Professional Documents
Culture Documents
Metrology and Quality Control
Metrology and Quality Control
Instructions:
1. All questions are compulsory.
2. Illustrate your answers with neat sketches wherever necessary.
3. Figures to the right indicate full marks.
4. Assume suitable data if necessary.
5. Preferably, write the answers in sequential order.
1
Scheme - G
Instructions:
1. All questions are compulsory.
2. Illustrate your answers with neat sketches wherever necessary.
3. Figures to the right indicate full marks.
4. Assume suitable data if necessary.
5. Preferably, write the answers in sequential order.
2
Scheme - G
Instructions:
1. All questions are compulsory.
2. Illustrate your answers with neat sketches wherever necessary.
3. Figures to the right indicate full marks.
4. Assume suitable data if necessary.
5. Preferably, write the answers in sequential order.
6. Mobile Phone, Pager and any other Electronic Communication devices are not permitted in
examination hall.
a) Differentiate between Line Standard, End Standard and Wavelength Standard. Give one
application of each of them.
b) Draw a neat labeled sketch of screw thread micrometer and state its principle of working.
a) Draw a well labeled sketch of a pneumatic comparator list down its components.
b) What is interchangeability? State its need and importance in mass production like
Automobile engine components.
c) What are angle gauges? State procedure to set the gauges.
d) State principle of three wire method. Where it is used?
e) State merits and demerits of acceptance sampling.
3
c) State different types of control charts used in SQC. State the types suitably used for Quality
by Attributes and Quality by Variables.
d) Define Quality by Variable and Quality by Attribute with suitable examples.
e) With neat sketch explain measurement of tooth thickness by constant chord method.
c) Design a plug gauge for checking a hole of dimension 20±.05 considering 2% wear allowance
and 1 % manufacturing allowance.
d) How does the cost of rework and repairs affect the cost of quality?
R .027 .011 .017 .009 .014 .017 .023 .021 .015 .026
Given A2= 0.577 D3 = 0 and D4 = 2.114