BHP Billiton

SGO WP2 Concentrator Project


Sierra Gorda, Chile
Project No.: B2SG Page 1 of 1

FIELD MATERIAL REQUEST / SALIDA DE MATERIALES BODEGA INTERNACIONAL

FOR MATERIAL REQUEST FOR MATERIAL RETURN FOR PURCHASE

REQUESTED BY COMPANY/DEPARTMENT/DISCIPLINE SALIDA N°


RAUL ALARCON FLUOR-SALFA
DELIVER TO (PERSON/COMPANY) REQUIRED DATE CWP DRAWING REV
LINEA:
FLUOR-SALFA 07-04-2020 2831-06-50-008
QT UNI
COMMODITY CODE MATERIAL DESCRIPTION SIZE STOCK
Y T
GUIA N° 01 C/U FLANGE SLIP ON RF 150 LBS 18”

REASON REQUIRED TEMPORARY WORK X INSTALLATION/FABRICATION


NOT SHOWN ON BOM FIELD CHANGE NOT REQUIRED
ENGINEERING OFFICE CHANGE MISPLACED OTHER (Describe)
ACTION TAKEN

SIGNATURE

AWP AUTORIZADO POR: RECIBIDO POR :

SERGIO ALARCON SERGIO ALARCON

FECHA:07-04-2020 FECHA: 07-04-2020 FECHA: 07-04-2020

DESPACHADO POR :
FECHA :08-04-2020