You are on page 1of 1

ACI 304: Measuring, Mixing, Transporting, and Placing Concrete

Wednesday, April 24, 2002


8:30-11:30 AM
Marquette A
Marriott Renaissance Center
Detroit, Michigan

1. Call to Order
1.1 Distribution of previous minutes
1.2 Introduction of members and guests
1.3 Members present:
1.4 Guests present:

2. Approval of Dallas, Texas Minutes


2.1 Additions, corrections, motion to approve

3. Membership Status
3.1 Notification by members unable to attend:
3.2 Introduction of new members:

4. Subcommittee Reports
4.1 ACI 304R-00: Guide for Measuring, Mixing, Transporting, and Placing Concrete (Dave
Baker)
4.2 ACI 304.2R-96: Placing Concrete by Pumping Methods
4.3 ACI 304.3R-96: Heavyweight Concrete: Measuring, Mixing, Transporting, and Placing
(K. Wolf)
4.4 ACI 304.5R-91: Batching, Mixing, and Job Control of Lightweight Concrete (Doug
Rhiel)
4.5 ACI 304.6R: Guide for the use of Volumetric -Measuring (T R Clapp)

5. Old Business
Review Sub-Committee Chair Status:
#1 Preplaced Aggregate Concrete – Michael Gardner as Chair
#2 Pumping – no changes
#3 Heavyweight – no changes
#4 Belt Conveyors – no changes
#5 Lightweight – _________ as Chair
#6 Volumetric – T.R. Clapp as Chair
#7 Guide – Royce Rhoads – Chair
Michael Gardner, Kerry Burke added to sub-committee
#8 Editorial – no changes
#9 Statistical Process Control – no changes

6. New Business
6.1 Meeting time?

7. Adjourn

You might also like