TASKS ACOMMPLISHED AREA IN METER IN PCS.

COST PER TOTAL COST

CONCRET & CHISLING WORK 183.36 27 4950.72

HARD CORE 75.44 25 1886

BLOCK WORK 54.03 80 4322.4

PLASTERING WORK 82.95 80 6636

BRICK WORK 20.94 110 2303.4

MANHOLE WORK 11 200 2200

CRACK CHISLING & PLASTERING 22 200 4400

ELECTRICAL WORK POINT 50 100 5000

CURVE STONE 21 150 3150

ELECRTICAL PLASTERING 22 100 2,200

3 1000 3,000.00
MANHOLE WORK
TOTAL 40,048.52 birr
TASKS TO DO

CHISLING AND PLASTERING 480 225 108,000


44.63 80 3570.4
CHISLING AND PLASTERING
285.35 80 22,828.30
SCREED WORK(EXCLUDE STAIRCASE)
134,398.30 birr
TOTAL