You are on page 1of 1

20

19

A
ERV
RES

18
21
DRO
CUA

ERVA
RES

DRO
CUA ENTE
T
EXIS

22

191-V-02
+0.00

17

3.96 3.78 5.25

13

SECONDARY MODULE 14 CIVIL WORKS


8 12
STRUCTURE ELEMENTS
3.80

15 7

6 2 STAIRS AND ACCESSES

5.60
16

9
SECONDARY MODULE MAIN EQUIPMENT
1
11 PEDESTRIAN PASSAGE
EXISTING RACK (+3.40 m)
1.80

10
MAIN MODULE
EXISTING EQUIPMENT
3.47

LEVEL +0.00 N TAG DESCRIPTION N TAG DESCRIPTION


13.00 6.12
1 166V05 SEPARATOR 12 166P05 266S01 TO 266V08 PUMP
1.87
2 166V04 KOH REACTOR 13 166P06 266S01 TO 266V04 PUMP
3 166V05 FLASH TANK 14 166P07 266V02 TO 163V02 PUMP
4 166E01 HEAT EX. STEAM 15 166P01 266V04 TO 166E01 PUMP
5 166E02 HEAT EX. WATER 16 166P02 266V01 TO 163V02 PUMP
5.65

6 166V02 BUFFER TANK 17 163V02 RECOVERED FEED TANK


7 166SB01 SALT BOX 18 191P03 1-2 SULPHURIC FEED PUMPS
8 166P07 END PUMP 19 163P10 1-2 CITRIC FEED PUMPS
9 - AIR RENOVATION SYSTEM 20 166V8 LIGHT FRACTION TANK
3.28

10 266V02 A/B COMMERCIAL KOH IBC 21 - NEW ELECTRICAL PANEL SHELTER


11 266P04 KOH DOSING PUMP 22 - EXISTING MCC

00 BASIC DESIGN JUN 2020 RUBÉN LÓPEZ DIEGO GONZÁLEZ RUBÉN CEREIJO
REV MODIFICATION DATE OUTLINED CHECKED APPROVED
CLIENT

PROJECT: P-2020-011
BRUSCA PROJECT:
CRISTOBAL PIÑÓN FERNÁNDEZ
INDUSTRIAL ENGINEER POTASSIC GLYCERIN WW TREATMENT STUDY
N°: 1.605 ICOIIG
THIS DRAWING IS NOT VALID WITHOUT SIGNATURE DRAWING
SCALE FORMAT Nº DRAWING SHEET
LAYOUT
1/200 A3 01 1/2