You are on page 1of 1

TECHINCAL WORK ONLY

SCHEDULE OF SUBMISSION DRAWING

( 1ST STAGE )

ARCHTECTURE DRAWING 0

SIGNATURE OF PROFESSIONS 12,000 / =

PRINTING 3,000 / =
_______________________ _________

( 2ND STAGE )

STRUCTURE DRAWING WORK

DESIGN 60,000 / =

STRUCTURE PRINTING 15,000 / =

SOIL TESTING 1,50,000 /=

SIGNATURE OF PROFESSIONS 60,000 /=

TOTAL AMOUNT = 3,00,000 /=

You might also like