Nuform Perimeter Safety Screen System is, NUFORM PERIMETER SAFETY SCREEN

• A perfect solution for advertising purposes SYSTEM (NFSS)


• An attractive intention from the marketing point of view

• NFSS : Crane Lifting


• NFSS : Hydraulic Lifting

“The building is always enclosed and safe, falls and dropped,


equipment can be eliminated.”

Contact Us
NUFORM SYSTEM ASIA PTE LTD NUFORMSYSTEM (M) SDN BHD
NUFORM NUFORM
8 Changi South Lane,
#03-01 Singapore 486113
Tel: +65 6214 9244 / 6214 9210
Fax: +65 6445 3282
A-07-11, Level 7, Empire Tower,
Empire Subang, Jalan SS 16/1
47500 Subang Jaya, Selangor
Tel: +603 5611 3859
N SYSTEM N SYSTEM
Email: enquiry@nuform.com.sg Fax: +603 5613 3858 The Formwork Specialist The Formwork Specialist
Website: www.nuform.com.sg Email: enquiry@nuform.com.my
Nuform Perimeter Safety Screen System (NFSS) Nuform Perimeter Safety Screen System (NFSS)

High Safety & High Flexibility System Specifications


● Nuform Perimeter Safety Screen System enclosure for
safeguarding work on the construction floor. ● Allowable Load = 50 kN (5 ton)
● Safety Screen is a system in which the entire unit is
structure-guided at all times, even while lifting. ● Height of Concrete Casting = 2.0m ~ 5.0m
● Workers are protected from all climatic influences. ● Lifting Speed = 1m / 5minutes
● Safe lifting also possible in high winds.
● Lifting Method = By Crane or
● Variable influence widths, for ideal adaptation to structure
geometry.
Hydraulic Lifting
● Suitable for Floor Heights of between 2.50m and 5.0 m.
● The Nuform Perimeter Safety Screen System - guided
repositioning, either by crane or hydraulic.
Suspension Point Set-up for Floor Slab Suspension Point Set-up for Perimeter Gable Wall

Cone Screw B7 Universal


Guiding Device Additional Trimmer Climbing Sealing Sleeve “K”
Cone 15.0 Guiding Device
Hydraulic Cylinder Bar 4T13, 300mm
Hydraulic Cylinder
Universal Climbing
Sealing Sleeve Cone 15.0
“K” Additional Trimmer
Bar 4T13, 300mm Cone Screw B7
Cast-in Stop Anchor
Cast-in Stop 15/11cm
Anchor 15/11cm
Set-up for Universal Climbing
Cone 15.0 with Stop Anchor 15/11cm
(Slab Thickness ≥ 175~200mm) Set-up for Universal Climbing
Cone 15.0 with Stop Anchor 15/11cm
(Wall Thickness ≥ 175~200mm)
Cone Screw B7 Universal
Additional Trimmer Climbing Sealing Sleeve “K”
Bar 4T13, 300mm Cone 15.0
Sealing Sleeve Universal Climbing
“K” Additional Trimmer Cone 15.0
Bar 4T13, 300mm
Cast-in Stop Anchor Cone Screw B7
15/13cm
Cast-in Stop
Anchor 15/13cm
Set-up for Universal Climbing Set-up for Universal Climbing
Cone 15.0 with Stop Anchor 15/13cm Cone 15.0 with Stop Anchor 15/13cm
(Slab Thickness ≥ 200~250mm) (Wall Thickness ≥ 200~250mm)

Cone Screw B7 Universal


Additional Trimmer Climbing Sealing Sleeve “K”
Bar 4T13, 300mm Cone 15.0 Universal Climbing
Cone 15.0
Sealing Sleeve Additional Trimmer
“K” Bar 4T13, 300mm
Cast-in Stop Anchor
15/16cm Cone Screw B7
Cast-in Stop
Anchor 15/16cm Set-up for Universal Climbing
Set-up for Universal Climbing
Cone 15.0 with Stop Anchor 15/16cm Cone 15.0 with Stop Anchor 15/16cm
(Slab Thickness ≥ 250mm) (Wall Thickness ≥ 250mm)

FLOOR SLAB MOUNT PERIMETER GABLE WALL MOUNT

N NUFORM
SYSTEM N NUFORM
SYSTEM
The Formwork Specialist The Formwork Specialist
01 02
Installation Steps Climbing Steps

1 2 3 4
Importants:
Specifications of Hydraulic Cylinder
• Move the safety screen towards the
• Operation function is suspension
suspension points and guide it with
pin on Guiding device
the aid of tag lines.
• Lifting capacity 40kN
• The jaws must be fully opened.
• Full stroke is 500mm
• Use PPE against falling during
• Normal Climbing speed is
assembly work on unsecured building
10mm/ Second
edges or provide temporary guardrails
• Weight of the cylinder is 18 kg
if necessary.
• Suspend the safety screen on the
suspension pin by the stopper.
Importants:
Refer to the working drawing for
• The Hydraulic unit must be only
the stopper location.
operated by an operator who has
received technical instructions by • Close the jaw and make sure to secure

the Nuform supervisor it properly with assembly pin.

• The operator must check if there • Once the safety screen in fully secured,

is any interference on the system lifting chains can now be removed.

and its safety before operating the • Fixed the hinge cover and toe board

hydraulic unit to close the gaps.

• Do not touch any driving part • All the remaining gaps will be covered
during the operation with suitable means. Ensure that neither
• When raining , the hydraulic unit the climbing procedure nor the
must be prevented from being wet opening of the flap is impaired.
• If broken, contact us for repair • In the event of unsecured building edges,
guardrail assembly will be fixed.
• Preparation for the construction of the
next floor will be done once all the gaps are
fully covered.

Step-1. Step-2. Step-3. Step-4


● Move the safety screen ● Safety screen suspended position. ● Prepare suspension point. ● Climbing is in progress
towards the suspension points. ● Prepare for construction of next floor. ● Mount the slab anchor unit & guide with 300mm hydraulic lift.
● Prepare the positioning point. suspension shoe on the next floor. ● Climbing is completed.
● Fix the hydraulic system. ● Dismount the slab anchor unit with
● Lift up the gap decking. guide suspension shoe at the lowest
● The required cube compressive strength of the floor.
concrete at the time of loading ≥ 15 N/mm2.
● Ready to climb.

N NUFORM
SYSTEM N NUFORM
SYSTEM
The Formwork Specialist The Formwork Specialist
03 04
Preparation of Anchor Point and Suspension Point Nuform Perimeter Safety Screen System Suspension Shoe
Anchor Point Slab Anchor Unit 1 2
Cone Screw B7 cm M30x70L

Universal Climbing Cone 15.0


Sealing Sleeve “K”

Cast-in Stop Anchor Dia. 15.0cm

Position the next anchoring point before casting the slab Fix the standard slab anchor unit in to the universal
Note: climbing cone 15.0 with a cone screw B7 cm.
Note:
● Universal climbing cone are supplied with
sealing sleeves, “K”. ● A tightening torque of 100 Nm (20kg assuming a
● Always screw the stop anchor into the universal cone ratchet length of approx. 500mm) is sufficient.
until it is fully engage. ● If the cone screw B7 cm is tightened more than this
Stopper
● Embed the universal climbing cone so that it is flush may cause damage the screw, the only tool allowed Vertical Profile
with concrete surface. to be used is the reversible ratchet 3/4”. Jaws Fully Opened
● Tie the stop anchor tightly to the reinforcements with Suspension Point
binding wire.
Jaws Fully Opened
● Never weld or heat tie rods - risk of fracture.
● Fully rotate and open jaws of suspension shoe. ● Lower the safety screen onto the suspension pin.
● Prevent the vibrator from touching the positioning point. ● Lift the safety screen by crane and guide it towards
● Protect the thread from soiling. the suspension shoe.

3 4
Flexibility of Slab Anchor Unit Fix the shoe adaptor into the end face of the standard
slab anchor unit with a cone screw B7 cm.

● Insert suspension shoe onto the shoe adaptor & insert


Guide Suspension
the safety pin into the suspension shoe until it is fully
Shoe
Shoe Adaptor Standard Slab Anchor Unit, engaged.
(2/100x50x5 TFC 430Lg) ● Turn the safety pin downwards. The suspension shoe
is now secured against accidental lift-out.

By adjusting the upper screw of the anchor unit, the


standard slab anchor unit can be moved back and front Vertical Profile Vertical Profile
up to 40mm.

● Adjusting concrete construction mistake or


straightness and etc. Jaws Closing Jaws Fully Closed
in Progress
● It has been designed to be applied to a structure
which has an angular change.
● Jaws of suspension shoe close in progress. ● Jaws of suspension shoe fully closed.

N NUFORM
SYSTEM N NUFORM
SYSTEM
The Formwork Specialist The Formwork Specialist
05 06

You might also like