Professional Documents
Culture Documents
Approvals:
Document Control
Change Record
Reviewers
Name Position
Distribution
Note To Holders:
If you receive an electronic copy of this document and print it out, please write your
name on the equivalent of the cover page, for document control purposes.
If you receive a hard copy of this document, please write your name on the front
cover, for document control purposes.
Contents
Document Control...................................................................................................................ii
Overview...................................................................................................................................4
Overview
The purpose of this test script is to validate the Production. This script will test the
“Core” functionality of the modules involved.
The recommended sequence for TE.040 testing of Production Business Process is:
1 – Process Engineer
2 – Production supervisor
10 Process Engineer
20 Production Supervisor
Event: Description:
Step Process Step Path and Action Input Data Expected Results Actual Results
# Description
Event: Description:
Ste Process Step Path and Action Input Data Expected Results Actual Results
p# Description
Event: Description:
Step Process Step Path and Action Input Data Expected Results Actual Results
# Description
Step Process Step Path and Action Input Data Expected Results Actual
# Description Results
Open Issues
1. <Description of issue>
Closed Issues
1. <Description of issue>