Name Date Start Date End Date 1 Consultancy NHIDCL/Nagaland/AE/CL( 28/01/202 27/01/202 21/02/202 Services for 0-33)/2019 0 0 0 Authority Time Engineer for 11:0Hrs Supervision of Construction of (i) 2Lane with hard shoulders of Changtongy a Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 (Design Km 0.000 to Km 18.779) (Design Length 18.779 Km) in the state of Nagaland under NH (O) Plan (ii) 2 Lane with hard shoulders of Changtongy a Longleng Road on Project Tender Tender Tender S.No Tender No Document Name Date Start Date End Date EPC basis from existing Km 16.530 to Km 29.530 (Design Km 18.779 to Km 33.428) (Design Length 14.649 Km) in Nagaland https://infracon.nic.in/projects.asp?nid=2