b. Determine the pre-consolidation pressure, pc. c. Find the compression index, Cc. From the e-log p plot; b. Pc=115 kN/m2 c. Compression Index (Cc); From the slope of graph; P1= 300 kN/m2, e1= 0.9 P2=500 kN/m2, e2= 0.8 e 1−e 2 0.9−0.8 Therefore, Cc= log P2 = ( ) P1 log ( ) = 0.451 500 300