Ketraco’s 400/220kV Suswa switching and converter substation is located approximately 80km, North West of Nairobi, alo
substation is the largest substation in Kenya and is regarded as a strategic national asset since it serves as an entry and exc
generation into the national grid for power originating from different generator locations including; the Olkaria geotherma
Ethiopian Hydros.
Suswa substation, together with associated transmission projects will form the backbone of the Kenya National Grid by in
80km, North West of Nairobi, along the Maai Mahiu-Narok highway. The
since it serves as an entry and exchange point for geothermal, wind and hydro-
including; the Olkaria geothermal complex, Turkana wind power, and the
Length
1,045 Km line (433 km in Ethiopia and 612
km in Kenya)
428 Km
25 Km
90 Km
100 Km
e of the Kenya National Grid by interconnecting the Western, Coastal and the