BUBBLE DECK SLAB SYSTEM

A Seminar report submitted to the

A P J Abdul Kalam Technological University

in partial fulfillment of the requirements

for the award of the degree of

MASTER OF TECHNOLOGY
IN
STRUCTURAL ENGINEERING

By
ASHLIN T V

UNT17CESE04

DEPARTMENT OF CIVIL ENGINEERING


UNIVERSAL ENGINEERING COLLEGE
THRISSUR 680123, KERALA
NOVEMBER 2017
UNIVERSAL ENGINEERING COLLEGE, THRISSUR
DEPARTMENT OF CIVIL ENGINEERING

CERTIFICATE
This is to certify that the seminar entitled

BUBBLE DECK SLAB SYSTEM


Submitted by
ASHLIN T V
in partial fulfillment of the requirements for the award of Degree of
MASTER OF TECHNOLOGY IN STRUCTURAL ENGINEERING
to the A P J Abdul Kalam Technological University is a record of bonafide work
done by her
under my supervision and guidance and this work has not been submitted elsewhere
for any
degree or diploma.

Mrs. Femina G M Ms. Athira Ramachandran


Assistant Professor Assistant Professor
Seminar Guide Seminar Coordinator
Department of Civil Engineering Department of Civil
Engineering

Mrs. Bindumol V G
Associate Professor and Head
Department of Civil Engineering
Department of Civil Engineering M.Tech Seminar
Report 2017

ACKNOWLEDGMENT

First and the foremost, I shall thank God Almighty who gave me the inner strength,
resource and ability to complete the work successfully, without which all my
efforts
would have been in vain.

I wholeheartedly thank my seminar guide Mrs. Femina G M (Asst. Professor, Dept. of


Civil Engineering) for her valuable advice and support.

I express my heartfelt thanks to our seminar coordinator Ms. Athira Ramachandran


(Asst. Professor, Dept. of Civil Engineering), for her helpful feedback and timely
assistance.

I express my sincere gratitude to our PG Coordinator, Dr. M K Veerankutty for his


moral support to complete my work successfully.

I am grateful for the cooperation and constant encouragement from Mrs. Bindumol V
G,
Head of Department of Civil Engineering, for her valuable advice and motivation.

I am grateful to our principal, Dr. T P Ramachandran for providing me good


facilities
and proper environment for developing my seminar and to do it in the required way.

I convey my sincere thanks to all other faculties for their help and encouragement.
I thank
all my family and friends who have helped me during the work, with their
inspiration and
cooperation.

ASHLIN
T V

i Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

ABSTRACT

Bubble deck slab is a method of virtually eliminating a part of concrete from the
middle
of a slab, which is not performing any structural function, and thereby reducing
structural
dead weight. Recycled plastic hollow spheres replace the in-effective concrete in
the slab,
and thus reducing the dead weight and increasing the efficiency of the floor. By
introducing bubble decks, it leads to 30 to 40% lighter slab which reduces the
loads on
the structural members, and of course of the entire building. This system provides
a wide
range of cost and construction time reduction. The aim of this paper is to discuss
about
the various properties of Bubble deck slab. The paper also gives a brief idea about
the
different Bubble deck slabs, their production, installation and advantages over
conventional concrete slabs.

Keywords: - Bubble deck slab, recycled plastic hollow spheres, voids, dead weight.

ii Universal Engineering
College
Department of Civil Engineering M.Tech Seminar Report 2017

CONTENTS

ACKNOWLEDGEMENT i

ABSTRACT ii

TABLE OF CONTENT iii

LIST OF FIGURES vi

LIST OF TABLES v

1. INTRODUCTION 1

2. TYPES OF VOIDED FLAT SLABS 3

2.1 AIRDECK. 3

2.2 COBIAX 3

2.3 U-BOOT BETON 3

2.4 BEE PLATE SYSTEM 4

2.5 BUBBLE-DECK 4

3. BUBBLE DECK SLAB 6

3.1 MATERIALS 6

3.1.1 Concrete 6

3.1.2 Steel 6

3.1.3 Plastic spheres 7

3.2. TYPES OF BUBBLE DECK SLAB 8

3.2.1 Type A- Filigree elements 8

3.2.2 Type B- Reinforcement modules 9

3.3.3 Type C- Finished planks 9

4. PRODUCTION AND CARRYING OUT 10

5. STRUCTURAL PROPERTIES OF BUBBLE DECK SLABS 15

5.1 COMPRESSIVE STRENGTH AND FLEXURAL CAPACITIES 15

iii Universal Engineering College


Department of Civil Engineering M.Tech Seminar Report 2017

5.2 SHEAR STRENGTH 15

5.3 DURABILITY 16

5.4 SOUND INSULATION 16

5.5 FIRE RESISTANCE 17

5.6 VIBRATION 17

6. ADVANTAGES AND LIMITATIONS OF BUBBLE-DECK 18

6.1 ADVANTAGES OF BUBBLE DECK 18

6.1.1 Material and weight reduction 18

6.1.2 Structural Properties 18

6.1.3 Construction and time saving 18

6.1.4 Cost saving 19

6.1.5 Green Design 19

6.2 LIMITATIONS OF BUBBLE DECK 19

6.2.1 Skilled labour 19

6.2.2 Structural monitoring 20

7. CONCLUSIONS 20

REFERENCES 21

iv Universal Engineering College


Department of Civil Engineering M.Tech Seminar
Report 2017

LIST OF FIGURES

Fig. No. Title Page


No.

1.1 Cut-through Section of Bubble-Deck 2

2.1 Section of Bubble deck slab 5

3.1 Construction of Biaxial hollow core slab 7

3.2 Plastic spheres along with reinforcement 7

3.3 Type A- Filigree Elements 8

3.4 Type B- Reinforcement Modules 9

3.5 Type C- Finished Planks 9

4.1 Bubbles at stock 10

4.2 Welding the reinforcement 10

4.3 Diagonal girders 11

4.4 Preparation of bottom layer concrete 11

4.5 Lowering bubble lattice 12

4.6 Compaction process 12

4.7 Finished filigree elements 13

4.8 Finished filigree elements transported 13

4.9 Finished filigree elements placing 14

4.10 Concreting and finishing the bubble deck slab 14

v Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

LIST OF TABLES

Table No. Title


Page No.

3.1 Different types of plastic bubbles available in market


8

vi Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

1. INTRODUCTION
For decades, several attempts have been made to create biaxial slabs with hollow
cavities
in order to reduce the weight. Most attempts have consisted of laying blocks of a
less
heavy material like expanded polystyrene between the bottom and top reinforcement.

Due to the limitations in hollow-core slabs, primarily lack of structural


integrity,
inflexibility and reduced architectural possibilities, focus has been on biaxial
slabs.
Several methods have been introduced during the last decades, but with very limited
success, due to major problems with shear capacity and fire resistance as well as
impractical execution.

Bubble deck eliminates up to 35% of the structural concrete. When coupled with the
reduced floor thickness, smaller foundations and columns, construction costs can be
reduced by as much as 10%.

With virtually no formwork, no downturn beams or drop heads, and fast coverage of
typically 350ft2 per panel, using Bubble deck means floor cycles up to 20% faster
than
traditional construction methods. Regardless of project size, shape or complexity;
simply
shore, place, and pour to quickly install concrete decks.

The Bubble deck system offers a wide range of advantages in building design and
during
construction. There are a number of green attributes including; reduction in total
construction materials, use of recycled materials, lower energy consumption and
reduced
CO2 emissions, less transportation and crane lifts that make Bubble deck more
environmentally friendly than other concrete construction techniques.

Bubble deck can achieve larger spans as compared to a site cast concrete structure
without the need for post-tensioning or pre-stressed sections. The total
construction time
for the structure was reduced and allowed the consultants to fast track the design
without
the interior design finalized. The total time from design inception to completion
of
structure was less than 12 months.

The Bubble deck, on the other hand, creates such a cushion of air between layers of
concrete with the reinforcement of both the metal grid and the weight distribution
across
the plastic spheres.

1 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

One notable difference about Bubble deck technology is that it allows for stronger,
and
often thicker, slabs of concrete that span larger areas, as well as the opportunity
to
architecturally design larger cantilevers. The hollow spheres at the core of this
technology
allow for an approximately 35% reduction of dead weight from the building’s
concrete
slabs. When those slabs cover a larger area, there is also no requirement for
supporting
columns, walls, and down stand beams.

Fig. 1.1 Cut-through Section of Bubble-Deck

2 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

2. TYPES OF VOIDED FLAT SLABS

2.1 AIR DECK

The Air deck concept was patented in 2003 and comprises an inverted plastic
injection
moulded element which is vibrated into the lower slab during the production process
by a
robotic arm. The advantage of this system is that no retaining mesh is required to
hold
down the voiding elements during on site pouring of the second layer. As the boxes
can
be nested there are transport advantages versus other voiding systems. The static
calculations are according to standard Euro code 2 norms.

2.2 COBIAX

The Cobiax system makes use of the same voided slab principles of creating voids
within
the concrete slabs to lighten the building structures. Elliptical and torus shaped
hollow
plastic members, termed as void formers, are held in place by a light metal mesh
for easy
installation between the top and bottom reinforcement layers of a concrete slab.

2.3 U-BOOT BETON

U-Boot Beton is a recycled polypropylene formwork that was designed to create two-
way
voided slabs and rafts. The use of U-Boot Beton formwork makes it possible to
create
mushroom pillars, with the possibility to have the mushroom in the thickness of the
slab.

U-boot does not use spherical void formers like previous systems, but uses
truncated-
pyramid shaped void formers instead. These void formers create many grid shaped
beams
making up the slab. The U-boot system is similar to the Cobiax system in terms of
construction because it is meant to be cast entirely on-site using formwork. After
forms
are erected, the steel and void formers are placed before the concrete is poured in
two
lifts. In addition to the many design benefits that all voided slab systems
provide, the U-
boot system has one benefit over systems that use spherical void formers the shape
of the
U-Boot void formers allows them to be stacked efficiently during transportation to
the
site, saving space and potentially leading to reduced shipping costs compared to
spherical
former systems.
3 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

2.4 BEE PLATE SYSTEM

The BEEPLATE Honeycomb Floor is an efficient solution for wide span reinforced
concrete flat slabs with any suspension. Spans between up to 20 m with floor depths
between 34 cm and 70 cm can be achieved. By using buoyancy free hollow bodies,
assembly is particularly easy. The hollow bodies are built in with the help of
spacer clips.
At the same time they work as a separator between the upper and lower layers of
reinforcement. The alveolar layout of the hollow bodies guarantees a maximum
concrete
reduction and therefore weight reduction of up to 35%. The BEEPLATE should be
supported bottom-up in the area of the BEEPLATE concrete webs. In areas where a
column under a hollow body is inevitable, must load transfer to the adjacent
BEEPLATE
concrete webs is to be realized by a sufficiently dimensioned crossbeam. Supports
which
are on top of the BEEPLATE should possibly be assembled only in the BEEPLATE
concrete web areas. If holes are drilled into the BEEPLATE slab - for example for
the
positioning of the formwork these have to be closed afterwards. If there is danger
of
penetrating water into a hollow body, the lower side has to be tapped off and spot-
drilled.
No water must remain in a hollow body void.

2.5 BUBBLE-DECK

In the 1990s, a new system was invented, eliminating the above problems. The so-
called
Bubble deck technology invented by Jorgen Breuning, locks ellipsoids between the
top
and bottom reinforcement meshes, thereby creating a natural cell structure, acting
like a
solid slab. A voided biaxial slab is created with the same capabilities as a solid
slab, but
with considerably less weight due to the elimination of superfluous concrete.

Bubble deck slab is a biaxial hollow core slab invented in Denmark. It is a method
of
virtually eliminating all concrete from the middle of a floor slab not performing
any
structural function, thereby dramatically reducing structural dead weight. Bubble
deck
slab is based on a new patented technique which involves the direct way of linking
air
and steel. Void forms in the middle of a flat slab by means of plastic spheres
eliminate
35% of a slab's self-weight, removing constraints of high dead loads and short
spans. Its
flexible layout easily adapts to irregular and curved plan configurations. The
system
allows for the realization of longer spans, more rapid and less expensive erection,
as well
as the elimination of down-stand beams. According to the manufacturers, Bubble deck
4 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

slab can reduce total project costs by three percent. Bubble deck slab is a new
innovative
and sustainable floor system to be used as a self-supporting concrete floor. The
application of the Bubble deck slab floor system in the Netherlands is manifested
as the
world-wide first application. The Bubble deck slab floor system can be used for
storey
floors, roof floors and ground floor slabs. A Bubble deck slab floor is a flat slab
floor,
therefore without beams and column heads. The principal characteristic is that
hollow
plastic spheres are incorporated in the floor, Clamped in a factory-made
reinforcement
structure. This reinforcement structure constitutes at the same time the upper and
lower
reinforcement of the concrete floor.

The reinforcement structure with spherical shapes and possibly a thin concrete
shell as
precast slab floor are supplied to the construction site in factory-made units with
a
maximum width of 3 meters; they are installed on site and are assembled by
installing
connecting rods and by pouring concrete. After the concrete has set, the floor is
ready to
be used. The ratio of the diameter of the plastic spheres to the thickness of the
floor is
such that a 35 % saving is achieved on the material or concrete consumption for the
floor
in comparison with a solid concrete floor of the same thickness.

Fig 2.1 Section of Bubble deck slab

The saving on weight obtained in this way has the result that a Bubble deck slab
floor can
provide the required load-bearing capacity at a smaller thickness this leads to a
further
advantage, resulting in a saving of 40 to 50 % of the material consumption in the
floor
construction. This is not the last of the advantages of the Bubble deck slab floor
system:
because of the lower weight of the floor system itself, also the supporting
constructions

5 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

such as columns and foundations can be less heavy. This can results eventually in a
total
weight or material saving on the building construction of up to 50 %. Since the
weight of
the structure reduced, this type of structure can useful to reduce earthquake
damage.

3. BUBBLE DECK SLAB

3.1 MATERIALS

Bubble deck slab is composed of three main materials; they are concrete, steel and
plastic spheres:

3.1.1 Concrete

The concrete is made of standard Portland cement with max aggregate size of 20 mm.
No
plasticizers are necessary for concrete mixture. Tests have proved that the
characteristic
compressive strength of concrete is achieved by bubble deck slabs in the same
manner as
that of solid slabs. In certain type of bubble deck slab a thin layer of concrete
at the
bottom is precast at the manufacturing plant. This is done so as to place the
bubbles as per
the specifications. These are achieved by placing concrete in platforms and
lowering the
bubbles into concrete. This concrete will be compacted by platform vibrator or
formwork
vibrator. The remaining concreting is done at site, and it can be compacted with
needles
vibrators and surface vibrators.

3.1.2 Steel

The steel reinforcement is of grade Fy60 strength or higher. The steel is


fabricated in two
forms -meshed layers for lateral support and diagonal girders for vertical support
of the
bubbles. Fig 4.1 shows the arrangement of steel and bubbles in a Bubble deck slab.
Steel
reinforcement is mainly arranged as soon as the bubbles are prepared. Proper
locking of
bubbles are only possible by placing them in reinforcements. The spherical shape
makes
it non-stackable. Thus the bubbles are held in place in the lattice by proper steel
reinforcement. Generally reinforcement is provided in mesh type along the top and
bottom. The top and bottom reinforcements are then held together by welding with
the
help of diagonal short length bars. The steel reinforcement is designed as per the
design
procedure. Suitable extra bars and shear reinforcements are to be provided as and
when
required.
6 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

Fig 3.1 Construction of Biaxial hollow core slab

3.1.3 Plastic spheres

The hollow spheres are made from recycled high-density polyethylene or HDPE. Fig
4.2
shows the hollow plastic spheres which are ready to be transported to site. Plastic
bubbles
are available in different sizes based on the size of structure and it is tabulated
in Table
3.1. The main disadvantage of bubbles is that it is not stackable. These HDPE
bubbles
can be salvaged and reused again or recycled. This contributes to the Green
properties of
bubble deck slab.

Fig 3.2 Plastic spheres along with reinforcement

7 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

Table 3.1 Different types of Plastic Bubbles available in market

Minimum
Bubble Minimum slab
centre to
Version diameter thickness
centre spacing
(mm) (mm)
(mm)

BD230 180 230 200

BD280 225 280 250

BD340 270 340 300

BD390 315 390 350

BD450 360 450 400

BD510 405 510 450

BD600 450 600 500

3.2. TYPES OF BUBBLE DECK SLAB

3.2.1 Type A - Filigree elements

Bubble deck Type A is a combination of constructed and unconstructed elements. A


60mm thick concrete layer that acts as both the formwork and part of the finished
depth is
precast and brought on site with the bubbles and steel reinforcement unattached.
The
bubbles are then supported by temporary stands on top of the precast Layer.
Additional
steel may be inserted according to the reinforcement requirements of the design.

Fig 3.3 Type A- Filigree Elements

8 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

3.2.2 Type B - Reinforcement modules

Bubble Deck Type B is a reinforcement module that consists of a pre-assembled


sandwich of steel mesh and plastic bubbles, or "bubble lattice". These components
are
brought to the site, laid on traditional formwork, connected with any additional
reinforcement, and then concreted in place by traditional methods.

Fig 3.4 Type B- Reinforcement Modules

3.3.3 Type C- Finished planks

Bubble Deck Type C is a shop-fabricated module that includes the plastic spheres,
reinforcement mesh and concrete in its finished form. The module is manufactured to
the
final depth in the form of a plank and is delivered on site. Unlike Type A and B,
it is a
one-way spanning design that requires the use of support beams or load beams.

Fig 3.5 Type C- Finished Planks

9 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

4. PRODUCTION AND CARRYING OUT


Stage 1:

Pre-fabricated plastic bubbles are made of recycled plastic. These plastic bubbles
are
made in certain moulds. Plastic bubbles are available in different diameters.

Fig 4.1 Bubbles at stock

Stage 2:

Production of the bubble-lattice by welding the top and bottom reinforcement


together.
The bubbles are kept in place by locking them in-between the top and bottom
reinforcements. To prevent the escape of bubbles the top and bottom reinforcements
are
suitably welded together.

Fig 4.2 Welding the reinforcement

10 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

Stage 3:

The diagonal girders keep the bubbles fixed between the top and bottom
reinforcement.
Short length diagonal bars are used to connect the top and bottom reinforcements.

Fig 4.3 Diagonal girders

Stage 4:

Preparation of concrete for filigree-bottom at the assembly line. For the bubble
lattice to
be kept in place a thin layer of concrete is prepared. These may be prepared in
platforms
or tables.

Fig 4.4 Preparation of bottom layer concrete

11 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

Stage 5:

The bubble-lattice is lowered into the concrete. Bubble lattice consists of the top
and
bottom reinforcement along with the bubbles. In filigree elements the bubble
lattice is
placed into the concrete layer. But in reinforcement modules the bubble lattice as
such is
transported to the site.

Fig 4.5 Lowering bubble lattice

Stage 6:

Vibration of the concrete. The vibration of the bottom layer of concrete may be
done by
platform vibration, table vibration etc. Compaction of concrete is an inevitable
part of the
manufacturing of concrete.

Fig 4.6 Compaction process

12 Universal
Engineering College
Department of Civil Engineering M.Tech Seminar
Report 2017

Stage 7:

Finishing of a filigree-element and Finished Bubble Deck filigree-element. Now the


filigree elements are finished and stocked.

Fig 4.7 Finished filigree elements

Stage 8:

Bubble Deck filigree-element at stock and transportation of Bubble Deck filigree


elements on trucks. As the elements are finished they can easily be transported to
the site
by trucks.

Fig 4.8 Finished filigree elements transported

13 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

Stage 9:

Transport in the air through tower cranes and fitting the filigree elements in
place. This
requires skilled labours. Care should be taken that the joints are attached tightly
and
chamfered.

Fig 4.9 Finished filigree elements placing

Stage 10:

Concreting, compacting and surface finishing of the bubble deck slab. Needle
vibrators
are used for compaction during concreting. And suitable surface vibrators are used
for
finishing the surface so as to gain a pleasant appearance.

Fig. 4.10 Concreting and finishing the bubble deck slab

14 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

5. STRUCTURAL PROPERTIES OF BUBBLE DECK SLAB

5.1 COMPRESSIVE STRENGTH AND FLEXURAL CAPACITIES

Bubble deck slab is conceived to omit a significant volume of concrete (compared to


a
solid slab) in the central core where the slab is principally un-stressed in
flexure. In slabs,
the depth of compressed concrete is usually a small proportion of the slab depth
and this
means that it almost always involves only the concrete between the ball and the
surface so
there is no sensible difference between the behavior of a solid slab and Bubble
Deck. The
only elements working are the outer 'shell' of concrete on the compression side and
the
steel on the tension side. In terms of flexural strength, the moments of resistance
are the
same as for solid slabs provided this compression depth is checked during design so
that
it does not encroach significantly into the ball.

5.2 SHEAR STRENGTH

In any flat slab, design shear resistance is usually critical near columns. The
shear stresses
remote from the columns diminishes rapidly and outside the column zones it has been
demonstrated by testing and calculation the transverse and longitudinal shear
stresses are
within the capacity of the Bubble deck slab system. Near the columns, bubbles are
left out
so in these zones a Bubble deck slab is designed exactly the same way as a solid
slab.
Shear resistance of Bubble deck slab is 0.6 times the shear resistance of a solid
slab of the
same thickness. If this is exceeded by the applied shear, at a column for example,
we
leave out the balls and use the full solid shear values. Using Euro code 2, we
would
calculate the applied shear at 2d and subsequent perimeters from the column face as
per
the code requirements, as well as at the column face itself. We would then compare
this
to our calculated resistance. If the applied shear is less than the unreinforced
hollow slab
resistance, no further check is required. If the applied shear is greater than the
hollow slab
resistance we omit balls and make it solid and then check the solid part. The shear
capacity is measured for two ratios of aid (distance from imposed force to support
divided
by deck thickness). For these reasons, it is demonstrated that the design may be
carried
out in every way treating the slab as a solid slab, with the provisions mentioned
above,
which are all taken account of in the design process. Euro code 2, which is fully
compatible with the system, for our design and which is somewhat more up to date
than

15 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

BS811O. Punching shear the average shear capacity is measured to 91 % compared to


the
calculated values of a solid deck.

5.3 DURABILITY

The durability of bubble deck slab is not fundamentally different from ordinary
solid
slabs. The concrete is standard structural grade concrete and combined with
adequate bar
cover provides most control of durability commensurate with normal standards for
solid
slabs. When the filigree slabs are manufactured, the reinforcement module and balls
are
vibrated into the concrete and the standard and uniformity of compaction is such
that a
density of surface concrete is produced which is at least as impermeable and
durable,
arguably more so, to that normally produced on site. Bubble deck slab joints have a
chamfer on the inside to ensure that concrete surrounds each bar and does not allow
a
direct route to air from the rebar surface. This is primarily a function of the
fire resistance
but is also relevant to durability.

Cracking in Bubble deck slab is not worse, and probably better, than solid labs
designed
to work at the same stress levels. In fact Bubble deck slab possesses a continuous
mesh,
top and bottom, throughout the slab and this ensures shrinkage restraint is well
provided
for and that cracking is kept to a minimum whether it is intrinsic or extrinsic
cracking.
Unlike an off-the-shelf product, this is a system that is bespoke designed for each
and
every project. All the peculiarities of a project are therefore taken into account
in the
design; therefore there is no risk of the product being misused by applying it to
uses for
which it is not intended.

5.4 SOUND INSULATION

A comparison was made between Bubble Deck and one-way prefabricated hollow deck
of similar height. The noise reduction with Bubble Deck was 1db higher than the one
way
prefabricated hollow deck. The main criterion for reducing noise is the weight of
the deck
and therefore Bubble Deck will not act otherwise than other deck types with equal
weight. The Bubble deck slab construction is following every usual criterion, and
can be
calculated according to usual principles.

Bubble deck performs acoustically in a better way than any other hollow or solid
floor
surfaces. Because of the three-dimensional structure and the graduated force flow,
the

16 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

hollow spheres have a positive influence on sound insulation. The tests reveals
that the
airborne sound insulation is even higher than expected. This indicates the bubbles
have a
positive influence on sound insulation. The main criteria for reducing noise is the
weight
of the deck and therefore Bubble deck evidently will not act otherwise than other
deck
types with equal weight.

5.5 FIRE RESISTANCE

The fire resistance of the slab is a complex matter but is chiefly dependent on the
ability
of the steel to retain sufficient strength during a fire when it will be heated and
lose
significant strength as the temperature rises. The temperature of the steel is
controlled by
the fire and the insulation of the steel from the fire. In any case, all concrete
is cracked
and, in a fire, it is likely that the air would escape and the pressure dissipated.
If the
standard bubble material is used, the products of combustion are relatively benign,
certainly compared to other materials that would also be burning in the vicinity.
In an
intense prolonged fire, the ball would melt and eventually char without
significance or
detectable effect. Fire resistance depends on concrete cover nearly 60-180 minutes.
While
Bubble deck slabs are not designed to provide thermal insulation due to
encapsulation of
the air bubbles within the center of the concrete slab Bubble deck achieves between
17%
to 39% higher thermal resistance than an equivalent solid slab of the same depth.
Bubble
deck slabs can therefore make a useful contribution towards the thermal insulation
achieved by the overall construction.

Designers attention is drawn to the fact that non-insulated concrete slabs forming
part of
the external building envelope can produce cold surfaces where certain conditions,
dependent upon the relative humidity and dew point, may result in formation of
condensation. It is recommended a condensation risk analysis is undertaken where
Bubble deck slabs form part of the external building envelope.

5.6 VIBRATION

Reinforced concrete slab structures are generally less susceptible to vibration


problems
compared to steel framed and light weight skeletal structures, especially is not
immune
from vibration in all cases so this light must be checked just as it should be in
appropriate
solid slab applications. Where deflections are large, as indicated by the static
design, it is
often an indication that the structure is sensitive to vibration. The lighter
weight of the

17 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

bubble deck slab may be exploited if it can usefully alter the modal frequencies of
a slab.
The most effective weapons against vibration particularly resonant vibration are
stiffness
and damping. If we consider damping to be similar to solid slabs and concentrate on
stiffness, we may observe that a bubble deck slab can be provided over 2 times the
stiffness obtained from a solid slab for the same quantity of concrete used. This
can be
exploited in vibration sensitive applications. At the present time, the static
modification to
the flexural stiffness is applied.

6. ADVANTAGES AND LIMITATIONS OF BUBBLE DECK

6.1 ADVANTAGES OF BUBBLE DECK

6.1.1 Material and weight reduction

The dominant advantage of a Bubble deck slab is that it uses 30-50% less concrete
than
normal solid slabs. The HDPE bubbles replace the non-effective concrete in the
center of
the section, thus reducing the dead load of the structure by removing unused, heavy
material. Decreased concrete material and weight also leads to less structural
steel since
the need for reinforcement diminishes. The building foundations can be designed for
smaller dead loads as well. Overall, due to the lighter floor slabs, the several
downstream
components can be engineered for lower loads and thus save additional material
(Wrap).

6.1.2 Structural properties

Due to the lower dead weight of the slab and its two-way spanning action, load-
bearing
walls become unnecessary. Bubble deck is also designed as a flat slab, which
eliminates
the need for support beams and girder members. As a result, these features decrease
some
of the structural requirements for the columns and foundations. Additionally,
Bubble deck
slabs can be designed and analyzed as a standard concrete flat slab according to
research
performed on its strength and ductility.

6.1.3 Construction and time saving

On site construction time can be shortened since Bubble deck slabs can be precast.
Type
A includes a 60 mm precast concrete plate as the base and formwork for the slab.
This
type of slab would eliminate the need for onsite erection of formwork, thus
significantly
cutting down construction time. Similar to modem precast concrete flooring modules,
18 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

Bubble deck can be fully shop fabricated and transported on site for installation
as well.
Time savings can also be achieved through the faster erection of walls, columns and
MEPs due to the lack of support beams and load bearing walls for this innovative
flat
slab. Addition time may be saved from the quicker curing time since there is less
concrete
in the slab.

6.1.4 Cost saving

In relation to the savings in material and time, cost reductions are also typical
with the
Bubble deck system. The decreased weight and materials mean lower transportation
costs, and would by more economical to lift the components. With less on-site
construction from the full and semi-precast modules, labor costs will decrease as
well. In
addition, money can be saved downstream in the design and construction of the
building
frame elements (columns and walls) for lower loads. There is a slight rise in
production
costs for the Bubble deck slab due to the manufacturing and assembly of the HDPE
spheres. However, the other savings in material, time, transportation and labor
will offset
this manufacturing price increase (Stubbs).

6.1.5 Green design

The number of owners, designers and engineers who desire green alternatives is
growing
exponentially. Bubble deck is a fitting solution for lowering the embodied carbon
in new
buildings. According to the Bubble Deck Company, 1 kg of recycled plastic replaces
100
kg of concrete. By using less concrete, designers can save up to 40% on embodied
carbon
in the slab, resulting in significant savings downstream in the design of other
structural
members. Carbon emissions from transportation and equipment usage will also
decrease
with the use of fewer materials. Additionally, the HDPE bubbles can be salvaged and
reused for other projects, or can be recycled.

6.2 LIMITATIONS OF BUBBLE-DECK

6.2.1 Skilled labour

This type of construction needs skilled labours for efficient completion of work.
Skilled
labours are not easily available and their wages are unaffordable.

19 Universal Engineering
College
Department of Civil Engineering M.Tech Seminar
Report 2017

6.2.2 Structural health monitoring

The inspection for bubble deck slabs is difficult as compared to conventional slab
system.
It is difficult to monitor the structural health conditions.

9. CONCLUSIONS

In the present scenario of the construction industries we need different types of


methods
which are more economical, easy to construct and environment friendly. The Bubble
Deck Slab is one the technology which helps us to achieve the economy, easy to
construct
and environment friendly. Bubble deck Technology is the innovative system that
eliminates Concrete in the mid section, secondary supporting structure such as
beams
reinforced concrete columns or structural walls.

Bubble Deck eliminates up to 35% of the structural concrete. When coupled with the
reduced floor thickness and facade, smaller foundations and columns, construction
costs
can be reduced by as much as 10%. In Comparison with weight of the structure,
Bubble
Deck Slab is lighter than the Solid Deck Slab. The Bubble Deck system offers a wide
range of advantages in building design and during construction. There are a number
of
green attributes including; reduction in total construction materials, use of
recycled
materials, lower energy consumption and reduced CO2 emissions, less transportation
and
crane lifts that make Bubble Deck more environmentally friendly than other concrete
construction techniques. Bubble Deck Slab is suitable for use in all building types
especially open floor designs such as commercial, educational, hospitals and other
institutional buildings. In the end we can conclude that the future of construction
is
Bubble Deck Slab and more studies, researches and experiments for the various sizes
of
the HDPE Hollow ball and the thickness of the slab are required to gain its
popularity and
usage of this technology.

20 Universal
Engineering College
Department of Civil Engineering M.Tech Seminar Report
2017

REFERENCES

1. Arathi Shetkar & Nagesh Hanche (2015),” An Experimental Study on Bubble


Deck Slab System with Elliptical Balls”, International Journal of Science
and
Research, 12(1), 21-27.
2. Bhagyasree G Bhade & Barelikar S M (2016), “ An Experimental Study of Two
Way Bubble Deck slab With Spherical Hollow Balls”, International Journal of
Recent scientific Research, 7(6), 11621-11626
3. Mike Mota (2013), “voided two way flat slabs”, American Society of Civil
Engineers Journal”, 1640-1649
4. Neeraj Tiwari & Sana Zafar (2016), “ Structural Behaviour of Bubble Deck
Slabs
and Its Application”, International Journal for Scientific Research and
Development, 6(2), 433-437
5. Prabhu Teja P, Vijay Kumar P, Anusha SMounika C H, Purnachandra Saha
(2012), “Structural Behavior of Bubble Deck Slab”, International Conference
on
Advance in Research, Science and Management, 383-388
6. Raj R Vakil & Dr. Mangulkar Madhuri Nilesh (2017), “Comparative Study of
Bubble-Deck and Solid Deck Slab”, International Journal of Advance Research
in Science and Engineering, 6(10), 383-392.
7. Shivani Mirajkar & Mitali Balapur (2017), “Study of Bubble- Deck Slab
System”,
International Journal of Advance Research in Science and Engineering, 7, 01-
05.
8. Surendar M & Ranjitham M (2016), “ Numerical and Experimental Study on
Bubble Deck Slab”, International Journal of Engineering Science and
Computing, 6(5), 5959-5962