Rated TOV
BIL d1 d2 d3 d4 d5 d9 d10 l2 l4 l6 l7 l8 l9 l10 r1 r2 s1 s2 s3 s4
voltage kV d6 d7 d8 l5 m1 m2 n1 t1 t2
kVp max. min. max. min. min. max. max. max. min. max. min max. max. min. min min min. max. min. max.
[kV] r.m.s
123 550 230 +0.5 +0.5 +0.3 +1 +0.3 +0.5
A to to to 100 112 110 100 300 255 299 298 250 350 50 18 757 5.5 85 30 50 55 M10 M12 12 10 1.5 257 294 295 266 80 320 A
170 750 325 -0 -0 -0.3 -1 -0.3 -0.5
X-X
830
779
d1
t1
C C
W
5 $
d5
5 $
d2
d6
s2
s1
d7
4xM16x30/35 deep
threaded hole
for steel structure
D l2
D
4xm1
tightening torque l5
30Nm
40
787
35
407,5
17
E E
30 $
280
F F
W
B
(1:1) 1. ABB Cable Sealing end connection according to IEC 62271-209:2007.
Delivery condition: Top side 36 l7 = 120
Dimensions (e.g. d1, d2) according IEC. Parts from other supplier a
need to be according to IEC 62271-209:2007. Otherwise there is a ri
that interfaces do not fit together.
W-W l8
(2:5) 2. Prior to assembly onto the SF6-Switchgear housing, the SF6-side
of the bushing has to be protected against absorption of moisture.
H Parts made of insulating material have to be protected against the
H
absorption of moisture at all times, e.g. during manufacturing,
storage and assembly.
l10 d1
n1xm2
t1
l4
* Delivery of parts from other supplier can be also performed from ABB.
In this case the scope of delivery needs to be coordinated with ABB.
4xm1
d10
d9 supplied by switchgear manufacturer. Delivery from ABB will be conduct
t2
d3
d4
90
Comments Order Scale Units Format
$
- 2:5 mm A0
Prepared Based on
GIS
l5 2016-11-02 D.Trinh
N Reviewed
2016-11-03 K.Foerter
Responsible department
PGHV/DE/TC/GIS
Language
en/de N
6 Approved
2016-11-04 M.Koordt
Document kind
of 1
The information contained in this document has to be kept strictly
confidential. Document id. Revision
Any unauthorized use, reproduction, distribution or disclosure to third parties
is strictly forbidden. ABB reserves all rights regarding IntellectualRights.
Property