The document outlines a proposed project to establish a facility for manufacturing 3,168 lunch boxes per day using injection moulding in Gelapukhuri, Tinsukia, Assam. The facility would require 8,000-10,000 square feet of space and cost approximately 62-82 lakh Indian rupees to build. The manufacturing process involves feeding raw polypropylene into a hopper, injection moulding the plastic under heat and pressure, and finishing the moulded lunch boxes. Utilities needed include a 72 kW electricity connection and 80 liters per minute of circulating water. 10 workers would be required to operate the facility.
The document outlines a proposed project to establish a facility for manufacturing 3,168 lunch boxes per day using injection moulding in Gelapukhuri, Tinsukia, Assam. The facility would require 8,000-10,000 square feet of space and cost approximately 62-82 lakh Indian rupees to build. The manufacturing process involves feeding raw polypropylene into a hopper, injection moulding the plastic under heat and pressure, and finishing the moulded lunch boxes. Utilities needed include a 72 kW electricity connection and 80 liters per minute of circulating water. 10 workers would be required to operate the facility.
The document outlines a proposed project to establish a facility for manufacturing 3,168 lunch boxes per day using injection moulding in Gelapukhuri, Tinsukia, Assam. The facility would require 8,000-10,000 square feet of space and cost approximately 62-82 lakh Indian rupees to build. The manufacturing process involves feeding raw polypropylene into a hopper, injection moulding the plastic under heat and pressure, and finishing the moulded lunch boxes. Utilities needed include a 72 kW electricity connection and 80 liters per minute of circulating water. 10 workers would be required to operate the facility.
Name of Project Facility for Manufacturing Lunch Boxes
Project Location Gelapukhuri, Tinsukia, Assam
Area Requirement 8000 -10,000 sq ft Approx. Project cost INR 62-82 lakh Project Scale Production capacity per day @25 seconds for single lunch box for 22 hours: 3,168 pieces Process Manufacturing Process In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper, plasticized by heating and then injected under pressure into a cold mould, where it sets and is then ejected as the finished products. The three successive main stages that are followed in the procedure of manufacturing Feeding of PP raw material into the hopper Injection moulding process. Finishing of the moulded product.
Utilities Electricity ( connected Load) : ~72 KW
Water: 80 litre/min water will be circulated through fixed tank capacity is 15,000-20,000 Litres Manpower Requirement 10 workers Nodal Agency Assam Industrial Development Corporation (AIDC)