TE.040 System Test Script Doc Ref: Mazraa
14 june 08

Document Control

Change Record

Date Author Version Change Reference

14-jun-08 Yasser Elleithy 1.0 No Previous Document

Reviewers

Name Position

Distribution

Copy No. Name Location


1
Library Master Project Library
2 Project Manager
3
4

Note To Holders:

If you receive an electronic copy of this document and print it out, please write your
name on the equivalent of the cover page, for document control purposes.

If you receive a hard copy of this document, please write your name on the front
cover, for document control purposes.

File Ref: TE40 Mazraa (v. 1) ii


TE.040 System Test Script Doc Ref: Mazraa
14 june 08

Contents

Document Control...................................................................................................................ii

Overview...................................................................................................................................4

Business Scenarios Test Sequences.......................................................................................5

10 Test Specification Process Engineer.................................................................................6

20 Test Specification – Production Supervisor..................................................................10


Create and release Batch................................................................................................10
Open Issues......................................................................................................................12
Closed Issues...................................................................................................................12

File Ref: TE40 Mazraa (v. 1) iii


Doc Ref: Mazraa
14 june 08

Overview

The purpose of this test script is to validate the Production. This script will test the
“Core” functionality of the modules involved.
The recommended sequence for TE.040 testing of Production Business Process is:

 1 – Process Engineer

 2 – Production supervisor

File Ref: TE40 Mazraa (v. 1) 4


Doc Ref: Mazraa
14 june 08

Business Scenarios Test Sequences


Test Status: Review, Success, and Defective
Sequenc Test Name Tester1 Tester2 Tester3 Test Date Notes
e# Status

10 Process Engineer
20 Production Supervisor

File Ref: TE40 Mazraa (v. 1) 5


Doc Ref: Mazraa
14 june 08

10 Test Specification Process Engineer

Business Business Flow: Summary Process:


Process: Production

Event: Description:

Step Process Step Path and Action Input Data Expected Results Actual Results
# Description

10.1 Login to Applications User Name = A selection of


Production Responsibilitie
Password = s will display.
87654321
10.2 Select appropriate Responsibility = Process
responsibility Process Engineer Engineer User
or Navigator
Production displays
10.3 Define Process Engineer > Process
Process Operations Operation
Operatio Details
n And Activates
Activity
10.4 Enter Operation Name 1‫ والبسترة‬,‫الخلط‬
10.5 Enter Version Number 1

10.6 Enter Operation 1‫ والبسترة‬,‫الخلط‬


Description
10.7 Enter the Operation 01-DEC-2007
Date 00:00:00
10.8 Enter the process PK
quantity UOM
According to the
machine process
Quantity
10.9 Choose from the List of ‫عملية تجهيز‬
value Activity name
10.1 Click on the resource Choose from list
0 tab to enter the of value labor or
resources and process machine or both
quantity and Usage Add process
quantity and
usage
10.1 If you want to add 2nd Choose from list
1 resource click new and of value labor or
choose from the list of machine or both
value Add process
quantity and
usage
10.1 Click on the Save icon Transaction
2 in the top Tool Bar. complete
record applied
and save
10.1 Click Action Approve for The operation
3 menuchange general use status will be

File Ref: TE40 Mazraa (v. 1) 6


Doc Ref: Mazraa
14 june 08
Step Process Step Path and Action Input Data Expected Results Actual Results
# Description

statusApprove for Approved for


general use General Use
10.1 Define Process select the menu
4 Engineer:Process
Routing Routings

10.1 Enter Routing name FAPCF200100000


5 preferred to be like 0
formula name
10.1 Enter Routing Version 1
6
10.1 Enter Routing ‫مسار االالت عصير التفاح‬
7 description ‫ لتر‬1 ,‫الجولد‬
10.1 Enter the valid routing 01-DEC-2007 .
8 date 00:00:00
10.1 Enter the routing 1000
9 quantity
10.2 Enter the routing UOM PK
0

10.2 Enter the routing 1%


1 Planned loss

File Ref: TE40 Mazraa (v. 1) 7


Doc Ref: Mazraa
14 june 08

Business Business Flow: Summary Process:


Process: Order to Shipment O

Event: Description:

Ste Process Step Path and Action Input Data Expected Results Actual Results
p# Description

Business Business Flow: Summary Process:


Process:

Event: Description:

Step Process Step Path and Action Input Data Expected Results Actual Results
# Description

10.2 Enforce step


2 Check on the box dependency
10.2 Assign the dependant 3‫ والبسترة‬,‫الخلط‬
3 operation
10.2 Enter step quantity to 100 LT
4 each operation
10.2 Assign the 2nd 3‫التعبئة‬
5 operation
10.2 Enter step quantity to 1000 PK
6 each operation
10.2 Click on the Action Generate step Step
7 menu dependency dependency
generated
successfully
10.2 Click on the Action Change status to The Routing
8 menu approve for status will be
general use Approved for
General Use
10.2 Click on the Save icon
9 in the top Tool Bar.
10.3 Define Process Select menu
0 Engineer:Recipes
Recipe
10.3 Enter the recipe Name FANCF2001000000
1
10.4 Enter the recipe version 1
2
10.3 Enter the recipe ,‫وصفة انتاج عصير االناناس‬
3 description ,‫الجولد‬
10.3 Enter the recipe product FANCF2001000000
4 name
10.3 Enter the recipe FANCF2001000000
5 Formula name
10.3 Enter the recipe routing FANCF2001000000
6 name

File Ref: TE40 Mazraa (v. 1) 8


Doc Ref: Mazraa
14 june 08
Step Process Step Path and Action Input Data Expected Results Actual Results
# Description

10.3 Click on the step Operation step


7 material/Association And item
associate with the
operation
10.3 On the 1st line 10 3‫ والبسترة‬,‫الخلط‬ Ingredient
8 1
RCAP1CF2001000
0
10.3 2nd line 3‫ والبسترة‬,‫الخلط‬ Ingredient
9 2
RPAAPCF2001000
0
10.4 3rd line 3‫التعبئة‬ Ingredient
0 3
RPCCB300100000
0
10.4 4th line 3‫التعبئة‬ Ingredient
1 4
RPFCF2B0100000
0
10.4 5th line 3‫التعبئة‬ Ingredient
2 5
RPFCF2B0100000
0
10.4 6th line 3‫التعبئة‬ Ingredient
3 6
RPN045000000000
10.4 7th line 3‫التعبئة‬ Ingredient
4 7
RPG003G0100000
0
10.4 8th line 3‫التعبئة‬ Product
5 1
FAPCF2001000000
10.4
6
10.4 Click on the Save icon
7 in the top Tool Bar.
10.4 Close the menu
8
10.4 Click on the validity rule Enter the effective
9 Tab date 01-DEC-2007
00:00:00
10.5 Click on the Save icon
0 in the top Tool Bar.
10.6
1
10.6 Click on the action Change status The Recipe
2 menu Approve for status will be
general use Approved for
General Use
10.6 Click on the validity rule
3 Tab
10.6 Click on the action Change status The Validity
4 menu Approve for rule status will

File Ref: TE40 Mazraa (v. 1) 9


Doc Ref: Mazraa
14 june 08
Step Process Step Path and Action Input Data Expected Results Actual Results
# Description

general use be Approved


for General Use

File Ref: TE40 Mazraa (v. 1) 10


Doc Ref: Mazraa
14 june 08

20 Test Specification – Production Supervisor

Business Business Flow: Summary Process:


Process: production
Create and
release Batch
Event: Description:

Step Process Step Path and Action Input Data Expected Results Actual
# Description Results

20.1 Create Production Supervisor: Create Choose Recipe FAPCF200100000


Document name from the 0
Batch list of value
20.2 Click on the product tab Choose from FAPCF200100000
the list value 0
product name
20.3 Enter the product Quantity and 1000 PK
UOM
20.4 Enter Planned to start date 14-JUN-2008
15:58:00
20.5 Click OK Batch created
20.6 Batch Production Supervisor:Batch Find Batch
Details number
Detail Or Recipe
name
20.7 Enter Batch Number and click 14 Batch detail form
Find
20.8 Click Action menu to release Release
batch status
20.9 Click Action menu to release Enter actual
batch status date of starting
the batch
20.10 Click on the step tab Batch Step form
20.11 Click Action menu Release step
20.12 Click on the batch detail tab
20.13 Click on transact material tab Enter sub
inventory
Lot
Quantity
20.14 Close form Actual quantity
20.15 Click on the step tab
20.16 Click Action menu Complete 1st Status complete
step
20.17 Click Action menu Release step
2nd operation
20.18 Click on the batch detail tab
20.19 Click on transact material tab for Enter sub
all material inventory
Lot
Quantity

File Ref: TE40 Mazraa (v. 1) 11


Doc Ref: Mazraa
14 june 08
Step Process Step Path and Action Input Data Expected Results Actual
# Description Results

20.20 Close form


20.21 Click on the step tab
20.22 Click Action menu Closed the 1st
and 2nd
operation
20.23 Close form
20.24 Transact tab Transact
material
product put
the acuat
product
quantity on
FGI sub
inventory
20.25 Action menu complete then close Batch status
the batch closed

File Ref: TE40 Mazraa (v. 1) 12


Doc Ref: Mazraa
14 june 08
Open and Closed Issues

Open Issues

1. <Description of issue>

Closed Issues

1. <Description of issue>

File Ref: TE40 Mazraa (v. 1) 13