WHAT WHERE WHY

 Construction industries,need  Minimise probability of pro-


to upgrade their perfor-  Wuhan, China
ject delay
mance by construct build-
ings in a short period of  Rapid construction im-
time. portant like construction of
new hospital within 10 days
 Technology used to speed up in Wuhan to overcome the
TREND IN CONSTRUCTION
construction but construction shortage of medical treat-
: WUHAN HOSPITAL (hospital that build with-
owners put low investment in 10 days) ment resources when Covid-
on technology 19 coronavirus outbreak.
PREPARED BY

NUR IMANINA BT NOOR’AZMI (2018680066)

NUR AMINAH BT ABUDLLAH (2018223934)


WHO AKMA NABILA BT ADAM (2018225272) HOW

 Construction owner
 Digital tools like BIM (Building
 All parties that involved in Information Modelling), allowed
construction stage the hospitals’ design institutes to
 Person incharged during the WHEN utilize the industrial internet,
bringing together hundreds of
constructions of Wuhan hos-
BIM designers nationwide.
pital is China Construction  The construction start on 24
 Drones and wearble will monitor
Third Engineering Bureau January 2020 - 2 February 2020. and keep the workers safe.
Co,1000 project managers
 Hence, the construction of hospi-  Robots will required for more
and 5000 workers tal in Wuhan for Coronavirus on- strenuous tasks.
ly took around 10 days only.