EHS INSPECTION REPORT

PRINCIPAL
PROJECT NAME: Commercial Villa Dubai Oasis Constructions
CONTRACTOR:
Mr. SAIF EISSA OBAID AL
CLIENT / OWNER: Al Ain – AL MWAJEI
MANSOURI
NEXT ENGINEERING
CONSULTANT: DATE: 28/11/2018
CONSULTANTS
PROJECT REF. No.: ADCE/ EHS / IR -
MANAGEMENT:
The following categories were covered during inspection of your site.
Sl Sl
Activity / Hazard C NC NA Activity / Hazard C NC NA
No No
1 Principal Contractor’s site specific 22 Cantilever loading platforms
EHS Policy & Plan ● ●
2 Access to appropriate Standard 23 Form work, Reinforcement, Concreting,
Operating Procedure's and Risk ● Masonry operation ●
Assessments?
3 Information, Training, Instruction and 24 Pre-cast erections
Supervision to employees ● ●
4 Evidence of all staff completing 25 Lifting operations & accessories
appropriate EHS training? ● ●
5 Reporting of Accidents, Near misses 26 Manual Handling
& Dangerous occurrences ● ●
6 Staff involved in risk assessment/ 27 Welding and cutting operations
investigation/ other consultative ● ●
activities
7 Documentation – Induction, TBT, Risk 28 Excavation, Trenching, Shoring
Assessments, Method Statements ● ●
8 etc.
Provision of First aid supplies and 29 Confined Spaces
First Aid Personnel at site. ● ●
9 Emergency Escape Route, Assembly 30 Permit to Work System (PTW)
● ●
Points and Exits
10 Fire prevention & protection 31 Mechanical Plant and Equipment
(Maintenance. , Certifications/ Registers
● if available, Training and

Competencies)
11 Waste Management ● 32 Portable power tools ●
12a Welfare Facilities (General, Eating, 33 Electrical Safety
Washing/ Toilets, Lighting) ● ●
13 Housekeeping (General Site/ Building 34 Compressed gas cylinders storing &
Conditions, Waste Containers, ● usage ●
Flooring).
14 Site Fencing, Access control & Public 35 Noise & Vibration control
protection ● ●
15 Traffic Management & Pedestrian 36 Heat Stress and Remote locations
ways ● ●
16 Visitor Sign in Procedure and Record 37 Signs, Signals, Barricades, Tags
● (Hazardous Areas, Restricted Areas, ●
PPE Requirements)
17 Security Guard 38 Personal Protective Equipment at work
● ●
18 Scaffolds, Work platforms, Access & 39 Hazardous material (handling
Egress ● ,storage ,signage and disposal) ●
19 Openings, Edges 40 Unwanted/Toxic emissions/ Dust at
● site( Handling and Disposal) ●
20 Protection from Falling material 41 Control of Environment aspects &
● impacts

21 Sloping and Fragile roofs 42 Other Observations(Demolition etc)
● ●
* Legend: C – Compliant NC – Non Complaint NA – Not Applicable
V1/ 07 May 2014

* Please note the inspection provides a snap-shot of observed conditions (NC’s) on site and not
intended to be a comprehensive assessment.

EHS INSPECTION REPORT
Project Activity Overview: Timescale Category Codes :-
1 = Immediate
Significant Aspects: 2 = 24 Hours

Man Power:

Following are the observations requiring attention:


*NC Brief Description of Non Location at Timescale Action Taken by the
Sr. No
Code Compliance Site Code Contractor

*NC Code is for internal use only.


Inspected By Site Representative Date & Time
Name: Name:
Position: Position:

The above listed observations were noticed at the project site, and may not be limited to a single location.
EHS INSPECTION REPORT

12
 

 



 

 


* Thesephotographs act as an evidence of EHS breaches noticed at the project, and may not be limited to a
single location.
EHS INSPECTION REPORT

12
 

 



 

 


* Thesephotographs act as an evidence of EHS breaches noticed at the project, and may
not be limited to a single location.