- scoping and re
packaging of work without claiming any cost or compensation of any kind
Either, we recommend that these reduced works from package 5 to be added to package 3 due to the
following reason
i. The location of the ongoing work (package 3) is in proximity with the location of the remaining
work from package 5.
ii. The Contractor is undertaking similar works and he has already mobilized with plant and
equipment on the same area.
iii. The work can easily be accommodated and completed within the ongoing package 3 contract
period.
iv. To prevent the possibility of paying the contractor for package 5 compensation if he remains on
the site while waiting for the package 3 contractor to finish the work, so that he can complete
his work.
To ensure the project is completed without Legal and financial complication we advise the employer to
re – pack Package 5 and do additional work to package 3.
Yours faithfully
Peter Mare
TAREHE: 06/12/2019
YAH: UJENZI WA DARAJA LA ZIMBILI MTO MSIMBAZI NA BARABARA ZENYE UREFU WA KM 0.6 ‘
ZIMBILI BRIDGE & APPROACH ROADS CONSTRUCTION AT MSIMBAZI RIVER BASIN MIUNDOMBINU YA
BARABARA NA HUDUMA ZA KIJAMII ‘CONSTRUCTION OF INVESTMENT INFRASTRUCTURE AND OTHER
SOMO: KUOMBA IDHINI YA KAZI YA NYONGEZA KWA AJILI YA UJENZI WA DARAJA LA ZIMBILI NA
BARABARA ZENYE UREFU WA KM 0.6.
Tafadhali husika na mada tajwa hapo juu pamoja na barua zenye kumb tajwa hapa chini
i. Barua kumb na. 51312/1/01/011/pm ya tarehe 19 novemba, 2019 kutoka kwa Mhandisi
Mshauri wa Mradi wa DMDP UWP
ii. Barua kumb na. 51312/1/1/01/02/073/pm ya tarehe 04 novemba, 2019 kutoka kwa Mhandisi
Mshauri wa Mradi wa DMDP UWP
iii. Barua kumb na. 51312/1/1/01/02/071/pm ya tarehe 22 Octoba, 2019 kutoka kwa Mhandisi
Mshauri wa Mradi wa DMDP UWP
iv. Barua kumb na. 51312/1/1/01/02/062/pm ya tarehe 26 June, 2019 kutoka kwa Mhandisi
Mshauri wa Mradi wa DMDP UWP
v. Barua kumb na. DMDP/PE/19/02/6 VOL V ya tarehe 14 June, 2019 kutoka kwa Katibu Mkuu –
Kitengo cha Mradi wa DMDP Tamisemi
vi. Barua kumb na. IMC/U – 1/2/11 ya tarehe 07 June, 2019 kutoka kwa Katibu Mkurugenzi wa
Manispaa ya Ilala
vii. Barua kumb na. IMC/DMDP/U – 1/2/26 ya tarehe 28 May, 2019 kutoka DMDP Ilala
viii. Barua kumb na. 51312/7/01/02/154/pm ya tarehe 04 May, 2019 kutoka kwa Mhandisi Mshauri
wa Mradi wa DMDP UWP
ix. Barua kumb na. 51312/7/01/02/048/lk ya tarehe 26 Novemba, 2019 kutoka kwa Mhandisi
Mshauri wa Mradi wa DMDP UWP
x. Barua kumb na. 51312/7/01/02/044/pm ya tarehe 24 Novemba, 2018 kutoka kwa Mhandisi
Mshauri wa Mradi wa DMDP UWP
xi. Barua kumb na. 51312/7/01/02/039/lk ya tarehe 13 Agost, 2018 kutoka kwa Mhandisi Mshauri
wa Mradi wa DMDP UWP (nakala za barua hizi zote zimeambatanishwa kwa rejea yako)
UTANGULIZI:
Awali wakati wa ujenzi wa barabara ya zimbili iliyopo kwenye package na 6 ilipoanza kutekelezwa mwezi
October, 2017, ndipo ilipogundulika kuwa kuna uhitaji wa ujenzi wa daraja hilo. Wakati wa usanifu wa
Mradi wa Ujenzi wa barabara hiyo ya Zimbili pamoja na kazi zingine za package 6 kulikuwa na Makalavati
(Box culverts) ya midomo mitano (5 cell) kuvuka mto msimbazi ambapo hakukuwa na haja ya kujengwa
kwa daraja hilo.
Baada ya mvua kubwa zilizonyesha mwezi machi hadi mei, 2018, mto Msimbazi katika maeneo
mbalimbali ya Jiji la Dar es Salaam ulifunikwa na kupelekea kupanuka na kusababisha mmomonyoko
ulioharibu vivuko mbalimbali na nyumba za Wananchi na mali zao kwa Wakazi waliokuwa wanaishi
kando kando na Mto Msimbazi..
Kutokana na kupanuka kwa Mto Msimbazi pia kulisababisha Makalavati ‘5 cell box culvert’ kwenye
barabara ya Zimbili kuathiriwa na kusababisha barabara kutopitika kabisa na kupelekea usumbufu kwa
wananchi wa Gongolamboto na Ukonga wanaotumia barabara hiyo.
Halmashauri ilichukua hatua za dharura kutengeneza eneo hilo kwa kushirikiana na Wananchi pamoja na
Mkandarasi CICO kwa ajili ya kutumika kwa muda, ingawa mpaka sasa kinaendelea kutumika kama
kivuko cha muda japokuwa makalavati yamebomolewa na maji.
Kwa kuwa eneo hilo la daraja awali halikuwepo kwenye mpango wa kujengwa Mhandisi Mshauri
alimwandikia barua Mwajiri wake (Hlmashauri ya Manispaa ya Ilala) taarifa kuhusu hali halisi ya
makalavati hayo kutoa ushauri wa mapendekezo yake akimuomba amruhusu kufanya usanifu wa nini
kifanyike katika eneo hilo.
Mkurugenzi ambaye ni Mwajiri wake alimruhusu kuendelea na usanifu, ambapo vikao vya pamoja na
Wahandisi kutoka TMISEMI – Kitengo cha Mradi waDMDP na Benki ya Dunia vilikaa baada ya
kutembelea Mradi na kumwagiza Mtaalamu Mshauri kufanya usanifu wa haraka.
Mtaalamu Mshauri alifanya usanifu na kupendekeza kujenga daraja lenye urefu wa mita 40 na upana wa
mita 8 pamoja na mita 600 za barabara na ujenzi huo utagharimu TZS 4,304,066,255
Baada ya Mtaalam Mshauri kukamilisha usanifu aliwasilisha taarifa hiyo ya usanifu kwa Mwajiri,
Kitengo cha Mradi wa DMDP – TAMISEMI, TARURA, Wataalam Wahandisi TA na Benki ya Dunia. Baada
ya taarifa ya usanifu kuwasilishwa maeneo tajwa ilifanyiwa marekebisho mbalimbali ya Kitaalamu na
kisha kuwasilisha taarifa ya mwisho yenye makadrio ya Kihandisi (Final Design Report with BOQ).
Hata hivyo mjadala wa upatikanaji wa fedha kwa ajili ya Ujenzi huo ulifanyika kwa pamoja na Wahandisi
kutoka Benki ya Dunia, Tamismi – Kitengo cha Mradi, Manispaa ya Ilala, TARURA na Mtaalam Mshauri
UWP, na Mhandisi Mshauri aliagizwa kuwasilisha taarifa kuonyesha endapo fedha zinazobaki kwenye
utekelezaji wa miradi maeneo mengine ya miradi iliyokamilika kama zitatosha kugharamia ujenzi wa
daraja hilo.
Baada ya Mhandisi Mshauri kuwasilisha taarifa hiyo ya fedha zitakazobaki, TAMISEMI kwa kushirikiana
na Halmashauri waliomba kibali cha kutumia fedha hizo zitakazobaki kutoka Benki ya Dunia kwa ajili ya
kujenga daraja hilo la Zimbili ambapo awali halikuwepo kwenye mradi.
Wataalam na viongozi wa Benki ya Dunia walipitia taarifa hiyo ya Mtaalam Mshauri na kuruhusu
utekelezaji wa kazi uendelee na kushauri kazi hii ya ujenzi wa daraja la Zimbili apewe Mkandarasi
anayeendelea na kazizenye asili sawa na ujenzi wa daraja.
Baada ya Benki ya Dunia kuruhusu ujenzi wa daraja hilo, kikao cha pamoja kati ya Tamisemi Kitengo cha
Mradi, Mhandisi Mshauri UWP, TAs, Halmashauri na TARURA walikubaliana kuwa, kazi hii ya ujenzi wa
daraja apewe Mkandarasi M/s CICO ‘Chongquing International Coorporation. Hata hivyo, Mhandisi
Mshauri alishaandaa Addendum na kuiwasilisha kwa Mwajiri.
SABABU ZA KUMPA MKANDARASI CICO KUFANYA UJENZI WA DARAJA HILO KAMA KAZI YA
NYONGEZA NI KAMA IFUATAVYO:-
i. Kazi hiyo ya ujenzi wa daraja ina asili sawa ‘same nature’ na ujenzi wa mifereji kwenye bonde la
mto Msimbazi unaofanywa na Mkandarasi M/s CICO. Mkandarasi huyo ameonyesha alishawahi
kufanya kazi za ujenzi wa madaraja.
ii. Kazi hii ya ujenzi wa daraja haikuwepo kwenye mpango ‘PAD’ wa awali, hivyo isingeweza
kujengwa kama kazi mpya kwa kuwa Miradi yote inayotekelezwa kwa awamu hii ya kwanza ni ile
iliyopo kwenye mpango ‘PAD’ ambayo Benki ya Dunia ilishaidhinisha.
iii. Fedha za ujenzi wa daraja hilo zinatokana na fedha zitakazobaki kutoka kwenye miradi mingine
ya DMDP inayotekelezwa.
iv. Mkandarasi anayeendelea na kazi M/s CICO hahitaji kulipwa fedha za kuwasilisha vifaa,
wataalamu na vifaa vingine (Mobilization and demobilization cost) kwa kuwa yupo eneo ambalo
mradi unapaswa kutekelezwa.
v. Mkandarasi wa Package 6 ambaye alikuwa anajenga barabara ya Zimbili Mkataba wake umeisha
yupo kwenye umaliziaji na muda wa matazamio ‘’Snaglist and DLP’’.
vi. Ujenzi wa daraja hilo kwa kumtumia Mkandarasi aliyepo Kazini tayari kutaharakisha upatikanaji
wa daraja hilo kwa wakati ili kuepuka usumbufu unaweza kujitokeza endapo daraja la muda
lililopo litasombwa na maji kwa kuwa tayari limekwisha dhoofika sana.
USHAURI NA MAPENDEKEZO
1. Sheria na Kanuni za Manunuzi zizingatiwe wakati wa utekelezaji wa mapendekezo haya.
2. Kwa kuwa gharama ya ujenzi huo wa daraja ikiwa kazi ya nyongeza utagharimu billion 4.30 na
ukilinganisha na gharama ya ujenzi wa Mfereji ya Mkandarasi pendekezwa ni sawa na ongezeko
la asilimia 30% ya Mkataba wa CICO unaendelea, ni vyema maombi haya yakapata idhini ya Bodi
ya zabuni na Kikao cha Kamati ya Fedha na Utawala kabla ya utekelezaji
Kwa kuwa kazi hii inapaswa kutekelezwa mapema ili kuweza kuzuia madhara yanayoweza
kujitokeza muda wowote kwa sababu ya udhaifu wa makalavati yaliopo na mvua zinazoendea,
nawasilisha kwa ajili ya kutolewa maamuzi ili kazi iweze kutekelezwa mapema.
KATIBU MKUU,
OR – TAMISEMI 3RD & 4TH FLOOR MELLENIUM
TOWER BUILDING,
S.L.P 34314,
Halmashauri ya Manispaa ya Ilala ikiwa ni moja kati ya Manispaa za Jiji la Dar Es Salaam zinazotekeleza
mradi wa DMDP chini ya Ofisi ya RAIS – TAMISEMI, inatarajia kutumia fedha Tsh. 4,304,066,255
kwaajili ya kujenga daraja la Zimbili linalovuka mto Msimbazi kama kazi ya nyongeza kwenye mradi wa
package 2 Mkandarasi CICO ambapo daraja hilo la Zimbili package 6 iliyokuwa inajengwa na
Mkandarasi Nyanza Road Works ambaye kazi yake ipo kwenye kipindi cha matazamio.
Ujenzi wa daraja hilo unatarajia kufanyika kama kazi ya dharura ama muhimu kutokana na kivuko/box
culvert lililokuwepo kuwa bovu na hatarishi kwa kuvuka ama kutumiwa na watu baada ya kusombwa na
maji ya mto huo na kusababisha kuta na nguzo kuvunjika. Kwa sasa kivuko hicho kimefanyiwa
marekebisho ya dharura ili kiweze kutumika kwa muda tu ila endapo mvua za masika zinazo kisiwa
kuanza hivi karibu zitakuwa nyingi, barabara hiyo muhimu haitakuwa na mawasiliano na wananchi
wanaweza kupata adha.
Jumanne K. Shauri
Mkurugenzi wa Manispaa ya Ilala
Halmashauri Manispaa ya Ilala
HALMASHAURI YA MANISPAA YA ILALA
TAREHE: 30.12.2019
Tafadhali husika mada tajwa hapo juu pia rejea taarifa yangu ya simu
kukujulisha hali ya kukatika kwa mawasiliano kwenye barabara tajwa hapo
juu.
UTANGULIZI
HALI HALISI
Baada ya mvua kunyesha tarehe 28.12.2019, daraja hilo la zamani
limeharibiwa na kukatika kwa mawasiliano. Hata hivyo, ukarabati wa mara
kwa mara umekuwa ukifanyika ili kuruhusu kupitika kwa muda wakati ujenzi
wa daraja jipya ukisubiri kuanza. (Naambatisha na picha kuonyesha hali
halisi).
USHAURI
Nashauri ujenzi wa daraja jipya ungeanza mapema kwa kuwa Benki ya Dunia
wametoa ruhusa ya kufanyika ujenzi ili kuondZokana na athari hizo
zinazoweza kutokea.
Nawasilisha.
Mhandisi Mwandamizi
HALMASHAURI YA MANISPAA YA ILALA
TAREHE: 30.12.2019
Tafadhali husika mada tajwa hapo juu pia rejea maekelezo yako kwenye simu
tarehe 29.12.2019.
Yapatikane mawe tripu tano (5) za gari ya ukubwa wa tani saba (7) ili kuzuia
mmomonyoko zaidi. Gharama ya mawe hayo itakuwa shilingi 200,000@5 sawa
shilingi 1,000,000/- pamoja na kuweka kifusi cha changarawe tripu tatu (3) @
150,000/- sawa na shilingi 450,000/- Jumla yote shilingi 1,450,000/-
Nawasilisha.
Mhandisi Mwandamizi
ILALA MUNICIPAL COUNCIL
ALL COMMUNICATIONS TO BE ADDRESSED TO THE MUNICIPAL DIRECTOR
Dear Sir,
Reference is made to the above subject as well to the written complaint addressed and
sent to our higher level office of the Government and World Bank regarding the delay
of the completion of the mentioned project above.
We have received an email attached with written letter from World Bank which was
addressed and sent to their office showing and mentioning various weakness within
the package 5 project (Copy that letter is attached for your reference). Among the
weaknesses is delay of completion of drainage works, road humps, road signs,
markets and all other works.
Due to that complaint letter, the World Bank team has decide to organize themselves
to visit Ilala Municipal Council DMDP project and they have scheduled the visiting to
be on 29th and 30th January, 2020 and the Bank has required the PORALG and Ilala
Municipal Council to respond by writing on the complaint as quick as possible basing
the Time frame for completion this package 5 including Bombom markert, provision of
street lights, road safety/furniture’s and storm water drains.
7Therefore, we are then asking you to respond on this rised matter and prepare for the
coming of the taem from World Bank and PORALG as scheduled.
We hope that you will quickly act.
Dear Sir,
Please refer to the above Subject and the received email attached with a hand
writing letter from a local person Mr. Mtengeki of Kiwalani Ward regarding
package 5 DMDP project.
The complaint letter which has 19 pages, in summary has mentioned the
failure of project completion timely especially on storm water drains, Bombom
market, provision of street lights and road safety/ furniture’s.
For the case of road safety; most of the roads have installed with road signs
except the provision of road humps which the Contractor has instructed to
make sure that are early provided to all roads although, the Contractor is
claiming for his IPC no. 14 and 15 payments for more than 2 months now.