You are on page 1of 3

MYSKILLS CAMPUS KALUMPANG

TRAINING PATHWAY
ME-020-2:2012 PENYEJUKBEKUAN DAN PENYAMANAN UDARA DOMESTIK
START
IDENTIFY EXPECTED
ME- 020-2:2012 SEQUENTIAL STEPS FOR
COMPOLETION OF WORK

PERFORM VENTILATION FAN PERFORM AIR COOLED


WA 1 L2 SPLIT UNIT (INDOOR)
INSTALLATION
INSTALLATION

CARRY OUT POTENTIAL RISK WA 1


WA 1 L2 L2
COCU 01 AND HAZARD ASSESSMENT
RISK COCU 01
& HAZARD
RISK & HAZARD
ASSESSMENT PERFORM VENTILATION FAN PERFORM AIR COOLED
ASSESSMENT WA 2 L2 SERVICING COCU 05 SPLIT UNIT SERVICING
COCU 05
AIR COOLED SPLIT
AIRUNIT
COOLED
(1HP)SPLIT
COCU 03
COCU 03 WA 2 L2 UNIT (1HP)
INSTALLATION & WA 2 L2
VENTILATION FAN
EVALUATE THE RISK AND
VENTILATION FAN INSTALLATION &
MAINTENANCE
DECIDE WHETHER EXISTING (1HP) INSTALLATION
(1HP) INSTALLATION MAINTENANCE
PRECAUTION ARE & MAINTENANCE PERFORM VENTILITION FAN PERFORM AIR COOLED
ADEQUATE OR MORE & MAINTENANCE TROUBLESHOOTING SPLIT UNIT
SHOULD BE DONE THOUBLESHOOTING

WA 3 L2 WA 3 L2 WA 3 L2

PERFORM VENTILATION FAN PERFORM AIR COOLED


CARRY OUT SAFETY SPLIT UNIT REPAIRING
REPAIRING
PRECAUTION REQUIRED TO
ELIMINATE/ CONTROL
HAZARDS PLANING
WA 4 L2
WA 4 L2
WA 4 L2

PERFORM WINDOW UNIT Perform industrial automation engineering sketching


INSTALLATION MC-091:2016 - C01
MC-091:2016
(E01) - C01
WA 1 1/5
(E01)
INDUSTRIAL
PERFORM TYPES OF WA 1 INDUSTRIAL
SYSTEM APPROACH
L2 AUTOMATION
IDENTIFICATION AUTOMATION
ENGINEERING Perform two dimensional (2D) industrial automation
ENGINEERING engineering drawing development
PERFORM WINDOW UNIT DRAWING
WA 1 L2 SERVICING DRAWING WA 2 2/5
COCU 04
COCUUNIT
WINDOW 04
COCU 02 PERFORM REFRIGERANT WINDOW WA 2 Perform three dimensional (3D) industrial automation engineering
COCU 02
REFRIGERANT RECOVERY OF THE SPECIFIC (1HP) UNIT L2
drawing development
REFRIGERANT SERVICE (1HP) &
INSTALLATION
HANDLING INSTALLATION & WA 3 3/5
HANDLING MAINTENANCE PERFORM WINDOW UNIT
WA 2 L2 MAINTENANCE TROUBLESHOOTING

Prepare industrial automation drawing bill of materials


WA 3 L2
PREPARE REFRIGERANT
HANDLLING RECORDS WA 4 4/5
PERFORM WINDOW UNIT
REPAIRING
WA 3 L2 Perform industrial automation engineering drawing filing

WA 4 WA 5 5/5
L2

END
ME-020-2:2012
END
ME-020-2:2012
TRAINING PATHWAY
ME-020-2:2012 PENYEJUKBEKUAN DAN PENYAMANAN UDARA DOMESTIK

START
IDENTIFY EXPECTED
ME- 020-2:2012 SEQUENTIAL STEPS FOR
COMPOLETION OF WORK

PERFORM VENTILATION FAN PERFORM AIR COOLED


WA 1 L2 SPLIT UNIT (INDOOR)
INSTALLATION
INSTALLATION

CARRY OUT POTENTIAL RISK WA 1 WA 1


COCU 01 AND HAZARD ASSESSMENT L2 L2
RISK COCU 01
& HAZARD
RISK & HAZARD
ASSESSMENT PERFORM VENTILATION FAN PERFORM AIR COOLED
ASSESSMENT WA 2 L2 SERVICING COCU 05 SPLIT UNIT SERVICING
COCU 05
AIR COOLED SPLIT
AIRUNIT
COOLED
(1HP)SPLIT
COCU 03
COCU 03 WA 2 L2 UNIT (1HP)&
INSTALLATION WA 2 L2
VENTILATION FAN
EVALUATE THE RISK AND
VENTILATION FAN INSTALLATION &
MAINTENANCE
DECIDE WHETHER EXISTING (1HP) INSTALLATION
PRECAUTION ARE (1HP) INSTALLATION MAINTENANCE
& MAINTENANCE PERFORM VENTILITION FAN PERFORM AIR COOLED
ADEQUATE OR MORE & MAINTENANCE TROUBLESHOOTING SPLIT UNIT
SHOULD BE DONE THOUBLESHOOTING

WA 3 L2 WA 3 L2 WA 3 L2

PERFORM VENTILATION FAN PERFORM AIR COOLED


CARRY OUT SAFETY SPLIT UNIT REPAIRING
REPAIRING
PRECAUTION REQUIRED TO
ELIMINATE/ CONTROL
HAZARDS PLANING
WA 4 WA 4 L2
L2
WA 4 L2

PERFORM WINDOW UNIT


INSTALLATION

PERFORM TYPES OF WA 1 L2
SYSTEM APPROACH END
IDENTIFICATION ME-020-2:2012
PERFORM WINDOW UNIT
WA 1 L2 SERVICING
COCU 04
COCUUNIT
WINDOW 04
COCU 02 PERFORM REFRIGERANT WINDOW WA 2
COCU 02
REFRIGERANT RECOVERY OF THE SPECIFIC (1HP) UNIT L2
REFRIGERANT SERVICE (1HP) &
INSTALLATION
HANDLING INSTALLATION & PERFORM WINDOW UNIT
HANDLING MAINTENANCE
WA 2 MAINTENANCE TROUBLESHOOTING
L2

WA 3 L2
PREPARE REFRIGERANT
HANDLLING RECORDS
PERFORM WINDOW UNIT
REPAIRING
WA 3 L2

WA 4 L2

You might also like