Professional Documents
Culture Documents
New Entries or Copy from std A000000 change it as per your requirement.
SAVE
B000 and B001 are standard base for raw material and wagesbyou can create your on
base-copy from
Standard
C001 and C031 are standard Overhead for raw material OH aad Mafg. OH you can
create your own OH key-copy from
Standard.
We use over head 1 for planned and 2 for actual, define your OH rate on which system
calculate OH cost.
Again select C001 and click on “credit”
Credit key CR1 standard--- you can create your own Credit
SAVE
PM01 – std costing variant you can create your own, copy from PM01
Select Valuation variant
Select Activity Type/Processes
SAVE
Assign Cost Element to Valuation Categoriy---OIK2
New Entries
Define respective GL Account with Val. Category Like Z01. Maintain all category
Z02,Z03, .
Click detail
1. Allocation structure—A1 ( Assign )
2. Default cost center ---
3. Valid receiver --- where you want to settle the cost ( Chose Settlement
Optional )
“SAVE”
New Entry
SAVE
Select MAT and click “Source”
After complete the assignment select MAT again and click on settlement.
New entry