You are on page 1of 10

Universidad Nacional Autónoma De Honduras

Facultad de Ciencias Económicas, Administrativas y Contables


Maestría en Administración de Empresas
Centro Universitario Regional Nor-Oriental

Asignatura:
Administración de Operaciones

Tema:
Guía de Trabajo No. 6

Catedrático:
MSc. Ramon Sarmiento

Maestrante:
Ana Patricia Salinas Cardona MAE225821

Juticalpa, Olancho Mayo, 2020


Taller de Trabajo Missouri
The
The computations
computations are
are complete.
complete.
Layout

Data
Assigned Flow/Load
Room Table Maquinado Inmersion Acabado Revestido
Room 4 Maquinado 0 6 18 2
Room 1 Inmersion 0 0 4 2
Room 3 Acabado 0 0 0 18
Room 2 Revestido 0 0 0 0
NOTE: The distance from Room J to Room I should not be a blank but should be the same as the distance from Room I to Ro
Assigned Distance/Cost
Dept table Room 1 Room 2 Room 3 Room 4
Inmersion Room 1 0 20 12 8
Revestido Room 2 20 6 10
Acabado Room 3 12 6 4
Maquinado Room 4 8 10 4

Total movement 336 Cost/Moveme 0.5 Total cost

Movement computations
Second Cost/Distanc
First dept Second dept Load/Flow First room room e Product
Maquinado Maquinado 0 Room 4 Room 4 0 0
Maquinado Inmersion 6 Room 4 Room 1 8 48
Maquinado Acabado 18 Room 4 Room 3 4 72
Maquinado Revestido 2 Room 4 Room 2 10 20
Inmersion Maquinado 0 Room 1 Room 4 8 0
Inmersion Inmersion 0 Room 1 Room 1 0 0
Inmersion Acabado 4 Room 1 Room 3 12 48
Inmersion Revestido 2 Room 1 Room 2 20 40
Acabado Maquinado 0 Room 3 Room 4 4 0
Acabado Inmersion 0 Room 3 Room 1 12 0
Acabado Acabado 0 Room 3 Room 3 0 0
Acabado Revestido 18 Room 3 Room 2 6 108
Revestido Maquinado 0 Room 2 Room 4 10 0
Revestido Inmersion 0 Room 2 Room 1 20 0
Revestido Acabado 0 Room 2 Room 3 6 0
Revestido Revestido 0 Room 2 Room 2 0 0
stance from Room I to Room J.

168
Taller Missouri
Enter
Enter the
the flow
flow table
table and
and the
the distance
distance table
table in
in the
the shaded
shaded area.
area. Then
Then either
either en
en
the
the room
room NUMBERS
NUMBERS into into which
which you
you want
want to
to place
place each
each process
process in in the
the column
column
Layout labeled
labeled 'Room
'Room assignment'
assignment' oror use
use the
the SOLVE
SOLVE button
button to
to find
find the
the optimal
optimal layout
layou

Data
Assigned Flow/Load
Room Table Maquinado Inmersion Acabado Revestido
Room 1 Maquinado 6 18 2
Room 2 Inmersion 4 2
Room 3 Acabado 18
Room 4 Revestido
NOTE: The distance from Room J to Room I should not be a blank but should be the same as the distance from Room I to Ro
Assigned Distance/Cost
Dept table Room 1 Room 2 Room 3 Room 4
Maquinado Room 1 20 8 12
Inmersion Room 2 10 6
Acabado Room 3 4
Revestido Room 4

Total movement 412 Cost/Moveme 0.5 Total cost

Movement computations
Second Cost/Distanc
First dept Second dept Load/Flow First room room e Product
Maquinado Maquinado 0 Room 1 Room 1 0 0
Maquinado Inmersion 6 Room 1 Room 2 20 120
Maquinado Acabado 18 Room 1 Room 3 8 144
Maquinado Revestido 2 Room 1 Room 4 12 24
Inmersion Maquinado 0 Room 2 Room 1 0 0
Inmersion Inmersion 0 Room 2 Room 2 0 0
Inmersion Acabado 4 Room 2 Room 3 10 40
Inmersion Revestido 2 Room 2 Room 4 6 12
Acabado Maquinado 0 Room 3 Room 1 0 0
Acabado Inmersion 0 Room 3 Room 2 0 0
Acabado Acabado 0 Room 3 Room 3 0 0
Acabado Revestido 18 Room 3 Room 4 4 72
Revestido Maquinado 0 Room 4 Room 1 0 0
Revestido Inmersion 0 Room 4 Room 2 0 0
Revestido Acabado 0 Room 4 Room 3 0 0
Revestido Revestido 0 Room 4 Room 4 0 0
the
the shaded
shaded area.
area. Then
Then either
either enter
enter
place
place each
each process
process in in the
the column
column
EE button
button to
to find
find the
the optimal
optimal layout.
layout.

e distance from Room I to Room J.

206

D) La mejor distribucion en relacion al costo es el Plan B


Taller Missouri
Enter
Enter the
the flow
flow table
table and
and the
the distance
distance table
table in
in the
the shaded
shaded area.
area. Then
Then either
either enter
ente
the
the room
room NUMBERS
NUMBERS into into which
which you
you want
want to
to place
place each
each process
process in in the
the column
column
Layout labeled
labeled 'Room
'Room assignment'
assignment' oror use
use the
the SOLVE
SOLVE button
button to
to find
find the
the optimal
optimal layout.
layout.

Data
Assigned Flow/Load
Room Table Maquinado Inmersion Acabado Revestido
Room 1 Maquinado 6 18 2
Room 2 Inmersion 4 2
Room 3 Acabado 18
Room 4 Revestido
NOTE: The distance from Room J to Room I should not be a blank but should be the same as the distance from Room I to Ro
Assigned Distance/Co
Dept st table Room 1 Room 2 Room 3 Room 4
Maquinado Room 1 20 10 6
Inmersion Room 2 8 12
Acabado Room 3 4
Revestido Room 4

Total movement 440 Cost/Moveme 0.5 Total cost

Movement computations
Second Cost/Distanc
First dept Second dept Load/Flow First room room e Product
Maquinado Maquinado 0 Room 1 Room 1 0 0
Maquinado Inmersion 6 Room 1 Room 2 20 120
Maquinado Acabado 18 Room 1 Room 3 10 180
Maquinado Revestido 2 Room 1 Room 4 6 12
Inmersion Maquinado 0 Room 2 Room 1 0 0
Inmersion Inmersion 0 Room 2 Room 2 0 0
Inmersion Acabado 4 Room 2 Room 3 8 32
Inmersion Revestido 2 Room 2 Room 4 12 24
Acabado Maquinado 0 Room 3 Room 1 0 0
Acabado Inmersion 0 Room 3 Room 2 0 0
Acabado Acabado 0 Room 3 Room 3 0 0
Acabado Revestido 18 Room 3 Room 4 4 72
Revestido Maquinado 0 Room 4 Room 1 0 0
Revestido Inmersion 0 Room 4 Room 2 0 0
Revestido Acabado 0 Room 4 Room 3 0 0
Revestido Revestido 0 Room 4 Room 4 0 0
the
the shaded
shaded area.
area. Then
Then either
either enter
enter
place
place each
each process
process in in the
the column
column
EE button
button to
to find
find the
the optimal
optimal layout.
layout.

the distance from Room I to Room J.

220
Creasey Interprises
Enter
Enter the
the flow
flow table
table and
and the
the distance
distance table
table in
in the
the shaded
shaded area.
area. Then
Then either
either enter
ente
the
the room
room NUMBERS
NUMBERS into into which
which you
you want
want to
to place
place each
each process
process in in the
the column
column
Layout labeled
labeled 'Room
'Room assignment'
assignment' oror use
use the
the SOLVE
SOLVE button
button to
to find
find the
the optimal
optimal layout.
layout.

Data
Assigned Flow/Load
Room Table Dobladoras Materiales Soldaduras Taladros Esmeriles
Room 1 Dobladoras 10 20
Room 2 Materiales 50 100 50
Room 3 Soldaduras 25
Room 4 Taladros 25 50
Room 5 Esmeriles 50 100
Room 6 Tornos 25 20
NOTE: The distance from Room J to Room I should not be a blank but should be the same as the distance from Room I to Ro
Assigned Distance/Co
Dept st table Room 1 Room 2 Room 3 Room 4 Room 5
Dobladoras Room 1 20 20
Materiales Room 2 20 20 40
Soldaduras Room 3 20
Taladros Room 4 40 20
Esmeriles Room 5 20 20
Tornos Room 6 20 20

Total movement 13000 Cost/Moveme 1 Total cost

Movement computations
Second Cost/Distanc
First dept Second dept Load/Flow First room room e Product
Dobladoras Dobladoras 0 Room 1 Room 1 0 0
Dobladoras Materiales 10 Room 1 Room 2 20 200
Dobladoras Soldaduras 0 Room 1 Room 3 0 0
Dobladoras Taladros 20 Room 1 Room 4 20 400
Dobladoras Esmeriles 0 Room 1 Room 5 0 0
Dobladoras Tornos 0 Room 1 Room 6 0 0
Materiales Dobladoras 50 Room 2 Room 1 20 1000
Materiales Materiales 0 Room 2 Room 2 0 0
Materiales Soldaduras 100 Room 2 Room 3 20 2000
Materiales Taladros 50 Room 2 Room 4 40 2000
Materiales Esmeriles 0 Room 2 Room 5 0 0
Materiales Tornos 0 Room 2 Room 6 0 0
Soldaduras Dobladoras 0 Room 3 Room 1 0 0
Soldaduras Materiales 25 Room 3 Room 2 20 500
Soldaduras Soldaduras 0 Room 3 Room 3 0 0
Soldaduras Taladros 0 Room 3 Room 4 0 0
Soldaduras Esmeriles 0 Room 3 Room 5 0 0
Soldaduras Tornos 50 Room 3 Room 6 20 1000
Taladros Dobladoras 0 Room 4 Room 1 0 0
Taladros Materiales 25 Room 4 Room 2 40 1000
Taladros Soldaduras 0 Room 4 Room 3 0 0
Taladros Taladros 0 Room 4 Room 4 0 0
Taladros Esmeriles 50 Room 4 Room 5 20 1000
Taladros Tornos 0 Room 4 Room 6 0 0
Esmeriles Dobladoras 0 Room 5 Room 1 0 0
Esmeriles Materiales 50 Room 5 Room 2 20 1000
Esmeriles Soldaduras 0 Room 5 Room 3 0 0
Esmeriles Taladros 100 Room 5 Room 4 20 2000
Esmeriles Esmeriles 0 Room 5 Room 5 0 0
Esmeriles Tornos 0 Room 5 Room 6 0 0
Tornos Dobladoras 0 Room 6 Room 1 0 0
Tornos Materiales 0 Room 6 Room 2 0 0
Tornos Soldaduras 25 Room 6 Room 3 20 500
Tornos Taladros 0 Room 6 Room 4 0 0
Tornos Esmeriles 20 Room 6 Room 5 20 400
Tornos Tornos 0 Room 6 Room 6 0 0
the
the shaded
shaded area.
area. Then
Then either
either enter
enter
place
place each
each process
process in in the
the column
column
EE button
button to
to find
find the
the optimal
optimal layout.
layout.

Tornos

50

the distance from Room I to Room J.

Room 6

20

13000

R// Dobladoras al area 1, materiales a la 2, soldadura a la 3, Taladros a la 4, molinos a la 5 y tornos a la 6