This document is a field material request form from Raul Alarcon of Fluor-Salfa for the BHP Billiton SGO WP2 Concentrator Project in Sierra Gorda, Chile. It requests one 150 pound flange slip on that is 18 inches for installation and fabrication for the project with a required date of April 7, 2020. The material was authorized by Sergio Alarcon and received by him as well.
This document is a field material request form from Raul Alarcon of Fluor-Salfa for the BHP Billiton SGO WP2 Concentrator Project in Sierra Gorda, Chile. It requests one 150 pound flange slip on that is 18 inches for installation and fabrication for the project with a required date of April 7, 2020. The material was authorized by Sergio Alarcon and received by him as well.
This document is a field material request form from Raul Alarcon of Fluor-Salfa for the BHP Billiton SGO WP2 Concentrator Project in Sierra Gorda, Chile. It requests one 150 pound flange slip on that is 18 inches for installation and fabrication for the project with a required date of April 7, 2020. The material was authorized by Sergio Alarcon and received by him as well.