You are on page 1of 1

1.

30

1.30
ROOF DECK ROOF DECK

2.70

2.70
19TH FLOOR LINE 19TH FLOOR LINE

2.70

2.70
18TH FLOOR LINE 18TH FLOOR LINE

2.70

2.70
17TH FLOOR LINE 17TH FLOOR LINE

2.70

2.70
16TH FLOOR LINE 16TH FLOOR LINE

2.70

2.70
15TH FLOOR LINE 15TH FLOOR LINE

2.70

2.70
14TH FLOOR LINE 14TH FLOOR LINE

2.70

2.70
13TH FLOOR LINE 13TH FLOOR LINE

2.70

2.70
12TH FLOOR LINE 12TH FLOOR LINE

2.70

2.70
11TH FLOOR LINE 11TH FLOOR LINE

53.30

53.30
2.70

2.70
10TH FLOOR LINE 10TH FLOOR LINE

2.70

2.70
9TH FLOOR LINE 9TH FLOOR LINE
2.70

2.70
8TH FLOOR LINE 8TH FLOOR LINE
2.70

2.70
7TH FLOOR LINE 7TH FLOOR LINE
2.70

2.70
2ND FLOOR
6TH FLOOR LINE
LINE 2ND FLOOR
6TH FLOOR LINE
LINE
2.70

2.70
5TH FLOOR LINE 5TH FLOOR LINE
2.70

2.70
4TH FLOOR LINE 4TH FLOOR LINE
2.70

2.70
3RD FLOOR LINE 3RD FLOOR LINE
2.70

2.70
2ND FLOOR LINE 2ND FLOOR LINE
3.00

3.00
FFL FFL
NGL NGL
.40

.40
FRONT ELEVATION REAR ELEVATION
SCALE: 1:200M SCALE: 1:200M

BATANGAS STATE UNIVERSITY PROJECT TITLE SUBMITTED BY SHEET CONTENT SHEET NO.
COLLEGE OF ENGINEERING,
ARCHITECTURE AND FINE ARTS COMMERCIAL BUILDING SUAREZ, KIM CHARLONE A.
CE - 5204 FRONT ELEVATION
CIVIL AND SANITARY REAR ELAVATION A
PROJECT LOCATION SUBMITTED TO
ENGINEERING DEPARTMENT 2
LIPA CITY, BATANGAS ENGR. RHEA S. DE OCAMPO

You might also like