Module 7 : Introduction to Fire Requirements

Module 8 : Concept of Fire Safety


Module 9 : Compliance to UBBL 245(2) – JBPM Approval
Module 10 : Schedule 5,6,7 & 10
Module 11 : PART IX – Miscellaneous
By law 254-258
MANY OF THE P3 CANDIDATES ARE
TERRIFIED OF BOMBA QUESTION
SOME BECOME PANIC,
BLANK, AND MOSTLY REGRET THAT
THEY DID NOT STUDY OR TRY TO
UNDERSTAND BOMBA
REQUIREMENTS WHEN THEY HAD
THE CHANCE.
SOME CHOOSE NOT TO ANSWER

University
Of
Architecture

“Any thing interesting hAppen in bombA


clAss lAm p3?”
ALTHOUGH THEY KNOW FOR A FACT THAT, IT
CONTRIBUTES ¼ OF THE PAPER 1 TOTAL MARKS.

30

25 25 25 25 25 25 25 25
25

20 20 20
20

15

10

0
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
WHILE SOME ARE READY TO ANSWER AND
SUCCEED
INTRODUCTION

1. WHY DO WE NEED BOMBA REQUIREMENTS?

•To ensure all building to comply with fire safety


requirements.
•To keep public safety as a priority
•Standard best practice for the market.
•As a guideline for designers to design with
consideration of fire safety.
1. WHAT
WHATARE
ARELEGISLATIVE
THE TECHNICAL
REQUIREMENT
GUIDELINE INVOLVE?
TO FOLLOW?

TECH REQ. TECH ILLUSTRATION LA PROCEDURES Provision of fire


service department
HIERARCHY OF LEGAL COMPLIANCE

STAGE ACT/GUIDELINE RESPONSIBILITY


1. SUBMISSION SDBA 70 PSP & SP
2.COMPLIANCE TECHNICAL UBBL & BOMBA PSP & SP
GUIDELINE GUIDELINE BOOK

3. AUTHORITY SUBMISSION BOMBA GUIDELINE- PSP & SP


GUIDE CCC AND OSC
PROCEDURE

4. VERIFICATION UBBL SCHEDULE 10 & PSP, SP, BOMBA


FIRE SERVICE ACT

5. MAINTENANCE FIRE SERVICE ACT BUILDING OWNER


& BOMBA
UBBL 1984 CONTENT

PART I – Prelim PART VI – Constructional


By law1-2 requirement
By law 81-132
PART II- submission of
plan for approval
By law 3-29
PART VII – Fire
PART III- Space, light and requirements
ventilation UBBL By law 133-224
By law 30-47
PARTS PART VIII – Fire
PART IV – Temporary alarm, fire
works in connection detection, fire
with building operations extinguishment, & fire
By law 48-52 access
By law 225-253
PART IX – Miscellaneous
PART V – Structural By law 254-258
requirements
By law 53-80 & Schedule 1-10