Nomenclature… By Don Del Nero, P.E., C.D.T.

he genesis for this article came although it has fostered significant light that several manufacturers have

T from attending the closing lun-


cheon at the Toronto No-Dig
Conference and dining with just one of
progress in application of the auger
boring technology, there is still a need
to get the word out that jack and bore
developed cutting-edge technologies
around the concept of pilot-tube micro-
tunneling. To this, they deserve great
those great people who come from all is an antiquated term. In my aforemen- credit. It is a natural tendency to attempt
facets of the industry. He is a seasoned tioned lunch conversation, this subject to set apart “your similar” technology
geotechnical engineer but is new to came up and, unfortunately, we both from someone else’s. That just makes
the trenchless industry. It was a fasci- have come across the use of jack and simple business sense.
nating conversation because it gave a bore on many a set of drawings in Well, allow me to build my case that
fresh perspective through a window recent times. As such, the industry real- we should consider standardizing the
that can sometimes get blurred from ly needs to continue to make a diligent vernacular associated with this tech-
spending so much time in our industry. effort to educate those around us. nology. A case can be made that pilot-
The conversation revolved around the There is no clear solution to this “fail- tube microtunneling, although it has
various trenchless technologies in use ure to communicate” and it is so rooted similar elements to a microtunnel oper-
and the challenges with overlapping in our profession as a whole that it is ation, is not truly a microtunnel. In
and even confusing nomenclature. difficult to change. Complicating the consideration of space that will be left
When we engage our careers on a day- matter of vernacular is that there are for another day. What we need to do is
to-day basis, it is sometimes difficult to still DOTs that have a specification to build a case around vernacular that
maintain a view of the bigger picture called jack and bore. DOTs are not everyone can live with. In that light, the
because of all the minutia.To encapsulate always behind as several have adopted term “piloted auger boring” seems to fit
this article, a quote is highlighted from the Geotechnical Baseline Report con- the bill. This is rooted on the premise
one of my favorite movies, “Cool Hand cept, which is state of the practice. It that pilot-tube microtunneling has
Luke.” The quote is from a dialogue may be a simple matter of continuing more in common with auger boring
between the prison superintendent and to disseminate the information across than it does with microtunneling. So,
prisoner Luke, who had just been caught industry sectors. In this endeavor, we why should we standardize this tech-
after another escape. In this scene, the must also be cognizant of the reality of nology into a term that might be more
prison superintendent tells the prisoners information saturation. The best broadly utilized? For starters:
and Luke,“What we’ve got here is a fail- approach at this point is to continue
ure to communicate.” dissemination of information through 1. Marketing the product becomes
This quote is so poignant in articulat- No-Dig and other technical forums, to easier because folks are (or will
ing the challenge associated with continue this message in industry jour- be) more familiar with the term
explaining some of our technologies.At nals, and encourage colleagues, owners and enhancements or proprietary
the root of the challenge was the com- and contractors to attend NASTT’s aspects can be more easily
mon terms jack and bore and pilot-tube New Installation Methods Good highlighted;
microtunneling. To expound on these Practices Course. 2. Owners don’t get the feeling they
terms and hopefully articulate the chal- The use of pilot-tube microtunneling are the guinea pig when a
lenge with the use of these terms, I as a vernacular and as a technology has technology is mobilized that
have asked two questions that deserve become a mainstay in our industry. The comes with a label they are not
deliberation. I might add that the prolif- pilot tube concept was originally devel- familiar with;
eration of the following vernacular is oped in Germany for 4- and 6-in. diame- 3.There is a significant cost difference
most likely the result of the rapid devel- ter house connection pipe. From there between a microtunnel equipment
opment of trenchless technologies it has blossomed into a viable and cost- operation and a pilot-tube
over the last 20 years. effective means of installing small diam- microtunnel operation; and
What is jack and bore? Unfortunately eter pipe (up to 24 in. in its early form in 4. Coming up to speed on the various
this term is still rampant in our indus- the United States).There is hesitation to technologies becomes easier for
try. There are many technologies that label it “small diameter” because manu- the newcomers; which we are
jack pipe and that use some form of facturers are now coming out with desperately in need of.
boring. It is a little surprising that this these systems for pipe larger than 48 in.
generic term is still pervasive. It has At the same time, other terms relating to Admittedly, this one is a little more
been five years since the promulgation similar (or even the same) technology complex, but it is at least worthy of
of ASCE’s Manuals and Reports on have been disseminated including guid- more dialogue.
Engineering Practice No. 106, ed boring system, auger drills, pilot pipe Don Del Nero, P.E., C.D.T., is a global
Horizontal Auger Boring Projects, jacking and guided boring machine. tunnel specialist for CH2M HILL, based in
2004.This is a very good reference and To start out, it is important to high- Atlanta.

66 TRENCHLESS TECHNOLOGY May 2009 www.trenchlessonline.com