Professional Documents
Culture Documents
Document No.: HOS-SQM-MOS-008-00 Document Title: METHOD STATEMENT FOR CMU BLOCK WORK
Please include the MoS, how the CMU will be protected from Surface runoff method will be
1 ACWA POWER 22-Apr-20 22-Apr-20 Open
rainwater flow. submitted seperately
Please include how the gap between the ground and the flat pack CMU peripheri will be built
4 ACWA POWER 22-Apr-20 22-Apr-20 Open
botom will be filled / covered. underside of flatpacks