Professional Documents
Culture Documents
Handbook On Maintenance of Switch Expansion Joint PDF
Handbook On Maintenance of Switch Expansion Joint PDF
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
HANDBOOK
ON
MAINTENANCE OF SWITCH
EXPANSION JOINT
FOR L.W.R./C.W.R.
CAMTECH/C/04
December - 1997
Centre
for
Advanced
Excellence in Maintenance
Maintenance
TECHnology
HANDBOOK
ON
MAINTENANCE OF
SWITCH EXPANSION
JOINT
CONTENTS
S.No. Description Page
1. INTRODUCTION 1
2. MAINTENANCE OF SEJ. 1
3. GAPS AT SEJ. 1
4. DAMAGE TO SEJ. 2
5. BUCKLING OF TRACK 3
PREFACE
Gwalior R.S.Dubey
Date : 10 July,98 Joint Director (Civil)
FOREWORD
Indian Railways have a running track of about 81,000 Kms. As
on 31.03.97, 60618 Kms. has been modernised into Welded
Track out of which 31,914 Kms. is with long Continuous
Welded Rails and 28,704 Kms. is with Short Welded Rails.
Gwalior D. K. Saraf
Date : 20th July, 1998 Director
1. INTRODUCTION
2. MAINTENANCE OF SEJs
3. GAPS AT SEJ
Gaps at SEJ shall be adjusted at the time of laying/
subsequent destressing of LWR/CWR.
52 kg/60kg 40mm
others 60mm
5. BUCKLING OF TRACK
General
*****
Table - I
PARAMETERS FOR STANDARD I.R. RAIL SECTIONS
52 Kg 66.15 - do - - do -
90 R 56.95 - do - - do -
75 R 47.37 - do - - do -
Table - II
Table - III
60 Kg(UIC)/ 52 Kg 40 mm
Other 60 mm
EXAMPLE
= A E2 t2/ 4R
= 66.15 x 2.15 x 106 x (1.152 x 10-5)2 x (76)2 / 4 x 13.28
= 2.052 cm
= 20.50 mm
*******
td + 28 -- -- -- 28
td + 25 -- -- 30 28 to 31
td + 20 -- 34 30 to 35 28 to 31
td + 15 36 34 to 38 31 to 40 29 to 42
td + 10 37 to 40 34 to 42 32 to 45 30 to 47
td + 05 37 to 44 35 to 46 33 to 49 32 to 51
td 38 to 47 37 to 50 35 to 53 34 to 55
td - 05 40 to 49 39 to 53 37 to 56 36 to 59
td - 10 41 to 51 41 to 55 40 to 59 39 to 62
td - 15 44 to 53 43 to 57 43 to 62 42 to 65
td - 20 46 to 55 46 to 59 46 to 64 46 to 67
td - 25 49 to 56 50 to 61 50 to 66 50 to 69
td - 30 53 to 56 54 to 62 54 to 67 54 to 71
td - 35 56 58 to 62 59 to 68 59 to 71
td - 40 -- 62 64 to 69 64 to 73
td - 45 -- -- 69 70 to 74
td - 48 -- -- -- 74
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparioson of gaps at site.
td + 28 -- -- -- 27
td + 25 -- -- 30 27 to 28
td + 20 -- 33 30 to 35 27 to 31
td + 15 36 34 to 38 31 to 40 28 to 37
td + 10 36 to 40 34 to 43 32 to 45 30 to 42
td + 05 37 to 44 35 to 46 33 to 50 32 to 52
td 38 to 47 37 to 50 35 to 53 34 to 56
td - 05 40 to 50 39 to 53 37 to 57 36 to 60
td - 10 41 to 52 41 to 56 40 to 60 39 to 63
td - 15 44 to 54 44 to 58 43 to 63 42 to 66
td - 20 46 to 55 47 to 60 46 to 65 46 to 67
td - 25 50 to 56 50 to 61 50 to 67 50 to 70
td - 30 53 to 57 54 to 62 55 to 68 55 to 72
td - 35 57 56 to 63 59 to 69 60 to 73
td - 40 -- 63 65 to 70 65 to 74
td - 45 -- -- 70 72 to 75
td - 48 -- -- -- 75
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparioson of gaps at site.
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 13
td + 28 -- -- -- 26
td + 25 -- -- 29 26 to 30
td + 20 -- 33 29 to 35 26 to 36
td + 15 36 33 to 38 30 to 40 27 to 42
td + 10 36 to 40 34 to 43 31 to 46 29 to 48
td + 05 37 to 44 35 to 47 32 to 50 31 to 53
td 38 to 47 36 to 51 34 to 55 33 to 57
td - 05 40 to 50 38 to 54 37 to 59 36 to 61
td - 10 41 to 53 41 to 57 42 to 62 39 to 65
td - 15 44 to 55 44 to 60 43 to 65 43 to 68
td - 20 47 to 56 47 to 62 46 to 67 47 to 71
td - 25 50 to 58 51 to 63 51 to 69 51 to 73
td - 30 54 to 58 55 to 64 56 to 71 56 to 75
td - 35 58 60 to 65 61 to 72 72 to 77
td - 40 -- 65 67 to 73 68 to 77
td - 45 -- -- 73 74 to 78
td - 48 -- -- -- 78
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparioson of gaps at site.
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 14
td + 28 -- -- -- 29
td + 25 -- -- 31 29 to 32
td + 20 -- 35 32 to 36 30 to 37
td + 15 37 35 to 39 32 to 40 30 to 42
td + 10 37 to 40 35 to 42 33 to 44 32 to 46
td + 05 38 to 43 36 to 45 34 to 48 33 to 50
td 39 to 46 37 to 48 36 to 51 35 to 53
td - 05 40 to 48 39 to 51 38 to 54 37 to 56
td - 10 41 to 50 41 to 53 40 to 57 39 to 59
td - 15 43 to 51 43 to 55 42 to 59 42 to 61
td - 20 45 to 53 46 to 57 45 to 61 45 to 64
td - 25 48 to 53 48 to 58 49 to 62 49 to 65
td - 30 51 to 54 52 to 59 52 to 64 52 to 67
td - 35 54 55 to 59 56 to 64 57 to 68
td - 40 -- 59 60 to 65 61 to 69
td - 45 -- -- 65 66 to 69
td - 48 -- -- -- 69
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparison of gaps at site.
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 15
td + 28 -- -- -- 29
td + 25 -- -- 31 29 to 32
td + 20 -- 34 31 to 36 29 to 37
td + 15 37 34 to 38 32 to 40 30 to 42
td + 10 37 to 40 35 to 42 33 to 44 31 to 46
td + 05 38 to 43 36 to 46 34 to 48 33 to 50
td 39 to 46 37 to 49 36 to 52 34 to 54
td - 05 40 to 48 39 to 51 38 to 55 37 to 57
td - 10 41 to 50 41 to 54 40 to 57 39 to 60
td - 15 43 to 52 43 to 55 42 to 60 42 to 62
td - 20 46 to 53 46 to 57 46 to 62 45 to 64
td - 25 48 to 54 49 to 58 50 to 63 49 to 66
td - 30 51 to 54 52 to 59 53 to 64 53 to 68
td - 35 55 56 to 60 57 to 65 57 to 69
td - 40 -- 60 61 to 66 62 to 69
td - 45 -- -- 66 67 to 70
td - 48 -- -- -- 70
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparison of gaps at site.
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 16
td + 28 -- -- -- 28
td + 25 -- -- 30 28 to 31
td + 20 -- 34 30 to 36 28 to 37
td + 15 37 34 to 38 31 to 40 29 to 42
td + 10 37 to 40 35 to 42 32 to 45 30 to 47
td + 05 37 to 44 36 to 46 33 to 49 32 to 51
td 38 to 46 37 to 49 35 to 53 34 to 55
td - 05 40 to 49 39 to 52 37 to 56 36 to 58
td - 10 41 to 51 41 to 55 40 to 59 39 to 62
td - 15 44 to 53 43 to 57 43 to 61 40 to 64
td - 20 46 to 54 46 to 59 46 to 64 46 to 67
td - 25 49 to 55 50 to 60 50 to 65 52 to 69
td - 30 52 to 56 53 to 61 54 to 67 54 to 70
td - 35 56 57 to 62 58 to 68 59 to 71
td - 40 -- 62 63 to 68 64 to 72
td - 45 -- -- 68 69 to 73
td - 48 -- -- -- 73
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparison of gaps at site.
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 17
td + 28 -- -- -- 26
td + 25 -- -- 29 26 to 30
td + 20 -- 33 29 to 35 27 to 36
td + 15 36 33 to 38 30 to 40 28 to 42
td + 10 36 to 40 34 to 43 31 to 46 29 to 48
td + 05 37 to 44 35 to 47 32 to 50 30 to 52
td 38 to 47 36 to 51 34 to 54 33 to 57
td - 05 40 to 50 38 to 54 37 to 58 36 to 61
td - 10 42 to 53 41 to 57 42 to 61 39 to 65
td - 15 44 to 55 44 to 59 43 to 64 43 to 68
td - 20 47 to 56 47 to 61 47 to 67 47 to 70
td - 25 50 to 57 51 to 63 51 to 69 51 to 73
td - 30 54 to 58 55 to 64 56 to 70 56 to 74
td - 35 58 62 to 65 61 to 71 61 to 76
td - 40 -- 65 66 to 72 67 to 77
td - 45 -- -- 72 73 to 77
td - 48 -- -- -- 77
Note : The above values have been calculated with initial setting of gaps at SEJ as 40 mm.
Where initial setting of SEJ is 60 mm, 20 mm should be added to each of above
values for comparison of gaps at site.
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 18
td + 33 -- -- -- 47
td + 30 -- -- 49 47 to 49
td + 25 -- 52 49 to 53 47 to 54
td + 20 55 53 to 56 50 to 57 48 to 58
td + 15 55 to 58 53 to 59 50 to 60 49 to 61
td + 10 56 to 60 54 to 62 51 to 64 50 to 65
td + 05 57 to 63 55 to 65 53 to 67 51 to 68
td 58 to 65 56 to 67 54 to 69 53 to 71
td - 05 59 to 67 58 to 69 56 to 71 56 to 73
td - 10 61 to 68 60 to 71 59 to 73 58 to 75
td - 15 63 to 69 62 to 72 61 to 75 61 to 77
td - 20 65 to 70 65 to 73 64 to 77 64 to 79
td - 25 67 to 70 67 to 74 67 to 78 67 to 80
td - 30 70 71 to 74 71 to 78 71 to 81
td - 35 -- 74 75 to 79 75 to 82
td - 40 -- 62 79 79 to 82
td - 43 -- -- -- 82
td + 33 -- -- -- 45
td + 30 -- -- 48 45 to 48
td + 25 -- 52 48 to 52 46 to 53
td + 20 55 52 to 55 49 to 57 47 to 58
td + 15 55 to 58 52 to 59 49 to 61 48 to 62
td + 10 55 to 61 53 to 62 51 to 64 49 to 65
td + 05 56 to 63 54 to 65 52 to 67 51 to 69
td 57 to 65 56 to 68 54 to 70 53 to 72
td - 05 59 to 67 58 to 70 56 to 73 55 to 74
td - 10 61 to 69 60 to 72 59 to 75 58 to 77
td - 15 63 to 70 62 to 73 62 to 77 61 to 79
td - 20 65 to 71 65 to 74 65 to 78 64 to 81
td - 25 68 to 71 68 to 75 68 to 79 68 to 82
td - 30 71 72 to 76 72 to 80 72 to 83
td - 35 -- 76 76 to 81 76 to 84
td - 40 -- -- 81 81 to 84
td - 43 -- -- -- 84
td + 33 -- -- -- 43
td + 30 -- -- 46 43 to 47
td + 25 -- 50 46 to 51 44 to 52
td + 20 54 51 to 55 47 to 56 45 to 57
td + 15 54 to 58 51 to 59 48 to 61 46 to 62
td + 10 55 to 61 52 to 62 49 to 65 47 to 66
td + 05 56 to 64 54 to 66 51 to 68 49 to 70
td 57 to 66 55 to 69 53 to 71 52 to 73
td - 05 59 to 68 57 to 71 56 to 74 54 to 76
td - 10 61 to 70 61 to 73 58 to 77 57 to 79
td - 15 63 to 71 63 to 75 62 to 79 61 to 81
td - 20 66 to 72 66 to 76 65 to 81 65 to 83
td - 25 69 to 73 69 to 77 69 to 82 69 to 85
td - 30 73 73 to 78 73 to 83 73 to 86
td - 35 -- 78 79 to 83 79 to 87
td - 40 -- -- 84 84 to 87
td - 43 -- -- -- 87
Handbook on Maintenance of Switch Expansion Joint Dec, 97
CAMTECH/C/04 21
td + 33 -- -- -- 14
td + 30 -- -- 22 14 to 24
td + 25 -- 34 23 to 36 16 to 38
td + 20 43 34 to 46 24 to 49 18 to 52
td + 15 44 to 53 36 to 57 27 to 62 21 to 65
td + 10 45 to 62 38 to 67 31 to 73 25 to 77
td + 05 48 to 70 42 to 76 35 to 83 31 to 87
td 52 to 77 47 to 84 41 to 92 37 to 97
td - 05 56 to 83 53 to 91 48 to 99 45 to 105
td - 10 62 to 87 59 to 96 56 to 106 53 to 113
td + 33 -- -- -- 9
td + 30 -- -- 18 9 to 24
td + 25 -- 31 18 to 34 11 to 36
td + 20 41 31 to 44 20 to 48 13 to 51
td + 15 42 to 52 33 to 56 23 to 62 17 to 65
td + 10 44 to 62 36 to 68 27 to 74 21 to 78
td + 05 47 to 71 40 to 78 32 to 85 27 to 90
td 51 to 79 45 to 86 39 to 95 35 to 101
td - 05 56 to 85 52 to 94 47 to 104 43 to 110
td + 33 -- -- -- 22
td + 30 -- -- 28 22 to 30
td + 25 -- 38 29 to 40 23 to 42
td + 20 46 39 to 48 30 to 51 25 to 54
td + 15 46 to 54 40 to 57 23 to 61 28 to 64
td + 10 48 to 62 42 to 66 35 to 71 31 to 74
td + 05 50 to 68 45 to 73 39 to 79 37 to 83
td 53 to 74 49 to 80 44 to 86 41 to 91
td - 05 57 to 79 54 to 85 50 to 93 47 to 98
td - 10 62 to 83 60 to 90 57 to 99 54 to 104
td - 15 67 to 86 66 to 94 64 to 103 62 to 109
td - 20 74 to 88 74 to 97 72 to 107 71 to 114
td - 25 81 to 99 82 to 99 81 to 110 84 to 117
td + 33 -- -- -- 18
td + 30 -- -- 25 18 to 26
td + 25 -- 36 25 to 38 19 to 40
td + 20 44 36 to 47 27 to 50 21 to 53
td + 15 45 to 54 38 to 57 29 to 61 24 to 65
td + 10 46 to 62 40 to 66 33 to 72 28 to 75
td + 05 49 to 69 43 to 75 37 to 81 33 to 85
td 52 to 76 48 to 82 42 to 89 39 to 94
td - 05 57 to 81 53 to 88 49 to 97 46 to 102
td - 10 62 to 85 60 to 94 56 to 103 54 to 109
td - 15 68 to 89 67 to 98 64 to 108 62 to 115
NOTES
OUR OBJECTIVE
To upgrade Maintenance
Technologies and Methodologies
and achieve improvement in
productivity and performance
of all Railway assets and manpower
which inter-alia would cover
Reliability, Availability,
and Utilisation.