1. DESIGN DATA
Pitch of Roof Truss
Horizontal Span of Truss
Ht. of eve from T/O walkway
Ht. of ridge from eve

2. DEAD LOAD
2.1. On Roof
i) S/W of Sheeting (0.6mm Bare Metal Thickness)
ii) Wt. of Purlin = 7.14kg/m/1.1m
Total DL on Roof

RIDGE
0.15
INTERMEDIATE 1.1 m
END 1.1m
1.1m
0.3 m

6.1

Loading Width for Node at


i) End Portion = 0.3 + 1.1/2
ii) Intermediate = ( 1.1 + 1.1 )/2
iii) Ridge portion= ( 1.1/2 ) + 0.15
Loading Span (m) Load
Applicable
for Gallery Effective
Mkd. At Left (A) At Right (B) Loading End
Width

0.75 2.451 1.976 0.13*1.976*0.85 = 0.22


2.451 2.500 2.476 0.13*2.476*0.85 = 0.27
2.500 1.910 2.205 0.13*2.205*0.85 = 0.24
Kink Gallery 1.910 1.915 1.913 0.13*1.913*0.85 = 0.21
1.915 2.592 2.254 0.13*2.254*0.85 = 0.25
2.592 2.523 2.558 0.13*2.558*0.85 = 0.28
2.523 0.400 1.462 0.13*1.462*0.85 = 0.16
0.400 3.000 1.900 0.13*1.9*0.85 = 0.21
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
18m
Gallery_Standard 3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 0.400 1.900 0.13*1.9*0.85 = 0.21
0.400 3.000 1.900 0.13*1.9*0.85 = 0.21
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
21m
Gallery_Standard 3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 3.000 3.000 0.13*3*0.85 = 0.33
3.000 0.400 1.900 0.13*1.9*0.85 = 0.21
0.400 1.400 1.600 0.13*1.6*0.85 = 0.18

Cross Over 0.400 2.200 1.500 0.13*1.5*0.85 = 0.17


DVC
PUR STEEL THERMAL POWER
STATION
(UNIT 1 & 2)

CULATION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

= 1:3
= 6.1 m
= 2.825 m
= 1.017 m

= 0.07 kN/m2
= 0.06 kN/m2 (Section considered : MC75 )
= 0.13

1.017 m

= 0.850 m
= 1.100 m
= 0.700 m
Load (kN) on Node at
Load on Truss
Intermediate Ridge or Portal

0.13*1.976*1.1 = 0.28 0.13*1.976*0.7 = 0.18 Portal


0.13*2.476*1.1 = 0.36 0.13*2.476*0.7 = 0.23 Truss
0.13*2.205*1.1 = 0.32 0.13*2.205*0.7 = 0.20 Truss
0.13*1.913*1.1 = 0.27 0.13*1.913*0.7 = 0.18 Truss
0.13*2.254*1.1 = 0.32 0.13*2.254*0.7 = 0.21 Truss
0.13*2.558*1.1 = 0.37 0.13*2.558*0.7 = 0.23 Truss
0.13*1.462*1.1 = 0.21 0.13*1.462*0.7 = 0.13 Portal
0.13*1.9*1.1 = 0.27 0.13*1.9*0.7 = 0.17 Portal
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*1.9*1.1 = 0.27 0.13*1.9*0.7 = 0.17 Portal
0.13*1.9*1.1 = 0.27 0.13*1.9*0.7 = 0.17 Portal
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*3*1.1 = 0.43 0.13*3*0.7 = 0.27 Truss
0.13*1.9*1.1 = 0.27 0.13*1.9*0.7 = 0.17 Truss
0.13*1.6*1.1 = 0.23 0.13*1.6*0.7 = 0.15 Portal

0.13*1.5*1.1 = 0.22 0.13*1.5*0.7 = 0.14 Portal


LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THERM
STATION
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

L&T DOC.NO.- F.DPUR.19-BN02-00-HTP-


170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR LC
DVC DOC. NO.- 2111-122-PVC-U-122
2.2 Load on Walkway Supporting Channel

Short Post

0.8 m Walkway 1090 mm Conv 1.1 m Walkway

1 2 3

Cross Beam

Weight of Chequered Plate, Handrail & Toe Guard

Wt. of Walk way channel (MC75)


Wt. of Toe Guard (Flat 100x6)
S/W of 6 O/P Chequered Plate
S/W of 3.15 thk Seal Plate
Wt. of Hand Rail (excluding toe guard)

a) Walkway Load (0.8m Wide)

Width of walkway
CRS of Conveyor Post
Width of Seal Plate = (1.09 + 0.15 + 0.15) m
Width of Seal Plate at ends= (0.5 + 0.3) m

Load on Chnnel at 1 :

Due to walkway channel


Due to s/w of Chequered plate = 0.62*0.8/2
Due to s/w of Seal Plate = 0.25*0.8
Due to s/w of Toe Guard
Due to s/w of handrail

Total

LARSEN & TOUBRO


LIMITED 2X500 MW DURGAPUR STEEL THERM
STATION
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

L&T DOC.NO.- F.DPUR.19-BN02-00-HTP-


170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR LC
DVC DOC. NO.- 2111-122-PVC-U-122

Load on Chnnel at 2 :

Due to walkway channel


Due to s/w of Chequered plate = 0.62*0.8/2
Due to s/w of Seal Plate = 0.25*1.39/2
Due to s/w of Toe Guard
Due to s/w of handrail
Total

b) Walkway Load (1.1m Wide)

Width of walkway

Load on Chnnel at 3 :

Due to walkway channel


Due to s/w of Chequered plate = 0.62*1.1/2
Due to s/w of Seal Plate = 0.25*1.39/2
Due to s/w of Toe Guard
Due to s/w of handrail

Total

Load on Chnnel at 4 :

Due to walkway channel


Due to s/w of Chequered plate = 0.62*1.1/2
Due to s/w of Seal Plate = 0.25*1.39/2
Due to s/w of Toe Guard
Due to s/w of handrail
Total
LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THERM
STATION
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

L&T DOC.NO.- F.DPUR.19-BN02-00-HTP-


170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR LC
DVC DOC. NO.- 2111-122-PVC-U-122
Loading Span (m) Load (kN) on Me
Applicable
for Gallery Effective
Mkd. At Left (A) At Right (B) Loading 1 2
Width
0.75 2.451 1.976 1.976*0.674 = 1.33 1.976*0.648 =
2.451 2.500 2.476 2.476*0.674 = 1.67 2.476*0.648 =
2.5 1.910 2.205 2.205*0.674 = 1.49 2.205*0.648 =
Kink Gallery 1.91 1.915 1.913 1.913*0.674 = 1.29 1.913*0.648 =
1.915 2.592 2.254 2.254*0.674 = 1.52 2.254*0.648 =
2.592 2.523 2.558 2.558*0.674 = 1.73 2.558*0.648 =
2.523 0.400 1.462 1.462*0.674 = 0.99 1.462*0.648 =
0.400 3.000 1.900 1.9*0.674 = 1.28 1.9*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
18m
Gallery_Standard 3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 0.400 1.900 1.9*0.674 = 1.28 1.9*0.648 =
0.400 3.000 1.900 1.9*0.674 = 1.28 1.9*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
21m
Gallery_Standard 3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 3.000 3.000 3*0.674 = 2.02 3*0.648 =
3.000 0.400 1.900 1.9*0.674 = 1.28 1.9*0.648 =
0.400 1.400 1.600 1.6*0.674 = 1.08 1.6*0.648 =

Cross Over 0.400 2.200 1.500 1.5*0.674 = 1.01 1.5*0.648 =


2.3 Load from Conveyor Post

Dead Load on each short post = 4.000

2.4. Load from Utility Pipes & Cable Trays

a) On Left Vert. Memb

Load due to 65NB pipe for SW = 0.150


Load Due to 50NB pipe for PW = 0.100
Total 0.250

b) On Right Vert. Memb

Load due to 65NB pipe for SW = 0.150


Load Due to 50NB pipe for PW = 0.100

Total 0.250

c) On both vertical Members due to Cable Tray

Load due to Cable Tray (600 wide) = 0.750


Load due to Cable Tray (300 wide) = 0.400

Total 1.150

Minimum load/MGT = 1.250

LARSEN & TOUBRO


LIMITED 2X500 MW DURGAPUR STEEL THERM
STATION
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

F.DPUR.19-BN02-00-HTP-
L&T DOC.NO.- 170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR LC
DVC DOC. NO.- 2111-122-PVC-U-122
Loading Span (m) Load (kN) on Me
Applicable
for Gallery Effective
Mkd. At Left (A) At Right (B) Loading Left Vertical Member (At each node)
Width
0.75 2.451 1.976 MAX((0.25+1.15),1.25)*1.976*0.5) =
2.451 2.500 2.476 MAX((0.25+1.15),1.25)*2.476*0.5) =

Kink Gallery
2.500 1.910 2.205 MAX((0.25+1.15),1.25)*2.205*0.5) =
Kink Gallery 1.910 1.915 1.913 MAX((0.25+1.15),1.25)*1.913*0.5) =
1.915 2.592 2.254 MAX((0.25+1.15),1.25)*2.254*0.5) =
2.592 2.523 2.558 MAX((0.25+1.15),1.25)*2.558*0.5) =
2.523 0.400 1.462 MAX((0.25+1.15),1.25)*1.462*0.5) =
0.400 3.000 1.900 MAX((0.25+1.15),1.25)*1.9*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
18m
Gallery_Standard 3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 0.400 1.900 MAX((0.25+1.15),1.25)*1.9*0.5) =
0.400 3.000 1.900 MAX((0.25+1.15),1.25)*1.9*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
21m
Gallery_Standard 3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 3.000 3.000 MAX((0.25+1.15),1.25)*3*0.5) =
3.000 0.400 1.900 MAX((0.25+1.15),1.25)*1.9*0.5) =
0.400 1.400 1.600 MAX((0.25+1.15),1.25)*1.6*0.5) =

Cross Over 0.400 2.200 1.500 MAX((0.25+1.15),1.25)*1.5*0.5) =

2.5. Load due to Lighting & Accessories

Load per node = 0.100

2.6. Load on truss bottom due to utility pipes

Load at bottom truss member (@75kg/m) = 1.125

2.7. Load from Side Sheeting


S/W of Sheeting = 0.07
Total number of Side runner per side = 2
Length of the vertical member = 2.825
S/W of Side Runner = 0.051

Loading Span (m) Load (kN) on Me


Applicable
for Gallery Effective
Mkd. At Left (A) At Right (B) Loading Load (kN/
Width
0.75 2.451 1.976 (0.07 + 0.051)*1.976 =
2.451 2.500 2.476 (0.07 + 0.051)*2.476 =
2.500 1.910 2.205 (0.07 + 0.051)*2.205 =
Kink Gallery
Kink Gallery 1.910 1.915 1.913 (0.07 + 0.051)*1.913 =
1.915 2.592 2.254 (0.07 + 0.051)*2.254 =
2.592 2.523 2.558 (0.07 + 0.051)*2.558 =
2.523 0.400 1.462 (0.07 + 0.051)*1.462 =
0.400 3.000 1.900 (0.07 + 0.051)*1.9 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
18m
Gallery_Standard 3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 0.400 1.900 (0.07 + 0.051)*1.9 =
0.400 3.000 1.900 (0.07 + 0.051)*1.9 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
21m
Gallery_Standard 3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 3.000 3.000 (0.07 + 0.051)*3 =
3.000 0.400 1.900 (0.07 + 0.051)*1.9 =
0.400 1.400 1.600 (0.07 + 0.051)*1.6 =

Cross Over 0.400 2.200 1.500 (0.07 + 0.051)*1.5 =


DVC
STEEL THERMAL POWER
ATION
IT 1 & 2)

ION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

Short Post

1090 mm Conv 0.8 m Walkway

4 2 1

= 0.0714 kN/m
= 0.047 kN/m
= 0.62 kN/m2 (Including stiffeners)
2
= 0.25 kN/m
= 0.107 kN/m

= 0.800 m
= 1.090 m
= 1.390 m
= 0.800 m

= 0.0714 kN/m
= 0.248 kN/m
= 0.2 kN/m
= 0.047 kN/m
= 0.107 kN/m

= 0.674 kN/m (With seal plate)

DVC
STEEL THERMAL POWER
ATION
IT 1 & 2)

ION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/28/2019

= 0.0714 kN/m
= 0.248 kN/m
= 0.174 kN/m
= 0.047 kN/m
= 0.107 kN/m
= 0.648 kN/m (With seal plate)

= 1.100 m

= 0.0714 kN/m
= 0.341 kN/m
= 0.174 kN/m
= 0.047 kN/m
= 0.107 kN/m

= 0.741 kN/m (With seal plate)

= 0.0714 kN/m
= 0.341 kN/m
= 0.174 kN/m
= 0.047 kN/m
= 0.107 kN/m
= 0.741 kN/m (With seal plate)
DVC
STEEL THERMAL POWER
ATION
IT 1 & 2)

ION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019
Load (kN) on Member At
Load on
Truss or
2 3 4 Portal

1.28 1.976*0.741 = 1.47 1.976*0.741 = 1.47 Portal


1.61 2.476*0.741 = 1.84 2.476*0.741 = 1.84 Truss
1.43 2.205*0.741 = 1.63 2.205*0.741 = 1.63 Truss
1.24 1.913*0.741 = 1.42 1.913*0.741 = 1.42 Truss
1.46 2.254*0.741 = 1.67 2.254*0.741 = 1.67 Truss
1.66 2.558*0.741 = 1.90 2.558*0.741 = 1.90 Truss
0.95 1.462*0.741 = 1.08 1.462*0.741 = 1.08 Portal
1.23 1.9*0.741 = 1.41 1.9*0.741 = 1.41 Portal
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.23 1.9*0.741 = 1.41 1.9*0.741 = 1.41 Portal
1.23 1.9*0.741 = 1.41 1.9*0.741 = 1.41 Portal
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.94 3*0.741 = 2.22 3*0.741 = 2.22 Truss
1.23 1.9*0.741 = 1.41 1.9*0.741 = 1.41 Truss
1.04 1.6*0.741 = 1.19 1.6*0.741 = 1.19 Portal

0.97 1.5*0.741 = 1.11 1.5*0.741 = 1.11 Portal


kN
(Refer Mechanical Drg. no. F.DPUR.19-YD00-00-HTP-620508)

kN/m
kN/m
kN/m

kN/m
kN/m

kN/m

kN/m
kN/m

kN/m

kN/m (As per Clause 5.2 of Doc. No.


F.DPUR.19-BN02-00-ZEN-160102)

DVC
STEEL THERMAL POWER
ATION
IT 1 & 2)

ION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019
Load (kN) on Member At
Load on
Truss or
At each node) Right Vertical Member (At each node) Portal

1.38 MAX((0.25+1.15),1.25)*1.976*0.5) = 1.38 Portal


1.73 MAX((0.25+1.15),1.25)*2.476*0.5) = 1.73 Truss
1.54 MAX((0.25+1.15),1.25)*2.205*0.5) = 1.54 Truss
1.34 MAX((0.25+1.15),1.25)*1.913*0.5) = 1.34 Truss
1.58 MAX((0.25+1.15),1.25)*2.254*0.5) = 1.58 Truss
1.79 MAX((0.25+1.15),1.25)*2.558*0.5) = 1.79 Truss
1.02 MAX((0.25+1.15),1.25)*1.462*0.5) = 1.02 Portal
1.33 MAX((0.25+1.15),1.25)*1.9*0.5) = 1.33 Portal
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
1.33 MAX((0.25+1.15),1.25)*1.9*0.5) = 1.33 Portal
1.33 MAX((0.25+1.15),1.25)*1.9*0.5) = 1.33 Portal
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
2.10 MAX((0.25+1.15),1.25)*3*0.5) = 2.10 Truss
1.33 MAX((0.25+1.15),1.25)*1.9*0.5) = 1.33 Truss
1.12 MAX((0.25+1.15),1.25)*1.6*0.5) = 1.12 Portal

1.05 MAX((0.25+1.15),1.25)*1.5*0.5) = 1.05 Portal

kN (at 3 locations)

kN (at 2 locations)

kN/m2

m
kN/m2 (Section considered : MC75 )

Load (kN) on Member At


Load on
Truss or
Load (kN/m) Portal

0.24 Portal
0.30 Truss
0.27 Truss
0.23 Truss
0.27 Truss
0.31 Truss
0.18 Portal
0.23 Portal
0.36 Truss
0.36 Truss
0.36 Truss
0.36 Truss
0.36 Truss
0.23 Portal
0.23 Portal
0.36 Truss
0.36 Truss
0.36 Truss
0.36 Truss
0.36 Truss
0.36 Truss
0.23 Truss
0.194 Portal

0.18 Portal
LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THER
STATION
TECHNOLOGY: (QFGDM) (UNIT 1 & 2)
F.DPUR.19-BN02-00-
L&T DOC.NO.-
HTP-170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR
DVC DOC. NO.- 2111-122-PVC-U-122

3. LIVE LOAD
3.1. On Roof
Pitch of Roof Truss
Roof Slope
Live load on roof = 0.75 - 0.02 x ( Roof Slope - 10 o)
Minimum Live Load on Truss

Hence Live Load on Truss Considered


Dust Load on Roof
Total Live Load on Roof

Loading Width on Plan for Node At

i) End Portion = (0.3 + 1.1/2)* cos(18.43)


ii) Intermediate = (( 1.1 + 1.1 )/2)* cos(18.43)
iii) Ridge portion= (( 1.1/2 ) + 0.15)* cos(18.43)

Loading Span (m) Load (kN) on


Applicable
for Gallery Effective
Mkd. At Left (A) At Right (B) Loading End
Width
0.75 2.451 1.976 1.3314*1.976*0.807 = 2.12
2.451 2.500 2.476 1.3314*2.476*0.807 = 2.66
2.500 1.910 2.205 1.3314*2.205*0.807 = 2.37
Kink Gallery 1.910 1.915 1.913 1.3314*1.913*0.807 = 2.06
1.915 2.592 2.254 1.3314*2.254*0.807 = 2.42
2.592 2.523 2.558 1.3314*2.558*0.807 = 2.75
2.523 0.400 1.462 1.3314*1.462*0.807 = 1.57
0.400 3.000 1.900 1.3314*1.9*0.807 = 2.04
3.000 3.000 3.000 1.3314*3*0.807 = 3.22
18m 3.000 3.000 3.000 1.3314*3*0.807 = 3.22
Gallery_Standar 3.000 3.000 3.000 1.3314*3*0.807 = 3.22
d 3.000 3.000 3.000 1.3314*3*0.807 = 3.22
3.000 3.000 3.000 1.3314*3*0.807 = 3.22
18m
Gallery_Standar
d

3.000 0.400 1.900 1.3314*1.9*0.807 = 2.04


0.400 3.000 1.900 1.3314*1.9*0.807 = 2.04
3.000 3.000 3.000 1.3314*3*0.807 = 3.22
3.000 3.000 3.000 1.3314*3*0.807 = 3.22
21m 3.000 3.000 3.000 1.3314*3*0.807 = 3.22
Gallery_Standar 3.000 3.000 3.000 1.3314*3*0.807 = 3.22
d 3.000 3.000 3.000 1.3314*3*0.807 = 3.22
3.000 3.000 3.000 1.3314*3*0.807 = 3.22
3.000 0.400 1.900 1.3314*1.9*0.807 = 2.04
0.400 1.400 1.600 1.3314*1.6*0.807 = 1.72
Cross Over 0.400 2.200 1.500 1.3314*1.5*0.807 = 1.61
DVC
UR STEEL THERMAL POWER
STATION
UNIT 1 & 2)

LATION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

= 1:3
= 18.43 Degree
= 0.581 kN/m2 Refer Table 2, IS 875 ( Part 2 )
2
= 0.400 kN/m Refer Table 2, IS 875 ( Part 2 )

= 0.581 kN/m2
= 0.750 kN/m2 (As per Clause 5.1.2 of
1.3314 kN/m2 Doc. F.DPUR.19-BN02-00-ZEN-160102)

= 0.807 m
= 1.044 m
= 0.665 m

Load (kN) on Node at


Load on
Truss or
Intermediate Ridge Portal

1.3314*1.976*1.044 = 2.75 1.3314*1.976*0.665 = 1.75 Portal


1.3314*2.476*1.044 = 3.44 1.3314*2.476*0.665 = 2.19 Truss
1.3314*2.205*1.044 = 3.07 1.3314*2.205*0.665 = 1.95 Truss
1.3314*1.913*1.044 = 2.66 1.3314*1.913*0.665 = 1.69 Truss
1.3314*2.254*1.044 = 3.13 1.3314*2.254*0.665 = 2.00 Truss
1.3314*2.558*1.044 = 3.56 1.3314*2.558*0.665 = 2.27 Truss
1.3314*1.462*1.044 = 2.03 1.3314*1.462*0.665 = 1.30 Portal
1.3314*1.9*1.044 = 2.64 1.3314*1.9*0.665 = 1.68 Portal
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*1.9*1.044 = 2.64 1.3314*1.9*0.665 = 1.68 Portal
1.3314*1.9*1.044 = 2.64 1.3314*1.9*0.665 = 1.68 Portal
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*3*1.044 = 4.17 1.3314*3*0.665 = 2.66 Truss
1.3314*1.9*1.044 = 2.64 1.3314*1.9*0.665 = 1.68 Truss
1.3314*1.6*1.044 = 2.22 1.3314*1.6*0.665 = 1.42 Portal
1.3314*1.5*1.044 = 2.09 1.3314*1.5*0.665 = 1.33 Portal
LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THERMAL
STATION
TECHNOLOGY: (QFGDM) (UNIT 1 & 2)

L&T DOC.NO.- F.DPUR.19-BN02-00-


HTP-170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR LC1A/B
DVC DOC. NO.- 2111-122-PVC-U-122

3.2. Load on Walkway Supporting Channels

LL on Walkway =

a) Walkway Load (0.8m Wide)

Load on Chnnel at 1 :

LL on Walkway = 3*0.8/2 =
Total

Load on Chnnel at 2 :

LL on Walkway = 3*0.8/2 =

Total

Load on Chnnel at 3 :

LL on Walkway = 3*1.1/2 =
Total

Load on Chnnel at 4 :

LL on Walkway = 3*1.1/2 =

Total

Loading Span (m) Load (kN) on Member A


Applicable
for Gallery Effective
Mkd. At Left (A) At Right (B) Loading 1 2
Width
0.75 2.451 1.976 1.976*1.2 = 2.37 1.976*1.2 =

Kink Gallery
2.451 2.5 2.476 2.476*1.2 = 2.97 2.476*1.2 =
2.5 1.91 2.205 2.205*1.2 = 2.65 2.205*1.2 =
Kink Gallery 1.91 1.915 1.913 1.913*1.2 = 2.30 1.913*1.2 =
1.915 2.592 2.254 2.254*1.2 = 2.71 2.254*1.2 =
2.592 2.523 2.558 2.558*1.2 = 3.07 2.558*1.2 =
2.523 0.4 1.462 1.462*1.2 = 1.76 1.462*1.2 =
0.400 3.000 1.900 1.9*1.2 = 2.28 1.9*1.2 =
3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
18m 3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
Gallery_Standa 3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
rd 3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
3.000 0.400 1.900 1.9*1.2 = 2.28 1.9*1.2 =
0.400 3.000 1.900 1.9*1.2 = 2.28 1.9*1.2 =
3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
21m 3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
Gallery_Standa 3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
rd 3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
3.000 3.000 3.000 3*1.2 = 3.60 3*1.2 =
3.000 0.400 1.900 1.9*1.2 = 2.28 1.9*1.2 =
0.400 1.400 1.600 1.6*1.2 = 1.92 1.6*1.2 =

Cross Over 0.400 2.200 1.500 1.5*1.2 = 1.80 1.5*1.2 =

4. MATERIAL LOAD

4.1. Load from Conveyor Post

Live Load on each short post =

Horizontal load along conv. =

Horizontal load across conv. =


DVC
STEEL THERMAL POWER
ATION
IT 1 & 2)

ION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

3.000 kN/m2

1.2 kN/m
1.200 kN/m

1.2 kN/m

1.200 kN/m

1.65 kN/m
1.650 kN/m

1.65 kN/m

1.650 kN/m

Load (kN) on Member At


Load on
Truss or
2 3 4 Portal

2.37 1.976*1.65 = 3.26 1.976*1.65 = 3.26 Portal


2.97 2.476*1.65 = 4.09 2.476*1.65 = 4.09 Truss
2.65 2.205*1.65 = 3.64 2.205*1.65 = 3.64 Truss
2.30 1.913*1.65 = 3.16 1.913*1.65 = 3.16 Truss
2.71 2.254*1.65 = 3.72 2.254*1.65 = 3.72 Truss
3.07 2.558*1.65 = 4.22 2.558*1.65 = 4.22 Truss
1.76 1.462*1.65 = 2.41 1.462*1.65 = 2.41 Portal
2.28 1.9*1.65 = 3.14 1.9*1.65 = 3.14 Portal
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
2.28 1.9*1.65 = 3.14 1.9*1.65 = 3.14 Portal
2.28 1.9*1.65 = 3.14 1.9*1.65 = 3.14 Portal
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
3.60 3*1.65 = 4.95 3*1.65 = 4.95 Truss
2.28 1.9*1.65 = 3.14 1.9*1.65 = 3.14 Truss
1.92 1.6*1.65 = 2.64 1.6*1.65 = 2.64 Portal

1.80 1.5*1.65 = 2.48 1.5*1.65 = 2.48 Portal

1.100 kN

1.000 kN

0.550 kN
LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THER
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

F.DPUR.19-BN02-00-
L&T DOC.NO.- HTP-170523 STRUCTURAL DESIGN CALCULATION FOR CO
DVC DOC. NO.- 2111-122-PVC-U-122

5. WIND LOAD

5.1. Calculation of Design Wind Pressure

Basic Wind Speed, Vb =


Risk Co-efficient factor, K1 =
Topography factor, K3 =
Importance factor K4 =
Terrain Category =
Terrain, height and structure size factor, K2

Design Wind
Vz =
h K2 K1 K3 K4 K1K2K3Vb
(m/s)

< 10 m 1.00 1.07 1 1 50.29


15 m 1.05 1.07 1 1 52.81
20 m 1.07 1.07 1 1 53.82
30 m 1.12 1.07 1 1 56.33
50 m 1.17 1.07 1 1 58.84

5.2. Internal Pressure Coefficient, Cpi

Internal Pressure Coefficient, Cpi =

5.3. Wind On Roof

5.3.1. Calculation of External Pressure Coefficient for Roof, Cpe

Width of conveyor gallery


=

h h/w Remarks
Gallery Mkd.
h h/w Remarks
Gallery Mkd.
CG-2 2.825 0.47 h/w < 1/2
CG-3 2.825 0.47 h/w < 1/2
CG-4 2.825 0.47 h/w < 1/2
CG-5 2.825 0.47 h/w < 1/2
CG-6 2.825 0.47 h/w < 1/2
CG-7 2.825 0.47 h/w < 1/2

Referring Table 6 of IS 875 ( Part 3 ) 2015

Cpe for h/w ≤ 1/2


Roof Angle EF GH EG FH
10 -1.2 -0.4 -0.8 -0.6
20 -0.4 -0.4 -0.7 -0.6
18.43 -0.53 -0.4 -0.72 -0.6

Cpe - Cpi for h/w ≤ 1/2


Condition
Cpi = 0.5 Cpi = -0.5
Wind Load on Roof Windward -1.03 -0.03
(Across Conv. Dir.) Leeward -0.9 0.1

LARSEN & TOUBRO


LIMITED 2X500 MW DURGAPUR STEEL THER
STATION
TECHNOLOGY:
(QFGDM) (UNIT 1 & 2)
F.DPUR.19-BN02-00-
L&T DOC.NO.-
HTP-170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR L
DVC DOC. NO.- 2111-122-PVC-U-122
5.3.2. Load on Roof Truss Cpi (+) for Wind Across Conveyor

Applicable Loading Span (m) Design Wind


for Gallery Effective Tributary Ka Pressure(pd)
At Left (A) At Right (B) Loading Area
Mkd. kN/m2
Width
0.750 2.451 1.976 12.75 0.982 1.38
2.451 2.500 2.476 15.98 0.961 1.35
2.500 1.910 2.205 14.23 0.972 1.37
Kink Gallery 1.910 1.915 1.913 12.34 0.985 1.39
1.915 2.592 2.254 14.54 0.970 1.37
Kink Gallery

2.592 2.523 2.558 16.5 0.957 1.35


2.523 0.400 1.462 9.43 1.000 1.41
0.400 3.000 1.900 12.26 0.985 1.39
3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
18m
Gallery_Standard 3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
3.000 0.400 1.900 12.26 0.985 1.39
0.400 3.000 1.900 12.26 0.985 1.39
3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
21m
Gallery_Standard 3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
3.000 3.000 3.000 19.35 0.938 1.32
3.000 0.400 1.900 12.26 0.985 1.39
0.400 1.400 1.600 10.32 0.998 1.40

Cross Over 0.400 2.200 1.500 9.68 1.000 1.41

5.3.2. Load on Roof Truss Cpi (-) for Wind Across Conveyor
Loading Span (m)
Applicable Design Wind
for Gallery Effective Tributary Ka Pressure(pd)
At Left (A) At Right (B) Loading Area
Mkd. kN/m2
Width
0.750 2.451 1.976 12.75 0.982 1.54
2.451 2.500 2.476 15.98 0.961 1.50
2.500 1.910 2.205 14.23 0.972 1.52
Kink Gallery 1.910 1.915 1.913 12.34 0.985 1.54
1.915 2.592 2.254 14.54 0.970 1.52
2.592 2.523 2.558 16.5 0.957 1.50
2.523 0.400 1.462 9.43 1.000 1.56
0.400 3.000 1.900 12.26 0.985 1.54
3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
18m
Gallery_Standard 3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
3.000 0.400 1.900 12.26 0.985 1.54
0.400 3.000 1.900 12.26 0.985 1.54
3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
21m
Gallery_Standard
21m
Gallery_Standard 3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
3.000 3.000 3.000 19.35 0.938 1.47
3.000 0.400 1.900 12.26 0.985 1.54
0.400 1.400 1.600 10.32 0.998 1.56

Cross Over 0.400 2.200 1.500 9.68 1.000 1.56


DVC
APUR STEEL THERMAL POWER STATION
(UNIT 1 & 2)

SIGN CALCULATION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

47.000 m/sec As per clause 5.1.4 of Doc. F.DPUR.19-BN02-00-ZEN-160102


1.07 As per clause 5.1.4 of Doc. F.DPUR.19-BN02-00-ZEN-160102
1 Refer Clause 6.3.3, IS 875 ( Part 3 ) 2015
1 Refer Clause 6.3.4, IS 875 ( Part 3 ) 2015
2
Refer Table 2 , IS 875 ( Part - 3 )

Wind Pressure
Pz = 0.6
Vz2 (kN/m2)

1.518
1.674
1.738
1.904
2.078

+ 0.5
1.017 m

-0.53 -0.4

h
6.100 m
6.100 m

E G
Wind
F H

Kd = 0.9
Kc = 0.9 For Pressure Case
Kc = 1 For Suction Case
Refer Clause 7.3.3.13, IS 875 ( Part 3)2015

Cpe+(+Cpi) Cpe+(-Cpi)

-1.03 -0.9 -0.03 0.1

DVC
PUR STEEL THERMAL POWER
STATION
(UNIT 1 & 2)

ULATION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

Load (kN) on Node at


Windward Side Leeward Side Load on Truss
or Portal
End Interm. Ridge End Interm. Ridge
-2.4 -3.1 -1.97 -2.09 -2.71 -1.73 Portal
-2.94 -3.8 -2.42 -2.57 -3.32 -2.12 Truss
-2.65 -3.42 -2.18 -2.31 -2.99 -1.91 Truss
-2.33 -3.01 -1.92 -2.03 -2.63 -1.68 Truss
-2.7 -3.49 -2.22 -2.36 -3.05 -1.94 Truss
-3.02 -3.91 -2.49 -2.64 -3.42 -2.18 Truss
-1.81 -2.34 -1.49 -1.58 -2.04 -1.30 Portal
-2.31 -2.99 -1.90 -2.02 -2.61 -1.66 Portal
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss 1.41
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-2.31 -2.99 -1.90 -2.02 -2.61 -1.66 Portal 1.56
-2.31 -2.99 -1.90 -2.02 -2.61 -1.66 Portal
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-3.47 -4.49 -2.86 -3.04 -3.93 -2.50 Truss
-2.31 -2.99 -1.90 -2.02 -2.61 -1.66 Truss
-1.97 -2.55 -1.63 -1.72 -2.23 -1.42 Portal

-1.85 -2.4 -1.53 -1.62 -2.1 -1.34 Portal

Load (kN) on Node at


Windward Side Leeward Side Load on Truss
or Portal
End Interm. Ridge End Interm. Ridge
-0.08 -0.11 -0.07 0.26 0.34 0.22 Portal
-0.1 -0.13 -0.08 0.32 0.41 0.27 Truss
-0.09 -0.12 -0.08 0.29 0.37 0.24 Truss
-0.08 -0.1 -0.07 0.26 0.33 0.21 Truss
-0.09 -0.12 -0.08 0.3 0.38 0.24 Truss
-0.1 -0.13 -0.09 0.33 0.43 0.27 Truss
-0.06 -0.08 -0.05 0.2 0.26 0.17 Portal
-0.08 -0.1 -0.07 0.25 0.33 0.21 Portal
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.08 -0.1 -0.07 0.25 0.33 0.21 Portal
-0.08 -0.1 -0.07 0.25 0.33 0.21 Portal
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.12 -0.15 -0.10 0.38 0.49 0.31 Truss
-0.08 -0.1 -0.07 0.25 0.33 0.21 Truss
-0.07 -0.09 -0.06 0.22 0.28 0.18 Portal

-0.06 -0.08 -0.05 0.2 0.26 0.17 Portal


Effective Width of Gallery 6.45 m

10 < 10 1
25 25 0.9
100 > 100 0.8
LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THER
STATION
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

L&T DOC.NO.- F.DPUR.19-BN02-00-HTP-


170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR
DVC DOC. NO.- 2111-122-PVC-U-122

5.4. Wind On Side Sheeting (Across Conv. Direction)

5.4.1. Calculation of Pressure Coefficient for Wall

Width of conveyor gallery


=

Span
h h/w L/w Case
Gallery Mkd. (mm)
CG-2 18000 2.825 0.47 2.96 h/w < 1/2
CG-3 18000 2.825 0.47 2.96 h/w < 1/2
CG-4 18000 2.825 0.47 2.96 h/w < 1/2
CG-5 18000 2.825 0.47 2.96 h/w < 1/2
CG-6 18000 2.825 0.47 2.96 h/w < 1/2
CG-7 18000 2.825 0.47 2.96 h/w < 1/2

For GG-2 to GG-7


Referring Table 5 of IS 875 ( Part 3 ) 2015
Cpe for h/w ≤ 1/2
Wind Angle A B C D
0 0.7 -0.25 -0.6 -0.6
90 -0.5 -0.5 0.7 -0.1

Spacings of Side-runners are shown in the figure.


Wind load will act at the points where side runners are connected.

Effective height for the bottom side runner, h1 = 1.075

Effective height for the top side runner, h2 = 1.075

A B A B
A B A B

0.2 -0.75 1.2

LARSEN & TOUBRO


LIMITED 2X500 MW DURGAPUR STEEL THER
STATION
TECHNOLOGY: (UNIT 1 & 2)
(QFGDM)

F.DPUR.19-BN02-00-
L&T DOC.NO.- HTP-170523
STRUCTURAL DESIGN CALCULATION FOR CONVEYOR
DVC DOC. NO.- 2111-122-PVC-U-122

5.4.2.1. Load on Side Sheeting Cpi (+)

Applicable Loading Span (m) Design Wind


for Gallery Effective Tributary Ka Pressure(pd)
Mkd. At Left (A) At Right (B) Loading Area
kN/m2
Width
0.750 2.451 1.976 5.60 1.000 1.41
2.451 2.500 2.476 7.01 1.000 1.41
2.500 1.910 2.205 6.25 1.000 1.41
Kink Gallery 1.910 1.915 1.913 5.42 1.000 1.41
1.915 2.592 2.254 6.38 1.000 1.41
2.592 2.523 2.558 7.24 1.000 1.41
2.523 0.400 1.462 4.14 1.000 1.41
0.400 3.000 1.900 5.38 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
18m
Gallery_Standard 3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
3.000 0.400 1.900 5.38 1.000 1.41
0.400 3.000 1.900 5.38 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
21m
Gallery_Standard 3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
3.000 3.000 3.000 8.49 1.000 1.41
21m
Gallery_Standard

3.000 0.400 1.900 5.38 1.000 1.41


0.400 1.400 1.600 4.53 1.000 1.41

Cross Over 0.400 2.200 1.500 4.25 1.000 1.41

5.4.2.2. Load on Side Sheeting Cpi (-)


Loading Span (m)
Applicable Design Wind
Effective Tributary Pressure(pd)
for Gallery Area Ka
Mkd. At Left (A) At Right (B) Loading kN/m2
Width
0.750 2.451 1.976 5.60 1.000 1.56
2.451 2.500 2.476 7.01 1.000 1.56
2.500 1.910 2.205 6.25 1.000 1.56
Kink Gallery 1.910 1.915 1.913 5.42 1.000 1.56
1.915 2.592 2.254 6.38 1.000 1.56
2.592 2.523 2.558 7.24 1.000 1.56
2.523 0.400 1.462 4.14 1.000 1.56
0.400 3.000 1.900 5.38 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
18m
Gallery_Standard 3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 0.400 1.900 5.38 1.000 1.56
0.400 3.000 1.900 5.38 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
21m
Gallery_Standard 3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 3.000 3.000 8.49 1.000 1.56
3.000 0.400 1.900 5.38 1.000 1.56
0.400 1.400 1.600 4.53 1.000 1.56
Cross Over 0.400 2.200 1.500 4.25 1.000 1.56
DVC
PUR STEEL THERMAL POWER
STATION
(UNIT 1 & 2)

CULATION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

C
6.100 m

Case A B
Ɵ L
3/2 < L/w < 4
3/2 < L/w < 4 Wind
3/2 < L/w < 4 D
3/2 < L/w < 4
3/2 < L/w < 4
3/2 < L/w < 4
w

Cpe - Cpi
Condition
Cpi = 0.5 Cpi = -0.5
Windward 0.2 1.2
Leeward -0.75 0.25

350

m
1450

A B
A B

0.25 350

DVC
PUR STEEL THERMAL POWER
STATION
(UNIT 1 & 2)

CULATION FOR CONVEYOR LC1A/B TRESTLES


Rev. 0 12/30/2019

Load (kN) on Node at


Load on
Windward Side Leeward Side Truss or
Portal
Load (P1) Load (P2) Load (P3) Load (P1) Load (P2) Load (P3)
0.6 0.6 -2.25 -2.25 Portal
0.75 0.75 -2.82 -2.82 Truss
0.67 0.67 -2.51 -2.51 Truss
0.58 0.58 -2.18 -2.18 Truss
0.69 0.69 -2.56 -2.56 Truss
0.78 0.78 -2.91 -2.91 Truss
0.45 0.45 -1.66 -1.66 Portal
0.58 0.58 -2.16 -2.16 Portal
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.58 0.58 -2.16 -2.16 Portal
0.58 0.58 -2.16 -2.16 Portal
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.91 0.91 -3.41 -3.41 Truss
0.58 0.58 -2.16 -2.16 Truss
0.49 0.49 -1.82 -1.82 Portal

0.46 0.62 0.46 -1.71 -2.3 -1.71 Portal

Load (kN) on Node at


Load on
Windward Side Leeward Side Truss or
Portal
Load (P1) Load (P2) Load (P3) Load (P1) Load (P2) Load (P3)
3.99 3.99 0.84 0.84 Portal
5 5 1.05 1.05 Truss
4.45 4.45 0.93 0.93 Truss
3.87 3.87 0.81 0.81 Truss
4.55 4.55 0.95 0.95 Truss
5.17 5.17 1.08 1.08 Truss
2.96 2.96 0.62 0.62 Portal
3.84 3.84 0.8 0.8 Portal
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
3.84 3.84 0.8 0.8 Portal
3.84 3.84 0.8 0.8 Portal
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
6.06 6.06 1.27 1.27 Truss
3.84 3.84 0.8 0.8 Truss
3.23 3.23 0.68 0.68 Portal
3.03 4.09 3.03 0.64 0.86 0.64 Portal
Effective Width of Gallery 2.83 m

10 < 10 1
25 25 0.9
100 > 100 0.8
LARSEN & TOUBRO
LIMITED 2X500 MW DURGAPUR STEEL THERMAL POWER
STATION
TECHNOLOGY:
(QFGDM) (UNIT 1 & 2)

L&T DOC.NO.- F.DPUR.19-BN02-


00-HTP-170523 STRUCTURAL DESIGN CALCULATION FOR CONVEYOR LC1A/B
TRESTLES
DVC DOC. NO.- 2111-122-PVC-U-
122
TEMPERATURE LOAD (TL)

Refer "ANNEXURE A-I OF PROJECT INFORMATION"


(Doc. No. 2111-121-PCGA-001)

Total temperature variation is considered as 2/3rd of the average maximum annual variation in tempera
The average maximum annual variation in temperature for this purpose is taken as the difference betwe
mean of the daily minimum ambient temperature during the coldest month of the year and mean of dail
maximum ambient temperature during the hottest month of the year. The structure is designed to withs
stresses due to 50% of the total temperature variation.

Following temperature data is considered as per “Project Site information”


(Doc. No. 2111-121-PCGA-001, Annexure A– I)

Lowest mean of daily minimum temperature = 4.4

Highest mean of daily maximum temperature = 46.4

Difference in temperature = 42

Design temperature = 0.5 * 2/3 *(Difference in temperature) = 14

The structure is designed for temperature load of 14 ˚C.