You are on page 1of 1

7,09 5

3,24
3 5

0,85
2

11,91

11,91
4

10,64
3,74
4 1,15
6

0,85
7,4
7
7

3,47
1

3,27
9
2,08

8
9
8
0,5

1,9
PROTECTION
2,6 WALL 3,65

N TAG DESCRIPTION D (mm) L (mm) V (m³) MATERIAL


1 166V05 SEPARATOR 1.70 5.70 13.00 PVDF
2 166V04 KOH REACTOR 1.20 2.20 2.50 PVDF
3 166V05 FLASH TANK 2.00 4.80 14.20 SAF 2205
4 166E01 HEAT EX. STEAM 0.70 5.00 - SAF 2205
5 166E02 HEAT EX. WATER 0.40 3.50 - CS
6 166V02 BUFFER TANK 1.00 2.50 2.00 AISI 316
1 TRAMEX FLOORING
(BOTH STORIES) 7 166SB01 SALT BOX 0.83 2.00 1.00 SAF 2205
8 166P07 END PUMP - - - -
9 - SALT CONTAINER 1.90 4.00 8.00 CS
9
8,7

5
4 3
2
00 BASIC DESIGN MAY 2020 RUBÉN LÓPEZ DIEGO GONZÁLEZ RUBÉN CEREIJO
3,7

REV MODIFICATION DATE OUTLINED CHECKED APPROVED


8 6
4,99

CLIENT
0,67

0,73

1,15

PROJECT: P-2020-011
HATCH
BRUSCA PROJECT:
CRISTOBAL PIÑÓN FERNÁNDEZ
INDUSTRIAL ENGINEER POTASSIC GLYCERIN WW TREATMENT STUDY
N°: 1.605 ICOIIG
CONTAINER
THIS DRAWING IS NOT VALID WITHOUT SIGNATURE DRAWING
IN / OUT
SCALE FORMAT Nº DRAWING SHEET
5,4
BASIC LAYOUT
1/100 A3 01 1/1

You might also like