यह अनुमोदन आपूितकतार् / ठे केदार को उनके अनुबंध संबंधी दाियत्व /िजम्मेदािरय से मुक्त नह करता है|
This Approval does not absolve the Supplier / Contractor of their contractual obligations / responsibilities
N1 H1
V1 104 109
T.L.
W.L. 110
T.L.
W.L.
K1A
N3 110A
103
101
107
W.L.
T.L.
102 M1
115
105
Furnish Nozzle Load in N(Newton) & Moment in
(Newton-Meter) as per PDIL doc. EM-PNMP-09
furnish the detail in drg. & B.O.M & revise the notes accordingly
101 106
K2
K1B Please check & revise
UC Earthing Lug
W.L.
T.L.
Please review
2000 Nozzle Loads are subjected to Sign reversal (+/-)
765 116
D1
0 15-12-2018 ISSUED FOR APPROVAL PLP HCA SP SP
PROJ-
REV DATE DESCRIPTION BY CHKD APPD.
ENGR
N2
Please Clarify
Please Clarify VENDOR DOCUMENT REVIEW
Vender may please consider the length A - ACCEPTED
116 Z - FINAL
of anchor chair bolt 150mm below the WITH COMMENTS
bottom of base plate of equipment. 1412
N - NOT ACCEPTABLE I - FOR INFORMATION
K1A K1B
114 111 ENGINEER'S SIGN. DATE -
0°
112 Indian Oil Corporation Limited
1-RF-13V04-SH1
H1
5 x 45o PROJECTS & DEVELOPMENT INDIA LIMITED
(NOIDA)
113
270°
UC
90°
K2 M1
Indian Oil Corporation Limited
N1 V1
N2 GENERAL ARRANGEMENT FOR
D1 AGEING LIQUOR VESSEL
(91-13-V04)
Revise
Nozzle orientation as per PDIL Doc. EM238-91.13-1404