APE Vibro Check List: prior to shipment for sale or rental
Date:__________________Sales Order Number:_________Vibro S/N:___________Owned by:___________
Ship Date:___________ Clamp S/N:______________Beam S/N:___________________________________ Checking the suppressor: Removed all wire rope for insurance reasons Inspected pin in moveable jaw Checked shackle pin cotter key and nut Put spare pin in tool box Checked large elastomers for cracks Provided spare allen wrench for jaws Checked small elastomers for cracks Checked fittings on clamp cylinder Inspected all bolts on all elastomers Inspected clamp housing for cracks Removed and inspected anti-cavitation valve Serial number welded with SS rod Checked pressure on brake valve Greased slide, replaced zert if required Inspected case drain relief valve (pop off valve) Inspected all clamp hoses & fittings Inspected line pull safety pin including bolts Installed hose retaining clips Inspected suppressor housing mounting bolts Removed air from clamp lines Inspected entire housing for weld failures Stroked jaws open and closed 3 times Installed two stage suppressor sticker Spare back up jaws inspected and loaded Installed safety line pull warning sticker Put extra clamp bolts in tool box Installed daily maintenance check list sticker Final visual check for cracks in jaws Inspected all hoses on suppressor Provided two extra clamp mount bolts Inspected all hydraulic fittings on suppressor Inspected all fittings on rifle bored top plate Vibro test Removed any foreign steel welded to suppressor Cleaned quick disconnects Welded and shaped any imperfections All quick disconnects have caps & plugs Inspected o-rings on quick disconnects Vibro gearbox: Put spare o-ring kit in tool box Removed and cleaned sight glass Closed jaws and checked hoses for leaks Checked gearbox oil level Checked clamp pressure- hoses attached Flushed gearbox with filter system Clamp close light comes on properly Changed gearbox oil and added SCH 629 Mobil Test data Removed and cleaned magnetic drain plug Free hang drive pressure is:_____________ Checked/replaced damaged bearing cover bolts Cycles per minute with photo tach:_______ Removed, cleaned, and reinstalled breather Temperature of hyd oil:_________________ Checked motor bearing cover bolts Checked bottom of gearbox- all mounting holes Tips for APE service technicians: Ran drill tap down each mounting hole & cleaned Prior to removing clamp lines, release pressure by Ran straight edge across bottom of gearbox opening the jaws. Checked entire clamp mounting surface Checking the oil level in the vibro gearbox may be Checked hydraulic motor mounting bolts impossible if the sight glass is dirty. Remove the sight Checked motor couplers for leaks and loose bolts glass and spray it with some starting fluid. Then re- Torqued down motor coupler mounting bolts install, making sure you use some pipe thread tape to Inspected entire gearbox for weld cracks seal the fitting. Removed unauthorized welding on gearbox Oil level should be in the middle of the site glass. Removed bearing covers to inspect bearings Overfilling will cause overheating. Inspected inner and outer races of each bearing If the unit is going to operate in extremely cold weather then alternate fluids must be used. In addition, change Clamp attachment: please circle one 0-rings on QD’s and split flanges of vibro from 90 to 70 Type: sheet wood concrete caisson other durameter. Length of beams:__________ _______ ________ Describe pile type:______________________________ Spare parts: Checked to see if salesman knows pile thickness 2 ea. clamp fittings 1 set spare jaws Pile wall thickness is:____________________________ 1 ea. site glass 1 ea. spare jaw pin I am sure the jaws will open wide enough 1ea. socket for site glass 2 ea. fixed jaw bolts Torqued mounting bolts- they are tight! 1 ea. operations manual 2 ea. clamp mount bolts 2 ea. extra clamp lines APE hard hat stickers Replaced worn jaws, inspected teeth and bolts 2 ea. caps & plugs for clamp APE literature Put a wrench on fixed jaw bolts- confirmed tight Inspected by:__________________________ Comments: _____________________________ Equipment manager approval:___________ ______________________________________ Salesman acceptance:__________________ H/data/forms Sept 2002 PM 6.5