FW: For WPS establishment necessary arrangements

1 message

Sagar <sagar@unitedsystems.in> Sat, 1 Feb 2020 at 2:13 pm


To: B.L.narayana <factory@unitedsystems.co.in>
Cc: Durairaj Kumaraswamy <dr@unitedsystems.in>, Arun Kumar <arun@unitedsystems.in>, Satish
<satish@unitedsystems.in>

Dear Lakshmi Narayana,

The following welding procedure specification to be established under surveillance of TPAI and the same we Planned
now. For which you need to arrange the following and check and confirm.

1. Pipe welding with complete SMAW procedure:-

To carry out this test the following arrangements to be required.

a.2” pipe Sch 40 Test coupons – 2nos

b. E6010- 2.5 MM electrodes one packet with Batch certificate ( This we’ll arrange from office)

c.E7018-3.15 MM electrodes one packet with Batch certificate (This may be available at factory, check and confirm)

2. Pipe welding with complete SMAW+ GTAW procedure:-

To carry out this test the following arrangements to be required.

a. 2” pipe Sch 40 Test coupons – 2nos

b. ER70 S2- 2.4 MM filler wire one kg with Batch certificate (This may be available at factory, check and confirm)

c.  E7018-3.15 MM electrodes one packet with Batch certificate (This may be available at factory, check and confirm)

d.  Argon gas

e. Tig torch.

Regards,

Pyda Vijayasagar

+91-7893244187