No. Punch

1 PLWD-95790
Description

Damaged fireproofing to be repaired


Co

Create Punch Punch


From Create ID Punch Sheet Disc Priority Activity Issue Date Punch Action By

SS MC-15-179-01 SUBSYSTEM PUNCH IS_CO C 3. WALK-DOWN FOR MC (CONST) 43442 Kim, Inhag
Construction Punch
( PROJECT: 7T04 )

Clearance Vendor Informations


Internal
Expected Sub-Con Clearance Clearance Assistance Expected
Issue Name Account Date Clearance Date Date Cleared Name Checked Name Required Date Name

ERC (M.Farag) N AREA 2


Vendor Informations
Transfer to
Material Expedted Material Defect Exception
Required To Arrive Description Drawing No. Item No. Line No. Description List

N R1502,R1501 UNIT-15
Comments /
Remarks Flag UDCategory Forecast Date Update User

N MC-15 amnv
As of 2019-11-27

Xervon

Update Date inspection date GS inspector ERC inspector

43667 1/29/2020 Siva Hosny mohammed

1275811247
(46 EA)

Create
No. Punch Description From Create ID Punch Sheet Disc
I-05647
1 fire proofing damage to be repaired. SS MC-11-212-01 INSPECTION PUNCH FP_CO

2 I-06400 fire proofing damage to be repaired. SS MC-11-212-01 INSPECTION PUNCH IS_CO

3 I-06690 Fire proofing fin no. (XER-FIN-IF-FI-0830) comment to be cleared. SS MC-14-034-02 INSPECTION PUNCH PA_CO

4 I-06691 Fire proofing damage to be repaired. SS MC-14-034-02 INSPECTION PUNCH PA_CO

5 I-07004 fire proofing damage around top head to be repaired. SS MC-11-210-01 INSPECTION PUNCH PA_CO

6 I-07024 fire proofing to be done SS MC-11-222-01 INSPECTION PUNCH PA_CO

7 I-07056 fire proofing damage to be repaired. SS MC-14-170-01 INSPECTION PUNCH PA_CO

8 I-07071 Fire proofing damage to be repaired. SS MC-11-213-01 INSPECTION PUNCH PA_CO

9 I-07094 Fire proofing damage to be repaired. SS MC-11-216-01 INSPECTION PUNCH PA_CO

10 I-07116 Fire proofing damage to be repaired. SS MC-21-257-01 INSPECTION PUNCH PA_CO

11 I-07222 fire proofing damage to be repaired. SS MC-11-219-01 INSPECTION PUNCH PA_CO

12 I-07224 fire proofing damage to be repaired. SS MC-11-219-01 INSPECTION PUNCH PA_CO

13 I-07232 fire proofing damage to be repaired. SS MC-11-218-01 INSPECTION PUNCH PA_CO

14 I-07243 Fire proofing damage to be repaired. SS MC-14-174-01 INSPECTION PUNCH PA_CO

15 I-07424 fire proofing damage to be repaired. SS MC-11-218-01 INSPECTION PUNCH PA_CO

16 I-07427 fire proofing damage to be repaired. SS MC-11-219-01 INSPECTION PUNCH PA_CO

17 I-07429 fire proofing damage to be repaired. SS MC-11-219-01 INSPECTION PUNCH PA_CO

18 I-07827 fire proofing damage to be repaired. SS MC-11-082-01 INSPECTION PUNCH PA_CO

19 I-07829 fire proofing damage to be repaired. SS MC-11-082-01 INSPECTION PUNCH PA_CO

20 I-08510 Damage fireproofing SS MC-15-179-01 INSPECTION PUNCH IS_CO

21 I-08564 Damage fireproofing SS MC-22-249-01 INSPECTION PUNCH IS_CO

22 I-08573 fire proofing damage to be repaired. SS MC-22-245-01 INSPECTION PUNCH PA_CO

23 I-06096 Damage fireproofing SS MC-15-180-01 INSPECTION PUNCH PA_CO

24 I-08686 Damage fireproofing SS MC-21-259-01 INSPECTION PUNCH IS_CO

25 I-08805 Fire proofing damage to be repaired. SS MC-21-257-01 INSPECTION PUNCH PA_CO

26 I-06956 Damage on fireproof to be repaired SS MC-11-209-01 INSPECTION PUNCH IS_CO

27 I-06962 Damage fireproofing SS MC-21-268-01 INSPECTION PUNCH IS_CO


Damage fireproofing , it shall be checked by insulation team after
28 I-06966 scaffolding removal SS MC-15-177-01 INSPECTION PUNCH IS_CO
Damage fireproofing , it shall be checked by insulation team after
29 I-06970 scaffolding removal SS MC-15-177-01 INSPECTION PUNCH IS_CO

30 I-06977 Damage fireproofing. SS MC-15-070-02 INSPECTION PUNCH IS_CO


31 I-08924 Damage fireproofing SS MC-22-078-06 INSPECTION PUNCH IS_CO

32 I-08981 Damage fireproofing SS MC-22-078-06 INSPECTION PUNCH IS_CO

33 I-09114 Damage fireproofing SS MC-22-069-01 INSPECTION PUNCH IS_CO

34 I-09138 Damage fireproofing. SS MC-15-068-01 INSPECTION PUNCH IS_CO

35 I-09236 fire proofing damage to be repaired SS MC-15-197-01 INSPECTION PUNCH IS_CO

36 I-09275 Damage fireproofing SS MC-15-179-01 INSPECTION PUNCH IS_CO

37 I-07825 fire proofing damage to be repaired SS MC-51-305-02 INSPECTION PUNCH PA_CO

38 I-09298 first step of ladder NO#1 clashed with fireproofing. SS MC-15-203-01 INSPECTION PUNCH IS_CO

39 I-07944 fire proofing damage to be repaired SS MC-51-305-01 INSPECTION PUNCH PA_CO

40 I-09299 Damage fireproofing. SS MC-15-203-01 INSPECTION PUNCH IS_CO

41 I-08515 Damage fireproofing SS MC-15-070-02 INSPECTION PUNCH IS_CO

42 I-08533 Damage fireproofing SS MC-15-070-02 INSPECTION PUNCH IS_CO

43 I-09369 Damage fireproofing SS MC-15-196-01 INSPECTION PUNCH IS_CO

44 I-08673 Damage fireproofing SS MC-21-259-01 INSPECTION PUNCH IS_CO

45 I-09441 fireproofing clashed with ladder NO#1 SS MC-15-190-01 INSPECTION PUNCH IS_CO

46 I-08977 Damage fireproofing. SS MC-15-071-11 INSPECTION PUNCH IS_CO

47 I-09449 Damage fireproofing SS MC-15-190-01 INSPECTION PUNCH IS_CO

48 I-09054 fireproof damageto be done SS MC-15-181-01 INSPECTION PUNCH PA_CO

49 I-09471 Damage fireproofing. SS MC-15-064-01 INSPECTION PUNCH IS_CO

50 I-09160 Damage fireproofing. SS MC-15-046-04 INSPECTION PUNCH IS_CO

51 I-09805 fireproofing is not completed SS MC-15-194-01 INSPECTION PUNCH IS_CO

52 I-10103 Damage fireproofing SS MC-15-187-01 INSPECTION PUNCH IS_CO

53 I-09305 Damage fireproofing. SS MC-15-203-01 INSPECTION PUNCH IS_CO

54 I-09356 fire proofing damage to be repaired SS MC-15-192-01 INSPECTION PUNCH PA_CO

55 I-09414 fireproof damage to be complete SS MC-15-183-01 INSPECTION PUNCH PA_CO

56 I-10112 Damage fireproofing SS MC-15-187-01 INSPECTION PUNCH IS_CO

57 I-10186 Damage fireproofing SS MC-15-186-01 INSPECTION PUNCH IS_CO

58 I-10231 Damage fireproofing SS MC-15-185-01 INSPECTION PUNCH IS_CO

59 I-10668 Fireproof damage to be done SS MC-22-232-01 INSPECTION PUNCH PA_CO

60 I-10196 Damage fireproofing SS MC-15-195-01 INSPECTION PUNCH IS_CO

61 I-10204 fire proofing damage to be repaired. SS MC-15-177-01 INSPECTION PUNCH IS_CO


Damage fireproofing shall be checked by insulation team after
62 I-10205 scaffolding removal SS MC-15-177-01 INSPECTION PUNCH IS_CO
Damage fireproofing , it shall be checked by insulation team after
63 I-10209 scaffolding removal SS MC-15-177-01 INSPECTION PUNCH IS_CO
Damage fireproofing shall be checked by insulation team after
64 I-10262 scaffolding removal SS MC-15-177-01 INSPECTION PUNCH IS_CO

65 I-10267 fire proofing damage to be repaired. SS MC-15-177-01 INSPECTION PUNCH IS_CO

66 I-10785 Damage fireproofing SS MC-22-154-01 INSPECTION PUNCH IS_CO

67 Punch-01597 fire proofing damage to be repaired. SS MC-14-170-01 INSPECTION PUNCH PA_CO


I

Punch Punch Column


Priority Activity Clearance Column1 Column2 3 Column4 Column5 Column6

B 1. INSPECTION FIN (CONST) 43190 Tamer Yehia ERC ( Ahmed Rady )

B 1. INSPECTION FIN (CONST) 43104 Mohamed Younis ERC ( Ahmed Rady )

B 1. INSPECTION FIN (CONST) 07/29/2017 M.YOUNES ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 07/29/2017 M.YOUNES ERC (A.Elsayd)

C 1. INSPECTION FIN (CONST) 10/23/2018 M.YOUNES ERC TPI / GS QC

B 1. INSPECTION FIN (CONST) 10/23/2018 M.YOUNES ERC TPI / GS QC

C 1. INSPECTION FIN (CONST) 10/23/2018 M.YOUNES ERC TPI / GS QC

C 1. INSPECTION FIN (CONST) 43415 M.YOUNES ERC TPI / GS QC

C 1. INSPECTION FIN (CONST) 43415 M.YOUNES ERC TPI / GS QC

C 1. INSPECTION FIN (CONST) 43415 M.YOUNES ERC TPI / GS QC

C 1. INSPECTION FIN (CONST) 43263 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43263 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43263 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43263 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 12/16/2018 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 12/16/2018 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 12/16/2018 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43466 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43466 M.YOUNES ERC (A SEED)

B 1. INSPECTION FIN (CONST) Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) Mohamed Abdo ERC (A. Sayed)

C 1. INSPECTION FIN (CONST) M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43378 Mohamed Abdo ERC ( Ahmed Rady )

B 1. INSPECTION FIN (CONST) 02/17/2019 Mohamed Abdo ERC (A. Sayed)

C 1. INSPECTION FIN (CONST) 02/27/2019 M.YOUNES ERC (A SEED)

B 1. INSPECTION FIN (CONST) 43384 Mostafa Hassan ERC TPI / GS QC

B 1. INSPECTION FIN (CONST) 43384 Mohamed Abdo ERC TPI / GS QC

B 1. INSPECTION FIN (CONST) 43384 Mohamed Abdo ERC TPI / GS QC

B 1. INSPECTION FIN (CONST) 43384 Mohamed Abdo ERC TPI / GS QC

B 1. INSPECTION FIN (CONST) 43384 Mohamed Abdo ERC TPI / GS QC


B 1. INSPECTION FIN (CONST) 43649 GS ERC

B 1. INSPECTION FIN (CONST) 43741 GS ERC

C 1. INSPECTION FIN (CONST) 03/20/2019 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 03/24/2019 Mohamed Abdo ERC (A.Elsayd)

C 1. INSPECTION FIN (CONST) 03/26/2019 M.YOUNES ERC (A.Amir)

B 1. INSPECTION FIN (CONST) 03/31/2019 Mohamed Abdo ERC (A. Sayed)

C 1. INSPECTION FIN (CONST) 43466 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43500 Mohamed Abdo ERC (A.Elsayd)

C 1. INSPECTION FIN (CONST) 43617 M.YOUNES ERC (A SEED)

B 1. INSPECTION FIN (CONST) 43500 Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 43528 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 02/17/2019 Mohamed Abdo ERC (A. Sayed)

C 1. INSPECTION FIN (CONST) 04/13/2019 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 43741 Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 04/13/2019 Mohamed Abdo ERC (A. Sayed)

C 1. INSPECTION FIN (CONST) 03/16/2019 Mohamed Hassan ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 03/24/2019 Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 04/16/2019 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 04/25/2019 Mohamed Abdo ERC (A.Amir)

B 1. INSPECTION FIN (CONST) 43500 Mohamed Abdo ERC (A.Elsayd)

C 1. INSPECTION FIN (CONST) 43528 M.YOUNES ERC (A SEED)

C 1. INSPECTION FIN (CONST) 43712 Mohamed Hassan ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 04/25/2019 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 43682 Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 43804 Mohamed Abdo ERC (A.Elsayd)

C 1. INSPECTION FIN (CONST) 43684 Mohamed Hassan ERC (A.Amir)

B 1. INSPECTION FIN (CONST) 43682 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 43713 M.YOUNES ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 43713 Mohamed Abdo ERC (A. Sayed)

B 1. INSPECTION FIN (CONST) 43713 Mohamed Abdo ERC (A. Sayed)


B 1. INSPECTION FIN (CONST) 43804 Mohamed Abdo ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 43804 M.YOUNES ERC (A.Elsayd)

B 1. INSPECTION FIN (CONST) 07/14/2019 K.Mohey ERC (A.Amir)

C 1. INSPECTION FIN (CONST) 10/31/2018 M.YOUNES ERC (A SEED)


Inspection Punch
( PROJECT: 7T04 )

Vendor Column1 Colum


Column7 Column8 Column9 Informations 0 n11 Column12 Column13 Column14 Drawing No.

N MC-11 N

Unchecked MC-11 Unchecked

Unchecked MC-14 Unchecked

Unchecked Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-14 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-21 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-14 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-22 Unchecked

Unchecked MC-22 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-21 Unchecked

Unchecked MC-21 Unchecked

Unchecked MC-11 Unchecked

Unchecked MC-21 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked


Unchecked MC-22 Unchecked

Unchecked MC-22 Unchecked

Unchecked MC-22 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-51 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-51 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-21 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-22 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked


Unchecked MC-15 Unchecked

Unchecked MC-15 Unchecked

Unchecked MC-22 Unchecked

Unchecked MC-14 Unchecked


Transfer to
Defect Exception
Item No. Line No. Description List

E-1201 UNIT-12

E-1201 UNIT-12

FIN-GS-ME-214-R1/D-3701 UNIT-37

C-1101 UNIT-11

R-1301 UNIT-11

R-1401 UNIT-14

R-1204 UNIT-11

D-1201 UNIT-11

D-2111 UNIT-21

FIN-OC-ME-6929 / R-1206 A UNIT-12

FIN-OC-ME-6929 / R-1206 B UNIT-12

FIN-OC-ME-6936/D-1205 UNIT-12

C-1402 / FIN-OC-ME-6866 UNIT-37

FIN-OC-ME-6936/D-1205 UNIT-12

FIN-OC-ME-6930/R-1206 B UNIT-12

FIN-OC-ME-6929/R-1206 A UNIT-12

FIN-OC-ME-6928 / R-1205 B UNIT-12

FIN-OC-ME-6927 / R-1205 A UNIT-12

FIN-GS-ME- 0660 / R-1501 UNIT-15

FIN-OC-ME- 7364 / C-2214 UNIT-22

FIN-OC-ME-7375 / D-2210 UNIT-22

E-1501 UNIT-15

FIN-GS-ME- 0645 / C-2101 UNIT-21

FIN-GS-ME-0393 / D-2111 UNIT-21

D-1104 UNIT-11

C-2102 UNIT-21

E-1502D UNIT-15

E-1502C UNIT-15

D-1528 UNIT-15
FIN-OC-ME- 7246 / D-2227 UNIT-22

FIN-OC-ME- 7246/D-2227 UNIT-22

FIN-GS-ME- 0637 / C-2213 UNIT-22

GS-FIN-ME-0573 / D-1524 UNIT-15

FIN-GS-ME-0474 / D-1522 UNIT-15

FIN-GS-ME- 0646 / R-1502 UNIT-15


FIN-ARE-TK-11613 / TK-5108
B UNIT-51

GS-FIN-ME-0618 / D-1501 UNIT-15


FIN-ARE-TK-11614 / TK-5108
A UNIT-51

GS-FIN-ME-0618 / D-1501 UNIT-15

GS-FIN-ME-0658 / D-1518 UNIT-15

FIN-GS-ME- 0661 / C-1507 UNIT-15

FIN-GS-ME-586 / C-1506 UNIT-15

FIN-GS-ME- 0424 / D-2102 UNIT-21

FIN-GS-ME- 0637 / C-1502 UNIT-15

GS-FIN-ME-0550/D-1519 UNIT-15

FIN-GS-ME- 0637 / C-1502 UNIT-15

GS-FIN-ME-672 / D-1506 UNIT-15

GS-FIN-ME-0571 / D-1525 UNIT-15

GS-FIN-ME-0582 / D-1511 UNIT-15

FIN-GS-ME- 0430-1 / C-1504 UNIT-15

PTJ-FIN-ME-0580 / EA-1503 UNIT-15

GS-FIN-ME-0449 / D-1517 UNIT-15

FIN-GS-ME-0473 / C-1503 UNIT-15

GS-FIN-ME-673 / D-1507 UNIT-15

FIN-GS-ME- 0606 / C-1501 UNIT-15

GS-FIN-ME-0643 / D-1510 UNIT-15

PTJ-FIN-ME-0615 / D-1505 UNIT-15

GS-FIN-ME-714/C-2201 UNIT-22

FIN-GS-ME- 0430-1 / C-1505 UNIT-15

PTJ-FIN-ME-5090 / E-1502E UNIT-15

PTJ-FIN-ME-5090 / E-1502E UNIT-15

FIN-GS-ME- 0431 / E-1502B UNIT-15


PTJ-FIN-ME-5090 / E-1502E UNIT-15

FIN-PTJ-ME-5093 / E-1502 A UNIT-15

FIN-OC-ME- 7171 / D-2235 UNIT-22

FIN-OC-ME-7025/R-1401 UNIT-14
Comments /
Remarks Flag UDCategory Forecast Date Update User

N MC-11 mai
As of 2019-11-27
Xervon
Update Date Status Date GS inspector ERC inspector

43258
done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done FIN(4137) 12/10/2019 John

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

1/28/2020 siva Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

1/28/2020 siva Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

1/29/2020 John Hosny mohammed

1/28/2020 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/24/2019 John Hosny mohammed

done 1/19/2020 siva Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 11/5/2019 John Hosny mohammed

done 10/8/2019 John Hosny mohammed

done 10/27/2019 John Hosny mohammed

done 10/27/2019 John Hosny mohammed

done 10/8/2019 John Hosny mohammed


done 12/10/2019 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/23/2019 John Hosny mohammed

done 12/24/2019 John Hosny mohammed

1/29/2020 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/24/2019 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/24/2019 John Hosny mohammed

done 10/8/2019 John Hosny mohammed

done 11/6/2019 John Hosny mohammed

done 10/21/2019 John Hosny mohammed

done 10/27/2019 John Hosny mohammed

done 1/19/2020 siva Hosny mohammed

done 11/6/2019 John Hosny mohammed

done 1/19/2020 siva Hosny mohammed

done 10/21/2019 siva Hosny mohammed

done 10/8/2019 siva Hosny mohammed

done 11/6/2019 siva Hosny mohammed

done 12/23/2019 siva Hosny mohammed

done 12/24/2019 siva Hosny mohammed

done 10/27/2019 siva Hosny mohammed

1/19/2020 siva Hosny mohammed

done 10/21/2019 siva Hosny mohammed

done 1/19/2020 siva Hosny mohammed

done 10/8/2019 John Hosny mohammed

done 12/24/2019 John Hosny mohammed

1/28/2020 siva Hosny mohammed

done 11/6/2019 John Hosny mohammed

done 10/27/2019 John Hosny mohammed

done 10/27/2019 John Hosny mohammed

done 10/27/2019 John Hosny mohammed


done 10/27/2019 John Hosny mohammed

done 11/6/2019 John Hosny mohammed

done 12/10/2019 John Hosny mohammed

done 12/10/2019 John Hosny mohammed