LOCATION SITE Capacity (in kW)

ESIC BHOPAL 80

Installation work Done By Anureza Power Projects Pvt.Ltd.

B
H
O
P
A
L

GSI BHOPAL 40.3


Installation work Done By Anureza Power Projects Pvt.Ltd.

EPFO JABALPUR 31.2

J
A Installation work Done By Anureza Power Projects Pvt.Ltd.
B
A
L
P
U
R
GSI JABALPUR 20.25
Installation work Done By Anureza Power Projects Pvt.Ltd.
IBM JABALPUR 18.2

EPFO BHOPAL 16.9

DGMS JABALPUR 38.4

M
A
L
A
N
J R&D Lab Malanjkh 34.5
K
H
A
N
D

Star Trace Malanj 95.5


MRS Substation 41.6

WTP Building Mal 17.2

Shopping Center M 29.3

Copper Club Mala 58.5

Substation Malanj 14.3


DAV School Malan 55.3

N
A
G ESIC NAGDA 95.5 kW till now and have to be reduced to 45 kW
D
A

N
A
T
Project Office NATRAX
R
A
X
Canteen NATRAX

G
W
A
L ESIC Hospital, Gwalior
I
O
R

NOTE - Lug to be placed while doing connection in inverter at all sites (as done in Gwalior site) to avoid loose connection
NOTE - Inverter internal earthing (potential earthing) need to be rechecked and placed at sites, where it is missing
NOTE - The Highlighted points in issues section are the new punchpoints
NOTE - At all sites, Earth-pit to be marked with "heightned" sign board with nomenclature, resistance value, test date & test d
NOTE - At sites, where tables are on different roofs, so easy cleaning feasibility to be ensured, with proper water pressure upt
NOTE - At sites, where table to table distance (precisely, from back leg of one table to panel starting point of the behind table)
Issues

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
cleaning pump connection was temporary, no MCB was provided with the box
String Ferulling work is pending
HDPE conduit end sealing work pending
Tables are on different roof, so atleast one pump more is required
Shadow effect due to tree
Accessibility issue at site, as the entrance shutter remain closed, and one had to jump from stairs
AC Cable inserted to Inverter is having cuts in the conductor cable(yellow and red)
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Pump connection is not there
Earthing rod is Iron (instead of copper)

All HDPE conduit end sealing not done


String Ferulling work is pending

Clamps used for power cable dressing found in rusted condition


Shadow issue due to building structure at the site.
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Earth strip clamping not done properly.
No pump available at 2nd roof of site, required 1 more pump for proper cleaning.
one earth-pit had gone under road, at the site, and is not visible at all

Shadow effect at the site due to Building structure


Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
HDPE conduit end sealing not done
Table marking and nomenclature need to be done properly

Shadow effect due to tree


Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Pump cable conduit was broken, and need to be replaced
earthpit accessibility were difficult at the site, cleaning and proper passage to earthpit required
Shadow effect due to tree
Earthpit nomenclature was not done properly, at the site

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
String Ferulling work is pending
Cleaning pump not placed on proper structure.
Inverter bottom cover is loose.
In case of table to table earthing, earthwire is used instead of earth strip

String Ferulling work is pending

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Earth strip rusted at the site
HDPE conduit end sealing work is pending.

Shadow effect due to structure at the site( erected rod, building structure)

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)

String Ferulling work is pending


HDPE conduit end sealing work is pending.
Canopy was missing for the pump.

Painting work for Base concrete of table structure is pending


Cables from modules are passing through the Concrete base of the tables, which are difficult to repair or replace during O&M

No pump was present at the roof of the site, and the pump present at the ground floor is incapable for
sending water to top floor, for module cleaning
Shadow effect due to erected rod structure at the site
Requirement of one extra cleaning pump at site
Accessibility issues for the modules located at tin-shade.
Earthing of modules placed on tin-shade is pending

Modules placed on tin-shade roof is still mounted facing east direction


Nomenclature of ACDB is pending

String ferruling work is pending


Shadow effect due to tree
LA spike missing
Power cable entry to ACDB, gland not provided

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Accessibility issue to the panels at the site, for O&M Activity

String Ferulling work is pending


Accessibility issue to the panels at the site, for O&M Activity
Pump Canopy was missing

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
HDPE conduit end sealing not done properly
LA spike is absent

String Ferulling work pending


Shadow issue due to structure ( some cubical strcuture and dish antenna)

HDPE conduit end sealing work pending

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Accessibility issue at the plant
Earthpit rod, seems to be of Iron (rusting found)
Shadow issue at sitedue to tree

String Ferulling work pending


LA is absent
Shadow effect due to tree
Accessibility issue at the plant
ACDB end power cable glands is absent

Shadow effect due to trees present all around the school

String Ferulling pending


Power cable entry to ACDB, gland is not provided
Accessibility issue at the plant

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Requirement of one extra cleaning pump at site, as the roofs are quite distance apart

Shifting of modules had not done till now

String ferulling is pending


Marking and nomenclature of table is not done properly
Canopy is absent at the pump
pump connection is absent
No Pipe is there for cleaning
Netmetring is pending at the site
WMS to be installed, after detaching one from Jabalpur site
Eathpit cover missing and also one earthpit seems burnt
Marking and nomenclature of earthpit is pending
Shadow issue due to trees

Shadow effect at site, due to building structure

String ferulling is pending

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Table marking not done properly
No connection of pump, at site
Structure for pump and its canopy is missing at the site

No connection for pump


Proper structure and canopy is missing for the pump

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Pump can't suck water due to absence of full length of pipe
Proper Nomenclature and marking is pending at site
LA earthstrip is disconnected at site, so proper earthing is required
Power cable from inverter to LT panel is taken through normal ITB box to be replaced by proper ACDB with pr
one of earthpit was missing at site (i.e. proper earthpit box with nomenclature is missing)

All HDPE conduit end sealing from both end is pending

String ferulling work is pending


Marking and nomenclature of table not done properly
Problem in starting of pump at the site
extra modules (quantity -9) are left at the site, need to be removed or consumed.
Rusted earthstrip at the site

Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Extra materials (heavy in weight) lying in inverter room, need to be removed off)
A protective sheet from window side is required to protect inverter.
one gland is missing at the ACDB of the site.
Inverter internal earthing (potential earthing) is missing at this sies.
ACDB Board is shaking and a nut inside, which is loose can cause fault
Intello Communication Board is shaking, need to be tied properly with proper nut and bolt

ior site) to avoid loose connection


d at sites, where it is missing

ture, resistance value, test date & test due date


nsured, with proper water pressure upto the roofs:-
panel starting point of the behind table) is less than 10 feet, the shadow of one table on another table is present.
Status

NA
Completed
Completed
NA
NA
NA

NA

NA

NA

NA
NA
NA

NA

NA

NA
NA
NA

NA

NA

NA

pair or replace during O&M activity

NA
NA
NA

NA

NA
NA
NA

NA

NA
NA

NA

NA
NA

NA
NA
NA

NA
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA
NA

NA

NA

NA

nt.
Remarks

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
This point was not incude in BOQ aproval and neither technical RFP.

Ferulling of Strings Done at Inverter Side,At Modules End Marking done on Structure as advised by Fidus Team.Oct.17-019

This point was not incude in BOQ aproval and neither technical RFP.

That is clients property, so trees to be trimmed from clients end


Access Ladder is not in our scope and this can be offloaded to O&M agency.

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Done By FidusTeam , Anureza Power Not Installed any Pipeline system at site.
Earthing rod is Copper Bonded. It turns black after sometime.

Sealing of Conduit end done at the time of punch point clearing time. In oct.2019
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discussion with Subhoj

Materials supplies are not in Anureza Power Scope, some small Items are purchased from local market by Fidus Team Approval,Generraly Clampes get rusted in 3-4 months it
The space was very conjusted over the roof
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Earth strip route was changed as per the instruction of the customer & clamping is done as per the customer instruction

At GSI Bhopal, already the customer has created a lot of chaos regarding earthing area. That area is restricted & earthing is done as per instruction o

The space was very conjusted over the roof


Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Sealing of Conduit end done at the time of punch point clearing time. In oct.2019
Table Marking are done for String Tracing Purpose.

That is clients property, so trees to be trimmed from clients end


Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Everytimg was fine at time of first visit. After that repairing of the building came in prgress. Due to which the damage ocuured.
Bushes is clients property. Gardening work to be done from clients end. To trace Earthing pit, we have provided exact earthing pit location in a
That is clients property, so trees to be trimmed from clients end
Marking work was done but due to siteassacibility issue it may be irrased, We will Make it again.

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discussion with Subhoj

For less then 20KW, we have supplied 16sqmm cable as per BOQ

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o

The space was very conjusted over the roof

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu

during O&M activity

At this site, two motors of 1hp were placed at the time of first visit. Second motor was found stollen (in customer knowledge)
water tank (which is stollen), second motor is stollen on ground floor of RCC roof. Both are 1 hp which is sufficient to push to
The rod is clients property, so rod to be removed by client
Alteady two motors were present at the time of first visit. Now the second motor is stollen which is customers
Access Ladder is not in our scope and this can be offloaded to O&M agency.

Since the tilt angle of teenshed is 12degree, so it was not safe to install module post. But the CUF of this site is the best amo
than 5. Hence there is enough generation at this site.

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
That is clients property, so trees to be trimmed from clients end
As per first visit, LA was present at site. Items missing after that is not our reposibility.

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Access Ladder is not in our scope and this can be offloaded to O&M agency.

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Access Ladder is not in our scope and this can be offloaded to O&M agency.

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o

This LA is pointed type. In this there is no need of spikes.

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
The space was very conjusted over the roof

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Earthing rod is Copper Bonded. It turns black after sometime.
That is clients property, so trees to be trimmed from clients end

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
That is clients property, so trees to be trimmed from clients end
Access Ladder is not in our scope and this can be offloaded to O&M agency.

That is clients property, so trees to be trimmed from clients end

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu

Access Ladder is not in our scope and this can be offloaded to O&M agency.

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
This point was not incude in BOQ aproval and neither technical RFP.

There was no space provided by the client except roof

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu

Material stollen is not our responsiblility

Everything was fine at the time of first visit of O&M. Someone burning

That is clients property, so trees to be trimmed from clients end

The space was very conjusted over the roof

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o

2IN 1OUT ACDB box is already provided at the site. This is just a Box required for Inv

Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu

There was no space provided by the client except roof

Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
These items do not belong to us. And cleaning others mess is not in our scope.