CLIENT

CLIENT CONSULTANT

NOTES :

DESCRIPTION Owner's signature


A Approved.
B Approved with minor comments.
C Approved with major comments.
D Rejected.

REV. DATE BY DESCRIPTION CHKD. APPD.

KEY PLAN
1 2 3 4 5 6 7 8 9 10 11

PART01
PART02
A STAIRS
A
COMMUNI. ROOM PDU-1A-1 PDU-2A-1 PDU-3A-1 PDU-4A-1 PDU-5A-1
ITR ITR ITR ITR ITR
300KVA 300KVA 300KVA 300KVA 300KVA F14
F19 WC
F17
UP CRAH ROOM
6.47+m Main contractor :
F18
F.F.L KITCHENETTE

F16

B F.F.L B
UP
1 LOBBY LOBBY
HIGH
DENSITY RACK

F15 F13

CORRIDOR PASSENGER LIFT

F22 F11

SECURITY ROOM
STAGING
6.32+m F12
F20
F.F.L
6.32m
CORRIDOR
F.F.L
F10

C FM 200 FM 200
LOBBY C
F09
F23 RACKS ( 1200*600) F25
OFFICE ROOM Main consultant :
14 F24
F
HIGH
F21 DENSITY RACK

6.32+m OFFICE ROOM


F.F.L F21 Mearaj City, Cairo Ring Road, Bldg No: 2075 To 2078
Tel: (202) 2520 4500 (10 lines) Fax: (202) 2520 4505
FREIGHT LIFT WWW.shakergroup.com

G 03 CORRIDOR
G04
CORRIDOR
ARCHITECURE & LANDSCAPE CONSULTANT:
F07
COMMUNI. ROOM
D LOBBY F08
D
6.32+m
G02
F.F.L

E UP E
6.47m
FREIGHT LIFT
STAIRS CRAH ROOM F.F.L
B05
B01 UP F06

ITR ITR ITR ITR ITR


300KVA 300KVA 300KVA 300KVA 300KVA
PDU-1B-1 PDU-2B-1 PDU-3B-1 PDU-3B-1 PDU-5B-1
PROJECT :
F F

TELECOM EGYPT REGIONAL HUB


DATA CENTER

1 2 3 4 5 6 7 8 9 10 11
PART02
PART01

NO.: ABBR.: BUILDING NAME :

-- EE Regional Cloud Hub - RCH

DRAWING TITLE :
FIRST FLOOR PLAN
EARTHING SYSTEM LAYOUT
OVERALL

DRAWN AHMED AWAD SCALE 1/100 DATE FEB.2020


CHECKED PETER APPROVED AMR SHAHEEN
--- REV.
COMPANY PROJECT DWG. TYPE DISCIPLINE DWG. SEQUENCE
0
SCG 19060 EE 1F 00