You are on page 1of 4

Larsen & Toubro Limited, Construction.

PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamilnadu, India

CIN - L99999MH1946PLC004768

WOM Bill Annexure - EC578BIL0000026 DT :09 Apr 2020

Job Address : LE150317-CWSS to Natham in Dindigul District - Karur&Trichy, Dindigul, Tamilnadu, India, 624001

Vendor PAN : BPZPS3250K - VALID Company PAN : AAACL0140P

Vendor : SMS00089-SHANMUGAYA M (MSGH) - 3/38, WO No : EC578WOD7000099


NEDUNKULAMRAMANATHAPURAM
P.OSANKARANKOIL,TIRUNELVELI DIST WO Type : Regular Labour With
6277569095375179RAMINTERNET@VSNL.COM Materials

Bill Type : Running Bill

Accounting Center : SZ000010-Shared Services Centre - Accounting Center WO Date : 27 Sep 2017

Bill Date : 09 Apr 2020 WO From : 01 Jul 2017

Running Bill No : 2 WO To : 28 Jun 2019

Bill From : 01 Jun 2019 Bill To : 28 Jun 2019

WO Job : LE150317-CWSS to Natham in Dindigul District BU : Water Supply &


Distribution

SJV No : SJV Date :

Bank Voucher No : Voucher Date :

Cheque No : Cheque Date :

Values In: INR

Prev Bill Prev Bill This Bill


Sl No Item-Version-Markup Rate This Bill Amt Total Qty Total Amt
Qty Amt Qty

6C1FS017D - 1 - 0 - SCOPE :- Boring / drilling of borewell; Work Categorization :- Charges for Specialized contract inclusive of
1
Materials, Labour & Tools / P&M;- in Nos - 9954-Composite Supply of Works Contract - (SGST-6% + CGST-6% or IGST-12%)

1309.42 0.00 0.00 157.00 205578.94 157.00 205578.94

6C1LS00L8000004 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
2 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for 300MM Slucie Valve
Chamber-Cover Slabe for 300MM Slucie Valve Chamber in Nos -

2789.00 5.00 13945.00 0.00 0.00 5.00 13945.00

6C1LS00L8000005 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
3 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for 250MM Slucie Valve
Chamber-Cover Slabe for 250MM Slucie Valve Chamber in Nos -

1791.00 4.00 7164.00 0.00 0.00 4.00 7164.00

6C1LS00L8000006 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
4 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for 200MM Slucie Valve
Chamber-Cover Slabe for 200MM Slucie Valve Chamber in Nos -

1791.00 4.00 7164.00 0.00 0.00 4.00 7164.00

6C1LS00L8000010 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
5 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for Air Valve chamber in
350MM dia DI-Cover Slab for Air Valve chamber in 350MM dia DI in Nos -

1830.00 1.00 1830.00 0.00 0.00 1.00 1830.00

6C1LS00L8000011 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
6 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for Air Valve chamber in
300MM dia DI-Cover Slab for Air Valve chamber in 300MM dia DI in Nos -

1693.00 33.00 55869.00 0.00 0.00 33.00 55869.00

6C1LS00L8000012 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
7 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for Air Valve chamber in
250MM dia DI-Cover Slab for Air Valve chamber in 250MM dia DI in Nos -

1637.00 29.00 47473.00 0.00 0.00 29.00 47473.00

Report Generated at 1-May-2020 11:14:59 AM Page 1 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG


Larsen & Toubro Limited, Construction.
PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamilnadu, India

CIN - L99999MH1946PLC004768

WOM Bill Annexure - EC578BIL0000026 DT :09 Apr 2020

Prev Bill Prev Bill This Bill


Sl No Item-Version-Markup Rate This Bill Amt Total Qty Total Amt
Qty Amt Qty

6C1LS00L8000016 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
8 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for 200MM Scour Valve
Chamber-Cover Slab for 200MM Scour Valve Chamber in Nos -

1332.00 4.00 5328.00 0.00 0.00 4.00 5328.00

6C1LS00L8000017 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
9 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for 150MM Scour Valve
Chamber-Cover Slab for 150MM Scour Valve Chamber in Nos -

1332.00 3.00 3996.00 0.00 0.00 3.00 3996.00

6C1LS00L8000021 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
10 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for 80MM - 125MM Scour
Valve Chamber-Cover Slab for 80MM - 125MM Scour Valve Chamber in Nos -

1067.00 2.00 2134.00 0.00 0.00 2.00 2134.00

6C1LS00L8000029 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
11 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for Air Valve chamber in
150mm dia PVC 160MM dia DI-Cover Slab for Air Valve chamber in 150mm dia PVC / 160MM dia DI in Nos -

1499.00 12.00 17988.00 0.00 0.00 12.00 17988.00

6C1LS00L8000030 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
12 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for Air Valve chamber in
125mm dia PVC 140MM dia DI-Cover Slab for Air Valve chamber in 125mm dia PVC / 140MM dia DI in Nos -

1499.00 15.00 22485.00 0.00 0.00 15.00 22485.00

6C1LS00L8000031 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Precast concrete; Work
13 Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; Cover Slab for Air Valve chamber in
110mm dia PVC 100MM dia DI-Cover Slab for Air Valve chamber in 110mm dia PVC / 100MM dia DI in Nos -

1316.00 15.00 19740.00 0.00 0.00 15.00 19740.00

6C1LS00MB000003 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; All charges for construction of Air
Valve chamber in 150-160mm dia PVC Pumping main of size 1.20m x 0.90m x 1.00m upto the brickwork level. Scope includes
14 excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be provided by L&T at free of cost.-
All charges for construction of Air Valve chamber in 150-160mm dia PVC Pumping main of size 1.20m x 0.90m x 1.00m upto the
brickwork level. Scope includes excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be
provided by LT at free of cost. in Nos -

7309.00 12.00 87708.00 0.00 0.00 12.00 87708.00

6C1LS00MB000004 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; All charges for construction of Air
Valve chamber in 125-140mm dia PVC Pumping main of size 1.20m x 0.90m x 1.00m upto the brickwork level. Scope includes
15 excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be provided by L&T at free of cost.-
All charges for construction of Air Valve chamber in 125-140mm dia PVC Pumping main of size 1.20m x 0.90m x 1.00m upto the
brickwork level. Scope includes excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be
provided by LT at free of cost. in Nos -

7321.00 15.00 109815.00 0.00 0.00 15.00 109815.00

6C1LS00MB000005 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized contract inclusive of Materials, Labour & Tools / P&M; All charges for construction of Air
Valve chamber in 110-100mm dia PVC Pumping main of size 1.00m x 0.90m x 1.00m upto the brickwork level. Scope includes
16 excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be provided by L&T at free of cost.-
All charges for construction of Air Valve chamber in 110-100mm dia PVC Pumping main of size 1.00m x 0.90m x 1.00m upto the
brickwork level. Scope includes excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be
provided by LT at free of cost. in Nos -

6685.00 15.00 100275.00 0.00 0.00 15.00 100275.00

6C1LS00QW000005 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of Sluice Valve chamber in 300mm dia DI
Pumping main of size 1.80m x 1.20m x 1.30m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering
17
and Excluding Cover slab and Valve Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of Sluice
Valve chamber in 300mm dia DI Pumping main of size 1.80m x 1.20m x 1.30m upto the brickwork level. Scope includes excavation,
PCC, Brickwork and Plastering and Excluding Cover slab and Valve Fixing. Cement will be provided by LT at free of cost. in Nos -

13380.00 5.00 66900.00 0.00 0.00 5.00 66900.00

Report Generated at 1-May-2020 11:15:00 AM Page 2 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG


Larsen & Toubro Limited, Construction.
PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamilnadu, India

CIN - L99999MH1946PLC004768

WOM Bill Annexure - EC578BIL0000026 DT :09 Apr 2020

Prev Bill Prev Bill This Bill


Sl No Item-Version-Markup Rate This Bill Amt Total Qty Total Amt
Qty Amt Qty

6C1LS00QW000006 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of Sluice Valve chamber in 250mm dia DI
Pumping main of size 1.50m x 0.90m x 1.15m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering
18
and Excluding Cover slab and Valve Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of Sluice
Valve chamber in 250mm dia DI Pumping main of size 1.50m x 0.90m x 1.15m upto the brickwork level. Scope includes excavation,
PCC, Brickwork and Plastering and Excluding Cover slab and Valve Fixing. Cement will be provided by LT at free of cost. in Nos -

9135.00 4.00 36540.00 0.00 0.00 4.00 36540.00

6C1LS00QW000007 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; Brick masonry; All charges for construction of Sluice Valve chamber in 200mm
dia DI Pumping main of size 1.50m x 0.90m x 1.05m upto the brickwork level. Scope includes excavation, PCC, Brickwork and
19 Plastering , valve fixing and Excluding Cover Slab. Cement will be provided by L&T at free of cost.-All charges for construction of
Sluice Valve chamber in 200mm dia DI Pumping main of size 1.50m x 0.90m x 1.05m upto the brickwork level. Scope includes
excavation, PCC, Brickwork and Plastering , valve fixing and Excluding Cover Slab. Cement will be provided by LT at free of cost. in
Nos -

8556.00 4.00 34224.00 0.00 0.00 4.00 34224.00

6C1LS00QW000011 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of Air Valve chamber in 350mm dia DI Pumping
main of size 1.50m x 0.90m x 1.45m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering and
20
Excluding Cover slab and Air T Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of Air Valve
chamber in 350mm dia DI Pumping main of size 1.50m x 0.90m x 1.45m upto the brickwork level. Scope includes excavation, PCC,
Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be provided by LT at free of cost. in Nos -

12705.00 1.00 12705.00 0.00 0.00 1.00 12705.00

6C1LS00QW000012 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of Air Valve chamber in 300mm dia DI Pumping
main of size 1.35m x 0.90m x 1.35m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering and
21
Excluding Cover slab and Air T Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of Air Valve
chamber in 300mm dia DI Pumping main of size 1.35m x 0.90m x 1.35m upto the brickwork level. Scope includes excavation, PCC,
Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be provided by LT at free of cost. in Nos -

10291.00 33.00 339603.00 0.00 0.00 33.00 339603.00

6C1LS00QW000013 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of Air Valve chamber in 250mm dia DI Pumping
main of size 1.35m x 0.90m x 1.35m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering , Air T
22
Fixing and Excluding Cover Slab. Cement will be provided by L&T at free of cost.-All charges for construction of Air Valve chamber in
250mm dia DI Pumping main of size 1.35m x 0.90m x 1.35m upto the brickwork level. Scope includes excavation, PCC, Brickwork
and Plastering , Air T Fixing and Excluding Cover Slab. Cement will be provided by LT at free of cost. in Nos -

9460.00 29.00 274340.00 0.00 0.00 29.00 274340.00

6C1LS00QW000014 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of Air Valve chamber in 200mm dia DI Pumping
main of size 1.20m x 0.90m x 1.20m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering and
23
Excluding Cover slab and Air T Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of Air Valve
chamber in 200mm dia DI Pumping main of size 1.20m x 0.90m x 1.20m upto the brickwork level. Scope includes excavation, PCC,
Brickwork and Plastering and Excluding Cover slab and Air T Fixing. Cement will be provided by LT at free of cost. in Nos -

8385.00 5.00 41925.00 0.00 0.00 5.00 41925.00

6C1LS00QW000017 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of 200mm Scour Valve chamber in 300mm dia DI
Pumping main of size 1.00m x 0.90m x 1.15m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering
24 and Excluding Cover slab and Valve Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of 200mm
Scour Valve chamber in 300mm dia DI Pumping main of size 1.00m x 0.90m x 1.15m upto the brickwork level. Scope includes
excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Valve Fixing. Cement will be provided by LT at free of cost.
in Nos -

8338.00 4.00 33352.00 0.00 0.00 4.00 33352.00

6C1LS00QW000018 - 1 - 0 - SCOPE :- Construction of valve chamber; OTHER SPECIFICATIONS :- Brick masonry; Work
Categorization :- Charges for Specialized Labour work; All charges for construction of 150mm Scour Valve chamber in 250mm dia DI
Pumping main of size 1.00m x 0.90m x 1.10m upto the brickwork level. Scope includes excavation, PCC, Brickwork and Plastering
25 and Excluding Cover slab and Valve Fixing. Cement will be provided by L&T at free of cost.-All charges for construction of 150mm
Scour Valve chamber in 250mm dia DI Pumping main of size 1.00m x 0.90m x 1.10m upto the brickwork level. Scope includes
excavation, PCC, Brickwork and Plastering and Excluding Cover slab and Valve Fixing. Cement will be provided by LT at free of cost.
in Nos -

8116.00 3.00 24348.00 0.00 0.00 3.00 24348.00

Report Generated at 1-May-2020 11:15:00 AM Page 3 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG


Larsen & Toubro Limited, Construction.
PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamilnadu, India

CIN - L99999MH1946PLC004768

WOM Bill Annexure - EC578BIL0000026 DT :09 Apr 2020

1366851.00 205578.94 1572429.94

Sl No Description Tax % Up to Previous This Bill Amount Total Amount

1 CGST 0.00 123016.59 12334.73 135351.32

2 SGST 0.00 123016.59 12334.73 135351.32

Total Tax : 246033.18 24669.46 270702.64

Total Bill Amount: 1612884.18 230248.40 1843132.58

Report Generated at 1-May-2020 11:15:00 AM Page 4 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG

You might also like