A Installation work Done By Anureza Power Projects Pvt.Ltd.
B
A
L
P
U
R
GSI JABALPUR 20.25
Installation work Done By Anureza Power Projects Pvt.Ltd.
IBM JABALPUR 18.2
M
A
L
A
N
J R&D Lab Malanjkh 34.5
K
H
A
N
D
N
A
G ESIC NAGDA 95.5 kW till now and have to be reduced to 45 kW
D
A
N
A
T
Project Office NATRAX
R
A
X
Canteen NATRAX
G
W
A
L ESIC Hospital, Gwalior
I
O
R
NOTE - Lug to be placed while doing connection in inverter at all sites (as done in Gwalior site) to avoid loose connection
NOTE - Inverter internal earthing (potential earthing) need to be rechecked and placed at sites, where it is missing
NOTE - The Highlighted points in issues section are the new punchpoints
NOTE - At all sites, Earth-pit to be marked with "heightned" sign board with nomenclature, resistance value, test date & test d
NOTE - At sites, where tables are on different roofs, so easy cleaning feasibility to be ensured, with proper water pressure upt
NOTE - At sites, where table to table distance (precisely, from back leg of one table to panel starting point of the behind table)
Issues
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
cleaning pump connection was temporary, no MCB was provided with the box
String Ferulling work is pending
HDPE conduit end sealing work pending
Tables are on different roof, so atleast one pump more is required
Shadow effect due to tree
Accessibility issue at site, as the entrance shutter remain closed, and one had to jump from stairs
AC Cable inserted to Inverter is having cuts in the conductor cable(yellow and red)
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Pump connection is not there
Earthing rod is Iron (instead of copper)
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
String Ferulling work is pending
Cleaning pump not placed on proper structure.
Inverter bottom cover is loose.
In case of table to table earthing, earthwire is used instead of earth strip
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Earth strip rusted at the site
HDPE conduit end sealing work is pending.
Shadow effect due to structure at the site( erected rod, building structure)
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
No pump was present at the roof of the site, and the pump present at the ground floor is incapable for
sending water to top floor, for module cleaning
Shadow effect due to erected rod structure at the site
Requirement of one extra cleaning pump at site
Accessibility issues for the modules located at tin-shade.
Earthing of modules placed on tin-shade is pending
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Accessibility issue to the panels at the site, for O&M Activity
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
HDPE conduit end sealing not done properly
LA spike is absent
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Accessibility issue at the plant
Earthpit rod, seems to be of Iron (rusting found)
Shadow issue at sitedue to tree
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Requirement of one extra cleaning pump at site, as the roofs are quite distance apart
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Table marking not done properly
No connection of pump, at site
Structure for pump and its canopy is missing at the site
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Pump can't suck water due to absence of full length of pipe
Proper Nomenclature and marking is pending at site
LA earthstrip is disconnected at site, so proper earthing is required
Power cable from inverter to LT panel is taken through normal ITB box to be replaced by proper ACDB with pr
one of earthpit was missing at site (i.e. proper earthpit box with nomenclature is missing)
Bolts, Nuts, Washers found in rusted condition(paint not required, need complete replacement)
Extra materials (heavy in weight) lying in inverter room, need to be removed off)
A protective sheet from window side is required to protect inverter.
one gland is missing at the ACDB of the site.
Inverter internal earthing (potential earthing) is missing at this sies.
ACDB Board is shaking and a nut inside, which is loose can cause fault
Intello Communication Board is shaking, need to be tied properly with proper nut and bolt
NA
Completed
Completed
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
nt.
Remarks
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
This point was not incude in BOQ aproval and neither technical RFP.
Ferulling of Strings Done at Inverter Side,At Modules End Marking done on Structure as advised by Fidus Team.Oct.17-019
This point was not incude in BOQ aproval and neither technical RFP.
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Done By FidusTeam , Anureza Power Not Installed any Pipeline system at site.
Earthing rod is Copper Bonded. It turns black after sometime.
Sealing of Conduit end done at the time of punch point clearing time. In oct.2019
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discussion with Subhoj
Materials supplies are not in Anureza Power Scope, some small Items are purchased from local market by Fidus Team Approval,Generraly Clampes get rusted in 3-4 months it
The space was very conjusted over the roof
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Earth strip route was changed as per the instruction of the customer & clamping is done as per the customer instruction
At GSI Bhopal, already the customer has created a lot of chaos regarding earthing area. That area is restricted & earthing is done as per instruction o
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement of nut bolts not po
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discussion with Subhoj
For less then 20KW, we have supplied 16sqmm cable as per BOQ
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
At this site, two motors of 1hp were placed at the time of first visit. Second motor was found stollen (in customer knowledge)
water tank (which is stollen), second motor is stollen on ground floor of RCC roof. Both are 1 hp which is sufficient to push to
The rod is clients property, so rod to be removed by client
Alteady two motors were present at the time of first visit. Now the second motor is stollen which is customers
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Since the tilt angle of teenshed is 12degree, so it was not safe to install module post. But the CUF of this site is the best amo
than 5. Hence there is enough generation at this site.
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
That is clients property, so trees to be trimmed from clients end
As per first visit, LA was present at site. Items missing after that is not our reposibility.
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
The space was very conjusted over the roof
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Earthing rod is Copper Bonded. It turns black after sometime.
That is clients property, so trees to be trimmed from clients end
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
That is clients property, so trees to be trimmed from clients end
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Access Ladder is not in our scope and this can be offloaded to O&M agency.
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
This point was not incude in BOQ aproval and neither technical RFP.
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Everything was fine at the time of first visit of O&M. Someone burning
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
2IN 1OUT ACDB box is already provided at the site. This is just a Box required for Inv
Ferruling done on Inverter end. At module end, we have done marking of strings on Frame of the Modules as per discu
Removal of rust using primer & kerosene oil & then zinc painting after that. Uninstallation of Modules & replacement o
These items do not belong to us. And cleaning others mess is not in our scope.
Remarks By Anureza Power