(1.) CONCRETING-GENERAL: (3.

) C O L U M N S :

1.01 G R A D E : FOR ALL STRUCTURAL MEMBERS USE SPECIFIED CONCRETE-MIX. AT 1.8.1 IF MAJOR HONEYCOMBING IS OBSERVED IN COLUMN, IT SHOULD BE DEMOLISED AND 3.01 F O R M S : COLUMN FORMS SHOULD BE MADE OF EITHER./WATER-PROOF PLYWOOD OR
JUNCTIONS OF MEMBERS WITH DIFFERENT GRADES OF CONCRETE,USE/CONCRETE OF RECONSTRUCTED. STEEL PLATES.
HIGHER GRADE. 1.8.2 FOR REPAIRS TO HONEYCOMBED CONCRETE FOLLOW THE FOLLOWING PROCEDURE : FORMS SHOULD BE ASSEMBLED BY BOLTING, not by NAILING. AFTER THE FORMS ARE
A) REMOVE ALL LOOSE AGGREGATES BY LIGHT HAMMERING AND CLEAN ALL DUST ASSEMBLED, CHECK FOR CENTRES, SIZE, RIGHT-ANGLE AND PLUMB ON BOTH FACES AT
1.02 W A T E R : FOR ALL CONCRETING WORK USE MINIMUM WATER REQUIRED FOR PROPER Rt.Angles. MAKE ALL EDGES PERFECTLY WATER-TIGHT BY APPLYING JOINT SEALING
WORKABILITY. CONTROL QUNTITY OF WATER CAREFULLY FOR EACH BATCH OF WITH WATER-JET.
B) IN CASE OF DEEP,NARROW HOLES, WIDEN THE SAME AT SURFACE, BY COMPOUND LIKE PUTTY. ENSURE WATER-TIGHTNESS BETWEEN DIFFERENT SHIFTS OF
CONCRETE. CONCRETING. DO NOT APPLY SHARP CROW-BARS FOR DE-SHUTTERING. TAKE UTMOST CARE
CHISELLING TO PERMIT ENTRY OF GROUT & GUNITE.
1.03 M I X E R : ALL CONCRETE SHALL BE MACHINE-MIXED.HAND-MIXING BE PERMITTED ONLY TO PREVENT DAMAGE TO THE CONCRETE EDGES WHILE REMOVING FORMS.
C) FIRST, SEAL-UP ALL HOLES,CRACKS & CREVICES WITH RICH CEMENT GROUT.
FOR MINOR STRUCTURAL ELEMENTS LIKE SMALL-SPAN LINTELS,LOFTS ETC.,ENSURE NEXT, COVER THE AFFECTED AREA BY GROUTING OF POLYMER:NON SHRINK CEMENT:
10% ADDITIONAL CEMENT IS USED. IF HYDROPHOBIC OR PUZZOLANA CEMENT IS 3.02 C O V E R - B L O C K S : PLACEMENT OF COVER-BLOCKS IS VERY VERY IMPORTANT
STONEDUST FINESAND IN 0.1:1:2.0 PRQ.PORATION BY PRESSURE PUMP OF 3 TO 4
USED,HAND MIXING IS NOT PERMITTED EVEN FOR MINOR WORK. ESPECIALLY FOR COLUMNS. NORMALLY COLUMN FORMS ARE PLACED AFTER REINFORCEMENT
KG/CM2.
CAGE IS ERECTED. HENCE TIE-UP COVER-BLOCKS OF APPROPRIATE SIZE, WITH
1.04 V I B R A T O R : ALL CONCRETE LAID IN FOOTINGS, COLUMNS, BEAMS, PARDIS AND ALL D) COVER THE REPAIRED PATCH WITH HESSIAN CLOTH AND CURE FOR MIN.10
LONGITUDINAL BARS, ON ALL FOUR SIDES OF THE REINF.CAGE, & PLACE SUCH LAYERS OF
IMPORTANT STRUCT. MEMBERS BE COMPACTED BY NEEDLE-TYPE INTERNAL DAYS.
COVER-BLOCKS at DISTANCE NOT EXCEEDING 1.0 m.c/c VERTICALLY. IN EACH SUCH
VEBRATORS, HOWEVER,FOR COMPACTING CONCRETE IN SLABS, DO NOT USE (2.) F O O T I N G S : LAYER, IT IS PREFERABLE TO STAGGER THE LEVELS OF 4 COVER-BLOCKS TO AVOID
NEEDLE-TYPE OF VIBRATOR, INSTEAD, USE SCREED-VIBRATORSOR MANUAL SCREED WEAKENING THAT SECTION OF COLUMN. IF COVER-BLOCKS TO AVOID WEAKENING THAT
TAMPERS. DO NOT PLACE VIBRATING NEEDLE ON REINF. BARS. AVOID OVER-VIBRATION; SECTION OF COLUMN. IF COVER-BLOCKS ARE MADE OF MORTAR, ENSURE THE STRENGTH OF
IT MAY CAUSE SEGGREGATION. ALSO AVOID VIBRATING CONCRETE WHICH HAS BEEN 2.01 B E D D I N G : ALL LOAD-BEARING WALLS AND COLUMN FOOTINGS SHOULD REST ON BLOCK TO BE HIGHER THAN THAT OF CONCRETE SPECIFIED FOR THE COLUMN.
SET FOR MORE THAN 30 MINUTES. IT IS GOOD PRACTICE TO KEEP A SPARE NEEDLE FOR FOUNDATION BED COMPRISING OF SOIL HAVING BEARING CAPACITY NOT LESS THAN 15
IMMEDIATE REPLACEMENT AT TIME OF FAILURE. t/SQ.M. CAREPULLY AVOID CONTACT OF FOUNDATION STRUCTURE WITH 3.03 S T A R T E R : IT IS A GOOD PRACTICE TO PROVIDE A STARTER OF HEIGHT 75 TO
BLACK-COTTON SOIL.PREPARE FOUNDATION BED BY LIGHT WATERING AND RAMMING. 100mm AT START OF COLUMN EITHER ON GROUND FLOOR OR UPPER FLOOR. CENTRES AND
1.05 P O U R I N G : CONCRETE SHOULD BE PLACED CAREFULLY IN THE FORMS. DO NOT AVOID EXPOSING THE BED TO ATMOSPHERE FOR LONG TIME. IF THE BED IS EXPOSED TO SIZE OF COLUMN SECTION BE CHECKED METICULOUSLY ON THIS STARTER, WHICH IS CAST
DROP CONCRETE FROM HEIGHT MORE THAN 2.0metres. WHEN COLUMN-FOOTINGS RAINS, remove MUD & LOOSE SOIL Before LAYING BEDDING CONCRETE. AFTER WITH CONTROLLED, RICH, HAND-MIXED CONCRETE BY SKILLED ARTISON, AND THE FORMS
LOCATED AT DEPTH MORE THAN 2.Om.ARE BEING CONCRETED, USE METAL CHUTES PREPARING THE SOIL-BED COVER THE SAME AS SOON AS POSSIBLE WITH BEDDING ARE ALSO MADE TRUE TO SIZE AND SHAPE BY GOOD CARPENTER. WHILE ERECTING THE
AND REMIX CONCRETE AT LOWER LEVEL, BEFORE PLACING INTO FORMS. CONCRETE. USE M-100(1:4:8) CONCRETE USING 35-50 MM SIZE AGGREGATES FOR FORMS FOR THE UPPER PART OF COLUMN, WATER-THIGHTNESS IS OBTAINED BY TIGHT
ALL THE JOINTS ARE TO BE LOFT ROUG BY PUTTING DRY AGGREGATE ON THE TOP BEDDING. CONCRETE. HOWEVER, DO NOT USE B.B.LIME CONCRETE FOR BEDDING. TOP FITTING OF FORMS WITH THE STARTER FACES.
AFTER CONCRETING TO RECIEVE THE NEXT CONCRETE FOR ALL R.C.C. STRUCTURAL OF BEDDING CONC. BE LEVELEED PROPERLY FOR RESTING FOUNDATION OF
MEMBERS. STRUCTURE. 3.04 CONCRETE USED FOR COLUMNS SHOULD BE MACHINE-MIXED AND VIBRATED. IN CASE OF
1.06 C U R I N G : ALL CONCRETE WORK BE CURED BY PROFUSE WATERING FOR A PERIOD OF FAILURE OF EITHER ADDITIONAL 15% CEMENT SHOULD BE ADDED. IN CASE OF FAILURE OF
MINIMUM 7 DAYS. FOR FLAT SURFACES LIKE SLABS, CREATE WATER-POND OF MIN. 2.02 F O R M S : IN CASE OF TRAPEZOIDAL FOOTINGS, PROVIDE WOODEN FORMS OF BOTH-the mixer and vibrator-CONCRETING OF COLUMNS BE STOPPED IMMEDIATELY.
50mm DEPTH. SPECIFIED HEIGHT TO FORM THE MINIMUM DEPTH OF FOOTING. CHECK THE FORMS FOR
ALL OTHER SURFACES BE COVERED WITH GUNNY-BAGS TO MAINTAIN MOIST ALIGNMENT (Line) LEVEL AND SHAPE. CHECK DIAGONALS. FIX-UP INTERMEDIATE 3.05 AFTER CASTING ONE SHIFT OF COLUMN, ROUGHEN THE TOP SECTION WITH
CONDITION. SUPPORTS TO AVOID BULGING. HOWEVER FOR FORMING THE PYRAMIDAL SHAPE, WIRE-BRUSH,REMOVE THE LAITANCE AND EXPOSE THE COARSE AGGREGATES. IT IS GOOD
FORMS MAY NOT BE USED BUT THE SHAPE BE FORMED BY EXPERT MASONS, NOT BY PRACTICE TO EMBED A FEW PICES OF 35-50 mm SIZE COARSE AGGREGATES WHICH MAY
1.07 C O V E R : PROVIDE PROPER COVER TO ALL REINFORCEMENT AS SPECIFIED BELOW. UNSKILLID LABOUR. THE EDGES OF PYRAMIDAL FORM SHOULD BE SHARP, IN PROPER PARTLY PROJECT OUT FOR GOOD BOND WITH THE NEXT SHIFT OF CONCRETE.
USE COVER BLOCKS OF APPROPRIATE SIZE. THE COVER-BLOCKS MAY BE OF RICH
LINE AND THE SURFACES SHOULD NOT BE CONCAVED. IN NO CASE CONCRETE BE CAST
MORTAR OR APPROVED QUALITY P.V.C. COVER-BLOCKS SHOULD BE SECURELY TIED TO
DIRECTLY AGAINST SOIL 3.06 WHILE CASTING CONCRETE OVER THE PREVIOUS SHIFT, PLACE AN INITIAL LAYER OF
THE REINFORCEMENT.
THICK CEMENT-SLURRY BEFORE PLACING REGULAR CONCRETE. ENSURE THAT THERE IS NO
1.0.8 REPAIRS TO HONEYCOMBED CONCRETE :- IN CASE, IF HONEYCOMBING IS OBSERVED LEAKAGE OF CEMENT SLURRY AT JUNCTION OF TWO SHIFTS. ALSO CHECK THAT THERE IS
WHILE OPENING THE FORMS, IT SHOULD NOT BE PATCHED UP UNTIL IT HAS BEEN GOT NO SHIFT OF COLUMN SECTION & ENSURE PLUMB. A PART OF THE COLUMN IS CAST WITH
INSPECTED BY THE CONSULTANT AND PROPER INSTRUCTION OBTAINED FOR REPAIRS. THE BEAM & SLAB. CENTERING OF THIS PART SHOULD ALSO BE IDENTICAL TO THE PART
BELOW. AVOID USING PIECES OF PLANKS AND JUNK IN FORMING SUCH COLUMN-CAPS.

SCHEDULE OF COVER : SCHEDULE OF DE-SHUTTERING :


MEMBER CLEAR COVER REMARKS S.N. STRUCTURAL ELEMENT TIME AFTER CONCRETING
(mm)
FOOTING 50 At Bottom & sides 1 SIDES OF BEAMS, COLUMNS & PARDIS 24 hours
COLUMNS 40 To Longitudinal Bars 2a BOTTOM OF SLABS UPTO 4.5m. SPAN 7 days
BEAMS 30 To Main Reinf. @ Top & Bot. 2b ABOVE 4.5m. SPAN 14 days
20 To Stirrups On Sides 3a BEAM-BOTTOMS : UP TO 6.0m.SPAN 14 days
SLAB 20 To Main Reinf. @ Top & Bot. 3b ABOVE 6.0m SPAN 21 days
4a BOTTOM OF CANTILEVER SLABS, 10 &
4b BOTTOM OF CANTILEVER BEAMS 21 days after

GENERAL NOTES