Subject: Owner's Comments

Project Title: KSA deployable hospital

Document No.: HOS-SQM-MOS-008-00 Document Title: METHOD STATEMENT FOR CMU BLOCK WORK

Approval Status: C rejected CRS Rev. No.: 00


Doc Rev. Comment
Comment # Comment Owner Section Chapter/topic Doc Rev Date The document pages must be numbered Owner Date EPC's Response EPC Date
No. Status

Please include the MoS, how the CMU will be protected from Surface runoff method will be
1 ACWA POWER 22-Apr-20 22-Apr-20 Open
rainwater flow. submitted seperately

MTC will be submitted along


2 ACWA POWER 22-Apr-20 What is the compressive strength of the CMU, please elaborate 22-Apr-20 Open
with the Material Submittal

No CMU is taking the direct


loads of Flat Pack, all over
3 ACWA POWER 22-Apr-20 How the Flat pack frames shall be fixed with the CMU 22-Apr-20 Open
flat packs will be resting
upon concrete foundations.

Please include how the gap between the ground and the flat pack CMU peripheri will be built
4 ACWA POWER 22-Apr-20 22-Apr-20 Open
botom will be filled / covered. underside of flatpacks